Agenda

• The Context & The Objective• What we learned from Energy Isolation Learning Phase• Energy Isolation Video

− Learning Phase Video (simplified or full version) - optional− Practicing Phase Video

• Energy Isolation Practicing Phase Key Points• What we can bring home• Summary – Learning & Practicing Phase• Group Discussion - GRACE

Page 3: Ei Practicing Final Pack English

The Golden Rule for Energy Isolation

• Any isolation of energy systems; mechanical, electrical, process, hydraulic and others, can not proceed unless:

the method of isolation and discharge of stored energy are agreed and executed by a competent person(s)

any stored energy is discharged a system of locks and tags is utilised at isolation points a test is conducted to ensure the isolation is effective isolation effectiveness is periodically monitored

The Golden Rules of Energy Isolation

Page 4: Ei Practicing Final Pack English

The Context & The Objective

• There have been Energy isolations immersion and improvement program over the past several years but unsafe energy isolations still occur:• BP E&P Group: 9 HiPOs in 2006. • BP Indonesia: 4 Recordable Incidents in 2006 (3 Tangguh, 1 VICO).

• The Objective:Continue building awareness in order to improve hazardassessment to create a safe energy isolation which aligned withControl Of Work Standard requirement.

Page 5: Ei Practicing Final Pack English

What We Learned from Energy Isolation Immersion – Learning Phase

• Energy Isolation Incidents Lesson Learned:− Fire & Spill Incident - October Platform – Egypt− Dump Truck Incident – In Salah Gas Project, Krechba, Algeria− Electrocution Incident – Trinidad Tobago Office

• Key Points:− Before conducting work, Identify source of energy involved

(Mechanical; Hydraulic; Electrical; Gas; Pneumatic; Water; Chemical; Nuclear; Gravitation)

− How can we Isolate the energy?− How can I secure the isolation?− Has the energy been discharged?− Have these process been periodically monitored?

Page 6: Ei Practicing Final Pack English

Energy Isolation Immersion Video

• Energy Isolation Learning Video (simplified or full version) - optional• Energy Isolation Practicing Video

Page 7: Ei Practicing Final Pack English

• Understand your local Energy Isolation procedures• Energy isolations must be conducted by a competent person• To conduct an energy isolation, remember 6 Key Points:

− Identify energy sources− Isolate energy− Discharge energy− Lock and Tag− Test Isolation− Communicate

Summary – Learning & Practicing

Page 8: Ei Practicing Final Pack English

Group Discussion – Grace Model

• Focus on hazard identification in your working area and How to create a safe energy isolation.

Page 9: Ei Practicing Final Pack English

Forward Plan

• Team Leaders cascade the Energy Isolation Practicing Phase:− Java PU: Iwan Jatmika – SPA− Tangguh PU: Shinta R.W. – SPA− Others: Shinta R.W. - SPASend the participant list to Shinta R. W.

• Regular review of Energy Isolation hazard register and the action embedded into the regular HSE discussion within each group/ function/ department.

Page 10: Ei Practicing Final Pack English

Back Up

• Sources of energy• Isolate energy• Log out & Tag Out• Isolation Test• Communication

Page 11: Ei Practicing Final Pack English

Sources of Energy

• Mechanical• Hydraulic• Electrical• Gas• Pneumatic• Water• Chemical• Nuclear• Gravitation

electrical

gas

chemical

waterpneumatic

Page 12: Ei Practicing Final Pack English

Isolate Energy

• Process Isolation

− Close or lock valves, or pressure discharge.

• Mechanical Isolation

− release, free equipment from gas/other energy sources

• Electrical Isolation− Secure/protect, release electrical sources.

Page 13: Ei Practicing Final Pack English

Isolate Energy – important notes

• Do Risk Assessment• Energy Isolation have to be approved (by Isolating Authority),

analysed, discussed and understood by workers involved.• Energy Isolation have to be monitored and conducted by a competent

person. • Energy Isolation has not been accomplished if the following tools have not

been installed (avoiding another person to open the isolation without permission):− Lock out – to secure the isolation will not be opened until the work

finished− Tag out – to inform the purpose of the isolation.

Page 14: Ei Practicing Final Pack English

Lock & Tag

Page 15: Ei Practicing Final Pack English

Isolation Test

• Lock Out and Tag Out are not safe enough• Do Isolation Test for ensuring that the isolation

has been effectively conducted.

