Page 1: ECP 11-0218 DC Supplies and Common Services …library.ukpowernetworks.co.uk/library/asset/30c25bfb-b41... · Web viewAdvise Commissioning Engineer if any drying out required Check

THIS

IS A

N U

NC

ON

TRO

LLED

DO

CU

MEN

T, T

HE

REA

DER

MU

ST C

ON

FIR

M IT

S VA

LID

ITY

BEF

OR

E U

SE

Document Number: ECP 11-0218

Version: 3.0

Date: 30/01/2017

DC SUPPLIES AND COMMON SERVICES TEST FORM

Substation Name

Substation Number

Circuit

Batteries

Purpose Manufacturer Cell Reference

Nominal Voltage (V)

No of Cells

Capacity (Ah)

Close trip and alarm

Telecontrol

Intertrip

LOPI

Battery Chargers

Purpose Manufacturer Type Serial Number Output

Float Boost

A V A V

Close trip and alarm

Telecontrol

Intertrip

LOPI

LV Auxiliary Supply Fail Relay

Manufacturer Type Phases Voltage

Fire Equipment

Manufacturer Type Number of Cylinders Number of Sections

Commissioning Tests

Commissioning shall follow the stages listed below. All detailed test results shall be recorded on the sheets provided at the rear of this Schedule.

Where battery commissioning is carried out by the Battery/Charger Contractor, the tests shall be based on the requirements of this Schedule but may follow the Contractor's procedures.

Page 2: ECP 11-0218 DC Supplies and Common Services …library.ukpowernetworks.co.uk/library/asset/30c25bfb-b41... · Web viewAdvise Commissioning Engineer if any drying out required Check

THIS

IS A

N U

NC

ON

TRO

LLED

DO

CU

MEN

T, T

HE

REA

DER

MU

ST C

ON

FIR

M IT

S VA

LID

ITY

BEF

OR

E U

SE

Document Number: ECP 11-0218

Version: 3.0

Date: 30/01/2017

Stage 1 – After Erection of Battery, Charger and Switchboard and Connection of AC Supply to Charger, but Before Equipment is Required for Use

Objective - to ensure erection is carried out satisfactorily and that working equipment is available for Stage 2 tests; also to maintain the battery charge level until required for service.

()

Check erection of battery, charger and switchboard and interconnection of same

Measure and record individual cell terminal voltages and specific gravities (where appropriate) of battery 'as received', before charger is connected and switched on

Check presence and value of all fuses

Check insulation to earth of battery connections, using 1000V megger

Check insulation to earth of charger and switchboard, using 1000V megger. Advise Commissioning Engineer if any drying out required

Check AC supply fuse and connections to Charger, and that correct supply is available

Check that Charger operates normally in both 'float' and 'boost' outputs. Record 'float' and 'boost' charger voltages and currents. (This does not necessitate carrying out the functional tests required in stage 2.)

At the end of these tests the charger is to be left in the 'Float' position with an AC supply on

Note: If it is not practicable to maintain the Battery on continuous float charge between stages 1 and 2, agreement shall be reached with the Battery Manufacturer on the procedure to be adopted.

No discharge shall be taken from the battery prior to Stage 2.

Page 3: ECP 11-0218 DC Supplies and Common Services …library.ukpowernetworks.co.uk/library/asset/30c25bfb-b41... · Web viewAdvise Commissioning Engineer if any drying out required Check

DC Supplies and Common Services Test Form Document Number: ECP 11-0218

Version: 3.0

Date: 30/01/2017

Stage 2 - When DC Supply System is Complete and Immediately Prior to Placing into Service

()

Ensure that the battery is in a charged condition prior to commencement of tests. This can be checked by reading the specific gravity of electrolyte in one cell, or for sealed cells, by reading the terminal voltage with charger 'off' and no load

Repeat Stage 1 test (5), unless Stages 1 and 2 are carried out concurrently when there will be no necessity to repeat

(For Plante cells only) Top up battery, if necessary, with distilled water. De-mineralised water may be used subject to approval by the battery manufacturer

Connect load equivalent to approximately 50% of charger rating and, with charger switched off, check that battery discharges correctly into it (instrument polarities correct, etc.) also that low voltage alarm relay operates. Discharge need not exceed 10-15 minutes

Switch charger on and to 'float'. Check charger attains full rated output (this rate may last for a short time only if Battery is in a fully charged condition) and that current-limit feature operates

Switch charger to 'boost' and, with load still connected, check that full rated output is obtainable. Note that maximum charger output may only persist for a short time before tapering down

Note, for sealed gas recombination cells, 'boost' charging must be kept to the minimum period

Switch charger back to 'float' position and, with load still connected, check that DC standing voltage is within limits required by the specification. Remove load, and check that voltage remains within limit

The correct 'float' voltage is carefully set-up and locked during test at the charger manufacturer's works, and should not normally require adjustment on-site

Check operating voltage of low voltage, charger fail (abnormal) and high voltage alarm relays. Record values on forms attached.

