12
RESUME NAME : KADAM JIGNESH ARJUNRAO BIRTH DATE : 16TH JUNE 1973 CONTACT NO : (M) 9924264001 PRESENT CONTACT NO : +91-9924264001 EMAIL ADDRESS : [email protected] SKYPE ID : kentech-jignesh ADDRESS : 3, GIRIRAJPARK SOCIETY, OPP. SHANTINGAR SOCIETY, WAGHODIA ROAD, VADODARA. 390019 STATE : GUJARAT COUNTRY : INDIA PASSPORT NO. ; F-8320212 MARUTIAL STATUS : MARRIED NATIONALITY : INDIAN EDUCATION QUALIFICATION :- SR. NO. EXAMINATION EXAMINOR CLASS PASSING YEAR 1. S.S.C. WITH TECHNICAL SUBJECT G.S.E.B. FIRST CLASS MAY - 1989 2. D.E.E. M.S.UNIVERSIT Y VADODARA HIGHER 2ND CLASS JULY-1992 3. GRADUATE IN ELECTRICAL ENGINEERING M.S UNIVERSITY TAMILNADU FIRST CLASS APRIL-2012 COMPUTER KNOWLEDGE: MS OFFICE, EXCEL, WORD, AUTOCAD-2009

ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV

Embed Size (px)

Citation preview

Page 1: ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV

RESUME

NAME : KADAM JIGNESH ARJUNRAO

BIRTH DATE : 16TH JUNE 1973

CONTACT NO : (M) 9924264001

PRESENT CONTACT NO : +91-9924264001

EMAIL ADDRESS : [email protected]

SKYPE ID : kentech-jigneshADDRESS : 3, GIRIRAJPARK SOCIETY,

OPP. SHANTINGAR SOCIETY,

WAGHODIA ROAD,

VADODARA. 390019

STATE : GUJARAT

COUNTRY : INDIA

PASSPORT NO. ; F-8320212

MARUTIAL STATUS : MARRIED

NATIONALITY : INDIAN

EDUCATION QUALIFICATION :-

SR. NO. EXAMINATION EXAMINOR CLASS PASSING YEAR

1. S.S.C. WITHTECHNICAL SUBJECT

G.S.E.B. FIRST CLASS MAY - 1989

2. D.E.E. M.S.UNIVERSITY

VADODARA

HIGHER2ND CLASS

JULY-1992

3. GRADUATE IN ELECTRICAL ENGINEERING

M.S UNIVERSITY TAMILNADU

FIRST CLASS APRIL-2012

COMPUTER KNOWLEDGE: MS OFFICE, EXCEL, WORD, AUTOCAD-2009

TOTAL EXPERIENCE : 20 YEARS

JOB PROFILE :

20 YEARS IN ELECTRICAL PRECOMM,COMMISSIONING, PROJECT EXECUTION,OPERATION,MAINTENANCE,QUALITY CONTROL & QUALITY ASSURANCE IN UPSTREAM/DOWNSTREAM OIL-GAS. FACILITY,PETROCHEMICAL,POWER PLANT,REFINERY,LNG PLANT & AIRPORT ETC

Page 2: ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV

SR. NO. COMPANY'S NAME POST HELD DURATION

1. AFCONS INFRASTRUCTURE LTD.OIL & GAS PROCESSING PLANT AT RELIANCE IND.LTD,KAKINADA

ELECTRICAL MANAGER

25TH FEB-2014 TO 24TH FEB-2015

2 PETROFAC EMIRATES LLC,UAE

SUPERVISOR-COMMISSIONING

7TH NOV.2012 TO 30TH

OCT.2013

3. AFCONS INFRASTRUCTURE LTD.OIL & GAS PROCESSING PLATFORM AT MUMBAI HIGH (ONGC),OFFSHORE

SR.ELECTRICAL ENGINEER

COMMISSIONING

26TH SEPT.2011 TO 31ST JAN.2012

4.KAZMUNAI SERVICES & CONTRACTING LLP,KAZAKHSTANOFFSHORE OIL & GAS PROJECT

E & I ENGINEER25DEC.2010 TO 10MAY 2011

5.

