111518 CFD Talk with Kevin
Gage pressure vs absolute pressureo Relative pressure is zero so gage pressureo Reference pressure is zero psi
AIM needs less input boundaries Alec
o Transient model changes with longer duration Kevin’s
o ANSYS Aimo Pressure relative to sea levelo Probably 5 degree attack angle o Steady State Model o Green sections are fully body
Open Actionso Find distance between original geometry o Run Steady state model o Measure the distance between the centerline and the default axiso Model a half body instead of a quarter body to account for angle of attack o Add a 5 degree attack angle to account for gusts of wind near altitude
Look into how big those gusts are (the balloon people)
111518 Agenda Decide 2nd semester meeting times
9:30 AM - 12:15 PM Tues/Thur Brainstorm list of required materials from Home Depot or Lowes
FiberFix patch on inside and bond https://www.homedepot.com/p/FiberFix-2-in-x-8-in-3-in-x-3-in-5-in-x-5-in-
Rigid-Patch-3-Pack-857101004969/206783889 What Bondo?
https://www.homedepot.com/p/3M-Bondo-32-fl-oz-Lightweight-Body- Filler-PN0262/202077782
Overview of open actions
Upcoming Schedule: Thanksgiving Break
o Most people gone Saturday 11/17 - Sunday 11/25o Full team meetings 11/18, 11/25 @ 9 pmo Meagan might be gone 11/25-11/26?o Art gone week after Thanksgiving
Gate Review with Art in Class - Thursday, 12/6 Detailed Design Review - Saturday, 12/8 Break Between Semesters
o Soft stop for end of semester (tentatively 12/8)o Schedule meetings over break
Integration Weekend tentatively 3/30/19 MSD 2
o Tues/Thurs
o 9:30 AM - 12:15 PM
Open Actions Meagan
Update CAD Make rods diameter similar to outer wall thickness Add hole for pipe
Load path Update Waiting on John to constrain engine
Meet with Dr. Lam after Thanksgiving break Bulk upload notes (eventually)
Tony Figure out shrinkage of methane - Tony (By thursday)
Figure out temperature of inside gases and perform Linear expansion equation Ask Boedo if you get stuck
Figure out the tension required of mounting structure - Tony afterwards Unfilled tank is put in tension (in the rods) compression (in the tank).
Once tank is filled and temp drops, it will compress. You don’t want the tank to lose contact with the structure
Drew Purchasing
FiberFix patches and bondo Need to order bulkhead attachment materials
Waiting on Meagan Cryo rated gasket
o Needs to be tensile strength ratedo 3” Diametero Waiting for thermal expansion numberso https://www.mcmaster.com/7549A11 o http://www.ppgaerospace.com/Products/Sealants/
Specialty-Products/PR-1665-Cryogenic-Adhesive.aspx 3 Point Bending Test Apparatus
Try to return aluminum Apply for NY Space Grant - Due December 1st
Travel to Northeastern for Integration (March) Shipping the rocket to CA (hella expensive)
Dig through drive for shipping receipts (Georgia - Boston)o 2-3 tanks of gas (x2 cars) =
UPS Estimationo https://wwwapps.ups.com/fctc/timeandcost?
loc=en_US&ActionOriginPair=SeamlessExperience___StartSession&FREIGHT_TYPE=LTL
Ship Before April 30th to Mark’s House
Alec
Update CFD Talk with Kevin on Thursday
Start FEA on bulkhead redesign Wednesday Need thrust numbers (Tony)
Alex Repair nosecone coupler Get rough estimates for material properties (fiberglass and carbon fiber from
body tubes and nose cone) Thanksgiving week
Claire Update nose cone drawings Make Tank mount adapters drawing (next week)
Waiting on Meagan Update 3 Point Bending stuff (eventually)
Adjust design to incorporate saw horses, laser pointer, and measurement attachments
111318 Agenda Brainstorm NY Space Grant usage
Due December 1st Engine bulkhead
Machining costs Helium Bulkhead
Probably should be under northeastern New nosecone Travel to conference Travel to Northeastern
2-3 tanks of gas (x2 cars) = Shipping the ro☻cket to CA (hella expensive)
Decide 2nd semester meeting times Brainstorm list of required materials from Home Depot or Lowes
Overview of open actions
Upcoming Schedule: Thanksgiving Break
o Most people gone Saturday 11/17 - Sunday 11/25o Full team meetings 11/18, 11/25 @ 9 pmo Call-in team meeting to be scheduled (if needed)
Decide on Thursday 11/15o Meagan might be gone 11/25-11/26?
Detailed Design Review tentatively 12/8 Break Between Semesters
o Gate Review on 12/6?o Soft stop for end of semester (tentatively 12/8)o Schedule meetings over break
Integration Weekend tentatively 3/30/19 MSD 2
o Only have to meet once a week with Arto Decide meeting time after 11/12o Should still be Tues/Thurs
Open Actions Meagan
Update CAD Make rods diameter similar to outer wall thickness Add hole for pipe
Load path Update Waiting on John to constrain engine
Tony Figure out shrinkage of methane - Tony
Figure out temperature of inside gases and perform Linear expansion equation Ask Boedo if you get stuck
Figure out the tension required of mounting structure - Tony afterwards Unfilled tank is put in tension (in the rods) compression (in the tank).
Once tank is filled and temp drops, it will compress. You don’t want the tank to lose contact with the structure
Drew Purchasing
Need to order bulkhead attachment materials Waiting on Meagan Cryo rated gasket
o Needs to be tensile strength ratedo 3” Diametero Waiting for thermal expansion numberso https://www.mcmaster.com/7549A11 o http://www.ppgaerospace.com/Products/Sealants/
Specialty-Products/PR-1665-Cryogenic-Adhesive.aspx 3 Point Bending Test Apparatus
Try to return aluminum
Alec Update CFD
Need mass flow rate out of engine Start FEA on bulkhead redesign
Need thrust numbers (Tony) Alex
Repair nosecone coupler Update new cone drawings
Claire Make Tank mount adapters drawing (next week)
Waiting on Meagan Update 3 Point Bending stuff (eventually)
111018 Preliminary Design Review Agenda
Room: GLE-2139 12:30 pm - 2:00 pm (1.5 hrs): Assign parts and practice presenting
o Drew - Team Vision, BOMo Meagan - Bulkhead Designo Claire - Engine Bulkhead Redesign, 3 Point Bending Test Apparatuso Alec - ANSYS stuff, Riskso Alex - Nosecone Tip, Nosecone Bendingo Tony (by 1:30 pm) - Engine Bulkhead Redesign, Design + Flowcharts
2:00 pm - 3:00 pm (1 hr): Preliminary Detailed Design Reviewo With Art, Kevin, John, Julian
Start presenting by 2:10 pm (!!!) 3:00 pm - 3:30 pm (0.5 hr): Peer Evals What needs completed before Saturday?
o Engine Bulkhead Redesign Tony and Claire
o Upload Foam Ring Benchmarking and Drawing? Waterjetting will be next phase
Agenda Vision - Drew CFD- Alec Nosecone-Alex Engine Bulkhead
Why redesign -Tony Redesign - Claire / Tony
Tank Mounting - Meagan BOM -Drew Test Plans -
Nosecone -Alex3 point bending -Claire
Design Flowcharts - Tony Risks- Alec Plans for next phase - Meagan
110818 Agenda Semester cutoff and plans for next semester
Tentatively - Last Design Review 12/8 Also tentative cutoff for the semester
Discuss a visit to Northeastern Virtual Meeting for Full Vehicle Model (everybody) Virtual CFD Meeting (Kevin and us)
Assign and Research NY Space Grant stuff Due December 1st Drew
Overview of open actions
Upcoming Schedule: Preliminary Design Review - Saturday 11/10 - Meet at 12:30PM
o 2-3 pm Review GLE-2149 (3149 is reserved for KGCOE open house !!)
