EIA Table for Gaizhou River Embankment Improvement Project Certificate serial No.: GUO-HUAN-PING-ZHENG-YI-ZI No.Grade B file No. of certificate for State Environmental Evaluating:1519 The Certificate issued by: Ministry of Environmental Protection of the People's Republic of China E1316 V7 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

EIA Table for

Gaizhou River Embankment Improvement Project

Certificate serial No.: GUO-HUAN-PING-ZHENG-YI-ZI No.(Grade B file No. of certificate for

State Environmental Evaluating):1519

The Certificate issued by: Ministry of Environmental Protection of the People's Republic of China

E1316 V7

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

2

Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering

Document type: evaluating the Impact on the Environment for Construction Report-tabulation

Consignor: Gaizhou City Urban Sewerage Limited Liability Company

Evaluation unit: Yingkou City Environmental Protection Scientific Research Institute (stamped)

Legal representative: LI Gui-hua (legal representative seal)

QUALIFICATION CERTIFICATE

OF ENVIRONMENTAL IMPACT ASSESSMENT FOR CONSTRUCTION PROJECT

Name of institutional units: Yingkou City Environmental Protection Scientific Research Institute

Address: No.3, West of Jin-niu-shan-da-jie Avenue, Zhan-qian District, Yingkou City,

Liaoning province, P. R. China

Legal representative: LI Gui-hua

Certificate Grade: B

Certificate serial No.: GUO-HUAN-PING-ZHENG-YI-ZI No.

(Grade B file No. of certificate for State Environmental Evaluating):1519

Period of validity: to 31th, Dec., 2011

Scope of Evaluating: sort of evaluating the Impact on the Environment for Construction Report----

Grade B

Spinning and synthetic fiber of light industry, building materials fire and electric power***

Sort of evaluating the Impact on the Environment for Construction Report-tabulation---- commonly

evaluating the Impact on the Environment for Construction Report-tabulation

Issued date: 1, Jan. 2008 (stamped the State Environmental Protection Administration with

national emblem’ seal)

Page 3: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

3

Chief engineer: QIU Lei Senior Engineer (SE)

Principal of project: QIU Lei Senior Engineer (SE)

Report compile

authorized

personnel

Professional duties

technical post

title

appraiser

Certificate No.

signature

QIU Lei Environmental

engineering

Senior Engineer B15190010600 QIU Lei’ sign

JIA Zi-he Environmental science Engineer B15190014 JIA Zi-he’ sign

Technology Auditing: LI Gui-hua (legal representative seal)

Page 4: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

4

EIA Table for Gaizhou River Embankment Imnprovement

Project

Name of project:

River channel regulation engineering of Gaizhou City sewage treatment engineering

Construct Unit:

Gaizhou City Urban Sewerage Limited Liability Company (seal)

Issued date: Apr. 2009

Report compile by Ministry of Environmental Protection of the People's Republic of China

Page 5: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

1

Table of Content

1. Basic information for construction projects ----------------------------------- 1

1.1 Project Background ----------------------------------------------------------------------------------------- 2

1.2 Project Overview -------------------------------------------------------------------------------------------- 3

1.3 The major existing environmental problems with Project-------------------------------------------- 6

1.4 Project location of the natural environment, social environment profiles ------------------------- 7

2. Environmental quality ---------------------------------------------------------- 14

2.1 Location of regional environmental quality status of construction projects --------------------- 14

2.1.1 Status of ambient air quality --------------------------------------------------------------------- 14

2.1.2 Status acoustic environmental quality ---------------------------------------------------------- 15

2.1.3 The main objective of environmental protection --------------------------------------------- 17

2.2 Evaluation applicable criteria ---------------------------------------------------------------------------- 19

2.3 Construction Project Analysis ---------------------------------------------------------------------------- 21

2.3.1 Construction period -------------------------------------------------------------------------------- 21

2.3.2 Operation period ----------------------------------------------------------------------------------- 22

3. Environmental Impact Analysis ----------------------------------------------- 24

3.1 Construction of the Environmental Impact Analysis ------------------------------------------------- 24

3.2 Operating Environment Impact Analysis --------------------------------------------------------------- 26

4. Planning Compliance Analysis ------------------------------------------------ 33

5. CONCLUSION ------------------------------------------------------------------ 34

6. Accessories Catalogue ---------------------------------------------------------- 35

Page 6: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

1

1. Basic information for construction projects

project Name river channel regulation engineering of Gaizhou City sewage treatment

engineering

Construct Unit Gaizhou City Urban Sewerage Limited Liability Company

legal representative ZHANG Tao Contact person WANG Xiao-hui

address Xihai economic and technological development, Gaizhou City

Contact Tel. 13940774556 Fax — P. C. 115200

construction situs Gaizhou City Moat --- Gaizhou City XIANG-SHUI River

Project Approved

unit —— Approved file No. ——

construction quality rebuild Sort of industry

and code

N7610

preventing and controlling flood

waterlogging Facilities Management

occupy area (㎡) —— Greening area

(㎡) ——

total

investment

(thousand yuan

RMB)

2269.91

in which:

environment

protection

investment

(thousand

yuan RMB)

11

Proportion of

Environmental investment

in total investment %

0.48

Began

construction

Date

Oct. 2009

Expected

Production

Date

Oct. 2010

Page 7: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

2

1.1 Project Background

The DAQING River will be divided into northern and southern areas in Gaizhou City, Gaizhou

landscape north of the city is mainly through the impact of the ditch into the moat, Drainage tend

towards: Moat --- XIANG-SHUI River --- DAQING Rive.

Currently, the moat end face design standards is not enough, After accounting only the Flood once in

five years’ design standards, Gaizhou City far less than the Flood 10-year return should be the

standard. Also in this case, In recent years, part of the channel on the moat built many illegal

buildings, Locally called " water drift ", Making the river cross section and cannot reduce dredging,

also dumping trash on both sides of the river, Reducing the river section, Hampered by flash floods,

reducing the discharge capacity. To improve urban flood control standard, improve the regional

ecological environment, Improve the quality of life of people Gaizhou City, Promote the building of a

harmonious society, Gaizhou Urban Drainage Limited Liability Company decided to start river

channel regulation engineering of Gaizhou City sewage treatment engineering, This project fully

utilize the existing drainage facilities, Be modified for imperfections, clear river through the original

is not smooth, Expansion of the river cross section, and riparian berm embankment conducted, build-

trim.

Under the “Environmental Impact Assessment" and “Construction Project Environmental Impact

Assessment Classification Catalogue " Gaizhou City Urban Sewerage Limited Liability Company

authorized to conduct an environmental impact assessment of the project work, Preparing the

environmental impact statement. Their commission, Now completed " Gaizhou sewage treatment

works - river treatment works environmental impact statement "

Send construction reporting environmental management department for approval.

Basic information for construction projects

Page 8: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

3

1.2 Project Overview

Project Name: River channel regulation engineering of Gaizhou City sewage treatment engineering

Project location: tributary rivers of the city moat on the north bank of DA-QING River of Gaizhou

City, see the specific project location in Figure 2.

Project Investment: The total investment of 22,699,100 yuan RMB CNY.

Project scope: moat total length of 3765 meters, 809 meters of which the western part of the

transformation is not included in this range, Reconstruct of the total length of 2956 meters, channel

width of 10 meters, Section height of 2.5 m, the slope coefficient m = 1.5m; The XIANG-SHUI River

total length of 1429 meters, this construction zone length of 1290 meters, river channel bottom width

of 18 m; Section height of 2.5 m, the slope coefficient m = 1.5.