KENTECH TECHNICAL SERVICESLLC,COUNTRY: RUSSIA,UAEOIL & GAS FIELD PROJECT

SR.E&I ENGINEER 1ST AUGUST 06 TO TILL 12TH AUGUST 2010

6. NATIONAL POWER ELECTORS & SUPPLIERSCOUNTRY. U.A.E.

PROJECT ENGR. 12TH OCT. 04 TO 26TH MARCH 06

7. RELIANCE IND. LTD.(REFINERY DIV.), JAMNAGAR.

CONSULTANT(ELECT. CONST.

ENGR.)

1ST JUNE 04 TO 8TH OCT. 04

8. ELCON ENGRS. PVT. LTD.DIST. BARODA

TESTING &COMMISSIONING

ENGR.

1ST JAN.04 TO 20TH MAY 04

9. AL-TURKI ENTERPRISES L.I.C.COUNTRY. OMAN [GULF]

ELECT. ENGR. 17TH FEB. 99 TO 19TH SEPT. 03

10. GUFIC LTD.DIST. VADODARA.

JR. ELECT. ENGR. 14TH JULY.96 TO 31ST JAN. 99

11. MANISH ENTERPRISES.DIST. VADODARA.

ELECTRICAL SUPERVISOR

8TH JUNE.95 TO 10TH JULY.96

12. M/S POWERTECH,DIST. VADODARA

ERRECTION ENGINEER

7TH FEB. 94 TO 6TH JUNE 95

13. JYOTI SWITCHGEAR LTD.DIST. KHEDA

APPRENTICE ENGINEER

1ST FEB. 93 TO 31ST JAN. 94

Page 3: ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV

FEB-2014 TO FEB-2015: AFCONS INFRASTRUCTURE LTD., OIL AND GAS PLANT,ON SHORE BOOSTER COMPRESSOR FACILITIES PROJECT AT RELIANCE INDUSTRIES AT KAKINADA AS A CONSTRUCTION MANAGER-ELECTRICAL

KEY RESULT AREAS

LOOKING AFTER THE TESTING, PRE-COMMISSIONING & COMMISSIONING WORK, ARRANGING CLIENT INSPECTIONS FOR WITNESSING INSTALLATION,TESTING ACTIVITIES.

OFFERED VENDOR ASSISTANCE, CHECKED MOTOR, LCS,LV & HV PANEL AND HANDLED MTO FOR PROJECT MATERIAL.

LOOKING AFTER THE INSTALLATION ACTIVITY FOR SWITCHGEAR PANEL BASE FRAME, MCC, PMCC,BUSDUCT,2.5MVA,6.6KV TRANSFORMER,PIPERACK CABLE LADDER INSTALLATION,PLANT LIGHTING & EARTHING AS WELL AS TESTING,PRECOMMISSIONING & COMMISSIONING OF ALL ELECTRICAL EQUIPMENT.

CLOSELY MONITORED SUB-CONTRACTOR ACTIVITY TO RECEIVE QUALITY WORK SUPPORTING SUB CONTRACTOR TO COMPLETE THE PROJECT WORK IN A SAFE

MANNER,LIMITED TIME WITH CLIENT SATISFACTION INVOLVED IN HANDLING ALL SITE WORK FOR E&I JOB AT PROJECT. PREPARED BOQ,METHOD STATEMENT,ITP FOR THE PROJECT. MEASURING & CERTIFYING SUBCONTRACTOR BILL OF QUANTITY.

