www.boramtec.com Electric Cutter Suction Dredger M2

Electric Cutter Suction Dredger M2 - Boramtech · BORAMTEC Bohr & Rammtechnik Berlin GmbH Köpenicker Allee 123-135 // 10318 Berlin / GERMANY fon +49 30 756544 - 0 fax +49 30 756544

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

www.boramtec.com

Electric Cutter Suction Dredger M2

BORAMTEC Bohr & Rammtechnik Berlin GmbHKöpenicker Allee 123-135 // 10318 Berlin / GERMANY

fon +49 30 756544 - 0fax +49 30 756544 - 11

[email protected]

2

M 2M 2

Content

General Arrangement Plan ................................................................................................... 3

Power Supply 6 kV on board ......................................................................................... 3

Power Supply 6 kV via land station and floating cable ................................................ 4

Electric Cutter Suction Dredger M2 ..................................................................................... 5

General ................................................................................................................................. 6

Shipbuilding ......................................................................................................................... 7

Pontoon 1 ...................................................................................................................... 7

Pontoon 2 ..................................................................................................................... 8

Pontoon 3 ...................................................................................................................... 8

Pontoon 4 ...................................................................................................................... 9

Pontoon 5 ...................................................................................................................... 9

Electric, Machinery, Hydraulic .......................................................................................... 10

Electric Equipment ...................................................................................................... 10

Machinery ................................................................................................................... 12

Hydraulic System ........................................................................................................ 13

Dredging System ................................................................................................................ 14

Drive for cutter head ................................................................................................... 14

Dredge Pump ............................................................................................................... 15

Spud Equipment .......................................................................................................... 15

Plain Suction Equipment ............................................................................................. 16

Winch System .................................................................................................................... 16

Dredge Master House ........................................................................................................ 17

Appendix 1: Dredge Pump Production ............................................................................... 18

BORAMTEC Bohr & Rammtechnik Berlin GmbHKöpenicker Allee 123-135 // 10318 Berlin / GERMANY

fon +49 30 756544 - 0fax +49 30 756544 - 11

[email protected]

3

M 2

General Arrangement Plan

Power Supply 6 kV on board

BORAMTEC Bohr & Rammtechnik Berlin GmbHKöpenicker Allee 123-135 // 10318 Berlin / GERMANY

fon +49 30 756544 - 0fax +49 30 756544 - 11

[email protected]

4

M 2

Power Supply 6 kV via land station and floating cable

BORAMTEC Bohr & Rammtechnik Berlin GmbHKöpenicker Allee 123-135 // 10318 Berlin / GERMANY

fon +49 30 756544 - 0fax +49 30 756544 - 11

[email protected]

5

M 2

Electric Cutter Suction Dredger M2Name M2 MachineryType E-Cutter 2 x Cat 3516 Je 1600 KWOwner Boramtec GmbH 1 x Bordnetzdiesel 200 KWBuild Orenstein & Kop-

pel, Lübeck1 x Hafendiesel 74 KW

ElectricRebuild 2003 2 x Generator Je 2000 KVAClass SUK Trafo 1 4000 KVADimensions E-Motor UWP 1600 KWLength overall 46,40 m Trafo 2 630 KVALength Pontoon 33,0 m Boardnet 400 VBreadth 10,08 m Hydraulic/Jetwater 400 KWMoulded Depth 2,52 mDraught 1,62 m WinchesStructural weight 360 t Ladder hoisting 15 tDredging Depth 18 by Cutter m Side 2 x 11 tDredging Depth 35 by Suction m Moving 4 xDischarge Pipe 600 mm Measurement Sys-

temSpudcarriage 3,5 m Production System xSpuds 25 m ACC x

BORAMTEC Bohr & Rammtechnik Berlin GmbHKöpenicker Allee 123-135 // 10318 Berlin / GERMANY

fon +49 30 756544 - 0fax +49 30 756544 - 11

[email protected]

6

M 2

GeneralThe dredger shown on page 2 has been constructed in 1966 on the Yard Orenstein & Koppel AG, Lübeck, Germany, for Möbius AG in Hamburg. The rules of German Authority SBG are accepted.After several jobs on a number of sites, the dredger has been reconstructed and highly modernized in the year 2003 especially for a Job on the Highway A 20.Electric motors as well as pumps have been renewed. Power supply and power distribution had been changed from direct current to three-phase-current.Two additional power generator sets with a power of 1710 kW each have been installed on additional pontoons. With the help of transformers the 6KV high voltage electric motor for the under-water-dredge-pump will be driven with a power of 1600 KW.The cutter drive together with the lower part of the cutter-ladder will be driven hydraulically by most modern cutter installation of 270 KW. Hydraulic driven winches as well as a hydraulic driven spudcarriage completing the dredge into a high power tool.A complete measuring system is installed for the control of dredging in an economical way.After completing his very successful last job already 8 months later in Lübeck, the dredger has been dismounted and been transported to Hamburg, where he is still laying idle.

