ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 2: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Digital IndustryOverall SRA Process

2

Dec ‘17 Jan ‘18Aug ‘17 Sep ‘17Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Nov ‘17Oct ‘17

Outline & teams definition

First draft

Second draft

for comments

by community

Final version

Team, half page & « Game Changers » description

V1 – Majorchallengesidentified

V3 – For review by assoc.mgtbodies

V2 – For review by assoc. expert councils.Topic & Major Challenges

V5 – Finaldraft for review by assoc.mgtbodies

Finalversion

May 4Kick-off

Dec 5-6EFECSWorkshopsDec 7th Core team& chaptersleaders

April 19Core team1st meeting

June 9Core team& chapterleaders

July 4Core team& chapterleaders

Sep 7Core team& chapterleaders

Oct 12Core team& chapterleaders

Beg Nov.(no mtg)

Dec 18(no mtgExcept if needed)

End Jan(no mtg)

July 18Coreteam

Aug 25Coreteam

Sep 29Coreteam

Oct 18Coreteam

V4 – Publiclyavailablefor comments+ PreliminaryinputTo ECSEL MASP

Nov 20Core team+ comm.

Over 250 expertsacross core team + 10 chapter teams

Page 3: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Digital IndustryOverall SRA structure

3

Page 4: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Digital IndustryChapter contributors

First Name Last Name Organization Country

Oscar Carlsson Midroc SE

Jon Kepa Gerrikagoitia IDEKO ES

Knut Hufeld Infineon Technologies DE

Miren Illarramendi Mondragon ES

Ove Jansson Ableko SE

Mika Karaila Valmet FI

Petter Kyösti LTU SE

John Lindström ProcessIT SE

Rob Meier DSM NL

Jan Nyqvist ABB SE

Roberto Uribeetxeberria Mondragon ES

Olli Ventä VTT FI

Martin Winter SusChem BE

4

Page 5: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Digital IndustryRelevance

• Digital Industry will require new applications and methods to get current factories work at the maximal flexibility & efficiency and optimized production level. As there will be less workers they should get more information.

• The only way to support information flow is to use new innovations and integrate them to normal work flow. This means that user should have access to information as he/she needs it.

• This kind of easy access requires still security and a lot back-end server capacity to process information ready to be used. Optimal system will setup itself according the designed and installed system.

• This means we should have self-organizing intelligence at the factory level.

• Disruption can happen as wireless sensors and new field connectivity solutions are needed with industrial internet. Cloud based network and integration will change value chain. One challenge is to use this kind of network fast and dynamic way.

5

Page 6: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Digital IndustryMajor Challenges

1. Developing digital twins, simulation models for the evaluation of industrial assets at all factory levels and over system or product life-cycles;

2. Implementing AI and machine learning, to detect anomalies or similarities and to optimize parameters;

3. Generalizing conditions monitoring, to pre-warn before damages and to help on-line decision-making;

4. Developing digital platforms, application development frameworks that integrate sensors and systems.

6

Page 7: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Digital IndustryGame Changers

Technological New Paradigms

• Advances in computing: Facing a new software complexity

• Increased connectivity

• Heterogeneous integration / comprehensive smart miniaturisedsystems

• Additive manufacturing / 3D printing

• Micro Nano Bio Systems (MNBS)

Business Model & Societal New Paradigms

• Everything as a Service

• Faster and shorter innovation cycles

• New transaction mechanisms for improved trust and security: Blockchain

• Virtual networked enterprise

• Vertical Integration & leadership

• When Consumers become prosumers

Page 8: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Digital IndustryCompared to wider scope

Condition monitoringCondition monitoring

AI & Machine learning

Digital platforms

Page 9: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Digital IndustryAreas for R&D&I for the Challenges

• Simulation• Multi-domain, tools-connected, simulation-based design

• Tracking mode simulation, model adaption based on measurements

• Artificial Intelligence• automated design features, technologies to connect intelligence

• High TRL level analysis, prediction and optimization, decision support

• Digital platforms• Move focus on the industrial or engineering applications. Engineering tools.

• High level, outperforming applications and systems, for the actual industrial and business needs

• Prepare for the era of 5G in communication technology, and especially its manufacturing and engineering dimension

• Interoperability cross platforms

• Solve the cyber-security problems.• Only safe, secure, and trusted platforms are accepted and survive in industry.