PETROFAC EMIRATES LLC, UAE, PROJECT- CENTRAL DEGASSING STATION (CDS) AT ASAB

RESPONSIBILITY:-

CARRYING OUT TESTING & COMMISSIONING OF 33, 11, 3.3, 0.433 KV TRANSFORMER,LV/HV SWITCHBOARD,MCC,LV/HV MOTOR, AUXILIARY DB, MOV DB, LIGHTING PANEL, AC/DC UPS AND LCS

KEEPING AN EYE ON SMOOTH TESTING & COMMISSIONING OF HV/LV MOTORS FOR MOL PUMP, BOOSTER PUMP, PW RE-INSPECTION PUMP, PW BOOSTER PUMP, FLARE KNOCK OUT DRUM MOTOR, GAS LIFT COMPRESSOR & IT’S AUXILIARIES

LOOKING AFTER THE COMPLETE PROCESSING OF MOTORS, SWITCHBOARD LV/HV, ACB, CKT- BREAKER, LOCAL CONTROL STATION FUNCTION CHECKS & REMOTE FUNCTION CHECKS WITH SCMS & DCS.

PERFORM WITNESSING & INSPECTION ACTIVITIES ON BEHALF OF ADCO TO ENSURE PRECOMM, COMMISSIONING ACTIVITIES ARE EXECUTED AS PER OWNER REQUIREMENT & STANDARD.

HIGHLIGHTS ESSAYED A KEY ROLE IN CARRYING OUT THE SHUTDOWN ACTIVITIES WITHIN TIME SUCCESSFULLY DELIVERED THE PROJECTS ON TIME. PERFORMED ALL TASK AS A JOB PERFORMER.

AFCONS INFRASTRUCTRE LTD (OIL& GAS FIELD PROJECT-OFFSHORE,ONGC)

JOB PROFILE: SR.ELECTRICAL ENGINEERPROJECT: ICPR GAS PROESSING PLATFORM AT MUMBAI HIGH (OFFSHORE)CLIENT: ONGC

Page 4: ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV

RESPONSIBILITY: – PRE-COMMISSIONING, COMMISSIONING WORK TO ARRANGE TPI & CIENT INSPECTION. CABLE LADDER /TRAY INSTALLATION ALL AREA PREPARE WORK PLAN FOR DAY TO DAY ACTIVITIES. PREPARE MTO FOR PROJECT MATERIAL PERFORM LOGIC CHECK FOR MOTOR,LCS,LV-HV PANEL PROVIDE ASSISTANCY TO VENDOR CONTROLLING SUB-CONTRACTOR ACTIVITIES TO GET QUALITY WORK RESPONSIBLE FOR EXECUTION OF ALL THE ELECTRICAL AND INSTRUMENT

INSTALLATION.

KAZMUNAI SERVICES & CONTRACTING LLP,KAZAKHSTAN

JOB PROFILE: E & I ENGINEER

PROJECT: KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM, OFFSHORE

CLIENT: AGIP KAZAKHSTAN NORTH CASPIAN OPERATING COMPANYNATURE OF WORK: HOOK UP & COMMISSIONING

RESPONSIBILITY: – PRE-COMMISSIONING, COMMISSIONING WORK CABLE LADDER /TRAY INSTALLATION FOR ALL AREA PREPARE WORK PLAN AS PER CIENT REQUIREMENT PREPARE MTO REQUIRED FOR PROJECT EXECUTION WORK. SITE VISIT & PREPARING SURVEY REPORT REPORTING TO CLIENT FOR PROJECT PROGRESS. PREPARE MTO FOR PUNCH LIST ITEMS. RESPONSIBLE FOR EXECUTION OF ALL E&I JOB AT SITE

KENTECH TECHNICAL SERVICES LLC ( RUSSIA ) JOB PROFILE: ELECTRICAL SUPERVISOR

JOBS HANDLED:

TESTING & COMMISSIONING ACTIVITIES WITH EXXON MOBILE COMPANY, USA IN ONSHORE NAPTHA PROCESSING PLANT

ACTIVELY INVOLVED IN E&I CONSTRUCTION ACTIVITIES IN LNG PLANT AT SAKHALIN,RUSSIA

ASSIGNED FOR VENDOR SULLIED NUOVO PIGNONE GAS TURBINE,HP/LP COMPRESSOR,AUX.COMPARTMENT,FUEL SKID,F&G,LIGHTING,INSTRUMENT CONSTRUCTION WORK.

