160
SR. NO DATE Name of the Inspector AREA VISITED ACTIVITY REMEDIAL ACTION SUGGESTED NAME OF THE Contractor STATUS RECTIFICATION REFERENCE WITH DATE AND SR. NO. 1 1-Sep-12 Bedabyas Dehury Siemens India Limited Erection & Alignment of Isolator of Dia-1 _ Siemens OK _ 2 1-Sep-12 Bedabyas Dehury Siemens India Limited Erection & Alignment of Isolator of Dia-2 _ Siemens OK _ 3 1-Sep-12 Bedabyas Dehury Siemens India Limited Erection & Alignment of Isolator of Dia-3 _ Siemens OK _ OBSERVATION/DEVIATION Checked alignment of male & female blades , moving of earth switch & connection of male/female blades as per drawing Chelked Opened & Closed operation manually. Inspected Mechanical interlock between isolator & earth switch & found OK. DAILY INSPECTION REPORT NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA DEPARTMENT : ELECTRICAL INSPECTION DATE : 01/09/2012 REPORT DATE : 01/09/2012

Electrical Dir Sep-2012

Embed Size (px)

DESCRIPTION

ele

Citation preview

Page 1: Electrical Dir Sep-2012

SR.

NODATE Name of the Inspector AREA VISITED ACTIVITY

REMEDIAL ACTION

SUGGESTED

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

1 1-Sep-12 Bedabyas Dehury Siemens India Limited Erection & Alignment of Isolator of Dia-1 _ Siemens OK _

2 1-Sep-12 Bedabyas Dehury Siemens India Limited Erection & Alignment of Isolator of Dia-2 _ Siemens OK _

3 1-Sep-12 Bedabyas Dehury Siemens India Limited Erection & Alignment of Isolator of Dia-3 _ Siemens OK _

OBSERVATION/DEVIATION

Checked alignment of male & female

blades , moving of earth switch &

connection of male/female blades as per

drawing

Chelked Opened & Closed operation

manually.

Inspected Mechanical interlock between

isolator & earth switch & found OK.

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 01/09/2012

REPORT DATE : 01/09/2012

Page 2: Electrical Dir Sep-2012

SR.

NODATE Name of the Inspector AREA VISITED ACTIVITY

REMEDIAL ACTION

SUGGESTED

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

1 3-Sep-12 Bedabyas Dehury Siemens India Limited Erection & Alignment of Isolator of Dia-2 & 3 _ Siemens OK _

2 3-Sep-12 Bedabyas Dehury Siemens India Limited Erection & Alignment of Isolator of Dia-2 & 3 _ Siemens OK _

3 3-Sep-12 Bedabyas Dehury Siemens India Limited Erection & Alignment of Isolator of Dia-2 & 3 _ Siemens OK _

Checked alignment of male & female blades ,

moving of earth switch & connection of

male/female blades as per drawing

OBSERVATION/DEVIATION

Checked alignment of male & female

blades , moving of earth switch &

connection of male/female blades as per

drawing & all found Ok

Chelked Opened & Closed operation

manually & found Ok.

Inspected Mechanical interlock between

isolator & earth switch & found OK.

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 03/09/2012

Page 3: Electrical Dir Sep-2012

SR. NO DATEName of the

InspectorAREA VISITED

1 4-Sep-12Bedabyas

Dehury

7

No Inspection Due To rain

DAILY INSPECTION REPORT

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSADEPARTMENT : ELECTRICAL

INSPECTION DATE : 04-09-2012

Page 4: Electrical Dir Sep-2012

ACTIVITY

7

No Inspection Due To rain

DAILY INSPECTION REPORT

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSADEPARTMENT : ELECTRICAL

INSPECTION DATE : 04-09-2012

OBSERVATION/DEVIATION

Page 5: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

No Inspection Due To rain

DAILY INSPECTION REPORT

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSADEPARTMENT : ELECTRICAL

INSPECTION DATE : 04-09-2012

OBSERVATION/DEVIATION

Page 6: Electrical Dir Sep-2012

NAME OF THE

ContractorSTATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR. NO.

