14
Engineering Modern Zambia www.eltechinvestments.com [email protected]

eil@eltechinvestments Brochure.pdf · and piping plants. MINESTONE: 1990 - 1999 Supply of Electrical Distribution Boards, feeder pillars and starter panels. Sub contracted to design,

Embed Size (px)

Citation preview

Page 1: eil@eltechinvestments Brochure.pdf · and piping plants. MINESTONE: 1990 - 1999 Supply of Electrical Distribution Boards, feeder pillars and starter panels. Sub contracted to design,

Engineering Modern Zambia

www.eltechinvestments.com

[email protected]

Page 2: eil@eltechinvestments Brochure.pdf · and piping plants. MINESTONE: 1990 - 1999 Supply of Electrical Distribution Boards, feeder pillars and starter panels. Sub contracted to design,

Substations

Transformers

Generators

(HV, MV & LV)

Electrification and Renewable Energy

Civil Engineering and Transportation

Generator Maintenance Substations Grid Extension

Page 3: eil@eltechinvestments Brochure.pdf · and piping plants. MINESTONE: 1990 - 1999 Supply of Electrical Distribution Boards, feeder pillars and starter panels. Sub contracted to design,

Business Overview

ELTECH is among the leading EPC contractors and suppliers in Zambia's electrical infrastructure

market, and our main goal is simply to provide the best customer service. From a solid and

competitive position based on over two decades of experience, we have developed a strong

reputation for growth, innovation and flexibility by anticipating and meeting the ever more complex

demands of our customers and the ever-changing business environment. Our success owes much

to the experience gained from our large installed base of electrical equipment and systems

country-wide ranging from large industrial power transmission and distribution systems to various

other end-user installations.

ELTECH supplies and also distributes on behalf of a number of manufacturers in Europe, America

and Asia. This includes a complete range of equipment, systems and services for the transmission

and distribution of electricity from power plants to large businesses and various other end users.

We also facilitate both mainstream and new renewable energy sectors.

Other business areas include civil engineering, mechanical engineering and industrial

transportation.

Page 4: eil@eltechinvestments Brochure.pdf · and piping plants. MINESTONE: 1990 - 1999 Supply of Electrical Distribution Boards, feeder pillars and starter panels. Sub contracted to design,

Electrical Engineering Projects

ELTECH designs, develops and maintains control schemes as well as complete turn-key projects

in high voltage, medium voltage and low voltage electrical installations. These works include,

amongst others, the installation and maintenance of:

Outdoor switchgear systems

Protection relays

Substations – Turnkey as well as rehabilitation

Power factor correction equipment and load flow management systems.

Generator installation and maintenance

National Power Grid - ELTECH provides a complete range of equipment, systems and

services for the transmission and distribution of electricity from power plants to large

businesses and various other end users. We are able to handle all areas in high, medium

and low voltage end user requirements.

Equipment supply - ELTECH supplies and distributes electrical equipment on behalf of a

number of manufacturers around the world

Page 5: eil@eltechinvestments Brochure.pdf · and piping plants. MINESTONE: 1990 - 1999 Supply of Electrical Distribution Boards, feeder pillars and starter panels. Sub contracted to design,

Transformer/Generator Installation and Maintenance

We are specialists in transformer and generator supply and installation, as well as maintenance.

BARLOWORLD Equipment Limited: 2001 -To Date. Generator Installation

ELTECH has been appointed by Barloworld Equipment as its Nominated Sub Contractor for Generator

Installation. Amongst several other works, we have been previously sub contracted for the following

Construction of Generator Rooms in George Compound Clinic, Matero Clinic, Kamwala Clinic and

Chilenje Clinic for the Ministry of Health, sponsored by CIDRZ (April 2004 – July 2004)

Installation of a 550 KVA standby generator for new Government Complex Ministries along

Independence Avenue.

Installation of 110 KVA Stand by Diesel Generator for Angola Embassy.

Installation of 110 KVA Generator for Danish Embassy.

Installation of 550 KVA Stand by Generator for UNDP.

Installation of 1.5 MVA Stand by diesel generator at Albidon Mine.

Installation of 550 KVA Stand by diesel generator at Albidon Mine.

Installation of 150 KVA, 88KVA Stand by diesel generators for the World Bank.

Installation of 30KVAs, 50 KVAs, 88 KVAs standby diesel generators for various customers on

behalf of Barloworld Equipment.

Installation and commissioning of 4 MVA Back up Standby Power Generator Plant with step up

Transformers for Zambian Breweries. This was a Turn Key Project which included all civil,

mechanical, electrical works and commissioning.

TAP PRODUCTS LIMITED: 2003

Supply of several motor control centerboards, starter panels, for the automation of their asbestos sheeting

and piping plants.