Full Team Call - Sunday 11/11 @ 9 PM Thanksgiving Break
o Most people gone Saturday 11/17 - Sunday 11/25o Full team meetings 11/18, 11/25 @ 9 pmo Call-in team meeting to be scheduled (if needed)
Decide on Thursday 11/15 Detailed Design Review tentatively 12/8 Break Between Semesters
o Gate Review on 12/6?o Soft stop for end of semester (tentatively 12/8)o Schedule meetings over break
Integration Weekend tentatively 3/30/19 MSD 2
o Only have to meet once a week with Arto Decide meeting time after 11/12o Should still be Tues/Thurs
Open Actions Meagan
Update CAD Round rods Make rods diameter similar to outer wall thickness Add hole for pipe Make rods longer and add more threads Thicken Top and Dimensions Check in full assembly for piping
Might have to cut a semi-circle hole for fuel tube Load path
Update Waiting on John to constrain engine Might break things if uploaded to GrabCAD
Rename Test fit Nose Cone Tip Material, Wall thickness, PSI, Temp for methane tank
Bothering NE Seamless Tanks (http://seamlesstanks.com/) On Hold -try not welding
Look for better thermal data - On Hold Tony
Upload old design (designs and flowcharts) Drew
Purchasing Need to order bulkhead attachment materials
Waiting on Meagan
Cryo rated gasketo Needs to be tensile strength ratedo 3” Diametero Waiting for thermal expansion numberso https://www.mcmaster.com/7549A11 o http://www.ppgaerospace.com/Products/Sealants/
Specialty-Products/PR-1665-Cryogenic-Adhesive.aspx 3 Point Bending Test Apparatus
EDGE Upload nose cone test plan Upload meshing/CFD stuff to EDGE
Whiteboard Photos Create list of outstanding EDGE items
Prototyping, Engineering Analysis, Simulationo Bulkhead FEA (Tony)o Gasket Benchmarking
Feasibility: Prototyping, Analysis, Simulationo Add Alec’s Powerpoint (once ready)
Plans for Next Phaseo Meagan
Nosecone Stiffness ‘Blurb’ Drawings, Schematics, Flow Charts, Simulations
o Add Tank Mount Drawing Cut Foam
Waterjet at Brinkman Lab - Submit What inputs we need
o DXF File Check helium tank diameter for inside diameter of
foam ringo 6-8” boundary around foam edgeo Bring material into shopo Put work order in
On shop computer Alec
Alex Machining of nosecone tip
If nosecone tip doesn’t fit - redo drawing and wait for more material Talk to Professor Ghoneim to discuss vibrational table versus accelerometers
Accuracy of model/ random variation Claire
Make Tank mount adapters drawing (next week) Waiting on Meagan
Machine Nose Cone tip on Monday Engine Bulkhead
110618 Agenda Semester cutoff and plans for next semester
Tentatively - Last Design Review 12/8 Also tentative Cutoff for the semester
Overview of open actions Meagan, Tony, and Alec work on load path geometry
Trim down main assembly to min
Upcoming Schedule: Preliminary Design Review - Saturday 11/10 - Meet at 12:30PM
o 2-3 pm Review GLE-2149 (3149 is reserved for KGCOE open house !!)
Thanksgiving Breako Most people gone Saturday 11/17 - Sunday 11/25o Call-in meeting to be scheduled
Move to next agendao Full Team Meetings every Sunday
11/18 11/25
Break Between Semesterso Decide a soft stop for end of semester (tentativelyo Schedule meetings over break
Integration Weekend tentatively 3/30/19
Open Actions Meagan
Update CAD Put in grabcad Thicken Top and Dimensions Check in full assembly for piping
Might have to cut a semi-circle hole for fuel tube Load path
Waiting on John to constrain engine Stick in structures -> FEA -> Static Model
Material, Wall thickness, PSI, Temp for methane tank Bothering NE Seamless Tanks (http://seamlesstanks.com/) On Hold -try not welding
Engine Bulkhead Redesign Got FEA analysis from Kevin
Look for better thermal data - On Hold Look up reverting GrabCAD
Tony Start Load Path model
Meagan started it, ask her for explanation (Sunday after 4pm) Engine bulkhead failure modes
In Slack - No testing Ask for other information (Thursday)
Upload old GTech FEA to EDGE
o Add blurb describing why we need to redesign based off picture
Upload old design (designs and flowcharts) Drew
Purchasing Need to order bulkhead attachment materials
Waiting on Meagan Cryo rated gasket
o Needs to be tensile strength ratedo 3” Diametero Waiting for thermal expansion numberso https://www.mcmaster.com/7549A11 o http://www.ppgaerospace.com/Products/Sealants/
Specialty-Products/PR-1665-Cryogenic-Adhesive.aspx 3 Point Bending Test Apparatus
EDGE Create list of outstanding EDGE items
Prototyping, Engineering Analysis, Simulationo Bulkhead FEA (Tony)
Feasibility: Prototyping, Analysis, Simulationo Add Alec’s Powerpoint (once ready)
Plans for Next Phaseo Meagan
Nosecone Stiffness ‘Blurb’ Drawings, Schematics, Flow Charts, Simulations
o Add Tank Mount Drawing Cut Foam
Waterjet at Brinkman Lab What inputs we need (by 11/6)
o DXF File Check helium tank diameter for inside diameter of
foam ringo 6-8” boundary around foam edgeo Bring material into shopo Put work order in
On shop computer Alec (work on this weekend)
Feasibility: Prototyping, Analysis, Simulation - Status Update Tank Mounting Attachment
Waiting on Meagan’s CAD model Rough CFD Model
Still tinkering with Fluent to get things to run correctly Having troubles with missing inputs from existing Still tinkering with boundaries
Meshing As complete as possible
Alex Machining of nosecone tip
Friday failed Plan is to go on Monday (go before 4pm)
Need to use programmable latheo Don’t really know how to use programmable lathe
Use ruined piece first to test angle Help with 3 point bending test Write blurbs for Testing
Write then send to Drew Claire
Make Tank mount adapters drawing (next week) Waiting on Meagan (should be done by saturday)
Machine Nose Cone tip on Monday
Goals - next week Drew be able to order tank mounting material Alec to be able to run initial CFD Tony working on load path geometry Alex to machine nosecone tip
110318 Agenda Overview of open actions
Do Work Meagan, Tony, and Alec work on load path geometry
Trim down main assembly to min
Upcoming Schedule: Group Meeting
o Saturday, 11/3 at 2PM, on campus (location TBD: look at slack) No Tony (zero on peer review)
Preliminary Design Review - Saturday 11/10 - Meet at 12:30PMo 2-3 pm Review
GLE-2149 (3149 is reserved for KGCOE open house !!) Northeastern schedule comparison
o Supposedly made schedule Thanksgiving Break
o Most people gone Saturday 11/17 - Sunday 11/25o Call-in meeting to be scheduled
Break Between Semesterso Schedule meetings over break
Integration Weekend tentatively 3/30/19
Open Actions Meagan
Update CAD Put in grabcad Thicken Top and Dimensions Check in full assembly for piping
Might have to cut a semi-circle hole for fuel tube Material, Wall thickness, PSI, Temp for methane tank
Bothering NE Seamless Tanks (http://seamlesstanks.com/) On Hold -try not welding
Engine Bulkhead Redesign Got FEA analysis from Kevin
Look for better thermal data - On Hold Look up reverting GrabCAD
Tony Start Load Path model
Meagan started it, ask her for explanation (Sunday after 4pm) Engine bulkhead failure modes
In Slack - No testing Ask for other information (Thursday)
Upload old GTech FEA to EDGEo Add blurb describing why we need to redesign based off
picture Upload old design (designs and flowcharts)
Drew Purchasing
Need to order bulkhead attachment materials Waiting on Meagan Cryo rated gasket
o Needs to be tensile strength ratedo 3” Diametero Waiting for thermal expansion numberso https://www.mcmaster.com/7549A11 o http://www.ppgaerospace.com/Products/Sealants/
Specialty-Products/PR-1665-Cryogenic-Adhesive.aspx 3 Point Bending Test Apparatus
Update Wrike EDGE
Upload nose cone test plan Upload meshing/CFD stuff to EDGE
Stuff from whiteboard Update BOM Create list of outstanding EDGE items
Prototyping, Engineering Analysis, Simulationo Bulkhead FEA (Tony)
Feasibility: Prototyping, Analysis, Simulationo Add Alec’s Powerpoint (once ready)
Plans for Next Phaseo Meagan
Nosecone Stiffness ‘Blurb’ Drawings, Schematics, Flow Charts, Simulations
o Add Tank Mount Drawing Cut Foam
Waterjet at Brinkman Lab What inputs we need (by 11/6)
o DXF Fileo 6-8” boundary around foam edgeo Bring material into shopo Put work order in
On shop computer Alec (work on this weekend)
Feasibility: Prototyping, Analysis, Simulation - Status Update Tank Mounting Attachment
Waiting on Meagan’s CAD model Rough CFD Model
Still tinkering with Fluent to get things to run correctly Having troubles with missing inputs from existing Still tinkering with boundaries
Meshing As complete as possible
Alex Machining of nosecone tip
Friday - 2pm with Claire Help with 3 point bending test Write blurbs for Testing
Claire Make Tank mount adapters drawing (next week)
Waiting on Meagan (should be done by saturday) Machine Nose Cone tip on Friday Put Nosecone Tip pictures on word document
Goals - next week Drew be able to order tank mounting material Alec to be able to run initial CFD Tony working on load path geometry Alex to machine nosecone tip
110118 Agenda Overview of open actions
Do Work Meagan, Tony, and Alec work on load path geometry
Trim down main assembly to min
Upcoming Schedule: Preliminary Design Review - Saturday 11/10 - Meet at 12:30PM
o 2-3 pm (Actual Presentation Text Art to let him know when we decide (including room number)
