57
El Seif Group

El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

  • Upload
    others

  • View
    30

  • Download
    0

Embed Size (px)

Citation preview

Page 1: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

El Seif Group

Page 2: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

• Saudi leading privately owned group

• Diverse business interests worldwide

• Established in 1951

• Committed to delivering the highest

quality and achieved client satisfaction

through high levels of professional

standards and efficiency

El Seif Group

Page 3: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

El Seif Group

Fields of Business:

• Engineering & Construction

• Commercial Investment

• Power Generation

• Pre-cast Production

• Insurance

• Industrial Investments

• Education

• Operation & Maintenance

• Security

• Facilities Management

• Hospitals Management

• O&M of District Cooling Plants

• MEP

• Properties Management

Page 4: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

El Seif Group

El Seif Group is a leading privately owned group of companies in the Kingdom of

Saudi Arabia with diverse business interests worldwide.

El Seif Group commenced operations in the Kingdom of Saudi Arabia and the

Middle East on 1951 in the commerce and transport sectors with a large vehicle

fleet that covered a wide network in the region. During the 1970's, the Group

established new companies in various fields of business which have become

credible leaders in their respective business fields and earned the trust of the

business and private banking communities.

From the beginning, the emphasis of the Group has been on quality, efficiency,

customer satisfaction, and long term planning. This philosophy has enabled the

companies of the Group to become among the top firms in their lines of business.

El Seif Group continues to grow as a leading force in the region. With its growing

resources, expanding activities and increasing involvement in regional property

development, the group’s role as an instrument in the region’s progress can only

get better.

El Seif Group

Page 5: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

El Seif Commercial Investment Company (ESI)

El Seif Commercial Investment Company is the investment arm of the Group. It

capitalizes on the group excellent knowledge and solid network of local and

international relationships to identify and formulate lucrative investment

opportunities.

The company’s team of highly qualified professionals and advisors are geared to

research, analyze and propose profitable investment opportunities with intense

assessment of technical, commercial and strategic issues.

The equity partners of El Seif Commercial Investment Company benefit from El

Seif's diversified management, planning and advisory capability that insure best

returns on their investments.

El Seif Commercial Investment Company operates in different markets across the

GCC with business interest includes construction, real estate development,

insurance, power generation, operation and maintenance, hospitals management,

medical equipment and hospital supplies.

El Seif Group

Page 6: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

El Seif Engineering Contracting Company is one of the top construction

companies in Saudi Arabia and the Middle East. It is reputable provider of world-

class construction and engineering services with a long list of prestigious projects

which represents some of the region’s major urban centers.

The company’s list of projects has included urban skyscrapers, modern hospitals,

residential developments, huge infrastructure projects, airports, power plants,

commercial complexes, technical facilities, as well as major military installations

and public works project requiring the highest levels of technical and

engineering sophistication.

El Seif Engineering Contracting Company continues to grow as a leading force

in the regional construction industry. With its growing resources, expanding

activities and increasing involvement in regional property development, the

company’s role as an instrument in the region’s progress can only get better.

El Seif Engineering Contracting Company

El Seif Group -

ESI

Page 7: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

NPC is a Saudi based company focusing on IPP and IWPP projects within the

Gulf Region.

NPC was the first company in Saudi Arabia to land the first Co-Generation IPP

project for SADAF/SABIC 250 MW power and 510 tone/hour steam co-

generation plant which is currently at the operation stage.

National Power Company (NPC)

El Seif Group -

ESI

Page 8: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Modern Arab Construction Company (MAC)

MAC is a Dammam based general contracting company, with emphasis on

the oil & gas, power projects and process industry mid to downstream.

MAC services include project and construction management, general

contracting, engineering, procurement and construction, international

procurement, logistics, in-country partnership to international EPC firms.

El Seif Group -

ESI

Page 9: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

RDB EL SEIF Company Ltd.

RDB-El Seif is a Saudi company established in 2008 and has grown rapidly to

become one of the leading precast concrete manufacturers in Saudi Arabia.

RDB-El Seif offers a complete precast concrete solution to all types of structures

and projects. The company has its main factory in Kharj new industrial area

employing more than 300 high qualified engineers, specialists and skilled labors.