Page 6: eil@eltechinvestments Brochure.pdf · and piping plants. MINESTONE: 1990 - 1999 Supply of Electrical Distribution Boards, feeder pillars and starter panels. Sub contracted to design,

MINESTONE: 1990 - 1999

Supply of Electrical Distribution Boards, feeder pillars and starter panels.

Sub contracted to design, supply, installation and commissioning of a control system for the

automatic firefighting equipment at Zimco Sports Complex.

NAPSA: 1999 – 2002 - CHOMA DEPOT, LUSAKA DEPOT, CHONGWE DEPOT

Carried out refurbishment of the electrical installation.

Serviced the building after it was gutted

Rewiring external lighting

Supply and installation of 7.5 Horse Power Pump plus Motor and Control Panel

ZAMBIA REVENUE AUTHORITY - LUSAKA: 2000

Installation of 75KVA and 30 KVA Generator sets at Livingstone, Victoria Falls Boarder posts, Kazungula

Boarder post and Kabwe respectively.

NATIONAL AIRPORTS CORPORATION – MFUWE: 2003 - 2013

Maintenance, testing and repairing of 11KV/400 volts transformers and 11KV oil circuit breakers. Complete

service of all M.V Air Circuit Breakers and repair of Battery Charger Unit. Service and repair of standby

Generator set, 11KV cable fault locating and cable jointing.

TIGER FEEDS LUSAKA – 2014, GENERATOR

MAINTENANCE

ZAMBIA SUGAR PLC-MAZABUKA: September 2003 to December 2003.

Supply, installation and commissioning of 33/3.3KV Transformer Relay Control Panels.

Protection, maintenance and Current Transformer verification tests.

Supply, installation, repair and comprehensive maintenance of 33KV and 3.3KV Oil Circuit

Breakers.

Construction of 33/0.4KV substation including commissioning.

Construction of 11KV lines.

TOTAL ZAMBIA: 2003

Rewiring star-delta panels for compressors

Installation of standby generator set at Total Headquarters

Installation of Air-compressor

Page 7: eil@eltechinvestments Brochure.pdf · and piping plants. MINESTONE: 1990 - 1999 Supply of Electrical Distribution Boards, feeder pillars and starter panels. Sub contracted to design,
Page 8: eil@eltechinvestments Brochure.pdf · and piping plants. MINESTONE: 1990 - 1999 Supply of Electrical Distribution Boards, feeder pillars and starter panels. Sub contracted to design,

TRANSMISSION, DISTRIBUTION & SUBSTATIONS

ELTECH provides a complete range of equipment, systems and services for the transmission and

distribution of electricity from power plants to large businesses and various other end users. We are able to

perform turnkey projects in generation, transmission and distribution phases.

Recent Projects

Kaoma Substation – rehabilitation works in 2013 Mumbwa – TBZ – Kaoma 33KV & 11 KV transmission

lines (over 380 KM covered) - 2014

Rural Electrification Projects: Mumbwa – TBZ – Kaoma (2011 – 2014)

This project (pictures above) included over 380 KM of 33 KV and 11 KV transmission and distribution lines

to the areas of Mumbwa, Kaoma and TBZ, including the rehabilitation of Kaoma 33 KV Substation.

Page 9: eil@eltechinvestments Brochure.pdf · and piping plants. MINESTONE: 1990 - 1999 Supply of Electrical Distribution Boards, feeder pillars and starter panels. Sub contracted to design,

Zesco Grid Extension Projects – 2012 – 2015

Eltech continues to be one of the main sub-contractors for nation grid extensions across Zambia

ABB POWER LINE (ZIMBABWE): December 2003 to May 2004

Sub contracted by ABB Power line to construct 60km of 11kv overhead line for Kitwe Rehabilitation project.

Copperbelt Energy – Luano Substation Rehabilitation – 2002

ELTECH was sub-contracted under the Norwegian Government’s Norad Funded Power Rehabilitation

Project Transmission System component by the main contractor Jacobsen Elektro As.

The project involved the following:

Replacement of conventional electro mechanical relays with modern numerical relays, and station

control replacements with computerized substation condition monitoring and control systems (SAT)

Replacement of the bulk oil 330kv oil circuit breakers with modern GEC Alsthom SF6 circuit

breakers and refurbishment of the existing air circuit breakers and rated at 330kv.

Replacement of old control cables with new ones and installations of new relay panels, outdoor

marshalling kiosks and all the termination and wiring involved.

Installation of protection relays for transformers, line bays and substation control equipment.

