EINRIP Project Handover Road Safety Audits Project PHO RSA Closing Meeting, Makassar
30 April 2012
David Williamson
Road Safety Auditor
VicRoads International
2
South Sulawesi ESS-01 : Sengkang – Impa Impa – Tarumpakkae
Construction in progress in accordance with original design plans
Road safety audit (RSA) of detailed design plans conducted in June 2007
Design incorporates some of the recommendations of the RSA
Work still to be completed: • Shoulder sealing • Traffic islands at two major intersections • Guardrail installation • Pavement markings
3
Delineation of curves
4
Delineation of hazards
5
Delineation of hazards
6
Removal of hazards
7
Intersections – Jl. Bau Baharuddin (0+170)
Existing island to be
remove and new island
to be constructed as per
the design
8
Intersections – Jl. Rusa (1+300)
9
Intersections – Jl. A Baso (3+250)
10
Speed limits
11
Signs
12
South Sulawesi ESS-02 : Bantaeng – Bulukumba
Construction is complete - PHO 12 March 2012
Variation order for additional road safety works based on the RSA of the detailed design has been prepared and is awaiting approval
13
Guardrail – terminals
14
Guardrail – connection at bridges
15
Guardrail – overlapping of panels
16
Guardrail – connection at bridges
17
Guardrail – length
18
Intersection at Sta. 6+100
19
Intersection at Sta. 24+090
20
Roadside hazards
21
Parking lane at the market (4+375)
22
Obscured signs
23
End of project at Bulukumba
24
Terima Kasih