The factory is equipped with the latest technology in production of precast

concrete elements.

Nowadays, RDB-El Seif has become a leading precast producer relied upon by

clients all over the Kingdom. For that, the company has supplied its services to

the North of the Kingdom, South, East, West, and the Central Region.

El Seif Group -

ESI

Page 10: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Amana Cooperative Insurance Company

Amana Cooperative Insurance Company (ACI) is a Saudi insurance company

listed in Tadawul. The company, which was formed in 2010, offers a wide range

of insurance solutions designed to meet the requirements of the individual and

corporate clients.

Amana’s portfolio includes a variety of products covering health (medical),

motor, property, fire, marine, engineering and other specialized insurances that

cover the activities of various business sectors such as industry, trade and

service.

El Seif Group

Page 11: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

GlobeMed Saudi Medical Claim Settlement Company

GlobeMed Saudi Medical Claim Settlement Company (GMS) which was

established in 2004, is a joint venture between El Seif, Delta Near East Holding

Company of Lebanon and GlobeMed Company Limited of British Virgin Island.

The company provides Third Party Administration (TPA) and Preferred Provider

Organization (PPO) services in support of the various healthcare benefits

programs being offered by insurance companies and employer groups.

El Seif Group

Page 12: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Trade Centre Company Limited

Trade Center Company Limited (TCCL) which owns Kingdom Center, is a mixed-

use real estate development company that has several developments

including the Four Seasons Hotel, a Mall and a Commercial Tower in its premises.

TCCL was formed in 1998 and the Kingdom Tower has been operating since

2002. El Seif is the second largest shareholder with 10.16% stake in the

company.

El Seif Group

Page 13: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Jubail Energy Company

Jubail Energy Company (JEC) was formed in July 2003 as a joint venture

between National Power Company (NPC) and Abu Dhabi National Energy

Company (TAQA) with each party having a stake of 75% and 25% respectively.

JEC was created in order to execute the captive co-generation project to

produce 250 MW electricity and 510 tons per hour steam for Saudi

Petrochemical Company (SADAF).

El Seif Group

Page 14: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

International Gases Company

International Gases Company (IGC) is a joint venture between Sipchem and

NPC for the purpose of building an industrial gases production facility.

The plant was commissioned in 2006 and started operating in 2009, while the

commercial production started in 2010.

IGC produces Carbon Mono Oxide and Hydrogen which is converted into

Ammonia. These gases are consumed by various industries in different

processes.

The designed capacity of the plant is to produce 340,000 ton / year of Carbon

and approximately 60,000 ton / year of Hydrogen.

El Seif Group

Page 15: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Kingdom Schools Company Limited

Kingdom Schools Company Limited (KSCL) is a Saudi company, established in

1998 for developing, managing and operating private schools.

KSCL, which started its operations in 2001, is among Saudi Arabia’s largest and

most respected private school groups, with more than 4,000 students enrolled

from kindergarten to high school level.

The company’s schools cater to over 4,000 students and employ more than

300 teachers, offering one of the highest ratios of teachers to students among

private schools in Saudi Arabia.

El Seif Group

Page 16: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Musaed El Seif & Sons Company (MES&S)

Musaed El Seif & Sons (MES&S) is a firm which started in the 1970's when it

accurately anticipated rising healthcare demand in the region and reinforced its

presence in this critical field by establishing a professional, highly qualified and

financially strong company.

Today, MES&S and its subsidiaries rank among the leading regional Hospital

Management, Property Management, Facility Management, Operation &

Maintenance, Security, and Catering companies with an outstanding reputation

for quality and efficiency.

El Seif Group

Page 17: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

El Seif Operation & Maintenance (ESOM) is a division of Musaed El Seif & Sons Co.

that specializes in Facility Management, soft services and specialist MEP

Operation & Maintenance services in the Kingdom and the Middle East. ESOM is

a corporate member of the British Institute of Facilities Management (BIFM) and

the only company in the Kingdom to be accredited by the British Institute of

Cleaning Sciences (BICSc). Today, the division has over 2,000 staff covering all

technical fields.