Management environment scheme: moat and the XIANG-SHUI River to maintain the original

appearance, Its riverside embankment, dredging and remediation, reach to drainage flood

requirements. Design standards for the 10 –year-flood return.

①Moat, XIANG-SHUI River revetment gravity is used whole, stone masonry structure.

② masonry particle size of not less than 0.3m, masonring should be perpendicular to the slope,

Embedded in each other tight, from the bottom to up masonring, masonry cement mortar grade of not

less than No. M10, Cement mortar pointing, pointing mortar should be used in cement masonry

cement ratio higher first gear.

③ moat , XIANG-SHUI River toward the river to the original, It should ensure that all the river

center turning radius of not less than 2.5 times the width of the water, Changes in the river channel

cross-section, transition section converge required to ensure smooth flow.

④ need to set the filter layer slope , basal slope cover depth of not less than 0.5m.

⑤ masonry embankment 20m spacing settings Deformation, slit width 20mm, asphaltic pouring rope

or bitumen sealing of wood inside filled for water proof.

⑥ masonry revetment located 5m drain spacing , using DN50UPVC drains, Water river channel

bottom end 0.5m, slope 5% higher.

⑦ the bottom of river using dry stone-piece masonring to improve the riverbed erosion resistance.

⑧ compacted backfill compaction should be layered, the density required to achieve more than 90 %.

Table 1 Moat tributary River section size calculation table

channel segment

name

The bottom of the

channel width B(m)

Section height

h(m)

Minimum slope

i(‰)

Length

(m)

Moat 10 2.5 1.5 2956

XIANG-SHUI

River 18 2.5 1.5 1290

Basic information for construction projects

Page 9: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

4

The Amount of Engineering

Table 2 major Engineering-amount for river channel treatment engineering Aggregates

Series

No. name Specification Unit Quantity

1 grouting Stonework volume —— Ten thousand

m3

4.65

2 dry laying Stonework volume —— Ten thousand

m3

0.85

3 Gravel Particle size 10~30 m3 50

4 UPVC pipe DN50 m 2700

5 Geotextile 300g/ m2 m

2 300

6 Railing —— m 8770

7 Curbs stone 200×100 m 2858

8 C25 concrete —— m3 75

9 excavation earth volume —— Ten thousand

m3

7.13

10 Filling earth volume —— Ten thousand

m3

1.48

11 River-bottom dredging

volume ——

Ten thousand

m3

7.78

The project detailed engineering floor-plan layout 1.

Page 10: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

5

Layout 1 Engineering floor-plan for River channel regulation

engineering of Gaizhou City sewage treatment engineering

Scale: 1:900

Page 11: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

6

1.3 The major existing environmental problems with Project The water from the hill in the north of Gaizhou City is mainly through the impact

the ditch into the moat, Drainage tend towards: moat - the XIANG-SHUI River –

DA-QING River.

Currently, the moat section design standards is not enough, After accounting only

once in 5 year-flood design standards, Gaizhou City far less than the 10-year-flood

return should be the standard. Also in this case, In recent years, part of the channel on

the moat built many illegal buildings, Locally called "the drift on the water", making the

river cross section and cannot reduce dredging,

Plus dumping trash on both sides of the river, reducing the river section, Hampered by

flash floods, reducing the discharge capacity. In the rain, the rain season, flash floods

from the urban through multi-strand uncontrolled flooding in the city, often overspread

enter the people inhabitation home. Direct impact on personal and property safety of

residents, disturbing Urban economic development and urban development.

Watercourse Status quo show-Photo

Page 12: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

7

1.4 Project location of the natural environment, social

environment profiles

Natural Environment Briefing

(1) Location

Gaizhou City location in the northwest of Liaodong Peninsula, East Wing of the Liao-he River

Delta, East to Xiu-yan county and Zhuang-he City, south bordering Wa-fang-dian City, North to

Yingkou city and Da-shi-qiao City, the west connected to the Liaodong Bay .

Southeast moat segment –XIANG-SHUI River treatment engineering starting N40°23'52.31",

E122°22'15.19";

Southeast moat segment - XIANG-SHUI River treatment engineering endpoint N40°24'07.2",

E122°20'25.5";

Moat northern section of the river treatment engineering starting N40°24'3.59" ,

E122°22'3.44";

North section of moat river treatment engineering endpoint N40°24'15.45" ,

E122°21'30.60",see Figure 2.

( 2 ) topography

Gaizhou urban built-up areas are mainly located in DA-QING River on both sides Between

Piedmont and the foothills north of the slow slope areas, Dumbbell-shaped outer contour was

something about 7 km, The average width of 2.5 km from north to south. Belong Piedmont hills

sloping topography, The terrain was East-high and West-low-lying, north--high to south-low-lying,

ground elevation between 5-18 meters.

Gaizhou Quaternary continental sedimentary geological formation, Alluvial - alluvial type. both

sides of the DA-QING river terraces and alluvial floodplain is composed of coarse sand and alluvial

origin, Gravel and pebble, a thickness of between 14 to 45 meters, Increased significantly from

upstream to downstream thickness. Groundwater in pore water main, DA-QING River was distributed

in both sides of the strip of sand, the water level has shown signs of 1.5 to 3.5 m,

Water is abundant.

Gaizhou seismic intensity of 7 degrees.

( 3 ) Climate and weather

Gaizhou west to coastal and surround by mountains, temperate is the north temperate zone

continental monsoon climate, Four seasons evidently, spring and autumn milder. Summer by the

southeast wind, southerly influence, hot but not dry; Winter by the north, northwest winds, long cold

period. The annual average temperature is 8.9 ℃, Hottest average temperature 24.8 ℃, extreme

maximum temperature in summer 34 ℃, Coldest average temperature -21.5 ℃, extreme minimum

winter temperatures -30 ℃, Average annual rainfall 700 ~ 800mm, the annual maximum rainfall

排风口

Page 13: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

8

1052.7mm, Annual evaporation 1587.6mm, relative humidity of 63% , the dominant wind direction

and frequency: Winter NNE (15), Summer SW (13), the average winter maximum wind velocity:

5.2m / s, Average winter outdoor wind speed 5 m/s, the maximum permafrost 111cm.

(4) Hydrology

Gaizhou City west to the Liaodong Bay, is located in the Liaodong Peninsula Rivers Watershed

Department, Natural river area is mainly DA-QING River, directly into the Liaodong Bay, Its

tributaries flow through the city moat, XIANG-SHUI River and ER-DAO river. DA-QING River

originates Da-shi-qiao eastern mountains, Two major tributaries upstream of the confluence to

WANG-HU village of Gaizhou City from east to west through, In the XI-HAI state-farm of the

southern and northern two injections Liaodong Bay. DA-QING River drainage area of 720.32 square

kilometers in the territory Gaizhou City, 61.5 km long river, historic maximum flow 2400m3 /s, The

average flow of 8.3 m3/s. DA-QING River upstream reservoirs and built SAN-DAO-LING and

SHI-MEN Reservoirs. Capacity of 108 million cubic meters, respectively, and 031.2 million cubic

meters, There are two large sluices built on the river downstream, Which is located 2.2 km West

Sluice Harbin-Dalian railway bridge downstream.

DA-QING River is a medium-sized river was too Muddy River, the closest HUN-TAI water

system of the DA-LIAO River Basin in Liaodong Peninsula. Currently in the urban section of the two

sides have dikes, North Shore levee flood control standard for the 20-year return.

