ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai www.cholarisk.com October 4 to 6, 2004

ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai October 4 to 6, 2004

Embed Size (px)

Citation preview

Page 1: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

ELECTRICAL SAFETY AUDITforXYZGujarat

Cholamandalam MS Risk Services Ltd. Chennai

www.cholarisk.com

October 4 to 6, 2004

Page 2: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Cholamandalam Risk Services Ltd.

A JV between Murugappa Group & MS Insurance, Japan

Executed RM services for various clients- India & rest of Asia

Page 3: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

ELECTRICAL SAFETY SERVICES -CLIENTSMRPL Refinery, MangaloreShasun Chemicals, CuddaloreAhmedabad Electricity Company, AhmedabadOrchid Pharmaceutical Company, ChennaiEID Parry Biochemicals, Tamil NaduBPCL, ManmadVikram Cements, Madhya PradeshChambal Fertilizers, RajasthanTI Diamond Chain, TNHLL, HaldiaVisaka Cements, Andhra PradeshBombay Dyeing, PatalgangaGMR Power plant, MangaloreCP Aqua Culture, TN Surat Electricity Company, SuratAditya Cements, Rajasthan

Page 4: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Close Out Presentation

ESA –approach, methodology & coverage

XYZ- High Priority Areas

XYZ-ESA- observations & recommendations

Page 5: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

ESA – Scope, Methodology & Coverage

Page 6: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

ESA- Scope of workCompliance to IERElectrical hazard identification: Shock, fire Lightning Protection HAC Earthing Static electricity issues EPM Accidents Review of All records & documents Training Electrical Protection

Sample tests Temperature Current Earth Resistance

Page 7: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

ESA Methodology

Opening Meeting -FamiliarizationDiscussion with Head-Electrical, review of key SLDESA Physical inspections Sample Testing Document & records review Meeting –various departments Close-Out meeting

Interim ReportFinal report submission

Page 8: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

AUDIT SCHEDULE (4 – 6 October 2004)

4 October - opening meeting, electrical system briefing, Main SLD review, switchyard visit, SS A,B, C, DG House, manufacturing blocks

5 Oct - Auditing of balance manufacturing areas completed

6 Oct – ER tests, Review of records & close out meeting+ discussion with relevant departments (safety, R&D, health centre, instrumentation, documentation, contractors, contract department, purchase, etc.)

Page 9: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Audit Coverage66 KV S/YDG House All Sub Stations (A, B, C, E)Transformers-various areasCNC ShopHT Motor BuildingVPI AreaIMB AreaDT AreaTransformer Manufacturing Area, SS EAdmin BuildingRelay BuildingAuxiliary I & II buildingElectroplating/ Anodizing

• Turbocharger Area

•HV Disconnector Area

•Fuel Tanks (HSD, Solvent, Transformer oil)

•LTB Area

•Health Centre

• Workers’ Canteen

Page 10: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

ESA -Standards & Codes

BIS PublicationsNFPA CodesOISD StandardsIndian Electricity Rules, 1956British StandardsBest Engineering Practices

Page 11: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

ESA – Observations & Recommendations

Page 12: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

• Very receptive to improvement suggestions

•Availability of skilled technocrats, global expertise

•OHSAS 18001 certified plant

•Availability of testing resources

• Existence of systems and procedures

Page 13: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

LIMITATIONS

VERY OLD PLANTUNPLANNED EXPANSIONSRAPID GROWTHREQUIRES FUTURE PLANNINGLIMITED MAINTENANCE FORCE IN CERTAIN AREAS

Page 14: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

XYZ -High Priority Areas

PTPT Area- 1.5 MVA transformer, overloaded electrical panelCNC Shop floor- bay lightning panel Earthing issuesSS- E, PTPT areas – responsibility to be defined Electrical hotspots at terminations – potential fire hazardElectrical Panels – requires due attentionFire Hydrant system to be installedDGs in another plant area

Page 15: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Transformers

Silica gel in several transformers- to be re-activatedNeutral & body earth pits are not identified Oil soak pit for transformers with oil capacity above 2, 275 L (IER- 64- iv), eg. 4 MVA Oil draining arrangement for transformers above 9 KL capacity (Transformer EHV testing yard, 30 MVA transformer)- IER 64 v Annunciation for 7 MVA transformer not operational

Page 16: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Electrical Injuries

Use HRC fuse pullers to remove fuses 30 mA ELCBs used in DBs, extension boards Insist on using PPEs while working on live linesBattery rooms-cover battery terminalsIdentification of feeders / panels / circuits - missingUse of live U/G cable locator before excavationMaintain U/G cable lay out for reference No resuscitation chart displayed

Page 17: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Automated External Defibrillators (AED)

•250,000 deaths every year due to sudden cardiac arrest

•AEDs - to be part of Emergency Medical Kit

•For every minute that passes w/o defibrillation, the chances of survival decreases by 10%

