148
Parliamentary Debates (HANSARD) THIRTY NINTH PARLIAMENT FIRST SESSION 2015 LEGISLATIVE ASSEMBLY ESTIMATES COMMITTEE A & B SUPPLEMENTARY INFORMATION Tuesday, 9 June 2015 to Thursday, 11 June 2015

 · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

Parliamentary Debates (HANSARD)

THIRTY NINTH PARLIAMENT FIRST SESSION

2015

LEGISLATIVE ASSEMBLY ESTIMATES COMMITTEE A & B

SUPPLEMENTARY INFORMATION

Tuesday, 9 June 2015 to

Thursday, 11 June 2015

Page 2:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee
Page 3:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E611 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

SUPPLEMENTARY INFORMATION — ESTIMATES COMMITTEE A The information presented below appears essentially as provided by the departments.

Division 1: Parliament —

[Supplementary Information No A1.] Question: Ms R. Saffioti: asked if the Speaker could provide a list or summary of the functions he has held as Speaker over the past financial year, including how many functions were held and, in particular, which members of Parliament were invited to those functions?

Answer: Speaker’s Official Functions: July 2014 – June 2015

DATE OCCASION NATURE

2014 11th August Luncheon:

5 persons Public Affairs Director Executive Council of Australian Jewry. Members invited: None

11th August Afternoon Tea: 28 persons

Delegation from Kagoshima, Japan, City of Perth, and Parliamentary staff. Members invited: None

19th August Dinner: 10 persons

Retiring CPA Executive: Rt Hon Sir Alan Haselhurst, Members, Parliamentary Staff and Members. Members invited: 1 National, 1 Liberal and 1 ALP

27th August Luncheon: 8 persons

Lunch Meeting: Presiding Officers, Parliamentary Staff and selected representatives from the press. Members invited: None

3rd September Morning Tea:

6 persons Morning Tea: Executive of His Majesty’s Theatre. Members invited: None

16th September Reception: 6 persons

Reception: Members Discussion. Members invited: Labor Party Members

18th September Morning Tea: 5 persons

Farewell Call: Indonesian Consul-General. Members invited: None

22nd September Morning Tea: 9 persons

Visiting international Church Representatives and Members. Members invited: Hon Liz Behjat MLC Mr Ian Britza MLA

23rd September Luncheon: 4 persons

Lunch Meeting: Acting Speakers. Members invited: Ms Lisa Baker MLA Ms Wendy Duncan MLA Ms Janine Freeman MLA Mr Ian Britza MLA Mr Nathan Morton MLA Mr Peter Abetz MLA

23rd September Reception: 10 persons

Reception: Members Discussion.

Page 4:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

Members invited: Labor Members 21st October Luncheon:

8 persons Former Members Executive Committee and Presiding Officers. Members invited: None

25th November Reception: Co-hosted by the Presiding Officers, 80 persons

National Party Centenary Book Launch: costs to be shared between Presiding Officers. Members invited: all Members of Parliament

26th November Luncheon: Co-hosted by the Presiding Officers, 22 persons

HeritagePerth and 6PR Luncheon, and Parliamentary staff: costs to be shared between Presiding Officers. Members invited: None

2nd December Morning Tea:

26 persons End of Semester Thank-you morning Tea for Challenge TAFE students, Presiding Officers host one morning tea per semester. Members invited: None

9th December Lunch: 7 persons

Former Speakers Christmas Lunch. Members invited: None

10th December Dinner: 84 persons

Former Members Association Christmas Dinner; Presiding Officers are joint patrons of the Association and meal costs are shared between the Presiding Officers. Members invited: None

12th December Luncheon: 29 persons

Speakers Christmas Lunch for Legislative Assembly staff. Members invited: None

17th December Morning Tea: 20 persons

Parliamentary staff, members of the Jewish Community and Members. Members invited: Mr Peter Abetz MLA Hon Kate Doust MLC Hon Peter Katsambanis MLC Mr Ian Britza MLA

2015 28th January Morning Tea:

Co-Hosted by Presiding Officers: 12 persons

Liaoning People's Standing Committee, Parliamentary Staff and Members, costs shared between Presiding Officers. Members invited: Mr Christopher Tallentire MLA Ms Eleni Evangel MLA Mr Antonio Buti MLA Ms Simone McGurk MLA Mr John McGrath MLA Mr Paul Miles MLA Invited MLCs coordinated by the President’s Office

6th February Morning Tea: 2 persons

City of Vincent CEO. Members invited: none

17th February Luncheon: Delegation from Vasto City, Italy, City of Perth

Page 5:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E613

14 persons representatives and Parliamentary Staff. Members invited: None

10th March Afternoon Tea:

Co-Hosted by Presiding Officers; 26 persons

European Union Delegation. Members invited: None *Speaker did not attend due to MPI

10th March Reception: Co-Hosted by Presiding Officers; 60 persons

‘Coming Together’ Art Exhibition Launch; costs jointly shared between Presiding Officers. Members invited: All Members of Parliament

25th March Luncheon: 8 persons

Lunch Meeting: Speaker, Acting Speakers and Clerk. Members invited: Ms Lisa Baker MLA Ms Wendy Duncan MLA Ms Janine Freeman MLA Mr Ian Britza MLA Mr Nathan Morton MLA Mr Peter Abetz MLA

31st March Morning Tea: 2 persons

First Official Visit: His Excellency Dr Sabri Kiqmari, Ambassador of the Republic of Kosovo. Members invited: None

1st April Luncheon:

5 persons Thank you lunch for Parliamentary staff and ECU representatives (Coming Together Art Exhibition). Members invited: None

20th April Luncheon: 8 persons

New Taiwan Representative: Dr David Lee, and accompanying staff. Members invited: Mr Tony Kristicevic MLA Hon Dr Michael Nahan MLA Mr John McGrath MLA

23rd April Luncheon: 5 persons

Western Australian Trotting Association President and Executive Members. Members invited: None

1st May Luncheon:

2 persons Farewell Call - Indian Consul General, Mr Subarayudu. Members invited: None

19th May Luncheon: Co-Hosted by the Presiding Officers, 14 persons

Visiting Malaysian Delegation, Parliamentary Staff, and Members; costs to be shared between Presiding Officers. Members invited: Mr John McGrath MLA Invited MLCs coordinated by the President’s Office

30th June Morning Tea: Number of persons TBC

First Official Visit: His Excellency Mr Jean-Luc Bodson, Ambassador of Belgium. Members invited: None

Page 6:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E614 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

[Supplementary Information No A2.]

Question: Ms R. Saffioti: asked the Speaker to confirm whether the 500 Club used Parliament House over the past year for any activities.

Answer: Parliament House was not used as a venue by the 500 Club over the past year.

[Supplementary Information No A3.]

Question: Mr P.C. Tinley: asked if the Speaker could provide the rent costs paid by the Legislative Assembly and Parliamentary Services Department for outside office accommodation, including the total value of the outgoings, the term of the lease and any options.

Answer: Legislative Assembly (Lease costs for Level 1, 11 Harvest Terrace, West Perth)

Lease Costs (2014-15 estimate): Rent $480,347 Outgoings $271,451

Total $751,798 Term of lease 6 years from 15/12/2011, with two three year options

Parliamentary Services Department (Lease costs for space at Level 2, 11 Harvest Terrace, West Perth)

Lease Costs (2014-15 estimate): Rent $176,848 Outgoings $127,968

Total $304,816 Term of lease 6 years from 15/12/2011, with two three year options

[Supplementary Information No A4.] Question: Ms R. Saffioti: asked for a breakdown of the $295,000 of the $1,738 million that relates to works and alterations at Parliament House for the financial year 2014-15. Answer: The breakdown of the $295,000 expenditure is:

Catering equipment and facilities upgrade $197,101 Courtyard sail shading for student groups $19,839 Forecourt asphalt resurfacing $39,674 Plans and drawings project $9,799 Various minor works $28,567 $294,980

Division 44: Commerce—

[Supplementary Information No A5.] Question: Ms J. M. Freeman: asked whether the minister could provide a breakdown of FTE from last year of those who have gone, their classifications and their roles.

Answer: The FTE breakdown of employees who have vacated as a result of various Government voluntary severance schemes during 2013-14 is as follows —

Role Classification FTE Regional Senior Industrial Inspector (Albany) 5.4 1 Regional Senior Industrial Inspector (Broome) 5.4 1 Regional Senior Industrial Inspector (Kalgoorlie) 5.4 1 Senior Education Officer 4.1 1 Senior Education Officer 4.2 1 Receptionist 1.12 .50 Principal Legal Officer SCL5.3 .53 Senior Labour Relations Advisor 6.4 .53 Senior Labour Relations Advisor 6.1 .60 Principal Labour Relations Advisor 7.1 1 Principal Labour Relations Advisor 7.2 .60

Page 7:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E615

Labour Relations Advisor (Pay Equity Unit) 4.1 1 Principal Labour Relations Advisor 7.1 .60 Labour Relations Advisor 5.2 1 Principal Labour Relations Advisor 7.3 1 Labour Relations Advisor 4.1 1

[Supplementary Information No A6.] Question: Mr P.C. Tinley referred the parliamentary secretary to the second dot point on page 497, “Defence Industry and the Australian Marine Complex (AMC)”. It states —

The Industry and Innovation Division will continue to implement recommendations contained in the State’s response to the Defence White Paper ...

How many contracts have been won in the past 12 months and how many does the government expect to win in the next 12 months? I am talking about industry generally through the AMC and their total value, past and future.

Answer: The Common User Facility (CUF) does not “win” projects in a standalone capacity, local industry wins the projects and executes them through the CUF, if unable to do so in their own facilities. The CUF facilitates industry’s ability to win contracts by promoting past successful projects undertaken by local companies that have used the CUF as part of their project execution plans. The low risk to project delivery in terms of quality, timeliness and cost when utilising local content and accessing the CUF as part of major project plans is also promoted. The estimated economic benefit from projects undertaken at the CUF over the last twelve months is $220m. These projects include:

• Continued support to the Gorgon Project with Sub-sea Spools, LNG process plant dressing, logistics support,

• Defence services including docking of submarines and in-water support of frigates, • Marine maintenance of North West Shelf operational vessels, • Superyacht building and trials, • Wheatstone Project – power generator control room construction and process plant control rooms

construction, and • Minor short term projects in support of the local industry and load-out of projects manufactured outside

of the facility. The estimated economic benefit from projects in the next year is $150m and includes the completion of projects that are ongoing from this year and:

• Additional Defence works - docking of submarines and in-water support of frigates, • Two major subsea spool projects, • Alcoa process plant, and • Coal reclaimer machine for east coast operations.

The State is also promoting the capability of the CUF in regard to the following major maritime projects: Future Submarine, Future Frigate and Maritime Operational Support Capability.

In support of these projects the State will be promoting the CUF’s capabilities at the major international Maritime Exhibition and Conference PACIFIC 2015 taking place in Sydney from 6-8 October 2015.

[Supplementary Information No A7.]

Question: Ms L.L. Baker: asked how many inquiries does the Department of Commerce’s Wageline refer to the Employment Law Centre?

Answer: The Department of Commerce does not keep statistics on inquiries referred to the Employment Law Centre. Employment Law Centre reports indicate that 127 clients were known to be referred from Wageline to the Employment Law Centre in 2014. The statistics for the first half of 2015 are not available at this time.

[Supplementary Information No A8.]

Question: Mr D.A. Templeman: asked whether the Parliamentary Secretary to the Minister for Commerce could provide details of how many retirement villages are currently under investigation by the department for whatever reason because of noncompliance or concerns about their not complying with the legislation? And a list of all investigations currently being undertaken by the department with regard to retirement villages and their management in Western Australia.

Page 8:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E616 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

Answer: There are currently seven retirement villages with active investigations. The matters under investigation have not been concluded and no findings have been made as yet. It is therefore not considered appropriate to disclose the names of the villages concerned.

[Supplementary Information No. A9]

Question: Mr D.A. Templeman: asked whether the Parliamentary Secretary to the Minister for Commerce could provide details of whether there are any retirement villages that are being investigated for the bullying or abuse of their residents.

Answer: There is one retirement village currently under investigation in which allegations of bullying form a component of the issues being examined. As the matter is a current investigation it is not considered appropriate to identify the village.

[Supplementary Information No A10.]

Question: Ms J.M. Freeman: asked for the ‘Breakdown of that rental accommodation account, and the areas in which money was spent, such as how much is being paid for the magistrate, because that is only recent; it only came in with the act, did it not? The department has not been paying for the magistrate before that, but it does not really matter. Details on the magistrate, the policy work the department is doing, and the phone line. Is the parliamentary secretary able to break that down to show where it is going over the forward estimates?

(a) Breakdown of the rental accommodation account and the areas in which money is spent

In accordance with Schedule 1, Division 1, subclause (3)(b) of the Residential Tenancies Act 1987 (RT Act), the interest accrued by the Rental Accommodation Account (RA Account) is applied to: • reimbursement of costs and expenses of the Department of Commerce (the Department) in the

performance and functions associated with the Bond Administrator ($5.9 million in 2013-14); • reimbursement of the costs and expenses of the Department of the Attorney General (DoTAG)

incurred in the operation and administration of the Magistrates Court in connection with dealing with minor cases under the RT Act and the Residential Parks (Long-stay Tenants) Act 2006 (RP Act) ($2.7 million in 2013-14);

• grants in the form of service agreements with 16 not-for-profit agencies that provide tenancy advice and education services to residential tenants (the Tenancy Network) ($3.6 million (exc GST) in 2014-15); and

• a grant to the Department of Child Protection and Family Support (DCPFS) for supplementary funding of financial counselling services in accordance with a 2002 Cabinet decision ($0.5 million in 2013-14).

Reimbursement to DoTAG • DoTAG has been reimbursed from the RA Account for the costs and expenses it has incurred in

the operation and administration of the Magistrates Court in connection with dealing with minor cases under the RT Act and the RP Act since the RT Act commenced in 1987.

• The Department is not able to comment on how the reimbursement of the costs and expenses of DoTAG are calculated.

Breakdown of the Department’s costs attributed to the RA Account Of the $5.9 million the Department drew down from the RA Account in 2013-14, the costs relate to: • processing of residential tenancy bonds (43%); • compliance and conciliation of tenancy matters (16%); • accommodation and consumer protection overheads (15%); • Contact Centre and market analysis related to tenancy (8%); • legal services and strategic policy work related to tenancy (5%); and • other costs corporate communications, HR, IT and financial services (13%). The breakdown of expenses over the forward estimates is shown below*.

Expenses 2015-16 2016-17 2017-18 2018-19 Grants to Charitable and Other Public Bodies RA Account Grants $3.7m $3.8m $3.9m $4.0m Other Reimbursement to the Department of Commerce $6.3m $6.4m $6.4m $6.5m

Page 9:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E617

Reimbursement to the DoTAG $3.0m $3.1m $3.3m $3.4m Supplementary funding to the DCPFS $0.5m $0.5m $0.5m $0.5m TOTAL $13.5m $13.8m $14.1m $14.4m * All figures are rounded

[Supplementary Information No A11.]

Question: Mr D.A. Templeman: asked can the Parliamentary Secretary report on any progress made on retirement villages being charged commercial rates for electricity that is on-sold to them at a commercial rate rather charged at a residential rate?

Answer: The Department of Finance, Public Utilities Office is working with Synergy and Horizon Power to develop and implement arrangements that will seek to ensure residential customers under electricity on-selling arrangements, such as retirement village residents, pay no more for these supplies than the regulated power charges paid by households.

Division 45: Registrar, Western Australian Industrial Relations Commission —

[Supplementary Information No A12.] Question:

Ms J.M. Freeman: asked if the Parliamentary Secretary could provide details on the number of applications referred for conciliation, mediation and hearing, and to Commission in Court Sessions. Answer: In the current financial year, to date:

a) The number of applications referred for conciliation is 322; b) the number of applications referred for mediation is 1; c) the number of applications referred for hearing is 263; and d) the number of applications referred to a Commission in Court Session is 6

[Supplementary Information No A13.] Question: Ms J.M. Freeman: asked if the Parliamentary Secretary could provide details regarding the referral of people to various places, where they are referred to, and whether they are referred to the Employment Law Centre, by application. Answer:

a) The average number of enquiries referred to external agencies, per month, is 90;

b) external agencies are comprised of the Employment Law Centre, the Department of Commerce (inclusive ofWageline, WorkSafe), WorkCover, the Equal Opportunity Commission and the Fair Work Ombudsman;

c) of the average number of enquiries referred to external agencies each month, approximately 30 are referred to the Employment Law Centre; and

d) the nature of the enquiries, most commonly, concern unfair dismissal and denied contractual entitlements.

Division 3: Premier and Cabinet (Except Native Title) —

[Supplementary Information No A14.] Question: Mr M. McGowan: asked the Premier to provide us with a list of the outside users of his offices for functions. Answer: The following is a list of functions held at the Office of the Premier and Cabinet Room 2012

22 November – Premier’s Awards for Excellence in Public Sector Management 19 December – Thank you event for Dignitary Protection Unit (DPU)

2013

16 May - Farewell Hon Norman Moore MLC (paid for by Liberal MPs)

Page 10:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E618 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

29 July – Thank you event for the Board of Celebrate WA 24 October - Event with Harvard American Repertory Theatre and Nomad Two Worlds 6 November – Premier’s Awards for Excellence in Public Sector Management 29 November – Media Christmas get together in the courtyard (paid for by MPs) 19 December – Thank you event for DPU

2014

16 April – Perth Fashion Festival 2014 Exclusive Program Launch (paid for by Perth Fashion Festival) 16 June –EXCO Luncheon to farewell Governor 4 August – Celebrate WA, WA Day wrap up 5 November – Premier’s Awards for Excellence in the Public Sector Management 2 December – Partnership Forum – community sector - End of Year Function 3 December – 500 Club Cocktail Function (paid for by the 500 Club) 11 December – Media Christmas get together in the carpark (paid for by MPs) 17 December – Thank you event for DPU

2015 26 Mar 2015 – Closing event from the Industry and PhD Research Engagement Program

In addition, school groups come through the Office of the Premier and Cabinet Room as part of tours organised by the Constitutional Centre.

[Supplementary Information No A15.] Question: Ms R. Saffioti: asked for the total expenditure of the Bigger Picture campaign, by agency. The Chairman concluded that the total expenditure on advertising for the Bigger Picture campaign across portfolios is to be provided. Answer: Expenditure on advertising for the Bigger Picture campaign, by portfolio, for the current financial year up to 10 June 2015:

Bigger Picture Education $1.035 million (ex-GST) Bigger Picture Regional Development $721,870.80 Bigger Picture Planning $660,624.74 Bigger Picture Sport and Recreation $8,339.00 Bigger Picture Health $844,931.00 Bigger Picture Police $417,050.00

[Supplementary Information No A16.] Question: Mr M. McGowan: asked if the Premier could provide supplementary information on the total cost of the shark mitigation program, in particular the drum line initiative. Mr W.J. Johnston sought to clarify that the cost of the drum line initiative will be shown as a separate line item. The Premier committed to providing costs for all aspects of the program. Answer: A summary of the funding of the Government’s shark hazard mitigation strategy is as follows:

$12.237m SLSWA: allocated over five (5) years (2012-17) for beach and aerial safety surveillance and patrol programs along the metro and south west coasts.

$500,000 SLSWA: allocated over two (2) years (2012-14) for the purchase of 12 jet skis for the metro and greater southern regions.

$700,000 SLSWA: allocated over four (4) years (2014-18) for training, maintenance and replacement in relation to jet skis.

$175,000 Cottesloe Surf Life Saving Club: allocated for the construction of two (2) watchtowers.

$1.7m DoF: allocated to research including community engagement.

$2.05m DoF: allocated over five (5) years (2011-16) for operating costs associated with the Shark Response Unit.

$2m DoF: allocated over four (4) years (2012-16) to operational costs associated with the imminent threat policy.

$150,000 DoF: allocated over three (3) years (2013-16) to the development of a smartphone

Page 11:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E619

app.

$2m DoF: allocated over two (2) years (2013-15) for tagging and tracking of sharks.

$200,000 City of Busselton: allocated to a beach enclosure trial at Old Dunsborough.

$1.9m Research: allocated over four (4) years (2012-16) to Applied Research Programs into non-lethal shark detection and deterrent technologies managed through the Office of Science.

$1.282m DPC/DoF: allocated to a trial drum lining program between Jan and April 2014. *see further breakdown below*

$200,000 City of Busselton: allocated to an additional beach enclosure to be deployed at the Busselton foreshore in time for the start of the 2015/16 summer season.

$654,000 SLSWA: allocated to facilitate extended aerial patrols in the south west for the 2014/15 summer season.

$0 DoF: revised imminent threat guidelines – “Guidelines for taking sharks posing a serious threat to public safety”

$400,000 Allocated to two additional beach enclosures – locations to be determined.

$1.965m SLSWA: $655k allocated over three (3) years (2015-18) for extended aerial patrols in the south west.

TOTAL = $28.1m

DoF: Department of Fisheries

DPC: Department of the Premier and Cabinet

SLSWA: Surf Life Saving WA

A breakdown of the costs associated with the trial drum line program, which ran from 25 January to 30 April 2014 was provided in the Department of the Premier and Cabinet’s Review of the Western Australian Government’s Shark Hazard Mitigation Drum Line Program 2013-14 (pp 37-38), published on the Department’s website in June 2014 and which can be located at:

https://www.dpc.wa.gov.au/Publications/Documents/Review%20-%20Western%20Australia%20Shark%20Hazard%20Mitigation%20Drum%20Line%20Program%202013-14.pdf.

A summary of the breakdown is provided as follows:

Metropolitan (31 January to 30 April 2014) $757,000

South West (25 January to 30 April 2014) $524,568

Total $1,281,568

The following should be noted:

The DoF costs include approximately $100,000 for equipment associated with the construction of the drum lines, which were used in the metropolitan and south west deployments. When the totals for each region are adjusted for the cost of the equipment the total cost of the metropolitan deployment is approximately $707,000 and the south west deployment is approximately $575,000. The breakdown of the DoF component of the program was: $152,000 Standard Hours $170,000 Overtime $ 17,000 Bait $ 10,000 Security $100,000 Equipment $163,000 Fuel $145,000 Operating Costs (Accommodation, Transport etc.).

DoF already had an allocation of $262,000 in its budget for staffing and vessel operations that were directly applied to this program, leaving a balance of $495,000.

Page 12:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E620 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

Division 9: Western Australian Electoral Commission —

[Supplementary Information No A17.]

Question: Mr W.J. Johnston: asked the minister what is the budget for electoral roll management?

Answer:

a. The current figure that will be paid to the Australian Electoral Commission for updating the roll: i. $1,296,806.20 ($324,201.55 per quarter)

b. The number of staff and our staffing costs in our own enrolment area: i. Staff numbers – 7 people

ii. Staff costs – 1 July 2014 to 31 May 2015 – $520,898

[Supplementary Information No A18.]

Question: Mr W.J. Johnston: asked the minister what resources have the WAEC received free of charge from different government agencies?

Answer: Resources are received free of charge from the following government agencies:

a. Landgate: to provide services on land data to the Commission. b. Department of Finance: to provide services related to accommodation leasing. c. State Solicitor: to provide legal service to the Commission.

[Supplementary Information No A19.]

Question: Mr W.J. Johnston: asked the minister how many fee-for-service elections have been conducted by the Commission for the current financial year, and what were the names of the organisations for which elections have been conducted?

Answer: Type Basis Number

Union Industrial Relations Act 6

Other By agreement; full cost recovery 26

Total 32

a. Union elections: Organisation Election

Date Election Type

University of Western Australia Academic Staff Association 5/05/2015 General

Western Australian Municipal, Road Boards, Parks and Racecourse Employees' Union of Workers, Perth

16/09/2014 General and Casual

The Australian Nursing Federation, Industrial Union of Workers Perth 29/08/2014 General

Health Services Union of Western Australia (Union of Workers) 27/11/2014 General and Casual

The Master Plumbers and Gasfitters Association of Western Australia (Union of Employers)

19/12/2014 General

Master Painters, Decorators and Signwriters' Association of Western Australia (Union of Employers)

19/12/2014 General

b. “Other” elections: Organisation Election

Date Election Type

Page 13:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E621

Fire and Emergency Services Superannuation Board 13/08/2014 General

Curtin Student Guild 18/09/2014 General

Curtin Student Guild 16/01/2015 Re-count

National Trust of Australia (WA) 26/09/2014 General

University of Western Australia Student Guild 25/09/2014 General

Prison Officers' Appeal Tribunal 17/06/2015 General

Edith Cowan University Senate (Election of two enrolled students) 10/09/2014 General

Edith Cowan University Alumni 3/09/2014 General

Derbarl Yerrigan Health Service Inc. 22/11/2014 General

Derbarl Yerrigan Health Service Inc. 19/02/2015 Ballot

Royal Society for the Prevention of Cruelty to Animals Western Australia (Inc.)

17/10/2014 General

MDA National Limited 17/03/2015 General

CBH Group 16/02/2015 General

Tourism Council Western Australia Ltd 17/09/2014 General

Public Transport Authority 8/12/2014 General

Public Transport Authority 27/02/2015 General

Public Transport Authority 23/06/2015 General

The Returned & Services League of Australia (WA Branch) Inc. 17/10/2014 General

UWA Convocation 10/03/2015 General

Aboriginal Health Council of Western Australia 15/11/2014 General

Department of Education Services 24/10/2014 General - Voting in person

Department of Education Services 20/02/2015 General - Voting in person

South West Aboriginal Land and Sea Council 1/05/2015 General

The Dairy Goat Society of Western Australia Inc. 25/02/2015 General

City of Wanneroo 12/06/2015 Employee Agreement

Pacific Industrial Company 2/06/2015 Employee Agreement

Division 71: Transport —

Page 14:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E622 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

[Supplementary Information No A20.] Question: Ms S.F. McGurk: asked, please provide the number and percentage of grain containers (by rail) going to Fremantle Port. Answer: Between July 2014 and April 2015 a total of 10,406 grain containers arrived by rail at North Quay Rail Terminal. This represented 13% of the 81,141 rail containers for the 10 month period. The figure peaked in August 2014 at 22%.

[Supplementary Information No A21.] Question: Ms R. Saffioti: asked please provide a table of the recurrent expenditure from the Perth Parking Levy (PPL) and the capital items expected to be paid for by the PPL each year over the next four years? Answer:

Perth Parking Management Account

2015/16 2016/17 2017/18 2018/19

$'000 $'000 $'000 $'000

Revenue 57,118 58,231 59,871 59,871 Expenditure: Recurrent: CAT Services 15,292 15,292 15,292 15,292 CBD Transport Plan 4,750 2,250 2,250 2,250 All Other 1,289 1,147 1,147 1,147 Total Recurrent 21,331 18,689 18,689 18,689 Capital: Wellington Street Bus Station 34,696 12,619 0 0 CAT Buses 5,000 7,000 6,268 0 Total Capital 39,696 19,619 6,268 0 Total Expenditure 61,027 38,308 24,957 18,689

Division 72: Commissioner of Main Roads (Except Service 7: Office of Road Safety) —

[Supplementary Information No A22.] Question: Ms R. Saffioti: asked can the Minister provide the breakdown cost between the Malaga–Reid intersection and the duplication from Erindale to Marmion, which includes the freeway bridge upgrade? Answer: Construction Cost Breakdown is as follows:

• Awarded Contract Sum - $65,040,904. • Reid Highway Duplication (Erindale Road to Duffy Road) and Reid Highway Widening (Duffy Road

to Marmion Avenue) – $32,661,384. • Reid Highway / Malaga Drive Interchange - $32,379,520.

[Supplementary Information No A23.]

Question: The Chairman (Ms J.M. Freeman): asked can the Minister tell me when LED lights will be installed at Alinjarra Primary School in Alexander Heights? Answer: Electronic School Zone signs are programmed to be installed and operational at Alinjarra Primary School on the 17 June 2015.

[Supplementary Information No A24.] Question: Ms R. Saffioti: asked can the Minister provide the reason for the substantial reduction in the budget for minor works from $73 107 000 in 2014–15 down to $28 605 000 in 2015–16?

Answer: At the start of the year the Minor Works category commences with a low base, and generally, the level of minor works increases throughout the year as additional funds are provided via either third parties or

Page 15:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E623

Main Roads redirection of internal funds to undertake small Capital Works projects. Hence the difference between the 2014-15 estimated out-turn of $71 million compared to the 2015-16 budget of $28 million. In the case of 2014-15 the effect has been magnified somewhat with an historically high base of $44 million plus additional works added to the category during the year. The 2015-16 initial budget of $28 million is only slightly lower than the estimated forward estimates, or normal trend.

[Supplementary Information No A25.] Question: Ms R. Saffioti: asked can the Minister provide a list of road projects that have and have not been delivered on time and on budget? Answer: The data extract from Main Roads system has identified a total of 93 eligible contracts valued at $640 million to be completed by June 2015.

However, the current “On time/ On budget” key performance indicator relates to all Main Roads Works contracts with an award value exceeding $136,363 and are scheduled to be completed by the end of May 2015, this includes 82 contracts valued at $589 million.

Based on the information in the Main Roads Contract Tracking System (CTS):

• 63 of 82 contracts (77%) were completed on time. • 79 of 82 contracts (96%) have been completed on budget.

Please refer to Attachment 1 for further information in regards to 57 contracts with an award value exceeding $500,000. The raw data is provided and then broken down by contract with the reasons for non-compliance in each case.