Gaizhou City moat originated in the East, the northern foothills, surrounded by two tributaries of the

Old City, And sinks on the XIANG-SHUI River in the city, which injected in DA-QING River west

about 600 meters away. The water of moat in flood season is large, is the main drainage, flood

channel Gaizhou City.

The ER-DAO river originates in southern Gaizhou City, into the DA-QING River in the

DA-QING River upstream at more than 600 meters, is the eastern area of the south of river of the city

Gaizhou drainage, flood channels.

Briefing the social environment

Gaizhou City jurisdiction over two district administration-offices, 15 towns, 21 townships.

Gaizhou urban built-up areas by the two district administration-offices (XI-CHENG and GU-LOU)

and CHENG-GUAN towns, TAI-YANG-SHENG town, XIHAI township, HONG-HUA-YU

township, TUAN-SHAN-ZI town and part of the region and demographic composition. The city's

total population of 87.7 million, land area of 3053 square kilometers, In which: Gaizhou 18.38 million

urban population,

Urban built-up area 14.90 square kilometers. Gaizhou County authorize upgraded Gaizhou City

in 1992, Accelerate the development of the national economy, showing industry-led, Agriculture,

forestry (fruit), animal husbandry, fisheries structure no more comprehensive development. 2004 GDP

of 4.58 billion yuan RMB CNY, First, second and tertiary industries accounted for gross domestic

product (GDP) was 29.58%, 40.99% and 29.44%. The past three years, an average annual GDP

growth rate of 16.6%.

Gaizhou City has a strong geographical and resource advantages in the social and economic

development. Located in the Shenyang-Dalian Highway and the Bohai economic zone, Has a long

history, rich cultural heritage, abundant natural resources and suitable climatic conditions, the rapid

development of small towns. Municipal government on urban infrastructure and create favorable

environment for the development of economic society, Achieve sustainable development very

recognition.

Page 14: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

9

Project location of the natural environment, social environment profiles

Overview surroundings

This project is River channel regulation engineering of Gaizhou City sewage treatment

engineering Including east, south, and the northern section of the moat river treatment

and the XIANG-SHUI River treatment. Coastal environment include:

Ambience See Figures 3, 4.

Residents along lines of the river channel treatment engineering

Residents along lines of the river channel treatment engineering

Residents along lines of the river channel treatment engineering

Page 15: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

10

Project location of the natural environment, social environment profiles

Residents along lines of the river channel treatment engineering

Gaizhou City government along lines of the river channel treatment engineering

shops along lines of the river channel treatment engineering

shops along lines of the river channel treatment engineering

Page 16: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

11

Figure 2 Location Map

River treatment Section

Page 17: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

12

Figure 3 The northern section of the moat surrounding the river channel treatment environment schematic

Residential zone

Residential zone

Residential zone

Shops zone

Residential zone

Shops zone

River treatment Section

Page 18: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

13

Figure 4 Schematic of the surrounding environment for East to South section of Moat---XIANG-SHUI River treatment area

Residential zone

Residential zone

Residential zone

River treatment Section

Procuratorate

Gaizhou City

government

Residential zone

Residential zone

Page 19: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

14

2. Environmental quality

2.1 Location of regional environmental quality status of construction projects

2.1.1 Status of ambient air quality

Ambient air quality monitoring stations using Gaizhou City Environmental Protection

station field monitoring data on 29 August – 31 August, Monitoring results in the table

below.

Monitoring sites: K1 300 meters dominant wind project on wind direction;

K2 dominant wind project 300 meters downwind of each set point.

Monitoring Project: TSP, PM10

Monitoring time: 3 days of continuous monitoring, monitoring daily average, At least one

sampling time of 12 hours per day.

Table 3 Ambient Air Quality Statistics Unit:mg/m3

date Point-set

Monitoring Project

TSP PM10

29 August K1

K2

30 August K1

K2

31 August K1

K2

"Ambient Air Quality Standard" (GB3095-1996)

II-grade standard 0.30 0.15

Above table shows, the regional daily average concentration in ambient air TSP, PM10

are less than "Ambient Air Quality Standards." GB3095-1996 standard limits in the

II-grade standard requirements, fine ambient air quality.

Page 20: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

15

Environmental quality

2.1.2 Status acoustic environmental quality

In order to understand the project area acoustic environmental quality, Gaizhou City

Urban Sewerage Limited Liability Company commissioned Gaizhou City Environmental

Protection Monitoring station processed investigate for Residential and other sensitive

areas of N1 along the project settings, N2, N3, N4 all 4 points on 29 – 30 August 2011,

investigation into daytime and night monitoring, Monitoring results are shown in Table 4.

Table 4 Status of the plant boundary acoustic environmental quality Unit: dB(A)

Point-set

daytime Night-time

8/29 8/30 standard 8/29 8/30 standard

N1 55 45

N2 55 45

N3 55 45

N4 55 45

Above table shows, the boundary daytime and nighttime sound

environmental qualities of the project are in line with "Sound environmental

quality standards." In (GB3096-2008) Class I standard limits, The project

area is better sound quality of the environment.

Page 21: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

16

Figure 5 Monitoring Sites

Page 22: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

17

2.1.3 The main objective of environmental protection

The project is located within the Gaizhou City; The River is the transformation of

reconstruct and treatment on the basis of the original river, Does not involve the demolition,

land acquisition and other problem, Coastal residents have office space and other sensitive

targets, Depending on pollution during construction and operation period to difference analysis

determined, Specific conservation objectives in the following table:

Table 5 objective of environmental protection

period Environmental

factors

Protection target

name Distance Protection level Pollution Source

Construction

period

Atmospheric

Environment Coastal residents,

Office space Close

GB3095-1996

II-grade

Construction dust

and dredging

stench

Surface water Treatment

section of the

river

—— ——

Construction

waste, construction

solid waste

Acoustic

environment

Coastal residents,

Office space Close

GB3096-2008

I-grade

Construction

noise, transport

Ecology Works on both

bank sides Close

Construction land use, vegetation

damage, Excavation site of vegetation,

soil erosion

Operation

period

Surface water Treatment

section of the

river

—— ——

Residents living

along the water,

Garbage

Evaluation applicable criteria

Page 23: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

18

Enviro

nm

ental q

uality

standard

s

Ambient Air Quality:

Implementation of the national "Ambient Air Quality Standards" the

(GB3095-1996) II standard limits.

PM10 daily average concentration of 0.15 mg/m3;

TSP daily average concentration of 0.30 mg/m3.

Sound quality of the environment:

Implementation of the national "sound environmental quality standards."

The (GB3096-2008) Class 1 standard limits,

Class I daytime 55 dB (A) at night 45dB (A).

Pollu

tant em

ission stan

dard

s

Exhaust gas

Construction of the implementation of "Integrated Emission Standard of Air

Pollutants" (GB16297-1996) in the II standards.