INSTALLATION OF CABLE TRAY/LADDER, FIELD INSTRUMENT, JB, TUBING, INSTRUMENT & ELECTRICAL CABLE LAYING AS WELL AS GLANDING & TERMINATION

Page 5: ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV

JOB PROFILE: SR. E & I ENGINEER (ABUDHABI) PROJECT : SBM OFFSHORE TDS 2000 CLIENT : LONE STAR & ODEBRECHT COUNTRY : ABU DHABI (U.A.E).

JOBS HANDLED:

WORKED AS SR.E & I ENGINEER FOR THEIR NEW PROJECT IN ABU-DHABI., RECRUTING CANDIDATES & PROVIDING TRAINING TO SELECTED CANDIDATES IN INDIA FOR THE PERIOD FROM 1ST JULY-2008 TO 21ST DEC-2008.

WORKED AS A WORK PACK ENGINEER WITH BECTEL PROJECT LNG AT ASAB,ABUDHABI FOR THE PERIOD FROM 22ND DEC.2008 TO 31ST JULY-2009.WORK INVOLVES PREPARING CONSTRUCTION WORK PACK WHICH CAN BE EASILY HANDLED BY ENGINEER, FOREMAN & TECHNICIAN.RAISING TECHNICAL QUERY,DAILY COORDINATION WITH FIELD ENGINEER,SUPERVISOR TO FIND OUT ANY DIFFICULTIES TO EXECUTE JOB,SUBMITTING DELY NOTICES.

WORKED AS A WORK PACK ENGINEER WITH KENTECH FOR GPC OMPANY HOLDING OFFSHORE PLATFORM CONSTRUCTION WORK AT MUSFFA DRY DOCK YARD IN ABUDHABI

MAJOR RESPONSIBILITIES:RESPONSIBLE FOR THE MANAGEMENT OF ALL SITE AND PROJECT ACTIVITIES, PREPARING WORK PACK FOR CABLE PULLING AND GLANDING & TERMIANATION FOR ENTIRE RIG-1 AND RIG-2 PROJECT.

AFTER RECEIVING ALL ENGINEERING DRAWINGS FROM CLIENT, I REVIEW ALL ENGINEERING DRAWINGS AND RAISING TECHNICAL QUERY IF THERE IS ANY DISCREPANCY BETWEEN SINGLE LINE DIAGRAM WITH TERMINATION DRAWINGS AS PER PROJECT AND SITE REQUIREMENT, MY RESPONSIBILITIES INCLUDES REFER ALL VENDOR DRAWINGS (KONGSBERG, NOV) AND CHECK PHYSICALLY ALL CONNECTOR AND TERMINALS ARE AVAILABLE INSIDE LOCAL CONTROL PANELS AND JUNCTION BOXES AS PER THE VENDOR TERMINATION DRAWINGS ON SITE.

ATTENDING WEEKLY ENGINEERING METING WITH SBM ENGINEERING TEAM AND HIGHLIGHTING ALL ENGINEERING ISSUE AND CONSTRAINS ON SITE.

ENSURE AND MAKE SURE ALL REQUIRED MATERIAL HAS TO BE ISSUED FORM SBM AND STORED IN KENTECH STORE TO SPEED UP CONSTRUCTION ACTIVITIES ON SITE, E.G. CABLE DRUMS (ALL SIZE AS PER CABLE SCHEDULES), CABLE GLANDS, TERMINATION KITS, CABLE LUGS, MCT BLOCKS AND OTHER PROJECT REQUIRED MATERIALS.

THIS PROJECT INCLUDES MANY INSTRUMENTATION & CONTROL SYSTEMS, DURING MY WORK ON OFFSHORE RIG I INVOLVED IN MANY SYSTEMS LIKE POWER MANAGEMENT, VESSEL MANAGEMENT, DYNAMIC POSITIONING, THRUSTER CONTROL, BALLAST CONTROL, DRILLING, EMERGENCY MACHINERY, AUXILIARY MACHINERY, OFE BOP, ESD, FIRE & GAS, CCTV, TELEPHONE & LAN, PAGA, ENTERTAINMENT, COMMUNICATION, NAVIGATION, RADIO AND SATELLITE SYSTEMS.

