Upload
angelica-anderson
View
221
Download
3
Tags:
Embed Size (px)
Citation preview
Edinburgh, June 2006Edinburgh, June 20061
Interferometry: FP6 & Interferometry: FP6 & FP7FP7
Alain Chelli, LAOG and Jean-Marie Mariotti Center Alain Chelli, LAOG and Jean-Marie Mariotti Center
Andreas Quirrenbach, U HeidelbergAndreas Quirrenbach, U Heidelberg
on behalf of the European interferometric on behalf of the European interferometric communitycommunity
OPTICON Meeting, June 2006, Edinburgh
Edinburgh, June 2006Edinburgh, June 20062
Activities in FP6Activities in FP6
Alain ChelliAlain Chelli
Andreas QuirrenbachAndreas Quirrenbach
Edinburgh, June 2006Edinburgh, June 20063
Integrating Integrating interferometry into interferometry into mainstream astronomymainstream astronomy
ObjectivesObjectives
• Maintain & reinforce european interferometryMaintain & reinforce european interferometry• Generate a long term european vision Generate a long term european vision • Integrate new countriesIntegrate new countries• Formation/exchange of students/investigatorsFormation/exchange of students/investigators• Make the VLTI an end-to-end service Make the VLTI an end-to-end service
instrumentinstrument
Edinburgh, June 2006Edinburgh, June 20064
Participants: 14 Participants: 14 countries+ ESA + ESO (> countries+ ESA + ESO (> 20 labs)20 labs) Universität Wien (Austria)Universität Wien (Austria) Universitè de Liège (Belgium)Universitè de Liège (Belgium) Academy of Sciences (Czech Republic)Academy of Sciences (Czech Republic) Jean-Marie Mariotti Center for Interferometry, JMMC (France)Jean-Marie Mariotti Center for Interferometry, JMMC (France) Max-Planck-Institut für Astronomie (Germany)Max-Planck-Institut für Astronomie (Germany) Konkoly Observatory (Hungary)Konkoly Observatory (Hungary) Technion (Israel)Technion (Israel) Torino University (Italy)Torino University (Italy) Nederlandse Onderzoekschool Voor Astronomie, NOVA (The Nederlandse Onderzoekschool Voor Astronomie, NOVA (The
Netherlands)Netherlands) Torun University (Poland)Torun University (Poland) Porto University (Portugal)Porto University (Portugal) Universidad Autonoma Madrid (Spain)Universidad Autonoma Madrid (Spain) Observatoire de Genève (Switzerland)Observatoire de Genève (Switzerland) University of Cambridge (United Kingdom)University of Cambridge (United Kingdom) European Space AgencyEuropean Space Agency European Southern ObservatoryEuropean Southern Observatory
Edinburgh, June 2006Edinburgh, June 20065
6th Framework Program
Integrated Infrastructure Initiatives (I3)
OPTICONPC: Gerry Gilmore / PS: John Davies
Marie-Curie ProgramPC: P. Garcia
JRA4PC: Chelli
Network 5PC: A.Quirrenbach
Euro-Interferometry Initiative (EII)
Executive Board(JRA4+N5+MC boards)
Scientific Council(1 representative per country)
Chair: T. Henning
MOU
Edinburgh, June 2006Edinburgh, June 20066
WP1: Exchange visitor programWPL: Andrej Niedzelski (Torun)
WP2: Working groupsWPL: S. Wolf (MPIA)
WP3: Modeling & TechnologyWPL: Jean Surdej (U. Liege)
Network # 5 Network # 5 ““Integrating interferometry into mainstream astronomy”Integrating interferometry into mainstream astronomy”
PC: Andreas Quirrenbach (U. Heidelberg)PC: Andreas Quirrenbach (U. Heidelberg)(http://www.strw.leidenuniv.nl/~eurinterf)
~ 10 exchange programs per year
2 WG: Radiative transfer & Stellar Atmosphere
Asteroseismology
Objective: Initiate science case & technology roadmapfor next-generation facility
260K€
Edinburgh, June 2006Edinburgh, June 20067
Joint Research Activity # 4 Joint Research Activity # 4 ““Integrating interferometry into mainstream astronomy”Integrating interferometry into mainstream astronomy”
PC: Alain Chelli (LAOG)PC: Alain Chelli (LAOG)(http://eii-jra4.ujf-grenoble.fr)
WP1Advanced Instruments
(2nd Generation VLTI Instruments)
WP1.1: Concepts to FeasibilityWPLs: Uwe Graser (Heidelberg)
& Denis Mourard (OCA)
WP1.2: Cophasing & fringe tracking
WPL: Mario Gai (Torino)
Objective: facilitate the use of modern interferometric facilities such as ESO’s VLTI to a non specialist end user
WP2: Off-line data reduction SoftwareWPL: Gilles Duvert (LAOG) SPM: Gerard Zins (LAOG)
500K€
500K€
Objective:Prepare 2nd generation of VLTI instruments
Edinburgh, June 2006Edinburgh, June 20068
Advanced instruments: Advanced instruments: preparing VLTI2 preparing VLTI2 instrumentsinstruments