BORAMTEC Bohr & Rammtechnik Berlin GmbHKöpenicker Allee 123-135 // 10318 Berlin / GERMANY

fon +49 30 756544 - 0fax +49 30 756544 - 11

[email protected]

7

M 2

ShipbuildingThe complete dredger is dismountable into a number of five pontoons with following dimensions in detail:

Pontoon 1 ( Stb forward) L x B x H = 18 x 3,45 x 2,8 mPontoon 2 ( PS forward) L x B x H = 16 x 3,2 x 2,8 mPontoon 3 ( Stb aft) L x B x H = 15 x 3,45 x 3,0 mPontoon 4 ( Middle aft) L x B x H = 10 x 3,0 x 2,8 mPontoon 5 ( PS aft) L x B x H = 17 x 3,45 x 3,0 m

The two power aggregates as well as the main trafo are located on additional Flexi-Float pontoons to be coupled on main pontoons.

Assembled the dredger has following main dimensions in total:

Length Pontoon = 46, 4 mBreadth Pontoon = 10 m

The GAP given in Appendix 1 is showing the details of the dredge in general with a dredging depth by cutting of -18m. All stability criteria according to SBG are strictly confirmed. Above the deck the Dredge Master House is located for the best view around. In detail the pontoons divided as follows:

Pontoon 1Dayroom with kitchen and partly store

Kitchen and dayroom pontoon 1Deck potoon 1

BORAMTEC Bohr & Rammtechnik Berlin GmbHKöpenicker Allee 123-135 // 10318 Berlin / GERMANY

fon +49 30 756544 - 0fax +49 30 756544 - 11

[email protected]

8

M 2

Pontoon 2 Workshop

Pontoon 3Electric equipment, machinery and winch hydraulic

Workshop with processing machines Workshop with compressor and store

Deck and companion way Pontoon 3 Switchboard for several users

BORAMTEC Bohr & Rammtechnik Berlin GmbHKöpenicker Allee 123-135 // 10318 Berlin / GERMANY

fon +49 30 756544 - 0fax +49 30 756544 - 11

[email protected]

9

M 2

Pontoon 4Machinery and hydraulic equipment

Pontoon 5Switch equipment for dredge pump drive

Hydraulic pumps for cutterdrive, jet water pump Hydraulic device for spud equipment

Deck with companion ways and hatches Starter for high voltage motor

BORAMTEC Bohr & Rammtechnik Berlin GmbHKöpenicker Allee 123-135 // 10318 Berlin / GERMANY

fon +49 30 756544 - 0fax +49 30 756544 - 11

[email protected]

10

M 2

Electric, Machinery, Hydraulic

Electric EquipmentDuring reconstruction for the special dredging job Highway A 20 the M 500 has been repowered into an electric dredge. The necessary power of high voltage 6 kV will be delivered either by the Power Aggregates on flexifloat pontoons or via landscaped power station and floating cable.

8

Electric,Machinery, Hydraulic

Electric Equipment

During reconstruction for the special dredging job Highway A 20 the M 500 has been repowered into an electric dredge. The necessary power of high voltage 6 kV will be delivered either by the Power Aggregates on flexifloat pontoons or via landscaped power station and floating cable.

BordnetzContainer

BORAMTEC Bohr & Rammtechnik Berlin GmbHKöpenicker Allee 123-135 // 10318 Berlin / GERMANY

fon +49 30 756544 - 0fax +49 30 756544 - 11

[email protected]

11

M 2

In detail:

9

Power Supply for Main User

In detail:

6 KV 6 KV Junction point Trafo

6KV – 400 V630 KVA

400 VPowersupply

StarterÖel

6 KV

UWP1600KW

Starter

400KW

Hydraulic

6 KV 500 KW

Power supply for main user

BORAMTEC Bohr & Rammtechnik Berlin GmbHKöpenicker Allee 123-135 // 10318 Berlin / GERMANY

fon +49 30 756544 - 0fax +49 30 756544 - 11

[email protected]

12

M 2

6kV, 1600 kW motor for under water pump drive

All necessary voltage and power can be seen in that detail chart. The container for power supply is completely available. Two generator sets each 2000 KVA as well as synchronization equipment are to be bought extra.

Machinery In pontoon 3 has been installed: Electric distribution board for several user as well as hydraulic pumps for winch drive and the two small power aggregats .According to Main Data Sheet (page 2) these are:

Harbour Diesel SetCAT C 4.4, Year 2002, 74 KW at 1500 Rpm

Power Supply Aggregat Perkins 1300Model GCD 230 A, Year 2002, 200 BHP at 1500 Rpm

BORAMTEC Bohr & Rammtechnik Berlin GmbHKöpenicker Allee 123-135 // 10318 Berlin / GERMANY

fon +49 30 756544 - 0fax +49 30 756544 - 11

[email protected]

13

M 2

All auxiliary systems like• Cooling water• Lubrication• Fuel• Ballast and Drainage system• Heating• Jetwater and Firefighting System • Cutter seal flushing• Dredge pump seal flushing

are completely installed.

Hydraulic SystemAlso in this pontoon the hydraulic equipment for the side winches are installed and the whole hydraulic system has been completely renewed in 2003.