Page 16: Ei Practicing Final Pack English

Communication

• Communicate to all parties involved:− Hand over Notes− Work Permit− Pre Job Meeting

Page 17: Ei Practicing Final Pack English

Back Up

• Energy Isolation Incidents:• BP E&P Group: HiPOs in 2006. • BP Indonesia: Tangguh Recordable Incidents in 2006

Page 18: Ei Practicing Final Pack English

EI Incident Lesson Learned:Pile Driving Barge Flash Fire IncidentTangguh LNG, Jan 06, 2006Actual Outcome: 1 Restricted WorkThe injured received 1st Degree burns to his faceCaused by a flash fire erupted from the

exhaustport and minor injuries to his eyes while

performingroutine troubleshooting inspection of a poorlyoperating diesel powered pile driving hammer.

Page 19: Ei Practicing Final Pack English

EI Incident Lesson Learned:Vibro Hammer Incident

• Tangguh LNG, Feb 12, 2006• Actual Outcome: 1 Medical Treatment

Injured employee was part of a 4 man crew which maintained the vibro hammer. There are 3 vibro hammers on site; 2 of them powered by 220V generators, the rest is powered by 380V generator. The employee terminated the 380V generator, and hooked it up into one of the 220V system.When one of the employee attempted to switch on the pump that controlled the chuck of the vibro hammer, it blew the cover off the switch and caused a flash fire. The worker received 2nd degree burns to his right hand.

Page 20: Ei Practicing Final Pack English

EI Incident Lesson Learned:Hook Release Incident

• Tangguh LNG, May 01, 2006• Actual Outcome: 1 Medical Treatment

The victim was assigned to assist in the transferring of materials from Crane Barge HI 32 to LCT Clever. The hook on the 6 ton sliding choker became stuck between the c-channel and the metal deck on the LCT. The rigging team could not release it. Both the victim and his co-worker each used a piece of timber pole in an attempt to raise the c-channel bundles to release the hook. Immediately after the hook was released, the victim's co-worker released his grip on his timber pole. This caused the victim's timber pole to fall back against the metal deck of the LCT Clever and caught his middle finger between the pole and the deck.

Back to context & Objective

Page 21: Ei Practicing Final Pack English

HIPO Incident – Wytch Farm, UK

• September 12, 2006• An operation was being planned to install

electrical cables into an SCR ( Silicon Controlled Rectifier ) electrical switchroom which supplies electric to the drilling mud pumps. The electrical distribution system is 600 volts and 1600 Amp rated. A worker lifted and shifted a roof panel (wood/metal/plastic sandwich). When this was done the panel contacted a live termination which was out of sight above the roof panel. This created a short circuit to earth, tripping the circuit breakers and shutting down the generator. The worker was checked by the paramedics and the BP doctor who confirmed that he did not receive an electric shock.

Page 22: Ei Practicing Final Pack English

HIPO Incident – GUPCO, Egypt

• September 09, 2006• Over pressurization of a Glycol/HC Condensate Vessel occurred as a

result of gas blowby from a Low Temperature Separator (LTS) when a shut down valve failed to close on low-low level in the separator. Gas entered the liquid side of the process over-pressuring the system to approx. 1.5 times normal working pressure. Contributing to the over pressure incident was the malfunction of a safety relief valve (PSV) on the vessel, and failure to operate of a second PSV on the inlet to the condensate pre-heater. Operators quickly spotted the malfunctions and relieved pressure by opening a manual by-pass valve.

Page 23: Ei Practicing Final Pack English

HIPO Incident – Shah Deniz, Azerbaijan

• September 11, 2006• A flame arrestor cap approximately five inches in diameter and

weighing approximately 1.5 kg came off a local vent as a projectile following a valve opening for depressurisation. The flame arrestor cap traveled approximately 45-50 meters before landing on a drilling rig walkway 33 meters above the rig floor. A nitrogen leak test was ongoing on the export gas pig launcher following the removal of de-watering pipework and re-instatement of blinds. The test pressure was 175 barg. The top of the local vent with the flame arrestor was one level above the pig launcher, and the operator could not see that an incident occurred. One of drilling deck crew heard the impact and reported it to the night shift Deck Foreman.

Back to context & Objective