6 Concept studies6 Concept studies (01/2004-06/2005)(01/2004-06/2005)• 4 Infrared multi-beams combiners4 Infrared multi-beams combiners• 2 visible instruments 2 visible instruments
2 (+1) instruments selected by ESO for 2 (+1) instruments selected by ESO for phase Aphase A
Edinburgh, June 2006Edinburgh, June 20069
WP2: Off-line Data WP2: Off-line Data ReductionReduction Software Software
WP2.2: Integration
WP2.3: Model-fitting
WP2.4: Astrometry
WP2.5: Image Reconstruction
WP2.1: Management & User Support
Software:Software: making the VLTI making the VLTI an end-to-end service an end-to-end service instrumentinstrument
1st Prototype used at the Gouttelas summer school
(June 2006)
Edinburgh, June 2006Edinburgh, June 200610
Marie-Curie programMarie-Curie program
06/2006Observations and data reduction with the VLTI
Gouttelas, France
2007Circumstellar disks and
PlanetsCAUP, Portugal
2007AGN’s
Arcetri, Italy
2008PRIMA
Siofok, Hungary
Edinburgh, June 2006Edinburgh, June 200611
Major MeetingsMajor Meetings
5 major meetings5 major meetings• JRA4 Kick-off (Nice 01/2004)JRA4 Kick-off (Nice 01/2004)• Science cases (JENAM 08/2004)Science cases (JENAM 08/2004)• Technology roadmap (JENAM, 08/2005)Technology roadmap (JENAM, 08/2005)• Joint EII/ESO workshop (Garching, 04/2005)Joint EII/ESO workshop (Garching, 04/2005)• Joint ARENA/JRA4 workshop (Nice, Joint ARENA/JRA4 workshop (Nice,
05/2006)05/2006)
EII Scientific CouncilEII Scientific Council• 12 meetings since its creation in 200212 meetings since its creation in 2002
Edinburgh, June 2006Edinburgh, June 200612
Major AchievementsMajor Achievements
Integrated and Expanded European Integrated and Expanded European interferometric community including interferometric community including Central EuropeCentral Europe
Jump-started VLTI 2Jump-started VLTI 2ndnd generation generation instrumentsinstruments
11stst prototype user-friendly software prototype user-friendly software being used at Gouttelas summer schoolbeing used at Gouttelas summer school
Initiated science case and technology Initiated science case and technology roadmap for next-generation facilityroadmap for next-generation facility
Edinburgh, June 2006Edinburgh, June 200613
Interferometry in FP7Interferometry in FP7
Andreas QuirrenbachAndreas Quirrenbach
Alain ChelliAlain Chelli
Edinburgh, June 2006Edinburgh, June 200614
Top-Level GoalsTop-Level Goals
Build on success of FP6 Build on success of FP6 Exploit current instrumentation to the fullestExploit current instrumentation to the fullest
• Networking (exchange visits, working groups)Networking (exchange visits, working groups)• User-friendly data reduction and analysis toolsUser-friendly data reduction and analysis tools
Support advances in VLTI instrumentationSupport advances in VLTI instrumentation• 2nd and 3rd generation instruments2nd and 3rd generation instruments
Prepare next-generation ground-based Prepare next-generation ground-based facilityfacility• Build science caseBuild science case• Conceptual design optionsConceptual design options• Develop critical technologiesDevelop critical technologies
Support space-based interferometrySupport space-based interferometry• Nulling technologyNulling technology• General science potentialGeneral science potential
Edinburgh, June 2006Edinburgh, June 200615
Proposed FP7 Proposed FP7 Networking ActivitiesNetworking Activities Fizeau Exchange Visitors ProgramFizeau Exchange Visitors Program WG on science case for next-generation WG on science case for next-generation
interferometerinterferometer WG on potential of Antarctica for WG on potential of Antarctica for
interferometry (link with ARENA)interferometry (link with ARENA) WG on Darwin science preparationWG on Darwin science preparation WGs on Interferometry and astrophysicsWGs on Interferometry and astrophysics
• E.g., asteroseismology, radiative transfer, E.g., asteroseismology, radiative transfer, fundamental stellar parametersfundamental stellar parameters
WG on VLTI instrumentsWG on VLTI instruments Conference series: Applications of Conference series: Applications of
interferometry to astrophysicsinterferometry to astrophysics
Edinburgh, June 2006Edinburgh, June 200616
Proposed FP7 JRA Proposed FP7 JRA Activities (1 of 2)Activities (1 of 2)
Advanced user-friendly data reduction Advanced user-friendly data reduction softwaresoftware