It should be noted that it is possible that there will be changes in these results when reporting in June 2015 as further information becomes available. The narrative for each reason is drawn from the regular reporting provided to Main Roads Corporate Executive. Attachment 1

Project Status - As at 31 May 2015

Total Projects >$500,000 Award Price

57

Completed on time 46 (80.70%)

Completed on budget 56 (98.25%)

Contract Number

Suggested Wording for PQ

Target Date

Practical Completion

Works completed

on time Award Value Target Value

On budget

0025/08-0037

Collie Lake King Road, Wagin to Ballaying Road - Widen and seal (157 to 162.39slk)

14-Jul-14

15-Jun-14 On time $

1,270,946.00 $1,398,040.60

On Budget

0025/08-0036

Northam Cranbrook Road - Widen & seal shoulders to 1m (193.55 to

23-Jul-14

14-Apr-14 On time $2,112,489.00 $2,323,737.90 On Budget

Page 16:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E624 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

204.21slk)

0021/08-0022

Great Northern Highway - Seal widening (2291.80 to 2299.97slk)

05-Aug-

14 18-Jul-14 On time $1,371,776.13 $1,508,953.74

On Budget

0026/08-0117

Northam Cranbrook Road - Widen & seal shoulders to 1m ( 336 to 340.800 slk)

13-Aug-

14 01-Aug-14 On time $1,227,119.66 $1,349,831.63

On Budget

0021/08-0020

Derby Highway - Construct Road Train Assembly Area (34.22 to 34.60slk)

02-Sep-

14 22-Oct-14 Late $1,702,322.00 $1,872,554.20

On Budget

0041/12-0007

Wubin Mullewa Road - Reconstruction & widening (86 to 100 slk)

09-Sep-

14 20-Jun-14 On time $6,789,198.29 $7,468,118.12

On Budget

0027/08-0054

Support PSP at the Judd St Ramp - Re-construct the existing River Wall & Sheet Pile

17-Sep-

14 05-Sep-14 On time $570,135.20 $627,148.72

On Budget

Contract Number

Suggested Wording for PQ

Target Date

Practical Completion

Works completed

on time Award Value Target Value

On budget

0041/12-0002

Goldfields Highway Upgrade, Wiluna to Meekatharra - Clearing and earthworks

21-Sep-

14 30-Nov-13 On time $5,634,154.46 $6,197,569.91

On Budget

0027/08-0046

Construct Principal Shared Path - Erindale Road to Balcatta Road

05-Oct-

14 05-Sep-14 On time $2,412,044.41 $2,653,248.85

On Budget

0234/12

Brand Highway - Replace Greenough River Bridge (No. 1740) & associated roadwork's

07-Oct-

14 24-Sep-14 On time $8,127,114.34 $8,939,825.77

On Budget

0022/08-0028

Marble Bar Road - Reconstruct & seal

17-Oct-

29-Aug-14 On time $2,836,447.99 $3,120,092.79 On Budget

Page 17:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E625

Contract Number

Suggested Wording for PQ

Target Date

Practical Completion

Works completed

on time Award Value Target Value

On budget

(97.7 to 98.8slk) 14

0026/08-0127

Pinjarra Williams Road - Seal widening (82.10 to 91.50 slk)

23-Oct-

14 05-Sep-14 On time $2,000,345.60 $2,200,380.16

On Budget

0021/08-0026

Gibb River Road, Mt Elizabeth to Hann River Section - Formation and drainage improvements (337 to 364slk)

23-Oct-

14 02-Oct-14 On time $3,606,000.00 $3,966,600.00

On Budget

0026/08-0134

Albany Lake Grace Road, Borden North - Reconstruct & seal including drainage improvements (108.15 to 111.46 slk)

02-Nov-

14 31-Oct-14 On time $1,065,216.60 $1,171,738.26

On Budget

0024/08-0020

Goldfields Highway / Casuarina Road - Replace existing culvert (15.41slk)

09-Nov-

14 10-Oct-14 On time $642,823.31 $707,105.64

On Budget

0026/08-0139

South Western Highway - Widen seal & install safety barriers (177.55 to 181 slk)

27-Nov-

14 19-Nov-14 On time $536,653.65 $590,319.02

On Budget

0027/08-0044

Construct Principal Shared Path - West Road to Success Hill Bassendean

27-Nov-

14 28-Nov-14 Late $2,274,917.38 $2,502,409.12 Over

0027/08-0061

Ennis Avenue/ Eleanora Dr & Grange Dr - Intersection Improvements

02-Dec-

14 02-Dec-14 On time $572,665.03 $629,931.53

On Budget

0027/08-0050

Kwinana Freeway North of Safety Bay Road - Construct Pavement Widening & install wire rope safety barrier

20-Dec-

14 28-Nov-14 On time $4,000,000.00 $4,400,000.00

On Budget

0026/08-0099

Bussell Highway, North Jindong to Carbanup - Widen, overlay to 7m with 1.5m shoulders & drainage ( 64.9 to 66.66 slk)

21-Dec-

14 12-Dec-14 On time $1,557,948.48 $1,713,743.33

On Budget

Page 18:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E626 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

Contract Number

Suggested Wording for PQ

Target Date

Practical Completion

Works completed

on time Award Value Target Value

On budget

0024/08-0022

Great Eastern Highway / Carins Road - Intersection upgrade

21-Dec-

14 21-Dec-14 On time $1,076,754.57 $1,184,430.03

On Budget

0024/08-0019

Goldfields Highway - Replace existing culvert at 120.55slk & associated works (120.30-120.84slk)

22-Dec-

14 04-Dec-14 On time $970,641.40 $1,067,705.54

On Budget

0027/08-0058

Kwinana Freeway - north and southbound carriageways from Thomas Road to Safety Bay Road - Supply & install wire rope safety barriers

24-Dec-

14 02-Oct-14 On time $2,972,160.00 $3,269,376.00

On Budget

0026/08-0131

Bussell Highway - Construct northbound passing lane & intersection improvement (90.62 to 92.67 slk)

26-Dec-

14 17-Dec-14 On time $2,764,314.76 $3,040,746.24

On Budget

Contract Number

Suggested Wording for PQ

Target Date

Practical Completion

Works completed

on time Award Value Target Value

On budget

0022/08-0039

Marble Bar Road - 15km Hit and Miss Gravel sheeting and reshaping (138.334 to 185.080slk)

28-Dec-

14 15-Dec-14 On time $1,249,228.17 $1,374,150.99

On Budget

0026/08-0138

Collie Lake King Road - Seal widening (36.35 to 59.70 slk)

07-Jan-15

24-Nov-14 On time $3,218,880.36 $3,540,768.40 On Budget

0183/10

Great Northern Highway- Realignment Port Hedland (1601.5 to 1610.6 slk)

11-Jan-15

15-Aug-14 On time $222,935,469.07 $245,229,015.98 On Budget

0027/08-0048

Ennis Avenue/ Willmot Street, Rockingham - Intersection improvements

22-Jan-15

22-Dec-14 On time $2,300,000.00 $2,530,000.00 On Budget

Page 19:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E627

0026/08-0140

Albany Highway , Settlement Road - Construct northbound passing lane (377.91 to 380.02slk)

01-Feb-

15 31-Jan-15 On time $1,437,634.01 $1,581,397.41

On Budget

0027/08-0065

Toodyay Road widening at The Springs Road (16:925 to 17:140 slk)

08-Feb-

15 20-Feb-15 Late $905,013.60 $995,514.96

On Budget

0022/08-0031

Great Northern Highway / Marble Bar Road - Intersection improvement

09-Feb-

15 04-Feb-15 On time $1,464,336.43 $1,610,770.07

On Budget

0041/12-0009

Goldfields Highway Upgrade, Wiluna to Meekatharra - Design: Preconstruction & Final Design (126.0 to 152.00slk)

12-Feb-

15 01-Apr-14 On time $672,006.06 $739,206.67

On Budget

0024/08-0024

Coolgardie Esperance Highway - Widening (101.40 to 104.30slk)

20-Feb-

15 09-Feb-15 On time $691,034.24 $760,137.66

On Budget

0041/12-0004

Goldfields Highway - Construct pavement & seal (703.9 to 715.0slk)

26-Feb-

15 02-May-14 On time $8,254,084.84 $9,079,493.32

On Budget

Contract

Number

Suggested Wording

for PQ

Target Date

Practical Completion

Works completed on time

Award Value Target Value On

budget

0025/08-0043

Collie Lake King Road - Improve road geometry, seal and widen shoulders 0 staged project (91.00 - 110.00slk)

05-Mar-15

16-Mar-15 Late $1,933,273.93 $2,126,601.32 On Budget

0026/ Bannister 08- 17-Feb-15 On time $1,057,095.85 $1,162,805.44 On

Page 20:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E628 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

08-0149

Marradong Road - Widen & seal shoulders (0.8 to 6.0 slk)

Mar-15 Budget

0024/08-0023

Great Eastern Highway / Focus Minerals & EMR Mine - Intersection upgrade

08-Mar-15

06-Mar-15 On time $1,499,208.85 $1,649,129.74 On Budget

0026/08-0142

Albany Highway, Narrikup - Construct passing lane

27-Mar-15

06-Mar-15 On time $1,354,270.09 $1,489,697.10 On Budget

0026/08-0150

Bussell Highway - Construct Margaret River Perimeter Road, Stage 1

19-Apr-15

07-May-15 Late $4,734,179.08 $5,207,596.99 On Budget

0027/08-0062

Construct Principal Shared Path - Between Shenton Park Train Station & Karrakatta Train Station along Stubbs Terrace

26-Apr-15

Late $2,480,799.98 $2,728,879.98 On Budget

0024/08-0026

Great Eastern Highway - Upgrade parking bay (573.7 to

11-May-15

23-Apr-15 On time $534,987.21 $588,485.93 On Budget

Page 21:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E629

574.25slk)

0252/09

Great Eastern Highway - Upgrade (Kooyong Rd - Tonkin Hwy) Project

18-May-15

28-Feb-13 On time $173,400,000.00 $190,740,000.0

0 On Budget

0027/08-0059

Toodyay Road - Intersection Improvements & Re-construction at Lewis Jones Crossing

26-May-15

Late $2,109,873.94 $2,320,861.33 On Budget

0027/08-0063

Lewis Jones crossing - Intersection upgrade

26-May-15

Late $2,144,269.75 $2,358,696.73 On Budget

0025/08-0047

Indian Ocean Drive - Construct southbound acceleration lane (66.44 to 68.59slk)

29-May-15

Late $567,361.82 $624,098.00 On Budget

Contract

Number

Suggested Wording

for PQ

Target Date

Practical Completion

Works completed on time

Award Value Target Value On

budget

0025/08-0049

Collie Lake King Road - Improve road geometry, seal and widen shoulders - staged project (91.00 -

29-May-15

Late $1,409,376.53 $1,550,314.18 On Budget

Page 22:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E630 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

110.00slk)

0025/08-0044

Northam Pithara Road - Shoulder and formation reconstruction, seal and widen to 9.0m

30-May-15

Late $1,985,110.71 $2,183,621.78 On Budget

0026/08-0155

Albany Highway, Norrish Road to Kojonup - Isolated pavement repair and geometric improvements

04-Jun-15

n/a $1,020,755.32 $1,122,830.85 On Budget

0080/14

Bussell Highway - Production of base course gravel

11-Jun-15

n/a $521,150.00 $573,265.00 On Budget

0064/14

Ennis Avenue - Intersection Upgrade Port Kennedy

18-Jun-15

n/a $2,259,953.57 $2,485,948.93 On Budget

0089/13

Great Eastern Highway - Widening and overlay from Bullabulling to Coolgardie (Shire of Coolgardie)

20-Jun-15

07-May-15 On time $27,181,482.74 $29,899,631.01 On Budget

0177/13

South Western Highway -

23-Jun-15

n/a $10,072,021.18 $11,079,223.30 On Budget

Page 23:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E631

Construct Ravensthorpe Heavy Vehicle Route

0063/14

Brand Highway, Bridge 1026 (Railway) - Reinforced concrete overly

23-Jun-15

n/a $798,539.99 $878,393.99 On Budget

0057/14

Coalfields Highway Upgrade - Production of base course gravel

25-Jun-15

n/a $628,200.00 $691,020.00 On Budget

0026/08-0132

Brockman Highway, Castle Curves - Widen seal & improve road alignment (55.25 to 57.70 slk)

26-Jun-15

29-Apr-15 On time $2,364,468.64 $2,600,915.50 On Budget

0223/13

Goomalling Toodyay Road - Replace Bridge No. 0635 & 0636 with culvert

30-Jun-15

n/a $972,071.95 $1,069,279.15 On Budget

Contract

Number

Suggested Wording

for PQ

Target Date

Practical Completion

Works completed on time

Award Value Target Value On

budget

0022/08-0035

Burrup Peninsula Road / Hearson Cove Road - Intersection

$569,457.86 $626,403.65 On Budget

Page 24:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E632 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

improvement

Late Projects - As at 31 May 2015

Contract Number

Description Targe

t Date

Practical

Completion

Works completed on time

Days Late Comments

0021/08-0020

Derby Highway - Construct Road Train Assembly Area (34.22 to 34.60slk)

02-Sep-

14

22-Oct-14

Late 50 Delayed due to availability of sealing and white lining resources.

0027/08-0044

Construct Principal Shared Path - West Road to Success Hill Bassendean

27-Nov-

14

28-Nov-14

Late 1

The site was damaged by graffiti vandals just prior to completion and the contractor was requested to remove the damage. In addition, a small additional portion of pavement marking was completed at the Success Hill end of the site at the point of conflict between pedestrians and cyclists

0027/08-0065

Toodyay Road widening at The Springs Road (16:925 to 17:140 slk)

08-Feb-

15

20-Feb-15

Late 12

The contractor went into administration mid-way through the contract, as a result another contractor needed to be engaged to finish the outstanding work.

0025/08-0043

Collie Lake King Road - Improve road geometry, seal and widen shoulders 0 staged project (91.00 - 110.00slk)

05-Mar-

15

16-Mar-15

Late 11

Minor delays due to slower production rates at commencement of contract & fatal crash investigation.

Contract Number

Description Targe

t Date

Practical Completio

n

Works completed on

time

Days Late Comments

0026/08-0150

Bussell Highway - Construct Margaret River Perimeter Road, Stage 1

19-Apr-

15

07-May-15

Late 18 Extension of time in progress for gravel supply & weather delays.

Page 25:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E633

0027/08-0062

Construct Principal Shared Path - Between Shenton Park Train Station & Karrakatta Train Station along Stubbs Terrace

26-Apr-

15 Late

Due to a number of delays on site including encountering a large volume of unsuitable material that had to be removed, and delays caused by Western Power, the PC date is now likely to be the end of May - a variation will be considered at the completion of works.

0027/08-0059

Toodyay Road - Intersection Improvements & Re-construction at Lewis Jones Cross intersection

26-May-

15 Late

Work is substantially complete, however there have been some changes to the scope works. In addition some of the re-surfacing work was not considered to meet roughness standards and as a result the contractor is being directed to relay.

0027/08-0063

Lewis Jones crossing - Intersection upgrade

26-May-

15 Late

Linked to contract 0027/08-0059. Work is substantially complete, however there have been some changes to the scope works. In addition some of the re-surfacing work was not considered to meet roughness standards and as a result the contractor is being directed to relay.

Contract Number

Description Targe

t Date

Practical Completio

n

Works completed on

time

Days Late Comments

0025/08-0047

Indian Ocean Drive - Construct southbound acceleration lane (66.44 to 68.59slk)

29-May-

15 Late

Revised estimate completion date 16/6/15

0025/08-0049

Collie Lake King Road - Improve road geometry, seal and widen shoulders - staged project (91.00 - 110.00slk)

29-May-

15 Late

Revised estimated completion date 5/6/15

0025/08-0044

Northam Pithara Road - Shoulder and formation reconstruction, seal and widen to 9.0m

30-May-

15 Late

Estimate completion date revises and updated in CTS - awaiting completion of line marking.

Page 26:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E634 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

Projects over budget - As at 31 May 2015

Contract Number

Description Targe

t Date

Practical Completio

n

Works completed on

time

Award Value

Target Value

On budg

et

Comments

0027/08-0044

Construct Principal Shared Path - West Road to Success Hill Bassendean

27-Nov-

14 28-Nov-14 Late

$2,274,91

7.38

$2,502,409

.12 Over

An additional retaining wall was constructed due to concerns raised by members of the public.

[Supplementary Information No A26.] Question: Mr P.C. Tinley: asked can the Minister provide, on the assumption Perth Freight Link is built, capacity of the port and the number of TEUs through to 2031.? Answer: The ultimate capacity of the port, and the timeframe in which this capacity is reached, is subject to a number of factors, including improved access and advancements in container handling technologies.

[Supplementary Information No A27.]

Question: Ms S.F. McGurk: asked can the Minister provide the information that feeds into the modelling around the number of trucks that we will be shifting from Fremantle, irrespective of where they come from Fremantle; that is, the number of trucks that are moving through the Perth Freight Link?

Answer: The number of trucks estimated to be moving through the Perth Freight Link, on Leach Highway between Carrington Street and Stirling Highway, by 2031 is 6,860 trucks per day.

Division 73: Public Transport Authority of Western Australia —

[Supplementary Information No A28.] Question: Mr F.A. Alban: asked, in relation to page 826 of the Budget Statements, can the PTA provide the actual number of buses provided to service the Ellenbrook-Aveley district to access Bassendean station, Morley Galleria and Midland? Answer: Weekdays Route 955 to Bassendean and Morley – 28 trips from Ellenbrook, 29 trips to Ellenbrook - 6 buses Route 956 to Bassendean – 23 trips from Ellenbrook, 22 trips to Ellenbrook - 4 buses Route 335 to Midland – 2 trips each way - 1 bus Feeder buses Route 334 – 28 trips each way to “The Shops” (shopping centre in Ellenbrook), 2 buses. Route 336 – 27 trips each way to “The Shops”, 2 buses. Route 337 – 29 trips to “The Shops”, 30 trips from “The Shops”, 3 buses. Saturdays Route 955 to Bassendean and Morley – 24 trips each way - 4 buses. Feeder buses Route 334 – 10 trips to “The Shops”, 11 trips from “The Shops”} combined 1 bus. Route 336 – 11 trips to “The Shops”, 12 trips from “The Shops”} Route 337 – 21 trips each way, 1 bus.

Page 27:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E635

Sundays and Public Holidays Route 955 to Bassendean and Morley – 10 trips each way - 2 buses.

[Supplementary Information No A29.] Question: Ms R. Saffioti: asked, in relation to page 826 of the Budget Statements can the PTA advise what the anticipated bus service kilometre increases are particularly for new suburbs, for 2015–16 and 2016–17?

Answer:

2015-16

An additional 850, 000 kilometres are anticipated to be introduced across the network, with new and extended services in Alkimos, Baldivis, the Ellenbrook area and Landsdale. Services will also be improved in existing areas, such as new links to Curtin University, the airport and Maylands.

Additional services projects are achieved through a combination of service kilometre growth and the reallocation of kilometres from under-performing services.

2016-17

An additional 600, 000 kilometres are anticipated to be introduced, primarily in creating the new high-frequency Route 960 Superbus from Mirrabooka Bus Station to Curtin University via Perth City.

Division 9: WA Health —

[Supplementary Information No A30.] Question: Ms M.M. Quirk: referred to Health System Overview, page 125 of the budget papers and asked– “I want some information about the presentations in recent months to emergency departments by patients suffering from respiratory illness and asthma because of prescribed burns. I want to know whether there has been an increase in presentations, and how many, if any, health warnings has the Department of Health put out this year?”

Answer: Data on Emergency Department (ED) presentations of patients suffering from respiratory illness and asthma because of prescribed burns is not recorded directly in ED Data Collection. The Department of Health (the Department) does not generally directly issue health warnings to the public in relation to prescribed burns. The Department has provided environmental and fire management agencies health-related information for their media statements and the agreed process between these agencies is that health warnings are included in media statements as part of “Smoke Haze Alerts”

[Supplementary Information No A31.] Question: Mr R.H. Cook: asked “Could the minister please provide the current weighted average unit costs of all hospitals in Western Australia?”

Answer: The latest national information available on the cost per national weighted average unit (NWAU) is that published by the National Health Performance Authority in their report titled National Health Performance Authority 2015, Hospital Performance: Costs of acute admitted patients in public hospitals in 2011–12 (the Report).

Appendix 1 to the Report on pages 32 and 33 provides the cost per national weighted average unit for major and large metropolitan hospitals in WA and can be found at the following link:

http://www.myhospitals.gov.au/docs/default-source/our-report-pdfs/hp_costsofacuteadmittedpatients_2011_12_rpt.pdf

[Supplementary Information No A32.] Question: Mr R.H. Cook: referred to Fiona Stanley Hospital Facilities Management Contract Negotiations, page 124 of the budget papers and asked—

“Would it be possible for the minister to provide us with a summary of information in relation to service delivery by Serco under its KPIs, and perhaps for simplification purposes across just those five areas, for the purposes of expediency and moving us forward?”

Page 28:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E636 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

Answer: According to the May 2015 Service Report provided by Serco and correct as at the end of May 2015, the Facility Management Services that were abated the most over the period (February to April 2015) are Cleaning, Estate Services, Helpdesk, Information and Communications Technology and Internal Logistics. A summary of the KPIs which accumulated the most failure points in each Service is provided below.

Service Line

Number of KPIs

in Service

KPIs which accumulated

the most Failure Points

KPI Explanation and Level of Performance

Cleaning Service 18

CL007

This KPI measures the arrival time for Isolation cleaning jobs. For the 5.78% of jobs that failed this KPI, the average arrival time was 22.48 minutes instead of the required 20 minutes. The FM attended every Isolation Cleaning job.

CL008

This KPI measures the arrival time for Emergency cleaning jobs. For the 15.88% of jobs that failed this KPI, the average arrival time was 15 minutes instead of the required 10 minutes. The FM attended every Emergency Cleaning job.

CL009

This KPI measures the time taken to complete the requested Emergency cleaning job. For the 10.85% of jobs that failed this KPI, the average completion time was 37.82 minutes instead of the required 30 minutes. The FM completed all emergency cleaning jobs.

Estate Service 31

ES004

This KPI measures the FM’s arrival time at the location of an asset with an Emergency fault. For the 2.58% of jobs that failed this KPI, the average arrival time was 30.56 minutes instead of the required 30 minutes. The FM attended every Emergency Fault.

ES006

This KPI measures the FM’s arrival time at the location of an asset with an Urgent fault. For the 2.84% of jobs that failed this KPI, the average arrival time was 61.46 minutes instead of the required 60 minutes. The FM attended every Urgent Fault.

Page 29:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E637

ES007

This KPI measures the time taken to complete Reactive Maintenance for an Urgent Fault. For the 0.23% of jobs that failed this KPI, the average time taken was 4 hours and 31.45 minutes instead of the required 4 hours and 30 minutes during peak operating hours and 8 hours and 1.45 minutes during off peak hours instead of the required 8 hours.

Helpdesk and Communications Service 24

HD014

This KPI measures the percentage of external calls answered within 15 seconds. The Helpdesk handled 162,415 calls of this type in this period. 11% exceeded a wait time of 15 seconds. The target for this KPI is 95% of calls answered in less than 15 seconds.

HD015

This KPI measures the percentage of external calls answered within 30 seconds. The Helpdesk handled 162,415 calls of this type in this period. 7% exceeded a wait time of 30 seconds. The target for this KPI is 99% of calls answered in less than 30 seconds.

HD016

This KPI measures the percentage of internal calls answered within 30 seconds. The Helpdesk handled 183,139 calls of this type in this period. 14% exceeded a wait time of 30 seconds. The target for this KPI is 70% of calls answered in less than 30 seconds.

HD017

This KPI measures the percentage of internal calls answered within 60 seconds. The Helpdesk handled 183,139 calls of this type in this period. 8% exceeded a wait time of 60 seconds. The target for this KPI is 99% of calls answered in less than 60 seconds.

Information and Communications Technology Service 34 ICT001

This KPI measures the availability of Class A applications (e.g. Automated Guided Vehicles). All applications need to be available 99.8% of the time. One application did not meet the target; the ICT problem management system was available for 99.29% for the month of February and met this KPI target during March and April.

Page 30:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E638 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

ICT002

This KPI measures the availability of Class B applications (e.g. Disptach). All applications are non-clinical and need to be available 99.5% of the time. One application did not meet the target, the medical device tracking system which was available for 99.31% of February. Work-arounds ensured there was no interruption to clinical activity.

ICT003

This KPI measures the availability of Class C applications (e.g. Parking Logic). All applications need to be available 98% of the time. One application did not meet the target, the learning and training system, which was available for 95.25% of February.

ICT033

This KPI measures the resolution times of Service requests against the times detailed in the Service Catalogue. The Service Catalogue has not yet been finalised so the FM currently fail this KPI. However users’ service requests are being addressed and there was no impact on patient safety.

Internal Logistics Service 11

LOG004

This KPI measures the completion time for emergency logistics jobs, primarily to move patients or equipment. For the 25% of jobs that failed this KPI, the average arrival time was 25.79 minutes instead of the required 20 minutes. The FM completed every emergency logistics request.

LOG005

This KPI measures the time taken to attend an urgent logistics request. For the 5.39% that failed this KPI, the attendance time was 42.37 minutes instead of the required 40 minutes.

LOG006

This KPI measures the time taken to complete an urgent logistics job. For the 8.65% that failed this KPI, the completion time was 53.65 minutes instead of the required 45 minutes.

Page 31:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E639

[Supplementary Information No A33.]

Question: Ms M.M. Quirk: asked and Dr K.D. Hames: stated – “I am happy to provide the answer to the first part of the question by way of supplementary information. As the member would expect, we do not have those numbers. We will provide the numbers of patients in the rehabilitation unit at Fiona Stanley Hospital who are from north of the river.”

Answer: From its opening on 4 October 2014 to the 10 June 2015, there have been 606 patients who, after receiving rehabilitation care, were discharged from the rehabilitation wards at Fiona Stanley Hospital. Of these, 188 (31.0%) were from the northern suburbs.

Please note that Inpatient Data Collections identifies the location of the patient based on their recorded postcode and suburb. The IDC use of the classification “northern suburbs” aligns with standard practice within the Department of Health, specifically the Epidemiology Branch.

Division 50: Fisheries —

[Supplementary Information No A34.]

Question: Mr D.J. Kelly: asked if the Department would be willing to provide supplementary information on the number of commercial fishers who have logged into and used the Fish Eye system each week since it has been rolled out and the budgeted annual operating costs for the Fish Eye system over the forward estimates.

Answer: Fish Eye is the name used to describe an information technology project that has modernised various systems and process used in fisheries management in Western Australia. The project has improved Department of Fisheries’ (Department) information technology infrastructure, replaced an outdated licensing system and built a catch and effort system capable of receiving both electronic and paper based returns from fishers.

The key components of the Fish Eye solution were delivered in the middle of 2013 and the West Coast Rock lobster fishery has been operating under the new arrangements since that time. Fisheye provides for:

• catch and effort statistics from fishers to be lodged electronically.

• licence renewals to be conducted electronically.

• commercial fishers to trade in quota in real time and analyse their results.

The Department does not maintain records of fishers who have logged onto the system, so usage of the system is best reflected in the statistics provided below relating to use of electronic lodgement or registration for using Fish Eye. In addition to the information below, 208 fishers have renewed Commercial Fishing Licences on-line since the service was provided as part of Fish Eye.

Catch and Effort Statistics

The following information includes the number of fishers who have used Fish Eye electronic submissions at least once in the relevant week. Fishers will typically submit information on more than one day per week.

LOG008

This KPI measures the percentage of non-urgent logistics jobs that are completed within 35 minutes from attendance at the job. In February 85.48% of jobs were completed in time. The target for this KPI is 90% of jobs are completed within 35 minutes of attendance. This KPI was met in March and April.

Page 32:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E640 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

Western Rock Lobster

Season 2013

Week starting Total

26-Aug 0

2-Sep 1

9-Sep 10

16-Sep 8

23-Sep 7

30-Sep 4

7-Oct 1

14-Oct 1

21-Oct 4

28-Oct 5

4-Nov 4

11-Nov 7

18-Nov 13

25-Nov 15

2-Dec 13

9-Dec 17

16-Dec 29

23-Dec 17

30-Dec 14

6-Jan 16

13-Jan 7

Western Rock Lobster

Season 2014

Week starting Total

15-Jan 25

22-Jan 25

29-Jan 29

5-Feb 27

12-Feb 28

19-Feb 28

26-Feb 27

5-Mar 28

12-Mar 21

19-Mar 21

26-Mar 21

2-Apr 21

9-Apr 21

16-Apr 20

23-Apr 21

30-Apr 24

7-May 21

14-May 21

21-May 28

28-May 23

4-Jun 23

11-Jun 16

18-Jun 22

25-Jun 22

2-Jul 20

9-Jul 13

16-Jul 10

23-Jul 13

Western Rock Lobster and Abalone

Season 2015

Week starting Total

15-Jan 44

22-Jan 40

29-Jan 37

5-Feb 36

12-Feb 40

19-Feb 36

26-Feb 37

5-Mar 35

12-Mar 36

19-Mar 31

26-Mar 23

2-Apr 19

9-Apr 24

16-Apr 28

23-Apr 28

30-Apr 30

7-May 30

14-May 30

21-May 29

28-May 26

4-Jun 20

Page 33:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E641

30-Jul 19

6-Aug 15

13-Aug 12

20-Aug 24

27-Aug 28

3-Sep 25

10-Sep 24

17-Sep 23

24-Sep 21

1-Oct 18

8-Oct 6

15-Oct 10

22-Oct 12

29-Oct 13

Western Rock Lobster

Season

2014

5-Nov 6

12-Nov 9

19-Nov 25

26-Nov 32

3-Dec 31

10-Dec 26

17-Dec 20

24-Dec 17

31-Dec 16

7-Jan 22

Page 34:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E642 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

Number of Fisheries licence holders registered to use Fisheye

Western Rock Lobster Abalone

Number of RL MFLs (current) 599 49

Number of RL MFLs Registered for Fish Eye 257 5

Number of entitlement transfers completed using Fish Eye on line services Season 2013

Week starting Total

2-Dec 1

16-Dec 1

30-Dec 1

Season 2014

Week starting Total

15-Jan 1

21-May 1

28-May 1

4-Jun 1

10-Sep 1

15-Oct 1

12-Nov 1

19-Nov 2

3-Dec 1

31-Dec 1

7-Jan 7

Season 2015

Week starting Total

15-Jan 5

22-Jan 1

29-Jan 3

12-Feb 2

26-Feb 2

12-Mar 2

9-Apr 1

23-Apr 2

7-May 1

28-May 2

The total recurrent costs of the various components of the Fish Eye program is $446,000 per annum.

[Supplementary Information No A35.]

Question: Mr D.J. Kelly: asked the minister to provide information which was clarified as being information on our port monitoring program and any results from that and whether biosecurity plans are subsequently in place for those ports and also for marinas.

Answer: The Department of Fisheries’ (Department) biosecurity program works on a risk based approach and seeks to maximise effectiveness through a focus on preventing the establishment of pests in partnership with industry. At the commencement of the program, ports were identified as high risks for receiving, and further dissemination of, marine pests and hence were an early focus for the program.

Thirteen known WA ports have monitoring plans in place for invasive marine species – Broome, Port Hedland, Dampier, Cape Lambert, Cape Preston, Anketell, Geraldton, Fremantle (and Henderson), HMAS Stirling, Bunbury, Albany, Esperance, and Barrow Island. The cost of implementation of the monitoring plans is met in most cases by the relevant port. In a few instances costs are currently borne by a relevant industry partner (for example, Chevron Gorgon meets the costs of monitoring Barrow Island as part of Ministerial Conditions under the Environmental Protection Act 1986).

The Department currently provides and funds comprehensive monitoring of Dampier, Port Hedland and Fremantle ports every two years to meet responsibilities under the Inter-Governmental Agreement on Biosecurity (IGAB). This monitoring system was designed more than ten years ago, targets non-priority species, and is now considered excessive. Monitoring every two years under the IGAB is expensive and considered less than effective as an early warning system for introduction of pests through vessel biofouling. The use of a simplified, manageable system based primarily on “settlement arrays” which are examined every three months is more appropriate and cost effective.. This system is being transitioned into, and funded by, the three ports

Page 35:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E643

above. As a result, the two year monitoring programs will cease at June 30 2015 and be replaced with the new three monthly program.

The results of the monitoring program are outlined within the Department’s annual Status Reports of Fisheries and Aquatic Resources SOFAR. The relevant section is on pages 321-333 of the most recent SOFAR report which is available on the Department’s website http://www.fish.wa.gov.au/Documents/sofar/status_reports_of_the_fisheries_and_aquatic_resources_2013-14.pdf .

With specific reference to marinas, the Department recognises the risk posed by recreational vessels and marinas for the introduction and spread of invasive marine pests. The Department has provided input into the development of a ‘marine biosecurity’ module of the ‘Fish Friendly Marinas’ initiative instigated by NSW and now being extended to other states. This marina-accreditation program considers aspects such as safety, security, environmental sustainability and more recently marine biosecurity. The Department is able to assess competence against the marine biosecurity parameters of the program. The Royal Perth Yacht Club is the first WA marina to be accredited as a ‘Fish Friendly Marina’. The Department will continue to assist in promotion of the program to WA marina operators through stakeholder engagement and partnership opportunities.

The Department also undertakes “delimiting” surveys at high risk marinas such as at Geraldton, Albany and Hillarys to establish baselines and identify patters of spread of existing pests (Didemnum perlucidum, and Codium fragile fragile).

[Supplementary Information No A36.]

Question: Mr P. Papalia: asked the Minister to provide, through supplementary information, the number of qualified biofouling inspectors who Fisheries employ as fisheries officers or any other positions and he would also like the number of biofouling inspectors who work in the state, who Fisheries does not employ – consultants or freelance and to know whether that number has decreased or increased in the last two years since a new qualification was created in 2013 and run by TAFE.

Answer: To attain accreditation, Biofouling Inspectors must complete:

1. The accredited TAFE course Biofouling Inspections Cert IV (either by attendance or recognition of prior learning or RPL)

2. Considerable infield inspection experience

Note: Existing approved Biofouling Inspectors have a four year grace period in which to complete the TAFE course.

Biofouling Inspectors

Group Number Qualifications Inspection experience requirement

a) Department of Fisheries (DoF) – Fisheries Officers

2 TAFE course attended and completed. Staff currently being confirmed against DoF criteria for inclusion on the WA approved biofouling inspectors list.

Completed - considerable in field inspection experience over last 3+ years while working as a DoF biosecurity compliance officer.

Inductions completed to work at local dry-dock facilities.

b) DoF - Research Scientists

1 (+ 2) One person previously listed on WA approved Biofouling Inspectors list, with PhD in marine science.

Two people not listed, but PhD’s in marine science and relevant work experience.

Significant previous and current work experience, including induction to work at local dry-dock facilities.

c) DoF - Management (1) TAFE course attended and completed.

Significant biosecurity experience in senior vessel management and marine biosecurity role.

Page 36:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E644 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

d) DoF – Other staff (2) Relevant work experience only.

Inspection experience working at the Department.

e) External – Accreditation commenced

4 TAFE course attended and completed.

In field inspection experience commenced, to be completed over next four years.

f) External – WA approved inspectors list

9 TAFE course or RPL recommended to be completed within four years from 2014.

Other qualifications complete include combinations of PhD/MSc/BSc in marine science and considerable industry experience.

Two Inspectors have arrangements with TAFE course through with TAFE for delivering course content and materials

Considerable in field inspection experience over last 5-20+ years, depending on the inspector.

g) External – Other potential inspectors

21* People with known relevant inspection experience, but not on the WA approved list.

Many have shown interest in attending the course to achieve accreditation.

Varying degrees of in field experience conducting inspections. Most work for Environmental Consultancy companies, or other other companies related to vessel management.

Total

Current WA Biofouling Inspectors

12

(=a+b+f)

Total additional potential WA Biofouling Inspectors

25

(=e+f)

Trends over past 3-5 years

TAFE has conducted one complete course (all three modules) in 2014, with a second planned for late 2015. Trend data will be available from 2015 on.

* Note that approximately the same number of people have expressed interest in attending the TAFE course without the intention of becoming an inspector. Instead, they want to use the information and experience from the course for work in related industries e.g. as a vessel manager, or Safety Health Environment (SHE) Manager for environmental consultancies, shipping agencies, or supporting services. This will improve vessel management for biofouling and invasive marine species, and therefore better marine biosecurity outcomes for WA.

[Supplementary Information No A37.] Question: Mr R.H. Cook: asked the Minister about the number of recreational boat safety checks carried out last summer between the months of December 2014 and April 2015. Can the minister also provide a month by month breakdown for these months?

Answer:

Date Number of Full Marine Safety Checks

Dec 2014 498

Jan 2015 495

Feb 2015 250

Page 37:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E645

Mar 2015 448

Apr 2015 316

Note: Data is incomplete for April 2015 as the data is still being entered by the Unit responsible for data collection and verification.

Division 10: Western Australian Tourism Commission —

[Supplementary Information No A38.]

Question: Mr P. Papalia: asked to be provided details of the marketing budget breakdown by target markets.

Answer: Below is a breakdown of the 2015-16 Destination Marketing budget as contained in the State Budget papers. Some of these figures are indicative as Tourism Western Australia is still in the process of finalising its detailed operational plans.

Destination Marketing Budget 2015-16

Target Markets

Australia 8,773,000

International Markets

(including representation fees, international labour

costs and overheads):

9,406,000

China (including Hong Kong) 2,639,000

United Kingdom 1,603,000

Singapore 1,108,000

Germany (including Switzerland) 910,000

United States of America 800,000

Indonesia 670,000

Malaysia 632,000

New Zealand 550,000

Japan 477,000

Korea 17,000

Total Target Markets 18,179,000

Other

Partnerships

(Regional Tourism Organisations, Perth Convention Bureau

and WA Visitor Centre)

9,178,000

Activity Benefitting all Markets:

Digital Marketing 1,357,000

Trade Marketing 570,000

Page 38:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E646 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

Public Relations and Familiarisations 535,000

Creative and Campaign Development 2,612,000

Salaries and administration 3,448,000

Marketing revenue

(airline in-kind sponsorship and industry contributions/participation fees) 585,000

Marketing Budget – Total Cost of Services 36,464,000

Marketing share of corporate overheads 7,074,000

Total Destination Marketing Budget 43,538,000

Division 74: Housing Authority —

[Supplementary Information No A39.]

Question: Mr P.C. Tinley: asked whether the minister could provide details of the housing stock that the Department of Housing owns that it rents to the open market, the time that they have been rented to the open market, the reasons why they have been rented to the open market and the total value of the rent received for that (the revenue number).

