Eko Atlantic City DevelopmentTransforming a Liability into an asset
Eko Atlantic – a brief history
• The Erosion of Bar Beach had been ongoing from 1905 to 2006
• At the time Eko Atlantic had commenced, 2.5km of beachfront had already been lost to the sea
• Since the year 2000 the Lagos State Government has been inviting proposals for a permanent solution to the problem
• South Energyx Nigeria Limited concluded concession agreement with Lagos State Government in 2005
Eko Atlantic – a brief history
Conditions of Bar Beach in 2005
Circa 2005
Circa 2005
Circa 2005
Circa 2005
Circa 2005
Circa 2005
Eko Atlantic – a brief history
The interim solution for the erosion of Bar Beach in 2006 was the shoreline protection works
executed by
Hitech Construction Company
Construction at toe of structure
Seaward face of structure
Roadside section of structure
Complete view of structure
Eko Atlantic - the final solution
•Reclaim 10 square kilometers of land off Victoria Island and parts of Lekki lost to the Atlantic Ocean during 100 years of coastal erosion
•Erect an eight kilometer long Sea Revetment to protect the entire development and Victoria Island
•Develop the land reclaimed into a city
•Depend entirely on private funds to complete the project
Eko Atlantic – Sea Revetment
EKO ATLANTIC’S LOCATION
VICTORIA ISLAND
EKO ATLANTIC
LEKKI
SEA REVETMENT
SEA REVETMENT
SEA REVETMENT ANIMATION
Eko Atlantic General Video
Eko Atlantic Progress to date
EKO ATLANTIC MASTER PLAN
LEKKI
EKO ATLANTIC’S LOCATION
VICTORIA ISLAND
EKO ATLANTIC
LEKKI
EKO ATLANTIC’S LOCATION
VICTORIA ISLAND
EKO ATLANTIC
LEKKI