•Has a voice prompt, cost USD 3000/-

•UK - not a legal requirement, but a Statutory requirement in US

•No legal liability for deaths involving the use of AEDs

Page 18: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Fire Detection & Protection Install smoke detection in: Un manned sub stations Review the Fire Alarm panel maintenance (discharged batteries)

Heavy grass growth noted in outdoor switch yard and SS E transformer yard Review smoke detector adequacy and installations in buildings as per TAC FA rulesReview Portable Fire Extinguisher installation based on IS 2190 (Turbocharger area) DG MCC room- install smoke detectionInstall Passive Fire Protection (PFP) measures in DG house, SS, various cable passesInclude electrical fire scenarios in EMP

Page 19: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Fire Protection

XYZ to consider installation of fire protection system Review PFE installation in various manufacturing blocksConsider HVWS system for 30 MVA transformer

Page 20: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Electrical Systems & Procedures

Electrical WPs / Electrical isolation Procedure: To be defined At present, only for contractors, include for XYZ employees also LOTO / Tag Out with fuse removal recommended

Electrical Change Control Procedure (ECCP) to be incorporated in all equipment modifications /additions (overloading issues in PTPT –MDP 1)

Display updated & approved SLDs in all SSs (no SLDs available for MDPs, SDPs) for ready reference

Include electrical fire scenarios (SS, transformers) in Emergency Management Plan (EMP)

Page 21: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Earthing

Earth resistance tests to be done for individual pits too.Earthing lay out to be updatedEarth pits may be provided with identification marksSingle earthing for 415 V equipment –several areasStructures to be earthed (PTPT Area- solvent tanks, etc.)4.5 Ohms noted in PTPT areaEnsure supervision while ER measurement66 KV SY fence to be earthed

Page 22: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Earth Leakage Tester

The earth resistance from the equipment to the earth pit can be measuredNon-Contact measurementContinuity loop testNo electrodes requiredCannot be used on flat conductors

Page 23: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Electrical Preventive Maintenance

Sky wire maintenance may be taken up annually to check up its physical condition /replace with vertical rodsBucholtz relay to be simulated for operation for transformersInstall surge counters and leakage meters in S/YGravel to be put in yards (66 KV, SS E transformers) 66 KV SW /Y -SF6 cubicle – not maintained, relay not calibrated, PS setting

Page 24: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Electrical Maintenance….

SS A- battery charger power comes from another plant through a COSSS log – to be reviewed by electrical maintenance in charge on a daily basisDGs- diesel oil level also needs to be monitored Electrical Protection co-ordination study to be done (various load additions, HT motor test, etc.)DGs- include trip and alarm settings in the log book

Page 25: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

EPM….

Non-standard electrical rubber mat used in several placesDGs installed in another plant premises: BC II (between XYZ DGs & another

plant DG)to be locked in off condition Approval from CEIG?

Page 26: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

EPM….

Series earthing for equipment Non-qualified electrical contractor electricians also are available Large lug for termination Loose terminations No cable glands

Cable trenches behind electrical panels- require periodic cleaning- fire hazard

Page 27: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

EPM…

Consider SRVs for 5 MVA indoor transformer (4050 L oil) at HT Motor test bay Consider oil soak pit

Extension boards not fitted with RCCBs CNC SHOP Main Electrical Panel: Oil soaked rubber mat Saw dust Oil barrels kept close to the panel

Aluminum lugs used on copper bus barsCNC lighting bay distribution panel- requires immediate attention

Page 28: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

EPM…

Electricians & test personnel to be given electrically tested safety shoesUse DI portable tools, instead of metallic toolsNo reference drawings for SDP / MDPsRe-wirable fuses used in SDP A2 Fuse DB – IMB Area Electrical isolation – to be defined as part of the electrical work procedure

Page 29: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

EPM….

Store room in DT building – install master control switch outside the room List of C- license holders may be displayed in main SS SS- E electrical maintenance- requires immediate attention: 1.5 MVA transformers- low oil level, yard full of

grass, all alarms on Overloading in one of the DPs Compressors- identification and load

distribution requires review

Page 30: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

EPM….

SS E – Compressors- series earthing followedHSD, solvent pipelines – flanges may be bonded to avert static discharges leading to fires, install FLP on-off push buttonsNow almost all mobile equipment has cable ends w/o plugs, install power receptacles wherever needed Keep all transformer yards locked ( SS E) All feeders may be identified (Electroplating section)

Page 31: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

EPM….

