E MC PAKI STAN PVT LT D

INTRODUCTION

CONSULTING CAPABILITIES

TRAININGS ON EHS

EMC GEO-TECHNICAL

STUDIES/EIA/IEE EXPERIENCE

AUDIT EXPERIENCE

ENVIRONMENTAL SITE ASSESSMENT

MISCELLANEOUS

WORK IN HAND

STUDIES/EIA/IEE EXPERIENCE (BRIEF DETAILS)

INDUSTRIAL HYGIENE

AUDIT EXPERIENCE(BRIEF DETAILS)

ENVIRONMENTAL SITE ASSESSMENT (BRIEF DETAILS)

ISO SPECIFIC EXPERIENCE (BRIEF DETAILS)

WASTE MANAGEMENT EXPERIENCE

WASTEWATER TREATMENT PLANT EXPERIENCE

C O N T E N T S

CO

MP

AN

Y P

RO

FIL

E

Page 3: EMC PROFILE UPDATED (25-11-2015)_opt

E MC PAKI STAN PVT LTD

MONITORING EXPERIENCE

SOIL & GROUNDWATER ASSESSMENT/MANAGEMENT

SOCIO-ECONOMIC IMPACT ASSESSMENT

HYDROLOGICAL STUDIES

KEY PERSONNEL

C O N T E N T S

CO

MP

AN

Y P

RO

FIL

E

Page 4: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 1

EMC Pakistan (Pvt) Limited is based in Karachi, Pakistan and was established in

January 1997. It is managed and operated by highly qualified, technical and

motivated team of professionals.

Leading staff members hold master's and doctorate degrees in the field of Environment

from some of the world's most prestigious institutions.

Our services are targeted at several disciplines of Environmental Engineering and

Management. We are especially focusing on Health Safety and Environment (HSE) and

their international standards which include all the aspects and considerations to improve

the HSE performance of an Organization.

We emphasize on information sharing and team work within the Company & with our

clients so that every client receives the best possible results.

CAPABILITY STATEMENT

EMC is a part of highly qualified and experienced consortium of professionals,

comprising of environmentalists, engineers, soil specialists, hydrologist, economists &

architects.

PARTICULARS

C O M P A N Y P R O F I L E

B A C K G R O U N D

CO

MP

AN

Y P

rO

FIL

E

Name of the Firm EMC Pakistan (Pvt) Ltd

Year of Establishment 1997

Address 503 Anum Estate Main Sharah -e-Faisal Karachi

EMAIL [email protected]

WEBSITE www.emc.com.pk

PHONE 92-21-34311466

FAX 92-21-34311467

Page 5: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 2

COMPANY’S VISION

By providing the highest quality of service to our clients and maintaining high levels

of professional ethics and admirable core values, our vision is to be top of the list of

preferred strategic partners in the field of environment and sustainability consulting.

COMPANY’S MISSION

EMC is determined to be the benchmark of quality within our industry by being

the most innovative, diversified environmental consulting firm in Pakistan.

All our consultants share and uphold a common set of admirable codes of

professional conduct and codes of ethics. They operate in selected market segments

focusing on energy, manufacturing and mining industries, drilling Chemical Storage,

LNG terminal and others. Geographically we cover the whole Pakistan and our areas of

specialty ranges from Environmental Impact Assessments to initial Environmental

Examination reporting.

To achieve the position EMC have committed to technical excellence with

significant resources devoted to building an array of new technological solutions and

services.

EMC is committed to embracing modern technology and providing our clients

with state of the art environmental information systems and solutions. We will provide

inspirational leadership in environmental strategy formulation and stakeholder

consultations in solving environmental problems. In order to identify environmental risks

and formulating mitigation measures environmental laws with integrity and fairness in

the process of conducting enviro legal and due diligence has been conducted

COMPANY PROFILE

CO

MP

AN

Y P

rO

FIL

E

Page 6: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 3

IMS Policy of EMC

At EMC, protecting the Environment is the foremost responsibility of our employees.

We use energy and resources efficiently and prevent generation of wastes while

providing our activities and services. This encourages our employees to be

environmentally responsible on the job and at home. Health & safety of our employees

are equally important while working & performing duties.

We recognize the contribution we make to the society, and will incorporate

sustainable development thinking into all our activities. We shall propagate this policy

among all our interested parties.

Our recognition and acceptance of these responsibilities will be demonstrated by our

commitment to:

n reducing environmental nuisance and preventing pollution risk related to our

activities;

n Complying with our regulatory, legislative, contractual or other obligations, and

anticipating them whenever possible;

n Continually improve our integrated management systems by reviewing objectives,

conducting audits and management reviews under International standards;

n Seeking to satisfy our customers fully by constantly adapting our services to their

current needs and future requirements;

n Guaranteeing that all employees and subcontractors are trained in accordance

with their roles and the work they undertake;

n Ensuring Prevention of injury & ill health at all workplaces for safety of our

employees and our suncontractors by systematically identifying potential risks and

applying the appropriate prevention measures.

September 22, 2014 Syed Nadeem Arif

Managing Consultant

COMPANY PROFILE

CO

MP

AN

Y P

rO

FIL

E

Page 7: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 4

EMC offers a variety of services, at both

Management and Specialist Level, which

includes the following :

I. Environmental Management

n Basic Assessments

n Screening and Scoping Studies

n Environmental Imapct Assessment

n Baseline Environmental Studies

n Environment Health & Safety

Audits

n EMS Audits & Compliance Audits

n Project Management

n Environmental Reviews

n Environmental Management

Program Reports

n Environmental Planning

n Environmental Reviews

n Public Consultation & Facilitation

II. Air Emissions

n Air Dispersion Modeling

n Air Emission Testing

III. Wastewater Testing

n Waste water Treatment Facilities on

Turn Key Basis

n Activated Sludge System

n Dissolve Air Flotation Unit

n Anaerobic and Aerobic Biological

Treatment

IV. Waste Management

n Designing of complete Waste

Management System

n Management of Hazardous & Non

Hazardous Wastes

n Provision of Waste Collection State

of the Art Bins

n Research for Reuse - Recycling of

Waste

OUR SERVICES

CO

MP

AN

Y P

rO

FIL

E

Page 8: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 5

V. Environmental Health &Safety Trainings

n Professional Development Programs-

PDPs:

n Company Specific Programs-CSP

are as follows:

n Employee Training and

Performance Technology

n Management of EHS Training

n EHS Awareness for all site

employees

n Training for Site EHS

Professionals

n Training for Site Personnel on

the Floor

n Training Methodologies

n Best Practices & Advanced

Technologies

I E n v i r o n m e n t a lManagement

Initial Environmental Examination(IEE) & Environmental ImpactAssessment (EIA)

EMC has a core team of expertise and

experience available to undertake full

spectrum of studies required for EIAs

and IEE in accordance with the national

and International guidelines or

requirements of Pakistan. Keeping in

view all the requirements and

guidelines provided within the legal

framework. Related to EIA’s EMC also

has significant experience in compiling,

auditing Environmental Management

plans (EMP). In fact EMC prides itself in

being able to provide a tailor made and

practical approach to EMPs.

Guidance on Compliance with NEQS& Self Monitoring & Reporting bythe Industries

As the limits for air emissions and

industrial liquid effluents have been

revised and set in the Environmental

Quality standards (NEQS), so in order to

ensure the industry do not exceed those

limits, we provide complete services for

carrying out Sampling of critical

parameters, Laboratory testing, Analysis

of test results and Preparation of Self

Monitoring Reports on a standard format

as required by the EPA.

Review of Initial Environmental

Health and Safety

EMC also conduct Health and Safety

review in order to develop and

incorporate Safety Statement a health

and safety policy that recognizes that

health and safety is an integral part of

the organization’s business performance.

OUR SERVICES

CO

MP

AN

Y P

rO

FIL

E

Page 9: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 6

They should ensure that this health and

safety policy is following the points

below:

• It is appropriate to the hazards and

risks of the organization’s work activities

and includes a commitment to protect,

so far as is reasonably practicable, its

employees and others, such as

contractors and members of the public,

from health and safety risks associated

with its activities

• It includes a commitment to comply

with relevant health and safety

legislation, codes of practice and

guidelines as a minimum

• Provides a framework for measuring

performance and ensuring continuous

improvement by setting, auditing and

reviewing health and safety objectives

and targets

• It is documented, understood,

implemented and maintained at all

levels the organization

• Clearly places the management of

health and safety as a prime

responsibility of line management from

the most senior executive level to first-

line supervisory level

• Covers employee health and safety

consultation and representation and

includes a commitment to provide

appropriate resources to implement the

policy

• Provides for employee co-operation

and compliance with safety rules and

procedures

Effective health and safety management

demands comprehensive health and

safety policies that fulfill the spirit and the

letter of the law, are effectively

implemented and are considered in all

business practice and

Environmental Studies / PollutionSurveys and Studies

To assess the degree of environmental

degradation and to set a baseline for future

work. This type of study helps in suggesting

future strategy to comply with the

regulatory requirements and to form a basis

for any management system.

Hazard Response Planning andHealth Risk Assessments

Qualitative Health Risk Assessment

(HRA) are conducted to establish health

risks factors and ranking method will

priorities the products, which present a

high risk during manufacture or

potential health risk during various

phases of manufacturing. High-risk

homogenous exposure groups are

normally identified and samplings of

products are conducted to assess if they

present a high risk.

OUR SERVICES

CO

MP

AN

Y P

rO

FIL

E

Page 10: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd 7

Evaluation of regulatory andlegislative constraints pertaining toEnvironmental Legislation and OtherRequirements.

To maintain legal and other compliance,

the organization must identify and

understand and address the regulatory

and other requirements applicable to

environmental aspects and services

related to Environment. To keep track of

legal requirements, EMC establishes and

maintains a list of all laws and regulations

relevant to the environmental aspects and

impacts of its activities. We have a highly

qualified and experienced Environmental

Lawyer as our associate who can provide

counseling on legal issues, related to

Environment for instance implications of

regulatory compliances and management

of other legal matters.

Guidance on Cleaner Technologies &Treatment Facilities (Area ofExpertise)

It is the need of the day to switch to

newer and cleaner technology, we at

EMC always stress on the cleaner

technologies which are green in nature

and helps in creating less pollution and

are environmental friendly.

Cleaner technology includes recycling,

renewable energy (wind power, solar

power, biomass, hydropower,

biofuels),information technology, green

transportation, electric motors, green

chemistry, lighting, Grey water, and

many other appliances that are now

more energy efficient. It is a means to

create electricity and fuels, with a

smaller environmental footprint and

minimize pollution. To make green

buildings, transport and infrastructure

both more energy efficient and

environmentally benign. Environmental

finance is a method by which new

clean technology projects that has

proven that they are "additional" or

"beyond business as usual" can obtain

financing through the generation of

carbon credits. A project that is

developed with concern for climate

change mitigation (such as a Kyoto

Clean Development Mechanism

project) is also known as a carbon

project.

While there is no standard definition of

"clean technology," it has been

described by Clean Edge, a clean

technology research firm, as "a diverse

range of products, services, and

processes that harness renewable

materials and energy sources,

dramatically reduce the use of natural

resources, and cut or eliminate

emissions and wastes." It notes that

"Clean technologies are competitive

with, if not superior to, their

conventional counterparts. Many also

offer significant additional benefits,

notably their ability to improve the

OUR SERVICES

CO

MP

AN

Y P

rO

FIL

E

Page 11: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd 8

lives of those in both developed and

developing countries.

Virtually all textile and chemical

industries have an impact on the

environment or are impacted by

environmental and related regulation.

The extent of that impact and how

clients navigate regulatory framework

and minimize the risk is a matter of

degree. We have suggested many

textile and chemical industries to

switch to cleaner technologies and

provided them sufficient knowledge

and information database to

implement these technologies

successfully.

Environmental and IndustrialHygiene, Monitoring & Control

We develop a plan for services together

with the client. We listen carefully to our

clients concerns, inform them about

regulatory requirements and our past

experiences with those issues. We have

developed exposure monitoring

strategies, such as chemical air sampling

or noise Monitoring. Our Company also

works with our client to develop effective,

yet workable, exposure control strategies,

including training of workers. Finally we

will report our findings in a professional,

comprehensive, yet understandable

fashion. We will support our clients to

help resolve any regulatory or mitigation

issues related to:

• Industrial Air Emissions and Effluent

Testing

• Indoor Air Quality

• Noise Monitoring and Mapping

illumination Survey

• Air Quality Measurement at work

place to determine occupational

exposure to Toxic substances

• Emissions and Acoustic Pollution

Abatement in Industries.

Environmental, Health & SafetyAudits

To remain competitive in business an

organization needs to be certified by

independent ISO auditors. The scope of

EHS auditing is expanding. In this context

we carry out Internal and Follow up

OUR SERVICES

CO

MP

AN

Y P

rO

FIL

E

Page 12: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 9

Audits before the final certification.

Auditing is no longer simply completing a

checklist to determine regulatory

compliance. To provide information on

the effectiveness of management

systems, opportunities for cost reduction

and continuous improvement

accomplishments auditing programs are

mandatory today. We have Qualified

EARA approved Lead Auditors for EMS

ISO 14001; we also conduct other

Environmental, Health & Safety Audits.

Our EHS auditing includes:

• Compliance Audit

• Site Impact Audit

• EHS Audits (e.g. waste,energy audits)

• Safety Audits

• Health and Safety Auditing and

Program Development

• Environmental Audits

• Due Diligence Regulatory

Compliance Auditing

• Third Party Assessment of Auditing

Programs

• Reporting and Auditing Information

• Management Training

Environmental Site Assessments

Environmental Site Assessment

Phase - I (ASTM E-1527)

The phase I of ESA is based on ASTM E-

1527 and helps in determining potential

environmental liabilities to establish the

basis for further investigation through the

establishment of baseline environmental

condition, comply necessary regulatory

requirements through the identification

of compliance deficiencies and develop

further remediation plans.

Environmental Site Assessment

Phase - II (ASTM E-1903-97 (2002)

Phase II ESA is site-specific and context-

specific. The phase II of ESA determines

the nature and extent of contamination

Phase II environmental site assessment

(ESA) of a parcel of property with

respect to the presence or the likely

presence of substances including but not

limited to those within the scope of the

Comprehensive Environmental

Response, Compensation and Liability

Act (CERCLA) (e.g., hazardous

substances), pollutants, contaminants,

petroleum and petroleum products, and

controlled substances and constituents

thereof. It specifies procedures based on

OUR SERVICES

CO

MP

AN

Y P

rO

FIL

E

Page 13: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 10

the scientific method to characterize

property conditions in an objective,

representative, reproducible, and

defensible manner.

Our team of Experts conduct Phase - I

ESA and based on findings of Phase - I,

recommendations are given for

conducting Phase - II ESA. Soil &

groundwater samples are collected from

identified areas to check for

contamination levels of pullutants

depending on the nature of past

operations at the facility. Mitigation

measures are recommended for

remediation of the soil & groundwater

and removal of the potential

contaminants.

Environmental Management System

(EMS) - ISO 14001

There is currently a monumental effort

by countries throughout the world to

establish a Universal Standard for

Environmental Management which affect

all phases of operation. We have

implemented it in many industrial

sectors. Our work methodology for

implementing this Standard comprises of

following steps:

1. Initial Environmental Review Report

2. Environmental Policy Formulation &

Planning

3. Environmental Policy Formulation &

Planning

4. Implementation, Training &

Documentation

5. Internal Audit

6. Application for the Certification

An Environmental Management System

(EMS) is a stepping stone to knowing

your environmental impact and risks

and being able to manage them

effectively. It also produces a positive

economic impact, delivering real savings

and making systems more robust.

II Air Emission

Air Dispersion Modeling

We have been working on air dispersion

molding and have done number of

project in which we have used

industrial source complex (ISC) model.

Air dispersion modeling is the

mathematical assessment of

contaminant impacts from emissions

sources within a study area. Factors

OUR SERVICES

CO

MP

AN

Y P

rO

FIL

E

Page 14: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 11

that impact the fate and transport of

contaminants in the atmosphere

include meteorogical conditions, site

configuration, emission release

characteristics and surrounding terrain,

amongst others.

Air Emission Testing

Air emission testing remains

necessary while performing any study

related to air pollution and to find out

prevention techniques. Thus EMC

works in close collaboration with

laboratories where these tests be

carried out.

III Wastewater Management

Wastewater Treatment Facilities onTurn Key Basis

We have another expertise of installing

Waste Water Treatment Plants of different

types. We can install WWTP having

different technologies like DAF Technology,

Activated Sludge System etc. We have

some satisfied clients whose WWTP are

running and cleaning the waste water

surpassing the local standards limits.

Wastewater Analysis/ FeasibilityStudy for Treatment Facilities

We conduct wastewater sampling and

analysis to identify the strength of

wastewater in stream. On the basis of

such feasibility studies we submit our

proposals for wastewater treatment

design to the clients. It helps make us

easy to establish real time data and to

consider all aspects in treatment design.

Our main areas of treatment are

industrial units however; we also intend

to work on municipal wastewater

treatment section.

Self Monitoring and Reporting forIndustrial Wastewater

Industries are liable to produce self

monitoring reports to relevant EPAs as

per the schedule given in the Laws &

Regulations. We also assist our clients in

self monitoring procedures and generate

report which includes findings and results

of self monitoring for the submission to

EPAs.

IV Waste Management

Designing of complete Waste

Management System

We analyze and design complete waste

waste management systems of the

company. Our main Emphasize is on

Reuse Recycle of the Product. We design

and supervise the client in implementing

OUR SERVICES

CO

MP

AN

Y P

rO

FIL

E

Page 15: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 12

this management system. We not only

help them in analyzing the problem but

we also prepare procedures and give

training to them on this issue. End to end

can be provided to our customers. Only

one component like making of the

management plan or implementing can

also be done if client requires.

Management of Hazardous & NonHazardous Wastes

We analyze the hazardous waste and

suggest the cost effective way of

disposing it off. We also stress on three

R's i.e. Reduce, Reuse and Recycle while

suggesting any solution related to

hazardous waste management. We also

provide services for collection,

transportation and disposal of waste.

While performing these jobs stress is

always on the laid down procedures of

WMC and the client.

Provision of Waste Collection Stateof the Art Bins

We can provide state of the art, custom

made bins according to the client's

requirements. These Bins can be from

Stainless Steel to Fibre Reinforced Plastic

(Fibre-Glass) material. The sizes can vary

according to requirement and usage. We

provide them and suggest the collection

procedures. These Color-Coded bins itself

provides segregation at source and does

not require any end-user segregation and

saves time and money.

Research for Reuse - Recycling ofWaste

We put emphasize on research and always

conduct tests on the waste to ascertain

their consistency. In the light of results of

the tests we provide cost effective and

simple solutions to our clients. We have

already provided many such solutions to

our clients who are using their hazardous

waste after recycling it at very nominal

charges. e.g. Reusing of 1-1-1- Tri-

choloro-ethlene (TCE) for degreasing after

recycling, reusing the waste oil sludge as

fuel in Cement Industry etc.

EPA Approval and Our Resources

We are working on it at the moment and

have already submitted an IEE (Initial

Environmental Examination) Report for

our Waste Disposal Facility which is

located outside Karachi towards GHARO

(Sindh). We have all the necessary

equipments available with us including

waste collection bins to transportation

Vans and Pneumatic Pumps with

compressors etc for removal and

transportation of waste safely.

Team Of Waste Management

A team of well qualified and experienced

professionals, the core of Waste

Management, provides well thought of

solutions keeping in view the different

dimensions of waste management and

their impacts on each component of the

environment. Masters and PhD's are

there in our team who has not only

technical knowledge of work but has

working capability as well. Detailed

resumes are included in the section of

OUR SERVICES

CO

MP

AN

Y P

rO

FIL

E

Page 16: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 13

Key Personnel's.

V Processing of CDM Projects

The CDM is the only instrument that is

available for developing countries to

assist them in achieving sustainable

development and contributing to the

ultimate objective of the United Nations

Framework Convention on Climate

Change (UNFCCC) to minimize GHG

emission. It aims to assist annex-1

Parties to implement a project activity

that reduces GHG emissions in non-

annex-1 Parties which are mostly the

developed countries, in return for

certified emission reductions (CERs). The

CERs generated by such project activities

can be used by annex-1 Parties to meet

their emissions targets under Kyoto

protocol. Being the signatory of Kyoto

Protocol Pakistan can benefit from CDM.

The processing of CDM projects is

complex task and almost no or very

little expertise is available in the

country. The EMCs professionals, by

attending various training programs,

national and international seminars

have developed ample expertise in

processing the CDM projects. In

addition the EMC has entered into a

long term understanding with an

international consultant based in

Singapore for processing CDM

OUR SERVICES

CO

MP

AN

Y P

rO

FIL

E

Page 17: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 14

Trainings on Environment,

Health & Safety

EMC is of the pioneer companies in

Environmental, Health & Safety Training

Providers. EMC Consultants, Team of EHS

Experts can provide you the best possible

trainings in EHS. We can customize the

training courses according to the needs of our

clients.

Catering the Health, Safety and

Environmental needs of industries the

training portfolio of EMC is two fold by

offering:

Customaries Training Programs-PDPs:

n These programs are carefully designed

based on industry feedback:

n Participants expected of senior and

middle management positions

n Shortest possible time 1-3 days to avoid

more time away from job Conducted at

hotel providing congenial learning

environment

Area Specific Programs:

n These programs are tailored as per specific

needs of a company to effectively

communicates message

n Advantages of Site, as personnel &

equipment available to train

n Time flexible as per convenience of the

company or some off season

Following are some of the EHStrainings which can be provided asIn-house courses:

1. General Environmental Awareness

2. Introduction to Environmental Management

Systems ISO 14001

3. Internal Auditing of EMS ISO 14001

4. How to implement effective Environmental

Management Systems ISO 14001

5. Introduction to EHS Auditing

6. Environmental Impact Assessment / Initial

Environmental Examination

7. Hazard Identification at Work place

8. Emergency Preparedness and response

Plan.

9. Env i ronmenta l Legis la t ion and i ts

requi rements

10. Solid and Hazardous Waste Management

11. Waste Water Management

TRAININGS ON EHS

CO

MP

AN

Y P

rO

FIL

E

Page 18: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 15

12. Air and Noise Pollution

13. Energy Conservation

14. Introduction to Hazard Analysis and

Critical Control Point (HACCP)

15. Introduction to Occupational Health &

Safety Management System OHSAS 18001

16. Internal Auditing of Occupational Health &

Safety Management System OHSAS 18001.

17. Lockout/Tagout/verify Awareness

18. Machine Guarding

19. Material Safety data Sheets (MSdS),

Spill Clean-Up and Blood Borne

20. Noise Prevention

21. Office Safety Awareness

22. Off the Job Safety - Home, Property, and

Personal Safety

23. Operational risk Management

24. Overhead Crane Safety

25. Personal Protection Equipment

26. Principle Types of Unintentional Fatal

Injuries

27. repetitive Motion Injuries

28. respirator Fit Testing and Training

29. respiratory Protection and Personal

Protective Equipment

30. response to Catastrophic Personal

Injury Loss

31. rigging Techniques

32. risk & risk Management

33. Safe Handling of Flammable and

Combustible Liquids

34. Safe Lifting

35. Safety and Health in the Office

Environment

36. Safety Talks "Your Link to Safety

Awareness Communication!"

37. Safe Work Permits

38. Sling Safety & Safe rigging Practices

39. Stress and Stress Management

40. Supervisor & Managers Safety

responsibilities (r & r)

41. The Control Of Hazardous Energy

(LOCKOUT/TAGOUT)

42. Using Technology In Safety To Work

Smarter, Not Harder

43. vehicle Safety and driving Safety

44. ventilation Systems As Control Measures

45. Warm Weather Injuries

46. Work Permit

47. Workplace Ergonomics

48. Workplace violence: What To Know

What To do

49. You Know You're A Safety Nut When

50. Zero Incidents

TRAININGS ON EHS

CO

MP

AN

Y P

rO

FIL

E

Page 19: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 16

Company Resources

Our Consultancy firm consists of a team

of highly skilled environmental consultants

based in Karachi.This company has also a

builtup a strong contact base with a

number of specialist sub-consultants and

draws on this pool of expertise to make up

a specific project team, ensuring a cost

effective and specialized team suited to

each project requirements.

Ownership & EqualOpportunities:

EMC is an equal opportunity employer. It

aims to ensure that it employs the best

applicant for a job and that no job

applicant or employee or project associate

receives less favourable treatment on the

ground of race, nationality, sex, age,

religion, languages or disability. This

applies to recruitment, promotion, training,

the application of grievance, disciplinary

and other procedures, the provision of

employee’s benefits and allterms and

conditions of employement.

CONSULTING CAPABILITIES

CO

MP

AN

Y P

rO

FIL

E

Page 20: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 17

1. China PEtrolEum PiPElinE EnginEEring CorPoration ComPany

2. Shanghai ElECtriC

3. Emaar PakiStan

4 attoCk CEmEnt PakiStan limitEd

5. WorkS & SErviCES dEPartmEnt, govErnmEnt of Sindh

6. Sindh tranSmiSSion & diSPatCh ComPany (StdC)

7. frontiEr WorkS organization (fWo)

8. luCky ElECtriC PoWEr ComPany (lEPC)

9. SPECial ProjECt managEmEnt unit, miniStry of CommuniCation, goP

10. PakiStan PEtrolEum ltd

11. CommuniCation & WorkS dEPartmEnt, govErnmEnt of Punjab

12. SiddiqSonS EnErgy Pvt limitEd

13. fiShEriES dEvEloPmEnt board

14. CrEEk dEvEloPErS Pvt limitEd

15. PakiStan atomiC EnErgy CommiSSion (PaEC)

16. gWadar Port authority

17. aWan trading Co. Pvt limtEd

18. national tranSmiSSion & dESPatCh ComPany limitEd

19.. Sindh Coal authority (SCa)

20. bahria toWn Pvt limitEd

21. dha - brEntWood Pvt limitEd

22. gEtz Pharma Pvt limitEd

23. galaxy ConStruCtionS (Pvt) limitEd

24. un-habitat

25. karaChi mEtroPolitan CorPoration (kmC)

26. landmark EntErPriSES

27. yunuS tExtilE millS limitEd

28. Efu lifE inSuranCE Co. limitEd

29. k- EnErgy Pvt limitEd

SOME PROMINENT CLIENTS

CO

MP

AN

Y P

rO

FIL

E

Page 21: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 18

30. ElEngy tErminal PakiStan limitEd (EtPl)

31. n.m. buildErS & dEvEloPErS

32. raniPur Sugar millS (Pvt) limitEd

33. Saima rEal EStatE

34. mEtro tWin toWEr

35. Canon ConStruCtion ComPany

36. Shirazi invEStmEntS (Pvt) limitEd

37. halima buildErS & dEvEloPErS

38. m.S. intErPriSES

39. C.l. buildErS & dEvEloPErS

40. bandhi Sugar millS limitEd

41. atlaS mEtalS (Pvt) limitEd

42. dalda foodS (Pvt) limitEd

43. abbott laboratoriES PakiStan limitEd

44. induS diStillEry & brEWEry (Pvt) limitEd

45. hamza brothErS imPEx (Pvt) limitEd

46. oriEnt WatEr tEChnologiES

47. induS motorS ComPany limitEd

48. king’S food (Pvt) limitEd

49. S.k. EntErPriSES

50. fina EnErji

51. Sarmad Poultry farm

52. agility logiStiCS (Pvt) limitEd

53. niShat millS limitEd

54. induS hoSPital

55. ghani gaSES

56. PaCifiC oil millS (Pvt) limitEd

57. titan EnErgy PakiStan (Pvt) limitEd

58. Pak Can intErnational

SOME PROMINENT CLIENTS

CO

MP

AN

Y P

rO

FIL

E

Page 22: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 19

59. PakiStan gEmS & jEWEllEry dEvEloPmEnt ComPany, miniStry of ProduCtion

60. ParthEnon (Pvt) limitEd

61. digri Sugar millS (Pvt) limitEd

62. PakiStan SPaCE & uPPEr atmoSPhErE rESEarCh CommiSSion (SuParCo)

63. Sindh WildlifE dEPartmEnt (govErnmEnt of Sindh)

64. ElEngy tErminal PakiStan limitEd (EtPl)

65. Ea ConSulting Pvt limitEd

66. dSmE Co limitEd

67. faraS fErtilizEr ComPany (Pvt) limitEd

68. agha StEEl induStriES

69. binaPuri PakiStan (Pvt) limitEd

70. dEnim intErnational (Pvt) limitEd

71. d.j. buildErS & dEvEloPErS

72. tEChnova EntErPriSES (Pvt) limitEd

73. Salim yarn millS (Pvt) limitEd

74. Siddiqui buildErS & dEvEloPErS

75. Sumya buildErS & dEvEloPErS

76. S.P. aSSoCiatES buildErS & dEvEloPErS

77. Country ProPErtiES

78. novatEx limitEd

79. futEhally ChEmiCalS (Pvt) limitEd

80. niPPon koEi Co. limitEd, jaPan

81. fauji oil tErminal& diStribution ComPany limitEd (fotCo)

82. Sino Sindh rESourCES (Pvt) limitEd

83. nbt Wind PoWEr PakiStan(Pvt) limitEd

84. zuhair buildErS

85. karaChi intErnational ContainEr tErminal limitEd (kiCtl)

86. iShaq EntErPriSES

87. hiba buildErS & dEvEloPErS

SOME PROMINENT CLIENTS

CO

MP

AN

Y P

rO

FIL

E

Page 23: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 20

88. niko rESourCES (PakiStan) limitEd

89. h.m.ilyaS tradErS

90. Euro buildErS & dEvEloPErS

91. fatima vEnturES & amatul ConStruCtionS

92. Sindh inStitutE of urology and tranSPlantation (Siut)

93. oil & gaS dEvEloPmEntComPany limitEd (ogdCl)

94. aSg mEtalS (Pvt) limitEd

95. anoud tExtilE millS limitEd

96. rECkitt bEnCkiSEr PakiStan

97. Sundar gaS (Pvt) limitEd

98. jaWEdan CorPoration limitEd

99. Engro voPak tErminal limitEd

100. kda offiCErS CooPErativE houSing SoCiEty

102. gEnEration SChool

103. noman buildErS (Pvt) limitEd

104. WaltErS PoWEr intErnational

105. glaxoSmithklinE

106. StatE lifE inSuranCECorPoration

107. rEySir EntErPriSES

108. ibadullah WElfarE truSt

109. divinE dEvEloPErS (Pvt) limitEd

110. luCky onE (Pvt) ltd

111. lakSon tobaCCo ComPany

112. a&a aSSoCiatES

113. haSCombE StoragE limitEd

114. mintEx (miniStry of tExtilE induStry)

115. kmC offiCErS CooPErativE houSing SoCiEty

116. karaChi urban tranSPort CorPoration (kutC)

117. PakiStan houSing intErnational limitEd (Phil)

SOME PROMINENT CLIENTS

CO

MP

AN

Y P

rO

FIL

E

Page 24: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 21

118. intErnational ComPlEx ProjECtS limitEd (dolmEn grouP of ComPany)

119. amrEli StEElS (Pvt) limitEd

120. karaChi ElECtriC SuPPly CorPoration (kESC)

121. mm PakiStan (Pvt) limitEd

122. al-tuWairqi grouP

123. mi-SWaCo ovErSEaS limitEd

124. China national maChinEry

125. PakiStan gaSPort limitEd

126. im tEChnologiES PakiStan (Pvt) ltd

127. fauji akbEr Portia tErminal (faPt)

128. quality golf PakiStan (Pvt) limitEd

129. national gaSES limitEd

130. Siza food (Pvt) limitEd

131. orix ProPErtiES PakiStan (Pvt) limitEd

132. PakiStan tExtilE City limitEd (PtCl)

133. taavun (Pvt) limitEd

134. aiSha StEEl millS

135. arEva (t&d) Pak Pvt

136. artiStiC millinErS

137. boSiCor PakiStan limitEd

138. b.P. PakiStan ExPloration & ProduCtion inC.

139. Cadbury PakiStan limitEd

140. CrESCEnt ChEmiCalS

141. dEWan Sugar millS

142. Eni PakiStan limitEd

143. fWq EntErPriSES (Pvt) limitEd

144. hinoPak motor limitEd

145. induS rEfinEry limitEd

SOME PROMINENT CLIENTS

CO

MP

AN

Y P

rO

FIL

E

Page 25: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 22

146. qaSim intErnational ContainEr tErminal (qiCt)

147. mari gaS ComPany limitEd.