Answer: The Department is able to provide the suburb, lease start date and the reason for private lease.

The Department is not able to provide the information requested regarding rent received, as the information requires an extensive manual process to locate and collate these details.

DISTRICT LEASE START DATE

REASON FOR TENANCY

ALBANY 3/05/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

ALBANY 30/05/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

AUGUSTA 23/09/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

BADGINGARRA 3/10/2011 SURPLUS TO CURRENT GROH REQUIREMENTS

BEVERLEY 18/01/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

BODDINGTON 15/12/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

BORDEN 9/11/2011 SURPLUS TO CURRENT GROH REQUIREMENTS

BROOKTON 14/10/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

BROOME 29/07/2009 SURPLUS TO CURRENT GROH REQUIREMENTS

BROOME 7/08/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

BROOME 15/12/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

BRUCE ROCK 2/11/2012 SURPLUS TO CURRENT GROH REQUIREMENTS

CAMBALLIN 22/09/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

CAMBALLIN 22/09/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

Page 39:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E647

CAREY PARK 13.12.2013 SOUTH WEST NATIVE TITLE SETTLEMENT

CARNARVON 8/05/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

CARNARVON 25/02/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

CASSIA 1/01/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

CUNDERDIN 30/01/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

DAGLISH 30.07.2012 REDEVELOPMENT

DALWALLINU 19/10/2009 SURPLUS TO CURRENT GROH REQUIREMENTS

DALWALLINU 7/07/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

DAMPIER 30/01/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

DARKAN 1/03/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

DENMARK 2/10/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

DERBY 14/09/2009 SURPLUS TO CURRENT GROH REQUIREMENTS

DERBY 24/09/2012 SURPLUS TO CURRENT GROH REQUIREMENTS

DERBY 24/09/2012 SURPLUS TO CURRENT GROH REQUIREMENTS

DERBY 24/09/2012 SURPLUS TO CURRENT GROH REQUIREMENTS

DERBY 15/08/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

DERBY 2/11/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

DONGARA 7/05/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

DOUBLEVIEW 19.12.2011 REDEVELOPMENT

DOUBLEVIEW 20.06.2011 REDEVELOPMENT

DOUBLEVIEW 23.04.2012 REDEVELOPMENT

DOUBLEVIEW 19.12.2011 REDEVELOPMENT

DOWERIN 4/12/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

DWELLINGUP 12/12/2012 SURPLUS TO CURRENT GROH REQUIREMENTS

ESPERANCE 1/09/2011 SURPLUS TO CURRENT GROH REQUIREMENTS

FITZROY CROSSING 17/04/2012 SURPLUS TO CURRENT GROH REQUIREMENTS

FITZROY CROSSING 15/01/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

FITZROY CROSSING 24/01/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

FITZROY CROSSING 11/11/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

FITZROY CROSSING 24/11/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

FITZROY CROSSING 6/08/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

Page 40:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E648 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

FORRESTFIELD 12.12.2013 SOUTH WEST NATIVE TITLE SETTLEMENT

FREMANTLE 20.09.2011 REDEVELOPMENT

FREMANTLE 20.09.2011 REDEVELOPMENT

FREMANTLE 04.04.2011 REDEVELOPMENT

FREMANTLE 03.02.2011 REDEVELOPMENT

FREMANTLE 07.02.2012 REDEVELOPMENT

FREMANTLE 15.03.2012 REDEVELOPMENT

FREMANTLE 04.04.2011 REDEVELOPMENT

FREMANTLE 02.08.2011 REDEVELOPMENT

FREMANTLE 03.02.2011 REDEVELOPMENT

FREMANTLE 07.03.2012 REDEVELOPMENT

FREMANTLE 28.01.2014 REDEVELOPMENT

FREMANTLE 12.12.2010 REDEVELOPMENT

FREMANTLE 24.06.2013 REDEVELOPMENT

FREMANTLE 25.11.2011 REDEVELOPMENT

FREMANTLE 04.04.2011 REDEVELOPMENT

FREMANTLE 03.02.2011 REDEVELOPMENT

GNOWANGERUP 20/02/2012 SURPLUS TO CURRENT GROH REQUIREMENTS

GNOWANGERUP 12/03/2012 SURPLUS TO CURRENT GROH REQUIREMENTS

GNOWANGERUP 14/02/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

GOSNELLS 22.12.2010 REDEVELOPMENT

HALLS CREEK 6/01/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

HALLS CREEK 7/04/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

HALLS CREEK 1/06/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

HALLS CREEK 15/10/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

HALLS CREEK 1/07/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

HAMILTON HILL 20.11.2013 SOUTH WEST NATIVE TITLE SETTLEMENT

HILTON 15.06.2011 REDEVELOPMENT

HILTON 22.02.2006 REDEVELOPMENT

HILTON 15.06.2011 REDEVELOPMENT

HILTON 13.05.2013 REDEVELOPMENT

Page 41:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E649

HYDEN 12/09/2012 SURPLUS TO CURRENT GROH REQUIREMENTS

INNALOO 07.03.2012 REDEVELOPMENT

INNALOO 08.08.2014 REDEVELOPMENT

INNALOO 23.07.2014 REDEVELOPMENT

JARRAHDALE 6/01/2006 SURPLUS TO CURRENT GROH REQUIREMENTS

JARRAHDALE 6/01/2006 SURPLUS TO CURRENT GROH REQUIREMENTS

JARRAHDALE 15/05/2006 SURPLUS TO CURRENT GROH REQUIREMENTS

JARRAHDALE 19/03/2008 SURPLUS TO CURRENT GROH REQUIREMENTS

JARRAHDALE 22/08/2008 SURPLUS TO CURRENT GROH REQUIREMENTS

JARRAHDALE 12/04/2011 SURPLUS TO CURRENT GROH REQUIREMENTS

JARRAHDALE 1/08/2011 SURPLUS TO CURRENT GROH REQUIREMENTS

JARRAHDALE 19/07/2012 SURPLUS TO CURRENT GROH REQUIREMENTS

JARRAHDALE 14/04/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

JERRAMUNGUP 30/04/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

JURIEN BAY 29/10/2012 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 1/05/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 7/06/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 27/05/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 15/09/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 12/10/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 1/11/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 17/01/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 17/02/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 21/02/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 14/07/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 14/07/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 28/05/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 30/05/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 10/09/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 7/11/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 17/10/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

Page 42:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E650 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

KARRATHA 10/11/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 2/11/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 12/01/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 23/01/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 30/01/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 7/07/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 24/07/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KARRATHA 29/07/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KATANNING 31/03/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KATANNING 17/06/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

KATANNING 16/02/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

KATANNING 7/04/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

KATANNING 8/04/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

KOJONUP 26/02/2006 SURPLUS TO CURRENT GROH REQUIREMENTS

KOJONUP 21/03/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KOJONUP 8/09/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KOJONUP 21/10/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KOJONUP 21/02/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

KONDININ 5/03/2006 SURPLUS TO CURRENT GROH REQUIREMENTS

KOOMBANA 11/10/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

KOOMBANA 10/10/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KOOMBANA 22/10/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KOOMBANA 4/12/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KOOMBANA 30/01/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

KOOMBANA 02.05.2014 AWAITING SALE

KULIN 29/04/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

KUNUNURRA 30/04/2008 SURPLUS TO CURRENT GROH REQUIREMENTS

KUNUNURRA 13/08/2010 SURPLUS TO CURRENT GROH REQUIREMENTS

KUNUNURRA 2/08/2010 SURPLUS TO CURRENT GROH REQUIREMENTS

KUNUNURRA 8/02/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

KUNUNURRA 28/05/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

Page 43:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E651

KUNUNURRA 31/05/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

KUNUNURRA 13/05/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KUNUNURRA 29/08/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KUNUNURRA 24/09/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

KUNUNURRA 28/10/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

LAKE GRACE 21/10/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

LAKE GRACE 22/10/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

LEEMAN 16/08/2011 SURPLUS TO CURRENT GROH REQUIREMENTS

MADDINGTON 29.10.2001 REDEVELOPMENT

MANNING 17.07.2012 REDEVELOPMENT

MARBLE BAR 14/08/2007 SURPLUS TO CURRENT GROH REQUIREMENTS

MARBLE BAR 18/09/2010 SURPLUS TO CURRENT GROH REQUIREMENTS

MAYLANDS 29.10.2001

40 UNIT COMPLEX WITH EXISTING PRIVATE TENANTS WAS PURCHASED FOR SOCIAL HOUSING IN 2001. AN

UNDERTAKING WAS GIVEN THAT EXISTING TENANTS COULD REMAIN. 39 PRIVATE TENANTS HAVE MOVED OUT AND BEEN REPLACED WITH SOCIAL HOUSING TENANTS. ONE PRIVATE

TENANT REMAINS

MECKERING 27/11/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

MEEKATHARRA 14/07/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

MEEKATHARRA 27/04/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

MERREDIN 21/04/2009 SURPLUS TO CURRENT GROH REQUIREMENTS

MERREDIN 6/01/2012 SURPLUS TO CURRENT GROH REQUIREMENTS

MERREDIN 28/05/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

MIDDLE SWAN 15.03.2013 REDEVELOPMENT

MILING 23/03/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

MOORA 19/06/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

MOUNT BARKER 04.08.2014 SOUTH WEST NATIVE TITLE SETTLEMENT

MOUNT TARCOOLA 18/11/2011 SURPLUS TO CURRENT GROH REQUIREMENTS

MUKINBUDIN 16/04/2012 SURPLUS TO CURRENT GROH REQUIREMENTS

MUKINBUDIN 28/02/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

NANNUP 20/05/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

NANNUP 16/02/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

Page 44:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E652 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

NAREMBEEN 8/06/2012 SURPLUS TO CURRENT GROH REQUIREMENTS

NAREMBEEN 23/11/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

NAREMBEEN 20/04/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

NARROGIN 26/10/2012 SURPLUS TO CURRENT GROH REQUIREMENTS

NARROGIN 25/01/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

NEWMAN 1/08/2011 SURPLUS TO CURRENT GROH REQUIREMENTS

NEWMAN 16/11/2012 SURPLUS TO CURRENT GROH REQUIREMENTS

NEWMAN 25/03/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

NEWMAN 6/07/2012 SURPLUS TO CURRENT GROH REQUIREMENTS

NEWMAN 30/05/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

NEWMAN 22/07/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

NOLLAMARA 14.03.2014 REDEVELOPMENT

NOLLAMARA 14.03.2014 REDEVELOPMENT

NORTH BEACH 27.06.2013 REDEVELOPMENT

NORTH BEACH 24.09.2013 REDEVELOPMENT

NORTH BEACH 26.03.2013 REDEVELOPMENT

NORTH BEACH 06.03.2013 REDEVELOPMENT

NORTH BEACH 18.07.2014 REDEVELOPMENT

NORTH BEACH 24.04.2013 REDEVELOPMENT

NORTH BEACH 24.04.2013 REDEVELOPMENT

NORTH BEACH 26.02.2015 REDEVELOPMENT

NORTH BEACH 09.01.2014 REDEVELOPMENT

NORTHAM 17/04/2012 SURPLUS TO CURRENT GROH REQUIREMENTS

NORTHAMPTON 16/01/2012 SURPLUS TO CURRENT GROH REQUIREMENTS

NULLAGINE 12/09/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

ONGERUP 24/09/2010 SURPLUS TO CURRENT GROH REQUIREMENTS

ONGERUP 30/06/2010 SURPLUS TO CURRENT GROH REQUIREMENTS

ONGERUP 3/09/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

ONSLOW 11/11/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

ONSLOW 28/11/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

ONSLOW 3/03/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

Page 45:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E653

PEMBERTON 27/11/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

PINGELLY 17/12/2007 SURPLUS TO CURRENT GROH REQUIREMENTS

PINGELLY 17/06/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

PINGELLY 26/07/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

QUAIRADING 22/09/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

QUAIRADING 21/11/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

QUINNINUP 5/03/2006 SURPLUS TO CURRENT GROH REQUIREMENTS

ROEBOURNE 21/01/2010 SURPLUS TO CURRENT GROH REQUIREMENTS

ROEBOURNE 26/11/2010 SURPLUS TO CURRENT GROH REQUIREMENTS

ROEBOURNE 30/06/2010 SURPLUS TO CURRENT GROH REQUIREMENTS

ROEBOURNE 13/05/2011 SURPLUS TO CURRENT GROH REQUIREMENTS

ROEBOURNE 15/04/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

ROEBOURNE 14/10/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

ROEBOURNE 14/10/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

ROEBOURNE 14/10/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

SAINT JAMES 03.08.2011 REDEVELOPMENT

SAINT JAMES 07.10.2013 REDEVELOPMENT

SAINT JAMES 22.12.2010 REDEVELOPMENT

SCARBOROUGH 01.08.2013 REDEVELOPMENT

SCARBOROUGH 20.10.2014 REDEVELOPMENT

SOUTH HEDLAND 04.06.2014 AWAITING SALE

SOUTH HEDLAND 04.06.2014 AWAITING SALE

SOUTH HEDLAND 04.06.2014 AWAITING SALE

SOUTH HEDLAND 04.06.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

Page 46:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E654 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 29.10.2014 AWAITING SALE

SOUTH HEDLAND 29.10.2014 AWAITING SALE

SOUTH HEDLAND 29.10.2014 AWAITING SALE

SOUTH HEDLAND 29.10.2014 AWAITING SALE

SOUTH HEDLAND 29.10.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

Page 47:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E655

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTH HEDLAND 01.07.2014 AWAITING SALE

SOUTHERN CROSS 3/10/2011 SURPLUS TO CURRENT GROH REQUIREMENTS

SOUTHERN CROSS 11/03/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

TOM PRICE 7/04/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

TOM PRICE 1/07/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

TOM PRICE 19/02/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

WESTMINSTER 23.04.2015 REDEVELOPMENT

WESTMINSTER 23.02.2015 REDEVELOPMENT

WESTMINSTER 08.04.2015 REDEVELOPMENT

WESTONIA 8/05/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

WICKEPIN 20/09/2011 SURPLUS TO CURRENT GROH REQUIREMENTS

WICKHAM 15/06/2012 SURPLUS TO CURRENT GROH REQUIREMENTS

WICKHAM 1/11/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

WICKHAM 10/02/2015 SURPLUS TO CURRENT GROH REQUIREMENTS

WUNDOWIE 19/02/2006 SURPLUS TO CURRENT GROH REQUIREMENTS

WYNDHAM 4/11/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

WYNDHAM 31/03/2014 SURPLUS TO CURRENT GROH REQUIREMENTS

WYNDHAM 7/07/2013 SURPLUS TO CURRENT GROH REQUIREMENTS

[Supplementary Information No A40.] Question: Mr P.C. Tinley: asked whether the minister could provide clarity around the decision taken to go for more than a single contractor in the metropolitan area in the recontracting of the head contractor services for maintenance in the Department of Housing’s housing stock.

Answer: Engaging multiple head contractors to manage the three metropolitan zones allows for comparisons between head maintenance contractor performance across the metropolitan regions. It also ensures business continuity in the event that a head-contractor in the metropolitan region could not meet service requirements.

[Supplementary Information No A41.]

Question: Mr P.C. Tinley: asked whether the minister could provide the cost of the Northgate IT system, broken down into three asset classes: hardware, software, and the cost of implementation and training.

Answer: The total project costs (inclusive of GST) for the purchase and implementation of Habitat (the Northgate IT system) can be broken down as follows:

Software $ 1 932 615

Hardware $ 188 657

Implementation and Training $21 175 557

Total $23 296 829

The total cost was within the project budget and compares favourably with similar projects carried out by other public housing authorities within Australia and New Zealand.

Page 48:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E656 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

[Supplementary Information No A42.]

Question: Mr F.M. Logan: asked whether the minister could provide clarity about the difference in the numbers provided to him in questions without notice 560 and 602 and the differential between the response to those questions and what has just been reported in response to questions in this estimates hearing.

Answer: The figures in question are the 18 000 figure reported in the Budget Papers and the figure of 13 731 reported to Parliament in response to questions without notice 560 and 602. The difference between the figures can be attributed to the following factors.

1. Effective Date The 2015-16 Budget Papers reported that more than 18 000 figure affordable homes have been delivered under the Affordable Housing Strategy. This represents the number as at 31 January 2015. The figures reported in questions without notice 560 and 620 and the figures reported by Mr Paul Whyte (acting director general) in the estimates hearing are correct as at 31 March 2015.

2. Newly Constructed Dwellings vs All Dwellings Delivered Under the Strategy Questions without notice 560 and 620 requested the number of dwellings physically constructed as part of the Affordable Housing Strategy, which was 13 731 as at 31 March 2015. The total number of affordable homes delivered under the Strategy at 31 March 2015, is 19 170, which is the figure provided by Mr Whyte. This includes both newly constructed homes and established dwellings that are affordable housing opportunities for people on low and moderate incomes.

[Supplementary Information No A43.]

Question: Mr P.C. Tinley: asked whether the minister could provide the resources applied to a government response to the risk around asbestos-related issues in public housing.

(In more detail, Mr Tinley was seeking the details of the resources that have been allocated to asbestos removal from public housing stock and the number of dwellings that asbestos has been removed from, including the ones from which we have physically removed the asbestos and from which we are reducing or taking away the risk.)

Answer: The Housing Authority provides staff with nationally accredited training to identify, inspect, record and manage the removal of asbestos containing materials (ACM) in their work place.

Since 2008 to 16 June 2015, the Housing Authority has reduced the number of public housing properties with ACM from 17,025 to 12,828.

From 1 July 2014 to 16 June 2015, the Housing Authority issued maintenance works orders totalling $1,406,173 to remove or reduce the risk of exposure to ACM in its properties. This figure does not include the cost of removing ACM where that cost is one part of a large quoted refurbishment or demolition work paid by invoice; however, the ACM’s removal is recorded on the Authority’s ACM register.

Racing and Wagering Western Australia —

[Supplementary Information No A44.]

Question: Mr P.T. Miles: asked under the line item on works in progress there is “Other Works”. Could the minister provide by way of supplementary information what those other works are as they are not specified?

Mr D.T. Redman: I am happy to provide by supplementary information some clarity around other works under works in progress.

Answer: The “Other” category refers to the existing business Capex Information Technology – operational Information Technology capital and the Head Office minor capital items as detailed in the table below:

2015/16 (‘000) 2016/17 (‘000) 2017/18 (‘000)

Replacement Information Technology Capital items 595 615 656 Other Head Office and Business Minor Capital 715 748 718

Total 1,310 1,363 1,374

Page 49:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E657

Division 54: Local Government and Communities (Except Service 5: Promotion and Support of

Multiculturalism) —

[Supplementary Information No A45.] Question: Mr D.A. Templeman: requested a detailed list of the number of Local Governments in Western Australia that received a concession at 50 per cent over the amount of $5,000?

Answer: There are five Local Governments in Western Australia that received a concession at 50 per cent over the amount of $5,000.

Local Government Rebate Amount $ MURRAY SHIRE $8,108.2 SWAN CITY OF $7,777.5 WANNEROO CITY OF $7,103.6 WANNEROO CITY OF $7,103.6 WANNEROO CITY OF $6,608.0 MUNDARING SHIRE OF $6,396.3 SWAN CITY OF $5,324.4 MUNDARING SHIRE OF $5,125.8 AUGUSTA-MARGARET RIVER SHIRE $5,108.4 MURRAY SHIRE $5,052.7

[Supplementary Information No A46.] Question: Mr D.A. Templeman: requested which local governments the 26,222 ratepayers who will be worse off by up to $100 and the 18,881 ratepayers who will be worse off by between $101 and $500 are in?

Answer: The information is as follows:

26,222 ratepayers who will be worse off by up to $100

Local Government No. of ratepayers

ALBANY CITY OF 780

ARMADALE CITY COUNCIL 1,018

ASHBURTON SHIRE 1

AUGUSTA-MARGARET RIVER SHIRE 287

BASSENDEAN TOWN COUNCIL 339

BAYSWATER CITY COUNCIL 575

BELMONT CITY COUNCIL 49

BEVERLEY SHIRE 16

BODDINGTON SHIRE 6

BOYUP BROOK SHIRE 17

BRIDGETOWN-GREENBUSHES SHIRE COUNCIL 38

BROOME SHIRE 11

BUNBURY CITY OF 1,044

BUSSELTON CITY 886

CAMBRIDGE TOWN COUNCIL 263

Page 50:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E658 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

CANNING CITY COUNCIL 85

CAPEL SHIRE 151

CARNAMAH SHIRE 1

CARNARVON SHIRE 51

CHAPMAN VALLEY SHIRE 1

CHITTERING SHIRE 52

CLAREMONT TOWN COUNCIL 261

COCKBURN CITY COUNCIL 124

COLLIE SHIRE 56

COOLGARDIE SHIRE COUNCIL 1

COOROW SHIRE 25

CORRIGIN SHIRE OF 1

COTTESLOE TOWN COUNCIL 65

CRANBROOK SHIRE 1

DANDARAGAN SHIRE 35

DARDANUP SHIRE 516

DENMARK SHIRE 122

DERBY/WEST KIMBERLEY SHIRE 4

DONNYBROOK-BALINGUP SHIRE 40

DUNDAS SHIRE COUNCIL 1

EAST FREMANTLE TOWN COUNCIL 93

ESPERANCE SHIRE 138

EXMOUTH SHIRE 34

FREMANTLE CITY COUNCIL 609

GINGIN SHIRE 84

GNOWANGERUP SHIRE COUNCIL 2

GOSNELLS CITY COUNCIL 783

GREATER GERALDTON CITY COUNCIL 508

HARVEY SHIRE COUNCIL 269

IRWIN SHIRE 101

JERRAMUNGUP SHIRE 8

Page 51:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E659

JOONDALUP CITY OF 1,401

KALAMUNDA SHIRE 611

KALGOORLIE-BOULDER CITY COUNCIL 24

KARRATHA CITY COUNCIL 4

KATANNING SHIRE 15

KELLERBERRIN SHIRE 5

KOJONUP SHIRE 23

KONDININ SHIRE 131

KWINANA TOWN COUNCIL 276

LAVERTON SHIRE COUNCIL 2

MANDURAH CITY COUNCIL 2,096

MANJIMUP SHIRE 39

MELVILLE CITY COUNCIL 838

MERREDIN SHIRE 9

MINGENEW SHIRE 5

MOORA SHIRE 7

MORAWA SHIRE 7

MOSMAN PARK TOWN COUNCIL 51

MT MARSHALL SHIRE COUNCIL 1

MUKINBUDIN SHIRE COUNCIL 4

MUNDARING SHIRE OF 700

MURRAY SHIRE 338

NANNUP SHIRE 4

NARROGIN TOWN COUNCIL 130

NEDLANDS CITY COUNCIL 375

NORTHAM SHIRE 179

NORTHAMPTON SHIRE 4

PEPPERMINT GROVE SHIRE 3

PERTH CITY COUNCIL 46

PINGELLY SHIRE COUNCIL 10

PLANTAGENET SHIRE 25

Page 52:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E660 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

PORT HEDLAND TOWN COUNCIL 1

QUAIRADING SHIRE COUNCIL 4

RAVENSTHORPE SHIRE 28

ROCKINGHAM CITY COUNCIL 339

SERPENTINE/JARRAHDALE SHIRE 213

SOUTH PERTH CITY COUNCIL 435

STIRLING CITY COUNCIL 1,414

SUBIACO CITY COUNCIL 131

SWAN CITY OF 1,630

TOODYAY SHIRE 262

VICTORIA PARK TOWN COUNCIL 436

VINCENT CITY COUNCIL 500

WAGIN SHIRE 1

WANNEROO CITY OF 3,727

WAROONA SHIRE 59

WONGAN-BALLIDU SHIRE 2

WYNDHAM/EAST KIMBERLEY SHIRE 13

YALGOO SHIRE OF 1

YORK SHIRE 111

Total no. of ratepayers 26,222

18,881 ratepayers who will be worse off by more than $100 and up to $500

Local Government No. of ratepayers

ALBANY CITY OF 960

ARMADALE CITY COUNCIL 824

ASHBURTON SHIRE 4

AUGUSTA-MARGARET RIVER SHIRE 325

BASSENDEAN TOWN COUNCIL 148

BAYSWATER CITY COUNCIL 120

BELMONT CITY COUNCIL 27

BEVERLEY SHIRE 11

BODDINGTON SHIRE 2

Page 53:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E661

BOYUP BROOK SHIRE 10

BRIDGETOWN-GREENBUSHES SHIRE COUNCIL 6

BROOME SHIRE 82

BUNBURY CITY OF 365

BUSSELTON CITY 679

CAMBRIDGE TOWN COUNCIL 453

CANNING CITY COUNCIL 30

CAPEL SHIRE 21

CARNARVON SHIRE 14

CHAPMAN VALLEY SHIRE 12

CHITTERING SHIRE 76

CLAREMONT TOWN COUNCIL 279

COCKBURN CITY COUNCIL 58

COLLIE SHIRE 14

COOROW SHIRE 8

COTTESLOE TOWN COUNCIL 172

CRANBROOK SHIRE 1

DANDARAGAN SHIRE 1

DARDANUP SHIRE 182

DENMARK SHIRE 33

DERBY/WEST KIMBERLEY SHIRE 36

DONNYBROOK-BALINGUP SHIRE 11

EAST FREMANTLE TOWN COUNCIL 244

ESPERANCE SHIRE 116

EXMOUTH SHIRE 16

FREMANTLE CITY COUNCIL 541

GINGIN SHIRE 18

GNOWANGERUP SHIRE COUNCIL 1

GOSNELLS CITY COUNCIL 320

GREATER GERALDTON CITY COUNCIL 1,213

Page 54:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E662 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

HARVEY SHIRE COUNCIL 63

IRWIN SHIRE 64

JERRAMUNGUP SHIRE 3

JOONDALUP CITY OF 860

KALAMUNDA SHIRE 208

KALGOORLIE-BOULDER CITY COUNCIL 17

KARRATHA CITY COUNCIL 14

KATANNING SHIRE 3

KELLERBERRIN SHIRE 2

KOJONUP SHIRE 14

KONDININ SHIRE 35

KWINANA TOWN COUNCIL 45

MANDURAH CITY COUNCIL 1,184

MANJIMUP SHIRE 7

MELVILLE CITY COUNCIL 522

MERREDIN SHIRE 21

MINGENEW SHIRE 3

MOORA SHIRE 3

MORAWA SHIRE 1

MOSMAN PARK TOWN COUNCIL 134

MUNDARING SHIRE OF 1,237

MURRAY SHIRE 98

NANNUP SHIRE 5

NARROGIN SHIRE 1

NARROGIN TOWN COUNCIL 56

NEDLANDS CITY COUNCIL 422

NORTHAM SHIRE 116

NORTHAMPTON SHIRE 7

PEPPERMINT GROVE SHIRE 12

PERTH CITY COUNCIL 32

Page 55:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E663

PINGELLY SHIRE COUNCIL 3

PLANTAGENET SHIRE 3

PORT HEDLAND TOWN COUNCIL 23

RAVENSTHORPE SHIRE 18

ROCKINGHAM CITY COUNCIL 60

SERPENTINE/JARRAHDALE SHIRE 405

SHARK BAY SHIRE 1

SOUTH PERTH CITY COUNCIL 530

STIRLING CITY COUNCIL 975

SUBIACO CITY COUNCIL 334

SWAN CITY OF 581

TOODYAY SHIRE 171

VICTORIA PARK TOWN COUNCIL 354

VINCENT CITY COUNCIL 220

WAGIN SHIRE 1

WANDERING SHIRE 2

WANNEROO CITY OF 2,488

WAROONA SHIRE 48

WONGAN-BALLIDU SHIRE 1

WYNDHAM/EAST KIMBERLEY SHIRE 5

YORK SHIRE 36

Total no. of ratepayers 18,881

[Supplementary Information No A47.] Question: Ms L.L. Baker: asked whether the minister could provide details of those organisations consulted as part of the review.

Answer: The list of the organisations who were interviewed as part of the procurement planning process review is detailed as follows:

Organisations

Australian Red Cross Society, East Perth

Carers WA

Centrecare, East Perth

Page 56:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E664 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

City of Armadale

City of Cockburn

City of Gosnells

City of Melville

City of Nedlands

City of Wanneroo

Connectgroups, Melville

Coolabaroo Aboriginal Early Years Support Service

Department for Child Protection and Family Support

Department of Aboriginal Affairs

Department of Finance

Department of Health

Department of Local Government and Communities

Department of Regional Development

Department of the Premier and Cabinet

Disability Services Commission

Escare, Esperance

Girl Guides, Burswood

Kununurra Neighbourhood House,

Linkwest

Manjimup Family Centre, Manjimup

Medicare Local

Meerilinga Young Children’s Services, Leederville

Mental Health Commission

Minister for Local Government; Community Services; Seniors and Volunteering; Youth

Ngala, Kensington

Office of Multicultural Interest s

Patricia Giles Centre, Joondalup

Rainbow Coast Neighbourhood Centre, Albany

Southcare Aboriginal Family Support, Manning

Page 57:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E665

Volunteering WA

WACOSS

Wanslea Family Services, Scarborough

Waroona Community Resource Centre, Waroona

YACWA

Youth Focus, Burswood

[Supplementary Information No A48.]

Question: Ms J.M. Freeman: asked whether the minister could provide details of: (a) the number of the full-time equivalents such as direct employees and casual staff brought in from any agencies to go through the Seniors Card verification process; (b) the number of volunteers in the Seniors Card Centre; and (c) the number of volunteers not working in the Seniors Card Centre as a result of the review.

Answer: (a) The Department of Local Government and Communities has employed 14 FTE staff on a casual basis through an agency to undertake the Seniors Card verification process.

(b) Twenty-six volunteers are available to the WA Seniors Card Centre. The number of volunteers working on a daily basis varies due to availability.

(c) The Seniors Card verification project commenced on 18 May 2015. Volunteer numbers in the WA Seniors Card Centre were not reduced as a result of the Seniors Card verification project.

The Department anticipated that following the announcement of the State Budget, there would be a larger than usual demand on the resources of the WA Seniors Card Centre as a result of seniors seeking information on the changes to concessions announced in the budget as well as advice on any changes to their own concessions status. To meet this demand, the Department recruited 10 additional FTE staff on a casual basis through an agency. Staff were recruited specifically for skills related to the interrogation and interpretation of database information, phone manner and efficient data entry. Volunteers at the WA Seniors Card Centre were offered alternative duties during this time. Volunteer numbers varied due to availability. Volunteers were transitioned back onto the Seniors Information Service phone line from 2 June 2015. The following numbers of volunteers working within the WA Seniors Card Centre from 4 May 2015 to 10 June 2015 are set out below:

• 4 May 2015 to 8 May 2015 – 7 • 11 May 2015 to 15 May 2015 – 8 • 18 May 2015 to 22 May 2015 – 6 • 25 May 2015 to 29 May 2015 – 3 • 2 June 2015 to 5 June 2015 – 9 • 8 June 2015 to 10 June 2015 – 12.

[Supplementary Information No A49.]

Question: Mr D.A. Templeman: asked whether the minister could provide a list of all of the current inquiries that the department is undertaking as supplementary information?

Answer: Local Governments that have complaints being assessed by the Department of Local Government and Communities are: 1. City of Albany 2. Shire of Augusta-Margaret River 3. Town of Bassendean 4. City of Bayswater 5. Shire of Broomehill-Tambellup 6. City of Bunbury 7. City of Busselton 8. Town of Cambridge 9. City of Canning

Page 58:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E666 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

10. Shire of Chittering 11. Shire of Coolgardie 12. Shire of Cuballing 13. Shire of Cue 14. Shire of Dardanup 15. Shire of Denmark 16. Shire of Derby-West Kimberley 17. Shire of Donnybrook-Balingup 18. Shire of Dumbleyung 19. Town of East Fremantle 20. City of Fremantle 21. Shire of Gingin 22. City of Gosnells 23. City of Greater Geraldton 24. City of Joondalup 25. City of Karratha 26. Shire of Katanning 27. Shire of Kulin 28. City of Melville 29. Shire of Moora 30. Shire of Mount Magnet 31. Murchison Regional Vermin Council 32. Town of Narrogin 33. City of Nedlands 34. Shire of Northam 35. Shire of Plantagenet 36. Town of Port Hedland 37. Shire of Serpentine-Jarrahdale 38. City of South Perth 39. City of Stirling 40. City of Subiaco 41. City of Swan 42. Shire of Toodyay 43. Shire of Wyndham-East Kimberley 44. Shire of York. [Supplementary Information No A50.]

Question: Ms J.M. Freeman: asked who was awarded money from the family foundation trust account for the past three years?