Page 10: eil@eltechinvestments Brochure.pdf · and piping plants. MINESTONE: 1990 - 1999 Supply of Electrical Distribution Boards, feeder pillars and starter panels. Sub contracted to design,

Mobile Tower Electrification

ABB ZAMBIA April: 2006

Sub contracted by ABB to erect 11kv lines to connect Cel Tel Sites in MAAMBA K1 SITE ,WATER WORKS

AND MASUKU SITE including installation and commissioning of 3nos 25kva,11kv/400 volt Transformers.

MTN and Airtel ZAMBIA: Mobile Tower Electrification - 2005 – till date

Sub contracted by MTN and Airtel to electrify their Cell sites by constructing 33kv and 11 kv lines and

installing PMT Transformers and connecting to ZESCO 33/11kv line network across Zambia. To date we

have electrified more than 300 towers for both mobile providers. Some of the sites that have been

energized in various provinces so far include:

Nampundwe mine, Lilayi basic, Kasisi Girls, Mukosha (Kabwe), Kitwe Boys, Kitwe ZNS, Ibex Hill,

Chalala Site, Walubwe (Katete), Kasama Institute, Kabulamwanda(Southern), Tuunga (Southern),

Mbabala(Southern), Mbala (Northern), Litiya (Western), Nambala (western), Twasekela(copperbelt),

Ten miles, Chiparamba Sub-Boma, Nyanje mission, Mbwindi, kalonge pump station, katunga,

Serenje Hill, Mayoba, Mpula, Chozi, Matumbo, Mapopo, St Francis, St Dorothy, Kapwila, Munyezi,

Mukwela, Mulambwe, Messengers, manyinga, mutanda Research, Kyawama, Mapanza, Mufumbwe

BB Site, Mwandi, Chipembi, Mumbwa Cotton Ginnery, malengwa Holy cross, katongo, Lukulu,

Katuba, Mwangwe, Kohima, MTN Highrise e.t.c.

Page 11: eil@eltechinvestments Brochure.pdf · and piping plants. MINESTONE: 1990 - 1999 Supply of Electrical Distribution Boards, feeder pillars and starter panels. Sub contracted to design,

CIVIL AND MECHANICAL ENGINEERING

We are specialists in Civil engineering works for all sorts of industries and purposes. Some of our projects

have included the following:

NATIONAL AIRPORTS CORPORATION: 2004

Renovations of the Central Stores Department

Construction of a storage slab at the Central Stores

Supply and fitting of Steel doors

Construction of DME/VOR foundation plinths at Ndola Airport (August 2005)

Renovations and roofing to Anansi ni Nkondo warehouse at Lusaka international Airport.

ZESCO – KITWE – CONTROL BUILDING: 2003

Renovations to the Building and reinforcement of the foundation building, under pinning of the control

building.

SPECTRA OIL: 2003 – To Date

Sub contracted to install steel fuel tanks of over 50,000 liters capacity in filling stations and

construction of reinforceable slabs.

Page 12: eil@eltechinvestments Brochure.pdf · and piping plants. MINESTONE: 1990 - 1999 Supply of Electrical Distribution Boards, feeder pillars and starter panels. Sub contracted to design,

CIDRZ: 2006

Construction of generator rooms at George compound clinic, Matero clinic, Kamwala clinic and

Chilenje Clinic.

Refurbishment and partitioning of the offices at HEAD OFFICE.

UNDP Headquarters: 2005

Extension of the generator room, Alick Nkhata Road Offices

CONCERN WORLDWIDE Headquarters: 2006

Renovations to country Directors house in Kalundu

Renovations and painting to concern offices (6610 Manchinchi Road, Northmead)

Page 13: eil@eltechinvestments Brochure.pdf · and piping plants. MINESTONE: 1990 - 1999 Supply of Electrical Distribution Boards, feeder pillars and starter panels. Sub contracted to design,

Corporate Social Responsibility

Our remote project teams who normally go out in the field will always experience cross cultural diversity

and different lifestyles of local communities. This is especially so because we always engage local man

power on projects such as Rural Electrification. Even though some infrastructure works may at times

interfere with certain local structures such as farmland, it is always our responsibility and priority to engage

with locals in order to justify the infrastructure developments, and we take such matters very seriously with

a goal to satisfy all stakeholders. We are also always looking for ways to contribute positively to local

communities – be it simply by social interactions, engaging in sport with the youth or contributing to a local

charity or school.

Page 14: eil@eltechinvestments Brochure.pdf · and piping plants. MINESTONE: 1990 - 1999 Supply of Electrical Distribution Boards, feeder pillars and starter panels. Sub contracted to design,

ELTECH Investments Limited

Stand 14674 Bombay Road (Opposite Farmer’s Market), Kamwala South

Lusaka, Zambia. P.O. Box 34701

www.eltechinvestments.com

[email protected]

+26 211 846048