Table 6 Air pollutant emission standards

Pollutants Fugitive emissions monitoring the concentration limits

Monitoring points Concentration(mg/m3)

Particulate matter The highest point of

the outer perimeter of

the concentration

1.0

Non-methane

hydrocarbon (NMHC) 4.0

Nitrogen oxides 0.12

Construction of dredging perform "malodorous pollutant discharge standards"

(GB14554-93) in the factory sector in the II standard criteria

Table 7 Malodorous pollutant concentration limits plant boundary

Type Ammonia Hydrogen sulfide Odor concentration

new rebuild-

continuation 1.5 0.06 20

Wastewater

Construction of the wastewater discharge execution "Liaoning Integrated

Wastewater Discharge Standard” (DB21-1627-2008)

Max permission wastewater directly discharged water pollutant emission

concentration:

CODCr ≤ 50mg / L, SS ≤ 20mg / L, petroleum ≤ 3.0mg / L

Page 24: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

19

2.2 Evaluation applicable criteria

Pollu

tant em

ission stan

dard

s

Noise

Construction noise perform" Construction Site environnemental noise

emission standards." (GB12523-90):

Table 8 Noise limits for construction site dB(A)

Day-time Night-time

70 55

Solid Waste

"General industrial solid waste storage and disposal site pollution

control standards." (GB18599-2001)

Oth

er criteria

N/A

Construction Project Analysis

Page 25: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

20

Process briefly (As shown in Figure )

The project includes a moat river treatment 1975 m, Building Bridges 6 sets, and the

construction process as follows:

1, the construction work to clean up the field

First, the construction site to clean up, removal of unauthorized building facilities, To

clean up the garbage around, transported to the landfill for filling deal.

2, the construction of diversion

Before construction, the river water can be less intercept, or river water diversion to

bypass the construction site, Avoid pollutants generated during the construction process

polluted water.

3, river dredging

River silt accumulated over the years more people carelessly discarded trash, Make the

river blockage, and use the excavator to clean up the river, dredge the river.

4, concrete works

According dike distribution line, select the appropriate field agitation, Using mixer

Dust

Stench

Noise

Automobile

exhaust

Solid Waste

Levee embankment

Foundation prevent seepage

Construction Diversion

Construction work to clean up the field

Dredging

Railing installation

Completion

Dust

Noise

Noise

Solid Waste

Page 26: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

21

2.3 Construction Project Analysis mixing concrete, concrete transport vehicle from the rubber tire After pouring chute

warehousing, flat vibrators vibrators, Before mixing sand, gravel, cement must be

inspected, Mix Concrete shall meet the requirements, after the completion of the

conservation should be noted.

5, flood embankment, bridge construction

Masonry first locates the actinomycetes, laying steel bridge engineering, Then choose the

stone masonry mortar mixing, and finally acceptance. The use of stone and mortar, which

must meet the design requirements, According to standard masonry completed.

6, railing installation

To be the main levees and bridges construction is completed, Install railing or barrier wall.

Completion of construction is completed use.

The main polluting process

2.3.1 Construction period Gaizhou City urban river channel pollution control projects, mainly in the

construction period incurred. Construction will emit a certain amount of "three wastes"

Adversely affect the amount of the surrounding environment, and excavation and

transportation engineering activities, Will also cause a certain impact on the regional

landscape.

(1) Waste gas: the construction of various engineering machinery and transport vehicles

burning gasoline, Diesel exhaust emissions contain THC, particulate matter, CO, NOX and

other atmospheric pollutants, After the construction site emissions will have some impact,

after the end of the construction period impact disappears; During the construction project

to be excavated foundations, leveling the land, Construction process dust generated some

adverse effects on the environment is inevitable.

Construction site dust in the wind, especially the larger and more severe dry weather

conditions. Construction dust is mainly produced in the following areas:

① construction machinery excavator produce dust;

② Construction spoil pile produce dust;

③ transport process generates dust;

④ venues dust.

(2) Stench: dredging project will be volatile malodorous gases desilting. Dredging uses a

dry dredging, through measures such as closure and drainage upstream of the dam, The

instream water drained, slightly dry silt dredging of conduct, when dredging silt, Riverbed

near the air H2S, NH3, etc. to produce higher concentrations of odor.

(3) Waste water: wastewater mainly comes from the sand material was washed with

water, Pouring concrete levees and maintenance, etc. Conservation of water by water

conservation 1m3 concrete needs 0.35m

3 meters, The amount of concrete for the project

75m3, Then the concrete curing water treatment project is 26.25m

3, If this part of the water

To be collected, due to its large alkaline and high suspended solids, Project area would

impact the aquatic environment. Construction workers are Villagers nearby towns, the

Page 27: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

22

Construction Project Analysis

Construction site is not set up construction camps, so no domestic wastewater emissions.

(4) Solid waste: construction process because after the main excavation of earth,

Part of the earth backfill use, outside the rest efflux earthwork of 56,500 m3,

The amount of river dredging sludge produced is 77,800 m3, Transported to the landfill

deal.

Engineering materials will produce a certain amount of scrap in the construction

process, The main components of the waste, such as gravel, crushed stone produced less

volume, diameter back for embankment filling.

(5) Noise: construction machinery and transport vehicles are in the generation of noise

during operation, Impact on the surrounding environment would interfere with the living

and rest. Location of the main construction area in Gaizhou City, near the river surrounded

by residential areas and office space etc.

Construction noise will have a major impact on sensitive areas such as residential and

office space. Construction of the main sources of noise construction machinery,

construction period, Single point source or point source flow patterns in the construction

zone moves Pollution intensity depends on the type and amount of transportation

construction methods, construction machinery, The main device noise value in the range

84 ~ 90 dB (A).

(6) The ecological effects: Temporary covering the construction process and reduce the

number of local land vegetation; The road will make the cut to fill the vegetation along the

stonework was a certain degree of damage during construction Green land occupation,

bare ground, So that the ecological structure near a certain degree of change; Works in

earth, after filling the exposed surface after rain washed easily lead to soil erosion, The

disturbance of the original landform, vegetation damage.

As the project area is not under special state protection of biodiversity resources, Does not

involve the demolition issue so sensitive ecological impact problem is to change the nature

of the soil erosion and land use.

2.3.2 Operation period After the project is completed, flood control standard will reach in 10-year-flood,

After the flood control project is completed, will greatly enhance the city's flood control

capacity, Reduction of industrial and agricultural production, commercial circulation

caused by city water, Daily life of residents, urban sanitation, water pollution, human

health and other effects.

Project to take "natural style" operation, which runs as a natural water level

fluctuations and carried maintaining the synchronization process and the nature of the

river Man hydrological processes, Maintain existing hydrology, hydraulics process during

the flood season, Remained reserved for existing ecological functions of the river, Will not

have much impact on aquatic organisms.

Page 28: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

23

The main pollutants and emissions prolepsis schedule

content

type Emission sources (No.)

Pollutant

Name

pre-treatment

concentrations

and amount

(Units )

concentrations

and emissions

(Units )

Atmospheric

pollutants

Construction

period

Construction

machinery

Stockyard

Transport

Dredging

TSP、CO、

NO2

TSP

TSP

Stench

Fugitive

emissions few

Water

Pollutants

Construction

period

Construction

site SS 200g/m

3,5.25kg 0

Solid Waste Construction

site

Earthworks

Silt

Gravel

56500m3

77800m3

few

0

Noise Construction

period

Construction of the main construction machinery noise source to a

single point source or point source flow moves in the construction

area, Pollution intensity depends on the type and amount of

transportation construction methods , construction machinery, The

main device noise value in the range 84 ~ 90 dB (A). These

mechanical noise-value from the running time of the sound source 5m

84-90db (A).

Ecology

Construction

period

The road was cut and fill stonework will allow a certain degree of

destruction of vegetation during construction, bare ground, so that the

ecological structure occurs near a certain degree of change; After

being exposed surface erosion caused by rain erosion prone , the

perturbation of the original landscape, Destruction of vegetation.