148. PfizEr PakiStan limitEd

149. PharmaCia & uPjohn (Pvt) limitEd

150. PakiStan Pta limitEd

151. ProCtor & gamblE

152. ShEll PakiStan limitEd

153. South aSia StEEl WorkS (Pvt) limitEd

154. Sui SouthErn gaS ComPany

155. thal EnginEEring

156. lilly intErnational (Pvt) limitEd

157. hamSonS induStriES

158. national rEfinEry limitEd (nrl)

SOME PROMINENT CLIENTS

CO

MP

AN

Y P

rO

FIL

E

Page 26: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 23

1. baSiC SurvEy on EnvironmEntal and SoCial ConSidEration for ProjECt

imProvEmEnt of national highWay n5 in karaChi City for jiCa

2. baSElinE Study for Solid WaStE managEmEnt in iSlamabad (SECtor 1-9 & 1-10)

for un-habitat

3. WatEr ConSErvation Study at omv kadanWari gaS fiEld for omv (PakiStan)

ExPloration & ProduCtion

4. SuPPlEmEntal fEaSibility Study on rEvival of karaChi CirCular railWay for

jiCa

5. baSElinE Study of kirthar ProtECtEd arEa ComPlEx for Sindh WildlifE

dEPartmEnt, govErnmEnt of Sindh

6. nation-WidE maPPing of induStriES to analyzE thE rEquirEmEnt of CombinEd

EffluEnt trEatmEnt PlantS (CEtPS) for miniStry of tExtilE induStriES,

govErnmEnt of PakiStan

7. Study on SoCial EnvironmEnt (SoSE) karaChi tranSPortation imProvEmEnt

ProjECt for jiCa

8. rESEttlEmEnt aCtion Plan (raP) for rEvival of karaChi CirCular railWay,

karaChi urban tranSPort CorPoration (kutC)

9. SPECial aSSiStanCE for thE ProjECt formulation (SaProf) for imPlEmEntation

of karaChi CirCular railWay (kCr) ProjECt

STUDIES

CO

MP

AN

Y P

rO

FIL

E

Page 27: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 24

1. EnvironmEntal & SoCial imPaCt aSSESSmEnt of 132kv tranSmiSSion linE from

nooriabad PoWEr Plant to kda grid Station, Sindh tranSmiSSion & diSPatCh

ComPany (StdC)

2. EnvironmEntal imPaCt aSSESSmEnt of ConStruCtion & rEhabilitation of

national highWay (n-5), jiCa/karaChi mEtroPolitan CorPoraton (kmC)

3. EnvironmEntal imPaCt aSSESSmEnt of karaChi – hydErabad motorWay (m9),

frontiEr WorkS organization

4. EnvironmEntal imPaCt aSSESSmEnt of 660 mW Coal firEd PoWEr Plant, luCky

ElECtriC PoWEr ComPany limitEd

5. EnvironmEntal imPaCt aSSESSmEnt of 500 kv tranSmiSSion linES for lakhra

Coal firEd thErmal PoWEr Plant ConStruCtion ProjECt, national

tranSmiSSion & diSPatCh ComPany (ntdC)

6. EnvironmEntal imPaCt aSSESSmEnt of grEEn linE raPid tranSit SyStEm for

SPECial ProjECt managEmEnt unit, miniStry of CommuniCation, goP

7. EnvironmEntal imPaCt aSSESSmEnt of dualization of faiSalabad byPaSS (ring

road) & faiSalabad to Chiniot road (PaCkagE - i) for CommuniCation &

WorkS dEPartmEnt, govErnmEnt of Punjab

8. EnvironmEntal imPaCt aSSESSmEnt of dualization of bahaWalPur - haSilPur -

bahaWalnagar road (PaCkagE - ii) for CommuniCation & WorkS dEPartmEnt,

govErnmEnt of Punjab

9. EnvironmEntal imPaCt aSSESSmEnt of dualization of ShEikhuPura - gujranWala

road (PaCkagE - ii) for CommuniCation & WorkS dEPartmEnt, govErnmEnt of

Punjab

10. EnvironmEntal imPaCt aSSESSmEnt of 132 kv SuPPly linE for induS hoSPital,

korangi

11. EnvironmEntal imPaCt aSSESSmEnt of 350mW Coal PoWEr Plant ProjECt for

SiddiqSonS EnErgy limitEd

12. EnvironmEntal imPaCt aSSESSmEnt of thE arkadianS for CrEEk dEvEloPErS

Pvt limitEd

13. EnvironmEntal imPaCt aSSESSmEnt of bahria gardEn City for bahria toWn Pvt

limitEd

14. EnvironmEntal imPaCt aSSESSmEnt of k-2/k-3 ProjECt for PakiStan atomiC

EnErgy CommiSSion

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 28: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 25

15. EnvironmEntal imPaCt aSSESSmEnt of gWadar Port EaStbay ExPrESSWay for

gWadar Port authority

16. EnvironmEntal imPaCt aSSESSmEnt of kPt Coal yard for aWan trading Co.

Pvt limitEd

17. EnvironmEntal imPaCt aSSESSmEnt of 50 CuSEC drainagE linE – thar Coal

bloCk-ii for Sindh Coal authority

18. EnvironmEntal imPaCt aSSESSmEnt of infraStruCturE dEvEloPmEnt of bahria

toWn karaChi for bahria toWn PrivatE ltd

19. EnvironmEntal imPaCt aSSESSmEnt of ProPoSEd buS raPid tranSit ProjECt

for bahria toWn PrivatE ltd

20. EnvironmEntal imPaCt aSSESSmEnt of “thE ShorE” for dha – brEntWood Pvt.

ltd

21. EnvironmEntal imPaCt aSSESSmEnt of ProPoSEd gEtz Pharma unit ii ProjECt

for gEtz Pharma (Pvt) limitEd

22. EnvironmEntal imPaCt aSSESSmEnt of naShaP dEvEloPmEnt ProjECt: Chanda

mEla & naShPa dEvEloPmEnt & ProduCtion lEaSES (d & PlS) for oil & gaS

dEvEloPmEnt ComPany limitEd

23. EnvironmEntal imPaCt aSSESSmEnt of gradE SEParatEd traffiC imProvEmEnt

Plan from ParktoWEr to a.t.naqvi roundabout for karaChi mEtroPolitan

CorPoration (kmC)

24. EnvironmEntal imPaCt aSSESSmEnt of bin qaSim Coal ConvErSion ProjECt for

k-EnErgy (Pvt) limitEd

25. EnvironmEntal & SoCial imPaCt aSSESSmEnt of ProPoSEd lng imPort tErminal

ProjECt for ElEngy tErminal PakiStan limitEd (EtPl)

26. EnvironmEntal imPaCt aSSESSmEnt of drilling & aSSoCiatEd aCtivitiES for

unitEd EnErgy PakiStan limitEd (uEPl)

27. EnvironmEntal imPaCt aSSESSmEnt of ExPloration aCtivitiES in kohat E.l for

oil & gaS dEvEloPmEnt ComPany limitEd (ogdCl)

28. EnvironmEntal imPaCt aSSESSmEnt of Canola oil ExtraCtion unit for dalda

foodS (Pvt) limitEd

29. EnvironmEntal imPaCt aSSESSmEnt of uSEd lEad aCid battEry rECyCling Plant

for atlaS mEtalS (Pvt) limitEd

30. EnvironmEntal & SoCial imPaCt aSSESSmEnt (ESia) of PakiStan floating lng

tErminal ProjECt in offShorE WatErS for dSmE Co. limitEd

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 29: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 26

31. EnvironmEntal & SoCial imPaCt aSSESSmEnt (ESia) of floating lng tErminal

ProjECt for fauji oil tErminal & diStribution ComPamy limitEd

32. EnvironmEntal imPaCt aSSESSmEnt of Sugar mill & CogEnEration Plant for

bandhi Sugar millS limitEd

33. EnvironmEntal imPaCt aSSESSmEnt Study of ConStruCtion of flyovErS on

Corridor v (Shahrah-E-PakiStan), karaChi mEtroPolitan CorPoration (kmC)

34. EnvironmEntal imPaCt aSSESSmEnt Study of ProPoSEd EdiblE oil rEfinEry for

PaCifiC oil millS (Pvt) limitEd

35. EnvironmEntal imPaCt aSSESSmEnt of nbt ii - 250mW Wind PoWEr ProjECt

for nbt Wind PoWEr PakiStan ii (Pvt) limitEd

35. EnvironmEntal imPaCt aSSESSmEnt of nbt iii - 250mW Wind PoWEr ProjECt

for nbt Wind PoWEr PakiStan iii (Pvt) limitEd

36. EnvironmEntal imPaCt aSSESSmEnt Study of ConStruCtion of flyovErS on

Corridor v at Sharah-E-PakiStan for karaChi mEtroPolitan CorPoration

(kmC)

37. EnvironmEntal imPaCt aSSESSmEnt of kPd tay intEgratEd dEvEloPmEnt

ProjECt for oil & gaS dEvEloPmEnt ComPany limitEd (ogdCl)

38. EnvironmEntal imPaCt aSSESSmEnt of Sumya Silk (rESidEntial Cum CommErCial

ProjECt) for d.j. buildErS & dEvEloPErS

39. EnvironmEntal imPaCt aSSESSmEnt Study of ShahEEd bEnazir bhutto bridgE

ovEr rivEr induS ConnECting ChaChran Sharif to mithankot for Ea

ConSulting (Pvt) limitEd

40 EnvironmEntal imPaCt aSSESSmEnt Study of faraS fErtilizEr’S aCid

manufaCturing Plant for faraS fErtilizEr ComPany (Pvt) limitEd

41. EnvironmEntal imPaCt aSSESSmEnt of agha StEEl millS for agha StEEl

induStriES

42. EnvironmEntal & SoCial imPaCt aSSESSmEnt of karaChi-hydErabad motorWay

(m-9) for binaPuri PakiStan (Pvt) limitEd

43. EnvironmEntal imPaCt aSSESSmEnt Study for karaChi tranSPortation

imProvEmEnt ProjECt (ktiP) for niPPon koEi Co. limitEd, jaPan

44. EnvironmEntal imPaCt aSSESSmEnt Study of 100mW nbt Wind PoWEr ProjECt

at dhabEji for nbt Wind PoWEr PakiStan (Pvt) limitEd

45. EnvironmEntal & SoCial imPaCt aSSESSmEnt of thar Coal mining ProjECt,

Sinhar vikian varvai, bloCk-1 for Sino-Sindh rESourCES

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 30: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 27

46. EnvironmEntal imPaCt aSSESSmEnt Study for ProPoSEd ExPloration aCtivitiES

in dakhni mining lEaSE for oil & gaS dEvEloPmEnt ComPany limitEd (ogdCl)

47. EnvironmEntal imPaCt aSSESSmEnt Study for SEiSmiC SurvEy in baran bloCk

for oil & gaS invEStmEntS limitEd (ogil)

48. EnvironmEntal imPaCt aSSESSmEnt Study for oil & gaS ExPloration in

fatEhjang bloCk for oil & gaS dEvEloPmEnt ComPany limitEd (ogdCl)

49. EnvironmEntal & SoCial imPaCt aSSESSmEnt of Coal ClinkEr & CEmEnt

tErminal for PakiStan intErnational bulk tErminal

50. EnvironmEntal imPaCt aSSESSmEnt of ComPaCt StEEl Plant for aSg mEtalS at

Port qaSim, karaChi

51. EnvironmEntal imPaCt aSSESSmEnt of drilling & aSSoCiatEd ProduCtion

aCtivitiES in hala bloCk for bP PakiStan ExPloration & ProduCtion inC.

52. EnvironmEntal imPaCt aSSESSmEnt of lng tErminal at Port qaSim for Engro

voPak tErminal limitEd

53. EnvironmEntal imPaCt aSSESSmEnt of luCky onE aPartmEntS & mall for

luCky onE (Pvt) limitEd

54. EnvironmEntal imPaCt aSSESSmEnt of StatElifE toWEr at iSlamabad for

StatElifE inSuranCE CorPoration

55. EnvironmEntal imPaCt aSSESSmEnt for 3 dSEiSmiC SurvEy oPErationS at

Sanghar bloCk, bP PakiStan ExPloration & ProduCtion inC.

56. EnvironmEntal imPaCt aSSESSmEnt of noman CaStEllo, noman buildErS (Pvt)

limitEd.

57. EnvironmEntal imPaCt aSSESSmEnt of Corridor-iv at Shahrah-E-faiSal, City

diStriCt govErnmEnt karaChi (Cdgk)

58. EnvironmEntal imPaCt aSSESSmEnt of dolmEn City ProjECt, intErnational

ComPlEx ProjECtS limitEd (iCPl)

59. EnvironmEntal imPaCt aSSESSmEnt of gizri flyovEr at dha, karaChi for

dEfEnCE houSing authority (dha)

60. EnvironmEntal imPaCt aSSESSmEnt of rEvival of karaChi CirCular railWay for

karaChi urban tranSPort CorPoration (kutC)

61. EnvironmEntal imPaCt aSSESSmEnt of kolaChi EnClavE dEvEloPmEnt for mm

PakiStan (Pvt) limitEd

62. EnvironmEntal imPaCt aSSESSmEnt of tuWairqi StEEl millS ProjECt for al-

tuWairqi grouP

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 31: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 28

63. EnvironmEntal imPaCt aSSESSmEnt of Sonda-jhErruk Coal minE for China

national maChinEry

64. EnvironmEntal imPaCt aSSESSmEnt of jhErruk PoWEr Plant for China national

maChinEry

65. EnvironmEntal imPaCt aSSESSmEnt of lng tErminal, jEtty & ExtraCtion

faCility for PakiStan gaSPort limitEd.

66. EnvironmEntal imPaCt aSSESSmEnt of oil PiPElinE (SPm-bPl)

67. EnvironmEntal imPaCt aSSESSmEnt of fErtilizEr & grain tErminal for fauji

akbar Portia marinE tErminalS (Pvt) limitEd for Port qaSim karaChi

68. EnvironmEntal imPaCt aSSESSmEnt of PakiStan tExtilE City, Port qaSim

karaChi

69. EnvironmEntal imPaCt aSSESSmEnt of mabarak CEntrE, lahorE for taavun

(Pvt ) limitEd

70. EnvironmEntal imPaCt aSSESSmEnt for aiSha StEEl millS

71. EnvironmEntal imPaCt aSSESSmEnt for boSiCor oil PakiStan limitEd

72. EnvironmEntal imPaCt aSSESSmEnt for boSiCor ChEmiCal PakiStan

73. EnvironmEntal imPaCt aSSESSmEnt of StEEl rE-bar and Cold rolling mill

for South aSia StEEl WorkS PakiStan (Pvt) limitEd

74. EnvironmEntal imPaCt aSSESSmEnt of irl at diStriCt thatta, dhabEji

75. EnvironmEntal imPaCt aSSESSmEnt of bajara-karaChi looP-linE (girEP-ii)

for Sui SouthErn gaS ComPany

76. EnvironmEntal imPaCt aSSESSmEnt of liquid Cargo tErminal for fWq

EntErPriSES (Pvt) ltd

77. EnvironmEntal imPaCt aSSESSmEnt for artiStiC millinErS dEnim ProCESSing unit

78. EnvironmEntal imPaCt aSSESSmEnt of qaSim intErnational ContainEr tErminal

ExtEnSion PhaSE-ii at Port qaSim

79. EnvironmEntal imPaCt aSSESSmEnt of karaChi ElEvatEd ExPrESSWay from

jinnah bridgE to quaidabad for City diStriCt govErnmEnt karaChi

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 32: EMC PROFILE UPDATED (25-11-2015)_opt

29

1. initial EnvironmEntal Examination of ConStruCtion and CommiSSioning of gPf- ii

in gambat South bloCk for PakiStan PEtrolEum ltd

2. initial EnvironmEntal Examination of Clifton viSta for burj buildErS &

dEvEloPErS

3. initial EnvironmEntal Examination of thE addrESS

4. initial EnvironmEntal Examination of ShrimP farming CluStEr dEvEloPmEnt to

EnhanCE SuPPly of raW matErial for SEafood induStry of PakiStan for

fiShEriES dEvEloPmEnt board

5. initial EnvironmEntal Examination of artiStiC millinErS unit 14 ProjECt for

artiStiC millinErS Pvt limitEd

6. initial EnvironmEntal Examination of uEPl Salamat gaS & SalEh oil faCility

ProjECt for unitEd EnErgy PakiStan limitEd (uEPl)

7. initial EnvironmEntal Examination of uP-gradation of road nEtWork from

SujaWal (thatta) to Wango mor via badin (PhaSE-i) for Sindh Coal authority

8. initial EnvironmEntal Examination of bahria gardEn City for bahria toWn

(Pvt) limitEd

9. initial EnvironmEntal Examination of ConStruCtion & oPEration of aErodromE

(airStriP) for unitEd EnErgy PakiStan limitEd (uEPl)

10. initial EnvironmEntal Examination of hoShang PEarl aPartmEntS ProjECt for

galaxy ConStruCtionS (Pvt) limitEd

11. initial EnvironmEntal Examination of oPal 225 mixEd-uSE building ProjECt for

galaxy ConStruCtionS (Pvt) limitEd

12. initial EnvironmEntal Examination of intEgratEd rESourCE rECovEry CEntrE

(irrC), iSlamabad for unitEd nationS human SEttlEmEntS Program

13. initial EnvironmEntal Examination of landmark toWEr for landmark

EntErPriSES.

14. initial EnvironmEntal Examination of 10 faCulty EduCation ComPlExES for

uSaid

15. initial EnvironmEntal Examination of addition of Coal firEd boilEr for yunuS

tExtilE millS limitEd (ytm)

16. initial EnvironmEntal Examination of naimat faCility ExPanSion ProjECt PhaSE-

v inCluding ConStruCtion ofCamP for unitEd EnErgy PakiStan limitEd (uEPl)

17. initial EnvironmEntal Examination of Efu lifE aSSuranCE building for Efu

lifE inSuranCE Co. limitEd

18. initial EnvironmEntal Examination of gradE SEParatEd traffiC imProvEmEnt

Plan from Park toWEr intErSECtion to a.t. naqvi roundabout for Ea

ConSulting Pvt limitEd

19. initial EnvironmEntal Examination of ProduCt uP-gradation ProjECt for

national rEfinEry limitEd (nrl)

20. initial EnvironmEntal Examination of amEEna toWEr for halima buildErS &

dEvEloPErS

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

EMC PAKISTAN PvT. LTd.

Page 33: EMC PROFILE UPDATED (25-11-2015)_opt

21. initial EnvironmEntal Examination of onE Way rEgimE at khayaban-E-mujahid &

khayaban-E-ShamShEEr for dEfEnCE houSing authority (dha)

22. initial EnvironmEntal Examination of naimat faCility ExPanSion ProjECt PhaSE-

iv for unitEd EnErgy PakiStan limitEd

23. initial EnvironmEntal Examination of 70 riviEra for mr. anjum rEhmat & mr.

nadEEm rEhmat ShEikh

24. initial EnvironmEntal Examination of korangi gaS turbinE PoWErPlant for

karaChi ElECtriC SuPPly CorPoration (kESC)

25. initial EnvironmEntal Examination of S.i.t.E gaS turbinE PoWErPlant for

karaChi ElECtriC SuPPly CorPoration (kESC)

26. initial EnvironmEntal Examination of quEEn’S rESidEnCia – i for n.m. buildErS

& dEvEloPErS

27. initial EnvironmEntal Examination of ProPoSEd 21 mW Co-gEnEration Plant

for raniPur Sugar millS (Pvt) limitEd

28. initial EnvironmEntal Examination of drilling & aSSoCiatEd aCtivitiES in

non-ProtECtEd arEaS of dSS bloCkS for unitEd EnErgy PakiStan limitEd

29. initial EnvironmEntal Examination of ChillEd WatEr Plant EnhanCEmEnt

ProjECt for PfizEr laboratoriES PakiStan (Pvt) limitEd

30. initial EnvironmEntal Examination of naimat - kauSar PiPElinE for unitEd

EnErgy PakiStan limitEd

31. initial EnvironmEntal Examination of Clifton Comfort for mr. muhammad

kaSSim & mrS rubina muhammad huSSain

32. initial EnvironmEntal Examination of Saima luxuria for Saima rEal EStatE

33. initial EnvironmEntal Examination of Euro hi-tECh rESidEnCy for Euro

buildErS & dEvEloPErS

34. initial EnvironmEntal Examination of uEP naimat faCility uPgradation ProjECt

for unitEd EnErgy PakiStan limitEd

35. initial EnvironmEntal Examination of mEtro tWin toWEr

36. initial EnvironmEntal Examination of faizan rESidEnCy for Canon ConStruCtion

ComPany

37. initial EnvironmEntal Examination of Port qaSim WarEhouSE for Shirazi

invEStmEntS Pvt limitEd

38. initial EnvironmEntal Examination of halima toWEr for halima buildErS &

dEvEloPErS

39. initial EnvironmEntal Examination of aziz hEavEn for kgS buildErS &

dEvEloPErS

EMC PAKISTAN PvT. LTd. 30

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 34: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 31

40. initial EnvironmEntal Examination for m.S. intErPriSES

41. initial EnvironmEntal Examination of zamzam toWErS for C.l. buildErS &

dEvEloPErS

42. initial EnvironmEntal Examination of 3.2 mW CogEnEration Plant for abbott

laboratoriES PakiStan limitEd

43. initial EnvironmEntal Examination of ProPoSEd additional 7.15 mW PoWEr

Plant for anoud PoWEr gEnEration limitEd

44. initial EnvironmEntal Examination of futurE dEvEloPmEnt in mkk bloCk for

unitEd EnErgy PakiStan limitEd

45. initial EnvironmEntal Examination of garmEntS StitChing (ExPanSion) for

artiStiC dEnim millS limitEd

46. initial EnvironmEntal Examination of ConStruCtion of undErground WatEr

StoragE tankS for glaxoSmithkinE PakiStan limitEd

47. initial EnvironmEntal Examination of ConStruCtion of 800 mEtErS tESt traCk

for induS motorS ComPany limitEd

48. initial EnvironmEntal Examination of maChiyara SPringfiEld for hanif abdani &

muhammad kaSSim

49. initial EnvironmEntal Examination of ProPoSEd makkah toWErS for halima

buildErS & dEvEloPErS

50. initial EnvironmEntal Examination of WaStEWatEr trEatmEnt Plant for king’S

food (Pvt) limitEd

51. initial EnvironmEntal Examination of Sumya ComfortS for hiba buildErS &

dEvEloPErS

52. initial EnvironmEntal Examination of Saima Clifton Park viEW for S.k. 

EntErPriSES

53. initial EnvironmEntal Examination of ConStruCtion & oPEration of jama mall

& rESidEnCy for maChiyara & Paragon grouP

54. initial EnvironmEntal Examination of 50 mW Wind PoWEr ProjECt for finErgy

(Pvt) limitEd

55. initial EnvironmEntal Examination of Sarmad Poultry farm

56. initial EnvironmEntal Examination of qaSim logiStiCS CEntrE for agility

logiStiCS (Pvt) limitEd

57. initial EnvironmEntal Examination of mEhran logiStiCS CEntrE for agility

logiStiCS (Pvt) limitEd

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 35: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 32

58. initial EnvironmEntal Examination of ProPoSEd 9 mW Wind PoWEr ProjECt

for titan EnErgy PakiStan (Pvt) limitEd

59. initial EnvironmEntal Examination Study of SmElting Plant at SitE for Pak

Can intErnational

60. initial EnvironmEntal Examination of aSSaying and hallmarking CEntrE for

PakiStan gEmS & jEWEllEry dEvEloPmEnt ComPany, miniStry of ProduCtion

61. initial EnvironmEntal Examination of intErnational buSinESS & ShoPPing

CEntrE for ParthEnon (Pvt) limitEd

62. initial EnvironmEntal Examination of Study of SalE of 2 mW SurPluS PoWEr to

hESC from digri Sugar millS for digri Sugar millS (Pvt) limitEd

63. initial EnvironmEntal Examination of SatEllitE data rECEiving ground Station

for agriCulturE ProjECt for PakiStan SPaCE & uPPEr atmoSPhErE rESEarCh

CommiSSion (SuParCo)

64. initial EnvironmEntal Examination of high PrESSurE tranSmiSSion PiPElinE &

nitrogEn blEnding faCility for ElEngy tErminal PakiStan limitEd (EtPl)

65. initial EnvironmEntal Examination of naxon’S marriagE hall

66. initial EnvironmEntal Examination of atlantiC marriagE hall

67. initial EnvironmEntal Examination of maChiyara toWEr

68. initial EnvironmEntal Examination of aviation EnClavE (houSing ProjECt) for

CEntral buildErS & dEvEloPErS

69. initial EnvironmEntal Examination of tayyabi gardEn for hiba buildErS &

dEvEloPErS

70. initial EnvironmEntal Examination of Euro duPlEx City for Euro buildErS

& dEvEloPErS

71. initial EnvironmEntal Examination of kotri unit ExPanSion ProjECt for

PhilliP morriS PakiStan limitEd

72. initial EnvironmEntal Examination of CaPaCity EnhanCEmEnt ProjECt - SahiWal

unit for PhiliP morriS PakiStan limitEd

73. initial EnvironmEntal Examination of ConStruCtion & oPEration of dEnim

intErnational (Pvt) limitEd

74. initial EnvironmEntal Examination Study for EStabliShmEnt of SmElting Plant

at hub induStrial trading EStatE, hub baluChiStan for tEChnova EntErPriSES

(Pvt) limitEd

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 36: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 33

75. initial EnvironmEntal Examination Study of ProPoSEd 2.7 mW (ExtEndablE to

12 mW)gaS baSEd PoWEr Plant at kotri-Sindh for Salim yarn millS (Pvt)

limitEd

76. initial EnvironmEntal Examination Study of graCE toWEr for Siddiqui buildErS

& dEvEloPErS

77. initial EnvironmEntal Examination of boPEt unit for novatEx limitEd

78. initial EnvironmEntal Examination of Sumya bridgE viEW - SuPEr luxury

aPartmEntS for Sumya buildErS & dEvEloPErS

79. initial EnvironmEntal Examination of Saima Pari CEntrE for S.P. aSSoCiatES

buildErS and dEvEloPErS

80. initial EnvironmEntal Examination of futEhally ChEmiCalS (Pvt) limitEd

81. initial EnvironmEntal Examination of ProPoSEd SEiSmiC SurvEy at badin bloCk

(non-ProtECtEd arEaS) for unitEd EnErgy PakiStan limitEd (uEP)

82. initial EnvironmEntal Examination of royal homES for CEntral buildErS &

dEvEloPErS

83. initial EnvironmEntal Examination of rESidEntial aPartmEntS for Country

ProPErtiES

84. initial EnvironmEntal Examination of rESidEntial aPartmEntS for Country

ProPErtiES

85. initial EnvironmEntal Examination of Euro ClaSSiC for Euro buildErS &

dEvEloPErS

86. initial EnvironmEntal Examination of al-ghafoor orChid for zuhair buildErS

87. initial EnvironmEntal Examination of ProPoSEd offShorE drilling of nmr-01

and nmr-02 WEllS in induS baSin for nikorESourCES (PakiStan) limitEd

88. initial EnvironmEntal Examination of Euro grand Park for Euro buildErS &

dEvEloPErS

89. initial EnvironmEntal Examination Study for ConStruCtion & oPEration of

al-ghafoor ChalEt for zuhair buildErS

90. initial EnvironmEntal Examination of nEW PoWEr houSE for karaChi

intErnational ContainEr tErminal limitEd (kiCtl)

91. initial EnvironmEntal Examination of SmElting Plant for h.m.ilyaS tradErS

92. initial EnvironmEntal Examination of CEntrEPoint for a&a aSSoCiatES

93. initial EnvironmEntal Examination of Com-3 for iShaq EntErPriSES

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 37: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 34

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

94. initial EnvironmEntal Examination of Sumya rESidEnCy for hiba buildErS &

dEvEloPErS

95. initial EnvironmEntal Examination of Euro CloCk toWEr for Euro buildErS

96. initial EnvironmEntal Examination uSE of magiC float modular floating jEtty

SyStEm (hdPE) for fatima vEnturES & amatul ConStruCtionS (South aSian

rESourCES grouP)

97. initial EnvironmEntal Examination of bitriSm bloCk at diStriCt Sanghar-

khairPur-ShahEEd bEnazir abad Sindh for oil & gaS dEvEloPmEnt ComPany

limitEd (ogdCl)

98. initial EnvironmEntal Examination of ProPoSEd tranSPlant toWEr for Sindh

inStitutE of urology & tranSPlantation (Siut)

99. initial EnvironmEntal Examination of maru-rEti gaS PiPElinE for oil & gaS

dEvEloPmEnt ComPany limitEd (ogdCl)

100. initial EnvironmEntal Examination of ProPoSEd 3d SEiSmiiC oPErationS in

tando ghulam ali (tga)& buzdar rEgionS for bP PakiStan ExPloration &

ProduCtion inC.

101. initial EnvironmEntal Examination of ProPoSEd 11.7 mW (ExtEndablE to 16

mW gaS baSEd PoWEr Plant at anoud tExtilE millS limitEd

102. initial EnvironmEntal Examination of CaPaCity EnhanCEmEnt & gmP

ComPlianCE for rECkitt bEnCkiSEr PakiStan

103. initial EnvironmEntal Examination of lPg StoragE & filling Station for

Sundar gaS limitEd

104. initial EnvironmEntal Examination of naya nazimabad houSing SChEmE PhaSE-i

for jaWEdan CorPoration limitEd

105. initial EnvironmEntal Examination of kda offiCErS CooPErativE houSing

SoCiEty

106. initial EnvironmEntal Examination of gEnEration SChool

107. initial EnvironmEntal Examination for ExPanSion of laCtam bloCk for

glaxoSmithklinE korangi Plant

108. initialEnvironmEntal Examination of rEntal PoWEr PlantS, naudEro, Sindh for

WaltErS PoWEr intErnational

109. initial EnvironmEntal Examination of SolvEnt StoragE WarEhouSE for rEySir

EntErPriSES

110. initial EnvironmEntal Examination of dalton Parking Plaza & ShoPPing mall

& uPgradation of zamzama Club & SPortS ComPlEx, dha PhaSE-v, karaChi,

Page 38: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 35

dEfEnCE houSing authority

111. initial EnvironmEntal Examination for dEvEloPmEnt of juma goth for thE

rESEttlEmEnt of ProjECt affECtEd PErSonS (PaPS), karaChi urban

tranSPort CorPoration

112. initial EnvironmEntal Examination of divinE mEga 2 ProjECt, lahorE, divinE

dEvEloPErS (Pvt) limitEd

113. initial EnvironmEntal Examination of City toWEr, SEvEn SEaS ConStruCtion

114. initial EnvironmEntal Examination of Corridor-iv at Shahrah-E-faiSal, City

diStriCt govErnmEnt karaChi (Cdgk)

115. initial EnvironmEntal Examination of houSing SChEmE ProPoSEd ovEr 200

aCrES of land for kmC offiCErS CooPErativE houSing SoCiEty

116. initial EnvironmEntal Examination of PEtro-ChEmiCal, raW matErial & fEEd

StoCk ProjECt, PakiStan houSing intErnational limitEd.

117. initial EnvironmEntal Examination for amrElli StEElS (Pvt) limitEd

118. initial EnvironmEntal Examination of WESt Wharf & haroonabad PoWEr

gEnEration unitS, karaChi ElECtriC SuPPly CorPoration (kESC)

119. initial EnvironmEntal Examination rEPort for drilling ChEmiCal StoragE

WarEhouSE, mi-SWaCo m-i ovErSEaS limitEd

120. initial EnvironmEntal Examination of WaStEWatEr trEatmEnt Plant hub

baloChiStan, ProCtor & gamblE PakiStan (Pvt) limitEd

121. initial EnvironmEntal Examination of karaChi it toWEr ComPlEx CiviC

CEntrE, karaChi

122. initial EnvironmEntal Examination of PoWEr Plant for intErnational

induStriES limitEd, landhi karaChi

123. initial EnvironmEntal Examination of aCaCia Country & golf Club karaChi

for quality golf PakiStan (Pvt) limitEd

124. initial EnvironmEntal Examination of lPg StoragE & bottling Plant for

national gaS limitEd. hub baluChiStan

125. initial EnvironmEntal Examination of mCdonald’S rEStaurant for Siza food

(Pvt) limitEd. f- 9 Park, iSlamabad

126. initial EnvironmEntal Examination of SErviCES aPartmEntS for orix

ProPErtiES PakiStan (Pvt) limitEd. lahorE

127. initial EnvironmEntal Examination of SofitEl rESidEnCE Clifton for triPlE

trEE aSSoCiatES

128. initial EnvironmEntal Examination of 5-StEEl bridgES for City diStriCt

govErnmEnt karaChi (Cdgk)

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 39: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 36

129. initial EnvironmEntal Examination for ExtEnSion of boSiCor PakiStan limitEd

130. initial EnvironmEntal Examination of jinnah toWn houSing SChEmE at kda-33

for daWood EntErPriSES

131. initial EnvironmEntal Examination for ExPanSion of lPg StoragE tankS at

Port qaSim for Shv EnErgy PakiStan limitEd.