Answer: The list of the grant recipients of the Western Australian Family Foundation for the past three years is detailed as follows:

2012-13

ORGANISATION $

Australian Parents Council Inc. -Indigenous Parent Factor Program Training and Workshops 40,000

SIDS and Kids – contribution to operations 5,000

Grandparents Day Grants Program – various recipients 64,655

Page 59:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E667

Brain Development Resource 9,091

Positive Image Awards – contribution to prizes 3,995

Meerilinga – Children’s Week sponsorship 20,000

Camp Quality – Christmas Family Camp 10,000

Outcare – Midnight Basketball program 25,000

Carers WA – Young Carers project 35,000

Rockingham PCYC – Weld for Life program 20,000

Yakamia P&C – Interactive community display 1,000

Get Real publication 2,091

Zonta House - Zonta International District Conference 8,000

Thank a Volunteer Day – various recipients 9,850

Awards Australia Southern Pty. Ltd. – 2013 Regional Achievement and Community Awards 15,500

Perth Zoo - Grandparents Day at Perth Zoo 10,958

Wheelchairs for Kids – contribution to operational costs 30,000

Barnardos Australia - Barnardo's Mother of the Year Awards 15,000

Peel Youth Services - Eyes Wide Open Leadership Project 40,000

TOTAL 365,140

2013-14

ORGANISATION $ Perth Zoo - Grandparents Day at the Perth Zoo 14,682 Thank A Volunteer Day Grants – additional grants 13,818 Positive Image Awards – contribution to prizes 3,995 The Fathering Project Ltd. – data collection project 25,000 Bunbury Respect Inc.- Bunbury Respect Project 50,000 Esther Foundation – contribution to program 25,000 Perth Hills and Wheatbelt Band Inc - Perth Hills and Wheatbelt Band Tour 5,000 Advocare - Establishment of Elder Abuse Helpline 40,000 Meerilinga – Children’s Week sponsorship 10,000

TOTAL 187,495

2014-15

ORGANISATION $ Sister Kate's Home Kids Aboriginal Corp - Celebration Event - Tree Planting $1,000 Shire of Shark Bay - equipment towards Australian Shukokai Karate Assoc. $4,200 Rotary Club of Byford & Districts - SJ Schools - Social Inclusion Project $1,500 Djarindjin Aboriginal Corp. - Youth drop-in centre’s Basketball Hoops program $5,000 Nannup Art Council – 2015 Nannup Visual Art Exhibition $10,000

Page 60:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E668 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

Blues at Bridgetown Inc. – Youth Festival events $10,000 WA Men’s Shed – WA Men’s Shed Conference 2014 $500 Shire of Kulin – Camp Kulin Youth Participation subsidy $5,000 Global Good Foundation - sponsorship of Friendship Games $10,000 Dreamfit Foundation – Modification of bike for a child with a disability $2,000 Alzheimer’s Association – 30th Conference of Alzheimer’s Disease International $5,000 YACWA - Youth Summit attendance $7,000 WACOSS - Drop-in Project $35,000 Communicare - Multicultural Playgroups project $20,000 Shire of Derby-West Kimberley – Derby Girls Group $10,000 Community Gardens Grants – various recipients $47,275 Shire of Mundaring – Smartboard for Swan Children and Family Centre $3,000 Nature Play WA – 2015 Father’s Day Adventure Challenge $18,800 Serpentine Primary School P & C Association - Kidsmatter Kafe Upgrades $5,000 YACWA – Home is Where My Heart Is – exhibition for Homelessness Week $5,000

TOTAL $205,275

[Supplementary Information No A51.]

Question: Ms M.M. Quirk: asked whether the minister could provide details of the number of applications for personal security devices that were received and funded through the Safety and Security Rebate?

Answer: From 1 January 2014 until 10 June 2015, the Department of Local Government and Communities received 6,228 applications for a rebate on a personal device under the Safety and Security Rebate. The department approved and paid 5,890 of these applications with a total value of $1,173,940.

[Supplementary Information No A52.]

Question: Ms J.M. Freeman: asked can the minister provide by way of supplementary information a breakdown of FTE classifications levels?... All of them–every service area, which is 1, 2, 3, 4, and 5. I would like the classifications and levels.

Answer: A breakdown of the number of Department of Local Government and Communities’ FTEs per classification level allocated to the relevant Service Area is:

DLGC allocation of FTEs to Services

Level Service 1

Service 2

Service 3

Service 4

Service 5

Administrative Support

Total

Level 1 2 0 0 7 0 0 9 Level 2 0 3 10 1 0 5 19 Level 2/4 0 0 0 10 0 0 10 Level 3 5 2 0 7 3 13 30 Level 4 24 9 0 22 1 12 68 Level 5 22 16 2 14 6 9 69 Level 6 11 9 0 11 4 10 45 Level 7 2 8 1 7 3 13 34 Level 8 1 1 0 2 1 5 10 Level 9 0 1 0 1 0 1 3 Specified Calling Level 5 0 1 0 0 0 0 1 Specified Calling Level 6 0 1 0 0 0 0 1 Class 1 0 0 0 0 1 0 1 Class 2 1 0 0 1 0 0 2 Director General 0 0 0 0 0 1 1

Page 61:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E669

Total 68 52 14 81 19 69 302 Administrative Support 11 27 2 25 3 69 FTE total as per budget papers 79 79 16 106 22 302

Note 1 – the full title of Service Areas are:

• Service 1 - Regulation and Support of the Early Education and Care Sector • Service 2 - Regulation and Support of Local Government • Service 3 - Payments to Individuals • Service 4 - Delivery of Community Services, Grants and Resources • Service 5 - Promotion and Support of Multiculturalism

Note 2 - The 302 FTEs outlined in the 2015–16 Budget Estimates, and their breakdown across the five Service Areas, include the policy, executive, operational and administrative support of Corporate Services, the Office of the Director General and support positions within Divisions. For ease of reference this is referred to as ‘Administrative Support’ and:

• an additional row has been included to reflect the contribution of ‘Administrative Support’ to each Service Area

• an additional column has been included regarding ‘Administrative Support’ classification level breakdown.

[Supplementary Information No A53.]

Question: Mr D.A. Templeman: would like a breakdown of the youth grants information as highlighted in that line item 632.

Answer: The breakdown of the youth grants is detailed as follows:

2015-16 Description $

Cadets WA Instructor Recognition Payments 750,000 Cadets WA River Rangers Instructor Recognition Payments 119,000 Youth Activity Grants 200,000 National Youth Week Grants 80,000 TOTAL 1,149,000

[Supplementary Information No A54.]

Question: Mr D.A. Templeman: would like as supplementary information the total budgeted expenditure for the cadet program. I would like to know the participation numbers for each of the nine cadet units by way of supplementary information.

Answer: The total expenditure for the cadet program is $3.6 million. The participation numbers for each of the nine cadet units is detailed as follows:

Cadet Type No of cadets

Bush Rangers 2266

Emergency Services 1804

Police Rangers 530

Red Cross 175

Surf Life Saving 545

St John Ambulance 251

Navy Cadets 309

Army Cadets 1026

Page 62:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E670 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

Air Force Cadets 795

[Supplementary Information No A55.] Question: Mr D.A. Templeman: asked for a breakdown of where the youth budget in programs, grants and funding services will be spent. Answer: The breakdown of the youth budget is detailed as follows:

Description $ Cadets WA – Cadet payments 2,736,000 Cadets WA Instructor Recognition Payments 750,000 Cadets WA River Rangers Instructor Recognition Payments 119,000 Youth Activity Grants 200,000 National Youth Week Grants 80,000 Youth Development and Support Services 1,816,235

TOTAL 5,701,235

Division 63: Fire and Emergency Services —

[Supplementary Information No A56.]

Question: Ms M.M. Quirk: asked Mr J.M. Francis: I agree to provide the member for Girrawheen, as supplementary information, the list of the expert advisers who did the consultation for the environmental study—whoever it was—for the Success Fire Station site.

Answer: The Workplace Contaminant Investigation – Success Career Fire and Rescue Station (February 2015) was undertaken by Golder Associates.

The environmental investigation was overseen and the report prepared by, Mike Woods (EHS Consultant) and Sarah McKiernan (Principal Toxicologist) of Golder Associates.

The Investigation of Kidney Cancer Cases at Success Fire Station (February 2015) was undertaken by the Department of Health WA.

An Independent Expert Advisory Panel provided the Independent Expert Advisory Panel Report on Investigation of Four Cases of Renal Cell Carcinoma in the Firefighters at Career Fire and Rescue Station in Hammond Road, Success (June 2015).

Members of the Panel were Dr. Joel Silbert (Occupational Physician), Dr. Tom Van Hagen (Medical Oncologist) and Professor Phillip Weinstein (Public Health Physician).

[Supplementary Information No A57.]

Question: Ms M.M. Quirk: asked Mr J.M. Francis: I agree to provide as supplementary information the number of SMS alerts that were sent out for each incident over the past 12 months.

Mr J.M. Francis: Yes, supplementary information A57 will include the total cost but also the best breakdown that we can reasonably provide. The Chairman (Ms W.M. Duncan): And the number of SMS alerts and the total cost. Answer: Emergency Alert is the national telephone warning system used by emergency services to send voice messages to landlines and text messages to mobile phones within a defined area about likely or actual emergencies.

The ongoing development of Emergency Alert has been managed by Emergency Management Victoria with input provided by each jurisdiction through the Contract Oversight Management Committee.

The Emergency Alert project phases are funded by all State and Territory governments, with each jurisdiction contributing to operating costs based on the proportion of the total population (WA 10%). This fee provides WA with the capability to utilise the Emergency Alert system.

Additional service fees are incurred from telecommunication carriers, Telstra and Optus, when Emergency Alert is utilised. Vodafone is also a telecommunication carrier, however they do not charge carrier fees.

From 1 July 2014 to 19 June 2015, Emergency Alerts were used for 23 campaigns in Western Australia, including Boddington, Bullsbrook and Northcliffe fires. A total of 231,955 voice messages to landlines and text messages to mobile phones were sent for those 23 campaigns.

Page 63:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E671

Table 1 below provides an overview of the total costs for Emergency Alert in Western Australia including the operating costs and telecommunication carrier fees from 1 July 2014 to 19 June 2015.

Table 1

Telecommunication Carrier Fees Operating Costs Total fee $11,410.84 $999,431 $1,010,841

Source data - Emergency Management Division, Department of Justice, Victoria

[Supplementary Information No A58.]

Question: Mr M.J. Cowper: asked Mr J.M. Francis: I agree to provide the member for Murray–Wellington with further information about the breakdown of the 24 FTEs he referred to on page 716 of the Budget Statements and where they have been allocated.

Answer: Other than the reference to the number of FTEs, the footnote narrative under the “Prevention and Mitigation Services” and “Emergency Services” tables are identical. These footnotes provide an explanation for the total increase in FTEs from the 2014/15 estimated actual FTE to the budgeted 2015/16 FTE of 38, for both DFES services, comprising 14 and 24 respectively .

[Supplementary Information No A59.] Question: The Chairman (Ms W.M. Duncan):Can the member clarify the supplementary information she wants the minister to provide?

Ms M.M. Quirk: It is the number of CALD employees within DFES, and in particular within the career firefighter cohort.

Mr J.M. Francis: That is the number of those who identify as being culturally and linguistically diverse?

Ms M.M. Quirk: Yes.

Mr J.M. Francis: I undertake to provide that information

Answer: As at 15 June 2015, the number of DFES employees who are identified as being culturally and linguistically diverse is 68 and within the Firefighter cohort, the number is 16.

[Supplementary Information No A60.]

Question: Ms M.M. Quirk: I think a couple of weeks ago, a public notice was published calling for the nomination of a prescribed association under this consultative provision of the Bush Fires Act. I wonder what the purpose of that advertisement was.

Ms M.M. Quirk: The nominations closed at four o’clock yesterday. Can the minister indicate how many organisations have nominated?

Mr J.M. Francis: I cannot, but I will try to answer that later today.

Ms M.M. Quirk: Can I take it as supplementary, please?

Mr J.M. Francis: I will provide the member for Girrawheen with the names of those who have nominated to be the nominated association. Answer: Two organisations replied to the notice that was published seeking nominations from associations or other bodies of persons to establish an advisory committee to provide advice or assistance on matters relevant to the operation or administration of the bush fire brigades under the Bush Fires Act 1954. Due to the organisations nominating in confidence, their details cannot be made public.

Division 65: Corrective Services —

[Supplementary Information No A61.]

Question: Mr P. Papalia: asked Mr J.M. Francis: I agree to provide by supplementary information to the member for Warnbro a baseline estimate on what it costs to accept a prisoner into prison; an outline of additional costs on a case-by-case basis that would make that initial cost of accepting a prisoner more expensive; and also a breakdown on that prison by prison across the state.

Answer: The Department of Corrective Services advises that the information requested is not recorded in a manner that is easily retrievable in the timeframe required.

Page 64:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E672 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

The Minister will table a comprehensive response in Parliament at the earliest available opportunity.

[Supplementary Information No A62.] Question: Mr P. Papalia: asked Mr J.M. Francis: I undertake to provide further information to the member for Warnbro about the location of the four bail coordinators employed by the Department of Corrective Services. Answer: The Department is funded for four Bail Coordinator positions. Three are located at the Central Law Courts and one at Hakea Prison.

The Department of Corrective Services is currently reviewing the delivery of bail coordination services as part of the overall review of offender management and, based on the findings of the Western Australian Auditor General’s Report on the Management of Adults on Bail.

[Supplementary Information No A63.] Question: Mr P. Papalia: asked Mr J.M. Francis: agreed to provide in supplementary information a list of consultants who have been engaged and are working on part of the reform process of the Department of Corrective Services and, additionally, what their contract terms are in regard to the amount of money they are being paid for those services. Answer: The Premier’s Circular 2005/08 defines consultants as: any person engaged on a fee-for-service basis to provide strategic advice for Government to act on. It does not include contractors who are engaged to provide a service that does not involve the provision of management advice to Government. Nor does it include functional advice for agencies to act on such as reviews of departmental computing needs, management audits or tender assessments. Accordingly, excluded from the definition are contracts in respect of engineering services, training programs, printing, computer development and support services, actuarial services, publicity and promotional programs, project management services, valuations, accounting services, customers surveys and bench marking. Consultants Name Period of Engagement Aggregate Value of

Engagement Engagement Purpose

Wirrpanda Foundation Ltd May 14 – Aug 14 $50,000 Provision of the Aboriginal &

Torres Strait Islander Development Program

Strategic Ventures Sept 14 $37,500 Social Impact Bonds

QL Management Consultants Apr 14 – May 14 $47,344 Cultural Change Strategy Development – Banksia Hill

Price Consulting Apr 14 to Dec 14 $97,848 Hr Recruitment and Classification Services

[Supplementary Information No A64.]

Question: Mr P. Papalia: asked Mr J.M. Francis: agreed to provide, as supplementary information to the member for Warnbro, the number of staff in the office of reform, their public sector levels and how many redundancies have been made in the department’s head office in the last two years and their level.

Answer: As at 17 June 2015 the number of employees working in the Office of Reform is as follows:

OOR Active Employees by Classification as at 17June 2015

LEVEL Total

Class 1 2

Class 3 1

Public Service Level 3 3

Page 65:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E673

Public Service Level 4 3

Public Service Level 5 3

Public Service Level 6 8

Public Service Level 7 8

Public Service Level 8 5

Public Service Level 9 0

Grand Total 33

[Supplementary Information No A65.] Question: Mr P. Papalia: asked Mr J.M. Francis: Certainly. I will provide as supplementary information to the member for Warnbro a breakdown of which service providers have been granted contracts through the Youth Justice Board innovation fund, and also how much those contracts were worth. Mr P. Papalia: And which ones, did the minister say? Mr J.M. Francis: Who gets them and how much. Mr P. Papalia: The providers and where they are located. Mr J.M. Francis: And where they are located, yes. Mr P. Papalia: Where the intervention is located. Mr J.M. Francis: Where the service is provided. Answer: The Department of Corrective Services (the Department) has entered into an agreement with the Wirrpanda foundation to fund the Moorditj Ngoorndiak longitudinal mentoring program via the Youth Justice Innovation Fund for an amount of $320,000 for one year.

Table One

Year 1 (2014/15) Year 2 (2015/16) Service to be provided to:

Wirrpanda Foundation - $320, 000 - Perth metropolitan area

In addition, the Youth Justice Board has recommended that the Youth Justice Innovation Fund fund the following programs (Table Two). While this funding has been announced, the Department has not yet entered into an agreement with these service providers. Table Two Year 1 (2015/16) Year 2 (2016/17) Service to be provided to:

Aboriginal Legal Service -$260,000

Aboriginal Legal Service -$260,000

Perth metropolitan area

Horsepower - $225,000 - Pilbara region

KALACC - $220,000 KALACC - $220,000 Kimberley region

As shown in the above tables, the total amount allocated to date is $1,505,000.

A total of $4 million has been allocated to the Youth Justice Innovation Fund (two separate announcements by the Government of $2 million).

The Youth Justice Board is currently considering the funding of further programs by the Youth Justice Innovation Fund

The Department of Corrective Services is also engaging with Non-Government organisations:

[Supplementary Information No A66.]

Page 66:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E674 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

Question: Ms L.L. Baker: asked Mr J.M. Francis: agreed to provide the member for Maylands supplementary information in relation to the non-government organisations that are providing youth justice services to the Department of Corrective Services.

Answer: The following Non-Government organisations are contracted by the Department of Corrective Services to provide programs for young people during the 2014/15 and 2015/16 financial years:

• Australian Red Cross • Centrecare • City of Cockburn • Geraldton Streetwork Aboriginal Corporation • Holyoake • HOPE • Jade Lewis and Friends • Life Without Barriers • Outcare • Save the Children • Sexual and Reproductive Health Western Australia • Shire of Carnarvon • Shire of Derby • Shire of Halls Creek • Swan Districts Football Club • Yaandina Family Centre • YMCA • Youth Involvement Council

In addition the Youth Justice Board Innovation Fund is providing pilot program funding to the following non-government organisations:

• Wirrpanda Foundation • Aboriginal Legal Service • Kimberley Aboriginal Law & Cultural Centre

[Supplementary Information No A67.] Question: Mr P. Papalia: asked Mr J.M. Francis: I agree to provide to the member for Warnbro as supplementary information the total amount spent since 2008 on building new prisons, new units within prisons, bunks, new work camps and existing work camps.

Answer: A summary of the original $655 million set aside for the Custodial Infrastructure Program is set out below:

Note: The Custodial Infrastructure Program consisted of a program of works designed to deliver 1,657 additional

Project Estimated Total Cost

2008/09 2009/10 2010/11 2011/12 2012/13 Outyears

Young Offenders Prison (80) 36,300 1,000 12,500 22,800 Eastern Goldfields Regional Prison (350)

232,000 - 20,000 38,800 76,700 82,500 14,000

Acacia Additional Capacity (387) 186,000 - 4,200 6,200 33,600 58,446 83,554 Warburton Work Camp (30) 17,000 - 11,200 5,800 - - - Wheatbelt Work Camp (20) 8,500 - 5,600 2,900 - - - Double Bunks (600) 12,000 - 12,000 - - - - West Kimberley Regional Prison (150)

149,450 5,000 80,600 38,320 25,530 - -

Wyndham Work Camp (40) 10,830 2,000 8,830 - - - - Sub Total 652,080 8,000 154,930 114,820 135,830 140,946 97,554

Recurrent funding 72,200 - - 5,600 27,800 37,800 1,000 West Kimberley Recurrent 29,226 - - 14,400 14,826

TOTAL 753,506 8,000 154,930 120,420 178,030 193,572 98,554 Capital and recurrent funding over forward estimates

2008/09 2009/10 2010/11 2011/12 2012/13 TOTAL Capital 8,000 154,930 114,820 135,830 140,946 554,526 Recurrent - - 5,600 42,200 52,626 100,426 Total 8,000 154,930 120,420 178,030 193,572 654,952

Page 67:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E675

beds. By the time the Eastern Goldfields replacement facility comes on-line, the program would have successfully delivered over 2,500 additional beds within the original parameters. The $655 million referred to is the last line that includes $554.5 million in capital expenditure, and $100.4 in recurrent expenditure, over five years.

Recurrent expenditure was set aside for operational costs associated with the building program that included new prisons at West Kimberley and Eastern Goldfields, along with the expansion of Acacia Prison.

Additional funds of $162,384 have also been spent on providing additional beds to Bandyup Womens Prison ($127,773), Greenough Regional Prison ($18,584) and West Kimberley Regional Prison ($16,027).

[Supplementary Information No A68.]

Question: Ms M.M. Quirk: asked Mr J.M. Francis: I just need to make it clear, because I have to put this on the record for Hansard. I agree to provide as supplementary information to the member for Girrawheen a breakdown of the number of sex offenders, but not those who are categorised as dangerous sex offenders, currently being held who have engaged in —

Ms M.M. Quirk: No, those who have currently been released without having done a program.

Mr J.M. Francis: For what period?

Ms M.M. Quirk: The last 12 months.

Mr J.M. Francis: Okay. That is for sex offenders who have not completed a sexual offending rehabilitation program in the last 12 months.

Ms M.M. Quirk: In other words, those who have served their full term.

Mr J.M. Francis: It is for those who have served their full term, because they would not have been eligible for parole.

Answer: From 1 June 2014 to 31 May 2015, there were 81 prisoners convicted of a sexual offence (other than those declared a Dangerous Sexual Offender under the Dangerous Sexual Offender Act 2006) who were released having served their full term. 29 of these completed a sexual offending rehabilitation program, and 52 prisoners did not complete a sexual offending rehabilitation program. This includes 23 who refused to take part in the program.

[Supplementary Information No A69.]

Question: Ms M.M. Quirk: asked Mr J.M. Francis: Only one of us can say this. I must repeat it back so that Hansard gets it down. I agree to provide the member with information on the prison population for the last calendar year, so far in this calendar year, and the modelling for the next five years for the low, medium and high-range projections.

Answer: 2014: Daily Average Prisoner Population by Facility All Prisoners in Adult Facilities for the period 1/01/2014 to 31/12/2014

Facility Name Male Female Total

ACACIA PRISON 990.17 0 990.17

ALBANY REGIONAL PRISON 303.89 0.59 304.48

BANDYUP WOMENS PRISON 0 293.45 293.45

BORONIA PRE RELEASE CENTRE 0 83.7 83.7

BROOME REGIONAL PRISON 18.11 0.96 19.07

BUNBURY REGIONAL PRISON 313.96 0 313.96

CASUARINA PRISON 745.49 0 745.49

EASTERN GOLDFIELDS REGIONAL PRISON 72.28 18.82 91.1

Page 68:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E676 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

GREENOUGH REGIONAL PRISON 235.83 61.27 297.1

HAKEA PRISON 960.88 0 960.88

KARNET PRISON FARM 307.98 0 307.98

PARDELUP PRISON FARM 81.2 0 81.2

ROEBOURNE REGIONAL PRISON 161.22 6.13 167.35

WANDOO REINTEGRATION FACILITY 49.28 0 49.28

WEST KIMBERLEY REGIONAL PRISON 140.49 23.97 164.46

WOOROLOO PRISON FARM 354.99 0 354.99

TOTAL 4735.76 488.89 5224.65

Note: Work camps are included under the parent prison facility

The daily average prisoner population results are calculated by summing the number of prisoners at the end of each day in the period, and dividing by the number of days in the period. Work camp prisoner population is included under the parent prison facility. In the above table, a breakdown is provided by facility, gender and Aboriginality.

Growth in the Adult custody prisoner population – 2014 change

Census as at 1 January 2014: 4,962

Census as at 31 December 2014: 5,399

Change Increase: 437

Change %: 8.81% increase

During 2014, the adult custody prisoner population increased from 4,962 prisoners on 1 January 2014, to 5,399 on 31 December 2014. The increase of 437 prisoners reflects a prisoner population increase of 8.81% over the twelve month period.

2015: Daily Average Prisoner Population by Facility

All Prisoners in Adult Facilities for the period 1/01/2015 to 15/06/2015

Facility Name Male Female Total

ACACIA PRISON 1268.69 0 1268.69

ALBANY REGIONAL PRISON 256.89 1.2 258.09

BANDYUP WOMENS PRISON 0 324.59 324.59

BORONIA PRE RELEASE CENTRE 0 90.16 90.16

BUNBURY REGIONAL PRISON 293.4 0 293.4

CASUARINA PRISON 770.87 0 770.87

EASTERN GOLDFIELDS REGIONAL PRISON 71.69 15.92 87.61

GREENOUGH REGIONAL PRISON 237.11 60.11 297.22

HAKEA PRISON 948.73 0 948.73

KARNET PRISON FARM 305.65 0 305.65

Page 69:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E677

PARDELUP PRISON FARM 80.27 0 80.27

ROEBOURNE REGIONAL PRISON 157.89 8.78 166.67

WANDOO REINTEGRATION FACILITY 60.8 0 60.8

WEST KIMBERLEY REGIONAL PRISON 179.1 26.78 205.88

WOOROLOO PRISON FARM 315.72 0 315.72

TOTAL 4946.81 527.54 5474.35

Note: Work camps are included under the parent prison facility

The daily average prisoner population results are calculated by summing the number of prisoners at the end of each day in the period, and dividing by the number of days in the period. Work camp prisoner population is included under the parent prison facility. In the above table, a breakdown is provided by facility, gender and Aboriginality. Growth in the Adult custody prisoner population – 2015 (YTD) change Census as at 1 January 2015: 5,402 Census as at 15 June 2015: 5,538 Change Increase: 136 Change %: 2.52% increase

During 2015, the adult custody prisoner population increased from 5,402 prisoners on 1 January 2015 to 5,538 on 15 June 2015. The increase of 136 prisoners reflects a prisoner population increase of 2.52% over the six month period.

Adult Custody Prisoner Population Projections: Projection 30/06/15 30/06/16 30/06/17 30/06/18 30/06/19 30/06/20

Upper Bound 5727 5959 6200 6444 6695 6952

Midpoint 5528 5753 5986 6223 6466 6715

Lower Bound 5329 5547 5772 6002 6237 6478

Source: Offender Population Projections – Updated June 2013

On 15 June 2015, the adult custody prisoner population was 5,538. The prisoner population is currently tracking slightly higher than the midpoint of the offender projection model from 2013, but is well between the upper and lower bounds.

Note that the Department of Corrective Services’ (the Department’s) prisoner population projection model was last updated in June 2013. The Department of Treasury is currently developing a Western Australian Prisoner Model projection model which, on completion, will replace the Department’s prisoner population projection model.

[Supplementary Information No A70.]

Question: Mr P. Papalia: asked Mr J.M. Francis: I agree to provide to the member for Warnbro supplementary information on how many prisoners were accepted into the prison system on remand in the last calendar year, how many were held on remand for less than six months and how many were held on remand for less than three months.

Mr P. Papalia: Without them subsequently having received a sentence beyond what they already received.

Answer: From 1/01/2014 to 31/12/2014, 4,658 prisoners were received into the Western Australian (WA) prison system on remand (698 female and 3,960 male).

Of these:

• 924 prisoners (131 female and 793 male) were held on remand for less than six months.

Page 70:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E678 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

• 3,314 prisoners (543 female and 2,771 male) were held on remand for less than three months.

Information provided is based on all prisoners received into WA prisons on remand during the period 1/01/2014 to 31/12/2014. Note that, in some cases, remanded prisoners served a fine default sentence during their stay (i.e. to cut out fines while in prison). Where applicable, days spent serving a fine default only sentences have been included in the remand period duration.

The numbers above reflect the number of individual receptions, rather than distinct people.

[Supplementary Information No A71.]

Question: Ms L.L. Baker: asked Mr J.M. Francis: Firstly, I agree to provide the member for Maylands the amount the department expended on health services each calendar year for the last five years. However, I will give her this information I have in front of me now. The department’s health services are largely focused on primary health care and are delivered and coordinated through the health services directorate, which has an operating budget for the 2014–15 financial year of $36.9 million.

Answer: The budget information provided below relates to each financial year as the Department’s financial systems do not operate on a calendar year.

2014/15: $36,747,629 (anticipated expenditure)

2013/14: $35,161,628

2012/13: $34,057,973

2011/12: $30,673,893

2010/11: $28,319,974

2009/10: $27,237,308

Division 67: Small Business Development Corporation —

[Supplementary Information No A72.]

Question: Ms L.L. Baker: asked Mr J.M. Francis: I agree to provide as supplementary information a breakdown of staff employed by the Small Business Development Corporation by gender and pay level.

Answer: The Small Business Development Corporation has a total Full Time Equivalent staffing level of 54, as reported in the budget papers. This comprises 63 full time, part time and casual employees, and includes staff currently on maternity leave and secondment to other agencies. A breakdown by gender and level is as follows:

Level Male Female Total 1 0 2 2 2 1 5 6 3 0 5 5 4 1 2 3 5 3 6 9 6 10 15 25 Specified Calling Level 4 1 0 1 7 3 5 8 8 2 0 2 Class 1 0 1 1 B4 Chief Executive Officer 1 0 1 TOTAL 22 41 63

Division 38: Corruption and Crime Commission —

[Supplementary Information No A73.]

Question: Mr M.J. Cowper: asked Mrs L.M. Harvey: We will provide by way of supplementary information the proportion of the 6,077 allegations of misconduct and police reviewable actions that were a result of local complaint resolution processes.

Answer: During the 2013-2014 Financial Year, the Corruption and Crime Commission (the Commission) received/assessed 7,260 allegations of misconduct, which includes allegations received pursuant to sections 21A

Page 71:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E679

(reviewable police action), 25 and 28 of the Corruption and Crime Commission Act 2003 (refer p.13 of the Commission Annual Report 2013-2014).

Of those allegations 2,830 relate to WA Police (39%). The 6,077 allegations referred to above were all allegations, received/assessed by the Commission as at 9 May 2014, and did not solely relate to WA Police. The Commission does not capture data concerning Local Complaint Resolution, which is an internal WA Police process.

Division 37: Attorney General —

[Supplementary Information No A74.]

Question: Ms M.M. Quirk: asked for, by way of supplementary information, the funding provided to the Employment Law Centre.

Answer: The Employment Law Centre is to be provided $139,004 as a one-off grant for 2015-16.

[Supplementary Information No A75.]

Question: Mr M.J. Cowper: asked for the number of warrants of execution that have been issued for unpaid court fines for the last 12 months, including those for goods and chattels.

Answer: The warrants of execution being referred to are now called enforcement warrants. This changed when the Fines, Penalties and Infringement Notices Enforcement Act 1994 (WA) was amended in August 2013. The amendments provided the Registrar with the ability to issue enforcement warrants for a debtor with any outstanding court fine and/or aggregated infringements of $2,000 or more. Enforcement warrants authorise the Sheriff to affix a warning notice to any vehicle licensed in the name of the debtor, immobilise any vehicle licensed in the name of the debtor, remove number plates from the any vehicle licensed in the name of the debtor, seize and sell so much of the debtor’s personal property and land as is necessary to recover the amount owed.

• 21,169 people have had a total of 90,360 warrants issued since 1 July 2014 to 12 June 2015;

• 53,855 against Court Fines; and • 36,505 against Infringements.

[Supplementary Information No A76.]

Question: Mr J.R. Quigley: asked, if possible, to provide by way of supplementary information the legal expenses the state has incurred in the defamation action by Mr Rayney.

Answer: The Attorney General will only be in a position to provide this information, upon request, at the conclusion of this matter. The cost incurred by the State in conducting commercial/civil litigation, and the nature and extent of the resources deployed by the State, may be of tactical value in relation to the decision making of the counterparty to the litigation.

[Supplementary Information No A77.]

Question: Mr J.R. Quigley: asked, if possible, to provide by way of supplementary information advice from the State Solicitor’s Office via the Attorney General’s office about the state’s legal costs to date for the Buckeridge matter.

Answer: The Attorney General will only be in a position to provide this information, upon request, at the conclusion of this matter. The cost incurred by the State in conducting commercial/civil litigation, and the nature and extent of the resources deployed by the State, may be of tactical value in relation to the decision making of the counterparty to the litigation.

[Supplementary Information No A78.] Question: Mr J.R. Quigley: asked for the costs incurred by the State Solicitor’s Office in providing advice with respect to the Bell matter referring to litigation funding disputes.

Answer: The Attorney General will only be in a position to provide this information, upon request, at the conclusion of this matter. The cost incurred by the State in conducting commercial/civil litigation, and the nature and extent of the resources deployed by the State, may be of tactical value in relation to the decision making of the counterparty to the litigation.

[Supplementary Information No A79.] Question: Mr J.R. Quigley: asked for, by way of supplementary information, the average cost of processing a prohibited behaviour order.

Page 72:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E680 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

Answer: The average cost of processing a Prohibited Behaviour Order is $2,139.

[Supplementary Information No A80.] Question: Mr J.R. Quigley: asked for, by way of supplementary information, the number of prohibited behaviour orders that have been issued since 1 July 2014 until now.

Answer: Seven.

[Supplementary Information No A81.] Question: Mr J.R. Quigley: asked for, by way of supplementary information, the cost to the state for the State Solicitor’s Office to provide advice to police with respect to the Criminal Organisations Control Act.

Answer: The Attorney General is unable to provide the information as it relates to the cost of conducting operational law enforcement.

[Supplementary Information No A82.]

Question: Mr P. Abetz: asked for, by way of supplementary information the number of Legal Aid matters that were granted to male applicants and to female applicants.

Answer: Grants of legal aid by law type and gender 2013-14

Law Type Total Applicants

Male Applicants

Female Applicants

Number % Number %

Criminal 6,023

4,957

82.30

1,066

17.70

Family* 2,916

885

30.35

2,031

69.65

Civil 406

158

38.92

248

61.08

Total 9,345

6,000

64.21

3,345

35.79

*A further 675 family law grants of aid were awarded for the independent representation of children, the gender of whom is not disclosed.

Division 40: Office of the Director of Public Prosecutions —

[Supplementary Information No A83.]

Question: Mr W.J. Johnston: asked for advice on where the funding for the settlement involving Mr and Mrs Mansfield as a result of confiscation proceeding was drawn and which Minister was responsible.

Answer: The funding was drawn from the State’s Consolidated Account. The responsible Minister is the Attorney General the Hon. Michael Mischin MLC.

Division 46: Finance (Except Service 5: Public Utilities Office) —

[Supplementary Information No A84.]

Question: Ms R. Saffioti: asked if the Minister could provide a breakdown of the State Fleet by passenger vehicles, commercial vehicles and any other vehicles?

Answer: Passenger vehicles 4,842

Commercial vehicles 5,865

Total 10,707

[Supplementary Information No A85.]

Question: Mr W. J. Johnston asked who verbally advised the agency of the transfer of the State Fleet from the former Minister for Finance to the Treasurer?

Page 73:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E681

Answer: The Director General Department of Finance advises me that the former Minister for Finance advised the agency at a meeting on 20 October 2014.

[Supplementary Information No A86.]

Question: Mr W.J. Johnston: asked were there other costs incurred in moving or accommodating an existing tenant from Hale House?

Answer: The Department of Finance did not incur any other costs in moving or accommodating an existing tenant from within Hale House. It is understood the Department of Education temporarily moved into existing leased premises in Beechboro, before relocating to a government-owned site in Padbury. This move was managed by the Department of Education, and consequently the Department of Finance is not aware of associated costs.

A lease consultant was engaged to procure alternate accommodation for the Office of the Leader of the Opposition (at a cost of $12,698.95 including GST), which occupied a demountable building on the Hale House site. The cost of a new lease for alternate accommodation at 1068-1070 Hay Street, West Perth (including outgoings and GST) is approximately $265,417 per annum.