Operation

period

After the flood control project is completed, will greatly enhance the

city's flood control capacity, Reduction of industrial and agricultural

production, commercial circulation caused by city water, Daily life of

residents, urban sanitation, water pollution, human health and other

effects. Mostly positive impact.

Environmental risks

The main risk of river treatment works construction of flood risk are

Construction machinery, oil spills, oil spills , basically does not have "

three wastes " pollution after the project is completed, Environmental

risks and other projects primarily levees collapse risk Environmental

risks above to take effective preventive measures, Ensure the safety of

river flood control project construction and operation period.

Page 29: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

24

3. Environmental Impact Analysis 3.1 Construction of the Environmental Impact Analysis Analysis of the environmental impact of atmospheric

Air pollutants construction period of the project mainly from the construction site, Bare

pavement, yards, roads and other open source and out of the site of particulate matter and

construction machinery, Vehicle exhaust emissions of pollutants. If you pay attention to the

prevention and control measures to be taken, Construction dust will affect the surrounding

environment, but with the end of the construction period, the impact of that is gone.

Dust pollution

The main part of the construction site dust is generated when driving the car road dust, dust

material, concrete mixing and other construction work dust, The main source of pollution is dust

and road dust caused by wind and yard materials.

As the project is linearly distributed engineering, concrete mixing and engineering field in

general with the process material directly stacked on both sides of the river close to dissipate into

the atmosphere, Kind of yard material, the nature and velocity of the yard near the amount of dust

from a great relationship, A small proportion of the material easily disturbed dust into the sky,

When a large proportion of small particles of material from correspondingly large amount of dust.

Yard pile of dust, including wind and dust, after unloading the vehicle causing dust and road dust

re- raised, etc. Will produce larger dust pollution; bring some impact on the surrounding

environment, but by watering can effectively suppress dust quantity, can reduce the amount of 70%

of dust.

Exhaust pollution

Will be discharged NO2, CO emissions during construction machinery operations. Because of

construction machinery in the construction site into a linear distribution of the river, and the

distance between each other, Construction machinery discharged NO2, CO gas is relatively small,

therefore does not have a greater impact on the surrounding environment.

Dredging stench

Analysis pollution intensity level by analogy, Referring to Mudanjiang

JIANG-NAN-PAO-ZI dredging project (summer dry dig) odor pollution levels, Close to shore odor

intensity 3 , there is an obvious odor; Odor intensity at a distance of 30m at the riverbank on the

reduced 2 , has a slight odor, Less impact on residents, at 100m from the banks of odor intensity

decreased to 0, Therefore, there is no impact on the scope of the odor from the river bank outside

the 100m .

Governance on both sides of the river is mostly residents of houses built, some facades of

houses close to the river bank, Therefore, there will be significant river reach neighborhoods smell

when dredging, but shorter construction period, Effects are short-term, the smaller the impact on

the surrounding residents. Mainly have an impact on construction workers; during the construction

process should pay attention to protective measures of construction workers.

Water Environmental Impact Analysis

Due to mechanical relatively concentrated, the entire construction of wastewater generated

Page 30: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

25

Environmental Impact Analysis

during construction. Construction of the production process, with the foundation excavation, soil

material mining, concrete pouring, Groups such as the production process of clearing the building,

will produce sludge, muddy water, etc.

Such waste water discharged directly into the water body is not allowed. You can set a

temporary sedimentation pond for screening waste generated by precipitation, After precipitation

may continue to return for the construction of the aggregate screening , do not enter the water body.

In addition, due to the sedimentation, and so will not have much impact in the distance, and the

impact of the limited time, after the end of the project until its effects can be eliminated.

Sound Environmental Impact Analysis

Construction equipment noise greater impact on the construction of the close proximity of

environmentally sensitive points (residential). But the project is characterized by mobile

construction, local construction period is shorter, thus the effect of noise on the construction phase

of the project is less than sensitive point, after the noise impact of the project will also be

completed.

In addition, the project during the construction of transport vehicles primarily for load dump

trucks, Concrete trucks , running noise of these devices is 80dB (A), One of the largest

transportation earthwork, the project site transportation routes nearby residents, Residential

vehicles whistle will sound environmental impacts caused by the instantaneous process of moving.

Solid Waste Environmental Impact Analysis

Construction process, after the main excavation of earth, some earth backfill use outside the rest

efflux efflux earthwork is 56500m3. The amount of river dredging sludge generated is 77800m

3,

transported to the landfill deal.

In addition, the project generates a certain amount of scrap materials in the construction

process, the main components of the waste, such as gravel, crushed stone produces less amount of

filling directly back to the riverbank, thus affecting the construction of solid waste generated less

impact on the environment.

Ecological Environmental Impact Analysis

The impact on the ecological environment construction projects mainly in the construction

period, construction work in process, Temporary covering engineering, special Subgrade land use,

vegetation, Soil erosion and other impacts. Governance sporadic growth on both sides reaches

arbor, shrubs and herbs. Construction process should be protected to avoid unnecessary damage.

Especially in the construction of levees in the course of the construction period, Roadbed filling or

excavation will change the original topography of land within the range, Destruction of existing

vegetation , so that the surface partial nudity, It also destroyed the original natural landscape and

the landscape, To bring the condition of soil erosion during the rainy season. Because the filling

and excavation to change the original roadbed slope topography and slope length, Before not take

measures to accelerate soil erosion within the construction area. In the long run, the river

ecosystem should not change significantly, Ecological impact during the construction phase of the

project focused on the construction. River training works not only improved flood control capacity,

Reduce flood damage to the ecological environment along the river, in the long run, the

implementation of the project on the changing environment has a positive effect. Changes in the

urban environment on health improve the city's image and improve the urban environment for

recreation has a very important significance.

Page 31: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

26

Environmental Impact Analysis

The project is Gaizhou City river channel drainage, flood channels, does not belong to the main

fish producing areas, No important wintering grounds, spawning and feeding grounds. Underwater

bottom protection software mattress construction process, Increase in the content of local river

suspension (SS), and reducing the revetment river shore water clarity, and therefore have a certain

impact on aquatic organisms, But the impact of a shorter range, estimated to affect a maximum

distance of about 500m, from the point of view of construction technology, Affect the time is very

short, so bottom protection software mattress construction has little effect on aquatic organisms.

3.2 Operating Environment Impact Analysis Ecological Environmental Impact Analysis

The proposed project is a non -polluted ecological impact of the project, Construction and

normal operation of the project location biomes, regional environment, Less affected by physical

and chemical properties of water and land, etc. generated within the affected area to reduce the

biomass, Species diversity are not large, non- endangered species disappear and land desertification

within the project area.

After the completion of the project, due to the construction of water and ecological

environment on both sides, The city is conducive to building artificial ecosystem, the formation of

a new combination of points, lines and urban ecological environment, this is a positive impact.

Analysis of the impact of the social environment

River flood control project construction, flood control capacity to the existing 10-year

return, Can improve the capacity of the city flood control and optimize the ecological environment

along the river. Project implementation process requires a lot of labor that can provide employment

opportunities for local residents, Increase income. Consumption of construction workers

construction period will also stimulate local economic development, Improve people's living

standards.

In addition, the construction of the project is conducive not only to improve the city's

flood control capacity, Also makes the city along the river Gaizhou landscape has changed

dramatically, to add a beautiful city with a landscape. Fully illustrated this flood control project on

social benefits is very significant.

