Earth flow (Limited velocity – max 8m/min) Thistle, Utah, 1986 Earth flow complex “Earth” – plastic clayey debris Motion on discrete slip surfaces (“mudslide”)

Earth flow complex - IPGPstep.ipgp.fr/images/1/1e/10-01_Earth_flows.pdf · 2009. 7. 29. · (Limited velocity – max 8m/min) Thistle, Utah, 1986 Earth flow complex “Earth” –

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

  • 1

    Earth flow(Limited velocity – max 8m/min)

    Thistle, Utah, 1986

    Earth flow complex

    “Earth” – plastic clayey debris

    Motion on discrete slip surfaces (“mudslide”)

  • 2

    This is a typical earth flow (the Frana di Morsiano): large crown, narrow channel, large foot, a thickness ranging from 10 to 50 m, medium slope angle from 8° to 11°, few kilometers in length………..……..and a village lying on it

    2000 villages lie on them

    Prof. G. BertoliniEmilia-Romagna Region, Italy

    Imbricate overthrusts

    Progressive failure

    Overload= high pore pressures

    Prof. G. BertoliniEmilia-Romagna Region, Italy

  • 3

    Active earth flow

    Dormant landslide

    (for the moment)

    Imbricated overthrusts

    Prof. G. BertoliniEmilia-Romagna Region, Italy

    A surging Earth Flow

    (Italy)

  • 4

    Earth Flow

    Marble Hill, Chilliwack

  • 5

    Earth flow complex: Lidar, first return

    Earth flow complex: Lidar, last return

  • 6

    Earth flow complex

    Earth Flow Stabilization Covatta mudslide, 1996

    (Prof L. Picarelli, Naples)

  • 7

    The alimentation zone

    Consequences of the movement

  • 8

    Consequences of the movement

    First emergency works

  • 9

    One year after

    Retaining structure at the foot of the mudslideto contrast river damming

    (Picarelli and Napoli, 2003)

  • 10

    Construction of the structural walls

    Safety channel assuring a continuousriver discharge

  • 11

    Run-off control

    Construction of structural walls at the neck of the alimentation zone

  • 12

    Reshaping of the crown; material substitution, deep and shallowdrainage in the depletion zone, stabilization of the neck