[Supplementary Information No A87.]

Question: Mr C.J. Tallentire: asked if the Minister could provide a global figure and evidence around that global figure that savings have been achieved through the planning and procurement of future state government office space as a result of this master planning approach?

Answer: The estimated avoided costs achieved through the improved management of the Minister for Works office accommodation portfolio have exceeded the forecast $20-25 million savings per annum by 2015, and are expected to be almost $28 million per annum in 2015.

This has been achieved through the:

• improved negotiating power by consolidating 23 agencies in 2010-12 into larger leases with lower rental costs and decentralising some agencies from the Perth CBD/CBD fringe;

• relocation of the Department of Commerce to the Mason Bird Building, Cannington, and Gordon Stephenson House, Perth, and reducing the floor space required by the existing agencies within Gordon Stephenson House; and

• introduction of the new Government Office Accommodation policy, which reduces the amount of office space to be used per person.

The avoided costs achieved through office relocations completed between 2009 and 2012 are estimated at $18.1 million per annum. Additionally, net savings of $44.3 million over ten years are estimated to be achieved from the relocation of the Department of Commerce from their previous leased portfolio to the Mason Bird Building, Cannington, and Gordon Stephenson House, Perth. The rationalisation of vacant workspace in Gordon Stephenson House is estimated to provide further avoided cost savings of around $36 million over ten years. Further avoided costs in excess of $1.4 million per annum are expected from approved fit-out and refurbishment works, while the application of the new government office density requirements has delivered additional estimated avoided costs of approximately $580,000 since 2014. [Supplementary Information No A88.]

Question: Mr W.J. Johnston: asked what was the cost of relocating the last two ministerial offices from London House to Dumas House? Answer: As at 16 June 2015, the relocation of the Minister for Agriculture and Food; Fisheries and Minister for Emergency Services; Corrective Services; Small Business; Veterans to Dumas House (inclusive of the costs surrounding the relocation of the Minister for Finance; Mines and Petroleum from Allendale Square to Level 10, Dumas House) totalled $1,968,604 (exclusive of GST). A breakdown of these costs is (all exclusive of GST):

• Capital works costs (at Dumas House) $1,804,689 • Consultancy costs $7,029 • Make good costs $156,886 [Supplementary Information No A89.] Question: Mr C.J. Tallentire: asked what is the annual lease cost for Level 10, London House for the Minister for Finance?

Page 74:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E682 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

Answer: As at 12 June 2015, the lease costs for Minister Marmion's office on Level 10, London House were:

Annual Rental Costs Detail Rate/Unit Area Amount GBCN ICT Standard Charge Rental Variable Outgoings Tenancy Cleaning

$45.00 $810.3375 $176.36 $14.73

558.17 558.17 558.17 558.17

$25,117.65 $452,306.08 $98,438.86 $8221.84

Total $584,084.43 Annual Car Parking Costs

Car Parking Car Parking Levy

Rate per bay $9085.440 $911.200

Number of bays 4 4

Amount $36,341.76 $3,644.80

Total $39,985.56

Total Lease Costs $624,070.99

[Supplementary Information No A90.]

Question: Ms R. Saffioti: asked who were the two agents involved in the sale of Lot 302 for Sunset and what was the total amount of commission paid?

Answer: Lot 302 was sold by TM Residential under a conjunctional (third party) arrangement with Mack Hall Real Estate.

Commissions paid for the sale totalled $140,250 (inclusive of GST).

[Supplementary Information No A91.]

Question: Mr C.J. Tallentire: asked if the Minister could provide a list of all the contracts over $1 million that did not go out to tender and the reason why?

Answer: The Department of Finance does not approve or authorise exemptions to State Supply Commission policies and has no record of agencies’ decisions to not proceed to tender for contracts over $1 million.

[Supplementary Information No A92.]

Question: Ms R. Saffioti: asked what is the suggested time frame for when a Bigger Picture sign should be removed after a project is completed?

Answer: It is standard practice for signs to be in place for the duration of the works, and be removed when “Practical Completion” has been achieved as part of the site clean-up.

Responsibility for the removal of the signs lies with the head contractor under the project contract.

Division 47: Mines and Petroleum —

[Supplementary Information No A93.]

Question: Ms R. Saffioti: asked what is the suggested time frame for when a Bigger Picture sign should be removed after a project is completed?

Answer: It is standard practice for signs to be in place for the duration of the works, and be removed when “Practical Completion” has been achieved as part of the site clean-up.

Responsibility for the removal of the signs lies with the head contractor under the project contract.

[Supplementary Information No A94.]

Question: Ms R. Saffioti: asked if the Minister could provide the volumes of iron ore predicted to be produced by iron ore miners over the forward estimates as well as the actual volume of iron ore produced during the 2014/15 financial year?

Answer: The 2014/15 financial year has not yet concluded and therefore the actual volume of iron ore produced cannot be provided. The estimated volume production of iron ore for 2014/15 is 716 million tonnes.

The volumes of iron ore predicted to be produced by iron ore miners over the forward estimates are as follows (estimates are in million tonnes):

Page 75:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee A — Supplementary Information 2015] E683

2015/16 Budget Estimate 2016/17 Forward Estimate 2017/18 Forward Estimate 2018/19 Forward

Estimate 748 772 797 799

[Supplementary Information No A95.]

Question: Mr W.J. Johnston: asked for the number of occasions during the preceding 12 months that a DMP inspector visited each onshore petroleum facility in Western Australia, including Major Hazard Facilities?

Answer: 186 Environmental Division Operating facilities 4 Drilling activities 13 Pipelines 7 Seismic 2 Island drilling activities 1 Island operating facilities 3 30 Resource Safety Division

• Petroleum Inspection 17 Safety Case Assessment 27 Audit activities 2 Investigation 1 47

• MHF Audits 18 Inspections 21 Investigation 1 40 Petroleum Division Metering and tanker offtake 5 Well integrity inspections 56 Other activities 8 69 [Supplementary Information No A96.]

Question: Mr W.J. Johnston: asked if the Minister could provide a breakdown of the 271 Resources Safety Division employees listed in the Budget Papers by occupation, with inspectors further categorised into individual inspector classes?

Answer:

Occupation Number Safety Inspector (Dangerous Goods Safety Act) 37 Safety Inspector (Mines Safety Act) 71 Safety Inspector (Petroleum Safety) 13 Explosives Reserve Officer / Manager 5 Administrative Assistant 12 Administrative Coordinator 1 Auditor 3 Business Analyst 2 Business Coordinator 1 Business Development Manager 1 Business Support Officer 2 Communications Manager 1

Page 76:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E684 [ASSEMBLY Estimates Committee A — Supplementary Information 2015]

Communications Officer 9 Corporate Occupational Health and Safety Adviser 1 Customer Service Manager 3 Customer Service Officer 10 Facilities Officer / Manager 4 Financial Accountant 2 Financial Officer 5 Financial/Budget Analyst 4 FOI Officer / Manager 3 Geographic Information Systems Analyst 1 Graduate Officer 3 Human Resource Clerk 1 Human Resources Consultant 2 ICT Customer Support Officer 4 Industrial Relations Officer 1 Lawyer 5 Lease Processing Officer 1 Librarian 1 Licensing Officer 2 Management Accountant 1 Ministerial Officer 1 Network Administrator 1 Payroll Officer 3 Principal Policy Officer / Project/Policy Officer 15 Recruitment Officer 2 Revenue Officer 1 Safety Systems Coordinator / Manager 4 Safety Systems Information Officer 6 Senior / Records Officer 10 Systems Administrator 2 Systems Analyst 9 Training and Development Advisor 3 Web Systems Officer 2 Grand Total 271

[Supplementary Information No A97.]

Question: Mr W.J. Johnston: asked if the Minister could provide a description of the process undertaken by the Department in order to recover unpaid fines and/or any further action taken to penalise those who do not pay a fine issued by the Department?

Answer: The consequence of failure to pay penalties imposed in lieu of forfeiture for breaching mining tenement conditions under the Mining Act 1978 are prescribed. The mining tenement is forfeited. The administration of this function is carried out by the Department’s Legislation and Compliance Branch under the Minister’s delegated authority.

It is the function of the Department of the Attorney General to administer enforcement of penalties imposed by the relevant court of jurisdiction for offences prosecuted against an offence under the relevant mining or petroleum legislation.

Penalties imposed by way of infringement notices for regulatory breaches are enforced under the Fines, Penalties and Infringement Notices Enforcement Act 1994 by the Fines Enforcement Registry. The Department refers outstanding penalties to the Fines Enforcement Registry for enforcement.

Page 77:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E685 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

SUPPLEMENTARY INFORMATION — ESTIMATES COMMITTEE B The information presented below appears essentially as provided by the departments.

Division 11: Regional Development —

[Supplementary Information No B1.]

Question: Regional Breakdown of Royalties for Regions Expenditure:

Mr D.A Templeman: Can the Minister provide the Royalties for Regions allocations (expenditure) for the nine regions of Western Australia for the years 2009 through to 2014 including the population and per capita spend for each region?

Answer: First we will provide the figures as close as we can get to the current numbers in terms of financial years, given that this financial year has not yet finished. Second, we will provide the Royalties for Regions spend in each of the financial years prior until now including the per capita spend.

B1 Response:

Reported Expenditure by Region – 2008-09 to 31 March 2015

2008-09 $

2009-10 $

2010-11 $

2011-12 $

2012-13 $

2013-14 $

2014-15 $

(as at 31 March

2015) Gascoyne 4 955 074 6 294 696 17 023 997 56 654 211 51 170 677 89 891 668 32 570 073

Goldfields-Esperance 11 309 007 19 169 758 23 932 129 50 927 338 56 958 243 99 576 548 52 383 733

Great Southern 10 903 257 16 515 229 43 689 525 51 915 278 62 188 950 57 010 189 32 725 984

Kimberley 10 594 954 86 022 338 95 283 709 122 910 007 198 138 650 222 213 026 63 907 733

MidWest 15 652 638 20 158 145 26 908 856 57 278 395 57 858 183 103 056 510 59 916 920

Peel 5 798 430 4 310 574 13 201 829 18 179 313 18 048 433 44 999 942 19 553 229

Pilbara 11 899 373 60 800 798 192 386 276 247 738 828 381 138 455 322 705 308 127 099 622

South West 15 517 704 18 413 120 29 676 881 58 550 412 98 840 923 117 994 059 65 553 981

Wheatbelt 32 280 939 29 442 875 46 466 834 78 659 970 77 480 525 144 442 114 94 169 185

Regional Expenditure WA

118 911 376 261 127 533 488 570 035 742 813 752 1 001 823 039 1 201 889 364 547 880 461

Source: Royalties for Regions Online database and Royalties for Regions Audited Annual Reports.

Note: Figures across financial years vary due to ongoing adjustments and amendments.

Regional Population – 2008 to 2014

2008 2009 2010 2011 2012 R 2013 R 2014 P

Gascoyne 9 380 9 434 9 507 9 674 9 785 9 897 9 959

Goldfields-Esperance 56 568 57 628 58 462 59 422 60 772 61 868 61 333

Page 78:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E686 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

2008 2009 2010 2011 2012 R 2013 R 2014 P

Great Southern 55 756 56 419 56 719 57 240 58 113 59 226 59 935

Kimberley 35 257 35 803 36 227 36 791 38 122 39 486 39 099

Mid West 52 779 53 927 54 473 55 311 56 540 57 818 58 183

Peel 99 014 104 419 107 581 112 675 118 663 124 619 128 798

Pilbara 53 670 56 578 58 912 61 777 64 164 66 290 67 503

South West 14 7869 152 560 156 186 159 730 164 744 169 661 174 052

Wheatbelt 71 499 72 267 72 664 73 195 73 984 74 768 74 774

TOTAL Regional WA

581 792 599 035 610 731 625 815 644 887 663 633 673 636

Perth 1 589 908 1 641 215 1 680 114 1 727 594 1 793 107 1 855 374 1 899 753

TOTAL State Population 2 171 700 2 240 250 2 290 845 2 353 409 2 437 994 2 519 007 2 573 389

Source: Australia Bureau of Statistics.

Key: R – Revised figures (since 30 August 2013) P – Preliminary figures

Per Capita Expenditure per Year – 2008-09 to 31 March 2015

2008-09

$

2009-10

$

2010-11

$

2011-12

$

2012-13

$

2013-14

$

2014-15 $

(as at 31 March 2015)

Gascoyne 528 667 1 791 5 856 5 230 9 083 3 270

Goldfields-Esperance 200 333 409 857 937 1 610 854

Great Southern 196 293 770 907 1 070 963 546

Kimberley 301 2 403 2 630 3 341 5 197 5 628 1 635

MidWest 297 374 494 1 036 1 023 1 782 1 030

Peel 59 41 123 161 152 361 152

Pilbara 222 1 075 3 266 4 010 5 940 4 868 1 883

South West 105 121 190 367 600 695 377

Wheatbelt 451 407 639 1 075 1 047 1 932 1 259

[Supplementary Information No B2.]

Question: MR M. McGowan: By way of supplementary information, detail of where that money ($85 million) was spent as part of the SuperTowns program across each of the communities that were part of it.

Mr D.T. Redman: I am happy to provide by way of supplementary information a very clear statement on where the resources under the $85 million SuperTowns program have

a) been spent

b) what has been acquitted

c) what has been outstanding to date

Answer:

Page 79:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E687

SuperTowns Projects - Agreement and Financial Information Project Agency Agree

ment Executed Date

Status Approved Allocation

Drawdown

Total Reported Expenditure

Drawdown less expense (*)

Receipts (includes interest and returns)

Cash Balance (*)

SuperTowns Development Planning Fund - Northam

Shire of Northam

FAA 11/11/2011

In Progress

575 000 575 000 566 894 8 106 21 018

29 124

SuperTowns Development Planning Fund - Wheatbelt Development Commission

Wheatbelt Development Commission

MOU 20/10/2011

Acquittal In Progress

363 000 363 000 376 200 -13 200 13 200

0

SuperTowns Development Planning Fund - South West Development Commission

South West Development Commission

MOU 1/11/2011

In Progress

1 567 000 1 567 000 1 551 184 15 816 21 552

37 368

SuperTowns Development Planning Fund - Shire of Morawa

Shire of Morawa

FAA 11/11/2011

In Progress

762 000 762 000 763 627 -1 627 1 627 0

SuperTowns Development Planning Fund - Great Southern Development Commission

Great Southern Development Commission

MOU 21/11/2011

In Progress

176 000 176 000 152 234 23 766 0 23 766

SuperTowns Development Planning Fund - Landcorp

LandCorp MOU 21/11/2011

Acquittal In Progress

498 391 498 391 575 635 -77 244 0 -77 244

SuperTowns Development Planning Fund - Landcorp for Katanning

LandCorp MOU 21/11/2011

In Progress

598 500 598 500 585 694 12 806 0 12 806

SuperTowns Development Planning Fund - Shire of Katanning

Shire of Katanning

FAA 21/11/2011

Acquitted

175 000 175 000 175 000 0 0 0

SuperTowns Development Planning Fund - Planning Officers

Department of Planning

MOU 21/11/2011

Acquitted

293 326 293 326 205 092 88 234 0 88 234

SuperTowns Development Planning Fund - Shire of Esperance

Shire of Esperance

FAA 11/11/2011

In Progress

719 000 719 000 669 592 49 408 0 49 408

SuperTowns Development Planning Fund - Shire of Boddington

Shire of Boddington

FAA 25/10/2011

Acquittal In Progress

399 000 399 000 399 000 0 0 0

SuperTowns Development Planning Fund - Shire of

Shire of Dandaragan

FAA 11/11/2011

Acquittal In Progress

595 000 595 000 602 207 -7 207 7 207 0

Page 80:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E688 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

Project Agency Agreement

Executed Date

Status Approved Allocation

Drawdown

Total Reported Expenditure

Drawdown less expense (*)

Receipts (includes interest and returns)

Cash Balance (*)

Dandaragan

Esperance Town Centre Revitalisation Masterplan

Shire of Esperance

FAA 29/06/2012

In Progress

380 000 380 000 403 673 -23 673 23 564

-108

Manjimup's Agricultural Expansion

Shire of Manjimup

FAA 25/06/2012

In Progress

6 955 000 6 955 000 3 789 702 3 165 298

336 443

3 501 741

Jurien Bay City Centre Enhancement Project - Dandaragan Shire

Shire of Dandaragan

FAA 29/06/2012

In Progress

12 137 850

12 137 850

9 097 075 3 040 775

758 699

3 799 474

Revitalisation of Manjimup's Town Centre

Shire of Manjimup

FAA 25/06/2012

In Progress

5 710 000 5 710 000 4 650 015 1 059 985

141 708

1 201 693

Multicultural and Aboriginal Engagement and Enhancement Project - Katanning

Shire of Katanning

FAA 29/06/2012

In Progress

255 000 255 000 265 430 -10 430 10 430

0

Ranford Water Capacity

Shire of Boddington

FAA 29/06/2012

In Progress

1 250 000 1 250 000 74 088 1 175 912

93 810

1 269 722

Avon Health and Emergency Services Precinct

Shire of Northam

FAA 29/06/2012

In Progress

4 814 550 4 814 550 5 076 308 -261 758 300 659

38 902

Margaret River Perimeter Road and Town Centre Improvements

Shire of Augusta-Margaret River

FAA 29/06/2012

Acquittal In Progress

1 940 000 1 940 000 2 047 204 -107 204 107 204

0

Esperance Waterfront Project - A World Class Foreshore Development - SuperTowns Development Project Fund 2011-12

Shire of Esperance

FAA 29/06/2012

In Progress

12 650 517

12 650 517

13 286 969 -636 452 636 452

0

Economic Development Implementation in the Boddington District

Shire of Boddington

FAA 29/06/2012

In Progress

1 173 298 1 173 298 1 163 268 10 030 51 077

61 107

Morawa Town Revitalisation Project

Shire of Morawa

FAA 29/06/2012

In Progress

3 000 000 3 017 191 2 481 739 518 261 188 090

723 542

North Midlands Solar Thermal Power Station Feasibility Study

Shire of Morawa

FAA 29/06/2012

In Progress

500 000 500 000 0 500 000 38 251

538 251

Esperance Economic Development Program

Shire of Esperance

FAA 29/06/2012

In Progress

193 350 193 350 55 190 138 160 12 426

150 586

Page 81:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E689

Project Agency Agreement

Executed Date

Status Approved Allocation

Drawdown

Total Reported Expenditure

Drawdown less expense (*)

Receipts (includes interest and returns)

Cash Balance (*)

Avon River Revitalisation and Riverfront Development (Stage 1)

Shire of Northam

FAA 29/06/2012

In Progress

3 655 435 3 655 435 2 866 549 788 886 52 847

841 734

Collie CBD Revitalisation

Shire of Collie

FAA 29/06/2012

In Progress

11 010 000

11 010 000

6 102 261 4 907 739

510 279

5 418 018

Supertowns Development Project Fund 2011-12 Katanning Town Centre Commercial and Streetscape Revitalisation

Shire of Katanning

FAA 29/06/2012

In Progress

8 715 000 8 715 000 5 165 910 3 549 090

510 743

4 059 833

Surfers Point Precinct Project

Shire of Augusta-Margaret River

FAA 29/06/2012

Acquittal In Progress

3 460 000 3 460 000 3 600 631 -140 631 140 631

0

$84 521 217

84 538 408

66 748 371 17 772 846

3 977 918

21 767 955

Source: RfR Online database

Negative amounts indicate non-Royalties for Regions funding reported as part of expenditure. Non-Royalties for Regions funds means funds not disbursed from the Royalties for Regions Special Purpose Account. It could include interest or recipient's own funding.

[Supplementary Information No B3.] Question: Royalties for Regions Expenditure on Advertising/Marketing/Promotions in 2013-14, and what is proposed to be spent on advertising for 2014-15, 2015-16. 2016-17.

Mr P. Papalia: Tell us what supplementary information he (Minister) will give us for television, newspapers (print) and signage advertising in major spends and across which programs, and out to the number of years, so that I can clarify –

Mr D. T. Redman: I am happy to provide by way of supplementary information the advertising budgets for the Department (Regional Development) and the nine development commissions.

Bigger Picture (which was done centrally)

Bigger ticket initiatives (larger projects) such as Pilbara Cities.

Answer:

Department of Regional Development

Financial Year Expenditure Budget

2013-14 $ 153 371.00 Not applicable

2014-15 (General) $ 131 149.51 $ 193 000.00

2015-16 Not applicable $ 198 000.00

2016-17 Not applicable $ 203 000.00

Total $ 284 520.51 $ 594 000.00

Bigger Picture

Financial Year Expenditure Budget

2013-14 Not applicable Not applicable

2014-15 $ 721 870.80 $ 915 000.00

2015-16 Not applicable Not applicable

Page 82:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E690 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

2016-17 Not applicable Not applicable

Total $ 721 870.80 $ 915 000.00

Peel Development Commission

Financial Year Expenditure Budget

2013-14 $ 1 938.00 Not applicable

2014-15 $ 20 354.00 Not applicable

2015-16 Not applicable $ 14 268.00

2016-17 Not applicable $ 15 919.00

Total 24 230.00 30 187.00

Great Southern

Financial Year Expenditure Budget

2013-14 $ 10 154.00 Not applicable

2014-15 $ 8 412.00 Not applicable

2015-16 Not applicable $ 10 000.00

2016-17 Not applicable $ 10 000.00

Total $18 566.00 20 000.00

Goldfields Esperance Development Commission

Financial Year Expenditure Budget

2013-14 $ 1 946.38 Not applicable

2014-15 $ 5 655.14 Not applicable

2015-16 Not applicable $ 5 000.00

2016-17 Not applicable $ 5 000.00

Total $ 7601.52 $ 10 000.00

Kimberley Development Commission

Financial Year Expenditure Budget

2013-14 $ 6 000.00 Not applicable

2014-15 $ 45 000.00 Not applicable

2015-16 Not applicable $ 10 000.00

2016-17 Not applicable $ 10 000.00

Total $ 51 000.00 $ 20 000.00

Wheatbelt Development Commission

Financial Year Expenditure Budget

2013-14 $ 23 681.74 Not applicable

2014-15 $ 16 208.33 Not applicable

2015-16 Not applicable $ 16 000.00

2016-17 Not applicable $ 21 000.00

Total $ 39 941.07 $ 37 000.00

Mid West Development Commission

Financial Year Expenditure Budget

2013-14 $ 5 150.00 Not applicable

2014-15 $ 8 148.00 Not applicable

2015-16 Not applicable $ 10 243.00

2016-17 Not applicable $ 5 606.00

Total $ 13 298.00 $ 15 849.00

South West Development Commission

Financial Year Expenditure Budget

2013-14 Not applicable Not applicable

2014-15 $ 3 379.00 Not applicable

2015-16 Not applicable Not applicable

2016-17 Not applicable Not applicable

Total $3 379.00

Pilbara Development Commission

Financial Year Expenditure Budget

2013-14 $ 42 880.37 Not applicable

2014-15 $ 4 685.48 Not applicable

2015-16 Not applicable $ 52 000.00

Page 83:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E691

2016-17 Not applicable $ 52 000.00

Total $47 565.85 $104 000.00

Gascoyne Development Commission

Financial Year Expenditure Budget

2013-14 $ 6 111.00 Not applicable

2014-15 $ 14 000.00 Not applicable

2015-16 Not applicable $ 15 000.00

2016-17 Not applicable $ 15 000.00

Total $ 20 111.00 $ 30 000.00

In relation to Royalties for Regions funded advertising expenditure on larger Royalties for Regions projects, the Department of Regional Development (DRD) funds a large number of government agencies that actually deliver the projects/programs and services.

As part of these funding arrangements it is not a reporting requirement for agencies to report to DRD with specific figures in relation to advertising expenditure. DRD does require that agencies report against key measures and milestones as agreed under executed Memorandums of Understanding for the transfer of funds.

It would require significant effort by DRD to source the relevant information from each agency responsible for larger funded Royalties for Regions projects. It may be more appropriate for the Member for Warnbro to approach the relevant Minister responsible for implementing the delivery of each individual larger Royalties for Regions funded project/program to obtain this information (for example the Minister for Health regarding funding of Regional Hospitals or the Southern Inland Health Initiative).

[Supplementary Information No B4.] Mr M McGowan: Maybe I can seek by supplementary information the levels of employment-current and future employment on (Ord).

Mr M McGowan: Could I seek by supplementary information the exact number of people employed, including local people and the exact number of Indigenous people as part of that.

Mr D.T Redman: I am happy to provide by way of supplementary information the numbers and the profile of employees currently employed by Kimberley Agricultural Investment Pty Ltd as that applies to the Ord development on Goomig and Knox plain, in which a development agreement is in place with the government

Answer: Kimberley Agricultural Investment Pty Ltd (KAI) advises that it employs 60 people with the following profile breakdown:

• 4 Chinese Nationals

• 56 locals of which 25 are Aboriginal.

[Supplementary Information No B5.] Question: Population figures for Pilbara Cities – Growth Profile

Mr M McGowan: I note further on, the so-called aim of Pilbara Cities is 50 000 residents in Karratha, 50 000 in Port Hedland and 15 000 in Newman. What is the current population of each of those cities? What has been the growth profile over the last few years?

Mr D.T Redman: By way of supplementary information I will get the current population figures and the movements for Pilbara Cities, which encompasses Karratha, Newman and Port Hedland. Answer: The estimated resident population for Pilbara Cities as at 30 June 2014 was 48 273:

City of Karratha 26 649

The township of Newman 6 162

The township of Port Hedland (including South Hedland) 15 462

Since 2010 the estimated resident population for Pilbara Cities has increased by 6 309:

City of Karratha 4 021

The township of Newman 500

Page 84:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E692 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

The township of Port Hedland (including South Hedland) 1 518

Division 12: Gascoyne Development Commission —

[Supplementary Information No B6.]

Question:

Mr M McGowan: I refer to 2012. I am after what aged-care facilities the state is funding via the Department of Regional Development or the Gascoyne Development Commission; in what years will they be constructed; how many beds; what is the funding; and how will that be managed?

Answer:

$14 million has been nominally allocated from the Royalties for Regions North West Health Initiative which is under the Department of Regional Development, for a 24 bed facility to be built on the Carnarvon Health Campus site. This will be managed by the WA Country Health Service as a multipurpose service i.e. a mixture of high and low care dependent upon the needs of the residents.

The Gascoyne Development Commission (GDC), Department of Regional Development (DRD), Department of Housing (DoH), Shire of Carnarvon (SoC) and Gascoyne Memorial Foundation (GMF) are advancing a Memorandum of Understanding and a subsequent business case for the construction of up to 15 independent living units (ILUs) on GMF's current ILU site at an estimated cost of $4.5 million: $3.3m has been allocated to the project from the Royalties for Regions Gascoyne Revitalisation Plan with the Department of Regional Development with endorsement by the Gascoyne Advisory Group, and $1.2m has been committed by the Department of Housing.

In addition, the Gascoyne Development Commission is working collaboratively with the Shire of Carnarvon to identify suitable land to enable the development of a prospectus, to secure investment into the construction of an ageing in place facility, with the option of a care component.

Division 13: Goldfields–Esperance Development Commission —

[Supplementary Information No B7.]

Question: Number of mobile phone towers provided under RMCP and proposed for RTP in the Goldfields- Esperance Development Commission Region

Dr G. G. Jacobs: Under the regional mobile communications program phase, how many telecommunications mobile phone towers will be allocated and constructed in this region? (Goldfields-Esperance Development Commission, particularly south east agricultural region) How much will be spent and what is the exact location of those mobile phone towers?

Mr D.T Redman: By way of supplementary information the number of mobile phone towers provided under RMCP, and that are predicted to be supplied under RMCP2 (RTP) in response to the question from the Member for Eyre on the Goldfields-Esperance Development Commission region.

Answer:

On 15 December 2014, the Western Australian Cabinet approved a Royalties for Regions allocation of $45 million to the Department of Commerce for the Regional Telecommunications Project (RTP). This new funding will build on the success of its predecessor program, the Regional Mobile Communications Project (RMCP) that received $40 million in Royalties for Regions funding. RMCP has established 113 mobile base stations in communities and along key transport corridors in regional, rural and remote parts of the State, extending Telstra’s mobile coverage footprint in Western Australia by 31 per cent. The RTP will address mobile coverage gaps in small communities and at strategic locations, primarily in the southern half of the State. There were 21 sites built under the original RMCP within the Goldfields Esperance Region as listed below:

Page 85:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E693

Shire Site Name

Coolgardie Coolgardie Higginsville Kambalda West Dundas Arubiddy Balladonia Bedonia Caiguna Dundas Shire Site Name Dundas Fraser Range Madura Mundrabilla Price Esperance Munglinup East Leonora Cosmos Nickel Tarmoola Mine Ngaanyatjarraku Blackstone Jameson Wanarn Warakurna Wingellina Ravensthorpe Ravensthorpe Exchange

The first 22 base stations under the RTP were announced on 20 February 2015. There are three sites planned for development within the Goldfields Esperance region under the first tranche of sites. Shire Site Name

Coolgardie Boorabbin Esperance Grass Patch Salmon Gums

The Department of Commerce is working closely with the Goldfields-Esperance Development Commission and other Regional Development Commissions to identify priorities across the state for the next tranche of sites under RTP.

These sites are expected to be co-funded by the Commonwealth Government under its $100 million Mobile Black Spot Program (MBSP). Applications to the MBSP closed on16 April 2015 and the outcome is expected to be announced at the end of June 2015.

Page 86:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E694 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

Any funds that remain after the State’s co-contributions to the MBSP have been finalised will be used to establish additional sites. Additional sites will be announced once agreements with one or more mobile network operators are concluded.

Division 21: Lands —

[Supplementary Information No B8.]

Question: Mr M McGowan asked: The Minister said that there have been a range of tranches, so by way of supplementary information, could I ask for a list of all the land that has been sold under this program, what was it sold for and what the original valuation was?

Answer: Please refer to table below for the response.

Top 20 Assets Sold to Date

Site Address/Name Valuation (excl. GST) Sale Price (excl. GST) Lot 500 Shaw Road, Wanneroo $3,700,000

(inclusive of GST Margin Scheme)

$3,700,000

Kaleeya Hospital Site, East Fremantle $11,800,000 - $13,100,000

$17,500,000

Kaleeya House, East Fremantle

(formerly part of Kaleeya Hospital)

$780,000 - $800,000 $810,000

UNDER CONTRACT

Potato Marketing Corporation, North Coogee

$4,500,000

$4,500,000

UNDER CONTRACT

[Supplementary Information No B9.] Question: Mr M McGowan asked: Is the second tranche publically available information? Answer: Properties that are currently on the market are listed in the table below.

Property Address Estimated Area (hectares)

Sales Listing Hyperlink

2 Weston Street, Cervantes 0.3764 http://www.jurienbayviewrealty.com.au/real-estate/property/681762/for-sale/land/wa/cervantes-6511/2-weston-street-/

2 Caley Way, Corrigin 1.505 http://www.eldersrealestate.com.au/rural/buy/property-wa-corrigin-586934

39 Hughes Street, Denham 1.015 http://raywhitesharkbay.com.au/wa/denham/1311012/

39 Sandhills Road, Donnybrook 0.3600 http://www.firstnational.com.au/buy-residential-real-estate/vacant-land-39-sandhills-road-brookhampton-wa-11885100024

Lot 127 Barr Street, Doodlakine 0.2197 http://regionalwa.eldersrealestate.com.au/our-people/greg-smith

47 Bartram Road, Dumbleyung 0.0956 http://www.realestate.com.au/property-residential+land-wa-dumbleyung-201205757

East Perth Power Station

Cnr East Parade and Summers Street

8.5000 http://www.mra.wa.gov.au/projects-and-places/east-perth-power-station/investment-opportunites

66 Sanderson Terrace, Kalannie 0.3727 http://regionalwa.eldersrealestate.com.au/our-people/greg-smith

28 Harvey Place, Kalbarri 0.0800 http://raywhitekalbarri.com.au/wa/kalbarri/805747/

Lot 555 Walker Street, Kalbarri 1.3124 http://www.realestate.com.au/property-residential+land-wa-kalbarri-

Page 87:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E695

200637715

16 Hunter Street, Kalgoorlie 1.9400 http://www.jmsons.com.au/comsale/west-kalgoorlie/16-18-hunter-street-west-kalgoorlie/4970268.aspx

18 Hunter Street, Kalgoorlie 3.7863 http://www.jmsons.com.au/comsale/west-kalgoorlie/16-18-hunter-street-west-kalgoorlie/4970268.aspx

973 Eulup-Manurup Road, Mount Barker

267.09 http://www.realestate.com.au/property-residential+land-wa-mount+barker-200990155

15 Mines Road, Norseman 0.0990 http://regionalwa.eldersrealestate.com.au/our-people/greg-smith

65 Taurus Street, Southern Cross 0.1012 http://www.eldersrealestate.com.au/vacant-land/buy/property-wa-southern-cross-462269

1015 Pechey Road, Swan View 2.3512 http://www.realestate.com.au/property-residential+land-wa-swan+view-200980099

189 Avon Tce, York 0.1528 http://www.eldersrealestate.com.au/vacant-land/buy/property-wa-york-460962

Division 51: Treasury — Item 75, WA Land Authority; and Item 86, Royalties for Regions —

[Supplementary Information No B10.] Dr G.G. Jacobs: My question refers to page 579 and is about the Western Australian Land Authority investing in the regions. The mission statement of LandCorp talks about creating space for growth. Many people I talk to have the view that it does not create enough space in a timely manner. Can the minister tell us what LandCorp has done in the regions in the industrial and residential land space? What projects can we point to that really show the work in the regions to truly create space for growth?

Dr G.G. Jacobs: The minister was talking about projects that have been carried out in certain regions, and I am asking what has been done in my region. I am happy for the minister to take that question on notice.

Answer:

Across regional Western Australia, during the 2013-14 reporting period, LandCorp delivered land for an additional 760 dwelling unit equivalents. In addition, LandCorp’s Economic Employment and Lands Program also delivered 44 general industrial lots across the State.