No Inspection Due To rain

DAILY INSPECTION REPORT

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSADEPARTMENT : ELECTRICAL

INSPECTION DATE : 04-09-2012

Page 7: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 5-Sep-12 Bedabyas Dehury

2 5-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 05/09/2012

Page 8: Electrical Dir Sep-2012

AREA VISITED ACTIVITY

Siemens India LimitedErection Of Clamp &

Connector of Isolators

Siemens India LimitedErection Of Clamp &

Connector of Isolators

OBSERVATION/DEVIATION

Visually Chelked the cleaness of Clamp &

connector

Visually chelked all clamp & connector

were connected as per drawing

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 05/09/2012

Page 9: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

_

_

OBSERVATION/DEVIATION

Visually Chelked the cleaness of Clamp &

connector

Visually chelked all clamp & connector

were connected as per drawing

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 05/09/2012

Page 10: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

Siemens OK _

Siemens OK _

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 05/09/2012

Page 11: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 6-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 06/09/2012

Page 12: Electrical Dir Sep-2012

2 6-Sep-12 Bedabyas Dehury

3 6-Sep-12 Bedabyas Dehury

Page 13: Electrical Dir Sep-2012

AREA VISITED ACTIVITY

Siemens India LimitedErection of Battery &

Battery rack

OBSERVATION/DEVIATION

Visually Chelked transit plug were replaced

with vent plug & found OK

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 06/09/2012

Page 14: Electrical Dir Sep-2012

Siemens India LimitedErection of Battery &

Battery rack

Siemens India LimitedErection of Battery &

Battery rack

Visually chelked all clamp,connector,nuts

& Bolts were properly tightened & found

ok.

Visually chelk all battery were connected

with proper polarity & found OK.

Page 15: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

_

OBSERVATION/DEVIATION

Visually Chelked transit plug were replaced

with vent plug & found OK

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 06/09/2012

Page 16: Electrical Dir Sep-2012

_

_

Visually chelked all clamp,connector,nuts

& Bolts were properly tightened & found

ok.

Visually chelk all battery were connected

with proper polarity & found OK.

Page 17: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

Siemens OK _

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 06/09/2012

Page 18: Electrical Dir Sep-2012

Siemens OK _

Siemens OK _

Page 19: Electrical Dir Sep-2012

REFERENCE PHOTO

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 06/09/2012

Page 20: Electrical Dir Sep-2012
Page 21: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 7-Sep-12 Bedabyas Dehury

2 7-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 07/09/2012

Page 22: Electrical Dir Sep-2012

AREA VISITED ACTIVITY

Siemens India Limited Erection Of IPS Tube Busbar

Siemens India Limited Erection Of IPS Tube Busbar

OBSERVATION/DEVIATION

Visually chelked the cleaness of IPS tube.

Chelked & Measured Al. IPS Tube cutting

as per approved Cutting schedule.

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 07/09/2012

Page 23: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

_

_

OBSERVATION/DEVIATION

Visually chelked the cleaness of IPS tube.

Chelked & Measured Al. IPS Tube cutting

as per approved Cutting schedule.

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 07/09/2012

Page 24: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

Siemens OK _

Siemens OK _

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 07/09/2012

Page 25: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 8-Sep-12 Bedabyas Dehury

2 8-Sep-12 Bedabyas Dehury

3 8-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 08/09/2012

Page 26: Electrical Dir Sep-2012

AREA VISITED ACTIVITY

Siemens India Limited Dropper Connection

Siemens India Limited Dropper Connection

Siemens India Limited Dropper Connection

OBSERVATION/DEVIATION

Visually Chelked correctness & tighteness

of clamp, connectors & hardware & found

OK.

Measured length of each dropper & found

each dropper maintained 12 m & found

OK.

Visually Chelked the use of deoxidizing

grease on conductors & clamp

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 08/09/2012

Page 27: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

_

_

_

OBSERVATION/DEVIATION

Visually Chelked correctness & tighteness

of clamp, connectors & hardware & found

OK.

Measured length of each dropper & found

each dropper maintained 12 m & found

OK.

Visually Chelked the use of deoxidizing

grease on conductors & clamp

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 08/09/2012

Page 28: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

Siemens OK _

Siemens OK _

Siemens OK _

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 08/09/2012

Page 29: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 10-Sep-12 Bedabyas Dehury

2 10-Sep-12 Bedabyas Dehury

3 10-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 10/09/2012

Page 30: Electrical Dir Sep-2012

AREA VISITED ACTIVITY

Siemens India LimitedDropper & Spacer

Connection

Siemens India LimitedDropper & spacer

Connection

Siemens India LimitedDropper & spacer

Connection

OBSERVATION/DEVIATION

Visually Chelked correctness & tighteness

of clamp, connectors & hardware & found

OK.