NATIONAL POWER ERATORS & SUPPLIERS, ABU DHABI (U.A.E.)JOB PROFILE: PROJECT ENGINEERJOBS HANDLED:

ADWEA PROJECT NO. G-1362 - REINFORCEMENT AND EXPANSION OF 33 KV NETWORK IN WESTERN REGION: SPECIFIC JOB WAS INSTALLATION 71,500 METRES 33 KV CABLES AND 22,100 METRES OF 15-PAIR PILOT CABLES. EXECUTED THE PROJECT INDEPENDENTLY WITHIN THE TIME SCHEDULE AND BUDGET

Page 6: ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV

ALLOCATION. THE WORK INVOLVED TRENCH EXCAVATION, HORIZONTAL DIRECTIONAL DRILLING FOR NDRC, 6-WAY ROAD CROSSING THRU OPEN CUTTING AND ENCASEMENT, ASPHALT REINSTATEMENT, INTERLOCKING TILES REINSTATEMENT, GREEN AREA REINSTATEMENT, TRANSPORTATION OF CABLES FROM ADWEA STORES TO WORK SITE, AND TESTING OF CABLES.

AADC PROJECT NO. G-1296 - (CURRENT PROJECT) EXPANSION & REINFORCEMENT OF 33 KV NETWORK IN AL-AIN : THE SCOPE IS INSTALLATION OF APPROXIMATELY 39000 METRES OF 33 KV POWER CABLE AND PILOT CABLES WITH ACCESSORIES IN AL AIN AREA. THE JOB INVOLVES TRENCH EXCAVATION, HORIZONTAL DIRECTIONAL DRILLING FOR NDRC, TRANSPORTATION AND TESTING OF CABLES.

LOAD SHEDDING & UNDER FREQUENCY PROTECTION SCHEME CHECK AT ABU DHABI & EASTERN REGION. .

ACHIEVEMENTS: APPROVED AS A SITE ENGINEER & SAFETY OFFICER BY ONE OF THE PRESTIGEOUS FIRM “ADDC” IN ABU DHABI.

EMPLOYER : RELIANCE ENGINEERING ASSOCIATES (P) LTD .A PART OF RELIANCE GROUP (HOLDING THEWORLD'S LARGEST OIL REFINERY AT JAMNAGAR), GUJARAT

POSITION : FULL TIME CONSULTANT - ELECTRICAL

MAJOR RESPONSIBILITIES:

EXECUTION OF FCO (FIELD CHANGE OVER) & PCO (PLANT CHANGE OVER) JOBS WHICH INCLUDE THE INSTALLATION OF ELECTRICAL EQUIPMENTS.

CO-ORDINATION WITH FIELD DESIGN CELL(DESIGN DEPT.) FOR ELECTRICAL RELATED MATTERS.

PREPARARTION OF PROGRESS REPORTS ON DAILY,WEEKLY & MONTHLY BASIS. RESPONSIBLE FOR LEADING THE TEAM OF ELECTRICAL CONTRACTORS IN DAY TO

DAY ACTIVITIES RESPONSIBLE FOR PREPARING CONSTRUCTION POWER NETWORK FOR

INSIDE/OUTSIDE BATTERY LIMIT ACTIVITIES. CHECKING MEASUREMENT CONTRACTOR BILLING & MATERIAL RECONCILIATION. PROPER PLANING OF MANPOWER & MATERIAL & EXECUTION OF THE FIELD