LandCorp currently has 1,134 residential, light industrial, tourism and commercial lots with a further 83 general industrial lots available for sale across regional Western Australia.

LandCorp is also working closely with other Government agencies, Local Government and industry to de-constrain land in most regional centres so it can be brought to market to meet current and future demand.

Within the local member’s region of Goldfields-Esperance, LandCorp has a stock of 131 lots available for sale in 11 towns within the region – 120 residential, light industrial tourism or commercial lots and 11 general industrial lots.

An example of a town where LandCorp has undertaken land development was Hopetoun with the Mary Ann Waters Estate which was established to accommodate the anticipated growth from the then BHP Nickel Mine. There are currently eight lots available for sale and 40 lots with approvals that can be released when demand returns.

In regards to the future development pipeline, LandCorp has been very active in developing land for social and economic growth, improving the liveability of regional towns in and around the local member’s electorate of Eyre. In partnership with the City of Kalgoorlie-Boulder, the Hannan’s Outline Development Plan has been completed which provides planning direction for an area totalling 324 hectares in Kalgoorlie’s North West Sector and is capable of delivering up to 2,000 residential lots.

Kalgoorlie’s future long term industrial land supply is also secured with ongoing works to de-constrain a 187 hectare parcel opposite the Anzac Drive industrial estate with the potential yield of up to 160 additional industrial lots. Additionally, LandCorp manages on behalf of the State, the Mungari Strategic Industrial Area between Kalgoorlie and Coolgardie which is available for larger or heavy industrial uses.

Page 88:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E696 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

LandCorp has worked with the Goldfields Esperance Development Commission and the Shire of Esperance on the Esperance SuperTowns initiative and contributed to the Esperance Growth Plan. As an active participant in Esperance Town Centre Revitalisation Implementation project, LandCorp has contributed to the Esperance Middletown redevelopment options analysis; provided an evaluation of the Shires’ Flinders residential state and is progressing the business case for the development of residential lots in Sinclair to meet a specific price point for key worker accommodation.

In addition to these activities, LandCorp manages the local Regional Development Assistance Program (RDAP) to deliver residential, commercial and industrial lots across regional Western Australia where private developers are not active. The initiative is aimed at helping towns which have identified a need for land to support economic and social growth, but struggle to attract sufficient interest from private developers. Local Governments can apply for inclusion in the local RDAP.

Through the local RDAP, LandCorp has produced 75 light industrial and 139 residential lots in 23 towns over the past four years, across the Mid-West, Wheatbelt, South West and Great Southern regions. LandCorp also has a further 237 lots under investigation or ready to proceed into development in another 26 towns, if demand for land can be demonstrated.

In some cases for example such as Menzies, LandCorp has provided development options for the Shire of Menzies to respond quickly, if mining of the Yilgarn iron ore deposits was to proceed in the near future.

Division 32: Western Australia Police —

[Supplementary Information No. B11.] Question: Mrs M.H. Roberts asked: Referring to ‘Spending Changes’ on page 363, provide a breakdown of how WA Police is achieving the following:

• 1% General Government Efficiency Dividend

• 15% Procurement Savings

• ICT Savings and Reform

Answer: WA Police has established a comprehensive reform program, ‘Frontline 2020’, to review all services, structure, production and business processes across the agency. This involves examining the efficiency, priority and value for money of all activities carried out, in order to increase the agency’s capacity to manage expenditure within approved budget parameters and maintain the delivery of core frontline outcomes.

These reductions in the WA Police budget have been addressed holistically through:

• staff reductions;

• renegotiation of service contracts; and

• changes to service delivery to internal stakeholders.

[Supplementary Information No B12.] Question: Mr W.J. Johnston asked: What were the average number of hits per day on the WA Police website during periods when the State Government’s ‘Bigger Picture’ advertising campaign was running?

What were the average number of hits per day during periods when the State Government’s ‘Bigger Picture’ advertising campaign was not running?

Answer: The Bigger Picture Policing Frontline 2020 campaign commenced 30 November 2014 and during this time ran three ‘television bursts’ consisting of 21 days each:

• Burst 1: 30 November 2014 – 20 December 2014

• Burst 2: 22 March 2015 – 11 April 2015

• Burst 3: 10 May 2015 – 30 May 2015

As at 11 June 2015, the campaign was ‘in market’ for a total of 63 days and ‘out of market’ a total of 131 days.

Campaign WA Police

Corporate Website

Bigger Picture Policing

Frontline 2020 Website

Website www.police.wa.gov.au www.frontline2020.police.wa.gov.au

In Market Sessions 78,166

(1,240 per day)

25,489

(404 per day)

Page 89:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E697

Out of Market Sessions 153,185

(1,169 per day)

26,711

(203 per day)

A session is defined as ‘individual visits’ to the website. When inactivity occurs for 30 minutes or more, and the user re-engages with the website on the same device, a new session is counted.

[Supplementary Information No B13.] Question: Mrs M.H. Roberts asked: What is the amount of money that has been allocated specifically to police recruitment advertising?

What is the amount of money that has been allocated specifically to Bigger Picture local policing team advertising?

Answer: Total funding allocated to police recruitment advertising:

2014-15 2013-14 2012-13

Police Recruitment Advertising Campaign $1.5m $2.0m $0.965m

Total funding allocated to the Bigger Picture, Local Policing Team advertising:

2014-15 2013-14 2012-13

Bigger Picture local Policing team $0.6 m Nil Nil

[Supplementary Information No B14.] Question: Mr R.F. Johnson asked for a list of all communications and ICT projects, and the initial estimated cost and current anticipated cost for each project.

Answer:

Project Name Initial Estimate Forecast Comments

Infringement Image Processing System (IIPS) Release and Database Upgrade

1,093,700 1,021,000 n/a

Fine Enforcement Registration Interface Enhancement Information not disclosed due to current tender processes.

Computer Aided Dispatch (CAD) Equipment Replacement Midland Information not disclosed due to current tender processes.

Exchange 2013 Upgrade 541,600 658,000 n/a

Site Livescan - Equipment Replacement 1,430,000 916,950 n/a

Crim Org Control Act (COCA) & Undisclosed Warrants Information not disclosed due to current tender processes.

Data Centre - Relocation Planning Information not disclosed due to current tender processes.

Forensics Remediation 300,000 325,109 n/a

Printer Optimisation 110,000 138,871 n/a

Radio Network and End User Devices Replacement 200,000 265,890 n/a

Site Consolidation 14_15 Works 1,391,762 1,392,000 n/a

Storage Management and Consolidation 14/15 564,000 660,000 n/a

Application Continuity & Improvement Project Outcomes Works Information not disclosed due to current tender processes.

Communications Business Continuity Facility (CBCF) Solidus Works 200,000 158,180 n/a

Page 90:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E698 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

InterActive Tactical Training System Replacement 1,300,000 100,000 Project cancelled

Network Security Update 14/15 Works 400,000 540,774 n/a

Radio Network Infrastructure Replacements - Qantar 14/15 1,800,000 2,144,828 n/a

Resource Management Information System (RMIS) Production Upgrade

246,000 348,000 n/a

Mobile Device Management Enhancement 14/15 90,000 90,193 n/a

Self Service Portal 140,800 236,500 n/a

Workforce Manager 243,000 205,498 n/a

Replace Application Load Sharing Infrastructure 710,500 579,636 n/a

Non-Traffic Infringement Management Solution 7,996,000 5,700,002 n/a

Prosecution (Briefcase) 10,980,000 15,275,000 n/a

Custodial Management 4,822,000 4,520,881 n/a

Business Intelligence Solution Information not disclosed due to current tender processes.

Computer Aided Dispatch (CAD) Replacement Information not disclosed due to current tender processes.

Digital Video Interview of Suspects 3,835,000 2,448,344 n/a

Website & Content Management System Redevelopment 2,500,000 1,800,000 n/a

Licensing and Registry 8,855,000 8,834,850 n/a

Regional Radio Network Replacement 71,086,000 72,946,000 n/a

Note: These figures reflect the total cost of the projects, including investing activities and expenditure expensed through the Income Statement, as opposed to what is included in the Budget Statements, which is the cost of ting activities only

[Supplementary Information No B15.]

Question: Mrs M.H. Roberts asked for the number of WA Police employees by employment type in the three service areas, namely:

• Metropolitan Policing Services

• Regional and Remote Policing Services

• Specialist Policing Services

Answer: The FTE figures by service reported in the Budget Statements do not reflect the actual number of WA Police employees in each service area, but rather the allocation of agency effort (total hours worked) applied to each service. This includes the allocation of effort from support areas such as Workforce, Business Strategy & Finance, and Business Information Systems.

A notional allocation of effort by employee group is presented below for the 2015-16 Budget estimate calculated as Full Time Equivalents (FTE). This allocation will vary from year to year based on operational requirements.

FTE Allocation by Employee group and Service for the 2015-16 Budget estimate

Employee Groups Metropolitan Policing Services

Regional and Remote Policing Services

Specialist Policing Services

Total

Sworn Police Officers 2,838 1,582 1,653 6,073

Police Staff 557 376 699 1,632

Police Auxiliary Officers 213 25 50 288

Wages & Traffic Wardens 5 24 138 167

Total 3,613 2,007 2,540 8,160

Page 91:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E699

[Supplementary Information No B16.]

Question: Mr R.F. Johnson asked for the date at which five cameras began operating from the five fixed speed camera locations on the freeway. Answer: The five fixed sites have all been consistently operating since 21 April 2015.

[Supplementary Information No B17.] Question: Mr R.F. Johnson asked for the date at which five cameras began operating from the five fixed speed camera locations on the freeway. Answer: The five fixed sites have all been consistently operating since 21 April 2015.

[Supplementary Information No B18.] Question: Mr R.F. Johnson asked: How many hand-held speed cameras are currently used by WA Police? Answer: WA Police operate 14 hand-held speed cameras, and one speed detection device that operates in combination with a long range camera.

[Supplementary Information No B19.] Question: Mrs M.H. Roberts asked: How many hours have the booze buses been deployed, each month, for the last six months (December 2014 to May 2015)? Answer:

Month Total

(hours:minutes)

December 2014 306:25

January 2015 356:37

February 2015 323:56

March 2015 302:37

April 2015 334:10

May 2015 406:35

[Supplementary Information No B20.] Question: Mrs M.H. Roberts asked: On page 370 in the section Financial Statements indicating a planned increase in the Total Cost of Services of $52.9 million, provide a breakdown of wages and salary costs for the increase mainly attributable to the additional employee program, and a summary of other categories responsible for the increase in the Total Cost of Services. Answer:

Movement in Total Cost of Services

2014-15 Estimated Actual to 2015-16 Budget

$m

Additional Employee Program funding

Salary and Superannuation 28.1

Other Staffing Costs (eg. Regional Housing & Uniforms) 4.1

Operating Expenses (eg. Vehicles & Consumables) 3.2

Total Additional Employee Program Funding 35.4

Other Initiatives General Salary and Cost escalation 38.4

Government Regional Officers Housing (GROH) Increase 6.0

Page 92:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E700 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

Community Safety Network Recurrent funding 5.3

Police and Community Youth Centres (PCYC) funding 2.0

Building a Better CCTV Network 0.7

Procurement Savings (2014-15 and 2015-16 measures) 0.5

Capping of Leave Liabilities at 2011-12 Levels 0.3

Armadale Justice Complex - Planning 0.2

District Allowance -1.4

Police Facilities Major Refurbishment -2.9

2014-15 Additional 1% Efficiency Dividend -3.5

ICT Savings and Reform 2014-15 -3.7

Workforce Renewal Policy -4.5

ICT Programs funding -6.1

2012-13 Efficiency Dividend of 2% (1% increase per annum) -13.2

Other Variances1 -0.6

Total Other Initiatives 17.5

Total 52.9 1 Note that the table includes significant items only. Minor variances have been consolidated under the line item ‘Other Variances’. [Supplementary Information No B21.] Question: Mrs M.H. Roberts asked: In relation to the information provided under the heading “Income from State Government” on page 371 in relation to resources received free of charge:

What are those resources?

How are those figures arrived at?

Answer: As part of the State Government’s interagency processes, formal advice is provided by agencies on what services have been provided free of charge and the value of those services for the annual financial statements. A breakdown of resources received free of charge by WA Police is as follows:

Resources Received Free of Charge 2014-15 Estimated Actual

2015-16 Budget

$'000 $'000

Procurement services, building and maintenance project management services and lease management services provided by Department of Finance

4,450 4,549

Legal services provided by the State Solicitor's Office 1,200 1,200

Title searches and valuation services provided by Western Australian Land Information Authority (Landgate) 500 500

Collection of firearm licences provided by Department of Transport 100 100

Total 6,250 6,349 [Supplementary Information No B22.] Question: Ms M.M. Quirk asked for a list of all meetings Community Engagement Division has had with communities from Culturally and Linguistically Diverse (CaLD) backgrounds, noting the community/group at the meeting and the date of the meeting. Answer:

MEETING CaLD GROUP DATE

Social Inclusion Strategic Planning Meeting Multicultural 16/06/2015

Forum - Multicultural Consultative Forum Multicultural 16/06/2015

Page 93:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E701

Meeting - MMRC Refugee Week (Metropolitant Migrant Resource Centre) Multicultural 15/06/2015

Meeting - Know Your Roots Somalian community 13/06/2015

Presentation - Al Hidayah Islamic Centre Muslim community 13/06/2015

Presentation - IEC Students from Parkwood and Thornlie Primary School Multicultural 09/06/2015

WA Police Event - Language Cards launch in Katanning Multicultural 08/06/2015

Forum - Imam & The Guy Next Door Multicultural 06/06/2015

Star Search Youth Program - Grand Final Multicultural 6/06/2015

Iraqi Community Celebration - Imam Al-Mahdi Iraqi community 06/06/2015

Presentation - AsETTS Training Lecture (Association for Services For Torture & Trauma Survivors) (Arabic Speaking - Hazari) Afghani community 06/06/2015

Meeting - Youth Program - Sikh Temple Sikh community 5/06/2015

Women's Group, Ishar Multicultural 5/06/2015

Presentation - Safety Talk/Social Media Muslim community 4/06/2015

WA Police Event - Commissioner's Morning Tea with the Muslim Community in WA Muslim community 3/06/2015

Meeting - Sikh Temple Sikh community 31/05/2015

Presentation - AsETTS Training Lecture (Association for Services For Torture & Trauma Survivors) Somalian community 30/05/2015

Meeting with Australian Islamic College Muslim community 5/05/2015

Alhidaya Centre Presentation For Students - (Personal Safety / Social Media) Muslim community 1/05/2015

Thornlie Islamic Campus Presentation For Parents - (Personal Safety / Social Media) Muslim community 1/05/2015

Thornlie Islamic Campus Presentation For Students - (Personal Safety / Social Media) Muslim community 1/05/2015

Presentation Healthy Multicultural 29/04/2015

Meeting - Southern Corridor Meeting Multicultural 27/05/2015

Presentation - Social Media - Smile of Hope Muslim Women's Group Muslim community 26/05/2015

Meeting with the President of Islamic Motivation Muslim community 24/04/2015

Presentation - Personal Safety Talk - Settlement Talk at Adults Migrant English Program (AMEP) Mirrabooka Multicultural 22/05/2015

Presentation - Personal Safety - Settlement Talk at AMEP Mirrabooka Multicultural 21/05/2015

Presentation - AsETTS Training Lecture (Association for Services For Torture & Trauma Survivors) Burmese & Chin community 16/05/2015

Meeting - Iraqi Community Representative - President of the Australian Iraqi Association for Cultural Connections Inc. (AIACC) Iraqi community 13/05/2015

Presentation - Social Media - Star Search Youth Program Multicultutal 9/05/2015

WA Police Event Participation - Information Stall City of Perth Multicultural 09/05/2015

Page 94:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E702 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

International Student Festival

Meeting - with Salvation Army to discuss human trafficking and abuses within CALD community Multicultural 06/05/2015

Forum - Cultural Aspects & Child Protection in New and Emerging Communities Multicultural 4/05/2015

Meeting - CaLD Action Group Meeting Multicultural 23/04/2015

Multicultural Hamony Event Multicultural 20/04/2015

Meeting - Celebration of Multicultural Harmony Multicultural 2/04/2015

Council of International Students WA (CISWA) Exec Council Meeting International students 1/05/2015

Meeting - Multicultural Advisory Group (Meeting with the IMAMS) Muslim community 31/03/2015

African Elders Meeting Multicultural 29/03/2015

Presentation - Driving in WA MMRC (Metropolitant Migrant Resourse Centre) Chin community 26/03/2015

Harmony Event Multicultural 26/03/2015

Pakistan Day Invitation Multicultural 21/03/2015

Harmony Day Mirrabooka Multicultural 21/03/2015

Meeting - Muslim Women Welfare and Advocacy Harmony Day Event Muslim community 21/03/2015

Ethnic Communities and Multicultural Interest Stakeholders Morning Tea Multicultural 20/03/2015

Chin Community Safety Talk Chin community 20/03/2015

WA Police Event Participation - Mirrabooka Harmony Day 2015 Multicultural 20/03/2015

Harmony Week Celebration Multicultural 16/03/2015

Presentation - Chin Community (Protective Behaviour) Chin community 12/03/2015

Imam's Meeting & TRG Networking Training Multicultural 10/03/2015

Meeting - Mirrabooka Group Planning Meeting Multicultural 10/03/2015

Forum - Multicultural Consultative Forum Multicultural 10/03/2015

Evening Event - Multicultural night under the stars 2015 Multicultural 1/03/2015

Forum - The IMAM , the Businesswoman & the Guy Next Door Multicultural 25/02/2015

AsETTS Training (Association for Services For Torture & Trauma Survivors) Multicultural 24/02/2015

Forum - Welcome to Stirling event for the Arabic Speaking Communities Forum Multicultural 21/02/2015

Presentation - International Student Talk (ECU Joondalup Campus) Multicultural 20/02/2015

Presentation - International Student Talk (ECU Mt Lawley Campus) Multicultural 18/02/2015

Presentation - Social Media & Personal Safety Multicultural 17/02/2015

Meeting - Mirrabooka Harmony Day Meeting 2015 Multicultural 3/02/2015

Presentation - Information Session - Muslim Women Welfare and Advocacy WA Muslim community 31/01/2015

Meeting - Mirrabooka Harmony Day 2015 Multicultural 20/01/2015

Project - UWA Project Survey Multicultural 19/01/2015

Page 95:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E703

Community Support - Candle Light Vigil Pakistani community 9/12/2014

Community Support - Interfaith ceremony tonight for victims of the Sydney Siege Multicultural 17/12/2014

Meeting - Burundi African community 13/12/2014

Presentation - Australia Law & Travelling Overseas, Forced Marriage Multicultural 9/12/2014

Presentation - For Muslim Parents of Different Multicultural Background Muslim community 9/12/2014

Forum - Multicultural Consultative Forum (MCF) Multicultural 9/12/2014

Meeting - Deputy Commissioner Meeting with the IMAMS Muslim community 4/12/2014

Presentation - For Muslim Parents of Different Multicultural Background Muslim community 4/12/2014

Meeting - Harmony Day meeting 2015 Multicultural 01/12/2014

Presentation - Safety Talk - Refugee Students Multicultural 28/11/2014

Presentation - Safety Talk (Women Group) Multicultural 26/11/2014

Presentation - Safety Talk (Womens Group) Muslim community 25/11/2014

Presentation - Refugee Student Safety Talk Multicultural 25/11/2014

Meeting - Kitchen Table Conversation on Violence against Women and their Children (Ishar-Multicultural Women Health Centre) Multicultural 21/11/2014

Meeting - Community Development Coordinator from ASeTTS (Association for Services For Torture & Trauma Survivors) Multicultural 21/11/2014

Meeting with Pastor and Team from Redeemed Care (Burundi) African community 20/11/2014

Networking Forum - City of Stirling CaLD Youth) Multicultural 18/11/2014

Presentation - Safety Talk (Women Group) Multicultural 14/11/2014

Presentation - Safety Talk (Woman Group) Muslim community 13/11/2014

Multicultural Seniors' Week (Safety Lecture) (Ishar - Multicultural Women Health Centre) Multicultural 12/11/2014

Multicultural Seniors' Week - Spice of Life (Ishar-Multicultural Women Health Centre) Multicultural 11/11/2014

Presentation - Safety & Danger & Social Media Multicultural 11/11/2014

Forum - Parenting Service Forum/ Mirrabooka Family Support Network Multicultural 10/11/2014

Meeting - Authentic Africa dance & Music African community 09/11/2014

Meeting - Multi-cultural Food Fair Multicultural 07/11/2014

Presentation - Refugee Student - Safety Talk Multicultural 7/11/2014

Forum - CMSS Panel Discussion / Foreign Fighters in Iraq and Syria (UWA) Multicultural 05/11/2014

Meeting - ASeTTS staff lunch (Association for Services For Torture & Trauma Survivors) Multicultural 05/11/2014

Presentation - Safety Talk & Social Media Multicultural 04/11/2014

Meeting - At Muslim Women Support Centre (Bentley) Muslim community 28/10/2014

National Mosque Open day - Southern River Muslim community 25/10/2014

Page 96:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E704 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

UWA Forum Discussion: Combating Islamophobia Multicultural 22/10/2014

CaLD youth Engagement Meeting (and attachments) Multicultural 21/10/2014

Presentation - International Student Talk (Personal Safety & Social Media) Multicultural 20/10/2014

Presentation - Safety Talk - Current Issues (Women's Group) Muslim community 17/10/2014

Forum - Parenting Service Forum Multicultural 15/10/2014

Meeting - Pink Scarf Day - Support Breast Cancer (Zen and Womens group from Ishar Attended) Multicultural 12/10/2014

Presentation - Safety Talk Vietnamese community 10/10/2014

UWA CMSS Panel Discussion: Islam in the Community Multicultural 9/10/2014

Meeting - ISHAR AGM (Ishar - Multicultural Womens' Health Centre) Multicultural 7/10/2014

Presentation - Safety Talk Multicultural 7/10/2014

Presentation - MMRC Driving Lecture (Metropolitant Migrant Resourse Centre) Chin community 3/10/2014

Training - Study Day - Working with Migrant Women & Families Multicultural 24/09/2014

Meeting - CaLD Youth Engagement Group Multicultural 19/08/2014

WA Police Event Participation - EID Mubarak Event Muslim community 28/07/2014

Presentation - International Student Talk) Safety Awareness Challenger Institute International Student Orientation Multicultural 15/07/2014

[Supplementary Information No B23.]

Question: Mrs M.H. Roberts asked: With reference to the 170 identified under the SDRM process that could be abolished in the future, how many of the positions have already been abolished and what is the status of the employees that currently occupy those positions?

Answer: 93.2 FTE have been abolished to date through Phases 1 and 2 of the SDRM process.

These FTE abolitions include:

Vacant positions

Redeployed to other positions Current re-deployees Separated through the voluntary

severance scheme 48.4 FTE 22.8 FTE 16.0 FTE 6.0 FTE

Division 33: Training and Workforce Development —

[Supplementary Information No B24.] Question: Mr F.M. Logan asked for a list of the funding that each State Training Provider and private providers receive from the State Government in 2015-16. Answer: Training delivery targets and funding levels have not yet been determined for 2016, consequently only notional allocations can be provided at this point.

The notional budget allocations for 2015-16 are: ($ million)

Central Institute of Technology 61

Challenger Institute of Technology 45

C Y O'Connor Institute 12

Durack Institute of Technology 24

Goldfields Institute of Technology 13

Great Southern Institute of Technology 17

Kimberley Training Institute 28

Page 97:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E705

South West Institute of Technology 21

Polytechnic West 78

Pilbara Institute 29

West Coast Institute of Training 23

Private Training Providers 101

[Supplementary Information No B25.]

Question: Mr F.M. Logan asked for a list of the number of redundancies that have already been funded out of the 2014-15 budget and the number of redundancies that have been identified for the 2015-16 budget period.

Answer: 2014-15: 240

2015-16: 0

Insurance Commission of Western Australia —

[Supplementary Information No B26.]

Question: Mr F.M. Logan asked: By way of supplementary information, could we have the exact number of claims underway in the industrial diseases division of ICWA and the exact increase in the number of extra claims that have occurred over the 2014-15 financial year; and can the Treasurer tell us whether the changes that were made recently – about a year or two ago – to the industrial diseases definition that included diffuse pleural fibrosis, which was debated in the house about how far it would go, have resulted in an increase in the number of claims accepted?

Answer: The number of claims underway (open claims) for the Compensation (Industrial Diseases) Fund is 10 (as at 12 June 2015). The number of new claims received in 2014-15 is seven which is an increase of three over the number received in 2013-14, which was four. The change to include Diffuse Pleural Fibrosis (DPF) occurred in 2011. Since that time, no claims have been received where DPF is the primary condition leading to the claim.

Synergy —

[Supplementary Information No B27.]

Question: Mr F.M. Logan asked if the Minister, in terms of the spot price purchases Synergy entered into, what was the best gas price Synergy got this year per terajoule – just on the spot price purchases?

Answer: There is no clear market indicator for spot gas prices and market research suggests volumes traded have been very small. As a guideline the attached Gas Trading Australia website provides some insight as to the historical prices and volumes of gas sold in the spot market.

http://www.gastrading.com.au/spot-market/historical-prices-and-volume.html

Horizon Power —

[Supplementary Information No B28.]

Question: Mr W.J. Johnston asked for the number of times in the Pilbara underground power process in Karratha the contractor or Horizon has disrupted or cut a Telstra connection? Does Horizon know how much it costs to make good the damage? Has any compensation been paid by Horizon to businesses because of disruption to phones?

Answer: The project has disrupted Telstra lines on eight occasions since the recommencement of phase two in November 2014. Two of these incidents were unavoidable as the disturbed lines were not visible on the Dial Before You Dig (DBYD) reference maps. On the six occasions where the lines were on DBYD, the contractor is responsible for all costs associated with fixing disrupted lines, therefore these costs are not borne by the Pilbara

Page 98:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E706 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

Underground Power Project. This includes any compensation to the customer for damages experienced due to the outage.

In the first phase of the project, Telstra lines were impacted on 29 occasions from 12 November 2011 to 28 May 2013. As discussed, these disruptions were the responsibility of the contractor, including all associated costs.

On each occasion in both phase 1 and phase 2 Horizon Power liaised directly with Telstra.

[Supplementary Information No B29.]

Question: Mr W.J. Johnston asked: How many bills for small businesses have been varied in Karratha and what was the total quantum of the difference between those bills? I am not after the individual ones but the aggregate figure. Answer: This information is owned by the City of Karratha who issued the rates notices associated with the Pilbara Underground Power Project to property owners in Karratha. Horizon Power has requested this information and will provide as soon as it is received. [Supplementary Information No B30.] Question: Mr B.S. Wyatt asked for an explanation of the amount of savings in the energy subsidy scheme from means testing in Aboriginal communities. Answer: The below table shows that the impact of means testing on Aboriginal Communities yields limited savings for Horizon Power suggesting that existing recipients in these towns will be largely unaffected by changes to the scheme.

[Supplementary Information No B31.] Question: Mr W.J. Johnston asked: What Aboriginal communities does Horizon Power have funding to regularise the power? Answer: Horizon Power has no funding to regularise power in any additional Aboriginal communities.

Division 51: Treasury (Except Item 86: Royalties for Regions) —

[Supplementary Information No B32.] Question: Ms R. Saffioti asked whether the Treasurer could provide a breakdown of the $1.2 billion for the new Perth Stadium, including exactly what it represents, whether it is all capital, whether part of it is financing and over what years. Answer: The total value of the design-build-finance-maintain (DBFM) contract with WESTADIUM is $1,212 million (Net Present Cost (NPC) – in 2014 dollars),which includes the cost to design, build, partially finance and maintain the Stadium and Sports Precinct (and some transport elements) over 25 years. This will be funded by a combination of State, user and hirer contributions. The WESTADIUM contract is delivering outstanding value for money over its 28-year life against the State’s benchmark Public Sector Comparator of $1,536 million. This represents a saving of $324 million (21%). The total NPC value of the WESTADIUM contract and the Public Sector Comparator are included in the Project Summary for the DBFM contract, which is available on the Department of Treasury website at http://www.treasury.wa.gov.au/cms/content.aspx?id=14210. The following section provides a break-down of the costs of the three components that make up the new Perth Stadium project. COMPONENT 1: STADIUM AND SPORTS PRECINCT Asset Value The asset value of the Stadium and its surrounding Sports Precinct totals $1,062.9 million, and comprises:

• $489.5 million for payments to WESTADIUM during the construction phase, for all of the construction works, plus the cost of some transport elements delivered under the DBFM contract, being:

‒ the stadium bus station; and ‒ public transport assembly areas;

Page 99:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E707

• $422.8 million for ongoing payments to WESTADIUM during the 25-year operating phase; and • $150.6 million for other costs not related to the WESTADIUM contract: pre-construction site works;

‒ the utilities works; ‒ the project management costs for the State project team; and ‒ a range of other costs (such as State advisors, loose furniture, some technology to be arranged

by the State).

The asset value is reflected in page 787 of Budget Paper No.2 (BP2) in the Statement of Financial Position of VenuesWest as an increase in non-current assets in 2017-18 (property, plant and equipment).

Construction Phase Payments

The payments to WESTADIUM during the construction phase total $489.5 million (or the State’s capital contribution), and are accounted for as a finance lease pre-payment.

The State’s capital contribution is reflected in BP2 as follows:

Agency Location in BP2

2015-16 Budget Estimate $’000

2016-17 Forward Estimate $’000

2017-18 Forward Estimate $’000

Total

Sport and Recreation Page 778 ‘Other payments – new Perth Stadium’ 209,100 224,600 42,400 476,100

Public Transport Authority Page 837 ‘Other payments’ 5,600 6,000 1,800 13,400

Grand total 489,500

Ongoing Payments – Capital Costs

In terms of ongoing payments during the 25-year operating phase, WESTADIUM will be paid capital costs and associated funding costs of $422.8 million – paid as monthly service payments, commencing in 2017-18 when the facility becomes operational. The monthly service payments are reflected in the 2015-16 BP2 as follows:

Agency Location in BP2

2015-16 Budget Estimate $’000

2016-17 Forward Estimate $’000

2017-18 Forward Estimate $’000

Total

VenuesWest Page 787 ‘Borrowings’ - - 422,831 422,831

Grand total 422,831

Although the total value of $422.8 million will be paid progressively over the 25-year operating phase, in accordance with the relevant accounting standard (AASB 117), the total lease liability is recognised up-front at the completion of the Stadium and Sports Precinct (scheduled to be in December 2017).

Additional Costs

The following table shows the additional costs that are not related to the contract with WESTADIUM and includes the costs of the pre-construction site works, the utilities works, and a range of other costs (such as State advisors, loose furniture, some technology to be arranged by the State), plus the project management costs for the State project team.

Agency Location in BP2 Estimated Total Cost $000

Sport and Recreation Page 774 35,480

Page 100:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E708 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

(asset investment) ‘new Perth Stadium – Sports Precinct’

Sport and Recreation (asset investment)

Page 774 ‘new Perth Stadium and Plaza’ 79,460

Sport and Recreation (asset investment)

Page 774 ‘new Perth Stadium Project Management – Department of Sport and Recreation’ 6,900

Sport and Recreation (asset investment)

Page 774 ‘new Perth Stadium Project Management – Strategic Projects’ 9,100

Sport and Recreation (new Perth Stadium Project – Planning)

Page 777 included in ‘Property, plant and equipment’ 12,100

Public Transport Authority (asset investment)

Page 833 included in ‘new Perth Stadium Transport Project’ 7,600

Total 150,640

COMPONENT 2: TRANSPORT INFRASTRUCTURE

The total cost of the transport infrastructure associated with the new Perth Stadium is $336.2 million, which includes:

• a new Stadium station and associated rail works to accommodate a six railcar platform (which replaces Belmont station);

• the Swan River pedestrian bridge; and

• a range of road modifications.

The transport infrastructure investment is reflected in BP2 (page 833) as part of the Public Transport Authority’s Works in Progress (new Perth Stadium Transport Project). This includes the $7.6 million of transport infrastructure delivered under the pre-construction site works as part of Component 1 above, but excludes $22.4 million for the bus-hub and pedestrian assembly areas delivered by WESTADIUM.

Accordingly, the total asset value for all new Perth Stadium-related infrastructure is $1,391.7 million, comprising $1,062.9 million (Component 1) plus $336.2 million (Component 2), less $7.6 million to avoid double-counting.

COMPONENT 3: MAINTENANCE PAYMENTS

There will be a range of payments made to WESTADIUM to cover the cost of maintenance, lifecycle replacements, services (such as security and waste management) and associated funding costs. It is intended for these costs to be met from revenue collected from Stadium hirers and users. These revenues and costs are not included in the budget estimates, as the State is currently negotiating with key users and undertaking a procurement process to appoint an operator. Once these processes have been concluded and final recurrent costs and revenue are known, VenuesWest’s operating budget will be adjusted accordingly, if necessary.

[Supplementary Information No B33.]

Question: Ms R. Saffioti asked whether the Treasurer could provide the profile of the $268 million in land asset sales revenue in the forward estimates.

Answer: CASHFLOW PROFILE

The following table outlines the cashflow profile for the estimated $268 million in additional land sales revenue.

2015-16 $’000

2016-17 $’000

2017-18 $’000

2018-19 $’000

Total $000

Stage 1 (Top 20) 50,000 65,000 80,000 80,000 275,000

Stage 2 (350 Properties) 42,000 61,700 20,000 - 123,700

Stage 3 - 20,000 20,000 40,000 80,000

Total Land Asset Sales Program 92,000 146,700 120,000 120,000 478,700

LESS

Existing Department of Lands’ 66,415 38,500 38,500 38,500 181,915

Page 101:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E709

2015-16 $’000

2016-17 $’000

2017-18 $’000

2018-19 $’000

Total $000

Land Sales Revenue(a)

New Land Sales Revenue(b) 25,585 108,200 81,500 81,500 296,785

LESS

Existing Main Roads’ Land Sales Revenue(c) 14,500 14,500 - - 29,000

Total Additional Land Sales Revenue 11,085 93,700 81,500 81,500 267,785

(a) Existing estimates for Crown land sales proceeds of $181.9 million are recorded in the DoL Administered Land Sales Revenue forward estimates.