o GLE-2149 (3149 is reserved for KGCOE open house !!) Northeastern schedule comparison - ON HOLD
Thanksgiving Breako Most people gone Saturday 11/17 - Sunday 11/25o Call-in meeting to be scheduled
Break Between Semesterso Schedule meetings over break
Integration Weekend tentatively 3/30/19
Open Actions Meagan
MechE lab computers should have full Ansys access - if not, see Dr. Boedo Update CAD
Put in grabcad Thicken Top and Dimensions - Thursday Check in full assembly for piping - Thursday
Might have to cut a hole Material, Wall thickness, PSI, Temp for methane tank
Bothering NE Seamless Tanks (http://seamlesstanks.com/) On Hold -try not welding
Engine Bulkhead Redesign Look for better thermal data - On Hold Look up reverting GrabCAD
Tony Start Load Path model
Meagan started it, ask her for explanation (Thursday) Engine bulkhead failure modes
In Slack - No testing Ask for other information (Thursday)
Drew Purchasing
Need to order bulkhead attachment materials Waiting on Meagan Cryo rated gasket
o Needs to be tensile strength ratedo 3” Diametero Waiting for thermal expansion numberso https://www.mcmaster.com/7549A11 o http://www.ppgaerospace.com/Products/Sealants/
Specialty-Products/PR-1665-Cryogenic-Adhesive.aspx 3 Point Bending Test Apparatus
EDGE Upload Bending Test Apparatus drawing Upload nose cone test plan Upload 3 Point Testing Apparatus BOM Edit Nosecone pictures Upload meshing/CFD stuff to EDGE Create list of outstanding EDGE items
Prototyping, Engineering Analysis, Simulationo Nothing
Feasibility: Prototyping, Analysis, Simulation
o Only content is link to ANSYS calculations Plans for Next Phase Nosecone Stiffness ‘Blurb’ Designs and Flowchart Drawings, Schematics, Flow Charts, Simulations
o Only Nose Cone Tip stuff Cut Foam
Waterjet at Brinkman Lab Talk to Jan and Rob
o When we can use it Down for at least 1-2 weeks
o What inputs we need DXF File 6-8” boundary around foam edge Bring material into shop Put work order in
Alec (work on this weekend) Feasibility: Prototyping, Analysis, Simulation - Status Update
Tank Mounting Attachment Waiting on Meagan’s CAD model
Rough CFD Model Still tinkering with Fluent to get things to run correctly Having troubles with missing inputs from existing Still tinkering with boundaries
Meshing As complete as possible
Alex Machining of nosecone tip
Friday - 2pm with Claire Help with 3 point bending test Blurb for nose cone testing
Claire Beef up 3-point test plan
Will have by Thursday Make Tank mount adapters drawing (next week)
Waiting on Meagan Machine Nose Cone tip on Friday
Goals - next week Drew be able to order tank mounting material Alec to be able to run initial CFD Tony working on load path geometry Alex to machine nosecone tip
103018 Agenda Meagan leaving early for interview or just wont show! Overview of open actions
EDGE Requirements for Preliminary Detailed Design Feasibility: Prototyping, Analysis, Simulation
Nose cone tip CFD - Alec Bulkhead attachment rings
3D Printed Drawings, Schematics, Flowcharts, Simulations Test Plans Designs and Flowcharts
Do Work Meagan, Tony, and Alec work on load path geometry
Trim down main assembly to min
Upcoming Schedule: Preliminary Design Review - Saturday 11/10
o 2-3 pm ? Text Art to let him know (including room number)
o GLE-2149 (3149 is reserved for KGCOE open house !!) Northeastern schedule comparison - ON HOLD Thanksgiving Break
o Most people gone Saturday 11/17 - Sunday 11/25o Call-in meeting to be scheduled
Break Between Semesterso Schedule meetings over break
Integration Weekend tentatively 3/30/19
Open Actions Meagan
Will reach out to Dr. Boedo & Dr. Ghoneim tomorrow about Ansys (recommended by Dr. Ghosh)
MechE lab computers should have full Ansys access - if not, see Dr. Boedo
Update CAD Put in grabcad Thicken Top and Dimensions - Thursday Check in full assembly for piping - Thursday
Might have to cut a hole Material, Wall thickness, PSI, Temp for methane tank
Bothering NE Seamless Tanks (http://seamlesstanks.com/) On Hold -try not welding
Engine Bulkhead Redesign Got FEA analysis from Kevin
Look for better thermal data - On Hold Look up reverting GrabCAD
Tony
Start Load Path model Meagan started it, ask her for explanation Engine bulkhead failure modes
Drew Purchasing
Need to order bulkhead attachment materials Waiting on Meagan Cryo rated gasket
o Needs to be tensile strength ratedo 3” Diametero Waiting for thermal expansion numberso https://www.mcmaster.com/7549A11 o http://www.ppgaerospace.com/Products/Sealants/
Specialty-Products/PR-1665-Cryogenic-Adhesive.aspx 3 Point Bending Test Apparatus
EDGE Upload Bending Test Apparatus drawing Upload nose cone test plan Upload 3 Point Testing Apparatus BOM Edit Nosecone pictures Upload meshing/CFD stuff to EDGE
Cut Foam Waterjet at Brinkman Lab
Waterjet is down (1-2 weeks) Talk to Jan and Rob
o When we can use ito What inputs we need
Or talk to Construct Mike on external waterjet sources Alec (work on this weekend)
Feasibility: Prototyping, Analysis, Simulation - Status Update Tank Mounting Attachment
Waiting on Meagan’s CAD model Rough CFD Model
Make sure dimensions are in English units Done
In Fluent Have a rough model runs for about 1s
Talk to Kevin about 30 ft Diameter and 30’ x 60’ x 60’ Ended on 20’ - can be changed later
Meshing As complete as possible
Alex Machining of nosecone tip
Complete sometime this week Friday - 2pm
Claire Beef up 3-point test plan
Will have by Tuesday Upload Bending Test Apparatus drawing to Drive
Working on drawings of test apparatus.
Tuesday Make Tank mount adapters drawing (next week)
Waiting on Meagan
Goals - next week Drew be able to order tank mounting material Alec to be able to run initial CFD Tony working on load path geometry Alex to machine nosecone tip
102718 Agenda Group Meeting Saturday 10/27 at 4:30pm
GLE-3149 Overview of open actions
EDGE Requirements for Preliminary Detailed Design Feasibility: Prototyping, Analysis, Simulation
Nose cone tip CFD - Alec Bulkhead attachment rings
3D Printed Drawings, Schematics, Flowcharts, Simulations Test Plans Designs and Flowcharts
Do Work Meagan, Tony, and Alec work on load path geometry
Trim down main assembly to min
Upcoming Schedule: Leads Meeting Sunday 10/28 at 8pm
o Alec (Yes), Tony (Maybe - has exam Monday), Claire (Yes), Alex (Maybe), Meagan (Yes - also has exam Monday), Drew (NO - Meeting 8-10)
Preliminary Design Review - Saturday 11/10o GLE-2149 (3149 is reserved for KGCOE open house !!)
Northeastern schedule comparison - ON HOLD Thanksgiving Break
o Most people gone Saturday 11/17 - Sunday 11/25o Call-in meeting to be scheduled
Break Between Semesterso Schedule meetings over break
Integration Weekend tentatively 3/30/19
Open Actions Meagan
Meeting scheduled with Dr. Lam Friday (tomorrow 10/26) 8-8:30am
Invite Dr. Lam to last Saturday review Will reach out to Dr. Boedo & Dr. Ghoneim tomorrow about Ansys
(recommended by Dr. Ghosh) Update CAD
Put in grabcad Thicken Top and Dimensions-Saturday Check in full assembly for piping -Saturday
Material, Wall thickness, PSI, Temp for methane tank Bothering NE Seamless Tanks (http://seamlesstanks.com/) On Hold -try not welding
Engine Bulkhead Redesign Look for better thermal data - On Hold Look up reverting GrabCAD
Tony Start Load Path model Engine bulkhead failure modes
Drew Purchasing
Need to order bulkhead attachment materials Waiting on Meagan Cryo rated gasket
o Needs to be tensile strength ratedo 3” Diametero Waiting for expansion numberso https://www.mcmaster.com/7549A11 o http://www.ppgaerospace.com/Products/Sealants/
Specialty-Products/PR-1665-Cryogenic-Adhesive.aspx 3 Point Bending Test Apparatus
EDGE Flesh out Gasket Benchmarking (Saturday) Upload Bending Test Apparatus drawing Upload 3 Point Testing Apparatus BOM Edit Nosecone pictures
Cut Foam Waterjet at Brinkman Lab
Waterjet is down (1-2 weeks) Jan and Rob
Alec (work on this weekend) Feasibility: Prototyping, Analysis, Simulation - Status Update
Tank Mounting Attachment Waiting on Meagan’s CAD model
Rough CFD Model Make sure dimensions are in English units In Fluent Talk to Kevin about 30 ft Diameter and 30’ x 60’ x 60’ box
Meshing Alex
Process for machining of nosecone tip
Verify the diameter of the tip and the actual nosecone and landing length (by 10/25) - Maybe move to Claire
Potential Machining Week 10 Beef up nosecone test plan
Claire Post nosecone tip drawing and tag Kevin Beef up 3-point test plan
Will have by Saturday meeting. Upload Bending Test Apparatus drawing to Drive
Working on drawings of test apparatus. Will have by Saturday meeting. Upload 3 Point Testing Apparatus BOM to Drive
Available in MSD SVN folder (Prelim Detailed Design -> 3-Point Bending Apparatus)
Already put up on EDGE page Make Tank mount adapters drawing (next week)
Waiting on Meagan
Goals - next week Drew be able to order tank mounting material Alec to be able to run enitial CFD Tony working on load path geometry Alex to machine nosecone tip
Questions for Full Team Meeting-Thermal expansion ratings
102518 Agenda In-Class
Brief announcements ME Shop/Brinkman Lab Overview (4435)
Directly after announcements - Sending Alex Potential “change” MSD Time
Update when everyone has scheduled classes 8am next semester (T,Th) Art said we can do 9am-12pm, 10am-1pm?