Visually Chelk Spacer were connected as

per drawing mantaining 2.5 meter gap &

Found OK.

Visually Chelked the use of deoxidizing

grease on conductors & clamp

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 10/09/2012

Page 31: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

_

_

_

OBSERVATION/DEVIATION

Visually Chelked correctness & tighteness

of clamp, connectors & hardware & found

OK.

Visually Chelk Spacer were connected as

per drawing mantaining 2.5 meter gap &

Found OK.

Visually Chelked the use of deoxidizing

grease on conductors & clamp

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 10/09/2012

Page 32: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

Siemens OK _

Siemens OK _

Siemens OK _

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 10/09/2012

Page 33: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 11-Sep-12 Bedabyas Dehury

2 11-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 11/09/2012

Page 34: Electrical Dir Sep-2012

3 11-Sep-12 Bedabyas Dehury

Page 35: Electrical Dir Sep-2012

AREA VISITED ACTIVITY

Siemens India LimitedErection of Isolator

Earthswitch

Siemens India LimitedErection of Isolator

Earthswitch

OBSERVATION/DEVIATION

Visually Examined for damaged or

Galvanizing defect of earth Switch & found

OK

Inspected the contact alignment of

earthswitch with Isolator & found Ok.

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 11/09/2012

Page 36: Electrical Dir Sep-2012

Siemens India LimitedErection of Isolator

Earthswitch

Inspected Mechanical interlock between

isolator & earth switch & found OK.

Page 37: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

_

_

OBSERVATION/DEVIATION

Visually Examined for damaged or

Galvanizing defect of earth Switch & found

OK

Inspected the contact alignment of

earthswitch with Isolator & found Ok.

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 11/09/2012

Page 38: Electrical Dir Sep-2012

_Inspected Mechanical interlock between

isolator & earth switch & found OK.

Page 39: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

Siemens OK _

Siemens OK _

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 11/09/2012

Page 40: Electrical Dir Sep-2012

Siemens OK _

Page 41: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 12-Sep-12 Bedabyas Dehury

2 12-Sep-12 Bedabyas Dehury

3 12-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 12/09/2012

Page 42: Electrical Dir Sep-2012

4 12-Sep-12 Bedabyas Dehury

Page 43: Electrical Dir Sep-2012

AREA VISITED ACTIVITY

Siemens India Limited Erection Of CRP panel

Siemens India LimitedErection of Support

Insulators of Isolators

Siemens India Limited Erection Of Tower

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 12/09/2012

OBSERVATION/DEVIATION

It was found that instead of CRP panel No

408 ,erected Panel No 405

It was found that more than 4nos of

erected support insulators found

damaged.

It was found that some of Tower bracing ,

Nuts & bolts were missing .

Page 44: Electrical Dir Sep-2012

Siemens India Limited Erection Of Isolator

It was found that erected Nuts & bolts of

Support Insulator were 16*50 instead of

16*60.

Page 45: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

Contractor has to rectify

it with interchanging of

Panel.

Suggested for change

suggested for

Reerection .

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 12/09/2012

OBSERVATION/DEVIATION

It was found that instead of CRP panel No

408 ,erected Panel No 405

It was found that more than 4nos of

erected support insulators found

damaged.

It was found that some of Tower bracing ,

Nuts & bolts were missing .

Page 46: Electrical Dir Sep-2012

suggested for

Reerection .

It was found that erected Nuts & bolts of

Support Insulator were 16*50 instead of

16*60.

Page 47: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

Siemens Open _

Siemens Open _

Siemens Open _

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 12/09/2012

Page 48: Electrical Dir Sep-2012

Siemens Open _

Page 49: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 13-Sep-12 Bedabyas Dehury

2 13-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 13/09/2012

Page 50: Electrical Dir Sep-2012

AREA VISITED ACTIVITY

MBPL yard Materials Inspection

MBPL yard Materials Inspection

OBSERVATION/DEVIATION

Visually Inspected 7650 Meter Control

cable & & 7270 Signal cable.according to

test Certificate & found Ok.