(b) $296.8 million from new land sales will be drawn from land holdings of other agencies, where the land is mostly freehold tenure. In most instances, legislative provisions will require these proceeds to be returned to each agency with the agency either to provide a return to the Consolidated Account, or having its appropriation reduced accordingly.

(c) Main Roads’ Budget includes $29 million in land sales proceeds for the years 2015-16 to 2016-17. As Main Roads assets comprise about 33% of the LASP Stage 2 (350 properties), an adjustment of $29 million has been made to avoid double-counting.

DIVESTMENT FUNDING FOR PREPARING LAND FOR SALE An amount of $17.3 million over four years ($8.3 million in 2015-16, $8.3 million in 2016-17, $0.3 million in 2017-18 and $0.3 million in 2018-19) was approved in the 2015-16 Budget for the creation of a Divestment Fund and its ongoing management. This represents the cost of de-constraining land identified under Stage 1 of the Land Assets Sale Program (LASP). Land Assets LASP Stage 1: Top 20 Properties Stage 1 of the DoL’s LASP comprises 20 parcels of land and is expected to realise $275 million in revenue over the forward estimates – noting that some of these sales have already been recorded in the existing DoL Administered budget. The estimates of sales revenue for Stage 1 are based on the actual sites being considered for sale over the remainder of 2014-15 and from 2015-16 to 2018-19. The estimated proceeds are based on either valuations from the Valuer General’s Office (VGO), or by private valuers, and potential de-constraining costs have a reasonable degree of certainty. Those properties expected to be sold during this period include:

• Lot 500 Wanneroo and Kaleeya Hospital (already sold for $20.9 million combined); and • Claremont Oval, Yirra Yaakin Theatre, the Potato Marketing Corporation Headquarters, Lots 420/421

Mandurah Road, the Fremantle Police Station, the Deaf School (Cottesloe), Swan Districts Hospital Site and the Department of Agriculture and Food site (Forrestfield).

The list below contains the comprehensive list of 20 properties that make up Stage 1. LAND ASSET SALES PROGRAM - STAGE 1 PROPERTIES

1. Claremont Oval; 2. Department of Agriculture and Food (DAFWA) Forrestfield Site; 3. DAFWA Medina; 4. Deaf School, Cottesloe; 5. Kaleeya Hospital, East Fremantle; 6. Public Transport Authority (PTA) Lots 420 and 421, Rockingham; 7. PTA Area C, Forrestfield; 8. Shenton Park Hospital; 9. Wanneroo Lot 500; 10. Fremantle Police Station;

Page 102:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E710 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

11. Industrial Foundation for Accident Prevention Site, North Lake; 12. Old Perth Girls School, East Perth; 13. Potato Marketing Corporation HQ, North Coogee; 14. Swan Districts Hospital, Middle Swan; 15. Yirra Yaakin Theatre, Perth; 16. DAFWA HQ, Kensington; 17. Police HQ, East Perth; 18. Princess Margaret Hospital, Subiaco; 19. East Perth Power Station; and 20. Woodside Maternity Hospital, East Fremantle.

LASP Stage 2: 350 Properties

The LASP Stage 2 properties are expected to realise proceeds of $123.7 million over the period to 2017-18.

The 350 properties have been identified primarily due to their vacant status according to the Government Property register. To obtain estimates of possible realisable proceeds from sale, Colliers International conducted a desktop valuation on each property. This process also incorporated assessments of the average cost of de-constraining the land needed to realise the property’s deemed value.

LASP Stage 3

The LASP Stage 3 has used a similar technique to estimate the likely net proceeds for properties as that for Stage 2 properties. Estimates from Stage 3 are for $80 million in sales from 2016-17 to 2018-19.

[Supplementary Information No B34.]

Question: Mr W.J. Johnston asked whether the Treasurer could provide the estimates of the expected reduction or change over the forward estimates in energy assistance payments from Horizon Power to Aboriginal townships.

Answer: Based on advice from Horizon Power, the impact on Aboriginal remote communities from means-testing the Energy Assistance Payment (EAP) from 2015-16 is projected to be minor.

As outlined in the below table, the estimated reduction in the EAP subsidy relating to Aboriginal communities is $1,883 in 2015-16 and $7,897 across the forward estimates period. This compares to an estimated total EAP subsidy reduction for all of Horizon Power’s eligible customers of nearly $1.4 million over this same period.

Horizon Power 2015-16 2016-17 2017-18 2018-19 Total

Impact on Aboriginal communities ($) -$1,883 -$1,902 -$2,003 -$2,109 -$7,897

Impact on operating subsidy ($’000) -$313 -$330 -$347 -$366 -$1,356

[Supplementary Information No B35.]

Question: Ms R. Saffioti asked whether the Treasurer could provide the explanation of what contributed to the change in those numbers under the Metropolitan Redevelopment Authority (as per table 8 of Budget Paper No. 3)?

Answer: As advised by the Metropolitan Redevelopment Authority, the proceeds from the sale of non-financial assets for the years 2015, 2016 and 2017 (shown in table 8 on page 63 of Budget Paper No.3) update the previously published forward estimates for the revised timing of proceeds from the sale of land in the Midland Redevelopment Area. At the time of the 2014-15 Mid-year Review, this sale was forecast to settle in 2017. However, the sale has now been brought forward and proceeds are forecast in 2015 and 2016. The proceeds from sale of non-financial assets for the 2018 year represent the proceeds from the sale of commercial property in the New Northbridge project area.

Page 103:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E711

Division 54: Local Government and Communities — Service 5, Promotion and Support of

Multiculturalism —[Supplementary Information No B36.]

Question: Mr B.S. Wyatt asked for a list of the members of the Multicultural Advisory Committee.

Answer: A list of members of the Multicultural Advisory Committee is below: Title Full Name Position Comments

Ms

Mara BASANOVIC

Chief Executive Officer, Volunteering WA

Dr

Ting CHEN

Vice President, Chung Wah Association

Mr Bob CRONIN Editor, The West Australian Ms Andrea CREADO Director, Ishar Multicultural Women’s

Health Centre

Ms

Luisa DI LALLO

Member of the Multicultural Organisation of Western Australia

Ms

Eleni EVANGEL MLA Member for Perth

Dr

Ashok KUMAR

Committee member, Indian Society of Western Australia

Resigned 8 January 2015

Dr

Milenko KOVAC

Committee member, Sports and Cultural Club Serbia WA

Resigned 1 July 2014

Mr Dante MARRIBAY President, Damayang Filipino Inc Dr Anh NGUYEN Vietnamese Community of WA Mr

Mahesh SINGH

Immediate Past President, Indian Society of WA

Dr

Casta TUNGARAZA President, African Women’s Council of Australia

Mr

Sammy YAP

President, Chung Wah Association

Mr Suresh Rajan

President, National Ethnic Disability Alliance

Mr Hallam Pereira

International Project Director, Department of Sport and Recreation

Division 55: Parks and Wildlife —[Supplementary Information No B37.] Question: Ms M.M. Quirk requested a list of the suite of 269 areas in the 2015-16 indicative prescribed burning program.

Answer:

District Burn No. Burn Name Burn Purpose Planned Burn Area (Ha)

Perth Hills PHS_001 Murray Pltn Windr/Red Tops Bushfire Risk Management,Silviculture 136.81

Perth Hills PHS_003 Wellbucket/Gorries Windr/Red Tops Bushfire Risk Management,Silviculture 899.23

Perth Hills PHS_005 Meelon NR Biodiversity Management,Research 3.66

Perth Hills PHS_006 Woondowing NR Biodiversity Management,Bushfire Risk Management 194.08

Perth Hills PHS_007 Moondyne 1 Biodiversity Management,Bushfire Risk Management 534.47

Perth Hills PHS_008 Toodyay Biodiversity Management,Bushfire Risk Management 678.98

Perth Hills PHS_011 Interface Super Prescription Bushfire Risk Management,Community Interest 17,993.40

Perth Hills PHS_014 Gordon 1 Biodiversity Management,Bushfire Risk Management 943.02

Perth Hills PHS_015 Moondyne 2 Biodiversity Management,Bushfire Risk 2,621.34

Page 104:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E712 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

Management

Perth Hills PHS_016 White Biodiversity Management,Bushfire Risk Management 625.90

Perth Hills PHS_017 Hakea (Pascoe) Biodiversity Management,Bushfire Risk Management 3,077.57

Perth Hills PHS_020 Zamia Biodiversity Management,Bushfire Risk Management 330.55

Perth Hills PHS_021 Victoria 1 Biodiversity Management,Bushfire Risk Management 196.61

Perth Hills PHS_024 Teesdale 1 Biodiversity Management,Bushfire Risk Management 838.90

Perth Hills PHS_026 Parkerville Biodiversity Management,Bushfire Risk Management,Community Interest 47.65

Perth Hills PHS_027 Araluen Biodiversity Management,Bushfire Risk Management 60.90

Perth Hills PHS_029 Welshpool Road Biodiversity Management,Bushfire Risk Management 46.72

Perth Hills PHS_030 Mundaring Weir Biodiversity Management,Bushfire Risk Management 878.46

Perth Hills PHS_032 Glen Forrest UCL Biodiversity Management,Bushfire Risk Management 48.28

Perth Hills PHS_034 Serpentine NP 1 Biodiversity Management,Bushfire Risk Management 607.47

Perth Hills PHS_035 Mundlimup 1 Biodiversity Management,Bushfire Risk Management 555.70

Perth Hills PHS_036 Bullsbrook NR Biodiversity Management,Bushfire Risk Management 119.88

Perth Hills PHS_037 Serpentine NP 3 Biodiversity Management,Bushfire Risk Management 790.80

Perth Hills PHS_038 Lesmurdie Falls NP Biodiversity Management,Bushfire Risk Management 15.89

Perth Hills PHS_039 Airstrip Bushfire Risk Management,Vegetation Management 45.68

Perth Hills PHS_040 Chandler 1 Biodiversity Management,Bushfire Risk Management,Silviculture,Water Catchment

2,895.66

Perth Hills PHS_042 Holmes 1 Biodiversity Management,Bushfire Risk Management 195.49

Perth Hills PHS_043 Amphion_Plavins Bushfire Risk Management,Silviculture 669.34

Perth Hills PHS_044 Saddleback 1 Biodiversity Management,Bushfire Risk Management 330.32

Perth Hills PHS_046 Dale Biodiversity Management,Bushfire Risk Management 8,037.04

Perth Hills PHS_047 Whittaker 1 Biodiversity Management,Bushfire Risk Management 1,375.93

Perth Hills PHS_048 Karnet Biodiversity Management,Bushfire Risk Management 2,194.29

Perth Hills PHS_049 Chandler (Mundlimup) Biodiversity Management,Bushfire Risk Management 718.18

Perth Hills PHS_050 Huntly Heaps Prescription Bushfire Risk Management,Vegetation Management 12,111.59

Perth Hills PHS_051 Willowdale Heaps Prescription

Bushfire Risk Management,Vegetation Management 7,765.09

Perth Hills PHS_052 Saddleback Heaps Prescription

Bushfire Risk Management,Vegetation Management 11,644.06

Perth Hills PHS_053 Banyowla RP Piles Burn Bushfire Risk Management,Community Interest 0.01

Perth Hills PHS_054 Icy Creek Burn Pile Bushfire Risk Management 0.11

Perth Hills PHS_055 Churchman Brook RP 1 Biodiversity Management,Bushfire Risk Management 22.93

Perth Hills PHS_056 Randall 1 Biodiversity Management,Bushfire Risk Management 5,189.49

Perth Hills PHS_057 Avon Valley NP2 Biodiversity Management,Bushfire Risk Management,Research,Vegetation Management

2,193.04

Perth Hills PHS_058 Mortimer Biodiversity Management,Bushfire Risk Management 4,758.01

Page 105:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E713

Perth Hills PHS_059 Sawyers 4 Biodiversity Management,Bushfire Risk Management 1,536.25

Perth Hills PHS_060 Victoria 2 Biodiversity Management,Bushfire Risk Management 1,970.13

Perth Hills PHS_061 Helena Valley Biodiversity Management,Bushfire Risk Management 499.62

Perth Hills PHS_062 Lane Poole Recreation Precinct

Biodiversity Management,Bushfire Risk Management 1,213.83

Perth Hills PHS_063 Geddes Biodiversity Management,Bushfire Risk Management 9,852.95

Perth Hills PHS_064 Amphion_Curara Bushfire Risk Management,Silviculture 4,762.54

Perth Hills PHS_065 Rhodes Place Bushfire Risk Management,Community Interest 2.04

Perth Hills PHS_066 Reservoir Biodiversity Management,Bushfire Risk Management 3,822.91

Perth Hills PHS_067 Holyoake 1 Biodiversity Management,Bushfire Risk Management 3,521.68

Perth Hills PHS_068 Wungong Clearfell Pits Bushfire Risk Management,Silviculture 16.96

Perth Hills PHS_069 Bindoon Military Biodiversity Management,Bushfire Risk Management 2,067.76

Perth Hills PHS_070 Victoria 3 Biodiversity Management,Bushfire Risk Management 354.62

Swan Coastal SWC_006 Yanchep NP 1 Biodiversity Management,Bushfire Risk Management 529.31

Swan Coastal SWC_007 Yalgorup National Park 2 Biodiversity Management,Bushfire Risk Management 585.14

Swan Coastal SWC_008 Yalgorup National Park 4 Biodiversity Management,Bushfire Risk Management 811.12

Swan Coastal SWC_010 SWC_183 Moore River NR Biodiversity Management,Bushfire Risk Management 2,444.21

Swan Coastal SWC_011 Boonanarring 1 Biodiversity Management,Bushfire Risk Management 413.90

Swan Coastal SWC_012 Twin Swamps Nature Reserve

Biodiversity Management,Bushfire Risk Management 154.81

Swan Coastal SWC_013 Leda NR Biodiversity Management,Bushfire Risk Management 86.41

Swan Coastal SWC_014 Neaves Nature Reserve Biodiversity Management 2.27

Swan Coastal SWC_015 Caraban SF 3 Biodiversity Management,Bushfire Risk Management,Research 874.36

Swan Coastal SWC_017 Treasure State Forest Biodiversity Management,Bushfire Risk Management 192.16

Swan Coastal SWC_021 Neerabup National Park Biodiversity Management,Bushfire Risk Management 433.85

Swan Coastal SWC_022 Gnangara south Bushfire Risk Management,Silviculture 6,849.73 Swan Coastal SWC_023 Gnangara north Bushfire Risk Management,Silviculture 2,893.23 Swan Coastal SWC_024 Pinjar south Bushfire Risk Management,Silviculture 1,104.83 Swan Coastal SWC_025 Pinjar north Bushfire Risk Management,Silviculture 8,115.11 Swan Coastal SWC_026 Yanchep east Bushfire Risk Management,Silviculture 6,264.59 Swan Coastal SWC_027 Yanchep west Bushfire Risk Management,Silviculture 933.48 Swan Coastal SWC_028 Gnangara south CF Bushfire Risk Management,Silviculture 6,849.73 Swan Coastal SWC_029 Gnangara north CF Bushfire Risk Management,Silviculture 2,893.23 Swan Coastal SWC_030 Pinjar south CF Bushfire Risk Management,Silviculture 1,104.83 Swan Coastal SWC_031 Pinjar north CF Bushfire Risk Management,Silviculture 8,115.11 Swan Coastal SWC_032 Yanchep east CF Bushfire Risk Management,Silviculture 6,264.59

Swan Coastal SWC_033 Yalgorup NP 1 Biodiversity Management,Bushfire Risk Management 1,571.55

Swan Coastal SWC_034 Austin Bay Nature Reserve Biodiversity Management,Bushfire Risk Management 123.07

Swan Coastal SWC_035 Woodman Point Regional Park

Biodiversity Management,Bushfire Risk Management 48.21

Swan Coastal SWC_036 Paganoni Regional Park Biodiversity Management,Bushfire Risk Management 122.87

Swan Coastal SWC_037 Yalgorup National Park 3 Biodiversity Management,Bushfire Risk 203.75

Page 106:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E714 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

Management

Swan Coastal SWC_038 RAAF 2 Biodiversity Management,Bushfire Risk Management 834.09

Swan Coastal SWC_040 Koolijerrenup Nature Reserve Biodiversity Management,Bushfire Risk Management 201.13

Swan Coastal SWC_043 Wanneroo Shooting Complex Biodiversity Management,Bushfire Risk Management 408.59

Swan Coastal SWC_044 Yellagonga Regional Park seed orchard Bushfire Risk Management 11.31

Swan Coastal SWC_045 RAAF 1 Biodiversity Management,Bushfire Risk Management 4,290.18

Swan Coastal SWC_046 Fynes Nature Reserve Biodiversity Management,Bushfire Risk Management 653.99

Swan Coastal SWC_047 Caraban State Forest 4 Biodiversity Management,Bushfire Risk Management 1,688.53

Swan Coastal SWC_048 Caraban State Forest 2 Biodiversity Management,Bushfire Risk Management 696.13

Swan Coastal SWC_049 Yalgorup National Park 5 Biodiversity Management,Bushfire Risk Management 333.98

Swan Coastal SWC_050 Caraban State Forest 1 Biodiversity Management,Bushfire Risk Management 201.26

Swan Coastal SWC_051 Moore River State Forest 1 Biodiversity Management,Bushfire Risk Management 748.89

Swan Coastal SWC_052 Yeal Nature Reserve 1 Biodiversity Management,Bushfire Risk Management 2,770.79

Swan Coastal SWC_053 Boonanarring Nature Reserve 2

Biodiversity Management,Bushfire Risk Management 1,681.11

Swan Coastal SWC_055 Boonanarring Crown Freehold Lot 403

Biodiversity Management,Bushfire Risk Management 746.94

Swan Coastal SWC_056 Yeal Nature Reserve 2 Biodiversity Management,Bushfire Risk Management 150.47

Swan Coastal SWC_058 Boonanarring Crown Freehold Lot 102

Biodiversity Management,Bushfire Risk Management 437.25

Swan Coastal SWC_059 Yanchep West CF Bushfire Risk Management,Silviculture 933.48 Swan Coastal SWC_060 BGPA Bold Park Bushfire Risk Management, Research 7.06 Swan Coastal SWC_061 BGPA - Kings Park Bushfire Risk Management, Research 5.15 Swan Coastal SWC_062 Jandakot RP Bushfire Risk Management 282.79

Swan Coastal SWC_063 Modong Nature Reserve (Jandakot RP) Bushfire Risk Management 155.90

Swan Coastal SWC_064 Wandi NR (Jandakot RP) Biodiversity Management,Bushfire Risk Management 30.58

Blackwood BWD_003 ARGYLE_206 Biodiversity Management,Bushfire Risk Management 418.13

Blackwood BWD_005 BRAMLEY_529 Biodiversity Management,Bushfire Risk Management 472.49

Blackwood BWD_006 BRAMLEY_768 Biodiversity Management,Bushfire Risk Management 154.12

Blackwood BWD_007 DONNYBROOK_015 Biodiversity Management,Bushfire Risk Management 1,400.13

Blackwood BWD_008 GREENBUSHES_243 Biodiversity Management,Bushfire Risk Management 168.86

Blackwood BWD_010 HARRINGTON_021 Biodiversity Management,Bushfire Risk Management 1,101.08

Blackwood BWD_011 HESTER_266 Biodiversity Management,Bushfire Risk Management 271.34

Blackwood BWD_013 JALBARRAGUP_325 Biodiversity Management,Bushfire Risk Management 684.08

Blackwood BWD_015 KERR_008 Biodiversity Management,Bushfire Risk Management 2,649.27

Blackwood BWD_016 McCORKHILL_999 Research 183.57

Blackwood BWD_018 NELSON_107 Biodiversity Management,Bushfire Risk Management,Silviculture 1,591.21

Blackwood BWD_020 SUES_BRIDGE_515 Biodiversity Management,Bushfire Risk Management 4.52

Blackwood BWD_022 YALLINGUP_735 Biodiversity Management,Bushfire Risk Management 9.21

Blackwood BWD_030 CONTO_824 Bushfire Risk Management 228.26

Page 107:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E715

Blackwood BWD_031 WHARNCLIFFE_757 Bushfire Risk Management 13.93

Blackwood BWD_032 BRAMLEY_533 Biodiversity Management,Bushfire Risk Management 1,199.60

Blackwood BWD_033 DARRADUP_119 Biodiversity Management,Bushfire Risk Management 1,308.94

Blackwood BWD_034 ELLIS CREEK_313 Bushfire Risk Management,Silviculture 1,040.54

Blackwood BWD_035 GREENBUSHES_402 Biodiversity Management,Bushfire Risk Management 271.02

Blackwood BWD_036 KEARNEY_122 Bushfire Risk Management,Silviculture 862.99 Blackwood BWD_037 MOLLOY_547 Bushfire Risk Management,Silviculture 3,553.29 Blackwood BWD_039 NELSON_134 Bushfire Risk Management,Silviculture 2,664.06

Blackwood BWD_040 WARNER_218 Biodiversity Management,Bushfire Risk Management 255.12

Blackwood BWD_041 YELVERTON_727 Biodiversity Management,Bushfire Risk Management 540.30

Blackwood BWD_042 NELSON BEATON KARRI CELLS Silviculture 532.30

Blackwood BWD_043 BILJEDUP_734 Biodiversity Management,Bushfire Risk Management 249.08

Blackwood BWD_044 LEEUWIN_743 Biodiversity Management,Bushfire Risk Management 124.22

Blackwood BWD_045 WARNER_023 Biodiversity Management,Bushfire Risk Management 1,185.04

Blackwood BWD_046 BLACKWOOD PLANTATIONS Silviculture 1,292.17

Blackwood BWD_047 ARGYLE_031 Bushfire Risk Management 108.45

Blackwood BWD_048 ARGYLE_032 Biodiversity Management,Bushfire Risk Management 2,767.59

Blackwood BWD_049 BARRABUP_312 Biodiversity Management,Bushfire Risk Management 719.80

Blackwood BWD_051 CATTERICK_001 Bushfire Risk Management,Silviculture 1,622.16

Blackwood BWD_052 GREENBUSHES_401 Biodiversity Management,Bushfire Risk Management 59.51

Blackwood BWD_053 GREGORY_117 Bushfire Risk Management,Silviculture 1,679.15

Blackwood BWD_054 HESTER_266 Biodiversity Management,Bushfire Risk Management 1,363.51

Blackwood BWD_058 RED GULLY_124 Biodiversity Management,Bushfire Risk Management 7,640.16

Blackwood BWD_059 TANJANERUP_390 Bushfire Risk Management,Silviculture 942.78 Blackwood BWD_060 WHARNCLIFFE_757 Bushfire Risk Management 61.76

Blackwood BWD_062 FOREST GROVE_504 Biodiversity Management,Bushfire Risk Management 298.40

Blackwood BWD_063 BEATON_116 Bushfire Risk Management,Silviculture 3,301.25

Blackwood BWD_064 BORANUP_730 Biodiversity Management,Bushfire Risk Management 525.11

Blackwood BWD_065 BORANUP_826 Biodiversity Management,Bushfire Risk Management 2,142.39

Blackwood BWD_066 BRAMLEY_532 Biodiversity Management,Bushfire Risk Management 568.06

Blackwood BWD_067 BUTLER_127 Biodiversity Management,Bushfire Risk Management 5,374.40

Blackwood BWD_068 CAMBRAY BARRABUP_104

Biodiversity Management,Bushfire Risk Management 2,757.77

Blackwood BWD_069 HESTER_022 Biodiversity Management,Bushfire Risk Management 868.85

Blackwood BWD_070 LEEUWIN_731 Biodiversity Management,Bushfire Risk Management 217.74

Blackwood BWD_071 MOWEN_523 Biodiversity Management,Bushfire Risk Management 2,079.86

Blackwood BWD_072 NOGGERUP_005 Biodiversity Management,Bushfire Risk Management 3,023.72

Blackwood BWD_073 RAPIDS_539 Biodiversity Management,Bushfire Risk Management 5,871.64

Page 108:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E716 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

Blackwood BWD_074 SCHROEDER_513 Biodiversity Management,Bushfire Risk Management 2,456.74

Blackwood BWD_075 TOWERS WOOP WOOP_007

Biodiversity Management,Bushfire Risk Management 3,443.49

Blackwood BWD_076 YALLINGUP_749 Bushfire Risk Management 149.62 Blackwood BWD_077 Thomson Brook Plantation Silviculture 285.24 Wellington WTN_001 FLEAYS 055 Bushfire Risk Management,Silviculture 3,262.54 Wellington WTN_003 SHOTTS 257 Bushfire Risk Management 600.17 Wellington WTN_004 TREES 032 Bushfire Risk Management,Silviculture 8,571.89

Wellington WTN_005 BRISTOL 067 Biodiversity Management,Bushfire Risk Management,Water Catchment 776.75

Wellington WTN_007 TREASURE 225 Biodiversity Management,Bushfire Risk Management 198.96

Wellington WTN_009 DAVIS 038 Biodiversity Management,Bushfire Risk Management 1,376.08

Wellington WTN_013 GUTHRIE 214 Bushfire Risk Management 44.70

Wellington WTN_014 KEMERTON 211 Biodiversity Management,Bushfire Risk Management 658.62

Wellington WTN_015 YARLOOP 281 Biodiversity Management,Bushfire Risk Management 52.62

Wellington WTN_016 KEMERTON 213 Biodiversity Management,Bushfire Risk Management 314.56

Wellington WTN_019 MCLARTY 801 / MYALUP 802 Bushfire Risk Management 551.41

Wellington WTN_020 Lowden 035 Biodiversity Management,Bushfire Risk Management 1,974.39

Wellington WTN_021 Gervasse 045 Biodiversity Management,Bushfire Risk Management 622.67

Wellington WTN_022 Korijekup 401 Biodiversity Management,Bushfire Risk Management 175.15

Wellington WTN_023 Edward 019 Bushfire Risk Management,Silviculture 2,605.09 Wellington WTN_024 Kent 006 Bushfire Risk Management,Silviculture 1,753.31 Wellington WTN_025 Yabberup 046 Bushfire Risk Management,Silviculture 1,732.63

Wellington WTN_026 Arcadia 234 Biodiversity Management,Bushfire Risk Management 566.11

Wellington WTN_027 Hadfield 025 Biodiversity Management,Bushfire Risk Management 1,547.23

Wellington WTN_028 Hoffman / Driver 003 Biodiversity Management,Bushfire Risk Management 1,302.21

Wellington WTN_029 Sherwood 064 Biodiversity Management,Bushfire Risk Management 1,844.06

Wellington WTN_030 Darrell 029 Bushfire Risk Management,Silviculture 1,037.28 Wellington WTN_031 Proprietary 062 Bushfire Risk Management 62.26

Wellington WTN_032 Davis 043 Biodiversity Management,Bushfire Risk Management 1,855.04

Wellington WTN_033 Worsley 072 Bushfire Risk Management 29.83 Wellington WTN_034 Wellington Discovery Forest Bushfire Risk Management,Silviculture 167.66

Wellington WTN_035 Bristol / Roseneath 065 Biodiversity Management,Bushfire Risk Management,Silviculture 3,589.78

Wellington WTN_036 Clarke 004 Bushfire Risk Management,Silviculture 1,422.76

Wellington WTN_037 Waterous / Mt William 002 Biodiversity Management,Bushfire Risk Management 1,068.07

Wellington WTN_038 Western 250 Biodiversity Management,Bushfire Risk Management 354.15

Wellington WTN_039 Hamilton 027 Biodiversity Management,Bushfire Risk Management,Water Catchment 1,630.95

Wellington WTN_040 Shotts 052 Biodiversity Management,Bushfire Risk Management 1,810.91

Wellington WTN_041 Chalk 008 Biodiversity Management,Bushfire Risk Management 1,156.59

Wellington WTN_042 Bennelaking 059 Biodiversity Management,Bushfire Risk Management 1,426.40

Wellington WTN_043 Muja 071 Biodiversity Management,Bushfire Risk Management 2,576.13

Wellington WTN_044 Stene 024 Biodiversity Management,Bushfire Risk Management 4,511.45

Page 109:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E717

Wellington WTN_045 Roseneath / Sherwood 064 Bushfire Risk Management 6,934.24

Wellington WTN_046 Kemerton 211 Biodiversity Management,Bushfire Risk Management 343.72

Wellington WTN_047 Dardanup 037 Biodiversity Management,Bushfire Risk Management 633.73

Wellington WTN_048 Centaur 051 Bushfire Risk Management,Silviculture 2,680.29 Wellington WTN_049 Clarke 208 Bushfire Risk Management 495.67

Wellington WTN_050 McLarty - heaps Bushfire Risk Management,Silviculture,Water Catchment

103.61

Wellington WTN_051 Collie East Bluegum Heaps Bushfire Risk Management,Silviculture 245.37

Donnelly DON_002 Barlee Biodiversity Management,Bushfire Risk Management 1,047.44

Donnelly DON_003 Lindsay Bushfire Risk Management 54.40

Donnelly DON_004 Glenlynn Biodiversity Management,Bushfire Risk Management 326.28

Donnelly DON_005 Topanup Biodiversity Management,Bushfire Risk Management 272.37

Donnelly DON_006 Giblett Biodiversity Management,Bushfire Risk Management 3,161.56

Donnelly DON_007 Big Brook Biodiversity Management,Bushfire Risk Management 135.39

Donnelly DON_008 Smith Brook NR Biodiversity Management,Bushfire Risk Management 19.82

Donnelly DON_009 Dingup Biodiversity Management,Bushfire Risk Management 198.29

Donnelly DON_010 Yanmah 2/4 Biodiversity Management,Bushfire Risk Management,Silviculture 726.19

Donnelly DON_011 Coonan 05 Biodiversity Management,Bushfire Risk Management,Silviculture 309.92

Donnelly DON_012 Poole Biodiversity Management,Bushfire Risk Management 3,835.56

Donnelly DON_014 Quinninup Biodiversity Management,Bushfire Risk Management 473.61

Donnelly DON_015 Gloucester NP Biodiversity Management,Bushfire Risk Management 509.05

Donnelly DON_016 Iffley 09 Bushfire Risk Management,Silviculture 5,053.11 Donnelly DON_019 Diamond Community Interest 27.46 Donnelly DON_021 Treenbrook/Big Brook Silviculture 1,310.51 Donnelly DON_022 Shannon Bushfire Risk Management 49.39

Donnelly DON_023 Channybearup Bushfire Risk Management,Community Interest 92.34

Donnelly DON_025 Sutton 09 Silviculture 10.18

Donnelly DON_026 Keninup Biodiversity Management,Bushfire Risk Management 1,696.86

Donnelly DON_027 Cleave Biodiversity Management,Bushfire Risk Management 3,084.40

Donnelly DON_028 Cascades Biodiversity Management,Bushfire Risk Management 214.44

Donnelly DON_030 Lake Muir Biodiversity Management,Bushfire Risk Management 806.29

Donnelly DON_031 Lane Bushfire Risk Management,Community Interest 63.43

Donnelly DON_033 Northcliffe Bushfire Risk Management,Community Interest 108.39

Donnelly DON_035 Netic Biodiversity Management,Bushfire Risk Management 560.88

Donnelly DON_036 Coonan Biodiversity Management,Bushfire Risk Management 1,864.31

Donnelly DON_037 Deanmill Bushfire Risk Management 107.86

Donnelly DON_038 Cardac Biodiversity Management,Bushfire Risk Management 1,450.43

Donnelly DON_039 Poorginup Biodiversity Management,Bushfire Risk 6,137.13

Page 110:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E718 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

Management

Donnelly DON_040 Alco Biodiversity Management,Bushfire Risk Management 455.59

Donnelly DON_041 Unicup Biodiversity Management,Bushfire Risk Management 243.75

Donnelly DON_042 Broke Biodiversity Management,Bushfire Risk Management 962.70

Donnelly DON_043 Kingston Biodiversity Management,Bushfire Risk Management 2,443.05

Donnelly DON_045 Murtin/Diamond/Quinninup Silviculture 241.28

Donnelly DON_046 Yerramin Biodiversity Management,Bushfire Risk Management 1,543.14

Donnelly DON_047 Jane Biodiversity Management,Bushfire Risk Management 1,192.55

Donnelly DON_048 Unicup/Bolbelup Biodiversity Management,Bushfire Risk Management 2,585.24

Donnelly DON_049 Keninup Biodiversity Management,Bushfire Risk Management 860.84

Donnelly DON_050 Meribup Bushfire Risk Management,Silviculture 4,866.19

Donnelly DON_051 Gordon Biodiversity Management,Bushfire Risk Management 573.08

Donnelly DON_052 Glenlynn Biodiversity Management,Bushfire Risk Management 587.80

Donnelly DON_053 Yendicup Biodiversity Management,Bushfire Risk Management 2,595.49

Donnelly DON_054 Dordagup Biodiversity Management,Bushfire Risk Management 5,714.55

Frankland FRK_002 Quarram Biodiversity Management,Bushfire Risk Management,Research 4,060.65

Frankland FRK_003 Harewood Biodiversity Management,Bushfire Risk Management 288.33

Frankland FRK_005 Hay Biodiversity Management,Bushfire Risk Management 162.04

Frankland FRK_006 Mattaband 04 and Challar 09 Bushfire Risk Management,Silviculture 793.10

Frankland FRK_007 Redmond Road Nature Reserve

Biodiversity Management,Bushfire Risk Management 84.38

Frankland FRK_008 Nornalup Biodiversity Management,Bushfire Risk Management 80.47

Frankland FRK_009 Nornalup Foreshore Bushfire Risk Management,Vegetation Management 5.99

Frankland FRK_010 Thames Biodiversity Management,Bushfire Risk Management 682.13

Frankland FRK_012 Giants Biodiversity Management,Bushfire Risk Management 348.22

Frankland FRK_014 Tootanellup Nature Reserve Biodiversity Management,Bushfire Risk Management 990.00

Frankland FRK_015 Fernhook Falls Recreation Site

Bushfire Risk Management,Vegetation Management 2.42

Frankland FRK_018 Inlet Biodiversity Management,Bushfire Risk Management 13,855.16

Frankland FRK_020 Pardelup Nature Reserve Biodiversity Management,Bushfire Risk Management,Vegetation Management 316.30

Frankland FRK_021 Tree Top Walk Bushfire Risk Management 30.26

Frankland FRK_023 Perillup Camballup Biodiversity Management,Bushfire Risk Management 6,429.68

Frankland FRK_024 Table Hill UMR Biodiversity Management,Bushfire Risk Management 2,367.60

Frankland FRK_025 Romance Powley Biodiversity Management,Bushfire Risk Management 12,774.02

Frankland FRK_026 London Surprise Biodiversity Management,Bushfire Risk Management,Research 9,008.32

Frankland FRK_027 Styx UMR Bushfire Risk Management,Community Interest 64.48

Frankland FRK_028 Rest Point Biodiversity Management,Bushfire Risk Management 388.72

Frankland FRK_029 Mt Clare Biodiversity Management,Bushfire Risk Management 559.21

Page 111:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E719

Frankland FRK_030 Challar Biodiversity Management,Bushfire Risk Management 5,893.47

Frankland FRK_031 Hiker Chitelup Biodiversity Management,Bushfire Risk Management 2,910.38

Frankland FRK_032 Hay Biodiversity Management,Bushfire Risk Management 1,582.66

Region Hectares Swan 199,269

South West 139,425 Warren 122,251

Total 460,944

Summary Count Forest Regions 269

[Supplementary Information No B38.] Question: Ms M.M. Quirk requested, with reference to the full time equivalent engaged in suppressing bushfires that threaten or occur on lands managed by the Department as shown on page 647, a breakdown by category (seasonal, casual, full-time, part-time), average age and length of service.

