41
Planned Programmes Appendix 2 Eco Impact Checklist Title of report: Procurement Of Roofing Contract Report author: Paul Chaffey Anticipated date of key decision : 1 st November 2016 Summary of proposals: To seek cabinet approval to renew a key housing maintenance contract that is due to expire 9 th January 2017. The housing maintenance contract to renew is for Roof Replacement to the City Council`s Housing Stock. I f Y e s Will the proposal impact on... B r i e f l y d e s c r i b e i m p a c t B r i e f l y d e s c r i b e M i t i g a t i o n m e a

Eco Impact Checklist Title of report: Procurement Of ... › documents › s8545 › 14d ECO Assess… · Planned Programmes Appendix 2 Eco Impact Checklist Title of report: Procurement

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • Planned Programmes

    Appendix 2

    Eco Impact ChecklistTitle of report: Procurement Of Roofing ContractReport author: Paul ChaffeyAnticipated date of key decision : 1st November 2016Summary of proposals: To seek cabinet approval to renew a key housing maintenance contract that is due to expire 9th January 2017. The housing maintenance contract to renew is for Roof Replacement to the City Council`s Housing Stock.

    If Yes…

    Will the proposal impact on... Yes/No

    +ive or-ive

    Briefly describe impact

    Briefly describe Mitigation mea

  • Planned Programmes

    sures

    Emission of Climate Changing Gases? -ive

    +ive

    Emissions of climate gases will arise through

    Where possible the chosen providers will b

    e e

  • Planned Programmes

    the use of energy, transport, fuel and materials

    ncouraged to use the most sustainable materials

    Use

  • Planned Programmes

    during works

    The works will have the potential to

    local resources & materials

    Reduce the travel impa

  • Planned Programmes

    improve energy efficiency by upgrading the loft i

    cts associated with the works

  • Planned Programmes

    nsulation to current building regulations.

    Bristol's resilience to the effects of climate change? +ive

    Energy e

  • Planned Programmes

    fficiency improvements with loft upgrades will hel

  • Planned Programmes

    p to increase the resilience of the city.

    Consumption of non-renewable resources? -ive

    Use of fo

    Where pos

  • Planned Programmes

    +ive

    ssil fuels & other non-renewable materials through

    sible, works will be scheduled to co-inside with a

  • Planned Programmes

    the use of energy, transport & materials during w

    ny other external works required, so as to minimis

  • Planned Programmes

    orks.

    Completed properties will have improved ther

    e energy, disruption and nuisance.

    The procurement

  • Planned Programmes

    mal efficiency and be watertight.

    process for appointing contractor(s) will include

  • Planned Programmes

    a sustainability assessment, and specific contract

  • Planned Programmes

    ual requirements as appropriate.

    Production, recycling or disposal of waste -ive

    Waste will arise

    Providers will ta

  • Planned Programmes

    during the delivery of these contracts

    ke responsibility for their waste, including adher

  • Planned Programmes

    ing to the waste duty of care by: R

    educing Waste wh

  • Planned Programmes

    ere possible

    Using products that are recyclable whe

  • Planned Programmes

    re possible

    Recycling as much waste as possible

    Haza

  • Planned Programmes

    rdous waste kept separately and disposed legally.

  • Planned Programmes

    The appearance of the city? +ive

    New roof tiles will improve the appearance of the

    The appearance of works will be considered as par

  • Planned Programmes

    homes concerned.

    t of any planning applications that may be necessa

  • Planned Programmes

    ry.

    Pollution to land, water, or air? -ive

    Works will involve the use and storage of mater

    Providers will operate in an environmentally re

  • Planned Programmes

    ials that could contaminate land, watercourses and

    sponsible manner and ensure correct storage of mat

  • Planned Programmes

    surface water drains if accidentally released.

    Wo

    erials.

    Contractors must work in compliance with E

  • Planned Programmes

    rks are likely to create dust & noise & solvent em

    nvironmental Agency Pollution Prevention Guideline

  • Planned Programmes

    issions.

    s

    Contractors must ensure procedures are in place

  • Planned Programmes

    to: S

    ecurely store any potentially polluting materi

  • Planned Programmes

    als and keep them away from watercourses & surface

  • Planned Programmes

    water drains

    Avoid washing out containers of paint

  • Planned Programmes

    or similar materials into drains

    Reduce dust

    Reduce

  • Planned Programmes

    noise pollution

    Wildlife and habitats? -ve

    Works could impact on priority sp

    Works will be subject to ecologic

  • Planned Programmes

    ecies or habitats in the roof.

    al mitigation plans agreed with BCC Environmental

  • Planned Programmes

    team.

    Work must comply with the Council’s duty und

  • Planned Programmes

    er the Natural Environment & Rural Communities Act

  • Planned Programmes

    , 2006 (Section 40).

    For works carried out in the

  • Planned Programmes

    nesting season (Apr-Sept) Contractors will carry o

  • Planned Programmes

    ut a pre-survey and if evidence of nesting birds,

  • Planned Programmes

    works will be delayed until the nest has been vaca

  • Planned Programmes

    ted.

    Consulted with: Steve Ransom/Claire Craner-Buckley

    Summary of impacts and Mitigation - to go into the main Cabinet/ Council ReportThe significant impacts of this proposal are…the use of raw materials, production of waste and consumption of fossil fuels for travel etc.

    The proposals include the following measures to mitigate the impacts… Where possible, works will be scheduled to co-inside with any other external works

    required, so as to minimise disruption and nuisance. The procurement process for appointing contractor(s) will include a sustainability

    assessment, and specific contractual requirements as appropriate. Insulation standards to building regulations will be achieved. The chosen contractor(s) will demonstrate compliance with the waste hierarchy by:

    o Preparing and adhering to Site Waste Management Plans.o Reducing waste e.g. through effective material storageo Reusing waste e.g. reuse of off-cuts.o Recycling as much waste as possible and using readily recyclable products.o Avoiding landfill wherever possible.

    Contractors will complete an Environmental Method Statement during tendering describing how they will mitigate the environmental impacts. This will form part of their contractual obligations.

    The net effects of the proposals are …The proposal will ensure the building fabric are maintained and water tight, along with improving thermal efficiency within the loft. This should lead to a positive environmental impact.Checklist completed by:Name: P

    aul Chaffey

    Dept.: Pl

  • Planned Programmes

    anned Programmes

    Extension: 25080

    Date: 11/08/2016

    Verified by Environmental Performance Team

    Claire Craner-Buck

  • Planned Programmes

    ley 15/8/16