Check operation of earth fault detector by connecting each pole of the system to earth in turn, via a 47k resistor

(For Plante cells only) Disconnect load, switch charger to 'boost', and continue until battery is fully charged. Then record specific gravity and voltage of each cell (with charging current still flowing)

(For all cell designs) Switch charger to 'float' and leave. It is important that an AC supply to the charger shall be maintained continuously from this point onwards, and the charger left in the 'float' position in order to keep the battery fully charged. Record all cell or monoblock terminal voltages on the form attached

Note, on some chargers the 'float' output may be labelled 'normal', whilst the 'boost' output may be selected on some by means of change over links inside, and on others by means of a switch either on the front or inside

Test operation of substation auxiliary supply fail relay, by reducing each phase input voltage in turn, and record operating voltages.

Check operation of telecontrol Alarm

Test operation of fire Protection equipment telecontrol alarm (where fitted)

© UK Power Networks 2017 All rights reserved 3 of 12

Page 4: ECP 11-0218 DC Supplies and Common Services …library.ukpowernetworks.co.uk/library/asset/30c25bfb-b41... · Web viewAdvise Commissioning Engineer if any drying out required Check

DC Supplies and Common Services Test Form Document Number: ECP 11-0218

Version: 3.0

Date: 30/01/2017

Type Purpose Date

Cell Temperature C Cell Temperature C

SG Correction Factor SG Correction Factor

BATTERY AS-RECEIVED BATTERY AS-RECEIVED

Cell SG V Cell SG V Cell SG V Cell SG V1 31 1 312 32 2 323 33 3 334 34 4 345 35 5 356 36 6 367 37 7 378 38 8 389 39 9 3910 40 10 4011 41 11 4112 42 12 4213 43 13 4314 44 14 4415 45 15 4516 46 16 4617 47 17 4718 48 18 4819 49 19 4920 50 20 5021 51 21 5122 52 22 5223 53 23 5324 54 24 5425 55 25 5526 56 26 5627 57 27 5728 58 28 5829 59 29 5930 60 30 60

Initial charger checks

Check battery polarity ()

Switch charger to float, check output A V

Switch charger to boost, check output A V

© UK Power Networks 2017 All rights reserved 4 of 12

Page 5: ECP 11-0218 DC Supplies and Common Services …library.ukpowernetworks.co.uk/library/asset/30c25bfb-b41... · Web viewAdvise Commissioning Engineer if any drying out required Check

DC Supplies and Common Services Test Form Document Number: ECP 11-0218

Version: 3.0

Date: 30/01/2017

Type Purpose Date

Cell Temperature C Cell Temperature C

SG Correction Factor SG Correction Factor

BATTERY AS-RECEIVED BATTERY AS-RECEIVED

Cell SG V Cell SG V Cell SG V Cell SG V1 31 1 312 32 2 323 33 3 334 34 4 345 35 5 356 36 6 367 37 7 378 38 8 389 39 9 3910 40 10 4011 41 11 4112 42 12 4213 43 13 4314 44 14 4415 45 15 4516 46 16 4617 47 17 4718 48 18 4819 49 19 4920 50 20 5021 51 21 5122 52 22 5223 53 23 5324 54 24 5425 55 25 5526 56 26 5627 57 27 5728 58 28 5829 59 29 5930 60 30 60

Initial charger checks

Check battery polarity ()

Switch charger to float, check output A V

Switch charger to boost, check output A V

© UK Power Networks 2017 All rights reserved 5 of 12

Page 6: ECP 11-0218 DC Supplies and Common Services …library.ukpowernetworks.co.uk/library/asset/30c25bfb-b41... · Web viewAdvise Commissioning Engineer if any drying out required Check

DC Supplies and Common Services Test Form Document Number: ECP 11-0218

Version: 3.0

Date: 30/01/2017

Type Purpose Date

Cell Temperature C Cell Temperature C

SG Correction Factor SG Correction Factor

BATTERY AS-RECEIVED BATTERY AS-RECEIVED

Cell SG V Cell SG V Cell SG V Cell SG V1 31 1 312 32 2 323 33 3 334 34 4 345 35 5 356 36 6 367 37 7 378 38 8 389 39 9 3910 40 10 4011 41 11 4112 42 12 4213 43 13 4314 44 14 4415 45 15 4516 46 16 4617 47 17 4718 48 18 4819 49 19 4920 50 20 5021 51 21 5122 52 22 5223 53 23 5324 54 24 5425 55 25 5526 56 26 5627 57 27 5728 58 28 5829 59 29 5930 60 30 60

Initial charger checks

Check battery polarity ()

Switch charger to float, check output A V

Switch charger to boost, check output A V

© UK Power Networks 2017 All rights reserved 6 of 12

Page 7: ECP 11-0218 DC Supplies and Common Services …library.ukpowernetworks.co.uk/library/asset/30c25bfb-b41... · Web viewAdvise Commissioning Engineer if any drying out required Check

DC Supplies and Common Services Test Form Document Number: ECP 11-0218

Version: 3.0

Date: 30/01/2017

DC Circuits

Insulation Tests 1000V Megger

Disconnect Circuits from battery and charger.