Turbocharger electrical panels – no access, broken switch handles ER tests: No updated L/O drawing High ER value PTPT area: 4 ohms plus Electrical maintenance to supervise ER tests

SS C- identify both rear and front panels with the same identification marks EPM- not complete, panels not included, not based on standards- re-align EPM based on NFPA 70 B

Page 32: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

EPM…

SS B- 25 KVA UPS panel & batteries installed on wooden boards, temporary mannerMCC / MDP / SDP maintenance: Cob webs Dust Open cable openings

Keep panel keys at every sub stationKeep HRC fuse pullers in sub stations- now pliers / bare hands are used. Use fully insulated fuse pullers / tools as required

Page 33: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

EPM…Heavy oil leak at radiator flange- SS B transformer 1.5 MVACritical loads- consider redundant cable from another feeder, follow another routeSingle isolator used for multiple loads (HT Motor MDB 1, VPI DP 3)Almost all spare feeders got used- consider revamp of electrical system, considering load additions for 10 yearsU/G cable installation – to be done as per IS 1255 Use live U/G cable locator before digging Use U/G cable lay out for reference / install route markers

Page 34: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

OISD 137-Electrical Equipment Inspection

Polarization Index Test PI = R10m /R1 m

2.5 –Excellent /Good 1-2-Questionable Relative value, shows IR deterioration

trend

Moisture Absorption Test K = R1m / R15s

1-damp insulation 1.3 or greater-dry

Page 35: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Electrical Maintenance

Transformer OLTC counter reading- OEM recommended maintenance to be carried outConsider using NFPA 70 B or OISD 137 for electrical preventive maintenance XYZ to consider hotspot detection and Thermography surveys as part of predictive maintenance XYZ to define AMC jobs as per standard practices (battery maintenance, etc.)

Page 36: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

EPM……

OLTC counter based EPM – not done, including oil test for diverter compartmentLoad currents of various loads taken: PTPT building- MDP 1- overloaded Final report will have more details, based on

details sought

Hotspot Detection: MDP 1, PTPT- 150 Degree C LTB Area– A4, Bay IV DP – 110 Degree C DT Area, Main Panel, 2 F2 DB Panel 2 – 77 Degree

C

Page 37: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Infra-Red Hotspot Detector

• Used as part of effective EPM

•Hotspot surveys on critical, high capacity motor terminations, measurement of continuously running critical motors

•Uses infra-red technology, with laser sighting

•Very effective as a predictive maintenance tool

• Interpretation of readings - very critical

Page 38: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Thermography Surveys

• Part of E-RBM Programme

•Identification of potential survey points / equipment and interpretation - very crucial

•NFPA 70 E recommends Thermographic surveys

Page 39: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Ultrasonic Detectors

Detects fault conditions from sounds due to tracking, corona, arcingPortable instrument, can be used on outdoor switchgear, panels, etc.Non-Contact type

Page 40: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

‘All electrical accidents are preceded by rise in temperature & sound’

Page 41: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Lightning Protection

Number of thunderstorm days, Baroda: 8LP not as per IS 2309 / NFPA 780- identify critical plants / areas and install LP for critical plants / buildings Buildings EHV test stations

Page 42: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Surge Protection

Most modern electronic systems are at risk:     •computers

    •data communication networks

    •building management systems

    •PABX telephone exchanges

    •CCTV equipment

    •fire and burglar alarms

    •telecom base stations

    •uninterruptible power supplies (UPSs)

    •programmable logic controllers (PLCs)

    •plant sensors

    •telemetry and data acquisition equipment.

Ensure surge protection for your EPBAX, DoT lines, UPS & Communication equipment

Page 43: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Innovative Electrical Safety Products

Page 44: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

More ES Products

•Non-Contact type voltage detector (magnetic field)

•Plug-In Wiring Checker (detects 14 wiring defects, ideal for testing sockets, BS 1363, faulty N, missing E, reverse P& N)

•Videoscanner, Metalliscanner (detects metallic pipes, conduits, rebar, within 15” concrete)

Page 45: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Automatic Fire D&E System

Fire Trace - local flooding application inside electrical switch gears / power panels- detects heat and the heat -sensitive tube punctures, letting out Ozone-friendly fire extinguishing gas

Page 46: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Linear Heat Sensing Cables

* Advantageous than detectors, more effective

•Consists of two cores separated by heat sensitive insulation

•LHSC applications:

•Cable trays in cable galleries

•Transformers

•Switch gears

Page 47: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

AFCIs

• Arcs - temperatures up to 20,000 degree C, Sun’s outer temperature- 5000 degree C

•No material on earth can withstand arc temperature

•RCCBs cannot detect arcing faults

•AFCIs - the innovative ES device after RCCBs

•AFCIs detects arcing waveforms and trips

•AFCIs - mandatory in all US homes from 2002 January onwards

Page 48: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

Arcing Waveforms

A loose wire at one terminal of a light bulb.

Arcing generated by a loose wire at a screw terminal.

Page 49: ELECTRICAL SAFETY AUDIT for XYZ Gujarat Cholamandalam MS Risk Services Ltd. Chennai  October 4 to 6, 2004

THANK YOU!!! Cholamandalam Risk Services Ltd.