Overview of open actions EDGE Requirements for Preliminary Detailed Design
Feasibility: Prototyping, Analysis, Simulation Nose cone tip CFD - Alec Bulkhead attachment rings
3D Printed Drawings, Schematics, Flowcharts, Simulations Test Plans Designs and Flowcharts
Do Work
Meagan, Tony, and Alec work on load path geometry Trim down main assembly to min
Upcoming Schedule: Claire at interviews Thursday 10/25 and Friday 10/26 (Good Luck!) Group Meeting Saturday 10/27 at 4:30pm
o GLE-3149 Leads Meeting Sunday 10/28 at 8pm
o Alec (Yes), Tony (Maybe - has exam Monday), Claire (Yes), Alex (Maybe), Meagan (Yes - also has exam Monday), Drew (NO - Meeting 8-10)
Preliminary Design Review - Saturday 11/10o GLE-3149
Northeastern schedule comparison - ON HOLD Thanksgiving Break
o Most people gone Saturday 11/17 - Sunday 11/25o Call-in meeting to be scheduled
Break Between Semesterso Schedule meetings over break
Integration Weekend tentatively 3/30/19
Open Actions Meagan
Meeting scheduled with Dr. Lam Friday (tomorrow 10/26) 8-8:30am Invite Dr. Lam to last Saturday review
Will reach out to Dr. Boedo & Dr. Ghoneim tomorrow about Ansys (recommended by Dr. Ghosh)
Update CAD Put in grabcad Thicken Top and Dimensions-Saturday Check in full assembly for piping -Saturday
Material, Wall thickness, PSI, Temp for methane tank Bothering NE Seamless Tanks (http://seamlesstanks.com/) On Hold -try not welding
Engine Bulkhead Redesign Look for better thermal data - On Hold Look up reverting GrabCAD
Tony Start Load Path model Engine Bulkhead failure modes
Drew Purchasing
Need to order bulkhead attachment materials Waiting on Meagan Cryo rated gasket
o Needs to be tensile strength ratedo 3” Diametero Waiting for expansion numberso https://www.mcmaster.com/7549A11
o http://www.ppgaerospace.com/Products/Sealants/ Specialty-Products/PR-1665-Cryogenic-Adhesive.aspx
3 Point Bending Test Apparatus EDGE
Flesh out Gasket Benchmarking (Saturday) Upload Bending Test Apparatus drawing Edit Nosecone Pictures Make digital mesh image
Cut Foam Waterjet at Brinkman Lab
Alec (work on this weekend) Feasibility: Prototyping, Analysis, Simulation - Status Update
Tank Mounting Attachment Waiting on Meagan’s CAD model
Rough CFD Model Make sure dimensions are in English units In Fluent Talk to Kevin about 30 ft Diameter and 30’ x 60’ x 60’ box
Meshing Alex
Process for machining of nosecone tip Verify the diameter of the tip and the actual nosecone and landing length
(by 10/25) - Maybe move to Claire Potential Machining Week 10
Beef up nosecone test plan Claire
Post nosecone tip drawing and tag Kevin Beef up 3-point test plan
Will have by Saturday meeting. Upload Bending Test Apparatus drawing to Drive
Working on drawings of test apparatus. Will have by Saturday meeting. Upload 3 Point Testing Apparatus BOM to Drive
Available in MSD SVN folder (Prelim Detailed Design -> 3-Point Bending Apparatus)
Already put up on EDGE page Make Tank mount adapters drawing (next week)
Waiting on Meagan
Goals - next week Drew be able to order tank mounting material Alec to be able to run enitial CFD Tony working on load path geometry Alex to machine nosecone tip
102318 Agenda In-Class
Brief announcements
Overview of The Construct:policies, resources, etc. 11:15 AM GLE-4435 Technology Tryouts 1:00 PM GLE-4425 (Q&A session, pick up a handout at start
of class if interested) RAFFLE!
Meagan wins! Potential “change” MSD Time
8am next semester (T,Th) Updates from leads meeting:
Estimated Launch May 18th (may be pushed back) Use topic specific channels/ post more updates and pictures NE starting building VTS
Pics in #prop Looking into tracing profile of tank No deadline for accelerometer
Alec needs frequency range Posted slack
should we VTS and integrate If we have time great, if not oh well drives schedule difference between tanks and skins
or just dump cryo stuff without Have NE measure it?
Overview of open actions EDGE Requirements for Preliminary Detailed Design
Team Vision (Written by Claire) Feasibility: Prototyping, Analysis, Simulation
Nose cone tip -Alex Bulkhead attachment rings - Meagan
3D Printed Gasket - Drew CFD, Mesh - Alec
Drawings, Schematics, Flowcharts, Simulations -Meagan/Claire Bill of Materials Test Plans - Alex and Claire Designs and Flowcharts - Tony Risk Assessment
Do Work
Schedule:Next 4 weeks: Review tentatively November 10th
Northeastern schedule comparison - ON HOLD Final deadline of of March/April Testing? Semester Breakage (work slipping)?
o
Open Actions
Meagan
Update CAD
Put in grabcad
Thicken Top and Dimensions-Saturday
Check in full assembly for piping -Saturday
Material, Wall thickness, PSI, Temp for methane tank
Bothering NE
Seamless Tanks (http://seamlesstanks.com/)
On Hold -try not welding
Engine Bulkhead Redesign
Look for better thermal data - On Hold
Look up reverting GrabCAD
Tony
Finish CFD model
Spline or datum
Start Load Path model
Drew
Purchasing
Need to order bulkhead attachment materials
Cryo rated gasket
o Needs to be tensile strength rated
o 3” Diameter
o Need expansion rates
https://www.mcmaster.com/7549A11
http://www.ppgaerospace.com/Products/Sealants/Specialty-
Products/PR-1665-Cryogenic-Adhesive.aspx
Alec
Feasibility: Prototyping, Analysis, Simulation - Status Update
Tank Mounting Attachment
Waiting on Meagan’s CAD model
Rough CFD Model
Alex
Process for machining of nosecone tip
Verify the diameter of the tip and the actual nosecone
Look at risks, make necessary updates, upload to EDGE
Beef up nosecone test plan
Claire
Make nosecone tip drawing (10-23)
Edit drawing
Drop a link to Kevin when done
Edge (whenever)
Bending Test Apparatus drawing
Make Tank mount adapters drawing (next week)
Goals - next week
Drew be able to order tank mounting material
Alec to be able to run enitial CFD
Tony working on load path geometry
Alex to machine nosecone tip
101818 Agenda Kickoff lecture ~30 minutes
Overview of next phase Subject matter consultation Purchasing Use of engineering standards
Overview of open actions EDGE Requirements for Preliminary Detailed Design
Team Vision Feasibility: Prototyping, Analysis, Simulation
Nose cone tip Bulkhead attachment rings
3D Printed Drawings, Schematics, Flowcharts, Simulations Bill of Materials Test Plans Designs and Flowcharts Risk Assessment
Do Work
Schedule: Next 4 weeks: November 10th
Northeastern schedule comparison Final deadline of of March/April Testing? Semester Breakage (work slipping)?
Open Actions Meagan
Update CAD Put in grabcad Update weight -Thursday Thicken Top and Dimensions-Saturday Check in full assembly for piping -Saturday
Material, Wall thickness, PSI, Temp for methane tank Bothering NE Seamless Tanks (http://seamlesstanks.com/) On Hold -try not welding
Engine Bulkhead Redesign Look for better thermal data
Tony Finish CFD model
Spline or datum Start Load Path model
Drew Purchasing
Foam - ordered https://www.mcmaster.com/93265K48
Tender Descender Sheath - ordered https://fruitychutes.com/buyachute/recovery-tethers-line-cutters-c-
9/recovery-tether-sheath-p-52.html Need to order bulkhead attachment materials
Cryo rated gasketo Needs to be tensile strength ratedo 3” Diameter
https://www.mcmaster.com/7549A11 http://www.ppgaerospace.com/Products/Sealants/Specialty-
Products/PR-1665-Cryogenic-Adhesive.aspx Put BOM on EDGE Put nosecone pictures under prototyping
Alec Feasibility: Prototyping, Analysis, Simulation - Status Update
Tank Mounting Attachment Waiting on Meagan’s CAD model
Rough CFD Model Alex
Flush out test plan and upload to EDGE (for Tuesday) Nose cone stiffness
Process for machining of nosecone tip Lathe - Talk to machine shop (10/16) Verify the diameter of the tip and the actual nosecone
Look at risks, make necessary updates, upload to EDGE Claire
Make nosecone tip drawing (10-23) Edit drawing
Edge (whenever) Bending Test Apparatus drawing
Make Tank mount adapters drawing (next week)
Goals - next week Drew be able to order tank mounting material Alec to be able to run enitial CFD Tony working on load path geometry Alex to machine nosecone tip
101618 Agenda System Design Recap Sit-in on another system review? Yes - at 12:30 (wherever you want to go ;) ) Overview of open actions
EDGE Requirements for Preliminary Detailed Design Team Vision
Feasibility: Prototyping, Analysis, Simulation Nose cone tip Bulkhead attachment rings
3D Printed Drawings, Schematics, Flowcharts, Simulations
Detailed fabrication instructions for each unique part List of purchased parts
Bill of Materials Test Plans Designs and Flowcharts Risk Assessment
Do Work
System Design Review Recap
Weight difference comparison of both ideas
Cage Concern Gasket Number of Rods Plumbing Concerns Tolerance in rolled tank Securing one end at tank seal
Welding Concerns Braising temps Heat treat (reheat treat) 900 psi rating
Schedule: Next 4 weeks: November 10th
Northeastern schedule comparison Final deadline of of March/April Testing? Semester Breakage (work slipping)?