El Seif Operation & Maintenance

El Seif Group –

MES&S

Page 18: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

El Seif Security

El Seif Security (ESS) is a specialized man-guarding security company. ESS is

classified by the Ministry of Interior with the highest security classification “1st”. The

company offers male and female man-guarding services to educational

facilities, banks, residential communities, commercial complexes, and

infrastructure utilities. ESS has a qualified team of over 1,000 trained and certified

men and women with great experience in operating Security Operations Centers

and Command and Control Centers for mega developments and gated high

security communities.

El Seif Group –

MES&S

Page 19: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

El Seif Brookfield Multiplex Services is a 50/50 joint venture company between El

Seif and Brookfield Multiplex to offer Corporate Real-estate, Property

Management, and Facility Management Services to the Saudi Market. ESBMS

executed many projects outside KSA and included in the list of projects; total

Facility Management and MEP Motor City Dubai; Emaar square Dubai FM

contract as well as many projects in Australia, New Zealand, and the UK.

El Seif Brookfield Multiplex Services

El Seif Group –

MES&S

Page 20: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Saudi Medicare Company

Saudi Medicare Co. (SMC) is a subsidiary of Musaed El Seif & Sons Co. and

specializes in Hospital Operation, Management and Maintenance in the GCC

region and its sister company United Medical Enterprises Group (UME) that is

based out of the UK for Operation, Management and Maintenance services. The

group specializes in healthcare including design, planning, commissioning,

operation, management and maintenance, PFI and PPP projects. In addition to

operation, management and maintenance of diagnostics centers across the

GCC region and UK.

El Seif Group –

MES&S

Page 21: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Saudi US Chiller Services

Saudi US Chiller Services is a 50/50 joint venture company between El Seif and US

Chillers to offer operation & maintenance for district cooling plants in the

Kingdom of Saudi Arabia. US Chiller Services operates in the UAE, Qatar, Bahrain,

and Kuwait. It has won awards for “Best O&M District Cooling Service Provider”

and the “Best O&M Chiller Service Provider” in the GCC.

El Seif Group –

MES&S

Page 22: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of

Japan. The activities of Hitachi Plant SA includes performing electromechanical

works, data centers, environmental projects, water treatment, power generation

including balance of plant and substations, oil & gas plants, incineration of solid

waste, district cooling plants, as well as all relevant operation & maintenance.

Hitachi Plant Saudi Arabia

El Seif Group –

MES&S

Page 23: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

United Medical Enterprises Group

United Medical Enterprises (UME) has been active in the United Kingdom since

1981. It has undertaken a variety of high profile projects in partnership with the

National Health Service and the Guy's and St. Thomas' trust, one of the most

respected teaching hospitals in the UK. Other projects in the UK include

management of facilities for King's College Hospital, St. Mary's Hospital and

Manchester Royal Infirmary.

El Seif Group –

MES&S

Page 24: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

El Seif Engineering Contracting Company

Page 25: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Branches in Middle

East

Page 26: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Projects in GCC

Page 27: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

• General Contracting

• Design and Build

• Project Management

• International Procurement

• Logistics

• Operation & Maintenance

Services & Activities

Page 28: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

• High-rise and Mixed-use Buildings

• Large-scale Residential and Commercial Complexes

• Hospitals and Medical Facilities

• Infrastructure Developments

• Airports

• Railway Stations

• Roads, Tunnels and Bridges

• Communication Projects

• Industrial Installations

• Power Generation and Transmission

• Electro-mechanical Works

• Operation & Maintenance

Project Types

Page 29: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Design Engineering Procurement Construction O&M

Company Strengths

Capabilities

Page 30: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

ISO 9001 Certified for Quality Management Systems

OHSAS 18001 Certified for Occupational Health & Safety Management Systems

ISO 14001 Certified for Environmental Management Systems

Company Strengths

Page 31: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Work Experience

High-Rise Buildings

Page 32: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Project Name Client Location Project Value Duration

Samba

Headquarters Tower

Samba Financial

Group Riyadh, KSA 1,300 Million SR

2010 ~ 2014

(42 months)

King Abdullah

Financial District –

Package (3)

Rayadah

Investment

Company

Riyadh, KSA 1,400 Million SR 2008 ~ 2012

(36 months)

Silhouette Tower Qatar Islamic Bank Doha, Qatar 600 Million SR 2006 ~ 2008

(28 months)