132. initial EnvironmEntal Examination of SofitEl toWEr Clifton karaChi for

triPlE trEE aSSoCiatES

133. initial EnvironmEntal Examination of maCh-kolPur for Sui SouthErn gaS

ComPany

134. initial EnvironmEntal Examination of mari gaS ComPany ltd. at ziarat bloCk

baloChiStan

135. initial EnvironmEntal Examination of alEEm SonS WEaving, Printing (Pvt)

limitEd

136. initial EnvironmEntal Examination of an outlEt of mC donald’S rEStaurant

at Clifton bEaCh for Siza foodS (Pvt) limitEd.

137. initial EnvironmEntal Examination of CrESCEnt ChEmiCal ComPany at kEPz

138. initial EnvironmEntal Examination of dEWan Sugar millS

139. initial EnvironmEntal Examination of WaStEWatEr trEatmEnt Plant for

hinoPak motorS

140. initial EnvironmEntal Examination of WaStEWatEr trEatmEnt Plant for PfizEr

141. initial EnvironmEntal Examination for hamSonS induStriES

142. initial EnvironmEntal Examination of additional StoragE tankS for national

rEfinEry limitEd.

143. initial EnvironmEntal Examination of dha WatErfront for dEfEnCE houSing

authority

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 40: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 37

1. EnvironmEntal audit - mama induStriES, Port qaSim, karaChi

2. buSinESS SoCial rESPonSibility (bSr) audit - niShat millS limitEd, lahorE

3. buSinESS SoCial rESPonSibility (bSr) audit - uS dEnim

4. buSinESS SoCial rESPonSibility (bSr) audit - artiStiC millinErS

5. buSinESS SoCial rESPonSibility audit - navEEna tExtilE millS, lahorE

6. buSinESS SoCial rESPonSibility audit - ahmEd laCE (nExgEn), karaChi

7. EhS audit - rECkitt bEnCkiSEr, karaChi

8. EnvironmEntal ComPlianCE audit - fmC lahorE

9. hSE ComPlianCE audit - monSanto PakiStan limitEd.

10. EnvironmEntal audit - ChEmitEx tExtilE induStry

11. EnvironmEntal ComPlianCE audit - WyEth PakiStan limitEd

12. duE diligEnCE audit - fauji kabirWala PoWEr Plant, Punjab

13. EhS audit - habibullah CoaStal PoWEr ProjECt, quEtta

14. duE diligEnCE audit- habibullah CoaStal PoWEr, quEtta

15. duE diligEnCE audit - Saba PoWEr limitEd, ShEikuPura

16. EhS audit - abbott laboratoriES Pak. limitEd

17. hSE ComPlianCE audit - PfizEr PakiStan limitEd

18. EhS ComPlainCEaudit - PharmaCia & uPjohn

19. duE diligEnCE ComPlainCE audit - Cadbury PakiStan limitEd, hub, baloChiStan

20. EmS audit - bP PakiStan (E & P)

21. EmS audit - PfizEr PakiStan limitEd

22. EmS audit - laSmo oil PakiStan

23. EhS audit - al-karam tExtilES

24. EhS audit - ExidE PakiStan limitEd

25. EhS audit - thal EnginEEring (automotivE)

26 EnvironmEntal audit - huSain Sugar millS

27. EmS audit - iCi PaintS

28. EmS audit - ParkE daviS PharmaCEutiCalS

29. EmS audit - hinoPak motorS

30. EhS audit - univErSal ChEmiCal induStry .

AUDIT EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 41: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 38

ENVIRONMENTAL SITE ASSESSMENT

CO

MP

AN

Y P

rO

FIL

E

1. EnvironmEntal SitE aSSESSmEnt PhaSE - i, johnSon & johnSon PakiStan (Pvt.) 

limitEd

2. EnvironmEntal SitE aSSESSmEnt of ShutdoWn faCility, gSk PakiStan

3. EnvironmEntal SitE aSSESSmEnt of ShutdoWn faCility, PharmaCia and uPjohn

PakiStan (Pvt.) limitEd

4. EnvironmEntal SitE aSSESSmEnt of faCility, WyEth PakiStan limitEd

5. EnvironmEntal SitE aSSESSmEnt of Sakhi - tangri trunk linE oil PilfEragE

SitE at Sakhi - i faCility, bP PakiStan Sakhi - i faCility

Page 42: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 39

1. ConSultanCy SErviCES of iSo-14000-2004 for hinoPak motorS limitEd.

2. in-houSE training on iSo-14000 for hinoPak motorS limitEd.

3. ConSultanCy SErviCES of iSo-14000 for PharmaCia uPjohn (Pvt) limitEd.

4. ConSultanCy SErviCES for iSo-14000 at al-karam tExtilE limitEd. (ProCESSing

mill).

5. intEgratEd managEmEnt SyStEm, baSEd on ohSaS 18001 and iSo-14000 for

PfizEr PakiStan.

6. ConSultanCy SErviCES for thE EStabliShmEnt of intEgratEd managEmEnt

SyStEm, baSEd on ohSaS 18001 for hinoPak motorS limitEd.

7. ConSultanCy SErviCES for thE EStabliShmEnt of intEgratEd managEmEnt

SyStEm, baSEd on ohSaS 18001 and iSo-14001-2004 for bP PakiStan limitEd.

8. iSo 14001-2004 rEviEW for hinoPak motorS limitEd.

9. ConSultanCy SErviCES for thE EStabliShmEnt of iSo 9001- 2000 and iSo

17025 SyStEmS for almEida tExtilE (Pvt) limitEd, EthioPia

10. Study rEPort on food WaStE diSPoSal for Eni-laSmo oil PakiStan limitEd.

(bhit CamP).

11. rECyCling of WaStE oil SludgE for bP badin PakiStan (ConCESSion arEa).

12. diSPoSal of WaStE oil SludgE and diffErEnt tyPES of ChEmiCalS from

laboratory for ShEll PakiStan limitEd.

13. diSPoSal of WaStEWatEr SludgE for mErCk SharPE dohmE

14. diSPoSal of hazardouS and non-hazardouS WaStE for PEtronaS oil

ExPlorationS

15. diSPoSal and inCinEration of ChEmiCalS, dyES and WaStE oil for al-karam

tExtilES

16. diSPoSal of WaStE oil, grEaSE, Paint and ChEmiCalS uSEd in thE ProCESS.

17. diSPoSal of WaStE flavourEd ChEmiCalS for Cadbury PakiStan limitEd.

18. rECyCling of SolvEnt (111-tCE) uSEd for dEgrEaSing for thal EnginEEring.

19. diSPoSal of WaStE ChEmiCalS for univErSal ChEmiCalS induStry

20. Study rEPort on WaStEWatEr diSPoSal/trEatmEnt for Eni- laSmo oil

PakiStan (bhit CamP).

21. daf (diSSolvEd air floatation) unit for WaStEWatEr trEatmEnt at Cadbury

PakiStan limitEd.

22. WaStEWatEr trEatmEnt Plant at thal EnginEEring.

MISCELLANEOUS

CO

MP

AN

Y P

rO

FIL

E

Page 43: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 40

23. WaStEWatEr trEatmEnt Plant at hinoPak motorS limitEd.

24. noiSE Study at ProduCtion faCilitiES, badin ConCESSion bloCk for bP PakiStan

ExPloration & ProduCtion inC.

25. EnvironmEntal monitoring of tuWairqi StEEl mill ProjECt for al-tuWairqi

grouP

26. EnvironmEntal managEmEnt & monitoring Plan for lakSon tobaCCo ComPany

limitEd

27. monitoring of WatErfront dEvEloPmEnt ProjECtS for dEfEnCE houSing

authority

24. rEPort on “Study into CauSES and EffECtS of EutroPhiCation in major lakES of

Sindh”

25. Study of Soil ProfilE of farmlandS around SEhWan trEatmEnt faCility for

Eni-laSmo, SEhWan

26. imPaCt of WaStEWatEr irrigation on thE groundWatEr at nagaWall nEar Eni-

laSmo bhit CamP SitE

27. noiSE Study of bP’S faCilitiES at badin ConCESSion arEa

28. ambiEnt air quality monitoring for bEaCon houSE SChool (jubilEE CamPuS)

29. ConSultiing SErviCES for air diSPErSion modEling of raW matErial

tranSPortation for PakiStan Pta limitEd Port qaSim

30. EnvironmEntal monitoring/managEmEnt Plan for lilly intErnational (Pvt)

limitEd.

31. initial EnvironmEntal rEviEW for hamSonS tExtilE millS (Pvt) lmitEd.

MISCELLANEOUS

CO

MP

AN

Y P

rO

FIL

E

Page 44: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 41

Shanghai ElECtriC

ENvIrONMENTAL IMPACT ASSESSMENT OF 2 X 660 MW POWErPLANT AT THAr COAL BLOCK-I

k-ElECtriC limitEd

ENvIrONMENTAL IMPACT ASSESSMENT OF 660 MW COAL FIrEd POWErPLANT IN POrT QASIM, KArACHI

China PEtrolEum PiPElinE EnginEEring CorPoration ComPany

ENvIrONMENTAL & SOCIAL IMPACT ASSESSMENT (ESIA) STUdY OF GWAdAr - NAWABSHAH LNG TErMINAL &

PIPELINE PrOJECT

Emaar PakiStan

ENvIrONMENTAL IMPACT ASSESSMENT FOr dEvELOPMENT OF CrESCENT BAY KArACHI (CBK) PrOJECT

frontiEr WorkS organization

ENvIrONMENTAL IMPACT ASSESSMENT OF KArACHI – THATTA dUAL CArrIAGEWAY

attoCk CEmEnt PakiStan limitEd

ENvIrONMENTAL IMPACT ASSESSMENT OF ATTOCK CEMENT LINE-III

WorkS & SErviCES dEPartmEnt, govErnmEnt of Sindh

ENvIrONMENTAL IMPACT ASSESSMENT OF GHOTKI KANdHKOT BrIdGE PrOJECT

invar intErnational holding inC.

ENvIrONMENTAL IMPACT ASSESSMENT STUdY FOr dEEP CONvErSION PETrOLEUM rEFINErY IN POrT QASIM,

KArACHI

Sindh Coal authority

WATEr MASTEr PLAN FOr THAr COALFIELd INCLUdING HYdrOGEOLOGICAL, WATEr SUPPLY ANd

WASTEWATEr MANAGEMENT STUdIES

minES & minEralS dEvEloPmEnt dEPartmEnt, govt of Sindh

ENvIrONMENTAL IMPACT ASSESSMENT dUE TO MINING ACTIvITIES IN SINdH

CrEEk dEvEloPErS Pvt limitEd

MONTHLY MONITOrING OF THE ArKAdIANS

bahria toWn Pvt limitEd

MONTHLY MONITOrING OF BAHrIA ICON CLIFTON

galaxy ConStruCtionS (Pvt) limitEd

MONTHLY MONITOrING OF HOSHANG PEArL APArTMENTS

galaxy ConStruCtionS (Pvt) limitEd

MONTHLY MONITOrING OF OPAL 225 MIXEd-USE BUILdING PrOJECT

Engro ElEngy tErminal limitEd (EEtl)

MONTHLY MONITOrING OF FAST TrACK LNG PrOJECT (OPErATIONS)

WORK IN HAND

CO

MP

AN

Y P

rO

FIL

E

Page 45: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 42

gEtz Pharma (Pvt.) limitEd

MONTHLY MONITOrING OF GETZ PHArMA

PakiStan intErnational bulk tErminal limitEd (Pibt)

MONTHLY MONITOrING

afroz tExtilE

MONTHLY MONITOrING

luCky CEmEnt limitEd

MONTHLY MONITOrING

yunuS tExtilE millS

MONTHLY MONITOrING OF UNIT 1, 2 & 3

PhiliP morriS PakiStan limitEd (formErly lakSon tobaCCo ComPany ltd)

MONTHLY ENvIrONMENTAL MONITOrING (SAHIWAL-UNIT)

PhiliP morriS PakiStan limitEd (formErly lakSon tobaCCo ComPany ltd)

MONTHLY ENvIrONMENTAL MONITOrING (KOTrI-UNIT)

atlaS mEtalS Pvt limitEd

MONTHLY ENvIrONMENTAL MONITOrING OF USEd LEAd ACId BATTErY rECYCLING PLANT PrOJECT

(OPErATIONS)

javEdan CorPoration limitEd

MONTHLY ENvIrONMENTAL MONITOrING OF NAYA NAZIMABAd

WORK IN HAND

CO

MP

AN

Y P

rO

FIL

E

Page 46: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 43

CliEnt/loCation: jiCa - karaChi

PrOJECT: BASIC SUrvEY ON ENvIrONMENTAL ANd SOCIAL CONSIdErATION FOr

PrOJECT IMPrOvEMENT OF NATIONAL HIGHWAY N5 IN KArACHI CITY

SCOPE: The survey was undertaken by EMC with an objective to collect

basic information on the important environmental and social aspects

of the project area which comprised 14.5 km section of N5 and its

immediate vicinity along the road length. The information thus

collected will be used for further preparation of EIA/rAP to be done

in Preparatory Survey.

CliEnt/loCation: un-habitat - iSlamabad

PrOJECT: BASELINE STUdY FOr SOLId WASTE MANAGEMENT IN ISLAMABAd

(SECTOr 1-9 & 1-10)

SCOPE: Conducting Baseline Study for Solid Waste Management in

Islamabad (Sector 1-9 & 1-10), Pakistan which will focus on the

waste generated by households, small businesses and vegetable

and fruit markets in the sectors

CliEnt/loCation: omv(PakiStan) ExPloration & ProduCtion g.m.b.h

PrOJECT: WATEr CONSErvATION STUdY AT OMv KAdANWArI GAS FIELd

SCOPE: review and benchmark OMv’s water consumption status. Identify

tangible water reduction (hardware and software issue such as

training and conservation campaign). Identify options for utilization

of ground water (through water treatment options).

develop a 3-5 years rolling plan to achieve the progressive

reduction in water conservation particularly in surface water

resources.

CliEnt/loCation: jiCa - karaChi

PrOJECT: SUPPLEMENTAL FEASIBILITY STUdY ON rEvIvAL OF KArACHI CIrCULAr

rAILWAY

SCOPE: The Supplemental Study on KCr presents the results of various

investigations and development plans along with cost estimations

under the broad categories viz. Socio-economic Survey of the Host

Population, Stakeholders’ Consultations and Information disclosure,

review of Earlier Investigations and related Studies, Environment

and Social Profile of the resettlement Site, results of Engineering

and Physical Surveys, resettlement Site development Plan and

Infrastructure Conceptual design, Cost Estimates, Project

development and Management Plans, and Socio-Economic and

Financial Analysis. Based on all these investigation reports and

plans, a layout for the resettlement Site for PAPs was prepared,

development of the site planned and practicality of the plan and

sustainability of long term functioning and maintenance of the

resettlement examined.

STUDIES

CO

MP

AN

Y P

rO

FIL

E

Page 47: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 44

CliEnt/loCation: Sindh WildlifE dEPartmEnt - govErnmEnt of Sindh, jamShoro

diStriCt – Sindh

PrOJECT: BASELINE STUdY OF KIrTHAr PrOTECTEd ArEA COMPLEX

SCOPE: A comprehensive baseline study was carried by Environmental

Management Consultants for Kirthar Protected Area Complex

(KPAC). The KPAC ecosystem comprises a system of mountains

and valleys. The mountains and valleys are largely wasteland.

The mountains still support a rich variety of plants, mammals,

reptiles, amphibians, fishes and invertebrate species. The valleys

have some 40,000 ha as agricultural land, where natural

vegetation has been replaced by cropland and does not support

rare or threatened plant species. Most of the plants species

present on such agricultural land are cultivated.

The habitats that still support the biodiversity of plant and animal

species are nevertheless face to face with threats from each of

the following parameters:

• Climate Change

• Human population

• Land conversion

• Agriculture

• Over harvesting

• Soil erosion

The loss of biodiversity is however, mainly the result of

impoverishment of resources, which has been induced by:

• recurring episodes of drought and an overall scarcity of rainfall

• Scarcity of surface water and hence over excavation of

groundwater. Climate change has been held largely responsible

for aridity of the environment and desiccation of soil. Additionally

drought conditions and excavation of groundwater from deep down

resources has reduced the availability of water in the root zone of

the plants. This has been going on for decades and that may be the

reason for dwarfing of all the tree species, and for coalescing of the

tree rings, which suggests that the root zone has remained deprived

of its share of water for a considerably long time.

Over exploitation of the already meager resources has now become

the way of life in KPAC since the land area is being expanded for

agriculture. This requires land clearing and the subsequent removal

of vegetation which includes some rare species that are considered

as weeds and of no commercial value.

Water being made available in the core habitat of the wildlife in

particular the large mammals, is being shared by the herds of

livestock whose population has been growing to the extent of being

2 livestock heads per capita.

Availability of green agricultural crops in the land area near the

wildlife habitats has induced the small mammals to encroach on

the agricultural fields. descending of the small mammals to lower

STUDIES

CO

MP

AN

Y P

rO

FIL

E

Page 48: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 45

levels has in certain cases prompted the large mammals to descend

to lower levels and thus encroach on others habitat.

The process of land degradation and loss of habitat has been

intensified during the last decade. The plant and wildlife species

are being lost due to i) increasing rate of deforestation, ii) expansion

in its agricultural area, and iii) development activities being based on

greed rather than need.

CliEnt/loCation: miniStry of tExtilE induStry, govErnmEnt of PakiStan, iSlamabad

PrOJECT: NATION-WIdE MAPPING OF INdUSTrIES TO ANALYZE THE rEQUIrEMENT

OF COMBINEd EFFLUENT TrEATMENT PLANTS (CETPS)

SCOPE: Ministry of Textile Industry has proposed:

1) Nationwide mapping study of the entire textile sector to identify

current provisions and need to introduce the interventions,

2) Prioritize future interventions,

3) Make a comprehensive policy proposal on environmental

compliance by the industry,

4) Analyze requirement of setting up Combined Effluent

Treatment Plants (CETP) s for environmental compatibility of the

industry and monitoring their performance.

Environmental Management Consultants, Pakistan has been

assigned to undertake a comprehensive study to accomplish these

tasks.

CliEnt/loCation: jiCa, karaChi

PrOJECT: STUdY ON SOCIAL ENvIrONMENT (SOSE) FOr KArACHI TrANSPOrTATION

IMPrOvEMENT PrOJECT

SCOPE: The Study for Karachi Transportation Improvement Project (KTIP)

has proposed 1) the 18 km long radial Corridor 01 to start from

Guru Mandir and to conclude at Surjani, 2) the 14.5 km long

Circular Corridor 2 to start from Singer Chowrangi and end at

NaganChowrangi, 3) the 15.5 km long radial Corridor 3 to begin

from Guru Mandir and end at Saforah Goth, 4) the 14.5 km long

Circular Corridor 4 to start from Cantt Station and terminate at

Singer Chowrangi, while 5) the 16.5 km long radial Corridor 6 to

operate between Tower and New SabziMandi.

The Study has offered the following four systems for public

consideration:

• Bus rapid Transit (BrT),

• Light rail Transit (LrT)

• Mono rail Transit and

• Metro rail Transit (MrT).

The Karachi Transportation Improvement Project is in line with

several national, provincial, and local policy frameworks that

highlight the need for enhancing Karachi’s urban transport network.

STUDIES

CO

MP

AN

Y P

rO

FIL

E

Page 49: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 46

CliEnt/loCation: karaChi urban tranSPort CorPoration (kutC), karaChi

PrOJECT: rESETTLEMENT ACTION PLAN (rAP) FOr rEvIvAL OF KArACHI

CIrCULAr rAILWAY

SCOPE: The revival of Karachi Circular railway has been proposed by

Karachi Urban Transport Corporation (KUTC), Pakistan railway

with the Assistance of Japan International Cooperation Agency

(JICA). The land for project is under the ownership of Pakistan

railway (Pr) but has been illegally encroached by large number

of squatter families. As per the National resettlement Policy and

Social Consideration Guidelines of JICA for International Funded

Projects, proper resettlement/relocation of the affected families

is very important

CliEnt/loCation: karaChi urban tranSPort CorPoration (kutC), karaChi

PrOJECT: SPECIAL ASSISTANCE FOr THE PrOJECT FOrMULATION (SAPrOF)

FOr IMPLEMENTATION OF KArACHI CIrCULAr rAILWAY (KCr) PrOJECT

SCOPE: This Framework of resettlement Action Plan is intended to

provide the project proponent of JICA funded project a planning

method of appropriate involuntary action plan for resettlement

arrangement. Thereby KUTC as a project proponent would be able

to develop appropriate resettlement Action Plan, or rAP.

Within the framework of rAP, Project Affected Persons (PAPs)

should be well informed of the result of social environmental

impact study, project proponent’s intention of resettlement

arrangement in advance of project implementation. Thereby

disseminated information to the PAPs will be able to consider over

time an appropriate psychological preparedness among the PAPs

in respect of resettlement activities

STUDIES

CO

MP

AN

Y P

rO

FIL

E

Page 50: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 47

CliEnt/loCation: Sindh tranSmiSSion & diSPatCh ComPany (StdC)/nooriabad PoWEr

Plant to k-ElECtriC grid Station at kda SChEmE 33

PrOJECT: ENvIrONMENTAL & SOCIAL IMPACT ASSESSMENT OF 132Kv

TrANSMISSION LINE FrOM NOOrIABAd POWEr PLANT TO KdA GrId

STATION

SCOPE: Electric Power will be generated and transmitted through newly

build overhead transmission line of about 95 km from 100 MWs

Nooriabad Power Plant to KdA Scheme-33, Karachi. The line route

is planned keeping in mind the less possible right-of-way section for

the line. Total 500 lattice steel towers will be erected to support the

conductor wires. A total of 66 angle towers (out of 500) will be

installed to divert the line according to the proposed route

CliEnt/loCation: jiCa/kmC/from quaidabad bridgE to StEEl mill intErSECtion

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF CONSTrUCTION &

rEHABILITATION OF NATIONAL HIGHWAY (N-5)

SCOPE: The Project intend to utilize Japan’s Grant Aid to widen the

Quaidabad- Pakistan Steel Intersection of N5 from 4 lanes to 6

lanes for approx. 11km, rehabilitate the pavement and construct

service roads and facilities for traffic management and safety

The existing rOW of 150ft (45.7m) is effectively utilized in

determining the road cross section. The cross section is composed

of 6 lane carriageway whose width is 3.65m per lane and the

service road having enough width for dual traffic. Also a green belt

made of planted trees is provided at the road edge so that rOW

can be clearly identified.

CliEnt/loCation: frontiEr WorkS organization/StartS off at km 13+000 (ProjECt

ChainagE 0+000) of thE nha PoSitionEd undEr thE

flyovEr/intErChangE ProvidEd for thE lyari ExPrESSWay on thE

lyari rivEr and EndS at 149+000 (ProjECt ChainagE 136+000) in

thE CloSEnESS of thE ClovEr lEaf intErChangE WhiCh iS PrESEnt on

thE hydErabad byPaSS

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF KArACHI – HYdErABAd

MOTOrWAY (M9)

SCOPE: The proposed 136 Km Karachi-Hyderabad M-9 project starts off at

Km 13+000 (Project Chainage 0+000) of the NHA positioned under

the flyover/interchange provided for the Lyari Expressway on the

Lyari river and ends at 149+000 (Project Chainage 136+000) in the

closeness of the clover leaf interchange which is present on the

Hyderabad Bypass.

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 51: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 48

The objective of the project is to:

• Strengthen the existing road infrastructure

• Construct existing 4-Lane Karachi-Hyderabad Superhighway as 6-

lane, access controlled in order to provide world class Motorway

(M-9) along with its associated facilities

• design and construct bridges, culverts and underpasses where

necessary

• Provide helpline services, services area and other motorway

facilities

CliEnt/loCation: luCky ElECtriC PoWEr ComPany limitEd/Port qaSim, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF 660 MW COAL FIrEd POWEr

PLANT

SCOPE: The proposed (1x660MW) Lucky Electric Coal Power Project

(LECPP) will be established over an area of 250 acres of land

acquired from Sindh Bor in deh Ghangiaro, Bin Qasim Town,

Karachi.

The main components of the proposed project include:

• Coal Handling System including dust Extraction and Supression

System

• Steam Generator, Turbine Generator and Auxiliary Units

• Cooling Water System

• Water & Effluent Treatment System

• Fire Protection System

• Air Conditioning & ventilation System

• Electrostatic Precipitators, Low NOx Burners, FGd

• A 200 meters high stack

• Ash Handling System with dry Ash Extraction & Temporary

Storage Facilities

• Electrical Systems: Generator Bus duct, Transformers,

Switchgears, Switch Yard etc

CliEnt/loCation: national tranSmiSSion & diSPatCh ComPany/jamShoro diStriCt,

Sindh

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF 500 Kv TrANSMISSION LINES

FOr LAKHrA COAL FIrEd THErMAL POWEr PLANT CONSTrUCTION

PrOJECT

SCOPE: The project comprises the following associated facilities including

the main power plant including ash pond, water intake & discharge

pipeline, water pump station and two access roads. The project also

includes 500 kv Transmission Lines (1.2 km x 2 and 4.2 km x2)

connecting to the existing transmission lines.

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 52: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 49

The main objectives of the Project are:

• respond to the urgent need to close the yawning gap between

power generation and demand

• Provide an economically viable and environmentally acceptable

power generation system to make the coal available for use in

power production, in view of the wide gap between supplies of

fossill fuel and demand.

• Ensure stable power production system for the country

• respond to the need of improvement in quality of life through

sustainable Energy resource development

CliEnt/loCation: SPECial ProjECt managEmEnt unit, miniStry of CommuniCation,

goP/ muniCiPal Park, Saddar to kESC PoWEr houSE ChoWrangi,

Surjani, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF GrEEN LINE rAPId TrANSIT

SYSTEM

SCOPE: The Project start point is at KESC Power House to the traffic study

in Surjani from where it runs southwards through Khwaja

Shamsudin Azeemi road toward Nagan Chowrangi along Shareh-

e-Usman. From Nagan Chowrangi it runs along Sharah-e-Sher

Shah Suri (South westerly) onto Nawab Siddiq Ali Khan road

through Nazimabad Petrol Pump intersection proceeding towards

Lasbella Chowk. At Lasbella Chowk the route turns South

eastwards onto Business recorder road and runs upto Guru

Mandar. On crossing Guru Mandar the Green Line route turns

south westward onto M. A. Jinnah road. The route westwards

crosses Numaish and reaches the Municipal Park.

CliEnt/loCation: CommuniCation & WorkS dEPartmEnt, govErnmEnt of Punjab/

Punjab

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF dUALIZATION OF FAISALABAd

BYPASS (rING rOAd) & FAISALABAd TO CHINIOT rOAd

SCOPE: The major improvements conceived under the road Improvement

Plan are outlined hereunder:

a) The Project targets to dualized and improved the existing road

of both Packages I and II as divided 2-lane road with median and

shoulders

b)Strengthen the road pavement structure to sustain heavy loads

c) Checking and verification of conditions of existing bridges and

culverts

d) Improvement of Geometrics of alignment, where required,

conditions are improved to cope with horizontal & vertical

clearances, improvement of the horizontal curves, stopping and

passing sight distances, steep grades and sharp curves to comply

highway standards

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 53: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 50

CliEnt/loCation: CommuniCation & WorkS dEPartmEnt, govErnmEnt of Punjab/

Punjab

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF dUALIZATION OF BAHAWALPUr -

HASILPUr - BAHAWALNAGAr rOAd

SCOPE: In Package II, two roads will be dualized one of which includes the

Hasilpur to Bahawal nagar road with a reported length of 80 km.

the Hasilpur to Bahawalnagar road starts at the outskirts of

Hasilpur city where the existing dual carriageway terminates and

single lane carriageway (both direction) starts. The project road

ends in the built-up area of Bahawalnagar city at Bhawali Chowk.

The major improvements conceived under the road Improvement

Plan are outlined hereunder:

a) The Project targets to dualized and improved the existing road of

Package II as divided 2-lane road with median and shoulders

b) Strengthen the road pavement structure to sustain heavy loads

c) Checking and verification of conditions of existing bridges and

culverts

d) Improvement of Geometrics of alignment, where required,

conditions are improved to cope with horizontal & vertical

clearances, improvement of the horizontal curves, stopping and

passing sight distances, steep grades and sharp curves to comply

highway standards

e) Improvement of traveling conditions to ensure design speed of

100 km/hour for rural areas and 70 km/hour for urban areas

CliEnt/loCation: CommuniCation & WorkS dEPartmEnt, govErnmEnt of Punjab/

Punjab

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF dUALIZATION OF SHEIKHUPUrA -

GUJrANWALA rOAd

SCOPE: Sheikhupura to Gujranwala road is 45 km in length. The project

road starts at end of flyover ramp over Motorway M-2 near

Sheikhupura city ends at flyover crossing (GT road crossing) near

Gujranwala city.

a) To dualize and improve the existing roads included in Packages I

& II as divided 2-lane road with median and shoulders

b) Strengthen the road pavement structure to sustain heavy loads

c) Checking and verification of conditions of existing bridges and

culverts

d) Improvement of Geometrics of alignment, where required,

conditions are improved to cope with horizontal & vertical

clearances, improvement of the horizontal curves, stopping and

passing sight distances, steep grades and sharp curves to comply

highway standards

e) Improvement of traveling conditions to ensure design speed of

100 km/hour for rural areas and 70 km/hour for urban areas

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 54: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 51

CliEnt/loCation: induS hoSPital/korangi CroSSing

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF 132 Kv SUPPLY LINE

SCOPE: The Indus Hospital Expansion project is in progress which

envisages higher demand for electricity to run its various facilities.

The proposed 132 kv Supply Line for Indus Hospital Korangi has

been planned to meet the demands. The Expansion will require ca

8MW for Phase I which is foreseen to be operational in the year

2018 and around year 2025 ca 16MW will be needed when Phase

III of The Indus Hospital Master Plan will e operational.

The Indus Hospital facilities, which will be supplied from existing

132 kv KE PrL Grid Station, via underground 132 kv cable. The

proposed 132 kv Supply Line for The Indus Hospital includes:

• Addition of a 132 kv HIS Line Bay at KE PrL Grid Station

• Underground Transmission Line between KE PrL Grid Station and

the proposed Indus Hospital’s Grid Station

• Construction of a dedicated 132 kv GIS Grid Station at The Indus

Hospital

CliEnt/loCation: SiddiqSonS EnErgy limitEd/Port qaSim, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF 350MW COAL POWEr PLANT

PrOJECT

SCOPE: The project includes a completely developed project including the

engineering, design, procurement, construction, commissioning

and operation of the plant, including a pulverized coal (PC)

generating plant, supercritical therma cycle, once through

sea-water cooling, single concrete chimney, air and water quality

controls (fabric filter baghouse and seawater flue gas

desulfurization (FGd) system), coal truck unloading and coal

storage facilities, ash disposal, balance-of-plant equipment

including all buildings and internal roads to provide a complete

power generation facility.

CliEnt/loCation: CrEEk dEvEloPErS Pvt limitEd/zulfiqar StrEEt no.1, oPPoSitE

dha Country & golf Club, PhaSE-viii, dha, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF THE ArKAdIANS

SCOPE: The Arkadians comprises 13 residential towers (32 and 24 storey

high), six office enclaves and a shopping mall in Zone G of the

Waterfront development Area.

This high-end development spanning over an area of 43.24 acres

comprises of high-rise to mid-rise residential towers, office towers

and a retail component supported with high-quality infrastructure,

ample car parking and recreational facilities.

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 55: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 52

CliEnt/loCation: bahria toWn (Pvt) limitEd/taluka naWabShah, diStriCt ShahEEd

bEnazirabad

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF BAHrIA GArdEN CITY

SCOPE: Bahria Garden City Nawabshah Project is a well planned project.

The proposed project has residential and commercial plots catering

for different needs of different classes of people. The residents

would have state of art facilities such as parks, school, hospital,

sports grounds mixed with open spaces, public buildings, roads

and parking etc.

The project is proposed to have 1199 residential and 125

commercial plots and 52 one bedded & 668 two bedded

Apartments of different sizes.

CliEnt/loCation: PakiStan atomiC EnErgy CommiSSion (PaEC)/ParadiSE Point,

karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF OF K-2/K-3 PrOJECT

SCOPE: The Karachi Nuclear Power Project(K-2/K-3) to be installed near

Paradise Point has two Generation-III NPPs of Pressurized Water

reactor (PWr) type each having capacity of 1100MW. The two

NPPs are expected to be connected with the National Grid by

2020/2021.