Open Actions Meagan
Update CAD Add screenshots under supplemental Put in grabcad Update weight -Thursday Thicken Top and Dimensions-Saturday Check in full assembly for piping -Saturday
Pic Showing interference Hand off drawings next week Link in slack
Bring in old nosecone To Alex Monday
Start compiling inputs for analysis (the ones that we already have) started
Searching for better thermal data Bothering NE
Temperature of material for skin analysis (material properties) On Hold -Waiting for more analysis details
Material, Wall thickness, PSI, Temp for methane tank Bothering NE Seamless Tanks (http://seamlesstanks.com/) On Hold -try not welding
Engine Bulkhead Redesign (next week) Find Failure method
Tony Finish CFD model
Spline or datum Start Load Path model
Drew Purchasing
Foam - ordered https://www.mcmaster.com/93265K48
Tender Descender Sheath - ordered https://fruitychutes.com/buyachute/recovery-tethers-line-cutters-c-
9/recovery-tether-sheath-p-52.html Aluminum - delivered Need to order wood from Home Depot for nose cone testing
Waiting on Alex On Hold until model
Need to order bulkhead attachment materials On hold until model
Upload BOM to Edge Look into gasket - Weird cryo adhesive from Kevin
http://www.ppgaerospace.com/Products/Sealants/Specialty-Products/PR-1665-Cryogenic-Adhesive.aspx
Updated Gantt chart to remove semesters Alec
Looking into meshing and determine loadpath Rough CFD Model Edge
“Update” risk (Thursday) Feasibility for tank mount
Alex Specing out materials for testing with potential cost (by Thursday) Flush out test plan for nosecone Process for machining of nosecone tip
Lathe - Talk to machine shop (10/16) Claire (all actions by (
Make nosecone tip drawing (thursday) Edge (whenever)
Team vision Bending Test Apparatus drawing
Make Tank mount adapters drawing (next week)
101118 Agenda
Key Dates: System Review
o Need to send link out to edge page by Friday noono Saturday 10/13/18 2pm - 3pm GLE 3149
Practice beforehand (@ 12:30pm!!) Peer evaluations afterwards Total time time commitment (12:30-3:30)
Meagan gone Oct 17-21st Claire gone Oct 11-12th, 24-25th Soft Requirement to go to a review next week
Agenda: In-Class
No Claire (flying out for interview - good luck, watch for hurricanes!) Overview of open actions from last meeting
Open Actions: Meagan
Send Art skype link Update CAD
Add screenshots under supplemental Put in grabcad Link in slack
Bring in old nosecone To Alex Monday
Start compiling inputs for analysis (the ones that we already have) started Searching for better thermal data Bothering NE
Temperature of material for skin analysis (material properties) Material, Wall thickness, PSI, Temp for methane tank
Waiting on CAD updates, will see if I can verify through customer website?
Bothering NE Seamless Tanks (http://seamlesstanks.com/)
Plans for Next Phase Review Thursday
Tony Update CFD File with new geometry
Lots of dimensions were wrong Contact Alec to see what he needs
Design and Flowcharts (for Thursday) Write blurb and do for two other components
Drew Add accelerometer pdf to Design review materials Add updated Wrike ‘screenshot’ (between Thursday and Systems Review) Upload Nosecone Feasibility to EDGE Remove system architecture text Purchase Tender Descender, Foam, and Aluminum
Order wood from Home Depot for nose cone testing Talk to MSD about Foam order (Thursday)
https://www.mcmaster.com/93265K48 Purchased
Order Tender Descender Sheath (Thursday) FruityChutes RT-L2
o https://fruitychutes.com/buyachute/recovery-tethers-line-cutters-c-9/recovery-tether-sheath-p-52.html
Tank Mounting Cage Rods (4) Aluminum
o What kind? Welded Ring for Tank Mounting (2)
Aluminumo What kind?
Ordered Nose Cone Tip Aluminum
o 6061o Bar stock - 6”o 1 1/4” Diametero https://www.mcmaster.com/1615t73
Alec Add accelerometer location Create Boundary for CFD (by Saturday) Feasibility: Prototyping, Analysis, Simulation - Status Update
Tank Mounting Attachment Waiting on Meagan’s CAD model
Send Accelerometer stuff and determine locations Waiting on VTS
Read through Northeastern Report by Tuesday Alex
Nosecone Stiffness Hand sketches - done Upload to drive
Drew to upload Specing out materials for testing with potential cost - by Thursday Process for machining of nosecone tip
Lathe - Talk to machine shop (by 10/16/18) Start process week of 16th
Systems Architecture Write blurb for EDGE (by Thursday)
Feasibility Upload to drive and write blurb (by Thursday)
Claire Get even more interviews!
First 3 WEEKS- October 4th Tank Mount CAD-Meagan Accelerometer Locations for Northeastern- Alec All MECE's learn ANSYS
o some Cross Section Model- Claire/Tony
o CAD needs to be updated Nosecone Tip CAD Verification- Tony Estimate Loads on Structure- Alec/Alex/Meagan
o Working on models, grouped info we have Tech Talk with Kevin (former GT Structures Lead)- Whole Team Continuous EDGE Updates- Drew Nosecone Stiffness Test Plan- Alex
100918 Agenda
Key Dates: Team Meeting
o Tuesday 10/09/18 6pm - 8pm Missing Alec (Excused - Informed Beforehand - A+ Work)
System Reviewo Need to send link out to edge page by Friday noono Saturday 10/13/18 2pm - 3pm GLE 3149
Practice beforehand (@ 12:30pm!!) Peer evaluations afterwards Total time time commitment (12:30-3:30)
Meagan gone Oct 17-21st Claire gone Oct 11-12th, 24-25th
Agenda: Overview of open actions from last meeting
Open Actions: Meagan
Bring Tip Thursday Work on tank mount CAD
Waiting for John to provide methane tank update (should be by 10/5) Need to verify
MAKE GRABCAD FOLDER -> RIT MSD (an airframe subfolder) Start compiling inputs for analysis (the ones that we already have) started
Searching for better thermal data Temperature of material for skin analysis (material properties)
Feasibility: Prototyping, Analysis, Simulation - Status Update Engine Bulkhead
Material, Wall thickness, PSI, Temp for methane tank Waiting on CAD updates, will see if I can verify through customer
website? Seamless Tanks (http://seamlesstanks.com/)
Need to bulk upload notes (by Friday) Plans for Next Phase (by Tuesday) Through Nov 10th
Update Gantt chart Machining Nosecone tip, setting up bending testing apparatus , Check
with Alec for analysis, run cfd, Measure stuff with calipers
Responded to Dr. Debartolo’s email about hazardous material (we have none)
Tony Update CFD File with new geometry
Tuesday by meeting (will let Alec know when done) Design and Flowcharts
Look at MyCourses or other EDGE pages Highlight components being designed by FAR-OUT JR
Drew Concept Development
Needs improved formatting Morphological Chart
Needs improved formatting Add BOM and Benchmarking to EDGE
In Google Drive Add pictures to benchmarking and write description Purchase Tender Descender, Foam, and Aluminum
Order wood from Home Depot for nose cone testing Foam
https://www.mcmaster.com/93265K48 Purchased
Order Tender Descender Sheath Fruitychutes RT-L2 (60 lbs. ?)
o https://fruitychutes.com/buyachute/recovery-tethers-line-cutters-c-9/recovery-tether-sheath-p-52.html
Tank Mounting Cage Rods (4) Aluminum
o What kind? Welded Ring for Tank Mounting (2)
Aluminumo What kind?