Jewels Twin Towers Cayan / The Jewels

Ltd Dubai, UAE 167 Million SR

2005 ~ 2007

(24 months)

Marina Tower Private

Development Beirut, Lebanon 750 Million SR

2003 ~ 2006

(36 months)

Kingdom Tower Kingdom Holding

Co. Riyadh, KSA 1,030 Million SR

1999 ~ 2002

(36 months)

Work Experience

High-rise Buildings

Page 33: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Jewels Twin Towers

Dubai, UAE

Marina Tower

Beirut, Lebanon

Kingdom Tower

Riyadh, KSA

Work Experience

High-rise Buildings

Page 34: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Samba Headquarters

Riyadh, KSA

KAFD – Package 3

Riyadh, KSA

Silhouette Tower

Doha, Qatar

Work Experience

High-rise Buildings

Page 35: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Work Experience

Residential & Commercial Complexes

Page 36: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Project Name Client Location Project Value Duration

Hail Shopping Mall Higher Education

Fund Hail, KSA 200 Million SR

2013 ~ 2014

(15 months)

Al Falah Community

Development Al Dar Properties Abu Dhabi, UAE 2,850 Million SR

2010 ~ 2012

(24 months)

Green Community Union Properties Dubai, UAE 950 Million SR 2006 ~ 2010

(36 months)

Asian Games Village

(Hamad Medical

City)

Ministry of Municipal

Affairs & Agriculture Doha, Qatar 661 Million SR

2004 ~ 2006

(20 months)

Al Tameer

Commercial Center

Arriyadh Development

Company Riyadh, KSA 338 Million SR

1996 ~ 2000

(48 months)

Residential and

Administrative Center

Ministry of Defense

and Aviation Al Hariq , KSA 245 Million SR

1993 ~ 1996

(30 months)

Military Camp,

Training Complex

and Military Hospital

Ministry of Defense

and Aviation

Wadi Al Dawaser,

KSA Classified Info

1989 ~ 1992

(36 months)

Work Experience

Residential & Commercial

Page 37: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Al Tameer Residential & Commercial Complex

Riyadh, KSA

Green Community

Dubai, UAE

Hamad Medical City

Doha, Qatar

Work Experience

Residential & Commercial

Hail Shopping Mall

Hail, KSA

Page 38: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Work Experience

Hospitals & Medical Complexes

Page 39: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Project Name Client Location Project Value Duration

Kingdom Hospital Kingdom Holding

Company Riyadh, KSA 220 Million SR

1997 ~ 2000

(30 months)

342-bed Zahle &

Saida

Governmental

Hospitals

Council for Development

& Reconstruction

Zahle & Saida,

Lebanon 120 Million SR

1997 ~ 2001

(48 months)

500-bed

Governmental

University Hospital

Council for Development

& Reconstruction Beirut, Lebanon 213 Million SR

1995 ~ 2001

(67 months)

Al Qatif (385-bed)

Central Hospital Ministry of Health Al Qatif, KSA 360 Million SR

1983 ~ 1986

(36 months)

Public Security

Forces Hospital Ministry of Interior Riyadh, KSA 57 Million SR

1982 ~ 1985

(36 months)

Four (100-bed)

Hospitals Ministry of Health

Rabigh, Al Ula, Al

Qunfuda &

Adhum, KSA

721 Million SR 1982 ~ 1984

(24 months)

Work Experience

Hospitals & Medical Complexes

Page 40: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Kingdom Hospital

Riyadh, KSA

Zahle & Saida Governmental Hospitals

Lebanon

Four 100-Bed Hospitals

KSA

Public Security Forces Hospital

Riyadh, KSA

Work Experience

Hospitals & Medical Complexes

Page 41: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Work Experience

Hospitality Projects

Page 42: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Project Name Client Location Project Value Duration

Five Star Hotel in

Tabouk Higher Education Fund Tabouk, KSA 290 Million SR

2011 ~ 2014

(30 months)

Five Star Hotel In

Hail Higher Educational Fund Hail, KSA 275 Million SR

2010 ~ 2013

(36 months)

Four Seasons Hotel

– Kingdom Tower Kingdom Holding Co. Riyadh, KSA 1,030 Million SR

1999 ~ 2002

(36 months)