Some of the important design features of K-2/K-3 NPPs are:

• Seismic design against peak ground acceleration of 0.3g

• Combination of active and passive safety design features

• Integrated feedback of Fukushima accident

• double shell reactor containment building with enlarged free

volume

• defence against large commercial aircraft crash

The main building/civil structures of the plant are given below:

• reactor Building

• Fuel Building

• Electrical Building

• Safeguard Building

• Nuclear Auxiliary Building

• Turbine Building

• Nuclear Waste Building

• diesel Gnerator Building

• Turbine Building

• 500kv and 132kv GIS Building

• Switchyard Control Building

• demineralized Water Building

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 56: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 53

CliEnt/loCation: gWadar Port authority/gWadar Port

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF GWAdAr POrT EASTBAY

EXPrESSWAY

SCOPE: The 4.3 km Expressway will be constructed along the castline

having a road of 6 lanes of 45 meter right of Way (roW). The

proposed expressway is dedicated for the operations of heavy

cargo traffic of Gwadar Port. The route of the expressway will be

enclosed and connected with the Free Zone of Gwadar Port.

The proposed project will integrate Gwadar Port with Makran

Coastal Highway and connects the Free Trade Zone with Future

Conatiner Terminal.

CliEnt/loCation: aWan trading Co. Pvt limitEd/karaChi Port truSt, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF KPT COAL YArd

SCOPE: KPT Coal Yard is mainly a storage and handling facility. Coal

handled at the yard is imported coal. It is imported via vessels

which berthed at Karachi Port Berths. Coal will be transported from

the vessels via trucks and stored in the project site in the form of

heaps which are created via bucket loaders. during storage, coal

will be wetted through seawater to avoid spontaneous combustion

and coal dust emissions. After storage, coal will be dispatched

through trucks covered with Tarpaulin to the customers

CliEnt/loCation: Sindh Coal authority, govErnmEnt of Sindh/thar Coal bloCk-ii

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF 50 CUSEC drAINAGE LINE

SCOPE: The project involves construction of an integrated effluent disposal

pipeline; it outlines the laying of a 1.2m diameter pipeline with an

approximate length of 37.5 km from Thar coal block-II. The

proposed facilities would have the capacity of transporting

approximately 50 cusecs of effluent water. This effluent consists of

groundwater extracted during mining and does not contain

impurities due to anthropogenic activities

CliEnt/loCation: bahria toWn PrivatE ltd/9 km from toll Plaza, SuPEr highWay,

mda SECtor 117-118, diStriCt malir, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF INFrASTrUCTUrE dEvELOPMENT

FOr BAHrIA TOWN KArACHI

SCOPE: The project site is situated around 9 km from the Toll Plaza, Super

Highway, MdA Sector 117-118, district Malir Karachi and 40 km

from the city centre. The project site is approximately 6,200 acres

in area and will accommodate around 450,000 residents.

The project constitutes the following major components:

• Master-planned Gated Community

• Advanced Security & rescue Services

• 5-star International Hotel & USGA standard 18 hole Golf Course

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 57: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 54

• Commercial Areas

• Gold-Class Cinemas

• State-of-the-art Sports Facilities

• World-class School, College and International University

• International standard Hospital

• International Theme Park, Play-land and Water rides

• Wonders of the world monuments (Eiffel Tower, Taj Mahal and

Statue of Liberty)

• Jamia Mosque

• High-rise Commercials

• Lakes

• Zoo & Botanical Garden

• 400ft Wide Jinnah Avenue

• Landscaped Parks

CliEnt/loCation: karaChi mEtroPolitan CorPoration/bahria toWn to toWEr

(bluE linE), karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF PrOPOSEd BUS rAPId TrANSIT

PrOJECT

SCOPE: The project comprises construction and operation of BrT (Blue

Line) which will connect Bahria Town to M.W. Tower. The main

route of BrT passes through 27.4 km corridor along existing M-9

from its commencement point in Bahria Town up to Sohrab Goth.

The rest 14.5km is planned within center median along Shahrah-e-

Pakistan, S. M. Toufeeq road, Jahangir road and M.A. Jinnah

road up to M.W. Tower. The total main route length along main

alignment is 41.9 km.

While, the link route of BrT facilitates linkage of Bahria Town with

Quaid-e-Azam International Airport. The link alignment also

intersects with BrT red Line at Malir Cantt. Check post No. 6. The

total link route length is 11.5 km, from its origin at Karachi Airport

to termination point at Super Highway, where it meets Blue Line

main alignment.

CliEnt/loCation: dha – brEntWood Pvt. ltd/Sahil avEnuE, Clifton, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF “THE SHOrE”

SCOPE: The proposed project is located at Sahil Avenue on two plots a

high-rise development comprising five towers. There is 60 feet

wide Khayaban-e-Iqbal between two plots i.e. East Wing and

West Wing. East Wing Plot area measuring 11220.32 Sq.yds

entailing construction of two 24 storey residential and one 20

storey office tower and West Wing Plot area measuring 11426.40

Sq.yds where another 24 storey residential towers will be

constructed, each tower having a mall and recreational area on G,

1st and 2nd Floors

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 58: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 55

CliEnt/loCation: gEtz Pharma (Pvt) ltd/korangi induStrial arEa

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OFPrOPOSEd GETZ PHArMA UNIT IIPrOJECT

SCOPE: The proposed project comprises of construction of a best-in-class facility for secondary manufacturing of multi dosage forms. The proposed facility will have separate buildings for the manufacturing of:• Solid & Liquid dose Products• Injectables• Metered dose Inhalers• Penicillin Products• Cephalosporin Products

CliEnt/loCation: oil & gaS dEvEloPmEnt ComPany ltd (ogdCl)/kyhbEr

PakhtunkhWa

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OFNASHAP dEvELOPMENT PrOJECT:CHANdA MELA & NASHPA dEvELOPMENT & PrOdUCTION LEASES (d & PLS)

SCOPE: The proroject would span over three functionally distinct phases based on the nature of activities:Phase I: Separation of oil & gas including oil stabilization and dispatch facility at MelaPhase II: Construction of a trunk line for gas transportation from Mela to NashpaPhase III: Gas Processing, LPG recovery/Extraction Plant and Allied Facilities at Nashpa Oil FieldProcessing of raw gas at Nashpa and separator gas at Mela would yield LPG, Sales Gas and Stabilized Condensate as final products. The anticipated production capacity at the Nashpa facility is as under:1. 90MMSCFd (sales gas + fuel gas)2. 16800* Barrel/day of Condensate3. 1120 Barrel/day of NGL4. 373 Ton/day of LPG5. 1 Ton/day of Propane

CliEnt/loCation: karaChi mEtroPolitan CorPoration (kmC)/Clifton, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OFGrAdE SEPArATEd TrAFFIC

IMPrOvEMENT PLAN FrOM PArK TOWEr INTErSECTION TO A.T. NAQvI

rOUNdABOUT

SCOPE: The proposed Traffic Improvement Plan Comprises:i) Flyover along 26th Street,/Shahrah-e-Firdausi providing for uninterrupted traffic movements along Sharah-e-Firdausi from dHA/Khayaban-e- Ittehad side towards A.T. Naqvi Chowk (Intersection) and onwards to Bin Qasim Park along with a direct access to the Bahria Town IconTower by means of an exclusive down rampii) Improved traffic management at A.T. Naqvi Chowk under the

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 59: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 56

above Flyoveriii) Underpasses for entry/exit movements to/from Bahria Town IconTower and Clifton Funland without any interruption to the through movements on main Shahrah-e-Firdausiiv) Interchange between Shahrah-e-Iran and Shahrah-e-Firdausi near Park Towers Intersection leading to 2-Talwar Intersection.v) Other at-grade improvements for better traffic management in theentire areavi) Provision of a number of grade-separated pedestrian crossings at important locations

CliEnt/loCation: k-EnErgy (Pvt) ltd, bqPS-1/Port qaSim, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OFBIN QASIM COAL CONvErSION

PrOJECT

SCOPE: The Proposed Project includes conversion of two fuel oil fired

boilers to coal fired boilers and installation of two new generation

units at BQPS-1. In addition to the new boilers, the conversion

project includes the facility for coal handling comprising the

following units:

• An open coal storage area surrounded by wind shield

• Conveyor hopper for delivery to the fuel converted units

• Coal handling covered conveyors

• Coal crusher and local conveyors in the open storage area

• Truck unloading system

• Water treatment facilities

• Condensate polishing equipment

• Ash electrostatic precipitator(s) with ash handling conveyors

• Bottom ash handling conveyors

• Ash storage silo

• Ash Pond

• dust prevention, and fire monitoring and prevention facilities

CliEnt/loCation: ElEngy tErminal PakiStan ltd (EtPl)/Port qaSim, karaChi

PrOJECT: ENvIrONMENTAL & SOCIAL IMPACT ASSESSMENT OF PrOPOSEd LNG

IMPOrT TErMINAL PrOJECT

SCOPE: The project includes constructing and operating a Liquefied

Natural Gas (LNG) terminal in Port Qasim, inclusive of ship

berthing and import facilities, floating storage tanks and

regasification equipment. The project intends to provide facilities

for receiving supplies of LNG via a conventional LNG carrier,

for offloading, transfer an loading into a Floating Storage and

regasification Arrangement (FSrA) which can be an FSrU, or

FSU+ On Shore regasification, or FSU + on barge regasification.

The FSrA will store and re-gasify the LNG and deliver the

regasified liquefied natural gas (rLNG) via jetty and onshore

associated facilities to the gas network operated by the in country

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 60: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 57

transmission pipeline providers.

The ESIA has been prepared to fulfill the regulatory requirements

of Pakistan Environmental Protection Act, 1997and to satisfy the

evaluation criteria of the World Bank and International Finance

Corporation (IFC).

CliEnt/loCation: unitEd EnErgy PakiStan ltd (uEPl)/Sanghar South bloCk

(ProtECtEd arEaS)

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF drILLING & ASSOCIATEd

ACTIvITIES

SCOPE: UEP plans to conduct drilling of exploratory and development wells

in the Protected Areas of dSS Blocks. UEP has been granted

Sanghar Block (2569-3) & digri Block (2568-19) by the

Government of Pakistan for the purpose of oil and gas exploration.

Sanghar Block lies across the Sanghar and Khairpur districts,

while digri Block lies across the Mirpurkhas, Hyderabad, Badin,

Umerkot and Sanghar district of the Sindh Province.

The proposed activities will include the following:

• design and location of the exploratory and development well.

• Mobilization of the civil contractor and the drilling rig.

• design, construction, and operation of access road(s) to the

drilling site and camp.

• Well site preparation.

• Laying of flow lines.

• Establishment and operation of the site camp.

• Well drilling, testing, and all related activities.

• Establishment of Early Production and Testing Facilities.

• Well abandonment or well capping for future production and

site restoration.

• demobilization.

CliEnt/loCation: oil & gaS dEvEloPmEnt ComPany ltd (ogdCl)/kohat E.l.

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF EXPLOrATION ACTIvITIES

SCOPE: The project comprises of conducting a total of 26 seismic profiles

of varying length measuring 439 km to acquire 2d seismic

reflection data.The project shall be carried out in three phases

which fall in the following areas:

• Phase-I lies in settled area of district Kohat and approximately

8 km of one line (Line # KH 49) intrudes in the tribal area of Kohat

• Phase-II of the project area lies in settled area of district Kohat,

Hangu and some profiles are included in the Orakzai Agency Area

• Phase-III of the project area lies in district Kohat, tribal area of

Kohat, tribal area of district Nowshera and tribal area of Peshawar

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 61: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 58

CliEnt/loCation: dalda foodS (Pvt) ltd/ Port qaSim , karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF CANOLA OIL EXTrACTION UNIT

SCOPE: The process of manufacture includes Canola seed cleaning, seed

pre-conditioning and flaking, seed cooking, pressing the flake to

mechanically remove a portion of the oil, solvent extraction of the

press-cake to remove the remainder of the oil, and desolventizing

and toasting of the meal.

The plant will have a capacity to process ~ 300 TPd (Tons Per

day) of canola seeds and to produce ~ 125 TPd of crude canola

oil for subsequent refining. Cost of the project is estimated at PKr

800 million.

CliEnt/loCation: atlaS mEtalS (Pvt) ltd/landhi, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF USEd LEAd ACId BATTErY

rECYCLING PLANT

SCOPE: The project will be constructed on a plot 168,000 sq.ft of land

approximately. The project development will include site formation

works and construction of infrastructure including plant building

structures, drains, sewers and utilities for the proposed Used Lead

Acid Battery recycling and Smelting Plant.

The major units include: Battery Collection Area, Storing Area,

Battery Breaking Unit, Pyrometallurgical Process Units, Furnace

and Bag House Unit, Power House etc.

CliEnt/loCation: dSmE Co. ltd/Sonmiani bay, union CounCil gadani, diStriCt

laSbEla, baluChiStan

PrOJECT: ENvIrONMENTAL & SOCIAL IMPACT ASSESSMENT (ESIA) OF PAKISTAN

FLOATING LNG TErMINAL PrOJECT IN OFFSHOrE WATErS

SCOPE: The project intends to provide facilities for receiving, storing and

regasifying LNG via a conventional LNG carrier by a Floating

Storage and regasification Unit (FSrU). The FSrU will be located

offshore in Sonmiani Bay and will store and re-gasify the LNG and

deliver the re-gasified liquefied natural gas (rLNG) via subsea

pipeline and onshore associated facilities to the gas network

operated by the in-country transmission pipeline providers SSGCL

and SNGPL.

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 62: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 59

CliEnt/loCation: fauji oil tErminal & diStribution ComPany limitEd (fotCo)/

Port qaSim, karaChi

PrOJECT: ENvIrONMENTAL & SOCIAL IMPACT ASSESSMENT (ESIA) OF FLOATING

LNG TErMINAL PrOJECT

SCOPE The proposed project aims at providing the necessary infrastructure

facility to bring in LNG into the Natural Gas (NG) network. The

infrastructure for the LNG Terminal will comprise four main elements

(i) FSrU; (ii) Jetty, berth, loading arms and supporting infrastructure

to secure the FSrU and LNG supply vessel and offload LNG

supplies; (iii) dredged berthing basin and approach pockets, and (iv)

high pressure send out pipeline to connect to the appropriate gas

transmission grid in close proximity to Port Qasim

CliEnt/loCation: bandhi Sugar millS ltd/diStriCt ShahEEd bEnazirabad - Sindh

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF SUGAr MILL & COGENErATION

PLANT

SCOPE: Construction and operation of sugar mill (capacity 7000 TCd)

and 12MW bagasse fired power generation unit. The objective of

the project is to construct and operate sugar mill at Nawabshah,

Bandhi Sugar Mill has a robust system of managing processes

and controls, which will be applied to the proposed project as well

CliEnt/loCation: PaCifiC oil millS (Pvt) ltd/EaStErn induStrial zonE - Port

qaSim, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF PrOPOSEd EdIBLE OIL rEFINErY

SCOPE: The proposed project will be established to refine crude canola

oil by installing a modern refining plant. The refining unit is designed

for making best usage of raw material in manufacturing of edible oil

to avoid wastage. Another benefit of this refining unit is that the

majority of the units produce hydrogenated product “Banaspati”,

while the same are geared for producing and marketing the cooking

oils as such

CliEnt/loCation: nbt Wind PoWEr ii PakiStan (Pvt) ltd/union CounCil jhangri,

taluka jhimPir – diStriCt thatta

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF PrOPOSEd 250 MW WINd

POWEr PrOJECT II

SCOPE: The project site has about 30931 acres of Government and Private land in Union Council Jhangri – Taluka Jhimpir - district Thatta. The Project includes designing, testing, manufacturing and operation as well as maintenance of the Wind Farm comprising 166 wind turbines. Total project area of the Wind Farm occupies an area of approximately 2203.6 acres on 5 strips of land. Each strip of land is approximately 150 m wide by 10 km long and the land between the strips is 2 km wide.

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 63: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 60

CliEnt/loCation: nbt Wind PoWEr iii PakiStan (Pvt) ltd/union CounCil jhangri,

taluka jhimPir – diStriCt thatta

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF PrOPOSEd 250 MW WINd POWEr

PrOJECT III

SCOPE: The project site has about 30931 acres of Government and Private

land in Union Council Jhangri – Taluka Jhimpir - district Thatta.

The Project includes designing, testing, manufacturing and

operation as well as maintenance of the Wind Farm comprising 166

wind turbines.

Total project area of the Wind Farm occupies an area of approximately

2171.2 acres on 5 strips of land. Each strip of land is approximately 150

m wide by 10 km long and the land between the strips is 2 km wide.

The entire Project Area encompasses 30931 cares for both phases 1

(NBT II) is 15734 acres and for phase 2 (NBT III) is 15197 acres.

CliEnt/loCation: karaChi mEtroPolitan CorPoration (kmC)/Sharah-E-PakiStan,

karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF COrrIdOr v

SCOPE: Construction & Operation of following four flyovers at the intersections:

1. Flyover at Ayesha Manzil

2. Flyover at Water Pump

3. Flyover at dak Khana

4. Flyover at Teen Hatti

CliEnt/loCation: oil & gaS dEvEloPmEnt ComPany ltd/kunnar - diStriCt hydErabad

Sindh

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF KPd TAY INTEGrATEd dEvELOPMENT

PrOJECT

SCOPE: Kunnar gas/condensate field is located in Hyderabad district about 26

kilometers from Hyderabad City. The Gas Processing Plant will be

constructed adjacent to Company’s existing LPG plant. Project

comprises of Wellhead facilities, Gas Gathering System and Gas

Processing Plant. The gas processing plant shall treat 312 MMscfd raw

gas and with a design margin of about 10%, the entire facilities shall be

capable of handling and treating 340 MMscfd raw gas and the

associated Sales Gas, Condensate, LPG and Produced Water etc.

design margin for Condensate Storage and Loading System shall be

15% instead of 10%. The 312 MMscfd raw gas shall yield 284 MMscfd

Sales Gas, 4400bb/day condensate and 387 MT/day LPG.

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 64: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 61

CliEnt/loCation: d.j. buildErS & dEvEloPErS/bahadur yar jung CooPErativE houSing

SoCiEty ltd, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF SUMYA SILK

SCOPE: Sumya Silk comprising construction of residential & Commercial Complex on a commercial Block. Sumya Silk is a 15 storey residential cum commercial developement project comprising residential apartments offering3 categories: 1) shops at lower ground, ground 1st & 2nd floors 2) Parking on 3rd to 6th 3) Flats plus recreation area on 7th floor, & 8th to 15 floor for flats only on 1916sq.yd area.

CliEnt/loCation Ea ConSulting Pvt ltd

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT STUdY OF SHAHEEd BENAZIr BHUTTO

BrIdGE OvEr rIvEr INdUS CONNECTING CHACHrAN SHArIF TO MITHANKOT

SCOPE: The proposed ‘Shaheed Benazir Bhutto Bridge over river Indus connectingChachran Sharif to Mithankot’ is a part of Government’s approach to uplift the living standards of the local population and to provide ways of inancial growth for the people. The project would essentially be comprised of two major components, (i) Construction of the proposed Shaheed Benazir BhuttoBridge (ii) Construction of approach roads and associated structures

CliEnt/loCation: faraS fErtilizEr ComPany (Pvt) limitEd/Port qaSim authority, karaChi

PrOJECT: ENvIrONMENTAL IMPACT STUdY OF FArAS FErTILIZEr’S ACId MANUFACTUrING

PLANT

SCOPE: The proposed project site is located in Eastern Industrial Zone of Port Qasim

Authority. The proposed acid manufacturing plant will be established over an

area of 2 acres.

The proposed project is an integrated Acid Plant that will produce Sulphuric

Acid, Formic Acid and Sulphonic Acid. The major components of the project

include the following main manufacturing units and associated structures:

• Sulphuric Acid Plant

• Formic Acid Plant

• Sulfonic Acid Plant

• Other Associated Structures

CliEnt/loCation: agha StEEl induStriES/Port qaSim, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF AGHA STEEL MILLS

SCOPE: The proposed Agha Steel Mill will be established on a 10 Acres of plot of

land located at Port Qasim, Karachi.. The production capacity of this steel

manufacturing plant will be 2,50,000 Tons per Annum.

The project will comprise the following components:

• Meltshop for production of High/Low carbon, Stainless Steel Products and

cast billets

• rolling Mill for production of hot rolled bar and wire rod

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 65: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 62

CliEnt/loCation: binaPuri PakiStan (Pvt) limitEd/ExiSting 136 km karaChi-

hydErabad SECtion of national highWay n-5

PrOJECT: ENvIrONMENTAL & SOCIAL IMPACT ASSESSMENT (ESIA) OF KArACHI-

HYdErABAd MOTOrWAY (M-9)

SCOPE: The project starts off at Km 13+000 (Project Chainage 0+000) of

the NHA reference under the flyover/interchange provided for the

Lyari Expressway on the Lyari river and ends at Km 149+000

(Project Chainage 136+000) in the proximity of the clover leaf

interchange on the Hyderabad Bypass.

The proposed project involves rehabilitation of the existing

134.35 Km (Length reduced by 1.65 Km at Hyderabad end,

terminating before Hyderabad Interchange) of 4-Lane carriageway

both northbound and south-bound and construction of an

additional new lane on the inner side of the Highway wherever

technically feasible. Both rehabilitation and widening bound

carriageways will be divided by a New Jersey Barrier.

Extensions are to be made to all the existing bridge structures

and culverts. Four (4) bridges have an additional extension on

either sode accommodating service roads to allow local traffic to

negotiate land locked areas between canals

CliEnt/loCation: niPPon koEi Co. ltd, jaPan/karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT STUdY FOr KArACHI

TrANSPOrTATION IMPrOvEMENT PrOJECT

SCOPE: The project will be implemented on two priority corridors named

as “Green Line Corridor” and “red Line Corridor”

The 22 km long proposed Green Line corridor originates from

Surjani Town and Terminates at regal Chowk Saddar. This route

passes through major roads of Karachi having significant demand

of passengers including Sakhi Hassan round About, Sher Shah

Suri road (Board Office round About), Nazimabad Chowrangi,

Gulbahar/Golimar, Business record road (Lasbela), Gurumandir

to M.A. Jinnah road up to radio Pakistan/Jamia Cloth Market.

There are 28 stations and one depot proposed on this corridor.

The 21 km long proposed red Line Corridor originates from Model

Colony (Tank Chowk) and Passing through Check Post No.6 of

Malir Cantt, Safoora Mazar-e-Quaid/People’s Party Secretariat to

Preedy Street Extension, Empress Market terminating at regal

Chowk. There are 27 stations and two depots proposed on red line

corridor.Both Green and red Lines will operate up to Jama Cloth

Market on M.A. Jinnah road on Green Line and to regal Chowk

along New M. A. Jinnah road on the red Line. This will avoid the

transfer between two lines near the center of the city.

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 66: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 63

CliEnt/loCation: nbt Wind PoWEr PakiStan (Pvt) limitEd/dhabEji

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT STUdY OF 100 MW NBT WINd

POWEr PrOJECT

SCOPE: The project has about 1500 Acres of SZABIST land in dhabeji on

the outskirts of Karachi. The project includes designing, testing,

manufacturing and operation as well as maintenance of wind

turbines.

The project includes installation and operation of 33 wind turbines

in Phase-I for the production of 50 MW. Phase-II comprises

installation of another 33 wind turbines and generation of 50 MW.

The total capacity generation will then be raised to 100 MW.

CliEnt/loCation: Sino-Sindh rESourCES/Sinhar vikian varvai, bloCk-1

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT STUdY OF THAr COAL MINING

PrOJECT

SCOPE: The project aims at mining of coal from Thar Coal field Block-1 for

power generation of 900 Mega Watts (MW)s. The main objective

of the Thar Coal Mining Project Block-1 is to develop the coal field

resource for power generation for energy and economic security

of the country.

CliEnt/loCation: oil & gaS dEvEloPmEnt ComPany ltd (ogdCl)/dakhni m.l

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT STUdY FOr OIL & GAS

EXPLOrATION

SCOPE: The seismic data acquisition will be carried out using a

combination of vibroseis and dynamite technologies.

The 2d seismic operation is estimated to span over a period of

4-6 months. The objective of the seismic survey is to explore the

subsurface in the area to identify hydrocarbon laden formations.

CliEnt/loCation: oil & gaS invEStmEntS ltd (ogil)/baran bloCk

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT STUdY SEISMIC SUrvEY

SCOPE: The proposed exploration activities include the acquisition of

approximately 400 line km of 2d and 100 sq. km of 3d seismic

survey in the Baran block. The seismic data acquisition will be

carried out using a combination of vibroseis and dynamite

technologies. The 2d and 3d seismic operation is estimated to

span over a period of 4 months for both 2d and 3d seismic

surveys.

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 67: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 64

CliEnt/loCation: oil & gaS dEvEloPmEnt ComPany ltd/fatEhjang bloCk

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT STUdY FOr PrOPOSEd

EXPLOrATION ACTIvITIES

SCOPE: The proposed exploration activities include the acquisition of

approximately 800-1000 line km of 2d seismic survey in the

Fatehjang block. The seismic data acquisition will be carried out

using a combination of vibroseis and dynamite technologies

The 2d seismic operation is estimated to span over a period of 4

months.

CliEnt/loCation: PakiStan intErnational bulk tErminal (Pibt)/Port qaSim,

karaChi

PrOJECT: ENvIrONMENTAL & SOCIAL IMPACT ASSESSMENT OF COAL CLINKEr &

CEMENT TErMINAL

SCOPE: In a two phase development, PIBT will build capacity for handling

up to 4 million tons per annum of coal, cement and clinker in

Phase I development. Handling capacity at additional 4 million

tons will be developed in Phase II.

At the end of Phase II, the terminal handling capacity will be 8

million tons per annum which can further be enhanced to 12

million tons per annum in future.The total estimated cost of

development in Phase I and II is estimated to be 140 million USd

As the project involves financial support by International Finance

Corporation (IFC) thus the ESIA study gratifies the evaluation

criteria of the funding body. Also all applicable national &

International guidelines and regulations have been used as

reference in preparing this ESIA.

CliEnt/loCation: Engro voPak tErminal ltd/Port qaSim karaChi

PrOJECT: ENvIrONMENTAL & SOCIAL IMPACT ASSESSMENT OF LNG TErMINAL

SCOPE: The project is intended to provide facilities for receiving supplies

of liquified natural gas (LNG) via conventional LNG carrier

(LNGC), for offloading and dockside transfer to an FSrA.The re-

gasified liquefied natural gas (rLNG) will be delivered via a jetty

and onshore facilities to the gas networks operated by SSGC

(underground/overhead connection to the pipeline proposed by

SSGC for MASHAL Project, off take, approximately 2 to 3 km in

length)

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 68: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 65

CliEnt/loCation: aSg mEtalS ltd/Port qaSim , karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF COMPACT STEEL PLANT

SCOPE: The proposed project is of an integrated steel making plant to

produce cast billets by recycling process using induction furnaces

for melting scrap. The process of producing liquid steel is such

that it helps refine the tapped heat from the Induction Furnace.

The secondary refining of liquid steel will be done at ladle furnace

before sending it to Continuous Casting Machine to cast the

billets

CliEnt/loCation: bP PakiStan ExPloration & ProduCtion inC./mirPurkhaS

PrOJECT: ENvIrONMENTAL & SOCIAL IMPACT ASSESSMENT OF drILLING &

ASSOCIATEd PrOdUCTION ACTIvITIES IN HALA BLOCK

SCOPE: The proposed project (drilling & Associated Activities) will be

carried out in Hala Game reserve which is located in Mirpurkhas

Block. The project area for which the study has been performed

covers about 9.538 km2.

CliEnt/loCation: luCky onE (Pvt) ltd/raShid minhaS road, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF LUCKY ONE APArTMENTS &

MALL

SCOPE: Lucky One is an Urban development Project comprising a Mall

& Apartments being established over an area of 15 acres at the

present site of Fazal Textile Mills Limited, on rashid Minhas

road in Federal B Industrial Area, Karachi. Lucky One will

include1500 large size apartments, which will attract a permanent

population of approximately 9000-10,000 people.

Conveniently situated on the prime location of Central Karachi, at

Fazal Mill roundabout, the apartments are easily accessible

through major flyovers of Karachi.

CliEnt/loCation: StatElifE inSuranCE CorPoration/iSlamabad

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF STATELIFE TOWEr

SCOPE: Statelife Tower is an Urban development Project comprising of 18

storeys Office Tower estalished over an area of 5,120 square

yard of commercial plot located in Blue Area at Jinnah Avenue,

Islamabad.

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 69: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 66

CliEnt/loCation: noman buildErS (Pvt) ltd/Clifton karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF NOMAN CASTELLO

SCOPE: The proposed project consists of Highrise Office Towers over

plot of 2000 Sq. Yds area at Boat Basin, Clifton, Karachi

CliEnt/loCation: bP PakiStan ExPloration & ProduCtion inC./Sanghar bloCk

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF 3-d SEISMIC OPErATIONS

SCOPE: The project of 3d Seismic Operations by BP Pakistan Exploration

Production Inc. in Sanghar South Block comprises the said

operation as a prelude to oil and gas exploration.The said Block

covers a total area of approximately 2477 sq. km and is located in

the Sanghar, and Khairpur districts of Sindh Province.

CliEnt/loCation: City diStriCt govErnmEnt karaChi (Cdgk)/Shahrah-E-faiSal,

karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF COrrIdOr-Iv

SCOPE: The project comprises construction of eight flyovers at the

intersections. This would develop Shahrah-e-Faisal as a signal

free expressway, presently managed through a series of

signalized intersections throughout the Shahrah.

CliEnt/loCation: intErnational ComPlEx ProjECtS ltd/Clifton, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF dOLMEN CITY PrOJECT

SCOPE: The project is located at the sea shore of Arabian Sea and is

being constructed on a plot of land measuring approximately

37,666 sq.yds.

dolmen City is among the most prestigious mixed use

development projects of Pakistan. It is being built to serve

corporate and commercial clients in an ultra modern business

environment.

CliEnt/loCation: dEfEnCE houSing authority/karaChi

PrOJECT: ENvIrONMENTAL ANd SOCIAL IMPACT ASSESSMENT OF GIZrI FLYOvEr

SCOPE: The Study “Transport Planning & Traffic Management Plan for

dHA”, revealed that approximately 44000 vehicles enter/leave

dHA from Submarine Intersection. All these vehicles pass

through Gizri Commercial Area to approach Khayaban-e-Hafiz.

Heavy traffic volume and encroachments in the Gizri commercial

area creates a chaos at this main entry/exit point.

due to the current traffic congestion problems, dHA started the

construction of 1.2 km long flyover in Gizri commercial area, in

order to solve the congestion problems.

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 70: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 67

CliEnt/loCation: karaChi urban tranSPort CorPoration (kutC)/karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF rEvIvAL OF KArACHI

CIrCULAr rAILWAY

SCOPE: Karachi Circular railway (KCr) will be revived as a Modern

Commuter System to meet the essential transportation need of

the citizens of Karachi. The total route length of the dual tracks

on the Karachi Circular railway project stage-I & stage-II is 43.12

Km (Karachi city to NIPA: 22.86 Km and NIPA to Karachi City

Station & along mainline: 20.26 Km) with 24 stations.

Stage III drigh road to Jinnah Airport (6.1 Km) is itself a viable

project and will be implemented after stabling initial operating

period of 7 years for stage I & II. This stage is neither included

nor under consideration for the funding by JICA. 290 trains/day

will be operated at 6 minutes headway in each direction with

capacity of 942/1391 passengers/train, 18840/30 passengers/hour

and 0.69 million passengers/day (As per SAPrOF Study).

CliEnt/loCation: mm PakiStan (Pvt) ltd/China CrEEk WatErfront along mai

kolaChi ExPrESSWay, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF KOLACHI ENCLAvE

dEvELOPMENT

SCOPE: The site for the project is located along China creek waterfront

along Mai Kolachi expressway, Karachi. This is the first in the

series of new urban centres that are being planned in greater

Karachi to help arrest further concentration of offices and

commercial activities in this area. The proposed Kolachi Enclave

development will contain commercial and residential blocks with

facilities such as parking, landscaping and recreational hub for

the local as well as foreign visitors. Project development will

include site formation works and construction of infrastructures,

drains, sewers and utilities and landscape areas.The site selected

for the project is 35.08 acres of land.19.08 acres of land has been

reclaimed while 16.0 acres of water front development has been

allocated for recreational purposes acquired by KPT for the future

development, of which 10 acres will be utilized by the tower

complex. The main tower would be 78 storeys high.

CliEnt/loCation: al-tuWairqi grouP, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF TUWAIrQI STEEL MILLS LTd.

SCOPE: The proposed project is related with the setting up of a steel mill plant to produce direct reduced iron in the first phase and steel and guidelines related to the project as well as appropriate international guidelines. The recommendations wouldbe given onthe basis of project activitiesof Pakistan Environmental Protection Act 1997.