ACTIVITIES WITHIN SPECIFIED TIME LIMITS. PREPARING WORK PERMITS & HAZARD ANALYSIS SHEETS FOR VARIOUS

ELECTRICAL ACTIVITIES COMPLIANCE OF HSE RULES & REQULATION AT ALL TIME DURING THE EXECUTION

OF JOB. PREPARATION OF ITPS, AS BUILTS DRAWING AT THE TIME OF COMPLETION OF

PROJECT.EMPLOYER :ELCON ENGINEERS PVT.LTD. POSITION: TESTING & COMMISSIONING ENGINEER.PROJECTS CARRIED OUT TESTING OF PROTECTIVE RELAY IN KRIBHCO AT HAZIRA. TESTING OF PROTECTIVE RELAY, HV CABLE IN GUARDEN IND. LTD. AT JHAGHADIA. TESTING & COMMISSIONING OF PROTECTIVE RELAY, 2.2 MW, 6.6 KV MOTOR, 6.6 KV

VCB, 33 KV VCB, 33 KV RELAY PANEL, 33 KV T/R, 33 KV SWITCH YARD, 6.6 KV SOFT STARTER, 6.6 KV CABLE, 415 V ACB, LV & HV PANEL SIMULATION AT WATER PUMPING STATION IN HYDRABAD & RAJASTH

AL TURKI ENTERPRISES LLC (ATE,LLC)POSITION: AREA ENGINEER (ELECTRICAL)

Page 7: ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV

WORKING WITH M/S AL TURKI ENTERPRISES LLC, SULTANATE OF OMAN WHICH IS AN ISO 9002 CERTIFIED COMPANY . FOUR YEARS OF EXPERIENCE AS ELECTRICAL ENGINEER, PROJECTS COVERING POWER PLANTS, OIL- GAS FIELD PROJECT.EXPERIENCE INCLUDES WORK WITH PDO, DESIGN CIVIL-MECHANICAL-ELECTRICAL-INSTRUMENTATION MULTIDISCIPLINARY TURNKEY PROJECTS THROUGH ATE LLC. IN ASSOCIATION WITH M/S JECOB. INTERNATIONAL LLC.APPROVED AS AN ELECTRICAL ENGINEER AS WELL AS QA/QC INSPECTOR BY PDO FOR CONTRACT NORTH OMAN AND SOUTH OMAN.POSITION AREA ENGINER (ELECTRICAL) AND PART TIME QC INSPECTOR FOR DCME&I CONTRACT WITH PDO.

RESPONSIBILITIES AS AREA ENGINEER:

RESPONSLE FOR LEADING THE TEAM OF ELETRICAL SUPERVISOR-TECHNICIAN-LINEMAN IN DAY TO DAY ACTIVITIES.

TO CARRY OUT TESTING AND COMMISSIONING ACTIVITIES FOR HV/LV APPARATUS LIKE 2MW, 6.6KV HV AND 90KW LV MOTOR, 33KV POWER TRANSFORMER, 33KV OHL 6.6KV BREAKER, LV SWITCH BOARD, AREA LIGHTING, EARTHING SYSTEM, UPS, PULSE RECTIFIER, IGNITION PANEL, 33KV HV CABLE.

TO COMPLETE SHUT DOWN JOB WITHIN AGREED TIMES IN OIL GETHERING STATION.

CARRY OUT INSTALLATION ACTIVITIES FOR VARIOUS PROJECTS. TO PROVIDE ASSISTANCE FOR PROTECTIVE RELAY TESTING. WITNESS ALL ELECTRICAL TESTS AND COPILATION OF TEST PACK AS PER PDO

REQUIREMENTS. TO MAKE PLANNING FOR EXECUTION OF RECEIVED JOB ORDERS. TO PREPARE JOB SAFETY PLANS AND TO IDENTIFY ZONE OF HAZARDOUS AREA.

TO COMPLY WITH THE CONTRACT QUALITY PLAN REQUIRMENTS. STUDY/REVIEW JOB ORDERS, MAKE SITE VISITS TO IDENTIFY DESIGN

DISCRIPANCIES, INTERFACES, MISMATCHES, ETC. PREPARE FIELD TROUBLE REPORTS, WORK DISCUSSION MEMORANDUM IN

CONSULTATION WITH PDO SITE SUPERVISOR, IN CASE OF ANY DEVIATIONS TO THE SCOPE OF WORK.