Battery Supply to Charger DC Board or Remote DC Board

DC polarity check ()

Fuse rating and link proved for correct function ()

Insulation resistance between cores MΩ

Insulation resistance positive to earth MΩ

Insulation resistance negative to earth MΩ

Closing (Solenoid) Supplies – Section 1

DC polarity check ()

Fuse rating and link proved for correct function ()

Insulation resistance between cores MΩ

Insulation resistance positive to earth MΩ

Insulation resistance negative to earth MΩ

Closing (Solenoid) Supplies – Section 2

DC polarity check ()

Fuse rating and link proved for correct function ()

Insulation resistance between cores MΩ

Insulation resistance positive to earth MΩ

Insulation resistance negative to earth MΩ

Trip and Close Alarm Supplies – Section 1 (Transformers)

DC polarity check ()

Fuse rating and link proved for correct function ()

Insulation resistance between cores MΩ

Insulation resistance positive to earth MΩ

Insulation resistance negative to earth MΩ

© UK Power Networks 2017 All rights reserved 7 of 12

Page 8: ECP 11-0218 DC Supplies and Common Services …library.ukpowernetworks.co.uk/library/asset/30c25bfb-b41... · Web viewAdvise Commissioning Engineer if any drying out required Check

DC Supplies and Common Services Test Form Document Number: ECP 11-0218

Version: 3.0

Date: 30/01/2017

Trip and Close Alarm Supplies – Section 2 (Transformers)

DC polarity check ()

Fuse rating and link proved for correct function ()

Insulation resistance between cores MΩ

Insulation resistance positive to earth MΩ

Insulation resistance negative to earth MΩ

Trip and Close Alarm Supplies – Section 1 (Feeders)

DC polarity check ()

Fuse rating and link proved for correct function ()

Insulation resistance between cores MΩ

Insulation resistance positive to earth MΩ

Insulation resistance negative to earth MΩ

Trip and Close Alarm Supplies – Section 2 (Feeders)

DC polarity check ()

Fuse rating and link proved for correct function ()

Insulation resistance between cores MΩ

Insulation resistance positive to earth MΩ

Insulation resistance negative to earth MΩ

Other Supplies (e.g. Auto Switching or Tap Change Control Common DC Supply)

DC polarity check ()

Fuse rating and link proved for correct function ()

Insulation resistance between cores MΩ

Insulation resistance positive to earth MΩ

Insulation resistance negative to earth MΩ

Cable Low Oil Pressure Circuits – Battery Supplies Number 1 Circuit

Number 2 Circuit

DC polarity check () ()

Fuse rating and link proved for correct function () ()

Insulation resistance between cores MΩ MΩ

Insulation resistance positive to earth MΩ MΩ

Insulation resistance negative to earth MΩ MΩ

© UK Power Networks 2017 All rights reserved 8 of 12

Page 9: ECP 11-0218 DC Supplies and Common Services …library.ukpowernetworks.co.uk/library/asset/30c25bfb-b41... · Web viewAdvise Commissioning Engineer if any drying out required Check

DC Supplies and Common Services Test Form Document Number: ECP 11-0218

Version: 3.0

Date: 30/01/2017

Intertrip Circuits – Battery Supplies Number 1 Circuit

Number 2 Circuit

DC polarity check () ()

Fuse rating and link proved for correct function () ()

Insulation resistance between cores MΩ MΩ

Insulation resistance positive to earth MΩ MΩ

Insulation resistance negative to earth MΩ MΩ

Charger Circuits

It is recommended that tests to detect possible earth faults on the charger be carried out in such a way as to include as much of the dc circuitry as practicable.

For batteries that are 'unearthed' and not fitted with a Battery Earth Fault Alarm detection circuit, under healthy conditions a Voltmeter connected from battery terminals to earth should indicate either no, or a very low value, of standing voltage. If significant readings are obtained, then the lower voltage indicates the leaky or faulty pole.

Where a Battery Earth Fault Alarm is installed, this will effectively place a high-impedance earth connection on the centre-point of the battery, so that under healthy conditions each battery pole will be at approximately half battery voltage to Earth. If the readings are greatly different, then the lower voltage indicates the leaky or faulty pole.

Battery Purpose

DC voltages measured from:

Positive terminal to earth V V V

Negative terminal to earth V V V

Telecontrol 48V Battery Supplies

Ensure terminal equipment e.g. outstation is disconnected at remote end before carrying out insulation tests.