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 71: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 68

CliEnt/loCation: fauji akbar Portia marinE tErminalS (Pvt) ltd/Port qaSim

karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF FErTILIZEr & GrAIN

TErMINAL

SCOPE: The project is located in Port Qasim and designed for handling

storing and bagging of fertilizers, grains and oil seeds, and

rice with combined tonnage of about four (04) million tons per

annum. The grains and fertilizers are unloaded and conveyed

with the help of bulk unloaders and conveyor offloading belts

CliEnt/loCation: China national maChinEry/thatta diStriCt Sindh

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF SONdA-JHErrUK COAL MINE

SCOPE: Sonda-Jherruk minefield is located in Union Council Jherruck

and Sonda, Thatta district, Sindh Province, Pakistan, at the

West of Indus river.The minefield is about 190 km of

transportation distance to Karachi in the southwest and about

38 km of transportation distance to Hyderabad in the north.

The proposed Sonda-Jherruck Coal Mine Project (SJCMP)

comprises sustainable development of coal mine and

minemouth at Sonda-Jherruck for production of 1.8 million

tons coal annually or 5000 tons/day.

The project involves investments of about US$ 315.79 million

Coal mine area has been leased for 30 years and coal

extraction from the mine will be approximately 1.80 million

tons per annum.

It has planned to sink a 180 m shaft to extract Coal. The

proposed project involves the development of mining site,

installation of mining machinery and equipment and

transportation of coal from the mine deep down. The

environmental assessment examined the potential for impacts to

Natural, Biological & Socio-Economic Environment of the

Project Area. The scope of EIA was in line with the World

Bank/IFC guidelines and all relevant National laws, regulations

and guidelines.

CliEnt/loCation: China national maChinEry/thatta diStriCt Sindh

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF SONdA-JHErrUK COAL

FIrEd POWErPLANT

SCOPE: The proposed power plant is located in Union Council

Jherruck, in Thatta district, Sindh Province, Pakistan, at the

west of Indus river. JPP Project is adjacent to the proposed

Jherruck/Sonda coal mine and is about 160 km to Karachi, 30

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 72: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 69

km (direct line) from Hyderabad City in the north and about 10

km from Sonda Town.

Jherruck Power Plant project (JPPP) is being initiated by a

Chinese firm named as Global Energy development (Private)

Ltd

This proposed power plant comprises sustainable development

of 3 X135 MW – mine – mouth Power Plant.

When completed JPPP will be a milestone to confront the

energy-poverty nexus, and to contribute to economic

development in the region. Total investment in 3x135 MW

super high pressure coal fired power plant is 464.68 Million USd

CliEnt/loCation: PakiStan tExtilE City/Port qaSim, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF TEXTILE CITY

SCOPE: The project is located in the Eastern Industrial Zone of Port

Qasim having covered area of about 1,250 acres. It is

developed to provide the domestic textile industry with state-

of the art infrastructure to maximize the production

capabilities to enable it to compete with best in the international

market

CliEnt/loCation: PakiStan gaSPort ltd/Port qaSim, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF LNG TErMINAL, JETTY &

EXTrACTION FACILITY

SCOPE: The project is located just North of Qutub Point in Kadiro Creek

linking main Port Qasim navigation channel with Korangi Creek.

It is specifically designed to accommodate LNG Cargo vessels

and re-gasification facility at the point of reception.

CliEnt/loCation: boSiCor oil PakiStan ltd/hub baloChiStan

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF BOSICOr OIL

SCOPE Bosicor Oil Pakistan planned to set up an oil refinery in order to

meet not only energy requirement of the country but also to

acquire additional security and desires flexibility in its supply.

CliEnt/loCation: boSiCor ChEmiCal PakiStan ltd/laSbEla baloChiStan

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF BOSICOr CHEMICAL

SCOPE Bosicor Chemical Pakistan is setting up an Aromatic Complex

project in district Lasbella, Balochistan. The total covered area of

the project is around 331,573 Square meters. It is an Aromatic

Complex having production capacity of 6,012,000

bbl/annum.Aromatic complex produce chemicals that are feed

stock for production of polyester fibers, plastics, pesticides etc.

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 73: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 70

CliEnt/loCation: taavun grouP uaE & govErnmEnt of Punjab/gardEn toWn

lahorE

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT FOr HIGH rISE BUILdING

SCOPE: This project is located in Garden Town, Lahore having covered

area of about 62,412m2

Mabarak Centre is a multi-use complex, consisting of four towers

and a horseshoe shaped building. It includes residential and office

towers, as well as conference halls, shopping mall and a five star

hotel. A high rise building with the name has been proposed by

Taa’vun which is a joint venture of Government of Punjab and

UAE Government. EIA study was conducted to assess the

environmental and social impacts of the roject and recommending

mitigation measures

CliEnt/loCation: boSiCor PakiStan ltd/baloChiStan

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF OIL PIPELINE (SPM-BPL)

SCOPE: BPL has planned to acquire oil from international market and

thus establishing a pipeline in association with Coastal refinery

Ltd. This pipeline will partly laid down under water and partly on

land. The concept of this project is establish a Single Point Moor

(SPM) in the sea at Khalifa Point from where it will be connected

to the pipeline and then pipeline will be connected to the storage

tanks of BPL.

CliEnt/loCation: aiSha StEEl mill/bin qaSim, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF AISHA STEEL MILLS

SCOPE: Aisha Steel Mill is a cold rolling unit located in the downstream

industrial zone of Pakistan Steel Mills in Bin Qasim The total

covered area of the project is 50 acres. The main components of

the mill are rolling mill, annealing furnace, pickling line and

galvanising unit. For making cold rolled and galvanised coils

raw materials including hot rolled strips/coil are used.

CliEnt/loCation: South aSia StEEl mill/Port qaSim, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF SOUTH ASIA STEEL MILLS

SCOPE: The project as a new steel mill is located in Port Qasim Area. It

comprises of three main components i.e. Cold rolling Mill, rebar

Mill and Thermal Power Plant.Billets are used as raw material for

rebar, hot rolled strips for cold rolling mill and coal for thermal

power plant.The cold rolling mill and thermal power plant covers

40 acres of total project area.

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 74: EMC PROFILE UPDATED (25-11-2015)_opt

CliEnt/loCation: induS rEfinEry ltd/dhabEji

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF INdUS rEFINErY

SCOPE: Indus refinery Ltd is an oil refinery which requires Environmental

Impact Assessment. EMC has successfully prepared and

submitted the Environmental Impact Assessment report in Jan

2006

CliEnt/loCation: Sui SouthErn gaS ComPany ltd

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF BAJArA-KArACHI LOOP LINE

(GIrEP-II)

SCOPE: The Bajara Karachi 24ӯ X 200 km loopline project (BKLP) is a

continuation of SSGCL’s transmission line expansion phase

under GIrEP II plan. The proposed gas pipeline will be

established at an estimated total cost of rs. 4437 million and will

follow thesame route on which its 18” Ø I.r.B.P (Indus right Bank

Pipeline), and 20” Ø I.r.B.P-CEP, 16” Ø I.L.B.P (Indus Left

Bank Pipeline) and 20” Ø Kadanwari Pipeline laid in 1975 and

1989 respectively are in operation.

Starting from Bajara in dadu district, the corridor for the Pipeline

would proceed along a 10 metre wide strip to Karchat – Sari –

Khadeji – ACPL, off-take point – Malir Mixing Plant – SMS Malir

and finally terminate at SSGCL’s Karachi Terminal.

Approximately half of the portion of this width will be acquired

while the other half will be leased on temporary basis by SSGCL.

CliEnt/loCation: fWq EntErPriSES (Pvt) ltd/Port qaSim, karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT FOr LIQUId CArGO TErMINAL

SCOPE FWQ is a Liquid Cargo Handling Company with Joint venture of

FELdA Malaysia and Westbury Pakistan. They are developing

Liquid Cargo Terminal at Port Qasim which requires

Environmental Impact Assessment. EMC has successfully

prepared the report

CliEnt/loCation: artiStiC millinEr’S ProCESSing unit/landhi induStrial arEa,

karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT OF ArTISTIC MILLINEr’S

SCOPE Environmental assessments of Artistic Milliner's proposed project

of denim Processing Unit situated in Landhi industrial Area

EMC PAKISTAN PvT. LTd. 71

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 75: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 72

CliEnt/loCation: qaSim intErnational ConatinEr tErminal (qiCt)/Port qaSim,

karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT FOr EXTENSION PrOJECT

SCOPE Existing QICT is approaching its capacity. Therefore, an extension

has been planned. IEE for the extension project thoroughly

investigated all impacts and recommended its mitigation alongwith

the management and monitoring plan. The report completed and

got NOC in december 2006.

CliEnt/loCation: City diStriCt govErnmEnt karaChi (Cdgk)/karaChi

PrOJECT: ENvIrONMENTAL IMPACT ASSESSMENT FOr KArACHI ELEvATEd

EXPrESSWAY FOrM JINNAH BrIdGE TO QUAIdABAd

SCOPE Karachi Expressway is constructed on the corridor that starts from

Jinnah Bridge near Karachi Port and passing through Saddar

Town, Jamshed Town, Shah Faisal Town and Malir Town, it

reaches Quaidabad in Landhi Town of the City district Government

of Karachi (CdGK). It is a signal free elevated express with a total

length of 25 km. It crosses over an existing railway track at PIdC

House.

EIA EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 76: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 73

CliEnt/loCation: PakiStan PEtrolEum ltd/gambat South bloCk

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CONSTrUCTION ANd

COMMISSIONING OF GPF - II

SCOPE: The propoject involves construction of 50 MMSCFd Gas Facility.

The Plant is to be designed to process up to 50 MMSCFd gas,

approximately 10 TPd LPG and 950 BPd Condensate. Sales Gas

shall be injected in Sui Southern Gas Company Limited (SSGCL)’s

network wheres Condensate and LPG shall be stored for its

onward dispatech to selected refineries and Marketing Companies

respectively. Condensate storage facilities shall comprise four

tanks of 1500 barrel capacity whereas LPG storage shall entail 3

bullets of 20 MT capacity each, summing up to 60 MT capacity.

CliEnt/loCation: burj buildErS & dEvEloPErS/kEhkaShan Clifton, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CLIFTON vISTA

SCOPE: The proposed project is being constructed on a total area of

1,605.00 SQ. Yrd (14,45SQ. FT). The project is seventeen (17)

storeys commercial cum residential development consisting of

residential flats from 5th to 16th floors that are spacious and

secure. The project features and design are in accordance with the

requirements of modern day living facilities such as parking area

and recreational facility.

CliEnt/loCation: thE addrESS buildErS & dEvEloPErS/bloCk-8, SChEmE-5,

Clifton, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF THE AddrESS

SCOPE: The proposed “The Address” is being constructed on a plot 1001

sq. yds. The project is fifteen (15) storeys commercial cum

residential development consisting of flats from 5th to 13th floors

that are spacious and secure which is conventionally situated

around library, colleges, schools and markets.

CliEnt/loCation: fiShEriES dEvEloPmEnt board/mirPur Sakro

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SHrIMP FArMING CLUSTEr

dEvELOPMENT TO ENHANCE SUPPLY OF rAW MATErIAL FOr SEAFOOd

INdUSTrY OF PAKISTAN

SCOPE: The project site is located in the deltaic region of river Indus, surrounded by a natural creek system in the north, south and the west. The project involves development of Shrimp Farming comprising 16ponds and associated infrastructure for the maintenance of the ponds. Key features of the shrimp ponds include:• Automatic Feeding• Horizontal Aerators andor/ Pedals• Salinity Control • Laboratory for quality and environmental control

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 77: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 74

CliEnt/loCation: artiStiC millinErS Pvt limitEd/korangi induStrial arEa, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF ArTISTIC MILLINErS UNIT 14

PrOJECT

SCOPE: The proposed AM Unit 14 facility will be located in Sector 25 of

Korangi Industrial Area on an area of 3.94 acres. The proposed

facility will consist of three floors housing the garments cutting,

stitching and finishing sections besides warehouse, utilities and

amenities – canteen, prayer area etc.

CliEnt/loCation: unitEd EnErgy PakiStan limitEd (uEPl)/diStriCtS tando

allahyar and matiari (mkk bloCkS)

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF UEPL SALAMAT GAS & SALEH

OIL FACILITY PrOJECT

SCOPE: United Energy Pakistan intends to construct a new 100 MMscfd

gas production facility at Salamat Gas Field and an Oil Handling

Facility to handle 10,000 BPd oil and 10,000 BPd water at Saleh

Oil Field. The project is needed due to the fact that UEP has

discovered new wells and in order to process the additional raw gas

and oil from these wells, existing production infrastructure would be

unable to cope with the production requirements with addition of

new wells in the MKK concession during 2104 and 2015.

The Salamat Gas facility shall have the following components:

• Production Separator (relocated from other facilities)

• Test Separators

• Amine Unit (relocated from Tangri)

• Gas dehydration Unit (Glycol) (from Mazari)

• Cooling systems (from Kauser)

• Condensate Storage & Loading

• Produced Water System

• Utilities (Hot Oil System, IA Compressors, Nitrogen Storage, rO

Plant, Fire water System)

• draining system

• Flare Stack and K.O. drums

CliEnt/loCation: Sindh Coal authority/naWabShah, SujaWal (thatta) to Wango

mor via badin

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF UP-GrAdATION OF rOAd

NETWOrK

SCOPE The project is located in districts Thatta, Sujawal and Badin. The project is divided into five construction packages for the division of assigning of construction and works along the proposed project route. The 176 km Thatta to Wango Mor road includes constructionof 5 bypasses, bridges and culverts. All the infrastructure facilities will be provided at the site as per the applicable national and international standards and codes

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 78: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 75

CliEnt/loCation: unitEd EnErgy PakiStan ltd (uEPl)/mkk ConCESSion arEa

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CONSTrUCTION & OPErATION

OF AErOdrOME (AIrSTrIP)

SCOPE: United Energy Pakistan intends to construct an airstrip near UderoLal (Tando Adam) for facilitating movement of its employees to andfrom oil and gas fields located around Tando Adam. The site is located mainly in district Sanghar, deh Taluka Tando Adam and partly in district Matiari, deh Mari, Taluka Matiari. Acording to the Master Plan, the facilities planned include Car Parking, Aircraft Parking, Passenger waiting room (Approx. 20 Persons), Shade for ground support equipment (Stairs for access/exit aircraft and barricades), and Power Supply System.

CliEnt/loCation: galaxy ConStruCtionS (Pvt) limitEd, Saddar toWn, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF HOSHANG PEArL APArTMENTS

PrOJECT

SCOPE: Hoshang Pearl Apartments Project is located on Hoshang road, adjacent to Karachi Club. The salient features of the proposed project are given below: • 31 Storey Building• 5 Star Fully Serviced Apartments & Penthouses• 24 Hours Concierge Service• designer Interior with Premium Finishing• Modern Exterior & Spacious Interior • Health Club, restaurant & Spa• State of the art IT & Communication Infrastructure• 24/7 real Time CCTv Surveillance• Express Elevators• 11 Floors dedicated for Spacious Parking• Central ventilation & High Performance Air Conditioning

System• International Fire & Safety regulations Assurance• 100% Back-up Power (No Load-Shedding)

CliEnt/loCation: galaxy ConStruCtionS (Pvt) limitEd, karaChi Cantt, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OPAL 225 MIXEd-USE BUILdING

PrOJECT

SCOPE: The Opal 225 Mixed-Use Building Project is situated in Karachi Cantonment, Karachi. The details of the project are given below:• Ultra modern Shopping Mall with the Local & International

brands• Food Court, restaurants, Executive Lounge & Movie Theater• Serviced Apartments operated by International 5 Star Hotel

Brand• SPA, Health Club, restaurant and Swimming Pool• 6 Basement Floors dedicated for spacious Car Parking• 100% Back-up Power• Modern Security and 24/7 real Time CCTv Surveillance• State of the IT and Communication Infrastructure

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 79: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 76

CliEnt/loCation: unitEd nationS human SEttlEmEntS Program/iSlamabad

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION STUdIES FOr INTEGrATEd

rESOUrCE rECOvErY CENTrE (IrrC)

SCOPE: Un-Habitat and UNESCAP is going to launch a pilot project for

Solid Waste Management in Islamabad. The pilot project will be

initiated through the establishment of Integrated resource

recovery Centers (IrrC) in the city.The IrrC will process 4 tons

of the waste generated by households and commercial points

located in G-15, and will convert the waste stream into resources.

CliEnt/loCation: landmark EntErPriSES/Clifton, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION STUdIES OF LANdMArK TOWEr

SCOPE: The Landmark Tower is located in Khakashan, Clifton along the

Khayaban-e-Jami in Karachi. The Tower comprises of a 23-

storeyed commercial building constituting solely its corporate

offices that shall be built over 1,000 sq.yards.

CliEnt/loCation: uSaid/PakiStan

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION STUdIES FOr CONSTrUCTION OF 10

FACULTY EdUCATION COMPLEXES

SCOPE: The purpose of this task order is to provide comprehensive

program management services, including the design, construction

management, equipping, and construction services for ten new

Faculty of Education complexes at ten existing university

campuses.

CliEnt/loCation: yunuS tExtilE millS ltd (ytm)/landhi induStrial arEa (lia),

karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF AddITION OF COAL FIrEd BOILEr

SCOPE: Yunus Textile Mills Limited has installed the Coal/rice

Husk/Bagasse Fired Water Tube Boiler to meet the energy needs

of the production units. The boiler is equipped with travelling gate

for firing the imported coal as primary fuel and mixing combination

of coal with 30% rice Husk and Bagasse as second option, on

gravity feeding system in the water cooled furnace.

CliEnt/loCation: unitEd EnErgy PakiStan ltd (uEPl)/naimat, taluka tando

adam, diStriCt Sanghar, Sindh

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF NAIMAT FACILITY EXPANSION

PrOJECT PHASE-v INCLUdING CONSTrUCTION OF CAMP

Scope: The site for the proposed project is located in the Tando Adam

Taluka, which lies in the western portion of the Sanghar district in

Sindh. The site lies in the fertile plain area, which has an average

elevation of about 50m. Naimat Phase v project includes the

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 80: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 77

following components:

• Production Separator

• Amine Unit

• Gas dehydration Unit (Glycol)

• Gas dehydration Unit (Mol. Sieve)

• LPG recovery Unit (Turbo-Expander)

• LPG Storage (Spheres) and Loading

• Condensate Stabilization Unit

• Condensate Storage & Loading

• Produced Water System

• Utilities (Hot Oil System, IA Compressors, Nitrogen Storage, rO

Plant, Fire Water System)

• draining System

• Flare Stack and K.O. drums

• Establishment and Operation of the site camp

CliEnt/loCation: Efu lifE inSuranCE Co. ltd/dha, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF EFU LIFE ASSUrANCE BUILdING

SCOPE: The proposed project comprises of construction of a 17-storeyed

commercial building comprising of offices built over 1821 sq.

yards. The total covered area of the project is 83674.40 sq. ft

providing vehicle parking from 2nd to 9th floor and occupancy

from 10th to 17th floor. It will be providing other facilities and

amenities for its occupants such as lifts, gymnasium, board room,

recreational area, male prayer area etc.

CliEnt/loCation: karaChi mEtroPolitan CorPoration/Clifton, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF GrAdE SEPArATEd TrAFFIC

IMPrOvEMENT PLAN FrOM PArK TOWEr INTErSECTION TO A.T. NAQvI

rOUNdABOUT

SCOPE: The proposed Traffic Improvement Plan comprises:

i. Flyover along 26th Street/Shahrah-e-Firdausi

ii. Improved Traffic Management at A.T. Naqvi Chowk under

the above Flyover

iii. Underpasses for entry/exit movements to/from Bahria Town

Icon Tower and Clifton Funland

iv. Interchange between Shahrah-e-Iran and Shahrah-e-

Firdausi near Park Towers Intersection leading to 2-Talwar

Intersection

v. Other at-grade improvements for better traffic management

in the entire area

vi. Provision of a number of grade-separated pedestrian crossings

at important locations.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 81: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 78

CliEnt/loCation: national rEfinEry ltd (nrl)/korangi induStrial arEa, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF PrOdUCT UP-GrAdATION

PrOJECT

SCOPE: The project involves value addition characteristics to the refinery products through improvement of product quality In terms of reduced Sulphur content thereby launching environment friendly petroleum products particularly diesel, gasoline and lube base oil. This objective will be achieved via two phase implementation of the project cumulatively referred as the Product Up-Gradation Project.The project will be executed in two distinct phases to undertake installation of Units according to the following layout.1. Naptha Block• Naptha Splitter Unit (NS)• Naptha Hydrotreator Unit (NHT)• ISOM Unit (PENEX/dIH)2. Heavy Oil Complex• Slurry Hydro cracking Unit (UOP Uniflex)• diesel Hydro-desulfurization Unit (UOP Unionfining)• vacuum distillation Unit (vdU)• vacuum Gas Oil Hydrocracking Unit (UOP Uncracking)• Mobil Selective dewaxing Unit (MSdW) Unit (Group-II Base

Oil)

CliEnt/loCation: halima buildErS & dEvEloPErS/Sindhi muSlim CooPErativE

houSing SoCiEty, jamShEd toWn, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF AMEENA TOWEr

SCOPE: Proposed project will be Basement + Ground + 1st Floor (Shops & Service Area) + 2nd to 8th Floors (Flats & Service Area) that features a Wastewater Treatment Plant at Ground Floor and Basement (Car & Motor Cycle Parking). The apartment features bedrooms that include a spacious drawing room, a well-ventilated kitchen with modern facilities and imported sanitary ware and fixtures.

CliEnt/loCation: dEfEnCE houSing authority (dha)/dEfEnCE houSing authority

(dha)

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF ONE WAY rEGIME AT KHAYABAN-E-MUJAHId & KHAYABAN-E-SHAMSHEEr

SCOPE: The project involves conversion of traffic regime on Khayaban-e-Shamsheer and Khayaban-e-Mujahid from previous two way trafficplan to one way. The conversion of two roads from dual way to one way was implemented by dHA after assessing the feasibility of the decision through the traffic studies (NESPAK Transport Planning & Traffic Management Plan (2005) and analysis of problems faced by the residents from the dual carriageway plan onthese roads. Keeping in view the recommendations of NESPAK, Khayabane Shamsheer and Khayabane Mujahid were converted from dual carriage way to one way regime in order to ease traffic

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 82: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 79

jams and to reduce the mid-block accidents at and around KhaddaMarket area. After the conversion, Khayabane Shamsheer, one ofthe widest roads in dHA, has been dedicated to the traffic incoming from Saudi Consulate towards Mcdonald’s on Sea viewwhile Khayabane Mujahid has been converted for outgoing traffic.

CliEnt/loCation: unitEd EnErgy PakiStan ltd/taluka khiPro – diStriCt Sanghar –

Sindh

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF NAIMAT FACILITY EXPANSION

PrOJECT PHASE-Iv

SCOPE: The project is located in Taluka Khipro district Sanghar, Sindh. The project is needed due to the fact that UEP has discovered new wells around the Naimat Facility and in order to process the additional raw gas from these wells, the existing facility requires expansion. The primary objectives of the project are: • To enhance production capacity of Naimat Facility by 50MMscfd.The new developments at the Naimat Facility include the following activities:• Installation of two 400GPM Amine Plants• Installation of one 50 MMscfd dehydration Plant• Installation of a new HP Separator Unit

CliEnt/loCation: mr. anjum rEhmat & mr. nadEEm rEhmat ShEikh/Clifton,

karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF 70 rIvIErA

SCOPE: The project site is located in Clifton on the main Sharah-e-

Firdousi. The project is a Twenty Nine (29) stories residential

cum commercial development consisting of residential apartments

offered & showrooms at ground and First Floor.

The project features and design are in accordance with the

requirements of modern day living facilities such as parking area

and recreation hall.

CliEnt/loCation: karaChi ElECtriC SuPPly CorPoration (kESC)/korangi, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF KOrANGI GAS TUrBINE POWEr

STATION UPGrAdATION

SCOPE: Power plant upgradation component involves; installation of 32

Heat recovery Steam Generators on all 32 Gas powered

Generator Sets and installation of one Steam Turbine Generator

with associated components. On completion, the project shall be

able to add 10 MW to the national grid by utilizing the waste heat

of flue gasses, in addition to existing 88 MW capacity. revamping

of grid component involves conversion of existing Air Insulated

Switchgear system to Gas Insulated Switchgear system. After the

completion of power plant component, the power station shall be

classified as a combined cycle power plant.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 83: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 80

CliEnt/loCation: karaChi ElECtriC SuPPly CorPoration (kESC)/SitE, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SITE GAS TUrBINE POWEr

STATION UPGrAdATION

SCOPE: Power plant upgradation component involves; installation of 32

Heat recovery Steam Generators on all 32 Gas powered

Generator Sets and installation of one Steam Turbine Generator

with associated components. On completion, the project shall be

able to add 10 MW to the national grid by utilizing the waste heat

of flue gasses, in addition to existing 88 MW capacities.

revamping of grid component involves conversion of existing Air

Insulated Switchgear system to Gas Insulated Switchgear

system. After the completion of power plant component, the

power station shall be classified as a combined cycle power

plant.

CliEnt/loCation: n. m. buildErS & dEvEloPErS/guliStan-E-Sajjad, haPPy homES

road, hydErabad

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF QUEEN’S rESIdENCIA – I

SCOPE: Queen’s residencia-I is residential cum commercial project

involves construction and operation of six floors building on an

area of 2800 Sq. Yards. Proposed project will be six (06) story

complex with 37 shops on ground floor and total 84 apartments.

The project shall provide parking capacity on basement and

ground floor for almost 111 cars. On each floor, there will be total

14 apartments. The project is aimed at providing modern day

residential facilities to the residents of Hyderabad.

CliEnt/loCation: raniPur Sugar millS (Pvt) ltd/taluka gambhat, diStriCt

khairPur

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF OF PrOPOSEd 21 MW CO-

GENErATION PLANT

SCOPE: The project comprises of construction, up gradation and

installation of power transfer components that includes power

cables, transformer, switch gears and other connectivity

equipments. The power plant through 01 No. of 6 MW alternator

and 01 No. of 15 MW alternator, is able to generate 21 MW

electricity out of which up to 6 MW is utilized by the ranipur

Sugar Mill, whereas up to 12MW surplus power will be supplied

to SEPCO during cane crushing season and 16 MW electricity

during off season.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 84: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 81

CliEnt/loCation: unitEd EnErgy PakiStan ltd/digri & Sanghar South bloCkS

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF drILLING & ASSOCIATEd

ACTIvITIES IN NON - PrOTECTEd ArEAS

SCOPE: The activities associated with the proposed development

program will comprise drilling of exploratory/development well,

associated activities and field development. If exploratory drilling

proves fruitful, and the petroleum reservoir is to be commecially

exploited, the field has to be developed for oil/gas production.

Field development activities may include:

• drilling of additional wells (Appraisal and Production Wells)

• Laying of Pipelines

• Construction of a Processing Plant

• Establishment of a residential Camp and Access road

CliEnt/loCation: PfizEr laboratoriES PakiStan (Pvt) ltd/SitE, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CHILLEd WATEr PLANT

ENHANCEMENT PrOJECT

SCOPE: The project involves installation of two new Absorption Chillers

having capacity of 350 tons each. The chillers are direct fired

dual fueled absorption chillers. Natural Gas will be used to fire

the system and diesel will be used when Natural Gas is

unavailable. The Gas Fired Chillers will replace the 480 tons of

electrically operated conventional chillers currently being used

in the facility

CliEnt/loCation: unitEd EnErgy PakiStan ltd/taluka khiPro, diStriCt Sanghar &

taluka matiari, diStriCt matiari – Sindh

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF NAIMAT – KAUSAr PIPELINE

SCOPE: Project invovles construction of a pipeline connecting Naimat Gas

Facility to Kausar Facility. Both the facilities will be connected

through 10 inches diameter pipeline having length of 31.7

kilometer approximately.

The study was specific to the laying/operation of the proposed

NAKA pipeline. Significant aspects covered included land use,

obstruction of infrastructure courses, disturbance of natural

habitats of fauna and flora species, relocation and compensation

for the effected (if any) and socio-economic factors.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 85: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 82

CliEnt/loCation: mr. muhammad kaSSim & mrS rubina muhammad huSSain/Clifton,

karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CLIFTON COMFOrT

SCOPE: The proposed project is development project covering a total plot area 1052.00 SQ.Yrd of a commercial plot located at main Gizri road. It is sixteen stories residential cum commercial development consisiting of residential apartments offered & number of showrooms at ground floor

CliEnt/loCation: Saima rEal EStatE/khalid bin WalEEd road, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SAIMA LUXUrIA

SCOPE: Proposed Project Invovles construction and operation of a 15 storybuilding in PECHS Block-2. There will be total 36 apartments in thebuilding with parking provided from first till third floor. recreational facilities will be provided on fourth floor which includeladies and gents gymnasium.

CliEnt/loCation: Euro buildErS & dEvEloPErS/north nazimabad, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF EUrO HI-TECH rESIdENCY

SCOPE: Proposed project will be fourteen (14) story apartment complex that features a recreation area, prayer hall, 1st to 3rd floor car andmotor cycles parking. The apartment features 3, 4 and 5 bedrooms that include a spacious drawing room, a well-ventilated kitchen with modern facilities and imported sanitary ware and fixtures.

CliEnt/loCation: unitEd EnErgy PakiStan/taluka khiPro – diStriCt Sanghar –

Sindh

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF UEP NAIMAT FACILITY

UPGrAdATION PrOJECT

SCOPE: The project is needed due to the fact that UEP has discovered new wells around the Naimat Facility and in order to process the additional raw gas from these wells, the existing facility is requiredto be upgraded

CliEnt/loCation: mEtro tWin toWEr/frErE toWn quartEr, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF METrO TWIN TOWEr

SCOPE: Proposed project will be thirty (30) story apartment complex that features a reception and waiting area, community shop, prayer hall, funeral parlor, community halls, library, board games, day care centre, billiard, male and female gymnasium and snooker, basement-1 and 2 as well as 1st – 5th floor car and motor cycles parking. Both the towers feature 4 bedrooms at each floor from 7th– 30th floors that include a spcious drawing room, a well-ventilatedkitchen with modern facilities and imported sanitary ware and fixtures

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 86: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 83

CliEnt/loCation: Canon ConStruCtion ComPany/jamShEd toWn karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF FAIZAN rESIdENCY

SCOPE: Proposed project will be a twelve (12) story apartment complex

that features a gymnasium, children play area, 1st – 4th floor car

and motor cycles parking. The apartment features 3 bedrooms

that include a spacious drawing room, a well-ventilated kitchen

with modern facilities and imported sanitary ware and fixtures

CliEnt/loCation: Shirazi invEStmEntS Pvt ltd/north WESt induStrial zonE Port

qaSim, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF POrT QASIM WArEHOUSE

SCOPE: The site is located at W3/II & III, North West Industrial Zone, Port

Qasim, Karachi. The proponent (SIPL) intends to establish a

warehouse in Port Qasim for temporary storage of containers

which are used by the proponent for shipment of different

materials.

Scope of project involves;

• Construction of warehouse

• Construction of offices

• Construction of guard room

• Transportation of containers to the site

• Firefighting arrangements

CliEnt/loCation: halima buildErS & dEvEloPErS/gulShan-E-iqbal, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF HALIMA TOWEr

SCOPE: The project involves construction and operation of a thirteen (13)

story building. There will be total 9 residential floors, with parking

provided from 1st till 3rd floor. Fourth floor will be used for

recreational as well as residential purpose

CliEnt/loCation: kgS buildErS & dEvEloPErS/fEdEral b arEa, bloCk-17,

SChEmE no. 16, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF AZIZ HEAvEN

SCOPE: Proposed project will be eighth story apartment complex that

features a recreation area, prayer hall, basement floor car and

motor cycles parking. the apartment features 3, 4and 5 bedrooms

that include a spacious drawing room, a well-ventilated kitchen

with modern facilities and imported sanitary ware and fixtures.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 87: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 84

CliEnt/loCation: m.S. intErPriSES/Clifton karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF M.S. INTErPrISES

SCOPE: The proposed project is development project covering a total

area of plot i.e. 972.00 Sq.Yrd. (8748.00 Sq.Ft.). The proposed

project will be fourteen storey apartment complex that features a

community hall, basement, ground floor and 1st – 4th car and

motor cycles parking. The apartment features 3 bedrooms at each

floor from 5th – 14th floor that includes a spacious drawing room,

a well ventilated kitchen with modern facilities and imported

sanitary ware and fixtures.

CliEnt/loCation: C.l. buildErS & dEvEloPErS/fatima jinnah road, Civil linE

quartErS, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF ZAMZAMA TOWErS

SCOPE: The proposed project is a development project covering a total

plot area i.e. 6051.00 Sq.Yrd. (54459.00 Sq.Ft.) of a residential

cum commercial plot located at the main Fatima Jinnah road. The

project development will comprises of site development works and

construction of infrastructure including building structures, drains,

sewers, and other utilities.