All Cables passed High Voltage, Conductor

resistance, inductance test, insulation

resistance & volume resistivity, Mutual

capacitance, L/R ratio, characterstic

impedance & FRLS test & found OK.

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 13/09/2012

Page 51: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

Contractor has to rectify

it with interchanging of

Panel.

Suggested for change

OBSERVATION/DEVIATION

Visually Inspected 7650 Meter Control

cable & & 7270 Signal cable.according to

test Certificate & found Ok.

All Cables passed High Voltage, Conductor

resistance, inductance test, insulation

resistance & volume resistivity, Mutual

capacitance, L/R ratio, characterstic

impedance & FRLS test & found OK.

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 13/09/2012

Page 52: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

Siemens Open _

Siemens Open _

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 13/09/2012

Page 53: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 14-Sep-12 Bedabyas Dehury

2 14-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 14/09/2012

Page 54: Electrical Dir Sep-2012

3 14-Sep-12 Bedabyas Dehury

Page 55: Electrical Dir Sep-2012

AREA VISITED ACTIVITY

Siemens India LimitedErection of Isolator

Earthswitch

Siemens India LimitedErection of Isolator

Earthswitch

OBSERVATION/DEVIATION

Visually Examined for damaged or

Galvanizing defect of earth Switch & found

OK

Inspected the contact alignment of

earthswitch with Isolator & found Ok.

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 14/09/2012

Page 56: Electrical Dir Sep-2012

Siemens India LimitedErection of Isolator

Earthswitch

Inspected Mechanical interlock between

isolator & earth switch & found OK.

Page 57: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

_

_

OBSERVATION/DEVIATION

Visually Examined for damaged or

Galvanizing defect of earth Switch & found

OK

Inspected the contact alignment of

earthswitch with Isolator & found Ok.

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 14/09/2012

Page 58: Electrical Dir Sep-2012

_Inspected Mechanical interlock between

isolator & earth switch & found OK.

Page 59: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

Siemens OK _

Siemens OK _

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 14/09/2012

Page 60: Electrical Dir Sep-2012

Siemens OK _

Page 61: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 15-Sep-12 Bedabyas Dehury

2 15-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 15/09/2012

Page 62: Electrical Dir Sep-2012

3 15-Sep-12 Bedabyas Dehury

Page 63: Electrical Dir Sep-2012

AREA VISITED

Siemens India Limited

Siemens India Limited

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 15/09/2012

Page 64: Electrical Dir Sep-2012

Siemens India Limited

Page 65: Electrical Dir Sep-2012

ACTIVITY

Erection & Alignment of Isolator

Erection & Alignment of Isolator

OBSERVATION/DEVIATION

Checked alignment of male & female

blades , moving of earth switch &

connection of male/female blades as per

drawing

Chelked Opened & Closed operation

manually.

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 15/09/2012

Page 66: Electrical Dir Sep-2012

Erection & Alignment of Isolator

Checked alignment of male & female blades ,

moving of earth switch & connection of

male/female blades as per drawing

Inspected Mechanical interlock between

isolator & earth switch & found OK.

Page 67: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

_

_

OBSERVATION/DEVIATION

Checked alignment of male & female

blades , moving of earth switch &

connection of male/female blades as per

drawing

Chelked Opened & Closed operation

manually.

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 15/09/2012

Page 68: Electrical Dir Sep-2012

_Inspected Mechanical interlock between

isolator & earth switch & found OK.

Page 69: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

Siemens OK _

Siemens OK _

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 15/09/2012

Page 70: Electrical Dir Sep-2012

Siemens OK _

Page 71: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 17-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 17/09/2012

REPORT DATE : 17/09/2012

Page 72: Electrical Dir Sep-2012

AREA VISITED

NO WORK DUE TO BISWAKARMA PUJA

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 17/09/2012

REPORT DATE : 17/09/2012

Page 73: Electrical Dir Sep-2012

ACTIVITY OBSERVATION/DEVIATION

NO WORK DUE TO BISWAKARMA PUJA

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 17/09/2012

REPORT DATE : 17/09/2012

Page 74: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTEDOBSERVATION/DEVIATION