Switchgear Marshalling Cabinet Supplies

DC polarity check ()

Fuse rating and link proved for correct function ()

Insulation resistance between cores MΩ

Insulation resistance positive to earth MΩ

Insulation resistance negative to earth MΩ

Tap Change Marshalling Cabinet Supplies

DC polarity check ()

Fuse rating and link proved for correct function ()

Insulation resistance between cores MΩ

Insulation resistance positive to earth MΩ

Insulation resistance negative to earth MΩ

© UK Power Networks 2017 All rights reserved 9 of 12

Page 10: ECP 11-0218 DC Supplies and Common Services …library.ukpowernetworks.co.uk/library/asset/30c25bfb-b41... · Web viewAdvise Commissioning Engineer if any drying out required Check

DC Supplies and Common Services Test Form Document Number: ECP 11-0218

Version: 3.0

Date: 30/01/2017

Channelling Equipment Supplies

DC polarity check ()

Fuse rating and link proved for correct function ()

Insulation resistance between cores MΩ

Insulation resistance positive to earth MΩ

Insulation resistance negative to earth MΩ

Data Concentrator and/or Outstation Supplies

DC polarity check ()

Fuse rating and link proved for correct function ()

Insulation resistance between cores MΩ

Insulation resistance positive to earth MΩ

Insulation resistance negative to earth MΩ

PAX Supplies

DC polarity check ()

Fuse rating and link proved for correct function ()

Insulation resistance between cores MΩ

Insulation resistance positive to earth MΩ

Insulation resistance negative to earth MΩ

110V Battery

High volt alarm Setting 128V Operates at V

High volt alarm time delay (1-5s nominal) ()

Low volt alarm (switchgear to BS 116) Setting 94V Operates at V

Low volt alarm (switchgear to BS 5311/IEC 56) Setting 100V Operates at V

Low volt alarm time delay 20-50ms ()

Charger fail alarm Setting 118V Operates at V

Charger fail alarm time delay (1-5s nominal) ()

48V Battery

High volt alarm Setting 56V Operates at V

High volt alarm time delay (1-5s nominal) ()

Low volt alarm Setting 47V Operates at V

Charger fail alarm Setting 51V Operates at V

Charger fail alarm time delay (1-5s nominal) ()

© UK Power Networks 2017 All rights reserved 10 of 12

Page 11: ECP 11-0218 DC Supplies and Common Services …library.ukpowernetworks.co.uk/library/asset/30c25bfb-b41... · Web viewAdvise Commissioning Engineer if any drying out required Check

DC Supplies and Common Services Test Form Document Number: ECP 11-0218

Version: 3.0

Date: 30/01/2017

Battery Alarm Circuits (with marshalling cabinet links open)

Insulation Resistance 110V Battery 48V Battery

High volt alarm between cores X37-X2 M M

to earth X37-E M M

Low volt alarm between cores X45-X2 M M

to earth X45-E M M

Charger fail alarm between cores X51-X2 M M

to earth X51-E M M

Common to earth X2-E M M

Common to earth W2-E M M

Alarm Checks 110V Battery 48V Battery

Check receipt of alarm signal at marshalling cabinet links

Low volt alarm () ()

High volt alarm () ()

Charger fail alarm () ()

Substation LV Supply Monitoring (Auxiliary Supply Fail)

Auxiliary Supply Fail Relay Phase Reduced

Voltage

Setting Operating

With normal voltages supplied check output relay energised. Next reduce voltage of each phase in turn and note voltage at which output relay de-energises

Red

Yellow

Blue

Supply Fail Alarm Circuit

Ensure marshalling cabinet links are open

Insulation resistance between cores X57-X2 M

Insulation resistance to earth X57-E M

Check alarm received at marshalling cabinet link ()

Fire Protection Alarm

Ensure marshalling cabinet links are open

Insulation resistance between cores X35-X2 M

Insulation resistance to earth X35-E M

Check alarm received at marshalling cabinet link ()

© UK Power Networks 2017 All rights reserved 11 of 12

Page 12: ECP 11-0218 DC Supplies and Common Services …library.ukpowernetworks.co.uk/library/asset/30c25bfb-b41... · Web viewAdvise Commissioning Engineer if any drying out required Check

DC Supplies and Common Services Test Form Document Number: ECP 11-0218

Version: 3.0

Date: 30/01/2017

Comments

Test Equipment

Purpose Make/Type Serial Number

Certification ()

Attach manufacturer’s specific tests (if applicable)

All tests have been completed satisfactorily

Contractor Commissioning Engineer (if applicable)

Organisation Name

Date Signature

UK Power Networks Commissioning Engineer

Name Signature Date

© UK Power Networks 2017 All rights reserved 12 of 12