Page 32: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

27

Environmental Risk Analysis

Construction of Risk Analysis

the main risks of Construction are the flood risk for construction, bank levee excavation

slope collapse, construction machinery and oil spills and other accidents.

(1) Construction of flood risk

Works in the flood season from May to October the construction, in the event of a large

flood, Will affect the diversion cofferdam construction and safety, and the safety of construction

workers, Flood water works should therefore take risk prevention measures, namely the river

cofferdam, Avoid flood diversion and other construction; construction should take advantage of the

river Automatic Hydrological Forecast System, make accurate and timely flood forecasting and

timely response to the development of the construction program, Will reduce the construction

period of the project and construction personnel flood risk harm to a minimum.

(2) Bank levee excavation slope collapse

Bank levee excavation works caused by the construction of slope collapse, not only endanger

the safety of construction workers, And make a lot of earthwork into the river, thereby affecting the

engineering section of water environmental quality, Therefore, the project should be reasonably

determine the proportion of bank levee construction grading, to ensure slope stability, leading

support equipment enforcement and the use of advanced support of groundwater subsidence and

other measures to prevent the risk of landslides and other slope.

(3) Construction of the oil spill, oil spill

Project during the construction phase, there will be some large machinery such as excavators,

Trucks and other construction machinery in the rivers and coastal conduct operations, prone spill

oil spill, So polluted river water or river floor, and even groundwater polluted river, Affect the

water or underwater flora and fauna, Therefore, the project construction unit should do routine

checks of equipment and facilities maintenance work, Equipment to prevent the occurrence of a

large area of the oil spill oil spill.

Trading Risk Analysis

(1) Geological risk factors levees collapsed

According to the survey, project implementation area no larger range of collapse, Landslides,

mudslides , and other undesirable projects collapsible loess area, The scope of the project nor the

regional faults, in a relatively stable state, Therefore, the project due to the geological factors are

less likely to shore levee slope landslides.

(2) The risk of an earthquake causing the collapse of the levees

Since the dam project is not high, so the smaller the risk of earthquake dam.

(3) The risk of flooding caused by the collapse of the levees

Section on natural flood works by improving the level of flood protection standards, ensuring

the smooth flood, reduce the risk of flood levees causing environmental collapse.

Page 33: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

28

Environmental Risk Analysis

(4) River levees collapsed causing erosion risk

Treatment project using dry stone revetment slope, slope strength is good, but permeable

erosion is serious. Engineering design, using a laid nonwoven geotextile filtration, Embankment to

prevent the loss of fine-grained soils, reducing the risk of erosion of river levees collapsed.

Page 34: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

29

Prevention & control measurest in construction project and expected treatment effect

Atmospheric pollutants

Construction period

Dusts mainly adopt the following measures:

Cement, lime and other materials prone to prevent dust storm covered measures to be taken

in the temporary storage; Road transport regular maintenance, cleaning, maintaining roads

operating normally; Transport earthwork and construction materials to use baffles and tarpaulin

closed during transport, Vehicle is not loaded too full to avoid spills during transport, such as

vibration.

Fuel gas mainly adopts the following measures:

Fuel machinery shall make use of premium fuel; regular fuel machinery, exhaust purifiers,

Smoke and dust and other equipment for testing and maintenance; strengthen the management of

construction machinery, Science and arrange its running time.

Engineering solid waste to have someone in charge of the temporary field, In windy

weather or air- dried under dust prone weather conditions, Using sprinkler measures to reduce

dust pollution; Green promptly taken residue field based on the use of slag field.

Odor pollution control measures:

Dredging engineering carried out in the dry season, segmented construction, clear out of the

mud, Gaizhou City garbage promptly transported to the landfill sanitary landfill; using artificial

dredging, Workers of the mud into the straw, it should transportation soon as temporarily unable

transit, the straw should be placed in a metal container containing mud or concrete ponds to

prevent leakage, and reduce dust and odor distribution. Silt transport using airtight measures,

Scattered along the way in order to prevent, smelly; attention to personal protective construction

workers, Protective equipment issued to the workers and to pay attention to check and rescue;

Residents around the announcement, ready to safeguards can mitigate the effects of odors on the

surrounding residents.

Water Pollutants

Construction period

In the formation of a temporary construction site excavation pit wastewater sedimentation

tank, available tarps or plastic film impermeable, so that the waste water discharged into the

wastewater settling tank stand precipitation, all the treated wastewater for sand and gravel and

then flushing or mixing concrete, mud in the interim period by evaporation, drying and other

natural drying dehydration, transit to dump nearest field after the construction segment

sedimentation pit landfill.

Construction of strengthening construction management, strictly control the construction

machine oil drip.

Noise

Construction period

Strengthen the construction machinery & transport vehicles maintenance and repair,

maintain machinery lubrication, Reduce operating noise; nighttime construction traffic should be

reduced, establishment of caution badges, vehicle speed limit within the construction zone 20km,

Page 35: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

30

Strict control of vehicle horns, limiting noise pollution vehicles;

Reasonable arrangements for the construction time, in schools, hospitals and other noise

sensitive areas of construction, Reasonably determine the construction layout, high noise source

device as far away from sensitive sites; Strengthen equipment and vehicle management area

residents gathered in the lot, whistle prohibit and other measures, Reduce the impact on residents

living environment.

In addition, before construction within the scope of the impact of construction noise and

other residents of the acoustic environment sensitive objects Promotional campaigns river

treatment works to make the masses understand and support the project.

Solid waste pollutants

Construction period

Excavation works should be possible utilization, prevent soil erosion; Slag heap and

river diversion cofferdam reasonable arrangement, scientific construction, River flow area to

minimize soil erosion.

Operation period

After the project is completed, the establishment of a clear sign to strengthen

propagandize for water environmental protection, Prohibited the dumping garbage in the river and

both sides of the range, Prevent water pollution and congestion river flood.

Ecology

During the construction period, mainly from erosion of river dredging, dredging, bank

levee and other damage to the surface of the embankment and vegetation; the impact of

construction materials, sludge and other waste in temporary stacking, handling, etc. on the

surrounding environment, failure to take appropriate measures to enable the proposed project site

soil loss of exponentially growing trend, therefore, strict environmental protection measures

should be taken to effectively control soil erosion occurs.

The construction area is the focus of prevention of soil erosion. Characteristics of the

river for the construction, during construction, to avoid the rainy season, set Landang diversion

cofferdam or small projects to avoid the loose sediment washed downstream. In addition, to

reduce damage to ground vegetation during construction.

Covering part of the construction of temporary access roads, waste pile and so on. To

minimize surface disturbance and destruction of vegetation; for construction materials such as

sand, Stone, concrete, etc. To focus stacking, to take temporary anti- percussive, prevent-wind

measures; Construction of temporary land take reasonable measures upon completion of

construction of ecological restoration.

In addition, the construction of strengthening the management of construction activities

and construction personnel, prohibit on river water pollution projects, reduction of impacts on

aquatic organisms; flood control and river training works bank levee after construction is

completed, the two sides of the slope greening and other measures, maintaining coordination with

the urban landscape, the landscape to achieve better results.

Prevention & control measurest in construction project and expected treatment effect

Page 36: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

31

Construction Project Planning Control Measures & Expected Treatment Effect

Environmental Investment

The environmental investment projects are shown in Table 9.