NO WORK DUE TO BISWAKARMA PUJA

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 17/09/2012

REPORT DATE : 17/09/2012

Page 75: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

NO WORK DUE TO BISWAKARMA PUJA

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 17/09/2012

REPORT DATE : 17/09/2012

Page 76: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 18-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 18/09/2012

Page 77: Electrical Dir Sep-2012

2 18-Sep-12 Bedabyas Dehury

3 18-Sep-12 Bedabyas Dehury

Page 78: Electrical Dir Sep-2012

AREA VISITED ACTIVITY

Siemens India LimitedComissioning of 48 Volts

Battery rack

OBSERVATION/DEVIATION

Visually Chelked transit plug were replaced

with vent plug & found OK

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 18/09/2012

Page 79: Electrical Dir Sep-2012

Siemens India LimitedComissioning of 48 Volts

Battery rack

Siemens India LimitedComissioning of 48 Volts

Battery rack

Visually chelked all clamp,connector,nuts

& Bolts were properly tightened & found

ok.

Visually chelk all battery were connected

with proper polarity & found OK.

Page 80: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

_

OBSERVATION/DEVIATION

Visually Chelked transit plug were replaced

with vent plug & found OK

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 18/09/2012

Page 81: Electrical Dir Sep-2012

_

_

Visually chelked all clamp,connector,nuts

& Bolts were properly tightened & found

ok.

Visually chelk all battery were connected

with proper polarity & found OK.

Page 82: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

Siemens OK _

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 18/09/2012

Page 83: Electrical Dir Sep-2012

Siemens OK _

Siemens OK _

Page 84: Electrical Dir Sep-2012

REFERENCE PHOTO

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 18/09/2012

Page 85: Electrical Dir Sep-2012
Page 86: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 19-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 19/09/2012

Page 87: Electrical Dir Sep-2012

2 19-Sep-12 Bedabyas Dehury

Page 88: Electrical Dir Sep-2012

AREA VISITED ACTIVITY

Siemens India LimitedComissioning of 48 Volts

Battery rack

OBSERVATION/DEVIATION

Visually chelked the electrolyte level of all

38 nos of battery of 48V of battery rack &

observed it mantained the max level of

battery & all found Ok.

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 19/09/2012

Page 89: Electrical Dir Sep-2012

Siemens India LimitedComissioning of 48 Volts

Battery rack

Visually chelked the Specific gravity of

electrolyte of all 38 nos of battery of 48V

of battery rack & observed it mantained

1.2 & all found Ok.

Page 90: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

_

OBSERVATION/DEVIATION

Visually chelked the electrolyte level of all

38 nos of battery of 48V of battery rack &

observed it mantained the max level of

battery & all found Ok.

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 19/09/2012

Page 91: Electrical Dir Sep-2012

_

Visually chelked the Specific gravity of

electrolyte of all 38 nos of battery of 48V

of battery rack & observed it mantained

1.2 & all found Ok.

Page 92: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

Siemens OK _

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 19/09/2012

Page 93: Electrical Dir Sep-2012

Siemens OK _

Page 94: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 20-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 20/09/2012

Page 95: Electrical Dir Sep-2012

AREA VISITED

NO WORK DUE TO BHARAT BANDH

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 20/09/2012

Page 96: Electrical Dir Sep-2012

ACTIVITY OBSERVATION/DEVIATION

NO WORK DUE TO BHARAT BANDH

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 20/09/2012

Page 97: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTEDOBSERVATION/DEVIATION

NO WORK DUE TO BHARAT BANDH

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 20/09/2012

Page 98: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

NO WORK DUE TO BHARAT BANDH

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 20/09/2012

Page 99: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 21-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 21/09/2012

Page 100: Electrical Dir Sep-2012

2 21-Sep-12 Bedabyas Dehury

3 21-Sep-12 Bedabyas Dehury

4 21-Sep-12 Bedabyas Dehury

Page 101: Electrical Dir Sep-2012

AREA VISITED ACTIVITY

Siemens India LimitedCommissioning of FC &

FCBC

OBSERVATION/DEVIATION

Visually Chelked the Bill Of Materials of 2

nos of FC & FCBC & all found OK.

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 21/09/2012

Page 102: Electrical Dir Sep-2012

Siemens India LimitedCommissioning of FC &

FCBC

Siemens India LimitedCommissioning of FC &

FCBC

Siemens India LimitedCommissioning of FC &

FCBC

Visually Chelked ratings plate details of

mounted all relays, switches, meters,

thyristors, transformers, all control cards &

other documents & all found OK.