ENSURE THE EXECUTION OF WORK IN ACCORDANCE WITH SCOPE OF WORK, PDO'S E.R.D,SHELL'S D.E.P.

PREPARATION OF AS BUILTS, TEST PACKS AND TAKING SITE MEASUREMENTS FOR SUBMISSION TO QUANTITY SURVEYOR.

FOCAL POINT FOR THE COMMUNICATION WITH PDO AND SUB CONTRACTOR IN ELECTRICAL RELEATING MATTERS.

RESPONSIBILITIES AS QC INSPECTOR:

Page 8: ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV

PREPARE AND APPROVE ATE QWPS, REVIEW SUBCONTRACTORS QCPS, QWPS PRIOR TO SUBMITTING TO PDO FOR FURTHER APPROVAL.

MAINTING THE QUALITY DOCUMENTS LIKE ERDS, QWPS, DEPS, STD. DRAWINGS. ETC.

PREPARE AND MAINTING QUALITY RECORDS LIKE TEST SHEETS/AS-BULLTS/SITE REPORTS ETC. AS REQUIRED BY THE QUALITY CONTROL PLANS.

ENSURE THAT ALL ACTIVITIES CARRIED OUT ARE IN COMPLIANCE WITH QUALITY REQUIRMENTSOF THE CONTRACT.

MONITOR SUBCONTRACTOR ACTIVITIES AS PER THE SUBCONTRACTOR'S APPROVED CONTRACT QUALITY PLANS.

CONTROL ALL MEASURING AND TESTING EQUIPMENTS RELEATED TO ELECTRICAL ACTIVITIES.

REVIEW OF CUSTOMER COMPLAINTS AND PROPOSE PROPER FEEDBACK TO AREA CO-ORDINATOR TO RESOLVE THE ABOVE.

ACHIVEMENTS.

1. APPROVED AS AREA ENGINEER FOR NORTH OMAN AND SOUTH OMAN BY PDO.2. REGISTERED AS COMPETENT ELECTRICAL PERSON (CEP) FOR LV WORK AND

AUTHORISED ELECTRICAL PERSON (AEP)FOR HV WORK WHICH IS CONSIDERED TO BE A MAJOR ACHIEVEMENTS IN PDO.

3. CERTIFIED AS PERMIT APPLICANT BY PDO.

PROJECTS CARRIED OUT IN NORTH OMAN AND SOUTH OMAN :

1. QAM OIL GETHERING STATION EXPANSION INVOLVES INSTALLATON/TESTING AND COMMISSIONING OF L. V. DIST. PANEL, DIESEL/GAS GENERATOR, INSTRUMENT AIR COMPRESSOR, LP FLARE MODIFICATION,INTER LOCKING SCHEME ARRANGEMENT, CHEMICAL INJECTION SKID AND AREA LIGHTING.

2. SAIHRAWL STAGE-2 INVOLVE INSTALATION-TESTING-COMMISSIONING OF 6.6KV, 2MW HV MOTOR, 6.6 KV SIEMENS BREAKER, HV PANEL CONTROL WIRING, 6.6KV HV CABLE, MOV, SHADE LIGHTING.

3. BURHAAN EARLY OIL AND GAS FIELD DEVELOPMENT.4. LP FLARE AND AP FLARE.5. ESP CONVERSION AND ESP HOOK UP.6. SNH.R.O PLANT 33KV OHL-17 KM.7. QARN ALAM AIR STRIP LIGHTING EXTENSION8. QARNALAM TELECOM BUILDING CONST.-DOMESTIC WIRING INCLUDES

INSTALLATION OF FIRE ALARM SYSTEM, UPS.9. BEAM PUMP HOOK UP NIMR/RIMA.10. MSV INSTALLATION AT NIMR.11. SCADA HOOK UP NIMR/RIMA.12. STREET LIGHTING-NIMR.13. NRPS WASHED OIL SYSTEM UPGRADE.14. CATHODIC PROTECTION FOR OIL TANKS/FLOW LINES15. CONST. OF 20 UNIT ACCOMMODATION FOR CLIENT (PDO)-DOMESTIC WIRING16. CUSTOM HEAD QUARTER BUILDING AT MCT. INCLUDES INSTALLATION OF CCTV,

FIRE ALARM SYSTEM.