Hydraulic pumps for winch hydraulic Hydraulic tank

Hydraulic pumps type Vestijk A4V SG 500 HD 10 Jet water pump Nyhuis HGTi 300 500

BORAMTEC Bohr & Rammtechnik Berlin GmbHKöpenicker Allee 123-135 // 10318 Berlin / GERMANY

fon +49 30 756544 - 0fax +49 30 756544 - 11

[email protected]

14

M 2

The drive for hydraulic pumps for the cutter drive as well as the drive for the jet water pump is done by an electric motor. This electric motor is for cutter drive when working as a cutter suction dredger or for jet pump drive when working as a plain suction dredger.Hydraulic system for spud carriage cylinder as well as for spud hoisting cylinders is also installed within this pontoon.

Dredging System

Drive for cutter headThe cutter drive has been built for a maxing depth for – 18m is installed as lower part of the cutter ladder with a length of 5,15 m. The cutter itself is a 5-blade crowncutter type 10 CB-AL-1455-180-Vo4 and is driven by a Hägglunds Hydraulic motor MB 400 with 180 KW at 30 Rpm. This lower part of the ladder with complete hydraulic drive is of standard from I H C dredger 5014 C and has to be ordered separately at IHC.

Cutter with dredge teeth Cutter lower part

BORAMTEC Bohr & Rammtechnik Berlin GmbHKöpenicker Allee 123-135 // 10318 Berlin / GERMANY

fon +49 30 756544 - 0fax +49 30 756544 - 11

[email protected]

15

M 2

Dredge PumpThe high voltage electric motor drives the dredge pump. The situation as an Under Water Pump is especially designed for highest concentration of mixture.In Appendix 1 the possible output is shown for different length of pipe line.The dredge pump of Type 500/1400 is at a power of 1600 KW for a mixture of 1,8 m³/sec or 6500 m³/h at a height of about 60 m WC.

6 kV motor for dredge pump drive Dredge pump mounted on ladder

Spud EquipmentDuring cutting the dredger will be moved about 45 ° to each side, portside and starboard. This will be done by the side winches with the working spud to be used as an anchor. The holding spud with a diameter of 762 mm and a length of 23,5 m has a fixed position in the pontoon and can just be hoisted and lowered by a hydraulic ram. This holding spud will be used as anchor as well, but only when the working spud will be removed to another position by the spud slide. Working spud has the same dimensions as the holding spud. Spud slide has a stroke of about 3,5 m, means three times of the height of the cutter head or just say three cuts. Spud slide and hoisting system

BORAMTEC Bohr & Rammtechnik Berlin GmbHKöpenicker Allee 123-135 // 10318 Berlin / GERMANY

fon +49 30 756544 - 0fax +49 30 756544 - 11

[email protected]

16

M 2

Plain Suction EquipmentWhen dismounted the lower cutter piece a flange for connection of an additional suction pipe of 600 mm on the main ladder is given. This suction pipe has to be ordered separately. The jetwater will be transported to one nozzle closed to the suction mouth and is loosening the soil to be dredged.In addition the jetwater pump has been installed .This pump will be driven by an electric motor, due to the absence of the cutter drive. With a capacity of about 1000 m³/h and a head of about 6 bar the right dimensions are given.

Winch SystemOn dredge M 500 there are following winches to be installed:

• Ladder hoisting winch Type HW 150, pull of 15 t, hydraulic driven• 2 Side winches of 15 t at 24 m/min, hydraulically driven• 4 Moving winches for plain suction device.

Side winch Ladder hoisting winch

Moving winches port side Moving winches starboard side

BORAMTEC Bohr & Rammtechnik Berlin GmbHKöpenicker Allee 123-135 // 10318 Berlin / GERMANY

fon +49 30 756544 - 0fax +49 30 756544 - 11

[email protected]

17

M 2

Dredge Master HouseFor a good view around, the dredge master house has been constructed at the highest point of the dredge. From this point the dredge will be handled by the dredge master, all necessary instruments and steering device are here installed.A density- and flow rate measuring system does the dredge master help to check the output of his dredge as well as the velocity of mixture in the delivery pipe. Measuring points for an ACC system are installed for a good evaluation.Due to the order of the “Atomaufsichtsbehörde” the transmitter for density- and flow meter had to be dismounted. To get it installed again on board , the next owner of the dredge M 500 had to show a so called “Umgangsgenehmigung” for this nuclear device. Only then the dredge can be used in an economical way.

Dredge master house

Desk in dredge master house

BORAMTEC Bohr & Rammtechnik Berlin GmbHKöpenicker Allee 123-135 // 10318 Berlin / GERMANY

fon +49 30 756544 - 0fax +49 30 756544 - 11

[email protected]

18

M 2

Appendix 1: Dredge Pump ProductionProduction Dredger M2 with 600mm Pipe Line on different discharge Length

20

Production Dredger M 500 with 600 mm Pipe Line on different discharge Length

0

500

1000

1500

2000

2500

0 1000 2000 3000 4000

2040 m³/h

1070 m³/h

m Pipe Line