Second-generation data processing for Second-generation data processing for VLTIVLTI
Optimized fringe trackingOptimized fringe tracking Contribution to 2Contribution to 2ndnd-generation VLTI -generation VLTI
instruments (?)instruments (?) Studies of 3Studies of 3rdrd-generation VLTI -generation VLTI
instrumentsinstruments
Edinburgh, June 2006Edinburgh, June 200617
Proposed FP7 JRA Proposed FP7 JRA Activities (2 of 2)Activities (2 of 2)
Guided optics (fibers, integrated optics)Guided optics (fibers, integrated optics) Nulling technology (link with ESA)Nulling technology (link with ESA) Detectors (single-pixel, energy resolution)Detectors (single-pixel, energy resolution) Multi-beam co-phasingMulti-beam co-phasing Array design conceptsArray design concepts Beam transport conceptsBeam transport concepts Beam combination technologyBeam combination technology Interferometer end-to-end modelingInterferometer end-to-end modeling
Edinburgh, June 2006Edinburgh, June 200618
JRA DeliverablesJRA Deliverables
Fully operational user-friendly software Fully operational user-friendly software packagespackages
Prototypes for key technologies Prototypes for key technologies (guided optics, nuller, single-pixel (guided optics, nuller, single-pixel detector)detector)
Realistic conceptual design(s) of next-Realistic conceptual design(s) of next-generation interferometergeneration interferometer
Edinburgh, June 2006Edinburgh, June 200619
Indicative BudgetIndicative Budget
Networking activities:Networking activities: € 775,000€ 775,000 Software & algorithms:Software & algorithms: € 1,200,000€ 1,200,000 Key technology development: Key technology development: € 1,800,000€ 1,800,000 Next gen. conceptual design: Next gen. conceptual design: € 850,000€ 850,000 Post 2Post 2ndnd gen. VLTI instruments: gen. VLTI instruments: € €
500,000500,000
Grand total: Grand total: € 5,125,000€ 5,125,000
EU Funding only; cost-sharing not includedEU Funding only; cost-sharing not included
Edinburgh, June 2006Edinburgh, June 200620
Principal InterfacesPrincipal Interfaces
ESO (VLTI) and ESA (Darwin)ESO (VLTI) and ESA (Darwin)• Leave programmatics to ESO/ESALeave programmatics to ESO/ESA• Support community and science casesSupport community and science cases
ELTsELTs• Technology synergies (co-phasing, mirror and Technology synergies (co-phasing, mirror and
telescope manufacturing, …)telescope manufacturing, …)
ARENA (Interferometry in Antarctica)ARENA (Interferometry in Antarctica)• Through dedicated networkThrough dedicated network• Deal mostly with specifics for interferometryDeal mostly with specifics for interferometry• Leave specifics of Antarctica for ARENALeave specifics of Antarctica for ARENA
High-Time-Resolution JRAHigh-Time-Resolution JRA• Specialized detectors (few pixels, energy resolution)Specialized detectors (few pixels, energy resolution)
Edinburgh, June 2006Edinburgh, June 200621
Activities outside Activities outside OPTICONOPTICON
Summer School SeriesSummer School Series• Marie Curie ProgramMarie Curie Program
Large Ground-Based Interferometer Large Ground-Based Interferometer design studydesign study• Preparation in FP6/FP7Preparation in FP6/FP7• Coordination with US (Decadal Review), Coordination with US (Decadal Review),
othersothers• Timing depending on FP7 funding Timing depending on FP7 funding
opportunitiesopportunities• Would seek OPTICON endorsementWould seek OPTICON endorsement
Edinburgh, June 2006Edinburgh, June 200622
Programmatic Programmatic QuestionsQuestions Number of participants in FP6 is largeNumber of participants in FP6 is large
• Success! Many groups are contributing, Success! Many groups are contributing, interferometric community is growinginterferometric community is growing
• Management is difficult, accounting is Management is difficult, accounting is tedious and expensivetedious and expensive
Preparation of next-generation facilityPreparation of next-generation facility• Design-study proposal to FP7 Design-study proposal to FP7 • Need to be ready in 2008 (?) – which level Need to be ready in 2008 (?) – which level
of maturity is required?of maturity is required?• Relation to roadmaps (ESFRI, Astronet) Relation to roadmaps (ESFRI, Astronet) • Interface with OPTICON activitiesInterface with OPTICON activities