CliEnt/loCation: abbott laboratoriES PakiStan ltd/landhi, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF 3.2MW COGENErATION PLANT

SCOPE: Abbott Laboratories Pakistan Ltd plans to install a 3.2 MW gas

turbine to replace twp of its current inefficient gas turbine.

Proposed project 3.2 MW Cogeneration Plant at Landhi will result

in increase in power generation capacity from 4MW to 5.2 MW

and reduction of natural gas consumption and reduce CO2

emissions which are part of Abbott’s environmental commitment

to reduce GHG emissions

CliEnt/loCation: anoud PoWEr gEnEration ltd/korangi induStrial arEa, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF PrOPOSEd AddITIONAL 7.15

MW POWEr PLANT

SCOPE: The proposed plant comprises of three Caterpillar (Model Cat

3520-C) gas power internal combustion engines, each coupled

with two MW generators. Each engine is capable to produce 975

KW. Natural Gas will be the main fuel for the plants. The plant is

technically designed to operate on gas generating units with 90%

power availability.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 88: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 85

CliEnt/loCation: artiStC millS ltd/korangi induStrial arEa, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF GArMENTS STITCHING

(EXPANSION) PrOJECT

SCOPE: The proposal involves construction and operation of an additional

Garments & Stitching section at the Artistic denim Mills in Korangi

Industrial Area on 1.14 acres area. The project shall contribute in

raising the share of denim fabric exports from Pakistan to the

international market.

CliEnt/loCation: glaxoSmithklinE PakiStan ltd/SitE, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CONSTrUCTION OF

UNdErGrOUNd WATEr STOrAGE TANKS

SCOPE: The proposed underground water tanks shall have the capacity

to store 100,000 gallons of water per tank ie.e total of 200,000

gallons. The proposed project shall be completed in two phases.

Construction of Tank No.1 shall be completed in four months and

Tank No. 2 in 6 months.

CliEnt/loCation: induS motorS ComPany ltd - north WEStErn induStrial zonE –

Port qaSim, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CONSTrUCTION OF 800

METErS TEST TrACK

SCOPE: The project involves construction of 800 meters long test track

within the Indus Motors facility in Port Qasim. The track will be

used for road testing of vehicles manufactured by Indus Motors

Company Ltd

CliEnt/loCation: mr. hanif abdani & mr. muhammad kaSSim, Clifton, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF MACHIArA SPrINGFIELd

SCOPE: Proposed project will be fourteen storey apartment complex that

features a community hall, basement floor car & motor cycles

parking. The apartment features 3 bedrooms that include a

spacious drawing room, a well-ventilated kitchen with modern

facilities and imported sanitary ware & fixtures.

CliEnt/loCation: halima buildErS & dEvEloPErS, dEhli mErChantilE SoCiEty,

karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF MAKKAH TOWEr

SCOPE: The project involves erection of a fifteen floor building (Ground +

14) for residential purpose in dehli Mercantile Society, Gulshan

Town, Karachi. The building shall include for parking floors, one

floor for recreational purpose and ten residential floors.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 89: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 86

CliEnt/loCation: king’S food (Pvt) ltd/korangi induStrial arEa, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF WASTEWATEr TrEATMENT

PLANT

SCOPE: The project will be implemented on 0.12 acres area of land which

is already acquired by the proponent.The Project includes

designing, construction and operation as well as maintenance of

the WWTP. The plant will be designed to treat an aggregate

270,000 GPd of industrial wastewater at its facility.

Sources of Waste Water Treatment Plant. The plant will be

designed to:

• Process wastewater

• rO rejection water

• domestic sewage from kitchen and washrooms

The wastewater treatment at the proposed WWTP will focus on

key water quality parameters e.g. TSS, TdS, pH, BOd and

COd.The treatment will be designed keeping in view (i) the

quality of effluent being received for treatment and (ii) NEQS

discharge limits for industrial effluents.

CliEnt/loCation: hiba buildErS & dEvEloPErS/bihar muSlim CooPErativE houSing

SoCiEty union ltd., karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SUMYA COMFOrTS

SCOPE: The project is thirteen (13) storeys residential development

consisting of flats from 5th to 13th floors that are spacious and

secure which is conventionally situated around library, colleges,

schools and markets thus providing an accessible distance from

all amenities of life. The project features and design are in

accordance with the requirements of modern day living facilities

such as parking area and recreational facility.

CliEnt/loCation: S.k. EntErPriSES/Clifton, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SAIMA CLIFTON PArK vIEW

SCOPE: The Proposed Project is being constructed on a total area of plot

1016.66SQ.Yd. (9150.00 SQ.FT.). The project is fourtee (14)

stories commercial cum residential development consisting of flats

from 5th to 14th floor and a number of showrooms at ground floor.

The project development will comprises of site development

works and construction of infrastructure including building

structures, drains, sewers, and other utilities.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 90: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 87

CliEnt/loCation: maChiyara grouP & Paragon grouP)/runChorE quartErS

nEar jama Cloth markEt, m.a. jinnah road, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CONSTrUCTION & OPErATION

OF JAMA MALL & rESIdENCY

SCOPE: The proposed project comprises construction of Basement, Ground Floor and 1st & 2nd Floors for Shops, 3rd to 7th Floors for Car Parking and 8th to 11th Floors for Flats only. The residential apartments are spacious, secure and are 13 Storey high which is conventionally situated around shopping malls, restaurants and a hospital.

CliEnt/loCation: finErgy (Pvt) ltd/jhimPir arEa of diStriCt thatta Sindh

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF 50 MW WINd POWEr

PrOJECT

SCOPE: The project includes designing, tesing, manufacturing and operation as well as maintenance of wind turbines.The proposed Finergy Wind Farm includes installation and operation of 33 sets of wind turbines for the production of 50 MW. The hub height is 80m and the runner diameter is 82m.

CliEnt/loCation: Sarmad Poultry farm/EaStErn induStrial zonE, Port qaSim,

karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SArMAd POULTrY FArM

SCOPE: Project involves construction, operation and maintenance of a Broiler Poultry Farm in Eastern Industrial Zone of Port Qasim. The Poultry farm is planned to keep and rear around 25,000 birds in its facility. dOC will be brought to the facility and will be reared under conditions satisfying local hygienic and OHS standards. regular inspection of bird health in the PF will be conducted.

CliEnt/loCation: agility logiStiCS (Pvt) ltd/Port qaSim, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF QASIM LOGISTICS CENTrE

SCOPE: The proposed Qasim Logistics Centre is located in NWI Zone, PQA, Karachi. The proposed Centre shall have facilities for specialised storage, logistics and dry and cold supply chain operations.Following facilities will be provided at the proposed Qasim Logistics Centre;• Bulk Storage• Fully operational Cross dock facility• Configurable racked pallet positions• Total Inventory Management• Bar Code Scanning• Multi user EdI capabilities• Temperature controlled facility• value Added Services – fulfillment, labeling, documentation compliance etc.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 91: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 88

CliEnt/loCation: agility logiStiCS (Pvt) ltd/Port qaSim, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF MEHrAN LOGISTICS CENTrE

SCOPE: The proposed Mehran Logistics Centre is located in GadapTown, Super Highway, Karachi. The proposed Centre shall have facilities for specialised storage, logistics and dry and cold supply chain operations.Following facilities will be provided at the proposed Qasim Logistics Centre;• Fully operational Cross dock facility• Configurable racked pallet positions• Total Inventory Management• Bar Code Scanning• Multi user EdI capabilities• Temperature controlled facility• value Added Services – fulfillment, labeling, documentation

compliance etc.• Maintenance Workshop for Transportvehicles / Trucks

CliEnt/loCation: titan EnErgy PakiStan (Pvt) ltd/taluka & diStriCt thatta -

Sindh

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF PrOPOSEd 9 MW WINd

POWEr PrOJECT

SCOPE: Project site is located in Jhimpir Wind Corridor 13 km off Thatta-Thano Bulla Khan road, Taluka & district Thatta in Sindh. The Wind Power Project will be estalished over 68 -02 acres of land. The project includes designing, testing, manufacturing and operation as well as maintenance of wind turbines. The proposed project includes installation and operation of 06 sets of wind turbines in Phase-I for the prodction of 9.0 MW (1500 KW x 6). The hub height is 80 m and the runner diameter is 82 m. The civil works of the wind farm includes the foundation of WTGS, foundation of box type transformers, erection patform, power collection route and access roads construction (expansion in the wind farm).

CliEnt/loCation: Pak Can intErnational/SitE, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION STUdY OF SMELTING PLANT

SCOPE: The site for the Proposed Project Coal Based Smelting Plant is

located in SITE Karachi. The area of the plot is about 2,000 Sq.

Yard.

The raw material used are :

• Used Lead Acid Batteries and other scrap material

(40M.T/day)

• reducing Agents (anthracite or the metallurgical coke

(charcoal) and the iron chips)

• Fixing Agent (Fluorspar along with soda ashor sodium

carbonate)

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 92: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 89

CliEnt/loCation: PakiStan gEmS & jEWEllEry dEvEloPmEnt ComPany, miniStry of

ProduCtion/bliSS ShoPPing CEntrE, zaib-un-niSa

StrEEt,Saddar, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF ASSAYING ANd HALLMArKING

CENTrE

SCOPE: The project comprises establishment of Lab/Centre for the

metallurgical analysis of alloys containing precious metals used in

jewellery making. The project includes installation and operation

of equipment used in the processes of assaying and hallmarking

during metallurgical analysis.

The centre will be used for metallurgical analysis of alloys

containing precious metals. Assaying determines the

fineness/composition of the precious metals (Gold, Silver,

Palladium and Platimun) in the alloy used in jewellery whereas

Hallmarking refers to the physically marking a piece of jewellery

according to specific laws to certify the purity of metal. Assaying

is carried out by a number of techniques which includes

destructive and non-destructive testing.

CliEnt/loCation: ParthEnon (Pvt) ltd/abdullah haroon road, Saddar, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF INTErNATIONAL BUSINESS &

SHOPPING CENTrE

SCOPE: The proposed project comprises construction of a (15) Floor

Building. The proposed project covering total area of 3,62088

Sq.ft. The project development will include site development

works and construction of infrastructure including building

structures, drains, sewers and other utilities. Elevators, Fire

Alarm and Protection System, Intercom System, Wi-Fi Internet

System, CCTv Surveillance System, Generators and amenities

areas have been allocated to make the project more attractive

CliEnt/loCation: digri Sugar millS (Pvt) ltd/taluka digri, diStriCt mirPurkhaS

Sindh

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION STUdY OF SALE OF 2 MW

SUrPLUS POWEr TO HESC FrOM dIGrI SUGAr MILLS

SCOPE: The project comprises of construction, up gradation and

installation of power transfer components that includes power

cables, transformer, switch gears and other connectivity

equipments.The power plant is provided with two Shinko 3

megawatt turbo generators to generate 6 MW electricity, out of

which upto 4 MW is utilized by the digri Sugar Mills, whereas,

upto 2 MW surplus power will be supplied to HESCO during cane

crushing season.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 93: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 90

CliEnt/loCation: PakiStan SPaCE & uPPEr atmoSPhErE rESEarCh CommiSSion

(SuParCo)/induStrial trianglE at iSlamabad highWay nEar

toll Plaza, iSlamabad

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SATELLITE dATA rECEIvING

GrOUNd STATION FOr AGrICULTUrE PrOJECT

SCOPE: The building locates in Industrial Triangle at Islamabad Highway

near Toll Plaza. The project requires the establishment and

operation of ground receiving station that will perform the

following operations:

• receiving signals from remote satellite

• Acquisition of Satellite remote Sensing (SrS) data for

agriculture crops in Pakistan

• Acquisition of SrS data will also be used for earth resources

surveying, mapping and environmental monitoring studies

• Acquisition of data for atmospheric/meteorological studies

CliEnt/loCation: ElEngy tErminal PakiStan ltd (EtPl)/Port qaSim, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF HIGH PrESSUrE TrANSMISSION

PIPELINE & NITrOGEN BLENdING FACILITY

SCOPE: The proposed ETPL site for rLNG at Port Qasim is at

Khiprianwala Island i.e. at the junction of Phitti and Kadiro Creek

System. The project will thus be integrated into the infrastructure

of Oil & Gas dedicated area at Port Qasim.

The proposed project involves construction/laying of a High

PressureTransmission Pipepline that will connect proposed Engro-

rLNG facility to the SSGC distribution network. The pipeline will

be primarily used to transfer regasified LNG (rLNG) and may

however be also used for transport of LPG.

CliEnt/loCation: mr. junaid & mr. umEr naqi/bahadur yar jang CooPErativE

houSing SoCiEty, bloCk 3, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF NAXON’S MArrIAGE HALL

SCOPE: The Marriage Hall is ground floor + Boundary wall, it comprising

bridal room, stage, toilet, store room, kitchen, reception, booking

office, open lawn, underground water tank, drive way and

proponent are also providing motor cycle parking area. The total

plot area of the project 1023.00 Sq. yrd or 9208.68 Sq. ft. The

project is surrounded by open spaces and serenity, Marriage Hall

is basically the latest addition to the accessible modern wedding

halls present in the area of Bahadurabad that promises optimum

space utilization, comfort and stylish making merry.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 94: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 91

CliEnt/loCation: PEChS bloCk 3, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF ATLANTIC MArrIAGE HALL

SCOPE: The proposed project is situated on Plot 1, 2, 3 PECHS Block-3.

The site is located Maqbool CO-OP Housing Society Ltd. (KCHS

Union) Karachi located on main Shaheed-e-Millat road.

The “Atlantic Marriage Hall” consists of ground floor for marriage

hall and car parking purpose only and the features of project are

dressing room, stage, toilet, kitchen, booking office, underground

water tank + OverHead water tank, driveway, lobby and proponent

is also providing motor cycle + car parking area in marriage hall.

The total plot area of the project is 4425 Sq.Yrd.

CliEnt/loCation: baShir maChiyara/Clifton, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF MACHIYArA TOWEr

SCOPE: The proposed project is a development project covering a total

area of plot i.e. 1220.75 Sq.Yrd, (10986.75 Sq.Ft). The project

development will comprises of site development works and

construction of infrastructure including building structures, drains,

sewers and other utilities. The project is surrounded by open

spaces and serenity.

CliEnt/loCation: CEntral buildErS & dEvEloPErS/gadaP toWn, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF AvIATION ENCLAvE(HOUSING

PrOJECT)

SCOPE: Aviation Enclave is proposed to have single and one unit

Bunglows measuring 120-400 sq. yds and open plots both in

residential and commercial category measuring 120-400 sq.yds

residential plots and 750-5295 sq.yds commercial plots.

CliEnt/loCation: hiba buildErS & dEvEloPErS/north nazimabad, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF TAYYABI GArdEN

SCOPE: Tayyabi Garden apartments are ground+ 15 floors car parking,

children play area, 12 floor residential project comprising 2 & 3

bedrooms super luxury apartments. The total area of the project

is 1000.00 Sq.Yrd. The project development will comprises of

site development works & construction of infrastructure including

building structures, drains, sewers and other utilities.

The project accommodates to all necessities which a family

desires from the residential areas and apartment buildings to the

schools, religious and business districts.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 95: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 92

CliEnt/loCation: Euro buildErS & dEvEloPErS/north nazimabad, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF EUrO dUPLEX CITY

SCOPE: The proposed project comprises construction of thirteen (13) floor apartments with 04, 05 & 06 rooms super executive apartments in three categories, Executive, Super Executive and duplex. The project also houses exquisitely designed ultramodern showrooms fit for multinational companies, chain stores, banks and other prestigious business establishments. The project is ideally locatedfor family living with easy access to schools, hospitals, parks, shopping centers and restaurants for a modern lifestyle.

CliEnt/loCation: PhiliP morriS PakiStan ltd/kotri, Sindh

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF KOTrI UNIT EXPANSION

PrOJECT

SCOPE: The site located in SITE Area Kotri district Jamshoro. The site area is spread over 1875 Acres of land.The proposed project will compose of the following units:• New primary processing including FTd area• renovation of existing primary building• Modification in secondary production area• Additional secondary area• Modification in utility building• Installation of gas fired power plant• Installation of Wastewater Treatment Plant• Generator house extension• Medical Centre• Modification of fire protection system in all buildings• Improvement in site equipment and services• Prayer Area• Workers Canteen

CliEnt/loCation: PhiliP morriS PakiStan ltd/SahiWal

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CAPACITY ENHANCEMENT

PrOJECT - SAHIWAL UNIT

SCOPE: The site located in Qadirabad, 20 km from Sahiwal. The site area is spread over 69635 m2 of land..The proposed project will compose of the following units:• New primary processing area• Modification in secondary production area • Additional secondary area• Modification in utility building• Installation of Wastewater Treatment Plant• Generator house extension• Medical Centre (Future Plan)• Modification of fire protection system in all buildings• Improvement in site equipment and services• Prayer Area• Workers Canteen

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 96: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 93

CliEnt/loCation: dEnim intErnational (Pvt) ltd/Port qaSim, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CONSTrUCTION & OPErATION

OF dENIM INTErNATIONAL (PvT) LTd

SCOPE: The proposed facility (dIPL) will be located in the Northwesternindustrial zone of Port Qasim Area over an area of 7 acres.The proposed denim processing unit will be established at Port Qasim to produce the finest quality of real indigo denim, and its variants, to suit the needs of discerning customers worldwide. With a current proposed capacityof 1 million meters per month, it can supply any variant of denim; basic, premium and high qualityoe/oe, ring/oe, ring/ring in 100% cotton as well as polyester and streach denim.

CliEnt/loCation: tEChnova EntErPriSES (Pvt) ltd/hub baluChiStan

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION STUdY FOr ESTABLISHMENT OF

SMELTING PLANT

SCOPE: The primary project is designed for the reclamation of the lead in the scrap automotive or industrial batteries on an environmentally sustainable basis & selling the same for further use in the production of lead oxides or in the casting of grids, which will be used again in the production of lead acid batteries.

CliEnt/loCation: Salim yarn millS (Pvt) ltd/kotri-Sindh

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION STUdY OF PrOPOSEd 2.7 MW (EXTENdABLE TO 12 MW) GAS BASEd POWEr PLANT)

SCOPE: The project comprises construction, installation and operation of 2.7 MW (extendable to 12 MW) Gas Based Power Plant being installed at Salim Yarn Mills.The proposed plant comprises of six Caterpillar (Model Cat 3520-C) gas power internal combustion engines, each coupled with two MW generators. Each Engine is capable to produce 1900 KW. Natural Gas will be the main fuel for the plants. The plant is technically designed to operate on gas generating units with 90% power availability.

CliEnt/loCation: Siddiqui buildErS & dEvEloPErS/nazimabad

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CONSTrUCTION & OPErATION

OF GrACE TOWEr

SCOPE: The proposed project is a Mixed Use development Project covering an area of 1153 square yards & located in Nazimabad. The project is fifteen stories residential and commercial development consisting of residential apartments offered in 06 categories. The project development will include site development works and construction of infrastructure including building structures, drains, sewers and other utilities. Elevators, fire alarm and protection system, intercom system, generators, and amenities areas have been allocated to make the project more attractive.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 97: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 94

CliEnt/loCation: novatEx limitEd/Shah latif toWn, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF BOPET UNIT

SCOPE: The project will comprise of a single production line of BOPET

film with an average production of approximately 25,000

tons/year. The BOPET line will be fully equipped with state-of-the

art technology for the production of a wide variety of polyester

films with thicknesses ranging from 12 um to about 100 um and

will be able to utilize not only for the packaging of products such

as confectionary, biscuits, potato snacks but also in textiles, tea,

soaps, shampoos, and many other applications.

CliEnt/loCation: Sumya buildErS & dEvEloPErS/PEChS bloCk-3, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SUMYA BrIdGE vIEW SUPEr

LUXUrY APArTMENTS

SCOPE: The proposed project comprises construction of seventeen (17)

stories of 03, 04 & 05-room executive suites and spacious,

modern showrooms ideal for prestigious national and international

companies.

CliEnt/loCation: S.P. aSSoCiatES buildErS and dEvEloPErS/north nazimabad,

karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SAIMA PArI CENTrE

SCOPE: The proposed Saima Paari Centre is being constructed on a

commercial plot of land measuring 18000.00 sq.ft (2000.00 sq.yd)

and is located in North Nazimabad, Karachi. The project

comprised of fourteen storeys residential and commercial

development consisting of 91 limited edition apartments of 4-5

rooms & showrooms at ground floor.

The project is ideally located for family living with easy access to

schools, hospitals, parks, shopping centers and restaurants for a

modern lifestyle

CliEnt/loCation: futEhally ChEmiCalS (Pvt) ltd/manghoPir road, SitE, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF FUTEHALLY CHEMICALS

SCOPE Futehally Chemicals is located at Site on an area of 6.75 Acres.

The project has been undertaken as part of increase in production

capacity of detergent manufacturing plant to 400 TPd (tons per

day) and also to increase procurement of generic raw, packaging

and finished product by construction of new warehouse.

Another expansion to diversify its toll manufacturing business

through the construction of a dedicated sate of the art facility to

cater to home care products and provision of wastewater

treatment plant.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 98: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 95

CliEnt/loCation: unitEd EnErgy PakiStan ltd (uEP)/badin bloCk (non-ProtECtEd

arEaS)

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF PrOPOSEd SEISMIC SUrvEY

SCOPE: The project of seismic operations by UEPL in non-protected area

of Badin Concession Block comprises the said operation as a

prelude to oil and gas explorations

The said Block covers a total area of approximately 6,600 sq.km

and located in the four districts of Sindh Province, which Badin

Thatta, Hyderabad and Mirpurkhas.

CliEnt/loCation: CEntral buildErS & dEvEloPErS/fatima jinnah road, Civil

linES, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF rOYAL HOMES

SCOPE: “royal Homes” is an Urban development Project comprising the

Twelve (12) Storey residential Towers to be constructed on a

plot of area measuring about 3,600 square yards located on

Fatima Jinnah road, Civil Lines.

CliEnt/loCation: Euro buildErS & dEvEloPErS/north nazimabad,karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF EUrO CLASSIC

SCOPE: The proposed project is a development project covering an area

of 26996.06 sq.ft. Euro Classic is basically the latest addition to

the accessible modern homes present in the area of North

Nazimabad that promises optimum space utilization, comfort and

stylish living. The project comprises of fire protection system,

earthquake proof structure, wide internal roads, underground

parking, modern elevators, a home automation system for energy

saving and easy living, Wi-Fi internet, water purification (reverse

osmosis system), imported sanitary ware and fixtures,

underground parking, modern elevators, porcelain floor tiles,

security and extreme privacy,sewerage treatment line, concealed

cabling (Tel, Cable and Intercom) and amenity areas have been

allocated to make the project more attractive

CliEnt/loCation: zuhair buildErS & dEvEloPErS/gulShan-E-iqbal bloCk-3

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF AL-GHAFOOr OrCHId

SCOPE: The Project comprises of a sixteen (16) storey tower over

1066.67yd2 area of commercial land. The project development

consists of 85 apartments offered in four (04) categories with 03,

04 and 05 room executive apartments.according to the proposed

building plan the basement is reserved for Air raid Shelter, the

Ground floor comprises Shops & Amenities area, 1st to 3rd floor

reserved for parking, 4th floor consist of parking & recreational

Area while 5th to 16th floor residential apartments

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 99: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 96

CliEnt/loCation: nikorESourCES (PakiStan) ltd/induS baSin bloCk-y

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF PrOPOSEd OFFSHOrE

drILLING OF NMr-01 & NMr-02 WELLS

SCOPE: The drilling will be conducted with an area of approximately 80

km to 100 km Southwest of Karachi and at least 60 km offshore

from the nearest landfall.The proposed well locations are located

within two 10 km radius polygons. The IEE Study has identified

the environmental aspects likely to arise from the drilling and

associatedactivities in Indus Basin Y and has made assessment

of the impact and recommended mitigation measures to ensure

environmental impacts are minimized and kept to acceptable

limits.

CliEnt/loCation: Euro buildErS & dEvEloPErS/nazimabad bloCk-1, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF EUrO GrANd PArK

SCOPE: The proposed project is located in Block-1, Nazimabad and is

Mixed Use development Project covering an area of 2502 sq.yds.

The project development will include site development works

construction of infrastructure including building structures, drains,

sewers, and other utilities. Elevators, fire alarm and protection

system, intercom system, generators, and amenities have been

allocated to make the project more attractive.

CliEnt/loCation: zuhair buildErS/PEChS, bloCk-2, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION STUdY FOr CONSTrUCTION &

OPErATION OF AL GHAFOOr CHALET

SCOPE: The proposed project is located in PECHS Block-2 comprising of

an eight storey tower with a 04 & 05 room super executive

apartment accentuated by its gorgeous elevation and evitable

location.The project covers an area of 438 sq. yds. The project

development will include site development works and construction

intercom system, Wi-fi Internet System, CCTv surveillanc

system, generators and amenities areas have been allocated to

make the project more attractive.

CliEnt/loCation: karaChi intErnational ContainEr tErminal limitEd (kiCtl)/

WESt Wharf, karaChi Port, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF NEW POWEr HOUSE

SCOPE: The proposed project comprises of construction of a new power

house at Karachi International Container Terminal (KICT).This will

include installation of eight diesel Engine driven generators after

removal from the Container Quay Cranes. All the generating sets

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 100: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 97

will run in parallel supported by a control/ synchronizing system.

requisite equipment like switch gears/step up/down transformers

will also be installed. Power supply cables will be laid up to each

Quay Crane (QC). A total of 8 nos. of Caterpillar engines which

shall be removed from the cranes and relocated in the power

house, will have a power generation capacity of 11.8 MW. The

area of the proposed powerhouse is 60m x 10.2m (612 sq. m)

which will be located inside the Terminal near the Engineer

Building. The estimated capita cost of the project is US$ 2.7m.

CliEnt/loCation: ilyaS tradErS/Port qaSim, karaChi, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SMELTING PLANT

SCOPE: The project includes setting up a smelting plant in PQ Karachi.

The smelting cycle in the rotary furnace includes following

sequence:

● Preheating of the rotary furnace to 1100oC to 1200oC.

● Feed of the charge mix into the furnace with Furnace

charging machine in 25-30min.

● rotation of the furnace at speed of 1 to 1.5 rPM

● Burning of organic materials at 60-90oC.

● drying of charge at 120oC to 150oC.

● Melting of metallic lead at 327oC.

● reduction of lead oxides and lead sulphate with reducing

agents at 650 oC to 1200oC.

● Formation of liquid Lead Bullion.

● Formation of a liquid slag.

● discharge of liquid lead through discharge port at periphery

of furnace.

● discharge of slag.

CliEnt/loCation: a&a aSSoCiatES/karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION FOr CONSTrUCTION OF

CENTrEPOINT

SCOPE: The Centrepoint Building comprises 3, 57,720 sq.ft. of

commercial space standing at a height of 492 feet including the

communication tower. It will comprise of office spaces, swimming

area and parking garage. The project development will include

site development works and construction of infrastructure

including building structures, drains, sewers, wastewater

treatment facility, landscaping of the area and other utilities.

International standards of design in commercial building have

been adopted. High speed elevators, security system, swimming

pools and amenities areas have been allocated to make the

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 101: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 98

project more attractive.

The project will be funded by Overseas Private Investment

Corporation (OPIC). The IEE study covers all national and

international requirements to meet the evaluation criteria of the

OPIC.

CliEnt/loCation: iShaq EntErPriSES/Clifton, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF PrOPOSEd rESIdENTIAL &

COMMErCIAL BUILdING PrOJECT “COM-3”

SCOPE: “COM-3” is an Urban development Project comprising two 32

Storeys residential cum Commercial Towers being established

over an area of 9689 square yards of a commercial plot located

at the edge of Khayaban-e- Saadi and Khayaban-e-Ghalib

adjoining at Bilawal Chowrangi in Block-6 KdA Scheme No. 05

of Clifton Karachi. Administratively the area falls in Saddar Town

of defunct CdGK.

CliEnt/loCation: hiba buildErS & dEvEloPErS/ShahEEd-E-millat road, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SUMYA rESIdENCY

SCOPE: The Sumya residency is a 14 storey residential development

consisting of 52 apartments offered in 6 categories. It offers 2,

& 4 Bedrooms Super Luxury Apartments. The features and

design are in accordance with the requirements of modern day

living and creative use of technology such as home automation

and internet facility. The project is ideally located for family living

with easy access to schools, hospitals, parks, shopping centres

and restaurants for a modern lifestyle. The unique modern

design with provision of large LCd screens for product

advertisement makes this building a landmark location in the

area which will be easily identifiable to guests of the residents

CliEnt/loCation: Euro buildErS/north nazimabad, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF EUrO CLOCK TOWEr

SCOPE: The proposed Euro Clock Tower (ECT) project comprises of

shops and residential flats shall be loacted in North Nazimabad,

Karachi.The project aims at providing a landmarkto the skyline in

the commercial and residential sector of North Nazimabad.

Euro Clock Tower is a 9 storey residential development

consisting of 63 apartments offered in 5 categories. building

height is 146 ft above ground level. The project is ideally located

for family living with nearby access to schools, hospitals, parks,

shopping malls and restaurants for an ideal family lifestyle.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 102: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 99

CliEnt/loCation: fatima vEnturES & amatul ConStruCtionS/karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION USE OF MAGIC FLOAT MOdULAr

FLOATING JETTY SYSTEM (HdPE)

SCOPE: Magic Float comprises of HdPE Material designed into

interlocking blocks for use above water.The HdPE material is

100% recyclable, resistant to oils, acids, frost, seawater corrosion,

chemicals and Uv rays.its high buoyancy, low maintenance and

ease of assembling and its environmental friendly composition

make it very viable product.

CliEnt/loCation: oil & gaS dEvEloPmEnt ComPany ltd (ogdCl)/diStriCt

Sanghar-khairPur-ShahEEd bEnazirabad Sindh

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF BITrISM BLOCK

SCOPE: The project area is located in South East of Sindh Province and

is about 26 km from Sanghar City. The project area is divided in

three districts i.e Sanghar, Khairpur and Shaheed Benazir Abad

The scope of work covers both acquisition of 2d/3d seismic

activity and drilling of wells. On the basis of seismic survey

results, three exploration wells will be drilled in the project area.

CliEnt/loCation: Sindh inStitutE of urology and tranSPlantation (Siut)/

Saddar, karaCh

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF PrOPOSEd SIUT TrANSPLANT

TOWEr

SCOPE: This public health project will be located on Yaqub Khan road.

The proposed SIUT Transplant Tower will be treating all

transplant patients under one roof and comprises of transplant

surgery ward, laboratory, radiology and will also accommodate

patients suffering from other diseases. The proposed tower would

be connected with the existing dewan Farooq Medical Centre

(dFMC).

CliEnt/loCation: oil & gaS dEvEloPmEnt ComPany ltd (ogdCl)/gotki, Sindh

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF MArU-rETI GAS PIPELINE

PrOJECT

SCOPE: This Maru-reti Gas Field is located in the Northern Sindh

Province, 7 km South of Ubaro. OGdCL intends to lay a gas

pipeline between Maru-reti gas wells to existing Guddu Power

Plant gas supply line for onward supply to Guddu Pipeline.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 103: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 100

CliEnt/loCation: bP PakiStan ExPloration & ProduCtion inC/badin ConCESSion

arEa

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF PrOPOSEd 3-dSEISMIC

OPErATIONS IN TANdO GHULAM ALI (TGA) & BUZdAr rEGIONS

SCOPE: Proposed seismic survey is use to produce a three-dimensional

(3d) map of the subsurface geological structures so potential

locations for oil and gas production wells can be identified with

greater accuracy.

CliEnt/loCation: anoud tExtilE millS ltd/nooriabad, Sindh

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF PrOPOSEd 11.7MW

(EXTENdABLE TO 16 MW) GAS BASEd POWEr PLANT.

SCOPE: The project comprises of construction, installation and operational

stages of 11.7 MW (extendable to 16 MW) gas based power plant

with waste heat recovery boilers (WHrB) and installation of

steam turbine to produce additional electricity

CliEnt/loCation: rECkitt bEnkiSEr/SitE karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CAPACITY ENHANCEMENT &

GMP COMPLIANCE

SCOPE: The project has been undertaken as a part of reckitt Benckiser’s

Capacity Enhancement and GMP Compliance Project, comprising

of addition of in-house production and packing of Harpic and

MPC (Multi Purpose Cleaner), capacity enhancement of veet

Cream and upgrade of disprin area to meet GMP compliance

requirements

CliEnt/loCation: Sundar gaS (Pvt) ltd/Port qaSim, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SUNdAr GAS LPG STOrAGE

& FILLING STATION

SCOPE: The proposed site for the Sundar Gas LPG storage and filling

facility is located in the LPG designated area at Plot F-01, North

West Industrial Zone of Port Qasim. The total area of the plant is

8090 sq.m.

