EDF R&D NEW TEST BENCH FOR LIQUID INDUSTRIAL FLOWMETER CALIBRATION FLOMEKO 2019 The 18th International Flow Measurement Conference 26-28 June 2019 | Lisbon, Portugal E. Thibert, S. Blairon, D. Boldo, E. Nanteau, J. Veau EDF R&D, 6 quai Watier, BP49, 78401 Chatou Cedex, France E-mail (corresponding author): [email protected]

EDF R&D NEW TEST BENCH FOR LIQUID INDUSTRIAL …flomeko2019.lnec.pt/proceedings/1029 Emmanuel Thibert.pdfTitre de la présentation | mm/aaaa | 4 FRANCE Île-de-France EDF Lab Chatou

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EDF R&D NEW TEST BENCH FOR LIQUID INDUSTRIAL …flomeko2019.lnec.pt/proceedings/1029 Emmanuel Thibert.pdfTitre de la présentation | mm/aaaa | 4 FRANCE Île-de-France EDF Lab Chatou

EDF R&D NEW TEST BENCH FOR LIQUID INDUSTRIAL

FLOWMETER CALIBRATION

FLOMEKO 2019The 18th International Flow Measurement

Conference

26-28 June 2019 | Lisbon, Portugal

E. Thibert, S. Blairon, D. Boldo, E. Nanteau, J. Veau

EDF R&D, 6 quai Watier, BP49, 78401 Chatou Cedex, FranceE-mail (corresponding author): [email protected]

Page 2: EDF R&D NEW TEST BENCH FOR LIQUID INDUSTRIAL …flomeko2019.lnec.pt/proceedings/1029 Emmanuel Thibert.pdfTitre de la présentation | mm/aaaa | 4 FRANCE Île-de-France EDF Lab Chatou

| 2

PRESENTATION OUTLINE

1. EDF R&D OVERVIEW

2. FLOWMETER CALIBRATION ISSUES FOR EDF

3. THE NEW EVEREST LOOP GLOBAL DESIGN

4. MONT-BLANC TEST BENCH LAYOUT AND PURPOSE

5. CONCLUSION AND PERSPECTIVES

Page 3: EDF R&D NEW TEST BENCH FOR LIQUID INDUSTRIAL …flomeko2019.lnec.pt/proceedings/1029 Emmanuel Thibert.pdfTitre de la présentation | mm/aaaa | 4 FRANCE Île-de-France EDF Lab Chatou

| 3

R&D THROUGHOUTTHE WORLDWith 3 centres in France and 6 abroad, EDF conducts research both nationally and at international level

EDF Research & Development1900 employees in France225 employees outside France

Page 4: EDF R&D NEW TEST BENCH FOR LIQUID INDUSTRIAL …flomeko2019.lnec.pt/proceedings/1029 Emmanuel Thibert.pdfTitre de la présentation | mm/aaaa | 4 FRANCE Île-de-France EDF Lab Chatou

| 4Titre de la présentation | mm/aaaa

FRANCEÎle-de-France

EDF Lab Chatou

A FEW FIGURES

EDF Lab Chatou is a long-established R&D site with cutting-edge expertise in hydraulics, renewable energies, nuclear power and environment.

� 13 hectares

� 61,000 m² of testing rooms

� More than 500 workstations

� 3 research departments

Page 5: EDF R&D NEW TEST BENCH FOR LIQUID INDUSTRIAL …flomeko2019.lnec.pt/proceedings/1029 Emmanuel Thibert.pdfTitre de la présentation | mm/aaaa | 4 FRANCE Île-de-France EDF Lab Chatou

| 5

INDUSTRIAL FLOWMETER CALIBRATIONS AT EDF R&D

A EDF R&D calibration test bench for- assessing flowmeters metrological behaviour in semi real industrial conditions

prior to on-site installations- testing innovative flowmeters metrological performance- providing experimental data to validate Computational Fluids Dynamics (CFD)

software in liquid industrial pipe flow configurations

An original design concept of EVEREST (1997) with two main objectives:

- to duplicate the behaviour of an industrial liquid pipe flow process as closely as possible

- to generate an accurate and steady reference flow rate

Page 6: EDF R&D NEW TEST BENCH FOR LIQUID INDUSTRIAL …flomeko2019.lnec.pt/proceedings/1029 Emmanuel Thibert.pdfTitre de la présentation | mm/aaaa | 4 FRANCE Île-de-France EDF Lab Chatou

| 6

EVEREST (1997-2017) limitations- reference flow rate uncertainties need an upgrade

� 0,3%-0,5% is no longer relevant for current R&D investigations- increase of bench maintenance costs due to ageing piping

� no stainless steel pipe in the operation section- new environmental challenges

� to decrease test benches environmental impact by efficiently managing water consumption