Work Experience

Hospitality Projects

Page 43: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Five Star Hotel

Tabouk, KSA

Five Star Hotel

Hail, KSA

Four Seasons Hotel – Kingdom Tower

Riyadh, KSA

Work Experience

Hospitality Projects

Page 44: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Work Experience

Other Special Buildings

Page 45: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Project Name Client Location Project Value Duration

King Abdullah

Project for

Development of

Security

Headquarters -

Phase 2, Package A

Ministry of Interior Riyadh, KSA 2,500 Million SR 2013 ~ 2016

(30 months)

Sport Hall and

Athletic Stadium

Saudi Aramco Jeddah, KSA 500 Million SR 2013 ~ 2015

(24 months)

Three Dedicated

Car Park Buildings

Rayadah Investment

Company Riyadh, KSA 500 Million SR

2012 ~ 2014

(24 months)

Haramain High-

speed Railway –

Passenger Stations

Saudi Railways

Organization

Jeddah &

Rabigh, KSA 4,600 Million SR

2011 ~ 2013

(27 months)

Convention Center

at KAFD

Rayadah Investment

Company Riyadh, KSA 220 Million SR

2011 ~ 2012

(9 months)

Work Experience

Other Special Buildings

Page 46: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Project Name Client Location Project Value Duration

Sabic Plastics

Application

Development

Center

Sabic Riyadh, KSA 350 Million SR 2010 ~ 2012

(20 months)

Royal Saudi Air

Defense

Headquarters

Building

Royal Saudi Air Defense

Force Riyadh, KSA Classified Info

1995 ~ 1997

(24 months)

Riyadh Passport

Headquarters

Building

Ministry of Interior Riyadh, KSA 118 Million SR 1980 ~ 1982

(24 months)

Work Experience

Other Special Buildings

Page 47: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Convention Center at KAFD

Riyadh, KSA

Sabic Plastics Application Development Center

Riyadh, KSA

MOI Passport Headquarters Building

Riyadh, KSA

Work Experience

Other Special Buildings

Sport Hall and Athletic Stadium

Jeddah, KSA

Page 48: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Work Experience

Infrastructure & Utilities

Page 49: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Project Name Client Location Project Value Duration

Roads Modifications for

Riyadh Bus Rapid Transit

Project - Phase 1

Arriyadh

Development

Authority

Riyadh, KSA 400 Million SR 2013 ~ 2015

(18 months)

Sadara Petrochemical

Complex - Steel and

Concrete Buildings

(Packages A & B)

Sadara Chemical

Company

(Aramco / Dow

Chemical JV)

Jubail, KSA 350 Million SR 2013 ~ 2014

(15 months)

Thumamah Road Junctions,

Depression, Travelators’

Tunnels and Landbridge

Rayadah

Investment

Company

Riyadh, KSA 275 Million SR 2011 ~ 2013

(20 months)

Princess Noura University –

Package 3 Ministry of Finance Riyadh, KSA 8,000 Million SR

2009 ~ 2011

(24 months)

Crude Oil Pipeline and

Metering Station for Riyadh

PP10

Saudi Electricity

Company /

Aramco

Riyadh, KSA 100 Million SR 2009 ~ 2011

(24 months)

Work Experience

Infrastructure & Utilities

Page 50: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Project Name Client Location Value Duration

Information Technology &

Communication Complex –

Infrastructure

Rayadah

Investment

Company

Riyadh, KSA 243 Million SR 2008 ~ 2010

(18 months)

Underground Car Parking &

Relocation of Diwan Amiri

Services Building at Al Diwan

Al Amiri

Al Diwan Al Amiri Doha, Qatar 240 Million SR 2007 ~ 2009

(24 months)

Sadaf Co-Generation IPP Jubail Energy

Company Jubail, KSA 750 Million SR

2003 ~ 2006

(36 months)

Baiji Power Plant

Rehabilitation Works USACE Baiji, Iraq Classified Info

2004 ~ 2005

(12 months)

Al Marai CPP2 Factory

Project

Al Marai

Company Ltd.

