13
Greater Cleveland Regional Transit Authority Electronic Repair (ER) Department Farebox Reliability Operations Committee RTA Mission: To Provide Safe, Reliable, Clean, and Courteous Public Transportation

Electronic Repair (ER) Department Farebox Reliability ... · Electronic Repair ITS Dept Central Rail District Revenue Service Quality Inventory Maintenance Planning Bus Districts

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Electronic Repair (ER) Department Farebox Reliability ... · Electronic Repair ITS Dept Central Rail District Revenue Service Quality Inventory Maintenance Planning Bus Districts

Greater Cleveland Regional Transit Authority

Electronic Repair (ER) DepartmentFarebox Reliability

Operations Committee

RTA Mission: 

To Provide Safe, Reliable, Clean, and Courteous 

Public Transportation

Page 2: Electronic Repair (ER) Department Farebox Reliability ... · Electronic Repair ITS Dept Central Rail District Revenue Service Quality Inventory Maintenance Planning Bus Districts

Greater Cleveland Regional Transit Authority

ER Dept. Maintenance Responsibilities

534

177

414

784

621 621

0

100

200

300

400

500

600

700

800

900

Apollo CameraSystem

Ticket VendingMachine

Destination Sign Farebox Lytx Drivecam Trapeze Radio

# OF AS

SETS

Page 3: Electronic Repair (ER) Department Farebox Reliability ... · Electronic Repair ITS Dept Central Rail District Revenue Service Quality Inventory Maintenance Planning Bus Districts

Greater Cleveland Regional Transit Authority

Farebox Defect Rate

2.76

2.28

1.84

2.23

2.91

2.162.06

1.66

2.10

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

2008 2009 2010 2011 2012 2013 2014 2015 2016

Defects/10

,000

 Transactio

ns

Year

Defects per 10,000 Transactions

Page 4: Electronic Repair (ER) Department Farebox Reliability ... · Electronic Repair ITS Dept Central Rail District Revenue Service Quality Inventory Maintenance Planning Bus Districts

Greater Cleveland Regional Transit Authority

“Continual Process Improvement”Farebox Maintenance Collaboration

Farebox Maintenance 

Electronic Repair

ITS Dept

Central Rail District

Revenue

Service Quality

Inventory

MaintenancePlanning

Bus Districts

Teamwork• Cohesive teamwork between 

departments and personneldirectly impacts the success offarebox maintenance efforts. 

Page 5: Electronic Repair (ER) Department Farebox Reliability ... · Electronic Repair ITS Dept Central Rail District Revenue Service Quality Inventory Maintenance Planning Bus Districts

Greater Cleveland Regional Transit Authority

“Continual Process Improvement”Actions Taken From 2012‐Present

o Service Quality entering work requests into maintenance softwareo Allows for improved defect tracking and identification

o 4 Training Modules completed at Tri‐Co AC/DC circuits, DC theory, solid state components,& circuit card assembly (CCA) repair

o New Repair Facility o Increased lab space, additional work benches

Page 6: Electronic Repair (ER) Department Farebox Reliability ... · Electronic Repair ITS Dept Central Rail District Revenue Service Quality Inventory Maintenance Planning Bus Districts

Greater Cleveland Regional Transit Authority

“Continual Process Improvement”Actions Taken cont.

o New test and repair equipmento Updated/Standardized equipment for each station

o Modified TRiM Replacement Programo The TRiM unit reads and writes fare mediao Historically the TRiM is responsible for 65‐70% of 

all Farebox defects.o Began February 2015

Page 7: Electronic Repair (ER) Department Farebox Reliability ... · Electronic Repair ITS Dept Central Rail District Revenue Service Quality Inventory Maintenance Planning Bus Districts

Greater Cleveland Regional Transit Authority

GenFare Inc. (GFI) Odyssey Farebox

Page 8: Electronic Repair (ER) Department Farebox Reliability ... · Electronic Repair ITS Dept Central Rail District Revenue Service Quality Inventory Maintenance Planning Bus Districts

Greater Cleveland Regional Transit Authority

Electronic Repair Woodhill Lab

Page 9: Electronic Repair (ER) Department Farebox Reliability ... · Electronic Repair ITS Dept Central Rail District Revenue Service Quality Inventory Maintenance Planning Bus Districts

Greater Cleveland Regional Transit Authority

Electronic Repair Woodhill Lab cont. 

Page 10: Electronic Repair (ER) Department Farebox Reliability ... · Electronic Repair ITS Dept Central Rail District Revenue Service Quality Inventory Maintenance Planning Bus Districts

Greater Cleveland Regional Transit Authority

Electronic Repair Woodhill Lab cont. 

Page 11: Electronic Repair (ER) Department Farebox Reliability ... · Electronic Repair ITS Dept Central Rail District Revenue Service Quality Inventory Maintenance Planning Bus Districts

Greater Cleveland Regional Transit Authority

“Continual Process Improvement”GFI Database for Predictive Maintenance 

Program (PMP)o Database managed and administered by Intelligent Transportation Systems (ITS) Department

o Utilizes nightly probing data from each fareboxo Enables predictive maintenance actions

o TRiM Diagnostic Reporto Bus History Reporto Maintenance Report

Page 12: Electronic Repair (ER) Department Farebox Reliability ... · Electronic Repair ITS Dept Central Rail District Revenue Service Quality Inventory Maintenance Planning Bus Districts

Greater Cleveland Regional Transit Authority

“Service Excellence”Next Steps

o Assign areas of focus for 3 supervisors [Q1 ‘17]o Increases effectiveness and streamlines communication

o Analyze PMP pilot results [Q2 ‘17]o Determine effectiveness by comparing PMP pilot results vs. historical 

defect and rebuild data

o Develop farebox operation/inspection SOP [Q2 ‘17]o Standardized overnight inspections will reduce pullout defects. 

Page 13: Electronic Repair (ER) Department Farebox Reliability ... · Electronic Repair ITS Dept Central Rail District Revenue Service Quality Inventory Maintenance Planning Bus Districts

Greater Cleveland Regional Transit Authority

Questions or Comments?