HSE TRAINING:

Page 9: ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV

OFFSHORE B.O.S.I.E.T – OPITO APPROVED TRAINING (VALIDITY UP TO 13/01/2015)

OFFSHORE SAFETY INDUCTION AND EMERGENCY TRAINING.

HELICOPTER UNDERWATER ESCAPE TRAINING.

BASIC LIFE SUPPORT.

BASIC FIRE AWARENESS.

SEA SURVIVAL

TEMPSC1. HSE INDUCTION2. H2S AWARENESS & ESCAPE3. HAZARD AWARENESS4. SUPER VISING SAFETY5. SCAFFOLDING APPRECIATION6. GAS TESTING7. PERMIT TO WORK-SIGNATORY8. ENVIRONMENTAL AWARENESS9. INCIDENT INVESTIGATION & REPORTING10. INDUSTRIAL FIRST AID & FIRE EXTINGUISHER

GUFIC LTD.

POSITION: JUNIOR ELECTRICAL ENGINEER

RESPONSIBILITIES :

MAINTENANCE OF PLC BASE ELECT. PANEL AND PLANT MACHINERY. TO SUPPORT THE YEARLY PRODUCTION TARGET TO ACHIEVE DESPATCH

SCHEDULE

PLANT MACHINERY : PLC11U, PLC-95U, AIR COMPRESSURE-10BAR DIESEL GENERATOR-250KVA POWER TRANSFORMER- 250KVA THREE PHASE STABILIZER- 250 KVA INVERTER TO CONTROL SPEED OF AC MOTOR.DC CARD 6RA22 TO CONTROL SPEED OF AC MOTOR.

MANISH ENTERPRISES (ELECT.CONTRACTOR) POSITION : ELECTRICAL ENGINEER(CONSTRUCTION)

RESPONSIBILITIES:

: DUTIES HAD BEEN PERFORMED UNDER VARIES CONTRACTS FROM GEB AND HIMALAYA COMPANY

CONST. AND COMMISSIONING OF 11 KV OHL. ASSEMBLY & INSTALLATION OF WIND MILL TOWER

:.

M/S POWER TECHPOSITION :ERRECTION ENGINEER

Page 10: ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV

RESPONSIBILITIES TO COMPLETE THE ERRECTION OF 100TON CAPACITY CATTLE FEED AND

POULTRY FEED PLANT MACHINERY. TO COMPLETE COMMSSIONING OF PLANT & HANDOVER TO CLIENT. PERFORM SCHEME CHECK & ASSURING CORRECT FUNCTIONING OF

CONTINEOUS PROCESS PLANT MACHINERY & CONTROL PANEL. TO CHECK THE CORRECT SEQUENCE OF MACHINE OPERATION &

INTERLOCKING SCHEME CHECK FOR ELECTRICAL PANEL.

PLANT MACHINERY : SCREW CONVEYOR, ELEVATOR, HAMMER MILL, PALLET MILL, PALLET

CONVEYOR,COOLER BATCH MIXER, AUTO WEIGHING M/C, SLAT CONVEYOR

JYOTI SWITCHGEAR LTD.POSITION: APPRENTICE ENGINEER (ELECTRICAL)

: I HAVE BEEN WORKED WITH THEIR PLANT IMPROVEMENT DEPT. [MAINT. DEPT.]

RESPONSIBILITIES : MAINTENANCE OF PLANT MACHINERY TO PROVIDE ASSISTANT TO

HEAD OF DEPT. TO MAINTAIN MINIMUM STOCK OF MATERIALS.