Nose Cone Tip Aluminum
o 6061o Bar stock - 6”o 1 1/4” Diametero https://www.mcmaster.com/1615t73
Create Budget sheet Alec
Learn more about Ansys and Fluent Create Boundary for CFD
Waiting on updated geometry from Tony Feasibility: Prototyping, Analysis, Simulation - Status Update
Tank Mounting Attachment Waiting on Meagan’s CAD model
Send Accelerometer stuff and determine locations Waiting on VTS
Read through Northeastern Report by Tuesday Alex
Nosecone Stiffness Hand sketches - done Upload to drive
Drew to upload Specing out materials for testing with potential cost - by Thursday Process for machining of nosecone tip (by Tuesday 10/16)
Lathe Systems Architecture (By Tuesday)
Will Review Thursday Feasibility
By Tuesday Talk with Dr. Ghoneim at 4pm 10/4
Look up nosecone from Public Missiles Claire
Feasibility: Prototyping, Analysis, Simulation - Status Update 3-Point Bending
Completed on EDGE Morph Chart
Remove text Redo image 3
Talk with Dr. Ghoneim at 4pm 10/4
NEXT 3 WEEKS- October 4th Tank Mount CAD-Meagan
o Reviewing Thursday Accelerometer Locations for Northeastern- Alec
o Reviewing Thursday All MECE's learn ANSYS
o some Cross Section Model- Claire/Tony
o CAD needs to be updated Nosecone Tip CAD Verification- Tony
o Good Estimate Loads on Structure- Alec/Alex/Meagan
o Working on models, grouped info we have Tech Talk with Kevin (former GT Structures Lead)- Whole Team
o Done Continuous EDGE Updates- Drew
o Doin’ fineeeeeee Nosecone Stiffness Test Plan- Alex
o Workin’
100418 Agenda
Key Dates: Team Meeting
o Tuesday 10/09/18 6pm - 8pm Missing Alec
System Review
o Saturday 10/13/18 2pm - 3pm GLE 3149
Agenda: In Class:
Work time Prepare for your SLDRs
Workin on it Overview of open actions from last meeting Investigate coming tasks (Wrike, EDGE, and MSD to-do’s)
Edge requirements for this section System Architecture - TBD Designs and Flowcharts -TBD
Updates from Leads Meeting: Have access to the Vertical Test Stand Folder Northeastern Needs to update full vehicle CAD (Deadline Mon 8th)
o CAD is currently incorrecto Need a list
Need to suggest accelerometers Mark (the PM) would like monthly full team meetings
Open Actions: Meagan
Work on tank mount CAD Waiting for John to provide methane tank update (should be by 10/5) Can’t make the option that mates with methane tank because tank CAD is
wrong… MAKE GRABCAD FOLDER
Start compiling inputs for analysis (the ones that we already have) started Searching for better thermal data
Temperature of material for skin analysis (material properties) Feasibility: Prototyping, Analysis, Simulation - Status Update
Engine Bulkhead Material, Wall thickness, PSI, Temp for methane tank
Waiting on CAD updates, will see if I can verify through customer website?
Seamless Tanks (http://seamlesstanks.com/) Need to bulk upload notes (by Friday) Check beam model by Boedo
Referred me to Dr. Ghoneim Plans for Next Phase (by Tuesday)
Update Gantt chart Machining Nosecone tip, setting up bending testing apparatus
Measure stuff with calipers Tony
Update CFD File with new geometry Tuesday by meeting (will let Alec know when done)
Design and Flowcharts Look at mycourses or other EDGE pages Highlight components being designed by FAR-OUT JR
Drew Concept Development
Needs improved formatting Morphological Chart
Needs improved formatting Add BOM and Benchmarking to EDGE
In Google Drive Add pictures to benchmarking and write description Purchase Tender Descender, Foam, and Aluminum
Order wood from Home Depot for nose cone testing Foam
https://www.mcmaster.com/93265K48 Purchased
Order Tender Descender Sheath Fruitychutes RT-L2 (60 lbs. ?)
o https://fruitychutes.com/buyachute/recovery-tethers-line-cutters-c-9/recovery-tether-sheath-p-52.html
Tank Mounting Cage Rods (4) Aluminum
o What kind? Welded Ring for Tank Mounting (2)
Aluminumo What kind?
Nose Cone Tip Aluminum
o 6061o Bar stocko 2” Diameter,
Create Budget sheet Alec
Create updated Risk Assessment - Done needs to be put on edge - Upload by Tuesday
Learn more about Ansys and Fluent Create Boundary for CFD
Waiting on updated geometry from Tony Feasibility: Prototyping, Analysis, Simulation - Status Update
Tank Mounting Attachment Waiting on Meagan’s CAD model
Send Accelerometer stuff and determine locations Waiting on VTS
Read through Northeastern Report by Tuesday Alex
Nosecone Stiffness Hand sketches - done Upload to drive
Drew to upload Specing out materials for testing with potential cost - by Thursday Process for machining of nosecone tip
Lathe
Systems Architecture By Tuesday
Feasibility By Tuesday
Talk with Dr. Ghoneim at 4pm 10/4 Look up nosecone from Public Missiles
Claire Feasibility: Prototyping, Analysis, Simulation - Status Update
3-Point Bending Completed on EDGE
Morph Chart Remove text Redo image 3
Talk with Dr. Ghoneim at 4pm 10/4
NEXT 3 WEEKS- October 4th Tank Mount CAD-Meagan
o Waiting on stuff Accelerometer Locations for Northeastern- Alec
o Waiting on stuff All MECE's learn ANSYS
o some Cross Section Model- Claire/Tony
o CAD needs to be updated Nosecone Tip CAD Verification- Tony
o Good Estimate Loads on Structure- Alec/Alex/Meagan
o Working on models, grouped info we have Tech Talk with Kevin (former GT Structures Lead)- Whole Team
o Done Continuous EDGE Updates- Drew
o Doin’ fineeeeeee Nosecone Stiffness Test Plan- Alex
o Workin’
10/02/18 Agenda
Key Dates: System Review
o 10/13/18 2pm-3pm Team Meeting
o 10/09/18 6-8pm
Agenda: In Class
Watch Systems Level Design Review Prep module (for class) Brief announcements Sign up for System Level Design Review (SLDR)
Must attend another team’s SLDR
By end of class (!!) Workshops
Team Purchasing - 11:30 am GLE 4435 2-3 days after tracking number says delivered to actually get to
MSD Contact Fruity Chutes to discuss NYS tax-exempt university [email protected] - Senior Design Lab Assistant email account
Help for Project Managers - 1:00 pm I/O Devices - 1:00 pm
Overview of open actions from last meeting Investigate coming tasks (Wrike, EDGE, and MSD to-do’s)
Edge requirements for this section Concept Development
Needs improved formatting (Drew) Morphological Chart
Needs improved formatting (Drew) System Architecture - TBD Designs and Flowcharts -TBD
Discuss and distribute inputs for analysis List of model inputs
- Simplified Load Path Geometry -- Solid Body Geometry- Fin Geometry- Material Properties- Fluid Properties- Temperatures
Updates from Leads Meeting: Have access to the Vertical Test Stand Folder Northeastern Needs to update full vehicle CAD (Deadline Mon 8th)
o CAD is currently incorrecto Need a list
Need to suggest accelerometers Mark (the PM) would like monthly full team meetings
Open Actions: Meagan
Work on tank mount CAD Can’t make the option that mates with methane tank because tank CAD is
wrong... Start compiling inputs for analysis (the ones that we already have) started Feasibility: Prototyping, Analysis, Simulation - Status Update
Engine Bulkhead Material, Wall thickness, PSI, Temp for methane tank
Waiting on CAD updates, will see if I can verify through customer website?
Need to bulk upload notes (by Friday) Check beam model by Boedo
Tony Verify external geometry
Download desktop application Check nosecone and boattail for Thursday
Drew Update Gantt chart
Updated, need to create new archived link Upload Standards documentation
Needs to be on EDGE Create BOM
In Google Drive (add to EDGE) Update customer name on EDGE
Updated Create Benchmarking off Kevin’s report (use bulkhead mounting)
Upload by Thursday Purchase Tender Descender, Foam, and Aluminum
Foam https://www.mcmaster.com/93265K48
Tender Descender Sheath Fruitychutes RT-L2 (60 lbs. ?)
o https://fruitychutes.com/buyachute/recovery-tethers-line-cutters-c-9/recovery-tether-sheath-p-52.html
Tank Mounting Cage Rods (4) Aluminum
o What kind? Welded Ring for Tank Mounting (2)
Aluminumo What kind?