Keeping in view the present scenario and demand, Sundar Gas

has planned to develop a storage facility of 120metric tons which

will be increased to 170metric tons.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 104: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 101

CliEnt/loCation: City diStriCt govErnmEnt karaChi (Cdgk)/Shahrah-E-faiSal,

karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF COrrIdOr-Iv

SCOPE: The project comprises of construction of flyovers to develop

Shahrah-e-Faisal as a signal free corridor, presently managed

through a series of signalized intersections throughout the

Shahrah.

This Initial Environmental Examination (IEE) report presents the

assessment of environmental impacts of construction &

operation of proposed signal free corridor at Shahrah-e-Faisal

Karachi.

CliEnt/loCation: haSCombE StoragE ltd/ShikarPur

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF BULK OIL STOrAGE FACILITY

SCOPE: Hascombe Storage Limited plans to launch the project of setting

up a Bulk Oil Storage Facility at district Shikarpur to facilitate the

increasing demand of petroleum products in the country by

speedily supplying the products in the target markets within reach

through accessible roads using fast transport services

CliEnt/loCation: kmC offiCErS CooPErativEhouSing SoCiEty/karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF HOUSING SCHEME PrOPOSEd

OvEr 200 ACrES OF LANd

SCOPE: The proposed project covers an an area of 200 acres and has

the potential to contribute towards revitalization of the housing

sector and towards the economic development of the country

CliEnt/loCation: amrElli StEElS (Pvt) ltd/dhabEji

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION AMrELLI STEEL MILLS

SCOPE: The proposed project is concerned with the establishment of

a melt shop and a hot rolling mill to reduce the import of steel and

iron, so an Initial Environmental Examination (IEE) has been

carried out to provide all necessary information on potential

environmental and social impacts at the different stages of the

project.

CliEnt/loCation: karaChi ElECtriC SuPPly CorPoration (kESC)/karaChi

PrOJECT INITIAL ENvIrONMENTAL EXAMINATION OF WEST WHArF & HArOONABAd

POWEr GENErATION UNIT

Scope: The proposed project is concerned with the establishment of power generation units to manage the acute power shortage in Karachi.An Initial Environmental Examination (IEE) has been carried out to provide all necessary information on potential environmental and social impacts at the different stages of the project.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 105: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 102

CliEnt/loCation: intErnational induStriES ltd/landhi karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF POWEr PLANT

SCOPE: The project will be situated at Landhi area on Survey Nos. 399

to 405, deh Sharabi, Landhi Town, Karachi. Land requirement

for the complete project is 40 acres.

International Industries is intending to establish Cold rolling

Mill and Gas Fired power plant to manufacture high quality of

Cold rolled Coils

CliEnt/loCation: ProCtor & gamblE PakiStan (Pvt) ltd/hub baloChiStan

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF WASTEWATEr TrEATMENT

Scope: The proposed project is concerned with the construction,

establishment and operation of Wastewater Treatment Plant.

An Initial Environmental Examination (IEE) has been carried out

to provide all necessary information on potential environmental

and social impacts at the different stages of the project.

CliEnt/loCation: jaWEdan CorPoration ltd/gadaP toWn, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF NAYA NAZIMABAd HOUSING

SCHEME PHASE-I

SCOPE: The proposed Naya Nazimabad HousingScheme is a multi use

project will be build on 1,238 acres and its major portion is located

in Gadap Town and minor is in Orangi Town. The project includes

residential plots for houses, large plots for flats, commercial

areas and other amenities including health facility, praying areas,

grave yard, schools, colleges, university and some green areas.

CliEnt/loCation: kda offiCErS CooPErativE houSing SoCiEty/gulShan-E-iqbal,

karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF KdA OFFICErS COOPErATIvE

HOUSING SOCIETY

SCOPE: The K.M.C O.C.H.S. is planned to be built on a total of 200 acres

out of which 60% shall be reserved for residential purposes

whereas 3.81% and 11.10% area shall be used as commercial

and amenities area respectively.

These amenities include mosque, parks and parking space,

public buildings and school/ colleges built on a total of 18 plots

altogether. As such, the project shall provide the residents easy

access to all facilities such as educational, health, recreation etc

Guidelines of Pak- EPA laws as well as other relevant

environmental legislations. It is essential that the project design,

construction and operations are such so as to pose no threat to

surrounding physical and biological environment, the work force

and the residents of the housing colony

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 106: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 103

CliEnt/loCation: gEnEration’S SChool/SitE arEa, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF GENErATION’S SCHOOL

SCOPE: The proposed South Campus of Generation’s School shall

be constructed in South Avenue SITE, Industrial Area, Karachi

having an area of 5.81 acres.

The project comprises of Standard Classrooms. Libraries, Labs,

Office Block, Playground and Inside Car Parking

CliEnt/loCation: glaxoSmithklinE/korangi karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION FOr EXPANSION OF LACTAM

BLOCK

SCOPE: Construction of facility for manufacturing of Lactam Products

(Cephalosporins) - tablets, capsules and suspension

CliEnt/loCation: WaltErS PoWEr intErnational (WPi)/ naudEro Sindh

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF rENTAL POWEr PLANTS

SCOPE: The project comprises construction, installation and operation

of two rental Thermal Power Plants. The rental Thermal

Power Plant being installed at Naudero, Sindh comprises two

gas turbines of 50MW and 51MW capacities on a 5-acre land

area near the Naudero Sugar Mills. Natural Gas will be the

main fuel for the plants. Associated with the Project are

provisions for connections to the electricity and gas grids

CliEnt/loCation: dEfEnCE houSing authority/karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF dALTON PArKING PLAZA &

SHOPPING MALL & UPGrAdATION OF ZAMZAMA CLUB & SPOrTS COMPLEX

SCOPE: The project comprises of a Parking Plaza, Shopping Mall, Club

& Sports Complex built over 100,000 m2.

CliEnt/loCation: rEySir EntErPriSES/SitE SuPErhighWay, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SOLvENTS STOrAGE

WArEHOUSE

SCOPE: The project comprises of the construction of Warehouse on a

plot of Industrial land having an area of about 1210 sq.yds.

Organic solvents (i) denatured Spirit (ii) N Butyl Acetate (iii) be

stored in drums & Underground Tanks.

The Proponent of this project M/s reysir Enterprises, supplies

organic solvents to customers with a wide range of performance

products designed to solve chemical problems associated with

the production, processing and transportation of Chemicals for

the manufacturing of paints.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 107: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 104

CliEnt/loCation: karaChi urban tranSPort CorPoration/karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION FOr dEvELOPMENT OF JUMA

GOTH FOr THE rESETTLEMENT OF PrOJECT AFFECTEd PErSONS

(PAPS)

SCOPE: This IEE report responds to the requirement of Pakistan

Environmental Protection Act, 1997 & the resettlement Action

Plan (rAP) prepared for the resettlement of Project Affected

Persons (PAPs) of the Project: revival of Karachi Circular

railway.The rAP was prepared in response to the EIA conducted

and approved earlier. The rAP required identification of site for

relocation of the Project Affected Persons (PAPs).The proponent,

KUTC, has identified 283 acres land opposite Juma Goth railway

Station & adjacent to urban area Shah Latif Township in Bin

Qasim Town.

CliEnt/loCation: divinE dEvEloPErS (Pvt) ltd/lahorE

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF dIvINE MEGA 2

SCOPE: divine Mega 2 has been proposed by the divine developers

(Pvt) Ltd.and is located in the newly developed area of Main

defence road Lahore Cantt. The project would have retail

Outlets, Anchor Stores, restaurants, Cafes, Executive Offices

with fully fitted kitchens andwashrooms, Shops, Banks,

prestigious showrooms at the ground floor and basement for

parking.

CliEnt/loCation: SEvEn SEa ConStruCtion/Clifton, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CITY TOWEr

SCOPE: The project initiated by the Seven Seas Construction Builders

and develops a residential cum commercial building on a plot

measuring 1023 sq. yds. The building comprises of 13 floors.

various steps undertaken in the IEE preparation included

understanding of the proposed operation; review of legislation

and guidelines; IEE scope and methodology includes collection of

secondary data; field data collection; impact identification;

recommendations for mitigation and monitoring measures;

development of Environmental Management Plan (EMP) and

reporting

CliEnt/loCation: mi-SWaCo m-i ovErSEaS ltd/karaChi

PrOJECT INITIAL ENvIrONMENTAL EXAMINATION rEPOrT FOr drILLING CHEMICAL

STOrAGE WArEHOUSE

Scope: An Initial Environmental Examination (IEE) has been carried out to provide all necessary information on potential environmental and social impacts at the different stages of drilling project. An IEE document has been prepared to meet the legislative requirement of Pakistan Environmental Protection Act 1997.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 108: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 105

CliEnt/loCation: quality golf PakiStan (Pvt) ltd/karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF ACACIA COUNTrY & GOLF CLUB KArACHI

SCOPE: Quality Golf Pakistan (Private) Limited – QGPL to set-up a country and golf club in Pakistan at a prime location of Karachi. This upcoming project has been named as ACACIA Country & Golf Club (ACGC) which is being established near Quaid-e-Azam International Airport, Malir Cantonment, Karachi.

CliEnt/loCation: triPlE trEE aSSoCiatES/Clifton, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF SOFITEL rESIdENCE

SCOPE: Triple Tree Holding being a local partner of ACCOr Group has proposed the serviced apartments in the Clifton, Karachi, which is named as Sofitel residence. The project proposed in the posh locality of the city.Sofitel residence will comprise of 33 floors and a basement. It will cover an area of 7655.67 yd2. Site is approximately 23 feet high from mean sea level. First three floors and ground floor will have shops, play area and health club.A dedicated 4 storeys car park has been proposed above the shopping area. Services area has been proposed further above in 2 floors. Serviced apartments will occupy 21 storeys just after the Services area. Last 2 floors will have mechanical and electrical installations.

CliEnt/loCation: national gaS ltd/hub baloChiStan

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF LPG STOrAGE BOTTLING

PLANT

SCOPE:: National Gases Limited has planned to set up LPG storage and filling facility in Hub, Balochistan. This proposed plant will be set up at 04 acres area with storage capacity 100 Metric Tons and filling capacity 25 Metric Tons per single shift. The annual throughput of LPG will be received by road tankers from source to filling plant and transfer to consumers by filling them into cylinders or decanting into the transport tanks for bulk supply through LPG Pumps.

CliEnt/loCation: Siza food (Pvt) ltd/f-9 Park, iSlamabad

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION FOr MCdONALd’S rESTAUrANT

SCOPE: Siza Food Pvt Ltd, who is Mcdonalds’s franchise owner in Pakistan, decided to open their first branch in F-9 Park, Islamabad.The assessment of this IEE study has been focused on the operation of restaurant. The major areas covered in the impact analysis include solid waste, waste water, noise, emissions, occupational safety and socioeconomic factors. Facilities which are included to manage restaurant operations include HvAC, water, natural gas, electricity, communication, illumination, water treatment and solid waste management. All these systems are installed as per international standards and calibrated at higher degree.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 109: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 106

CliEnt/loCation: orix ProPErtiES PakiStan (Pvt) ltd/gulbErg, lahorE

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION FOr SErvICES APArTMENTS

SCOPE: Orix Properties Pakistan (Private) Limited (OPPL) has proposed

the serviced apartments in the Gulberg town, Lahore, which is

posh locality of the city.

The site is located in the semi commercial area of Gulberg,

Lahore, which is a peaceful place and surrounded by the

residential bungalows. The infra structure around site is excellent

with spacious roads and proper sewerage system. There is no

significant flora and fauna found on site, except some wild bushes,

shrubs, herbs and some pet animals.

CliEnt/loCation: City diStriCt govErnmEnt karaChi/karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF 5-STEEL BrIdGES

SCOPE CdGK Is intended to construct 5-Steel bridges at different

locations of Karachi for which IEE study has been conducted to

assess the environmental and social impacts of the project in the

project vicinity and providing recommendations to mitigate those

impacts.

CliEnt/loCation: PakiStan houSing intErnational ltd/karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION FOr PETrO-CHEMICAL, rAW

MATErIAL & FEEd STOCK PrOJECT

SCOPE: The proposed project is concerned with the setting up of Tank

Terminal which will be used for storage of petrochemical raw

material and feedstock, so an Initial Environmental Examination

(IEE) has been carried out to provide all necessary information on

potential environmental and social impacts at the different stages

of the project; an IEE document has been prepared to meet the

legislative requirement of Pakistan Environmental Protection Act

1997.

CliEnt/loCation: im tEChnologiES PakiStan (Pvt) ltd/karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF KArACHI IT TOWEr COMPLEX

SCOPE: IT Tower Complex is a project of such nature that will provide

10,000 seats call centres, a three basement car parking area to

facilitate 2,500 cars at a time, food courts, high class shopping

arcade, Cineplex for entertainment purposes, a hotel and other

office spaces. Tower will have 47 stories. A total covered area of

2.8 million ft2 will be occupied by the tower. It is a project of IM

Technologies.This project is a multi-use complex and will fulfil

office needs as well as providing accommodation and

entertainment facilities. It will have world class support facilities

and services to manage the whole building through a centralised

building management system.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 110: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 107

CliEnt/loCation: boSiCor PakiStan ltd/hub, baloChiStan

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OFAddITIONAL STOrAGE TANKS

& ISOMErIZATION UNIT

SCOPE: The project is located at Khalifa Point on the coastline of the

Arabian Sea. Bosicor refinery is producing 600 bbls LPG, 32,610

bbls export naphtha, 42,090 bbls premier motor gasoline, 6000

bbls Bosicor light oil, 165,840 bbls high speed diesel and 24,740

bbls fuel furnace oil. BPL has planned to extend its operation by

adding up a new process unit (the Isomerisation Unit) which will

process light naphtha through isomerisation process to form high

octane products.

BPL also planning to increase its storage capacities for future

needs and for this purpose constructing11additional storage

tanks near existing storage tanks area with the capacity of

126,000 tons.Two additional new tanks are for crude oil and the

rest the product storage tanks.

CliEnt/loCation: daWood EntErPriSES, kda SChEmE-33, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OFJINNAH HOUSING SCHEME

SCOPE: dawood Enterprises has planned to launch advance housing

scheme in the area of Karachi development Authority Scheme-

33 Sector-29. The study was followed by site visits, details of

construction activities, post-construction activities such as

occupying of houses.

Environmental and social baseline has been taken from published

literature available specifically relevant to the Scheme-33 which

was further confirmed during ground visits conducted.

The assessment was focused on construction activities, existing

infrastructure of area, post construction activities and

transportation.The major areas covered in the impact analysis

include air emissions, wastewater, solid waste, community

development, adjacent landuse and traffic management.

CliEnt/loCation: Shv EnErgy (PakiStan) ltd, Port qaSim, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION FOr EXPANSION OF LPG STOrAGE TANKS

SCOPE: SHv Energy is one of the largest LPG production industries in Pakistan. SHv Energy has planned to extend its operations in Port Qasim area by its new expansion project of five above the ground LPG storage tanks adjacent to existing facility. At present SHv Energy has total land area of 5 acres out of which half of that area is being utilised by existing facility. The proposed extension project will start its operations on the remaining half portion of 5 acre land. The assessment was focused on construction activities i.e. foundation works, etc. and operations i.e. LPG storage, filling and transportation.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 111: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 108

CliEnt/loCation: triPlE trEE intErnational/Clifton, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION FOr CONSTrUCTION & OPErATION

OF SOFITEL TOWEr

SCOPE: Triple Tree International Hotel intends to establish Sofitel Tower

at Clifton, Karachi which will be comprises of 25 floors hotel,

shopping mall on ground floor and 5 floor basement parking.

The total area acquired for this development is about 7337.52

yd2 and at 28 ft height of sea level. The assessment was

primarily focused on the construction activities and later

operations of hotel procedures and relevant mechanics. The

major areas covered in the impact analysis include wastewater,

solid waste, occupational safety and socio-economic factors as

well as traffic management.

CliEnt/loCation: mari gaS/ziarat bloCk, baloChiStani

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION FOr SEISMIC SUrvEY &

EXPLOrATOrY WELL

SCOPE: Mari Gas intends to undertake seismic and drilling operations in

the southern part of Ziarat Block which lies in district Bolan. The

southern part of Ziarat Block occupies 95 km area in total.

A well organized team established to conduct field visits for

various locations that fall within the boundary of project area such

as Pir Ghaib, Bibi Nani, Khajuri, Barari, dranjan and Kirta. It is

expected that the well will be drilled to the nearby area of Bibi

Nani.

CliEnt/loCation: Sui SouthErn gaS ComPany ltd

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF MACH-KOLPUr ON QPL

(GIrEP-II)

SCOPE: The Mach Kolpur 18ӯ X 15 km loopline project (BKLP) is a

continuation of SSGCL’s transmission line expansion phase

under GIrEP II Plan.

The proposed gas pipeline will be estalished at an estimated total

cost of rs. 348 million. The loopline traverse along the existing

12ӯ Quetta Pipeline from Mach valve Assembly at Khobash to

Kolpur Main valve Assembly.

The total width of the corridor of impact of the proposed Mach-

Kolpur loopline would be 30’. Almost 90% of the loopline route

is traversing in the bed of Bolan river and the remaining 10%

barren rocky soil near Kolpur valve Assembly. This land having

width of around 20’ is to be leased for construction.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 112: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 109

CliEnt/loCation: alEEm SonS WEaving, dyEing, Printing (Pvt) ltd/SitE, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF ALEEM SONS

SCOPE Screening of the potential impacts during construction and

operation phase has been made, mitigation has been suggested

and finally monitoring plan was developed

CliEnt/loCation: Siza food (Pvt) ltd, SEa viEW/Clifton, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION

SCOPE IEE for a new Mcdonald's outlet at the Clifton Beach Karachi

along with a proposed park was carried out in which

environmental screening was made to assess the environmental,

ecological and social impacts of the project.

Finally mitigation were conducted. Screening was made for

environmental, social and ecological impacts of the project.

CliEnt/loCation: CrESCEnt ChEmiCalS/EPza, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF CrESCENT CHEMICALS

SCOPE An Initial Environmental Examination (IEE) has been carried out

to provide all necessary information on potential environmental

and social impacts at the different stages of establishment of

Crescent Chemical's project an IEE document has been prepared

to meet the legislative requirement of Pakistan Environmental

Protection Act 1997.

CliEnt/loCation: hinoPak motorS ltd/SitE, karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF WASTEWATEr TrEATMENT

PLANT

SCOPE Screening of the possible environmental impacts due construction

and operation of wastewater treatment plant

CliEnt/loCation: dEWan Sugar millS ltd,

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF dEWAN SUGAr MILLS

SCOPE dewan Sugar Mills Limited is installing distillery Plant in their

premises for which EMC has successfully prepared the Initial

Environmental Examination report in Sep 2004

CliEnt/loCation: Eni-laSmo/bhit, SEhWan

PrOJECT: IMPACT ASSESSMENT ON QUArrIES AT HALLEL SITE

SCOPE Study has been conducted for the environmental and ecological

impacts of quarries taken from the different sides along Hallel

road side.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 113: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 110

CliEnt/loCation: dEfEnCE houSing authority/karaChi

PrOJECT: INITIAL ENvIrONMENTAL EXAMINATION OF dHA WATErFrONT

SCOPE dHA has launched some futuristic landmark projects Water Front

development is one of such projects. The project is located on

the Southern portion of Karachi about 14kms long stretching from

Sindbad to the Golf Course.The project has multi-spectral land

use patterns in which residential, commercial and recreational

sites are developed.

IEE EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 114: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 111

EMC provides following industrial hygiene services for implantation of Industrial Hygiene Programs

for Organizations.

• noiSE SurvEyS and noiSE abatEmEnt SolutionS

detailed noise surveys are noise maps developed for the designated area. Noise reduction

measures are recommended to reduce noise at source.Selection of appropriate hearing

protection is carried out after determination of Octave band frequency and noise levels.

• aSSESSmEnt of PotEntial ExPoSurE of EmPloyEES to hazardouS SubStanCES

Survey of facility is carried out and risk assessment conducted to determine potential exposure

of employees to substances hazardous to health. This includes gas, vapours and particulate

matter. High exposure areas are highlighted for further determination of actual exposure levels

through industrial hygiene measurements

• dEtErmination of ExPoSurE lEvElS and mitigation mEaSurES to rEduCE ExPoSurES

Exposure levels are determined to assess the exposure of employees to hazardous substances

over an 8 hr. period to check against the Permissible Exposure Limits of the substances.

Measures to reduce exposure levels using the hierarchy of controls are outlined and

recommended. This includes selection of appropriate rPE as well.

• ErgonomiC aSSESSmEntS and SolutionS to imProvE dESign of job and Work StationS

Survey of manual handling activities and workstations is conducted to identify potential

ergonomic issues which could lead to Work related Musculoskeletal disorder (WrMSd).

Lighting levels are also determined in respect to the nature of work. determination of Heat and

Cold Stress during outdoor work and measures to reduce heat and Cold stress are

recommended.

We also provide customized trainings on the following:

• hEaring ConSErvation and noiSE ExPoSurES

Hearing Conservation and Noise Exposure training programs are provided to employees to

increase awareness on hearing conservation and the potential risks of hearing loss due to high

noise exposure. Training includes videos and case studies

• oCCuPational hEalth and ExPoSurE to hazardouS SubStanCES

Training on basics of Occupational Health highlighting the hazards of exposure to hazardous

substances is provided using videos and case studies

• ErgonomiCS

Basic training on Ergonomics is provided to employees using videos, and case studies

• SElECtion and uSE of PErSonal ProtECtivE EquiPmEnt

Selection and use of Personal Protective Equipment especially Hearing Protection and

respiratory Protective Equipment plays an important role in implementation of an industrial

hygiene management. Training on selection, handling, use and storage of PPE is provided to

both the users and management so that both are on the same level when ordering and using

the right PPE for the task in hand to provide maximum protection.

INDUSTRIAL HYGIENE

CO

MP

AN

Y P

rO

FIL

E

Page 115: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 112

CliEnt/loCation: mama induStriES (Pvt) ltd, Port qaSim, karaChi

PrOJECT: ENvIrONMENTAL AUdIT (PHASE-1)

SCOPE: Performed detailed environmental audit in order to observe and

record the environmental , health and safety compliance issues at

the terminal during operation and maintenance stages.

CliEnt/loCation: niShat millS ltd, lahorE

PrOJECT: BUSINESS SOCIAL rESPONSIBILITY (BSr) AUdIT

SCOPE: Conducted BSr Audit of dyeing and Finishing Units (review of

2011 audit)

A review of the progress against the last BSr audit

recommendations was carried out and gaps identified with

recommendations for improvement.

CliEnt/loCation: navEEna tExtilE mill (dEnim) lahorE

PrOJECT: BUSINESS SOCIAL rESPONSIBILITY (BSr) AUdIT

SCOPE: Audited the textile mill producing denim with the team of auditors

by covering local legislative requirements

CliEnt/loCation: ahmEd laCE (nExgEn) karaChi,

PrOJECT: BUSINESS SOCIAL rESPONSIBILITY (BSr) AUdIT

SCOPE: Conducted an audit at Ahmed Lace (Nexgen) and covered local

legislative requirements. Ahmed Lace manufactures Stickers, Tags,

and Printed ribbons.

CliEnt/loCation: rECkitt bEnkiSEr, karaChi & lahorE

PrOJECT: EHS COMPLIANCE AUdIT

SCOPE: Conducted EHS audit at three locations of rB Pakistan. rB

Pakistan is producing consumer as well as pharmaceutical

products.

CliEnt/loCation: fmC, lahorE

PrOJECT: ENvIrONMENTAL COMPLIANCE AUdIT

SCOPE: Conducted the audit for assessing the compliance at FMC. Local

environmental legislative and corporate requirements were

assessed.

AUDIT EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 116: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 113

CliEnt/loCation: monSanto PakiStan ltd, lahorE

PrOJECT: EHS COMPLIANCE AUdIT

SCOPE: Audited two locations of Monsanto Pakistan with the team of

auditors and covered the local legislative requirements and its

compliance at Monsanto Pakistan

CliEnt/loCation: ChEmitEx tExtilE induStry, karaChi, PakiStan

PrOJECT: ENvIrONMENTAL AUdIT

SCOPE: Conducted an environmental audit to check compliance with

national regulatory requirements. The audit was conducted and

completed in the year 1998.

CliEnt/loCation: WyEth PakiStan ltd

PrOJECT: ENvIrONMENTAL COMPLIANCE AUdIT

SCOPE: Conducted an environmental compliance audit for the Wyeth Pakistan

Limited in the year 2006 which specially focused the compliance of

operations of all industrial units with respect to the national regulatory

requirements as well as corporate requirements.

CliEnt/loCation: fauji kabirWala PoWEr Plant, Punjab

PrOJECT: dUE dILIGENCE AUdIT

SCOPE: Conducted an audit for the due diligence of power plant which

involved the performance check of power plant with respect to the

certain standards of care and corporate requirement.

CliEnt/loCation: habibullah CoaStal PoWEr Plant

PrOJECT: EHS AUdIT

SCOPE: Conducted an EHS audit in compliance with ISO-14001-2004

standards. All the units of power plant were being investigated as

well as office areas.

CliEnt/loCation: Saba PoWEr Plant, Punjab, PakiStan

PrOJECT: dUE dILIGENCE AUdIT

SCOPE: Conducted an audit for the due diligence of power plant which

involved the performance check of power plant with respect to the

certain standards of care and corporate requirement.

AUDIT EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 117: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 114

CliEnt/loCation: abbott PharmaCEutiCalS Pak (Pvt) ltd, karaChi, PakiStan

PrOJECT: EHS AUdIT

SCOPE: Conducted an EHS audit in compliance with ISO-14001-2004

standards. All the process units/areas of pharmaceutical industry

were being investigated as well as office areas.

CliEnt/loCation: uCi, S.i.t.E karaChi, PakiStan

PrOJECT: INITIAL ENvIrONMENTAL rEvIEW (IEr) rEPOrT FOr UNIvErSAL

CHEMICAL INdUSTrIES.

SCOPE: This study was carried out to assess the existing EMS

(Environmental Management System) in the company.

CliEnt/loCation: PfizEr PakiStan ltd, karaChi

PrOJECT: EHS COMPLIANCE AUdIT

SCOPE: Conducted this as the lead auditor and assessed the compliance

against the local regulatory and corporate requirements

CliEnt/loCation: PharmaCia & uPjohn, iSlamabad

PrOJECT: EHS COMPLIANCE AUdIT

SCOPE: Assessed this site and audited against corporate EHS legislative

and local regulatory requirements. This pharmaceutical company

is situated in the federal capital i.e. Islamabad, Pakistan

CliEnt/loCation: Cadbury PakiStan ltd, hub, baloChiStan

PrOJECT: dUE dILIGENCE COMPLIANCE AUdIT

SCOPE: Performed this and assessed the chocolate manufacturing industry.

CliEnt/loCation: bP PakiStan (E&P)

PrOJECT: EMS AUdIT

SCOPE: Assessed the BP sites in Badin Concession Area against ISO

14001 EMS systems and local legal requirements.This concession

area is in South East of Pakistan.

CliEnt/loCation: PfizEr PakiStan ltd, karaChi

PrOJECT: EMS AUdIT

SCOPE: As a Team Leader, performed ISO 14001 compliance audit for a

pharmaceutical plant located in Karachi, Pakistan.

AUDIT EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 118: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 115

CliEnt/loCation: laSmo oil

PrOJECT: EMS AUdIT

SCOPE: Performed ISO 14001 compliance audit for a Oil & Gas plant

located in Sindh Province of Pakistan

CliEnt/loCation: al -karam tExtilES, karaChi

PrOJECT: EHS AUdIT

SCOPE: Performed Environment, Health & Safety compliance audit for a

Textile Mill located in Karachi, Pakistan.

CliEnt/loCation: ExidE PakiStan ltd

PrOJECT: EHS AUdIT

SCOPE: Performed Environment, Health & Safety compliance audit.

CliEnt/loCation: thal EnginEEring (automotivE), karaChi

PrOJECT: EHS AUdIT

SCOPE: Performed Environment, Health & Safety compliance audit for an

Automotive Manufacturing Plant, located in Karachi, Pakistan

CliEnt/loCation: huSSain Sugar millS

PrOJECT: ENvIrONMENTAL AUdIT

SCOPE: Performed Environmental compliance audit for a Sugar Mill,

located in Sindh Province of Pakistan

CliEnt/loCation: iCi PaintS, karaChi

PrOJECT: EMS AUdIT

SCOPE: Performed ISO 14000 compliance audit for a Paint manufacturing

plant, located in Karachi, Pakistan

CliEnt/loCation: ParkE daviS PharmaCEutiCalS, karaChi

PrOJECT: EMS AUdIT

SCOPE: Performed ISO 14000 compliance audit for a Pharmaceutical

company, located in Karachi, Pakistan

CliEnt/loCation: hinoPak motorS , karaChi

PrOJECT: EMS AUdIT

SCOPE: Performed ISO 14000 compliance audit for vehicle manufacturing

company, located in Karachi, Pakistan.

CliEnt/loCation: univErSal ChEmiCal induStry, karaChi

PrOJECT: EHS AUdIT

SCOPE: Performed Environment, Health & Safety compliance audit for

Textile auxiliaries manufacturing located in Karachi, Pakistan

AUDIT EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 119: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 116

ENVIRONMENTAL SITE ASSESSMENT EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

CliEnt/loCation: Eni laSmo, SEhWan, PakiStan

PrOJECT: STUdY OF SOIL PrOFILE OF FArMLANdS

SCOPE: Soil study to prepare current soil profile of farmlands at Sehwan

to form basis for reutilization of treated water from Sehwan

Treatment Facility in the Farmlands. Soil tests indicated presence

of oil & grease in farmland soils, which affected the normal soil

mechanisms and disturbed the soil’s natural environment.

CliEnt/loCation: gSk PakiStan, lahorE

PrOJECT: ENvIrONMENTAL SITE ASSESSMENT OF SHUTdOWN FACILITY

SCOPE: The total area of facility was 25 acres and a total of 32 sites were

drilled for soil and groundwater sampling during Phase II

assessment.

CliEnt/loCation: PharmaCia and uPjohn PakiStan (Pvt.) limitEd

PrOJECT: ENvIrONMENTAL SITE ASSESSMENT OF SHUTdOWN FACILITY

SCOPE: The Total area of facility was 7 acres and a total of 8-10 sites

were drilled for soil and groundwater sampling during Phase II

assessment

CliEnt/loCation: WyEth PakiStan limitEd

PrOJECT: ENvIrONMENTAL SITE ASSESSMENT OF FACILITY

SCOPE: A total of 6-7 sites were drilled for soil and groundwater sampling

CliEnt/loCation: bP PakiStan limitEd, naimat baSal faCility

PrOJECT: BIOrEMEdIATION OF OIL CONTAMINATEd LANd

SCOPE: Oil leaked into subsoil of the Naimat Basal Facility area of

around 100 acres A total of 18-20 sites were drilled for soil

contamination and bioremediation of the soil was carried out

CliEnt/loCation: bP PakiStan Sakhi i faCility

PrOJECT: ESA OF SAKHI-TANGrI TrUNK LINE OIL PILFErAGE SITE AT SAKHI–I

FACILITY

SCOPE: Oil leakage was detected in the Trunk line from Sakhi remote

facility to Tangri processing facility. Leakage of oil over land area

of Manzoor Laghari and Makhan Laghari field. A total of 16 sites

were drilled and soil samples collected to check for oil

contamination.

Page 120: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 117

CliEnt/loCation: karaChi urban tranSPort CorPoration

PrOJECT: GEOLOGICAL SUrvEY FOr PrEPArATOrY SUrvEY (II) ON KArACHI

CIrCULAr rAILWAY rEvIvAL PrOJECT

SCOPE: The work was carried out in accordance with the Project

Specifications and under the supervision of representatives of

JICA (EMC). The Program of investigation included drilling of

boreholes at specified locations along the rout of Karachi

Circular railway, revival Project, Karachi. during drilling of

boreholes subsoil samples were collected and necessary

laboratory tests were conducted on selected samples. This

report is based on drilling of 90 (ninety) nos of boreholes (24

boreholes of 15m depth each, 44 nos of boreholes of 20m) with

field and lab test results and their analysis of the test data.

CliEnt/loCation: johnSon & johnSon PakiStan (Pvt.) limitEd

PrOJECT: PHASE I ESA ASSESSMENT

SCOPE: Phase I ESA assessment as per ASTM E 1527 Standard was

carried out of the facility to identify any potential risks /liabilities

at site due to past practices.