Chelked glanding of all the external cables

entering the panel & bloking of all the

unused cable entry holes & all found ok.

Chelked the proper Sealing & locking

arrangement of panel Door & found OK.

Page 103: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

_

OBSERVATION/DEVIATION

Visually Chelked the Bill Of Materials of 2

nos of FC & FCBC & all found OK.

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 21/09/2012

Page 104: Electrical Dir Sep-2012

_

_

_

Visually Chelked ratings plate details of

mounted all relays, switches, meters,

thyristors, transformers, all control cards &

other documents & all found OK.

Chelked glanding of all the external cables

entering the panel & bloking of all the

unused cable entry holes & all found ok.

Chelked the proper Sealing & locking

arrangement of panel Door & found OK.

Page 105: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

Siemens OK _

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 21/09/2012

Page 106: Electrical Dir Sep-2012

Siemens OK _

Siemens OK _

Siemens OK _

Page 107: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 22-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 22/09/2012

Page 108: Electrical Dir Sep-2012

2 22-Sep-12 Bedabyas Dehury

3 22-Sep-12 Bedabyas Dehury

4 22-Sep-12 Bedabyas Dehury

Page 109: Electrical Dir Sep-2012

AREA VISITED ACTIVITY

Siemens India LimitedTesting of FC & FCBC No

#01

OBSERVATION/DEVIATION

Visually measused Insulation Resistance

between Each i/p terminals to Earth &

Output Terminals to Earth & IR of

Transformer T1 & Transformer T6.

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 22/09/2012

Page 110: Electrical Dir Sep-2012

Siemens India LimitedTesting of FC & FCBC No

#01

Siemens India LimitedTesting of FC & FCBC No

#01

Siemens India LimitedTesting of FC & FCBC No

#01

Visually chelked operation of Relays,

Meters, Contactors,indication Lamps,

alarms & Found OK

Chelked glanding of all the external cables

entering the panel & bloking of all the

unused cable entry holes & all found ok.

Chelked metering & protection scheme &

Measured I/p & O/p 0f FC & FCBC at 0% &

100% load. & found OK.

Page 111: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

_

OBSERVATION/DEVIATION

Visually measused Insulation Resistance

between Each i/p terminals to Earth &

Output Terminals to Earth & IR of

Transformer T1 & Transformer T6.

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 22/09/2012

Page 112: Electrical Dir Sep-2012

_

_

_

Visually chelked operation of Relays,

Meters, Contactors,indication Lamps,

alarms & Found OK

Chelked glanding of all the external cables

entering the panel & bloking of all the

unused cable entry holes & all found ok.

Chelked metering & protection scheme &

Measured I/p & O/p 0f FC & FCBC at 0% &

100% load. & found OK.

Page 113: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

Siemens OK _

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 22/09/2012

Page 114: Electrical Dir Sep-2012

Siemens OK _

Siemens OK _

Siemens OK _

Page 115: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 24-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 24/09/2012

Page 116: Electrical Dir Sep-2012

2 24-Sep-12 Bedabyas Dehury

3 24-Sep-12 Bedabyas Dehury

4 24-Sep-12 Bedabyas Dehury

Page 117: Electrical Dir Sep-2012

AREA VISITED ACTIVITY

Siemens India LimitedTesting of FC & FCBC No

#02

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 24/09/2012

OBSERVATION/DEVIATION

Visually measused Insulation Resistance

between Each i/p terminals to Earth &

Output Terminals to Earth & IR of

Transformer T1 & Transformer T6.

Page 118: Electrical Dir Sep-2012

Siemens India LimitedTesting of FC & FCBC No

#02

Siemens India LimitedTesting of FC & FCBC No

#02

Siemens India LimitedTesting of FC & FCBC No

#02

Visually chelked operation of Relays,

Meters, Contactors,indication Lamps,

alarms & Found OK

Chelked glanding of all the external cables

entering the panel & bloking of all the

unused cable entry holes & all found ok.

Chelked metering & protection scheme &

Measured I/p & O/p 0f FC & FCBC at 0% &

100% load. & found OK.