Nose Cone Aluminum
o 6061 Create Budget sheet
Alec Create updated Risk Assessment - Done needs to be put on edge Learn more about Ansys and Fluent Create Boundary for CFD Feasibility: Prototyping, Analysis, Simulation - Status Update
Tank Mounting Attachment Send Accelerometer stuff and determine locations
Alex Nosecone Stiffness
Hand sketches Specing out materials for testing with potential cost - by Thursday Process for machining of nosecone tip
Claire Feasibility: Prototyping, Analysis, Simulation - Status Update
3-Point Bending
(Pulled from last term) NEXT 3 WEEKS- October 4th Tank Mount CAD-Meagan Accelerometer Locations for Northeastern- Alec
All MECE's learn ANSYS Cross Section Model- Claire/Tony Nosecone Tip CAD Verification- Tony Estimate Loads on Structure- Alec/Alex/Meagan Tech Talk with Kevin (former GT Structures Lead)- Whole Team Continuous EDGE Updates- Drew Nosecone Stiffness Test Plan- Alex
Tuesday Meeting -Edge Updated Needed
-Team Vision --Functional Decomp
-Remove text -Benchmarking -Drew-Concept Development
-Claire-Feasibility - Alex / Claire-Morph Chart
-Remove text -Redo image 3 -Claire
-Concept Selection -Drew to update
-Systems Architecture - Alex-Design and Flowcharts - Tony`-Risk Assessment -Alec -Design Review -Drew-Plans for Next Phase - Meagan
093018 Agenda-Tank mounting cad-Verify geometry-Feasibility doc
-Claire materials-Alex sketches
Actions that can be done next week: Find cryo rated foam from McMaster Carr (should be grey or black) -Drew
Waiting for next week’s purchasing meeting Nose cone tip material Economical Polyethylene Foam Insulation Sheets
Create Boundary for CFD Learn more about ansys and fluent -Alec Material, Wall thickness, PSI, Temp for methane tank -Meagan to ask John -Next week
5 in d 28 in l Cad model???? More at leads meeting
Question Kevin on how many foam rings are needed - Meagan ask in Slack -Next week 4 in total 2 sets of 2 in
Find material off list -DrewBuy:
Tank Mounting Cage Rods (4)o Aluminum
o What kind?o Vendor - McMaster Carr
Welded Ring for Tank Mounting (2)o Aluminum
o What kind?o Vendor - McMaster Carro ~7.5” Diameter, 4-6” Height
Nose Coneo Aluminumo Vendor - McMaster Carr
Tender Descender Sheatho Vendor - Fruitychutes
Foamo ~7.5” diameter circles
4 inches total - 2 sets of 2 incheso Vendor - McMaster Carr
Economical Polyethylene Foam Sheets 3’ x 4’ ; 1” thick; $37.18 Enough for ~24 circles
09272018 Thursday Team Agenda:
Key Dates: Meeting Sunday 30th 7-9pm 3149 System Review
Overview of open actions from last meeting Investigate coming tasks (wrike, EDGE, and MSD to-do’s) Discuss and distribute inputs for analysis
List of model inputs - Simplified Load Path Geometry -- Solid Body Geometry- Fin Geometry- Material Properties- Fluid Properties - Temperatures
Open Actions: Check Edge requirements for this section -Drew
Update customer name - Drew Benchmarking - Drew - off Kevin’s report - Can use bulkhead mounting (for
Sunday) Concept Development - TBD Feasibility: Prototyping, Analysis, Simulation - Status Update
Nosecone Stiffness (Alex) Hand sketches for Sunday
3-Point Bending (Claire)
Tank Mounting Attachment (Alec) Engine Bulkhead (Meagan)
Morphological Chart and Concept Selection (Uploaded) Systems Level Design Documents
System Architecture - TBD Designs and Flowcharts -TBD Updated Risk Assessment -Alec
Start compiling inputs for analysis (the ones that we already have) started -Meagan Saturday
DECIDED ENGLISH UNITS Work on tank mount CAD -Meagan - Sunday Update Gantt chart -Drew Sunday Standards documentation - Drew Verify nose cone geometry -Tony Thursday Verify external geometry -Tony Sunday BOM -Tony/Drew Thursday
Add what we have
Actions that can be done next week: Find cryo rated foam from McMaster Carr (should be grey or black) -Drew
Waiting for next week’s purchasing meeting Nose cone tip material Economical Polyethylene Foam Insulation Sheets
Create Boundary for CFD Learn more about ansys and fluent -Alec Material, Wall thickness, PSI, Temp for methane tank -Meagan to ask John -Next week
5 in d 28 in l Cad model???? More at leads meeting
Question Kevin on how many foam rings are needed - Meagan ask in Slack -Next week 4 in total 2 sets of 2 in
Find material off list -DrewBuy:
Tank Mounting Cage Rods (4)o Aluminum
o What kind?o Vendor - McMaster Carr
Welded Ring for Tank Mounting (2)o Aluminum
o What kind?o Vendor - McMaster Carro ~7.5” Diameter, 4-6” Height
Nose Coneo Aluminum
o 6061
o Vendor - McMaster Carr Tender Descender Sheath
o Vendor - Fruitychutes Foam
o ~7.5” diameter circles 4 inches total - 2 sets of 2 inches
o Vendor - McMaster Carr Economical Polyethylene Foam Sheets
3’ x 4’ ; 1” thick; $37.18 Enough for ~24 circles
092518 Tuesday Team Agenda:
Overview of open actions from last meeting Feasibility analysis Investigate coming tasks (wrike, EDGE, and MSD to-do’s) Component Level breakdown
Parts to be manufactured Parts to be analyzed System level breakdown of analysis
Discuss and distribute inputs for analysis List of model inputs
- Simplified Load Path Geometry -- Solid Body Geometry - Fin Geometry - Material Properties - Fluid Properties - Temperatures- FBD- Acceleration/Thrust/Velocity
Previous Open Actions: Find cryo rated foam from McMaster Carr (should be grey or black) -Drew
Nose cone tip material Economical Polyethylene Foam Insulation Sheets
Check Edge requirements for this section -Drew Functional Decomposition (To be uploaded) Benchmarking - Drew - off Kevin’s report - Can use bulkhead mounting Concept Development - TBD Feasibility: Prototyping, Analysis, Simulation - Work assigned today in class Morphological Chart and Concept Selection (to be uploaded)
Systems Level Design Documents System Architecture - TBD Designs and Flowcharts -TBD Updated Risk Assessment -Alec - Thursday
Start compiling inputs for analysis (the ones that we already have) -Meagan Saturday Work on tank mount CAD -Meagan (Working on this starting Tuesday because Exams :
(((( ) - Saturday Update documented morph table - Claire
Completed and saved to SVN folder - Systems Level Design Documents
Learn more about ansys and fluent -Alec can't continue until geometries are done Verify nose cone geometry -Tony Thursday Verify external geometry -Tony Saturday Material testing chart -Alex BOM -Tony/Drew Thursday Material, Wall thickness, PSI, Temp for methane tank -Meagan to ask John -Next week Question Kevin on how many foam rings are needed - Meagan ask in Slack -Next week
092218 AgendaSaturday Team Agenda:
System-level concepts selection Investigate coming tasks (wrike, EDGE, and MSD to-do’s) Component Level breakdown
Parts to be manufactured Parts to be analyzed System level breakdown of analysis
Discuss and distribute inputs for analysis List of model inputs
- Simplified Load Path Geometry -- Solid Body Geometry - Fin Geometry - Material Properties - Fluid Properties - Temperatures- FBD- Acceleration/Thrust/Velocity
Systems Concept (Engine Mount)
Saturday: design breakdown of potential tank mounts Create design matrix
092018 AgendaClass will consist of:
Brief Announcements Revisit/iterate on functional decomposition as necessary Discuss system-level concepts, and concept selection criteria. Full-time job search with Sarah Burke
Team Agenda: review/edit functional decomposition with Meagan and Drew included System-level concepts selection Investigate coming tasks (wrike, EDGE, and MSD to-do’s) Component Level breakdown (will be done saturday)
Parts to be manufactured Parts to be analyzed System level breakdown of analysis
Morphological Table Concatenate members 10 ideas to breakdown table
Distribute inputs for analysis List of model inputs
- Simplified Load Path Geometry -- Solid Body Geometry - Fin Geometry - Material Properties - Fluid Properties - Temperatures- FBD- Acceleration/Thrust/Velocity
Systems Concept (Engine Mount) Made drawings on whiteboard Saturday: design breakdown of potential tank mounts Create design matrix
Key Dates-Meet Friday at 6:30pm for foods and beverages (high importance!!) -Meet Saturday
Actions: Find cryo rated foam from McMaster Carr (should be grey or black) -Drew Check Edge requirements for this section -Drew Start compiling inputs for analysis (the ones that we already have) -Meagan Work on tank mount CAD -Meagan (Working on this starting Tuesday because Exams :
(((( ) Create agenda for saturday - Alex Create documented morph table - Claire Learn more about ansys and fluent -Alec Verify nose cone geometry -Tony Verify external geometry -Tony Material testing chart -Alex Y’ALL SLEEP - EVERYONE
091818 In Class Agenda:
Class will consist of: Brief Announcements Work through functional decomposition with team and Art - Claire
Initial functional decomposition diagram finished (picture will be put into Whiteboard Photos folder on the MSD Google Drive)
Art reviewed the initial functional diagram - Reword some of the blocks
Initial functional decomposition diagram drafted up into Google Drawings Review initial functional decomposition diagram on Thursday - 9/20
Review Peer Evals with Art Art didn’t need to go over the peer review Put peer review on public directory on project EDGE (Claire will do this by 9/20)
Other things to do:
Review Edge requirements for next phase and assign tasks including:
Functional Decomposition - Claire Initial functional decomposition diagram started in class Art reviewed initial diagram Review initial functional decomposition diagram on Thursday
Benchmarking Concept Development Feasibility: Prototyping, Analysis, Simulation Morphological Chart and Concept Selection Concept Selection System Architecture Designs and Flowcharts Updated Risk Assessment
Review Project requirements for next phase
Accelerometer Locations for Northeastern- Alec All MECE's learn ANSYS Cross Section Model- Claire/Tony Model simplification for analysis Nosecone Tip CAD Verification- Tony Estimate Loads on Structure- Alec/Alex/Meagan Continuous EDGE Updates- Drew Nosecone Stiffness Test Plan- Alex Tank Mount CAD-Meagan
Actions and To-dos -look into what is needed for Analysis
- List of analyses - Possible simplification of cad models - Model inputs needed
- Accel Locations - Still need Vertical test stand
- Stiffness of nosecone - Look at specs - define if average is sufficient
- Nosecone Tip Cad Verification - Tank Mount
- Touch base with Meagan on where this is at
List of model inputs - Simplified Load Path Geometry -- Solid Body Geometry - Fin Geometry - Material Properties - Fluid Properties - Temperatures- FBD- Acceleration/Thrust/Velocity
091618 Tech Talk with Kevin 2D analysis
o Reduce element count Change from 3D to 2D or 1D
List of analysis needed o Cross section view of rocket?
Stress distribution within rocket Way to do that within ANSYS or other post processing software ANSYS
o Solver and Mesher Tecplot
o https://www.tecplot.com/o Imports data from ANSYS results
Symmetry In final product, not every component will be placed exactly center Using this would be the last option, if all other options don’t pan
out Machining Bulkhead
o Does it require a 5-axis CNC? No Tank holding or engine bulkhead?