⇒ a complete revamping of the EVEREST test bench is needed

INDUSTRIAL FLOW METER CALIBRATIONS AT EDF R&D

Page 7: EDF R&D NEW TEST BENCH FOR LIQUID INDUSTRIAL …flomeko2019.lnec.pt/proceedings/1029 Emmanuel Thibert.pdfTitre de la présentation | mm/aaaa | 4 FRANCE Île-de-France EDF Lab Chatou

| 7

THE NEW EVEREST LOOP GLOBAL DESIGN(S)

Two objectives: - to maintain the specificity of the previous version

� generation of a steady liquid flow rate for test/calibration purposes in a semi-industrial scale

- to add new features such as� increasing the accuracy of flowmeter calibrations� providing tools for liquid velocity profile characterisation for realistic

pipe flow configurations� efficiently managing of the experimental loop environmental impact

⇒ These objectives have been achieved in 2019 with not one but two test benches:

� EVEREST (version 2019)

� MONT-BLANC (small version of EVEREST for velocity measurements (and calibration too!)

Page 8: EDF R&D NEW TEST BENCH FOR LIQUID INDUSTRIAL …flomeko2019.lnec.pt/proceedings/1029 Emmanuel Thibert.pdfTitre de la présentation | mm/aaaa | 4 FRANCE Île-de-France EDF Lab Chatou

| 8

EVEREST (2019): GLOBAL DESIGN

Page 9: EDF R&D NEW TEST BENCH FOR LIQUID INDUSTRIAL …flomeko2019.lnec.pt/proceedings/1029 Emmanuel Thibert.pdfTitre de la présentation | mm/aaaa | 4 FRANCE Île-de-France EDF Lab Chatou

| 9

EVEREST (2019): REFERENCE SECTION

Page 10: EDF R&D NEW TEST BENCH FOR LIQUID INDUSTRIAL …flomeko2019.lnec.pt/proceedings/1029 Emmanuel Thibert.pdfTitre de la présentation | mm/aaaa | 4 FRANCE Île-de-France EDF Lab Chatou

| 10

EVEREST (2019): MODULAR TEST SECTION

Page 11: EDF R&D NEW TEST BENCH FOR LIQUID INDUSTRIAL …flomeko2019.lnec.pt/proceedings/1029 Emmanuel Thibert.pdfTitre de la présentation | mm/aaaa | 4 FRANCE Île-de-France EDF Lab Chatou

| 11

MONT-BLANC LOOP: FOR EASIER VELOCITYPROFILE MEASUREMENTS IN PIPES

Prime Features DetailsCalibration test type Closed regulated loop

Flow meter reference Coriolis master meterTest section pipe size From DN40 up to DN150

Pipe compositions Stainless steelFluid Tap liquid water

Pressure range From 1 up to 8 barFluid temperature range From 23.5°C up to 24.5°C

Environment Temperature ambient temperature is regulated near 20°C

Flow rate range From 13 m3.h-1 up to150 m3.h-1

Flow metering uncertainty 0.1% (volume flow rate)

Two main purposes: - to investigate flowmeters uncertainties under low flow rates

� from 13 m3/h up to 150 m3/h- to prepare and adjust velocity measurement systems prior to any experimental

campaigns on EVEREST� smaller pipe size for better laser-based velocity measurements all over the

inner pipe diameter� easier management of pipe configuration setting changes

Page 12: EDF R&D NEW TEST BENCH FOR LIQUID INDUSTRIAL …flomeko2019.lnec.pt/proceedings/1029 Emmanuel Thibert.pdfTitre de la présentation | mm/aaaa | 4 FRANCE Île-de-France EDF Lab Chatou

| 12

MONT-BLANC LOOP: FOR EASIER VELOCITYPROFILE MEASUREMENTS IN PIPES

Page 13: EDF R&D NEW TEST BENCH FOR LIQUID INDUSTRIAL …flomeko2019.lnec.pt/proceedings/1029 Emmanuel Thibert.pdfTitre de la présentation | mm/aaaa | 4 FRANCE Île-de-France EDF Lab Chatou

| 13

EDF R&D has upgraded its flow rate experimental tools:

� EVEREST loop for industrial flowmeter uncertainty investigation under a realistic semi-industrial environment

� MONT-BLANC to characterise velocity profile of flows in any industrial pipes configurations

The next steps:

� to achieve an official recognition for our know-how through ISO17025 accreditation (by COFRAC : the French accreditation committee)

� to perform flow velocity measurements in circular pipe settings with a 3D3C PIV system

CONCLUSION

Page 14: EDF R&D NEW TEST BENCH FOR LIQUID INDUSTRIAL …flomeko2019.lnec.pt/proceedings/1029 Emmanuel Thibert.pdfTitre de la présentation | mm/aaaa | 4 FRANCE Île-de-France EDF Lab Chatou

Thank you for your attention