Page 119: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

_

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 24/09/2012

OBSERVATION/DEVIATION

Visually measused Insulation Resistance

between Each i/p terminals to Earth &

Output Terminals to Earth & IR of

Transformer T1 & Transformer T6.

Page 120: Electrical Dir Sep-2012

_

_

_

Visually chelked operation of Relays,

Meters, Contactors,indication Lamps,

alarms & Found OK

Chelked glanding of all the external cables

entering the panel & bloking of all the

unused cable entry holes & all found ok.

Chelked metering & protection scheme &

Measured I/p & O/p 0f FC & FCBC at 0% &

100% load. & found OK.

Page 121: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

Siemens OK _

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 24/09/2012

Page 122: Electrical Dir Sep-2012

Siemens OK _

Siemens OK _

Siemens OK _

Page 123: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 25-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 25/09/2012

REPORT DATE : 25/09/2012

Page 124: Electrical Dir Sep-2012

2 25-Sep-12 Bedabyas Dehury

3 25-Sep-12 Bedabyas Dehury

Page 125: Electrical Dir Sep-2012

AREA VISITED ACTIVITY

Siemens India LimitedErection of Isolator

Earthswitch

OBSERVATION/DEVIATION

Visually Examined for damaged or

Galvanizing defect of earth Switch & found

OK

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 25/09/2012

REPORT DATE : 25/09/2012

Page 126: Electrical Dir Sep-2012

Siemens India LimitedErection of Isolator

Earthswitch

Siemens India LimitedErection of Isolator

Earthswitch

Inspected the contact alignment of

earthswitch with Isolator & found Ok.

Inspected Mechanical interlock between

isolator & earth switch & found OK.

Page 127: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

_

OBSERVATION/DEVIATION

Visually Examined for damaged or

Galvanizing defect of earth Switch & found

OK

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 25/09/2012

REPORT DATE : 25/09/2012

Page 128: Electrical Dir Sep-2012

_

_

Inspected the contact alignment of

earthswitch with Isolator & found Ok.

Inspected Mechanical interlock between

isolator & earth switch & found OK.

Page 129: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

Siemens OK _

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 25/09/2012

REPORT DATE : 25/09/2012

Page 130: Electrical Dir Sep-2012

Siemens OK _

Siemens OK _

Page 131: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 26-Sep-12 Bedabyas Dehury

2 26-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 26/09/2012

REPORT DATE : 26/09/2012

Page 132: Electrical Dir Sep-2012

3 26-Sep-12 Bedabyas Dehury

Page 133: Electrical Dir Sep-2012

AREA VISITED ACTIVITY

Siemens India LimitedDropper & Spacer

Connection

Siemens India LimitedDropper & spacer

Connection

OBSERVATION/DEVIATION

Visually Chelked correctness & tighteness

of clamp, connectors & hardware & found

OK.

Visually Chelk Spacer were connected as

per drawing mantaining 2.5 meter gap &

Found OK.

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 26/09/2012

REPORT DATE : 26/09/2012

Page 134: Electrical Dir Sep-2012

Siemens India LimitedDropper & spacer

Connection

Visually Chelked the use of deoxidizing

grease on conductors & clamp

Page 135: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

_

_

OBSERVATION/DEVIATION

Visually Chelked correctness & tighteness

of clamp, connectors & hardware & found

OK.

Visually Chelk Spacer were connected as

per drawing mantaining 2.5 meter gap &

Found OK.

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 26/09/2012

REPORT DATE : 26/09/2012

Page 136: Electrical Dir Sep-2012

_Visually Chelked the use of deoxidizing

grease on conductors & clamp

Page 137: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

Siemens OK _

Siemens OK _

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 26/09/2012

REPORT DATE : 26/09/2012

Page 138: Electrical Dir Sep-2012

Siemens OK _

Page 139: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 27-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 27/09/2012

REPORT DATE : 27/09/2012

Page 140: Electrical Dir Sep-2012

2 27-Sep-12 Bedabyas Dehury

3 27-Sep-12 Bedabyas Dehury

Page 141: Electrical Dir Sep-2012

AREA VISITED ACTIVITY

Siemens India LimitedErection of Isolator

Earthswitch

OBSERVATION/DEVIATION

Visually Examined for damaged or

Galvanizing defect of earth Switch & found

OK

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 27/09/2012

REPORT DATE : 27/09/2012

Page 142: Electrical Dir Sep-2012

Siemens India LimitedErection of Isolator

Earthswitch

Siemens India LimitedErection of Isolator

Earthswitch

Inspected the contact alignment of

earthswitch with Isolator & found Ok.