Table 9 Environmental Investment Projects List

Series

No. Stage Environmental Project Name

Investment (ten

thousand yuan

RMB CNY)

1

Construction

period

sprinkler dust protection during

Construction 1.0

2 noise protection measures during

Construction 1.5

3 Trash- dust & sullage transportation during

Construction 3.0

4 Soil and Water Conservation Measures 5.0

5 Operation

period Garbage collection boxes 0.5

Total 11

Page 37: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

32

Control measures and expected treatment effect schedule

content

type Emission sources (No.)

Pollutant

Name Control Measures

Expected

treatment effect

Atmospheric

pollutants

Construction

period

Construction

machinery

Stockyard

Transport

Dredging

TSP、CO、

NO2

TSP

TSP

Stench

Strengthen the

construction

management,

cover, sprinkler,

speed, etc.

Closed, away from

residents

Meet the

standard

requirements

Emission

Water

Pollutants

Construction

period

Construction

site SS

The precipitate

was collected

centralized

processing

Zero Emissions

Solid Waste Construction

site

Earthworks

Dredging

Garbage dump

landfill Reasonable and

effective

disposal

Gravel synthetically

Utilization

Noise Construction

period

Vehicle speed limit, prohibit night driving construction, high

noise sources away from sensitive targets and other measures.

Ecology

Conscientiously implement soil and water conservation programs

and landscaping measures, make environmental risk prevention

measures perfect, the ecological impact to a minimum.

other N/A

Page 38: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

33

4. Planning Compliance Analysis

The project belong to the water sector "urban waterlogging

warning and flood control projects," Belong to the "Guiding Catalogue of

Industrial Structure Adjustment" (2005) encouraged projects, Not

"Guiding Catalogue of Industrial Development in Liaoning Province

(2008 version) "encouraged, restricted out of class and out of class,

Therefore, this construction project accord with the policy of national

industrial.

DA-QING River will be divided into northern and southern areas in

Gaizhou City, Gaizhou landscape north of the city is mainly through the

impact of the ditch into the moat, Drainage tend towards: moat --- the

XIANG-SHUI River --- DA-QING River. The river treatment works as

east south and north 3 sections of moat together 2956 meters,

XIANG-SHUI River 1290 meters. Project accord with "Gaizhou City

urban drainage, Drainage detailed planning manual "(2001) and "Gaizhou

City Master Plan" (2002 – 2020 year).

Page 39: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

34

5. CONCLUSION (1) The total investment of the project is 22,699,100 yuan RMB CNY. After the

implementation of the project have a better economic efficiency, Environmental

and social benefits.

(2) Project construction area of each monitoring sites TSP, PM10 concentrations are in

line with the "Ambient Air Quality Standards" (GB3095-1996) II standard limits, better

ambient air quality in the region.

(4) The construction period of the project environmental impact mainly are

Construction dust impact on the project and transportation routes along the river on

both sides of the ambient air and acoustic environment. Construction of wastewater

generated in this part of the waste water reuse for the project after precipitation, little

impact on the water environment; The project dredging silt transported to landfill

treatment, reuse all gravel embankment, Steel and other scrap recycling program for

sale.

(5) The construction and operation of the project will have an impact on the ecological

environment; National key project areas have the resources to protect biodiversity. The

project is mainly sensitive to ecological problems are soil erosion and its impact on

flora and fauna.

(6) According to decree of the National Development and Reform Commission

(NDRC) No. 40 in 2005 "Guiding Catalogue of Industrial Structure Adjustment"

(2005), the project is "water sector" in the "urban waterlogging warning and flood

control projects," Are encouraged projects, so construction of the project in line with

national industrial policies.

In summary, the construction of the project in line with national industrial

policy; Construction on the surrounding natural and social environment has little effect;

Construction of the project on the development of regional economic projects, Social

stability and harmonious development have a positive effect.

Adverse effects caused by the construction of the project can get various

measures to mitigate or eliminate, the project economic, social and environmental

benefits significantly, The environmental aspects of the project is feasible.

Page 40: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

6. Accessories Catalogue

1, Letter of Authorization for Environmental Impact Assessment

2, Environmental Monitoring Report

3, the construction project environmental approval and registration table

Page 41: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

Attachment 1

Concerning River channel regulation engineering

of Gaizhou City sewage treatment engineering projects

LETTER OF AUTHORIZATION

FOR ENVIRONMENTAL IMPACT APPRAISEMENT

Yingkou City Environmental Protection Science Research Institute:

Under the "Law of the People's Republic of China on Appraising of Environment

Impacts" and "Construction Project Environmental Impact Appraising Classification

Catalogue" our company decided to entrust your organization process compilation the

report for Evaluating the Impact on the Environment for Construction of river channel

regulation engineering of Gaizhou City sewage treatment engineering.

Commissioned by the project are as follows:

Project Investment: 22,699,100 yuan RMB CNY.

Construction scale: moat river treatment 2956 m,

XIANG-SHUI River treatment 1290 m

Requester (stamp): Gaizhou City Urban Sewerage Limited Liability Company

(stamped the Gaizhou City Urban Sewerage Limited Liability Company with the

Organization Code Certificate Of the People's Republic of China 2108240007104 seal)

Issued date: 1 Apr. 2009

Page 42: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

Attachment 2

River channel regulation engineering

of Gaizhou City sewage treatment engineering Project

Environmental quality surveillance measure monitoring report

Gaizhou City Environmental Protection Monitoring Station

(stamped the Gaizhou City Environmental Protection Monitoring Station with the

Organization Code Certificate Of the People's Republic of China 2108240001265 seal)

Issued date: 29 mar. 2009

Page 43: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

According with the "Authorization Environmental quality surveillance measure

monitoring program" requirements, had been entrusted with the direction of the project

by the Gaizhou City Public Utilities Bureau, Gaizhou Environmental Protection

Monitoring status of Gaizhou area environment were monitored by Gaizhou City

Environmental Protection Monitoring Station from 25 March 2009 to 27 March 2009.

Reported as follows:

First, the status of regional ambient air quality monitoring

Monitoring Project: TSP, PM10

Monitoring sites: K1 dominant wind direction upwind distance 300 meters away

from the project.

K2 Under the dominant wind direction wind 300 meters away

from the project.

Monitoring frequency: TSP, PM10 continuous monitoring of 3 days. Monitoring the

daily average.

Monitoring instruments: use KC-1000 model high flowrate TSP artificial

containers sampler configuration

PM10-1000 Particulate matter cutter, flow 1m3/min

12 hours of continuous sampling, monitoring TSP, PM10.

Analysis: TSP, PM10 using the gravimetric method.

Second, the status monitoring of acoustic environmental quality

Monitoring Project: environmental noise equivalent continuous A sound level.

Monitoring sites: Residential areas and other sensitive areas along the river

treatment works: Set N1, N2, N3, N4, total of four survey points.

Monitoring frequency: Continuous monitoring of two days. Twice daily: 10:00

and 22:00.

Monitoring instruments: AWA6218B type noise statistics analyzer.

Third, the monitoring results

1, ambient air quality status of the regional monitoring results are shown in Table 1.

2, the acoustic environmental quality monitoring results are shown in Table 2.