Riyadh – Kharj

Highway, KSA 133 Million SR

2002 ~ 2004

(24 months)

Riyadh Power Plant No. 9 -

1,200 MW Combined Cycle

Saudi Electricity

Company Riyadh, KSA 311 Million SR

1996 ~ 2001

(48 months)

Work Experience

Infrastructure & Utilities

Page 51: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Project Name Client Location Value Duration

Riyadh Power Plant No. 8,

Extension II - 500 MW

Saudi Electricity

Company Riyadh, KSA 296 Million SR

1994 ~ 1996

(24 months)

Design & Construction of

Generator Buildings and

Supply & Installation of Power

Generators

Royal Saudi Air

Force Tabouk, KSA Classified Info

1987 ~ 1988

(12 months)

King Khaled International

Airport - Central Plant & Utility

Buildings

Ministry of

Defense &

Aviation

Riyadh, KSA 126 Million SR 1981 ~ 1982

(12 months)

Arabsat – Ground Control

Earth Station

Arab Satellite

Communication

Organization

Saudi Arabia 113 Million SR 1979 ~ 1980

(12 months)

The Riyadh Satellite Earth

Station

Ministry of Post,

Telephone &

Telegraph

Riyadh, KSA 110 Million SR 1979 ~ 1980

(12 months)

Work Experience

Infrastructure & Utilities

Page 52: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Princess Noura University – Package 3

Riyadh, KSA

Riyadh Power Plant No. 8 & 9

Riyadh, KSA

Al Marai CPP2

Riyadh-Kharj Highway, KSA

Work Experience

Infrastructure & Utilities

Thumamah Road Junctions, Underpasses

and Landbridge - Riyadh, KSA

Page 53: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Work Experience

Airports & Defense Facilities

Page 54: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Project Name Client Location Value Duration

Design & Construction of

Weapons Facilities at Three

Airbases

Royal Saudi Air

Force

Kharj, Taif &

Dhahran,

KSA

Classified Info 2009 ~ 2012

(34 months)

Design & Construction of New

Doha International Airport -

Operation Facilities Package

NDIA

Committee Doha, Qatar 185 Million SR

2006 ~ 2010

(43 months)

Peace Sun IX Project – Khamis

Mushayt, KSA RSAF

Khamis Mushayt,

KSA Classified Info

1996 ~ 2001

(60 months)

Tiger Move F5 at King Faisal

Airbase RSAF Tabouk, KSA Classified Info

1995 ~ 1997

(24 months)

Aircrafts and Airbase Facilities

at ABF Site 04 RSAF Tabouk, KSA Classified Info

1993 ~ 1996

(36 months)

Aircrafts and Airbase Facilities

at ABF Site 06 RSAF Al Jouf, KSA Classified Info

1992 ~ 1996

(48 months)

Work Experience

Airports & Defense Facilities

Page 55: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Project Name Client Location Value Duration

Oasis V Facilities MODA KSA Classified Info 1989 ~ 1992

(36 months)

Expansion of King Faisal

Airbase RSAF Tabouk, KSA Classified Info

1989 ~ 1991

(24 months)

Geographical Support Facility RSAF Riyadh, KSA Classified Info 1989 ~ 1990

(24 months)

Long Range Radar (LRR) Site

Facilities N-69 RSAF Rafha, KSA Classified Info

1987 ~ 1989

(24 months)

Design and Construction of

an Airstrip MODA South Region, KSA Classified Info

1987 ~ 1988

(12 months)

Air Field Facilities 3 RSAF Khamis Mushayt,

KSA Classified Info

1985 ~ 1989

(48 months)

Air Field Facilities I RSAF Taif, KSA Classified Info 1985 ~ 1989

(48 months)

Work Experience

Airports & Defense Facilities

Page 56: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

Work Experience

Airports & Defense Facilities

Page 57: El Seif Group Seif Engineering Contracting Co...Hitachi Plant Saudi Arabia is a joint venture between El Seif and Hitachi Group of Japan. The activities of Hitachi Plant SA includes

• Tel: +966 11 454 9191

• Fax: +966 11 454 2759

• Address: Khaled Bin Al Waleed St., Al Hamra Area

PO Box 2774 Riyadh 11461 KSA

• Email: [email protected]

• Website: www.el-seif.com.sa

Contact Details