ENVIRONMENTAL SITE ASSESSMENT EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 121: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 118

CliEnt/loCation: S.i.t.E karaChi, PakiStan

PrOJECT: report on Environmental Audit of a Textile Processing Unit

SCOPE: The Environmental Audit of a Textile Unit was done for the Sindh

Environmental Protection Agency under a World Bank assisted

project. It was a joint venture of SEPA and EMC team and its

objectives were to examine environmental status of an industry

and to formulate its Environmental Management Plan (EMP).

CliEnt/loCation: hinoPak motorS ltd, S.i.t.E karaChi, PakiStan

PrOJECT: Consultancy Services of ISO-14000 - 2004.

SCOPE: Consultancy services were provided for the implementation of

EMS with the company in a stipulated time period.

CliEnt/loCation: hinoPak motorS ltd, S.i.t.E karaChi, PakiStan

PrOJECT: In-House Training on ISO-14000

SCOPE: Training program on environment related topics viz, Hazardous

and Non hazardous Waste Management, Waste Water

Management, Air & Noise Pollution and Energy Conservation at

Hino Pak Motors Ltd.

CliEnt/loCation: PharmaCia uP jhon, iSlamabad, PakiStan

PrOJECT: Consultancy Services of ISO-14000

SCOPE: Consultancy services for EMS ISO 14001 implementation and

certification.

CliEnt/loCation: thal Engg, korangi, karaChi, PakiStan

PrOJECT: Consultancy Services of ISO-14000

SCOPE: Provided consultancy services for implementation of EMS and

ISO 14001 certification.

CliEnt/loCation: al-karam tExtilE ltd, landhi, karaChi, PakiStan

PrOJECT: Consultancy Services for ISO-14000

SCOPE: Consultancy for the implementation of EMS and ISO 14001

Certification of various department viz. processing, weaving,

spinning and garments, has been provided

CliEnt/loCation: PfizEr, PakiStan, S.i.t.E karaChi

PrOJECT: Integrated Management System, based on OHSAS 18001 and

ISO 14001.

SCOPE: Practical implication of compulsory clausal requirements of ISO

14001 and OHSAS 18001 upon completion of necessary

documentation and following result oriented monitoring and

inspection techniques.

ISO SPECIFIC EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 122: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 119

CliEnt/loCation: hinoPak motorS ltd, S.i.t.E karaChi, PakiStan

PrOJECT: Consultancy Services for the establishment of Integrated

Management System, based on OHSAS 18001.

SCOPE: Practical implication of compulsory clausal requirements of Safety

& Security Management Systems OHSAS 18001 upon completion

of necessary documentation and following result oriented

monitoring and inspection techniques.

CliEnt/loCation: bP (PakiStan) ltd, karaChi, PakiStan

PrOJECT: Consultancy Services for the establishment of Integrated Management

System, based on OHSAS 18001 and ISO 14001 - 2004.

SCOPE: Practical implication of compulsory clausal requirements of Safety

& Security Management Systems OHSAS 18001 and

Environmental Management System ISO 14001 - 2004 upon

completion of necessary documentation and following result

oriented monitoring and inspection techniques.

CliEnt/loCation: hinoPak motorS ltd, S.i.t.E karaChi, PakiStan

PrOJECT: ISO 14001 - 2004 review

SCOPE: ISO 14001 - 2004 review was carried out for the implementation of

Environmental Management System accordingly to ISO

14001 - 2004 certification and its compliance.

CliEnt/loCation: almEida tExtilES (PrivatE) ltd, EthioPia

PrOJECT: Consultancy Services for the establishment of ISO 9001 - 2000

and ISO 17025 systems.

SCOPE: Establishment, Implementation and Compliance of Quality

Management Systems includes ISO 9001 - 2000 and Laboratory

Management System i.e. ISO 17025 certification.

ISO SPECIFIC EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 123: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 120

CliEnt/loCation: Eni-laSmo bhit - SEhWan, PakiStan

PrOJECT: STUdY rEPOrT ON FOOd WASTE dISPOSAL

SCOPE: detailed report was prepared for providing environmental friendly

solutions to manage their food waste at Bhit Camp Site Kirthar

Concession Area and methodologies has been drawn out for the

management of food waste.

CliEnt/loCation: bP badin PakiStan, ConCESSion arEa

PrOJECT: rECYCLING OF WASTE OIL SLUdGE

SCOPE: The British petroleum is engaged in the exploration and production

of oil and gas from the Badin Concession Area, required the

services of EMC for the disposal of its oil sludge in environmental

friendly manner. After being studied the characteristics of oil sludge

solution in the use of cement kiln was recommended and the oil

sludge has been utilized and recycled into cement kiln as

alternative fuel.

CliEnt/loCation: ShEll PakiStan limitEd, karaChi

PrOJECT: dISPOSAL OF WASTE OIL SLUdGE ANd dIFFErENT TYPES OF CHEMICALS

FrOM LABOrATOrY

SCOPE: Shell Pakistan is dealing in blending oils, petrol, hi-octane, diesel

and Furnace oil. The for the disposal of the waste oil, we once

again suggested the solution employing oil as substitute fuel for

cement kiln, EMC awarded one year contract of utilizing the oil

waste with same process with SPL. The waste chemicals were

incinerated in the cement kiln and exhaust emissions were tested

to monitor any air contamination. Some chemicals were recycled

as well for reuse

CliEnt/loCation: mSd (mErCk SharPE dohmE), SitE, karaChi PakiStan

PrOJECT: dISPOSAL OF WASTEWATEr SLUdGE.

SCOPE: Merck Sharpe dohme is a pharmaceutical company producing

varied range of products in the field of medicine. They generate

hazardous wastewater sludge produced during the treatment of

wastewater. The wastewater sludge was incinerated into the

cement kiln and the remainders were used as raw material for

cement manufacturing. The exhaust emissions were tested as per

the practice of monitoring air during incineration. The EMC has

signed of incinerating its sludge for one year.

WASTE MANAGEMENT EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 124: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 121

CliEnt/loCation: PEtronaS oil ExPlorationS, Sukkur , PakiStan

PrOJECT: dISPOSAL OF HAZArdOUS ANd NON HAZArdOUS WASTE

SCOPE: The Petronas Oil Exploration is engaged in exploration and

production of gas in Sindh was looking for the disposal of

hazardous and non hazardous waste for which EMC was

contacted. After analyzing the status of waste, it has been found

out that this waste can be recycled and reused. different venders

were contacted for the reuse of solid waste. EMC monitored the

whole activity to ensure its ultimate usage and disposal in a

environmental friendly manner

CliEnt/loCation: al-karam tExtilES ltd, landhi, karaChi

PrOJECT: dISPOSAL ANd INCINErATION OF CHEMICALS, dYES, ANd WASTE OIL.

SCOPE: Al-Karam Textile is one the leading textile industries in Pakistan

producing different types of cloths, mainly exporting its product

to European market.The use of chemicals and dyes are inevitable

for the production of cloths. After analyzing their waste, incineration

was sorted out as the best suitable option for disposal of waste

chemicals and dyes. This waste was incinerated into the cement

kiln and exhaust emissions were tested to monitor air

contamination.

CliEnt/loCation: hinoPak motorS ltd, SitE karaChi, PakiStan

PrOJECT: dISPOSAL OF WASTE OIL, GrEASE, PAINT ANd CHEMICALS USEd IN THE

PrOCESS.

SCOPE: The Hinopak Motors is mainly manufacturing heavy duty trucks,

dumpers and buses. The use of oil, grease and paint is quite

common in the process which generates the waste which should

be incinerated due to its toxicity, incineration was proceeded into

the cement kiln and hazardous waste was incinerated successfully.

The emissions were tested during the process.

CliEnt/loCation: Cadbury PakiStan ltd , hub, baluChiStan

PrOJECT: dISPOSAL OF WASTE FLAvOrEd CHEMICALS

SCOPE: The Cadbury Pakistan is a food industry producing various ranges

of chocolates uses flavored chemicals to enhance the taste and

smell of its product. The flavored chemical was expired and we

suggested incineration at cement kiln and performed this activity

according to the norms and procedures of EMC.The emissions

were tested for any possible air contamination

WASTE MANAGEMENT EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 125: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 122

CliEnt/loCation: thal EnginEEring, korangi, karaChi, PakiStan

PrOJECT: rECYCLING OF SOLvENT (111-TCE) USEd FOr dEGrEASING.

SCOPE: The Thal Engineering is Car Air-condition manufacturing industry,

were keen to dispose off its solvent named Tri Chloro Ethylene

(TCE) used for degreasing of equipments. EMC with the help of

PCSIr laboratory recycled the solvent which later utilized by Thal

Engg: again in their process. This saved them millions of rupees

and also good name as an environmental friendly company.

CliEnt/loCation: uCi, SitE, karaChi, PakiStan

PrOJECT: dISPOSAL OF WASTE CHEMICALS

SCOPE: The Universal chemicals Industry is renowned textile chemicals

making industry the disposal of waste chemicals which in being

incinerated in cement kiln. The exhaust emissions were tested

for monitoring of air produced during the incineration of chemicals.

They generate lot of hazardous chemical residue which is

hazardous in nature. Their waste was first neutralized and then

disposed off to a land fill site as benign material. Their waste oil

was also disposed off in lubricating industry and reused as

lubricating oil.

WASTE MANAGEMENT EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 126: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 123

CliEnt/loCation: Eni-laSmo, bhit - SEhWan, PakiStan

PrOJECT: STUdY rEPOrT ON WASTE WATEr dISPOSAL /TrEATMENT

SCOPE: detailed study on management of waste water generated from

their camp sites has been reported. Suggestions and

recommended for the environmental friendly solutions has been

provided.

CliEnt/loCation: Cadbury PakiStan ltd. hub, baluChiStan, PakiStan

PrOJECT: WASTE WATEr TrEATMENT PLANT

SCOPE: design, fabrication, installation, operation and maintenance of

wastewater treatment plant for food industry.

CliEnt/loCation: thal Engg

PrOJECT: WASTE WATEr TrEATMENT PLANT

SCOPE: design, fabrication, installation, operation and maintenance of

wastewater treatment plant.

CliEnt/loCation: hinoPak motorS ltd S.i.t.E karaChi, PakiStan

PrOJECT: WASTE WATEr TrEATMENT PLANT

SCOPE: design, fabrication, installation, operation and maintenance of

wastewater treatment plant. for the Automobile industry.

CliEnt/loCation: ShEllPakiStan ltd, karaChi

PrOJECT: WASTE WATEr TrEATMENT PLANT

SCOPE: design, fabrication, installation, operation and maintenance of

wastewater treatment plant

CliEnt/loCation: ProCtor & gamblE (Pvt) ltd

PrOJECT: WASTE WATEr TrEATMENT PLAN

SCOPE: Construction, establishment and operation of Wastewater

Treatment Plant

CliEnt/loCation: miniStry of tExtilE induStry, govErnmEnt of PakiStan, iSlamabad

PrOJECT: NATION-WIdE MAPPING OF INdUSTrIES TO ANALYZE THE rEQUIrEMENT

OF COMBINEd EFFLUENT TrEATMENT PLANTS (CETPS)

SCOPE: Feasibility Studies and preliminary design for Combined Effluent

Treatment Plants (CETPs) for Industrial Estate in Karachi, Lahore,

Faisalabad, Sialkot, Multan & Hub.

WWTP SPECIFIC EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 127: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 124

CliEnt/loCation: bP PakiStan ExPloration & ProduCtion, badin ConCESSion

PrOJECT: NOISE STUdY AT PrOdUCTION FACILITIES

SCOPE: The study has been carried out to determine the existing noise

levels of BP Pakistan sites at Badin Concession Area. The aims

and objectives of the study are to identify the causes of noise and

to highlight noisy areas to prevent health hazards caused due to

nuisance of noise.

CliEnt/loCation: al-tuWairqi grouP

PrOJECT: ENvIrONMENTAL MONITOrING OF TUWAIrQI STEEL MILL PrOJECT

SCOPE: The report contains the Environmental Monitoring results at the

site for construction of proposed Tuwairqi Steel Mills. This

monitoring is being performed by Environmental Management

Consultants in compliance to the condition of approval of IEE

issued from Sindh EPA in favour of Tuwairqi Steel Mills.

CliEnt/loCation: lakSon tobaCCo ComPany ltd

PrOJECT: ENvIrONMENTAL MANAGEMENT & MONITOrING PLAN

SCOPE: This Environmental Management & Monitoring Plan (EMMP)

has been prepared by Environmental Management Consultants

(EMC).This report provides an approach for managing monitoring

environment related issues and describes the institutional

framework for environmental management and resource

allocations to be carried out by Lakson Tobacco Company Limited

(LTC) for mitigating the negative impacts which may cause

degradation to the Environment.

CliEnt/loCation: dEfEnCE houSing authority (dha), karaChi

PrOJECT: MONITOrING OF WATErFrONT dEvELOPMENT PrOJECTS

SCOPE: dHA has launched some futuristic landmark projects. WaterFront

development is one of such projects. The project is located on the

Southern portion of Karachi about 14 kms longstretching from

Sindbad to the Golf Course. The project has multi-spectral land

use patterns in which residential, commercial and recreational

sites are developed.

The monitoring of three projects is being performed by EMC and

they are:

(1) Crescent Bay

(2) Creek Side Mall

(3) Creek Marina

MONITORING EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 128: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 125

CliEnt/loCation: britiSh PEtrolEum PakiStan (bPP), badin

PrOJECT: MONITOrING OF PErSONAL EXPOSUrE TO BTEX (BENZENE, TOLUENE,

XYLENE, ETHYL BENZENE)

SCOPE: On request of BP Pakistan Exploration and Production Inc., EMC

performed monitoring of BTEX exposure at Mazari Facility, district

Badin Sindh.

CliEnt/loCation: lilly intErnational (Pvt) ltd

PrOJECT: ENvIrONMENTAL MONITOrING/MANAGEMENT PLAN.

SCOPE: Lilly International (Pvt) Limited is an engineering firm for which

EMC has successfully preparing Environmental Monitoring /

Management Plan for Ubauro-Shaikh Wahan and Turnol-Chablat

Section since Jan 2006.

CliEnt/loCation: thatta, Sindh, PakiStan

PrOJECT: rEPOrT ON "STUdY INTO CAUSES ANd EFFECTS OF EUTrOPHICATION IN

MAJOr LAKES OF SINdH".

SCOPE: Out of the selected lakes of Sindh, Haleji and Kinjhar lakes were

studied in detail so as to determine the nature and extent of

eutrophy and overgrowth of aquatic weeds, and suggest strategy

for their control.

CliEnt/loCation: Eni-laSmo, SEhWan, PakiStan

PrOJECT: STUdY OF SOIL PrOFILE OF FArMLANdS ArOUNd SEHWAN TrEATMENT

FACILITY

SCOPE: The purpose of the soil study was to prepare the current soil

profile of farmlands at Sehwan. various parameters that may

affect soil quality were tested and the results documented for

specific ion toxicity of sodium, chloride, boron and microbiological

contamination of faecal origin etc

CliEnt/loCation: Eni-laSmo, naganWal, PakiStan

PrOJECT: IMPACT OF WASTEWATEr IrrIGATION ON THE GrOUNdWATEr

SCOPE: Possible soil and groundwater contamination has been envisaged

due to the wastewater irrigation on farm lands.

CliEnt/loCation: bP, badin, PakSitan, badin ConCESSion

PrOJECT: NOISE STUdY OF BP'S FACILITIES

SCOPE: The aim of study was to carry baseline survey of noise levels

within facilities vis-à-vis establish noise maps of BP facilities at

Badin Concession Area

MONITORING EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 129: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 126

CliEnt/loCation: bEaCoN houSE, korangi, karaChi, PakiStan

PrOJECT: AMBIENT AIr QUALITY MONITOrING

SCOPE: Ambient air quality in and around Beacon House School Jubilee

Campus located in Korangi Industrial Area Karachi was analyzed.

Sampling was carried out at four different stations on a 24 hour

basis for Oxides of Sulphur and nitrogen, carbon monoxide,

particulate matter and ozone.

CliEnt/loCation: PakiStan Pta ltd Port qaSim, karaChi

PrOJECT: CONSULTING SErvICES FOr AIr dISPErSION MOdELING OF rAW

MATErIAL TrANSPOrTATION

SCOPE: Pakistan PTA is a Chemical manufacturing company which

requires Consulting Services for Air dispersion of raw Material

Transportation at their premises in Port Qasim in October 2005

CliEnt/loCation: hamSonS tExtilE millS ltd, korangi, karaChi, PakiStan

PrOJECT: INITIAL ENvIrONMENTAL rEvIEW

SCOPE: Screening has been made for the environmental impacts of

towel manufacturer industry, solution were sorted out and finally

recommended has been made.

MONITORING EXPERIENCE

CO

MP

AN

Y P

rO

FIL

E

Page 130: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 127

Soil and groundwater assessment / management for designing /

installation of telecommunication tower

EMC geotechnical staff has conducted soil and ground water assessment /management prior to the

designing & installation of Telecommunication Towers all over the country for the following clients.

1. ufonE: PaCkagE 1; datE : SEP 2007 - aug 2013 no. of SitES: 536

2. zong : PaCkagE ii; datE fEb 2012 – aug 2013 no of SitES: 94

3. PtCl: PaCkagE vii; datE: fEb 2009-aPr 2010 no of SitES:25

4. Cm Pak: PaCkagE iii; datE :SEP-oCt 2009 no of SitES: 2

5. Warid: PaCkagE vi; datE: oCt 2007- jan 2009 no of SitES: 294

6. EriCSon : PaCkagE v ; datE: oCt 2007 no of SitES: 2

7. Pak tElECom : PaCkagE iv ; datE july – aug 2007 no of SitES: 3

SOIL & GROUNDWATER ASSESSMENT

CO

MP

AN

Y P

rO

FIL

E

Page 131: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 128

Socio-economic survey is based on the statistical approach such as housing, existing

population, rate of population growth, population forecasting & modeling. Health,

education, provision of infrastructures in the communities & the overall social improve

mental/development plan is designed. In the section of Economic survey, incomes of the

people, income sources & cost & benefit analysis of the said projects.

Census of households and individuals located within the project has to be undertaken to

register and document the status of potentially affected population within the project impact

area. It will provide a demographic overview of the population served by the resettlement

Plan (rP) and profiles of household assets and main sources of livelihood. It will cover

100% of the potentially affected population within the project impact area.

n rESOUrCE bASE. The resource base including land, water, and forest, etc., with

an assessment of its development and ecological potential in the pre-project

conditions. during the conduct of the census, legal boundaries of affected

properties and the right of way (rOW) are to be verified. Structures, trees and

other assets are to be recorded.

n ECONOMY bASE. The economy base of the affected people including the modes

and magnitude of production, consumption pattern, related economic institutions.

n hOUSEHOLd CENSUS. Household census covering immovable property owned by

the APs and other resources in their possession/use. These surveys would be

carried out in association with local and host communities as well as with the

local representatives.

n SOCIAL STrUCTUrES. The social structure, norms, customs, cultural centers,

traditions, patterns of leadership and institutions of social network.

n aFFECTEd PErSONS. The census will prima-facie identify Tenants, Sharecroppers,

Encroachers and a gricultural day labourers. during such census, those Affected

Persons are dependant on the existing infrastructure link for their livelihood, shall

also be identified and listed along with their identified income.

dATABASE mANAGEMENT

n dATA SOUrCES. As a pre-requisite for conducting the primary household surveys,

relevant information is to be collected from secondary sources. These include:

revenue records maintained, with regard to land particulars for facilitating

acquisition of properties and resettlement of oustees; Census records for

demographic information; - development agencies to get information on various

development programs for special sections of population like those living below

poverty line, Scheduled Tribes, Schedule Castes, etc.; and - Local organizations

including NGOs in order to involve them and integrate their activities in the

economic development programs of the displaced population.

n dATA COLLECTION. Household level contacts and interviews with each affected

family for completing the household socio-economic profile. Each of the

SOCIO-ECONOMIC IMPACT ASSESSMENT

CO

MP

AN

Y P

rO

FIL

E

Page 132: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 129

households surveyed and the structure/land likely to be affected by the project

has to be numbered, documented and photographed. Public consultation

exercises in different project areas to be conducted with the involvement of

Affected Persons. In these exercises, women among the Affected Persons are

to be involved to elicit their views and options on the overall planning of

resettlement activities. discussions with a cross-section of affected population

will help towards understanding the problems and preference of the APs.

n dATA aNALYSIS. The analysis would cover the following: population, population

density, age, sex ratio, literacy rates/education, gender issues, tribal issues,

religious groups, income, occupation and poverty line.

n dATA uPdATE. Since there is generally a time gap between the census and land

acquisition procedure, which will take at least one year, it implies that actual

physical relocation of APs may be delayed by a year. Therefore, it is suggested

that NGOs responsible for implementation of rP along with IPMU, should conduct

a rapid appraisal to continuously update information.

SOCIO-ECONOMIC IMPACT ASSESSMENT

CO

MP

AN

Y P

rO

FIL

E

Page 133: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 130

EMC conducts hydrological studies and assess the impact assessment. We conduct the

evaluation of the potential hydrological impacts on ground & groundwater. The following

provides an overview of existing work done and planned analyses.We have collected a big

amount of data that serves as the foundation for current water resource investigations in

Pakistan. We have some major studies undertaken to characterize groundwater movement

in Sindh and around.

Below is a brief description of activities currently under way:

n aSSEMBLE dATABASES

Assemble and maintain map, relational and other databases. These include

engineering, hydrologic and environmental components and include digital map

library, hydrologic database, physical/document library and image repository.

n CUrrENT grOUNdWATEr CONdITIONS

Currently developing maps, graphs and supporting databases to document

groundwater levels and chemistry within the study area and characterize

hydrogeologic conditions. depths to groundwater will be further characterized in

phreatophyte and irrigated areas. Water rights also will be described.

n CHArACTErIZE CUrrENT SPrING hYdrOLOGIC CONdITIONS

document and analyze current conditions of select springs within the project area,

including physical setting, local hydrogeology and spring flow sources

and dynamics.

n CHArACTErIZE bIOLOGICAL CONdITIONS aT SPrING-dEPENdENT aQUATIC, rIPArIAN

aNd WETLANd hABITATS

document current conditions of the spring-dependent habitats, including spring

pools and brooks, and riparian, wetland and open-water habitats.

n CHArACTErIZE CUrrENT PHrEATOPHYTE CONdITIONS

This includes distribution of phreatophytes and irrigated vegetation estimated

consumptive use and vegetation dynamics.

n CHArACTErIZE hYdrOGEOLOGIC SETTING

This includes a regional-scale hydrogeologic map, regional-scale hydrogeologic

sections, local-scale hydrogeologic maps of spring areas and structural maps.

nn dEvELOP grOUNdWATEr fLOW mOdEL

develop a groundwater flow model to simulate the groundwater effects of the

project. The model will be based upon some reputable and renowned software

for flow modeling.

n idENTIFY aNd EvALUATE hYdrOLOGIC mANAGEMENT aNd monitoring aLTErNATIvES

Identify and evaluate alternative hydrologic management and monitoring

programs for the project

HYDROLOGICAL STUDIES

CO

MP

AN

Y P

rO

FIL

E

Page 134: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 131

namE: SyEd nadEEm arif

PoSition: MANAGING dIrECTOr

qualifiCation: n Masters in Business Administration

n Bachelors of Civil Engineering

ExPEriEnCE: Mr. Arif is basically an Engineer having done his post graduation

in Business Management. He is an experienced trainer and has

conducted numerous courses and trainings on Environmental

Management, Environmental Auditing etc. He is a qualified auditor

for ISO 14000 Environmental Management Systems, ISO 9000

Quality Management Systems and OHSAS 18001 Occupational

Health & Safety Assessment Scheme. He has vast experience in

defining strategic planning, monetary and Technical matters,

scheduling of the projects, preparation of contractual claim

documents, report generation, computer based time scheduling

and planning, Coordination with the clients, negotiations etc. He

was a speaker at different seminars and workshops and has

delivered lectures on several topics related to Environment, Health

& Safety.

namE: dr mirza arShad ali baig

PoSition: PrINCIPAL ENvIrONMENTAL EXPErT

qualifiCation: n Phd. Chemistry, University of British Columbia (USA), 1961.

n Master of Chemistry, University of Karachi; 1953

ExPEriEnCE: dr. Baig is Ph.d. in Chemistry; University of British Colombia,

USA (1961) and M.Sc. in Chemistry; University of Karachi (1953).

He has professional experience of over 50 years, which includes

research, teaching, administration, consultancy and report writing.

Expertise and interests include natural resource management,

environmental audit, environmental impact assessment, development

of pollution control technologies, occupational health & safety,

hazardous material handling, technology transfer, agro-based

industry, rural industry, and small industry establishment. Worked in

Pakistan, Sultanate of Oman and Canada.

Generated most of the Baseline data for environmental parameters

for Karachi viz. Water Pollution, Air Pollution, Noise Pollution, Soil

Pollution, Industrial Pollution, and Marine Pollution, "Environmental

Audit of development Projects in Badin district" and most recently

"Environmental Profile of Karachi City district and vision 2020"

Chapter for Karachi Master Plan 2020".

K E Y P E R S O N N E L

CO

MP

AN

Y P

rO

FIL

E

Page 135: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 132

namE: dr. iqbal ali

PoSition: PrINCIPAL ENv. ENGINEEr & EXPErT ON WATEr

qualifiCation: n Ph. d.Civil Engineering University of Leeds, U.K. (1969)

n M. Tech. Water Power Engineering; Indian Institute of

Technology, Kharaghpur, India (1960)

n B.E. (Hon's) Civil Engineering: University of Jabalpur, India

(1958)

n P.G.C Airport Planning: SEATO Graduate School of Engineering

(Now AIT) Bangkok (1962)

ExPEriEnCE: He has a rich experience in the field of Environmental Engineering &

Management. The former director of Institute of Environmental

Engineering and research at N.E.d University developed the institute in

to a full-fledged teaching, research and consulting organization.

Carried out a large number of studies e.g. hazardous & solid waste,

air pollution, EIA, water treatment and coastal water pollution as

research supervisor, advisor, and consultant of the WHO

n EIA including Air and Water dispersion studies for the Keloil

LPG, Plant Bin Qasim, Karachi

n Analysis/Measurements of Flue Gas Emissions of KESC, Bin

Qasim Thermal Power Station.

n Environmental Pollution Assessment within Pakistan Steels.

n Environmental Assessment of the proposed Barge Mounted

Power Plant, Bin Qasim, Karachi-M/S. Pak. Engineering

Service (Pvt) Ltd., Karachi.

n Environmental Audit of Tapal Energy Ltd, Hub river road,

Karachi.

n Air Quality Assessment at Islamabad/rawalpindi - Federal

Environmental Protection Agency, Islamabad.

n Greenhouse Gas Inventory and National Least-Cost GHGs

Abatement Strategies Project, and Climate Change and Industrial

Emissions in Pakistan.

n Situational and Strategical analysis for Solid Waste Management

in Azad Jamu and Kashmir.

n Ambient Air Quality Assessment in the Northern Area, Pakistan

namE: Saquib Ejaz huSSain

PoSition: ENvIrONMENTAL & SOCIAL CONSIdErATION EXPErT

qualifiCation: n Masters in Applied Chemistry & Chemical Technology from

Karachi University

ExPEriEnCE: Mr. Saquib is working as an Environmentalist at EMC and has a

good command on conducting Environmental Assessment Studies.

He possess good knowledge on National and International

Legislations pertaining to the Protection of Environment and

Natural resources. He also has an experience of working at Sindh

K E Y P E R S O N N E L

CO

MP

AN

Y P

rO

FIL

E

Page 136: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 133

Ministry of Environment as an Assistant director, where he was

directly involved in the process of reviewing environmental

assessment reports and decision making in light of Pakistan

Environmental Protection Act 1997 and rules and regulations

framed there under.

namE: zulEkha Soorma

PoSition: HSE AdvISOr

qualifiCation: n Masters in Business Administration (Marketing) from IBA

ExPEriEnCE: Ms. Soorma is a Lead Auditor and has attended and passed the

IrCA certified courses for OHSAS 18001 and ISO 14001 and

Certificate Course in Industrial Environmental Management.

She is also a Green Belt in Lean and Six Sigma and has attended

Leading Edge and Leadership Edge Workshops organized by Senn

delany. She has an experience of 15 years in HSE and has also

worked in other disciplines like Quality Assurance and Production

during the course of her career in Pharmaceutical Industry. She has

successfully implemented EHS Management Systems at GSK

Pakistan Ltd and Wyeth Pakistan Ltd.

She is working as HSE Advisor at EMC since March 2010 and has

prepared Occupational Health and Industrial Hygiene procedures

for BP Pakistan besides imparting customised training on ISO

14001 to clients.

namE: taSnEEm bhatti

PoSition: SOCIO-ECONOMIC EXPErT

qualifiCation: n Masters in Business Administration from Institute of Business

& Administration, Pakistan

n Masters in Economics from University of Sindh, Jamshoro,

Pakistan

ExPEriEnCE: Ms. Bhatti has more than 20 years of experience in the field of

Sociology. She prepared social profiles of coastal communities of

Sindh and Baluchistan as well as rural areas of Sindh and

Baluchistan where companies like BP Pakistan, OMv, Eni and

Petronas have conducted oil and gas exploration. She also works

as a monitoring and evaluation officer on behalf of funding agencies

like JICA, AdB for social sector projects.

namE: ijaz huSSain

PoSition: CHEMIST

qualifiCation: n B.Sc. from Karachi University with major in Chemistry,

Biochemistry, & Microbiology.

K E Y P E R S O N N E L

CO

MP

AN

Y P

rO

FIL

E

Page 137: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 134

ExPEriEnCE: Mr. Ijaz Hussain has experience as a chemical analyst and

laboratory technician. In past he has been working with the

following organizations:

n defence research Organisation

n Zliten Gas Power & desalination Plant, Libya

n rehmat Hospital

due to his capabilities of handling administrative, logistic and

procurement work, he has also been partly associated with

procurement, logistics and administration department. Mr. Ijaz

Hussain is a core employee of EMC and working since 1997 and

have vast experience in managing office environment as well as

laboratory and sampling work. He is a well coordinating person and

has good knowledge of understanding of various aspects.

namE: muhammad haSEEb

PoSition: ENvIrONMENTAL SPECIALIST

qualifiCation: n Masters in Environmental Studies from University of Karachi, Pakistann Masters in Applied Chemistry & Chemical Technology from University of Karachi, Pakistan

ExPEriEnCE: Mr. Haseeb, Masters in Environmental Sciences & Applied Chemistry and Chemical Technology has experience as an environmentalist with special reference to data analysis and has good command on conducting Environmental Assessment Studies in the field of Oil & Gas, Construction, Mining, Chemicals and Pharma, Transportation, Urban development etc. Conduct Environmental Baseline Surveys and Environmental Monitoring, conduct environmental audits and prepare Environmental Management Plans for industries. Having experience of working with International donor Agencies like JICA, AdB, USAId He possesses good knowledge on National & International Laws, regulations and Guidelines pertaining to Environment & Social Issues.

namE: khurram ShamS khan

PoSition: SOCIAL dEvELOPMENT SPECIALIST

qualifiCation: n Master in Water Management from Institute of Water and Environment, Cranfield University, England n Bachelor in Economics and Environmental Studies from Bates College, Maine, USA

ExPEriEnCE: Mr. Khurram has an interdisciplinary knowledge base for framing and problems of socio-economic development and poverty reduction, Strong foundations in project design and planning, development of implementation and impact frameworks, policy review and monitoring & evaluation.Extensive experience in the development of various communication materials including strategy documents, grants, policy reviews, progress reports, donor updates, MOUs, and socio-

K E Y P E R S O N N E L

CO

MP

AN

Y P

rO

FIL

E

Page 138: EMC PROFILE UPDATED (25-11-2015)_opt

EMC PAKISTAN PvT. LTd. 135

economic reports.Exposed to the process of partnership-building and relationship management with donor agencies, corporate entities, government departments, civil society organizations, and local community groups.

namE: ahmEd zohair Siddiqui

PoSition: ENvIrONMENTAL ENGINEEr

qualifiCation: n Master of Environmental Engineering from University of Melbourne Australia

ExPEriEnCE: Civil/Environmental Engineer possessing 5+ years of diversified experience in the engineering and development sector with particular expertise in Environmental Management, Sustainable Infrastructure, Water quality/Treatment and Project Management. Postgraduate recipient of Master of Environmental Engineering degree from the department of Infrastructure Engineering at the University of Melbourne, Australia. Graduate Civil Engineer from the NEd University of Engineering & Technology. Presently employed as an Environmental Professional on a range of extensive infrastructure and energy projects across Pakistan. responsibilities include providing Environmental Investigation & Management expertise, liaising with and assisting clientele in acquisition of environmental permits, conducting comprehensive Environmental Impact Assessment (EIA) studies, performing Environmental Site Assessments and Environmental Compliance Monitoring (ECM).

K E Y P E R S O N N E L

CO

MP

AN

Y P

rO

FIL

E