Page 44: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

3. Meteorological data in Table 3.

Table 1 Regional ambient air quality monitoring results Status Table Unit: mg/m3

item

time

TSP PM10

25 Mar. K1 0.210 0.110

K2 0.211 0.112

26 Mar. K1 0.199 0.111

K2 0.211 0.112

27 Mar. K1 0.212 0.109

K2 0.213 0.113

Table 2 Status acoustic environmental quality monitoring results table Unit: dB(A)

sites

time

N1 N2 N3 N4

26 Mar. Day time 47.5 46.8 48.2 46.1

Night time 34.3 35.4 35.1 36.2

27 Mar. Day time 48.1 47.9 46.3 47.2

Night time 35.2 34.9 35.5 35.1

Page 45: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

Table 3 Meteorological data sheet

Item

item

time

Wind

direction

Wind

velocity

(m/s)

Temperature

(℃)

Barometric

pressure

(hpa)

Temperature

(%)

Weather

Conditions

25 Mar. North 1.9 14.1 1002.5 50 Sunny

26 Mar. North 1.5 15.2 1001.6 44 Sunny

27 Mar. North 1.8 14.4 1001.9 48 Sunny

Monitoring sites Schematic diagram

Page 46: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

Attachment 2 Construction Project Environmental Protection approval and registration table Fill form Unit (stamp): Completed by (signature): Project Manager (signature):

Co

nstru

ction

pro

ject

Name of project River channel regulation engineering of Gaizhou City sewage treatment engineering Construction Site The moat and XIANG---SHUI River of Gaizhou City

Construction

content & scale moat river channel treatment 2956 m, XIANG-SHUI River channel treatment 1290 m

Type of Construction □ New Construction rebuild, expansion construction □Retrofit technology

Industry Category N7610 Prevent flooding waterlogging Facilities Management Environmental Impact Assessment

Management Category

□ Report prepared Report prepared statement □Fill registration form

total investment(Ten

thousand yuan) 2269.91

Environmental Investment

(ten thousand yuan RMB) 11

Share

proportion (%) 0.48

Co

nstru

ct Un

it

Company name Gaizhou City Urban Sewerage Limited Liability Company Telephone 13940774556

Ev

aluatio

n U

nit

Organization name Yingkou City Environmental Protection

Science Research Institute Telephone 0417-2893755

Adress Xihai Economic-Technologlcal Development Area of Gaizhou City China

Postal Code 115200 address

No.3, West of Jin-niu-shan-da-jie Avenue,

Zhan-qian District, Yingkou City

China

Postal Code 115000

Legal representative SUN Tao Contact WANG

Xiao-hui Certificate No. GUO-HUAN-PING-ZHENG-YI-ZI No.1519 Evaluate Fund

ten thousand

yuan RMB

Env

iron

men

tal statu

s o

f

con

structio

n

pro

ject area

Environmental

Quality Level Ambient air: GB3095-1996 II-grade Surface water: Groundwater: Environmental Noise: GB3096-2008 I-class Seawater: Soil: Other:

Environmentally

sensitive features

□Nature Reserve □Scenic Area □Drinking water source protection zones □Basic farmland protection areas □Erosion Prevention areas □Desertified land ban protected areas □Forest Park □Geopark

□Important Wetlands □Basic prairie □Conservation units □Cherished habitats □World Natural Heritage □Key watersheds □main lake □Acid rain control areas or sulfur dioxide pollution control zones

(Indu

strial con

structio

n p

rojects fill)

Em

ission

s com

plian

ce & to

tal contro

l

Emissions & major

Contaminants

Existing projects (built + in progress) This project (the proposed change or adjustment) overall project (under construction + has been built or proposed adjustment to change)

actual

emission

concentra

tion (1)

allowable

emission

concentrati

on

(2)

actual

total

emissions

(3)

approved total

emissions (4)

predicted

emission

concentrati

on

(5)

allowable

emission

concentrat

ion

(6)

generation (7)

self-redu

ction

amount

(8)

predicted

total

emissions

(9)

total

emissions

approved

(10)

"with new bring

old" reductions

(11)

project

alternative

regional

balance

reductions

(12)

predicted

Total

emission

s (13)

approved

Total

emissions

(14)

increase &

decrease of

emissions

amount (15)

Wastewater

Chemical Oxygen

Demand

Ammonia nitrogen

Petroleum

Waste Gas

Sulfur dioxide

Page 47: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

smoke dust

Industrial dust

Nitrogen oxides

Industrial solid

waste

Oth

er

features o

f

pro

ject-relat

ed p

ollu

tants

S S

Note: 1, increase or decrease the amount of emissions: ( + ) indicates increase, ( - ) Indicates decrease

2, (12): refers to the amount of the project area is located through the "regional balance" substitute cut specifically for this project

3, ( 9 ) = ( 7 ) - ( 8 ) , ( 15 ) = ( 9 ) - ( 11 ) - ( 12 ) , ( 13 ) = ( 3 ) - ( 11 ) + ( 9 )

4, Unit: wastewater emissions - Ten thousand tons / year; Emissions - Ten thousand standard cubic meters / year;

Discharge of industrial solid waste - Ten thousand tons / year; water pollutant emission concentration - mg /l;

Atmospheric concentration of pollutant emissions - mg /cubic meter; Water pollutant emissions - tons / year; emissions of air pollutants - tons / year

Th

e main

indicato

rs of eco

logical d

amag

e contro

l

Impact and major measure

Ecological protection goals Name

Level or

quantity of

species

Impact grade ( severe,

in general, small )

Affect mode

( Occupation, cut

across the block

or both )

Avoidance,

reduction of

the number

or impact

of

protective

measures

the quantity

of species

Engineerin

g avoidance

Investment

(Ten

thousand

yuan RMB)

Another

construction

and function

of zoning

adjustment

of

investment

(Ten

thousand

yuan RMB)

Moved to the

proliferation of

investment

protection (Ten

thousand yuan

RMB)

Project management

investment protection

(Ten thousand yuan RMB) other

Nature Reserve zones

Water Source protection zones

--------

Important Wetlands

-------- --------

Page 48: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

Scenic Area

--------

The world's natural and cultural

heritage

-------- --------

Rare and endemic animals

--------

Rare and endemic plant

--------

Class and form

Occupation land (hm2)

Basic farmland Forest land Grass other

Immigration

Population

and

demolition

quantity

Engineering occupation

housebreaking

population

Environment

al Impact

transplant

population

out of

native

places

Allocation

relocatio

n of

migrants

other

Temporary

occupation

Perman

ent

occupat

ion

Temporarily

occupation

permanence

occupation

Temporarily

occupation

permanence

occupation

permanenc

e

occupation

acreage

After slowing EIA

And the area

restored

treatment

acreage for

water and

soil erosion

Engineeri

ng

treatment

(Km2)

Biology

treatment

(Km2)

reduce soil

erosion

quantity

(tons)

Soil erosion treatment rate

( % ).

Noise Control Engineering avoidance

Engineering

Shunt

(Ten

thousand

yuan RMB)

noise

barriers

(Ten

thousan

d yuan

RMB)

soundproof

windows(Ten

thousand yuan

RMB)

Green Noise

Reduction

(Ten

thousand

yuan RMB)

low-noise

equipment

and Process

(Ten thousand

yuan RMB)

other

Page 49: EIA Table for Gaizhou River Embankment Improvement Project...2 Name of project: river channel regulation engineering of Gaizhou City sewage treatment engineering Document type: evaluating

Business Scope (of Yingkou City Environmental Protection Scientific Research Institute)

◆ undertake various construction project environmental impact assessment services

◆ (1S014001 / I S09002/OHSASl8001) Management System certification consulting for companies

◆ assist enterprises for environmental labeling certification

◆ guidance and cleaner production audit

◆ Corporate Environmental Project Management

Telephone: 0417-2839005 0417-2839015

Facsimile: 0417-2839007

China Postal Code: 115003