Inspected Mechanical interlock between

isolator & earth switch & found OK.

Page 143: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

_

OBSERVATION/DEVIATION

Visually Examined for damaged or

Galvanizing defect of earth Switch & found

OK

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 27/09/2012

REPORT DATE : 27/09/2012

Page 144: Electrical Dir Sep-2012

_

_

Inspected the contact alignment of

earthswitch with Isolator & found Ok.

Inspected Mechanical interlock between

isolator & earth switch & found OK.

Page 145: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

Siemens OK _

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 27/09/2012

REPORT DATE : 27/09/2012

Page 146: Electrical Dir Sep-2012

Siemens OK _

Siemens OK _

Page 147: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 28-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 28/09/2012

REPORT DATE : 28/09/2012

Page 148: Electrical Dir Sep-2012

2 28-Sep-12 Bedabyas Dehury

3 28-Sep-12 Bedabyas Dehury

Page 149: Electrical Dir Sep-2012

AREA VISITED

Siemens India Limited

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 28/09/2012

REPORT DATE : 28/09/2012

Page 150: Electrical Dir Sep-2012

Siemens India Limited

Siemens India Limited

Page 151: Electrical Dir Sep-2012

ACTIVITY

Erection & Alignment of Isolator of Dia-2 & 3

OBSERVATION/DEVIATION

Checked alignment of male & female

blades , moving of earth switch &

connection of male/female blades as per

drawing & all found Ok

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 28/09/2012

REPORT DATE : 28/09/2012

Page 152: Electrical Dir Sep-2012

Erection & Alignment of Isolator of Dia-2 & 3

Erection & Alignment of Isolator of Dia-2 & 3

Chelked Opened & Closed operation

manually & found Ok.

Inspected Mechanical interlock between

isolator & earth switch & found OK.

Page 153: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

_

OBSERVATION/DEVIATION

Checked alignment of male & female

blades , moving of earth switch &

connection of male/female blades as per

drawing & all found Ok

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 28/09/2012

REPORT DATE : 28/09/2012

Page 154: Electrical Dir Sep-2012

_

_

Chelked Opened & Closed operation

manually & found Ok.

Inspected Mechanical interlock between

isolator & earth switch & found OK.

Page 155: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

Siemens OK _

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 28/09/2012

REPORT DATE : 28/09/2012

Page 156: Electrical Dir Sep-2012

Siemens OK _

Siemens OK _

Page 157: Electrical Dir Sep-2012

SR. NO DATE Name of the Inspector

1 29-Sep-12 Bedabyas Dehury

2 29-Sep-12 Bedabyas Dehury

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 29/09/2012

REPORT DATE : 29/09/2012

Page 158: Electrical Dir Sep-2012

AREA VISITED ACTIVITY

Siemens India LimitedErection Of Clamp &

Connector of Isolators

Siemens India LimitedErection Of Clamp &

Connector of Isolators

OBSERVATION/DEVIATION

Visually Chelked the cleaness of Clamp &

connector

Visually chelked all clamp & connector

were connected as per drawing

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 29/09/2012

REPORT DATE : 29/09/2012

Page 159: Electrical Dir Sep-2012

REMEDIAL ACTION

SUGGESTED

_

_

OBSERVATION/DEVIATION

Visually Chelked the cleaness of Clamp &

connector

Visually chelked all clamp & connector

were connected as per drawing

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 29/09/2012

REPORT DATE : 29/09/2012

Page 160: Electrical Dir Sep-2012

NAME OF THE

Contractor STATUS

RECTIFICATION

REFERENCE WITH

DATE AND SR.

NO.

Siemens OK _

Siemens OK _

DAILY INSPECTION REPORT

NAME OF CLIENT : JINDAL INDIA THERMAL POWER LIMITED

NAME OF PROJECT : 2X6OOMW THERMAL PROJECT,ORISSA

DEPARTMENT : ELECTRICAL

INSPECTION DATE : 29/09/2012

REPORT DATE : 29/09/2012