Tank bulkheado All made but need mounting setupo Need fiberglass washer
Bulkheads may reach 150 F - may need insulation Need to revisit GTech report
Engine bulkheado Need redesigned and remachined
Same footprint Radial holes need to bolt into bulkhead
Might need more material o This is FAR OUT Jrs responsibility
Prior concerns?o Manufacturing
Finishing tank mounting solution Revising the engine bulkhead
Uncertain design will survive launch
Missing fins Stability analysis near end of rocket build
o Stability is the difference between the center of gravity and the aerodynamic forces/pressures
Fin shapes decide where center of pressure goeso Easiest to changeo Small/short fins can reduce flutter
Rest of rocket hardware determines center of gravity Parachute Harness Engine bulkhead connecting to (other?) bulkhead rods
o 4 rods that need to be trimmed down at end Match Drilling - Drilling consistent bolt holes for bulkhead mounting
Will be a problem in Spring Drill holes while parts are assembled
o Recovery Ordered parachutes, ejection mechanisms, and Tender Descender The design requires both parachutes to be released from the same bay
Speed cannot be reduced too much during descent because cross breeze can cause the rocket to drift away
Drogue parachute drags out main parachute Pull tests
Tender Descender sheath needs to be purchased Link for sheath dropped in Airframe folder on Google Drive
091318 Agenda Run through edge
o Still need Team Values and Norms - Alex Planning and Schedule - Tony Meeting Notes - Meagan (Meagan got the notes into Word and Claire
linked it to EDGE) Design Review - TBD Planning Next Phase
Prep for Review on on Saturdayo Run through gantt chart and incorporate feedbacko Show up early at 10am Saturdayo Show Art how to use skype for business to connect into meeting (Meagan @
noon) Plans for Next Phase
o Subsystems Peer Review
o Can still talk about it on Saturday Self reflection first
Pros and Improvement Review GT Structures Report
o What do we want Kevin to go over? 2D analysis List of analysis needed
Take turns leading class meetings
o Who volunteers for Tuesday Drew -> Tony -> Alex -> Alec -> Claire -> Meagan
o Preps agenda and sends it out early and asks for inputo Talk about how it goes and incorporate feedback (learning experience :) )
Meeting with Dr. Lamo Try to Setup a meeting with her next week
McGreggors dinner next week?o Dinner/ Family Bonding
Meet at 6:30 on 9/21
Key Dates Launch Initiative Review Thur 09/12/18 Problem Definition Review Sat 9/15/18 11am EDT GLE 1139 Tech Talk with Kevin Sun 9/16/18 6:30pm GLE 3139
Actions: Post the edge link in #airframe so that other FAR OUT people can read it ahead of time-
Meagan Ask for test Stand -Alec Updated Use case with stakeholders- Claire Update Team Norms -Alex House of Q talk to Art - Drew Create powerpoint for review
o Agenda -Drewo Risks to note -Aleco ER and CR to note -Claire o Changed to plan - Meagan
091118 Agenda Reserve Room
o Drew - GLE 1139 Reserve a locker
o Claire Update Edge (a lot needs to be updated due Thursday by start of class)
o Sections Problem Definition Due
Team Vision (Done) Project Summary - Claire Project Background - Meagan Use Cases (Done) Project Goals and Key Deliverables
o Wording - Tonyo Gantt Chart - Meagan
Send link to Tony Customer Requirements - Claire Engineering Requirements - Claire
Constraints - Tonyo Per Structures Report
House of Quality - Drew Design Review Materials - TBD Plans for Next Phase - ALL
Planning & Execution Risk - Alec Team Values & Norms - Alex Intellectual - Drew Other Team Resources -Alec
o GLE 3149 Meeting Minutes, Notes, And & Actions
o Bulk upload as one documents- Meagan Communications - Alec
Presentationo Address mic issue
Alec - Test speaker Meagan Test Speaker
o Advice for Edge presentation Click on picture to enlarge Know what drives requirements Know dimensions Have Gantt chart assigned to people Are you supposed to go in depth with the requirements?
Just send ahead of time
Things to do-Agenda-Pre-read
-Present off of edge-Link Edge page to powerpoint
-Attend other design reviewThursday 09/11/18 P19103 @11:30
-Pear Eval-Sheet from Art
1. What did you do well2. What could you have done differently
-Risks
Saved for Thursday 09/11/18 Prep for Review on on Saturday Review GT Structures Report Post the edge link in #airframe so that other FAR OUT people can read it ahead of time
090818 Agenda
-Google docs magic thing---- not possible -Gantt????????
-can make “live” links aka snapshots in time-Solid Works -Ansys -Edge update -Design Review
Planning and Execution Problem Definition -Usecase-Customer Requirements -Engineering Requirements -Risks Management -Team Values and Norms -Communication
Agenda For Tuesday (09/11/18)-Reserve Room-Review GT Structures Report
-please have this read ahead of time
Other tasks before Review Powerpoint
090618 In Class Agenda
1. Key Datesa. General Worktimes Saturdays @ 4:30-6:30pm
i. This Saturday will be working on technical loginsb. Problem Definition Review Saturday 15th @ 11amc. Potential Tech Time with Kevin Sunday 16th @ 6:30pm
i. Needs to be confirmed2. Review/Update what’s needed on Edge
a. Customer requirementsb. Team Rolesc. Team Values/Norms
3. Prep for 3 week reviewa. Update CR and ER
4. Rough Agenda
a.
Risks:-Raw Stock damage -Manufacturing defect -Suppliers failure to meet delivery -Northeaster does not supply test data for vibrations as scheduled-Engine doesn't not fit in designed space -Analysis shows rocket design will fail -Design is not able to be manufactured-Loss of funding/exceeding funding -Damage during testing -Project transportation -Injury during build-Injury during flight -Loss of other teams support -Error in analysis leading to structural failure
Next Meeting:
Agenda:-Google docs magic thing---- not possible -Gannt????????-Solid Works -Ansys -Design Review -Edge update
090418 In Class Agenda1. Pick Team Name
a. Team Rocket 1,2,3,3 ,2= (11)b. Team Relatively closec. Far Out Jr 2, 3,2,2,3 = (12)d. Getting Highe. Flying High 3,2,1,1 = (7)f. Structurally Sound?1 = (1)g. Richie’s Rocketsh. RIT Rocketsi. RIT Rockettes 1 = (1) j. Liquid Meltdown 3,1 = (4)
2. Team Values/ Norms
Value 5 1
Be a reasonable Bring donuts to meetings, or lunch on Growl at other members,
human being :) occasion. Help out team members where you can. Remembers personal hygiene...
talks over others
Punctual You’re at the designated meeting spot by the agreed upon time. Communicate if you’re going to be late or miss a meeting.
Where you at?
Good Communication
CHECK SLACK! Give warning if you have to miss meetings, effectively share ideas and work. Speak up if you’re having trouble with something. Be direct.
F*** you (thank you for communicating) :). Real passive
Being Prepared Work completed, notes/questions prepared, has a pencil/pen. Please bring laptop.
Shows up without donuts/necessary materials for meetings
Reliable Getting your work done in a timely manner. Whats work?
Respectful! Allow everyone's opinions to be heard and considered.
F*** you (we appreciate your opinion) :)
3. Team Visiona. Share IP equally.
4. Team Rolesa. Done!
5. Pick outside meeting time from the when2meeta. Options
i. 4:30 - 6:30 Saturdays 1. -Thur Problem Definition 2. -Sat This week Tech Night 4:30 pm 3. -Tue-Thur Week 2 Review Kevins Document 4. -Sunday- Week 2 Kevin Tech night 6:30pm
b. Make a list of times people will be gonei. Drew - End of September
ii. Meagan - Oct 17-21iii. Claire - This weekendiv. Tony - September 29th (possibility)v. Alex -
6. Pick tech time with Kevina. Moved to maybe 2 weeks out - 6:30 Sunday 16th
7. Discuss Competitiona. Per the discussion at the leads meeting Sunday. We’re thinking that we won’t
make the competition deadline but would like to launch in May. Would like to discuss everyone’s thoughts on this.
8. Debrief about Saturday’s Design Reviewa. Where accelerometers will be placed
9. Review Customer Requirements Questions10. Key times
a. Problem definition Review Saturday 15th at 11am
090118 Vertical Test Stand Design Review Specs
o ~11 ft tall Tank Fit Up info
o ¼” holes for the mounting o Recessed on one side
Mounting plateso Look into removing bottom plate below engine
Or if keeping plate need a large clearance Data Collection
o Accelerometer needs to be purchased by northeastern Would like multiple accelerometers
Min 2 because it’s a noisy sensor Could try for vibrations at joints
o Load cell One purchased and one to buy by northeastern Issues with positioning because needs to be thru holes relatively close
Stand designo Are we sealing off electronics?
COTS box and clear coat (ie nail polish) Testing
o Failure analysis for leak testing Fails under what load
o Sealing with kcl Kcl vs npt
o Order min 3 tanks (have one ported with potentially npt) Almost if not identical to the seamless Keep one as backup
o Proof to leak check Do not change configuration
Further Design o bulkhead / tank adapter design
Change part of the loadpath o Use a teflon O-ring seal (ie cryo seals)
Proof of concept by chilling and crushing/pressing