Page 10: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Digital IndustryExpected achievements

• Industrial cases, solution examples, state of art technology• Agile projects, from fast prototypes to real use case solution

• Machine learning & AI integrated to solve problems and guide user• Existing platforms and algorithms

• Show with real examples how to use these

• Digital platforms used to integrate new sensors (wirelessly) and new applications• Digital twins helping in simulation & condition monitoring

• Condition monitoring with machine learning & AI

Page 11: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Digital IndustryExpected achievements

Next some examples

The current state of new technology

Page 12: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Digital IndustryAWS DeepLens

Page 13: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Digital IndustryVarjo headset: https://www.varjo.com/

Page 14: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Digital IndustryXR in Industry

Wearables & collaborationAvatars for presenceNon player character (NPC) for Valmet Virtual Expert (AI)

Page 15: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Digital IndustryConnecting real/simulated world to VR

Animated Domain objects with real-time valuesContext menu links for back end servers

Page 16: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Digital IndustryNext generation connectivity

NB-IOT proto-type:New connectivity for old and new sensors

Antenna

Modem + MCU

Page 17: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Digital IndustryTime Frame

• From NB-IOT 2018-2019 connectivity to real 5G 2020• New connectivity, providing more information from old & new devices

• Condition monitoring applications on cloud• 2018 as connectivity provide new way to store data• 2018-2019 Machine learning algorithms running and detecting, also on Edge level• 2020 AI based reasoning as expert

• Digital twins• 2018 Building models based on new data • 2019 Connecting these to machine learning

• Digital platfroms used to connect all above and providing building blocks and glue• 2018 prototypes and API OPS ways to connect platforms & clouds• 2019 Meta platform that can use YAML/JSON descriptions programmatic online integration and

interoperability

Page 18: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Digital IndustryThe floor is yours!

• Questions?

• Feedback?

• Inputs?

18

Page 19: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Digital IndustryFeedback and inputs

• <Item 1>

• <Item 2>

• <Item 3>

19

Page 20: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Research Funding instrument landscape

NATIONAL

Develop & Maintain

Critical Mass

National contract

EUREKA

Multi Trans-National

Programmes

National Priorities

National contract

H2020

Innovation & Infrastructure

European Priorities

EC contract

ECSEL-JU

ECS Programmes

National & European

Priorities

EC contract & National

contract

NATIONAL CROSS BORDER COOPERATION

NATIONAL FUNDINGEUROPEAN FUNDING

Page 21: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Digital IndustryPitched ideas

21

Idea Name Presenter Organization Grand Challenge

Arrowhead Tools Jerker Delsing Lulea University of Technology Connectivity and Interoperability

Cyril - Cyber ecosYstems of modulaR dynamIcpLatform technologies

Carl Gisleskog MS&L ComTech Digital platform

SOS4ALL - Accessible communication for all citizens for disaster and emergency risk management

Pilar Orero Universitat Autonoma de Barcelona

Jon Legarda Macon Universidad de Deusto

Han Zwijnenberg DAT.Mobility BV

Wolfgang Buchholtz Global Foundries

Loreto Mateu Fraunhofer IIS

SunRISE Christopher Nigischer NXP Machine learning

Page 22: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Funding instruments present at EFECS

• ECSEL JU (with AENEAS, ARTEMIS-IA, EPoSS)• 2018 call will open ***

• EUREKA programmes• Eurostars

• Call open, cut off date March 1st, 2018

• EURIPIDES²• Spring call 2018 PO deadline March 12th 2018

• ITEA3• Call 4 closing date February 15th 2018

• PENTA• Call 3 opens December 5th, 2017, deadline for PO February 13th, 2017

• SMART Manufacturing• Call 1 opens December 11th, 2017, deadline for PO March 9th 2018

• EUROGIA2020• Call closure February 22nd, 2018

• CELTIC-PLUS• Call closure April 23rd, 2018

• H2020

22

EUREKA Clusters

Page 23: ECS-SRA Digital Industry...Digital Industry Overall SRA Process 2 Apr ‘17 May ‘17 Jun ‘17 Jul ‘17 Aug ‘17 Sep ‘17 Oct ‘17 Nov ‘17 Dec ‘17 Jan ‘18 Outline & teams

Digital IndustryContact Information

23

Olli Ventä[email protected]

Mika KarailaValmet [email protected]

Knut [email protected]