Answer: This answer is provided for the December 2014 quarter, to illustrate the number of seasonal employees involved.

FTE

Category

Seasonal 72

Casual 5

Full-time 305

Part-time 2

Total 384

The average age of these employees is 44 years, and the average length of service is 12 years.

Note that the above count of employees is different to the FTE shown for Service 7 Bushfire Suppression at page 647 of the 2015-16 Budget Paper No. 2. The employees work on other services when not engaged on bushfire suppression.

[Supplementary Information No B39.]

Question: Mr C.J. Tallentire requested statistics on the rate of non-compliance for 2014-15, in relation to Outcomes and Key Effectiveness Indicators on page 644.

Answer: The percentage of non-compliance for 2014-15 is currently 15.4 per cent, based on the 345 actions audited to date.

Division 56: Environment Regulation —

[Supplementary Information No B40.]

Question: Mr C.J. Tallentire asked the Minister to provide, for the current financial year, information on the offset moneys that have flowed in and out through the Department of Environment Regulation.

Page 112:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E720 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

Answer: Between 1 July 2014 and 15 June 2015, a total of $3,840,091 was received by the Department of Environment Regulation through native vegetation clearing permit conditions requiring financial contributions to offset environmental impacts associated with clearing. No money has been dispersed from the offset account during this period, as the transfer of lands has not been completed.

Division 57: Botanic Gardens and Parks Authority —

[Supplementary Information No B41.]

Question: Mr C.J. Tallentire and Ms S.F. McGurk asked that the Minister provide the relevant clauses under which the contract was awarded for the new botanic terraces and community pavilion.

Answer: The Botanic Terraces and Community Pavilion commission was awarded to Plan E for $141,750 (excl. GST) under an existing Botanic Gardens and Parks Authority contract with Plan E: BGPA20112009 Landscape Architect Services.

The relevant clauses of the State Supply Commission Act 1991 under which the contract was awarded are: S17(1), S19(1), S19(2) and S21(1).

[Supplementary Information No B42.]

Question: Mr C.J. Tallentire asked that the Minister provide clarification/breakdown of the full-time equivalent numbers, and in particular, how many privatised jobs or contractors are funded by Rio Tinto.

Answer: Administrative staff 37 Retail staff 7 Outdoor staff 77 Science staff 14 Total 135

There are no “privatised jobs or contractors funded by Rio Tinto” however, Rio Tinto provides funding that supports Naturescape Activity Officers, Horticultural staff (including trainees), and Education Officers. The headcount varies on seasonal basis but the funding is sufficient to support approximately 4 FTEs over any 12 month period. Furthermore, as a result of the funding support from Rio Tinto, these BGPA employees are able to further utilise the assistance from as many as 40 regular Naturescape volunteers.

Division 58: Office of the Environmental Protection Authority —

[Supplementary Information No B43.] Question: Mr C.J. Tallentire asked for the cumulative total of money that could potentially flow into the Pilbara Strategic Offset Fund.

Answer: At this time no Pilbara conservation offset fund has been established.

Conditions have been placed on 15 projects requiring contributions to a government-established conservation offset fund or an alternative offset arrangement providing an equivalent outcome. These conditions are publicly available on the Environmental Protection Authority's website.

The contributions required for each project are dependent on a number of factors including the amount of vegetation cleared, the condition of the native vegetation cleared and location of the vegetation within the region. The contributions are generally only required to be paid when clearing occurs.

A government-industry working group is currently evaluating options for establishment of a Pilbara conservation offset fund and will make recommendations to the Minister for Environment in September this year. A decision will then be made by the Minister on the type and governance arrangements for the fund.

As the projects are in various stages of development, it is not possible to provide an accurate estimate of money that could be contributed to an offset fund.

Division 60: Heritage Council of Western Australia —

[Supplementary Information No B44.] Question: Ms M.M. Quirk asked if the Minister could provide the number of applicants that were unsuccessful in obtaining the maximum level of heritage grant, referred to in Grants and Subsidies on page 692.

Page 113:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E721

Answer: Nine

Division 68: Water —

[Supplementary Information No B45.] Question: Mr D.J. Kelly: Were any performance issues raised about the former director general during the time she was under the current minister, and were there any issues between the director general and members of the minister’s staff that adversely impacted upon the role or the performance of the role?

Answer: The Director General needed to take a period of extended personal leave. It was agreed, due to the number of major initiatives to be delivered by the Department of Water, the Director General would leave the position to enable this work to proceed.

[Supplementary Information No B46.] Question: Mr C.J. Tallentire: Clearly, there is a big difference between the thorough way the Department of Agriculture and Food did the Le Grange project extending over five years, with lots of extensive analysis. This project has had lots of media attention around it and is royalties for regions–badged, but the preliminary work has not been done. Yet, as I understand it, $3 million has been spent this financial year on Mowanjum but the Department of Water has not done the base work as did the Department of Agriculture for Le Grange. Is that the case?

Mr V.A. Catania: As I said, I encourage the member to go and have a look. At the end of the day, it is a trial. The importance of having a trial to allow for diversification in the pastoral industry is extremely important. We are happy to perhaps get back to the member with supplementary information on soil testing and other investigations.

I believe the member has asked for what soil testing has occurred; economic viability testing reports of irrigated agriculture at Mowanjum.

Answer: Mowanjum Aboriginal Corporation completed an initial soil assessment as part of its station development planning process which identified the irrigation site. Further soil testing and analysis is being undertaken as part of the irrigation trial. Mowanjum commissioned a business plan in May 2014 that showed the economic viability of irrigated agriculture at Mowanjum. This information was used by the State Government in support of the decision to proceed with the trial.

The Department of Water has drilled six monitoring bores and two production bores and undertaken detailed hydrogeological testing (pump testing and monitoring). The Mowanjum Aboriginal Corporation has undertaken the land development phase of the trial (including clearing, fencing and road construction) and is currently installing the irrigation infrastructure.

[Supplementary Information No B47.]

Question: Mr C.J. Tallentire: Have people connected to the Mangkajarra Wetlands been contacted for their input regarding the Mowanjum project?

Answer: The Department of Water has consulted widely regarding the implementation of the Mowanjum Irrigation trial. It consulted with the Nykina Mangala and Warrwa Native Title groups, the Shire of Derby West Kimberley and regional stakeholders. Consultation on the Mangkajarra Wetland has been with the Shire of Derby West Kimberly, which has management responsibility for the area.

The Department of Water has carried out a detailed hydrogeological assessment of the area for the Mowanjum project. This included monitoring and pump testing existing bores and the installation of six further monitoring bores and two production bores. The Department also used other available information in its assessment. This included the Mangkajarra Wetland Management Plan prepared by the Centre of Excellence in Natural Resource Management at the University of Western Australia. The hydrogeological assessment indicated no impact on the Mangkajarra Wetland.

[Supplementary Information No B48.]

Question: Mr D.J. Kelly: We want an explanation about why it is costing more money to house staff in Karratha but yet it is still considered to be the best value for money.

Answer: The leased accommodation at The Quarter in Karratha provides the best value for Government. While four of the ten government agencies relocating will pay more for office accommodation (including the

Page 114:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E722 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

Department of Water), the savings for the remaining six agencies exceeds this by over $300 000 in each financial year from 2016/17 onwards.

The “best value for money” needs to be considered across all the agencies to be relocated to The Quarter rather than individual agencies.

Water Corporation —

[Supplementary Information No B49.]

Question: Mr D.J. Kelly: What is the daily cost for the operation of the Denmark desalination unit with the different brine disposal options?

Answer: Water Corporation is still in the process of investigating three options for immediate brine disposal requirements and as such, the costs are indicative at this stage.

The approximate costs per kilolitre for each of the disposal options are listed below:

• Southern Seawater Desalination Plant (SSDP) - $83 / kL

• Albany storage - $42 / kL*.

• Licensed waste operator disposal - $183 / kL.

* this is a storage option only and does not include the future disposal costs of the stored water. [Supplementary Information No B50.] Question: Mr D.J. Kelly: What is the full cost of the Fresh Water Thinking Campaign as a component of the demand management campaign since its inception to this year to date?

Answer: $3,753,966.

Division 69: Sport and Recreation —

[Supplementary Information No B51.] Question: Mr P.C. Tinley: I would like year on year participation for vouchers issued by local government.

Mr D.T. Redman: I undertake to provide by way of supplementary information a breakdown by local government area of the number of vouchers issued annually on the KidSport program since its inception.

Answer:

Local Government Metro or Regional Area

Vouchers Breakdown per Financial Year

11/12 12/13 13/14 14/15

Albany Great Southern 563 732 777 1015

Armadale Metro 555 782 853 1007

Ashburton Pilbara 0 0 0 11

Augusta/Margaret River South West 43 230 225 207

Bassendean Metro 28 69 80 122

Bayswater Metro 98 216 275 307

Belmont Metro 280 322 328 398

Beverley Wheatbelt 9 33 28 22

Boddington - Murray hub Peel 0 0 0 0

Boyup Brook South West 4 91 39 52

Bridgetown/Greenbushes South West 0 132 92 96

Brookton Wheatbelt 19 22 9 29

Broome Kimberley 0 28 208 406

Broomehill - Tambelup Great Southern 0 58 54 115

Page 115:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E723

Bruce Rock Wheatbelt 2 4 4 11

Bunbury South West 223 398 518 511

Busselton South West 270 382 530 557

Cambridge Metro 0 20 33 50

Canning Metro 316 388 526 528

Capel South West 114 250 286 297

Carnamah Mid West 2 4 3 8

Carnarvon (Administrator) Exmouth, Shark Bay, Upper Gascoyne

Gascoyne

69 104 114 142

Chapman Valley - Northampton hub Mid West 0 0 0 0

Chittering Wheatbelt 13 48 85 162

Claremont - Mosman Park hub Metro 0 0 0

Cockburn Metro 448 622 712 513

Collie South West 47 117 170 242

Coolgardie Goldfields 0 0 10 24

Coorow Mid West 0 7 9 3

Corrigin Wheatbelt 28 24 39 24

Cottesloe - Mosman Park hub Metro 0 0 0 0

Cranbrook Great Southern 12 26 40 46

Cuballing Wheatbelt 1 0 10 2

Cue - Yalgoo hub Mid West 0 0 0 0

Cunderdin Wheatbelt 13 10 3 8

Dalwallinu Wheatbelt 5 3 0 0

Dandaragin Wheatbelt 1 20 8 16

Dardanup South West 6 111 128 163

Denmark Great Southern 126 212 178 180

Derby-West Kimberley Kimberley 0 0 0 0

Donnybrook/Balingup South West 0 45 72 124

Dowerin Wheatbelt 25 25 19 31

Dumbleyung Wheatbelt 16 34 26 33

Dundas Goldfields 0 0 0 38

East Fremantle Metro 12 26 1 0

East Pilbara Pilbara 0 0 0 0

Esperance Goldfields 198 219 302 358

Exmouth Gascoyne 13 29 26 17

Fremantle Metro 57 123 156 168

Gingin Wheatbelt 29 40 40 42

Gnowangerup Great Southern 22 36 48 51

Goomalling Wheatbelt 2 20 26 31

Page 116:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E724 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

Gosnells Metro 799 935 638 523

Greater Geraldton Mid West 152 404 556 698

Halls Creek Kimberley 0 0 0 0

Harvey South West 89 219 299 384

Irwin Mid West 28 47 64 43

Jerramungup Great Southern 10 14 48 30

Joondalup Metro 301 682 823 838

Kalamunda Metro 268 434 439 522

Kalgoorlie-Boulder Goldfields 0 135 260 354

Karratha Pilbara 0 0 0 31

Katanning Great Southern 70 143 176 157

Kellerberin Wheatbelt 22 35 37 78

Kent Great Southern 0 1 5 0

Kojonup Great Southern 9 24 59 51

Kondinin Wheatbelt 24 29 27 25

Koorda Wheatbelt 9 7 3 5

Kulin Wheatbelt 35 2 48 122

Kwinana Metro 228 358 406 457

Lake Grace Wheatbelt 2 14 10 7

Laverton Goldfields 0 0 0 0

Leonora Goldfields 0 0 0 0

Mandurah Peel 590 1046 1196 1350

Manjimup South West 0 313 326 330

Meekathara Mid West 0 0 233 0

Melville Metro 5 99 213 302

Menzies Goldfields 0 0 0 0

Merredin Wheatbelt 44 54 112 158

Mingenew Mid West 8 4 16 13

Moora Wheatbelt 17 80 36 57

Morawa Mid West 0 35 36 44

Mosman Park - Administrator (Claremont, Cottesloe, Peppermint Grove)

Metro

0 18 15 35

Mt Magnet Mid West 0 0 14 67

Mt Marshall Wheatbelt 1 3 0 0

Mukinbudin Wheatbelt 16 14 14 11

Mundaring Metro 94 225 265 293

Murchison - Yalgoo hub Mid West 0 0 0 0

Murray Peel 162 205 285 205

Nannup South West 1 135 180 118

Narambeen Wheatbelt 2 11 11 6

Narrogin (Shire) Wheatbelt 4 0 14 16

Page 117:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E725

Narrogin (Town) Wheatbelt 66 121 110 184

Nedlands Metro 8 35 16 39

Ngaanyatjarraku Goldfields 0 0 0 0

Northam Wheatbelt 96 163 203 310

Northampton (S) (Adminstrator) Chapman Valley (S)

Mid West 64 75 94 33

Nungarin Wheatbelt 6 17 16 20

Peppermint Grove - Mosman Park hub Metro 0 0 0 0

Perenjori Mid West 0 0 9 3

Perth - South Perth hub Metro 0 0 0 0

Pingelly Wheatbelt 6 38 46 55

Plantagenet Great Southern 102 137 170 213

Port Hedland Pilbara 0 40 84 77

Quiarading Wheatbelt 33 34 15 29

Ravensthorpe - Esperence hub Goldfields 0 0 0 0

Rockingham Metro 345 837 1239 1377

Sandstone Mid West 0 0 0 0

Serpentine-Jarrahdale Peel 41 111 151 158

Shark Bay - Carnarvon hub Gascoyne 0 0 0 0

South Perth Metro 36 67 64 166

Stirling Metro 501 1177 1180 1159

Subiaco Metro 13 13 24 34

Swan Metro 389 952 1398 1759

Tammin Wheatbelt 4 11 1 13

Three Springs Mid West 0 0 6 11

Toodyay Wheatbelt 8 53 63 50

Trayning Wheatbelt 5 46 48 28

Upper Gascoyne - Carnarvon hub Gascoyne 0 0 0 0

Victoria Park Metro 70 94 137 151

Victoria Plains Wheatbelt 0 3 3 3

Vincent Metro 0 35 43 86

Wagin Wheatbelt 5 6 25 29

Wandering Wheatbelt 0 0 1 2

Wanneroo Metro 457 1319 1766 2422

Waroona Peel 45 65 83 86

West Arthur - Narrogin hub Wheatbelt 0 0 0 0

Westonia - Merredin hub Wheatbelt 0 0 0 0

Wickepin Wheatbelt 21 65 34 27

Williams Wheatbelt 11 6 12 20

Page 118:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E726 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

Wiluna Mid West 0 0 0 198

Wongan-Ballidu Wheatbelt 0 14 8 7

Woodanilling Great Southern 0 2 0 0

Wyaalkatchem Wheatbelt 1 4 32 53

Wyndham-East Kimberley Kimberley 10 69 164 50

Yalgoo - Administrator for Cue Mid West 0 0 0 0

Yilgarn Wheatbelt 2 28 30 40

York Wheatbelt 45 58 102 79 Local Government Metro or

Regional Area

Kids Breakdown per Financial Year

11/12 12/13 13/14 14/15

Albany Great Southern 563 704 788 946

Armadale Metro 555 725 811 948

Ashburton Pilbara 0 0 0 11

Augusta/Margaret River South West 43 200 212 187

Bassendean Metro 28 64 77 115

Bayswater Metro 98 209 255 286

Belmont Metro 280 309 315 382

Beverley Wheatbelt 9 26 28 22

Boddington - Murray hub Peel 0 0 0 0

Boyup Brook South West 4 69 36 49

Bridgetown/Greenbushes South West 0 104 85 85

Brookton Wheatbelt 19 22 9 25

Broome Kimberley 0 28 187 372

Broomehill - Tambelup Great Southern 0 55 51 93

Bruce Rock Wheatbelt 2 4 4 9

Bunbury South West 223 369 480 480

Busselton South West 263 348 489 521

Cambridge Metro 0 20 31 48

Canning Metro 316 373 488 486

Capel South West 114 238 264 262

Carnamah Mid West 2 4 3 8

Carnarvon (Administrator) Exmouth, Shark Bay, Upper Gascoyne

Gascoyne

69 100 104 135

Chapman Valley - Northampton hub Mid West 0 0 0 0

Chittering Wheatbelt 13 45 83 148

Claremont - Mosman Park hub Metro 0 0 0

Cockburn Metro 447 607 691 495

Collie South West 47 107 164 228

Coolgardie Goldfields 0 0 10 21

Page 119:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E727

Coorow Mid West 0 7 9 3

Corrigin Wheatbelt 28 24 34 23

Cottesloe - Mosman Park hub Metro 0 0 0 0

Cranbrook Great Southern 12 26 40 43

Cuballing Wheatbelt 1 0 10 2

Cue - Yalgoo hub Mid West 0 0 0 0

Cunderdin Wheatbelt 13 10 3 8

Dalwallinu Wheatbelt 5 3 0 0

Dandaragin Wheatbelt 1 20 8 16

Dardanup South West 6 101 124 153

Denmark Great Southern 126 196 174 173

Derby-West Kimberley Kimberley 0 0 0 0

Donnybrook/Balingup South West 0 40 65 96

Dowerin Wheatbelt 24 25 17 30

Dumbleyung Wheatbelt 16 31 24 33

Dundas Goldfields 0 0 0 29

East Fremantle Metro 12 26 1 0

East Pilbara Pilbara 0 0 0 0

Esperance Goldfields 198 205 283 328

Exmouth Gascoyne 13 29 24 16

Fremantle Metro 57 122 156 157

Gingin Wheatbelt 29 39 38 40

Gnowangerup Great Southern 22 35 38 46

Goomalling Wheatbelt 2 15 25 25

Gosnells Metro 763 802 608 497

Greater Geraldton Mid West 152 377 504 646

Halls Creek Kimberley 0 0 0 0

Harvey South West 89 208 281 349

Irwin Mid West 28 43 59 39

Jerramungup Great Southern 10 14 44 30

Joondalup Metro 301 627 771 812

Kalamunda Metro 267 402 413 487

Kalgoorlie-Boulder Goldfields 0 135 246 328

Karratha Pilbara 0 0 0 31

Katanning Great Southern 70 123 157 142

Kellerberin Wheatbelt 22 35 35 72

Kent Great Southern 0 1 3 0

Kojonup Great Southern 9 23 52 48

Kondinin Wheatbelt 24 28 22 22

Page 120:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E728 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

Koorda Wheatbelt 9 7 3 5

Kulin Wheatbelt 35 2 48 93

Kwinana Metro 226 348 393 429

Lake Grace Wheatbelt 2 13 10 6

Laverton Goldfields 0 0 0 0

Leonora Goldfields 0 0 0 0

Mandurah Peel 587 962 1109 1251

Manjimup South West 0 276 284 311

Meekathara Mid West 0 0 231 0

Melville Metro 5 95 205 287

Menzies Goldfields 0 0 0 0

Merredin Wheatbelt 44 48 96 128

Mingenew Mid West 8 4 15 13

Moora Wheatbelt 17 71 34 47

Morawa Mid West 0 35 36 44

Mosman Park - Administrator (Claremont, Cottesloe, Peppermint Grove)

Metro

0 16 14 32

Mt Magnet Mid West 0 0 14 67

Mt Marshall Wheatbelt 1 3 0 0

Mukinbudin Wheatbelt 16 14 13 10

Mundaring Metro 94 210 247 273

Murchison - Yalgoo hub Mid West 0 0 0 0

Murray Peel 162 189 253 196

Nannup South West 1 115 131 109

Narambeen Wheatbelt 2 11 11 6

Narrogin (Shire) Wheatbelt 4 0 14 13

Narrogin (Town) Wheatbelt 66 117 106 151

Nedlands Metro 8 31 16 37

Ngaanyatjarraku Goldfields 0 0 0 0

Northam Wheatbelt 96 153 182 284

Northampton (S) (Adminstrator) Chapman Valley (S)

Mid West 64 60 84 31

Nungarin Wheatbelt 6 17 16 18

Peppermint Grove - Mosman Park hub Metro 0 0 0 0

Perenjori Mid West 0 0 9 3

Perth - South Perth hub Metro 0 0 0 0

Pingelly Wheatbelt 6 34 43 45

Plantagenet Great Southern 102 130 163 207

Port Hedland Pilbara 0 40 81 76

Quiarading Wheatbelt 33 32 15 27

Ravensthorpe - Esperence hub Goldfields 0 0 0 0

Page 121:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E729

Rockingham Metro 342 790 1153 1293

Sandstone Mid West 0 0 0 0

Serpentine-Jarrahdale Peel 41 101 140 151

Shark Bay - Carnarvon hub Gascoyne 0 0 0 0

South Perth Metro 36 65 60 151

Stirling Metro 497 1118 1137 1110

Subiaco Metro 13 13 24 32

Swan Metro 389 909 1281 1644

Tammin Wheatbelt 4 11 1 11

Three Springs Mid West 0 0 6 10

Toodyay Wheatbelt 8 51 62 48

Trayning Wheatbelt 5 42 33 27

Upper Gascoyne - Carnarvon hub Gascoyne 0 0 0 0

Victoria Park Metro 70 92 127 148

Victoria Plains Wheatbelt 0 3 3 3

Vincent Metro 0 35 41 85

Wagin Wheatbelt 5 6 24 27

Wandering Wheatbelt 0 0 1 2

Wanneroo Metro 457 1258 1695 2310

Waroona Peel 45 60 79 83

West Arthur - Narrogin hub Wheatbelt 0 0 0 0

Westonia - Merredin hub Wheatbelt 0 0 0 0

Wickepin Wheatbelt 21 60 30 26

Williams Wheatbelt 11 6 12 17

Wiluna Mid West 0 0 0 197

Wongan-Ballidu Wheatbelt 0 14 8 6

Woodanilling Great Southern 0 2 0 0

Wyaalkatchem Wheatbelt 1 4 25 44

Wyndham-East Kimberley Kimberley 10 66 159 50

Yalgoo - Administrator for Cue Mid West 0 0 0 0

Yilgarn Wheatbelt 2 25 24 37

York Wheatbelt 45 51 99 75 Local Government Metro or

Regional Area

$ Breakdown per Financial Year

11/12 12/13 13/14 14/15

Albany Great Southern $71,110.59 $98,503 $110,911 $147,318

Armadale Metro $70,951.05 $103,026 $127,649 $164,977

Ashburton Pilbara $0.00 $0 $0 $1,200

Page 122:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E730 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

Augusta/Margaret River South West $6,301.89 $31,909 $33,465 $29,921

Bassendean Metro $3,527.00 $9,311 $12,099 $10,313

Bayswater Metro $16,923.00 $37,811 $50,414 $57,481

Belmont Metro $44,715.00 $54,591 $56,711 $73,230

Beverley Wheatbelt $500.00 $2,511 $1,880 $1,670

Boddington - Murray hub Peel $0.00 $0 $0 $0

Boyup Brook South West $466.50 $11,346 $5,182 $7,107

Bridgetown/Greenbushes South West $0.00 $15,196 $11,395 $10,724

Brookton Wheatbelt $1,212.00 $2,427 $1,070 $2,474

Broome Kimberley $0.00 $3,000 $23,015 $38,260

Broomehill - Tambelup Great Southern $0.00 $3,752 $4,690 $8,045

Bruce Rock Wheatbelt $237.00 $526 $635 $665

Bunbury South West $26,036.00 $54,542 $66,624 $35,830

Busselton South West $33,111.00 $49,041 $78,820 $79,423

Cambridge Metro $0.00 $3,800 $6,160 $9,605

Canning Metro $57,110.00 $60,021 $102,123 $105,282

Capel South West $15,872.00 $33,724 $39,192 $42,132

Carnamah Mid West $80.00 $285 $405 $500

Carnarvon (Administrator) Exmouth, Shark Bay, Upper Gascoyne

Gascoyne

$7,825.00 $16,468 $19,445 $24,655

Chapman Valley - Northampton hub Mid West $0.00 $0 $0 $0

Chittering Wheatbelt $1,829.00 $7,157 $11,795 $24,177

Claremont - Mosman Park hub Metro $0.00 $0 $0

Cockburn Metro $82,386.00 $119,026 $140,251 $102,225

Collie South West $5,531.00 $12,605 $22,859 $32,339

Coolgardie Goldfields $0.00 $0 $780 $2,600

Coorow Mid West $0.00 $505 $825 $225

Corrigin Wheatbelt $3,172.00 $2,967 $5,102 $2,240

Cottesloe - Mosman Park hub Metro $0.00 $0 $0 $0

Cranbrook Great Southern $1,405.00 $3,805 $7,582 $9,045

Cuballing Wheatbelt $100.00 $0 $1,380 $270

Cue - Yalgoo hub Mid West $0.00 $0 $0 $0

Cunderdin Wheatbelt $955.00 $670 $255 $880

Dalwallinu Wheatbelt $240.00 $460 $0 $0

Dandaragin Wheatbelt $110.00 $1,795 $980 $2,795

Dardanup South West $330.00 $13,209 $18,158 $22,778

Denmark Great Southern $16,602.00 $27,525 $25,072 $22,759

Derby-West Kimberley Kimberley $0.00 $0 $0 $0

Donnybrook/Balingup South West $0.00 $4,066 $5,166 $13,840

Dowerin Wheatbelt $1,617.00 $1,992 $1,597 $2,033

Dumbleyung Wheatbelt $2,711.00 $5,585 $4,333 $6,348

Page 123:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E731

Dundas Goldfields $0.00 $0 $0 $4,429

East Fremantle Metro $2,210.00 $4,560 $157 $0

East Pilbara Pilbara $0.00 $0 $0 $0

Esperance Goldfields $21,375.00 $27,960 $40,941 $49,478

Exmouth Gascoyne $1,475.00 $3,820 $4,980 $2,900

Fremantle Metro $10,824.00 $23,986 $29,965 $32,547

Gingin Wheatbelt $3,912.00 $6,240 $6,115 $6,129

Gnowangerup Great Southern $2,066.00 $2,805 $3,155 $2,866

Goomalling Wheatbelt $180.00 $2,135 $4,000 $4,263

Gosnells Metro $142,132.50 $180,772 $119,189 $95,836

Greater Geraldton Mid West $20,224.00 $49,243 $72,152 $95,065

Halls Creek Kimberley $0.00 $0 $0 $0

Harvey South West $11,064.00 $23,537 $43,584 $51,788

Irwin Mid West $3,696.70 $6,394 $8,757 $4,371

Jerramungup Great Southern $611.00 $760 $3,060 $2,022

Joondalup Metro $53,404.00 $119,167 $144,782 $148,568

Kalamunda Metro $43,029.13 $73,640 $77,618 $97,476

Kalgoorlie-Boulder Goldfields $0.00 $17,048 $32,319 $42,695

Karratha Pilbara $0.00 $0 $0 $5,141

Katanning Great Southern $7,233.00 $16,369 $18,490 $15,560

Kellerberin Wheatbelt $1,648.99 $2,525 $3,252 $4,330

Kent Great Southern $0.00 $200 $600 $0

Kojonup Great Southern $430.00 $1,833 $5,117 $4,404

Kondinin Wheatbelt $1,760.00 $1,850 $4,154 $2,985

Koorda Wheatbelt $371.00 $410 $178 $239

Kulin Wheatbelt $1,865.00 $100 $3,465 $10,037

Kwinana Metro $40,685.00 $58,215 $71,667 $79,537

Lake Grace Wheatbelt $90.00 $805 $1,075 $935

Laverton Goldfields $0.00 $0 $0 $0

Leonora Goldfields $0.00 $0 $0 $0

Mandurah Peel $77,381.00 $162,500 $195,222 $245,749

Manjimup South West $0.00 $39,721 $44,164 $29,326

Meekathara Mid West $0.00 $0 $46,420 $0

Melville Metro $970.00 $18,140 $40,120 $60,060

Menzies Goldfields $0.00 $0 $0 $0

Merredin Wheatbelt $6,611.35 $5,910 $8,734 $13,570

Mingenew Mid West $721.00 $235 $1,141 $948

Moora Wheatbelt $1,430.00 $6,360 $3,635 $5,621

Morawa Mid West $0.00 $2,070 $5,790 $7,645

Page 124:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E732 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

Mosman Park - Administrator (Claremont, Cottesloe, Peppermint Grove)

Metro

$0.00 $3,410 $2,880 $6,850

Mt Magnet Mid West $0.00 $0 $1,100 $6,350

Mt Marshall Wheatbelt $33.00 $190 $0 $0

Mukinbudin Wheatbelt $1,087.00 $1,076 $970 $230

Mundaring Metro $14,133.90 $31,427 $40,746 $31,852

Murchison - Yalgoo hub Mid West $0.00 $0 $0 $0

Murray Peel $17,444.50 $25,000 $44,294 $31,522

Nannup South West $50.00 $8,465 $27,723 $18,809

Narambeen Wheatbelt $100.00 $565 $730 $430

Narrogin (Shire) Wheatbelt $720.00 $0 $1,890 $1,970

Narrogin (Town) Wheatbelt $7,149.00 $17,148 $16,572 $22,750

Nedlands Metro $200.00 $4,115 $2,382 $7,727

Ngaanyatjarraku Goldfields $0.00 $0 $0 $0

Northam Wheatbelt $7,842.00 $20,117 $27,973 $34,986

Northampton (S) (Adminstrator) Chapman Valley (S)

Mid West $6,189.00 $7,494 $7,438 $3,409

Nungarin Wheatbelt $822.00 $1,600 $1,322 $1,065

Peppermint Grove - Mosman Park hub Metro $0.00 $0 $0 $0

Perenjori Mid West $0.00 $0 $1,460 $475

Perth - South Perth hub Metro $0.00 $0 $0 $0

Pingelly Wheatbelt $590.00 $4,022 $4,413 $6,158

Plantagenet Great Southern $14,034.00 $20,199 $27,446 $38,953

Port Hedland Pilbara $0.00 $5,762 $10,726 $9,990

Quiarading Wheatbelt $2,820.00 $3,156 $1,448 $1,726

Ravensthorpe - Esperence hub Goldfields $0.00 $0 $0 $0

Rockingham Metro $57,879.00 $134,588 $210,751 $238,673

Sandstone Mid West $0.00 $0 $0 $0

Serpentine-Jarrahdale Peel $7,154.10 $17,746 $26,613 $28,242

Shark Bay - Carnarvon hub Gascoyne $0.00 $0 $0 $0

South Perth Metro $6,066.40 $8,743 $9,714 $30,411

Stirling Metro $87,743.45 $216,540 $220,529 $215,201

Subiaco Metro $2,120.00 $2,170 $4,495 $6,270

Swan Metro $65,379.00 $163,770 $245,108 $321,754

Tammin Wheatbelt $190.00 $777 $100 $665

Three Springs Mid West $0.00 $0 $520 $1,410

Toodyay Wheatbelt $595.00 $6,282 $8,906 $7,543

Trayning Wheatbelt $618.00 $2,035 $2,116 $1,800

Upper Gascoyne - Carnarvon hub Gascoyne $0.00 $0 $0 $0

Victoria Park Metro $10,890.00 $16,518 $25,347 $29,390

Victoria Plains Wheatbelt $0.00 $330 $325 $215

Page 125:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E733

Vincent Metro $0.00 $6,400 $7,664 $14,469

Wagin Wheatbelt $270.00 $568 $3,335 $2,760

Wandering Wheatbelt $0.00 $0 $140 $360

Wanneroo Metro $82,580.16 $244,206 $332,491 $464,967

Waroona Peel $6,088.00 $9,370 $12,316 $12,036

West Arthur - Narrogin hub Wheatbelt $0.00 $0 $0 $0

Westonia - Merredin hub Wheatbelt $0.00 $0 $0 $0

Wickepin Wheatbelt $1,695.00 $9,370 $3,080 $2,374

Williams Wheatbelt $904.00 $735 $1,205 $2,362

Wiluna Mid West $0.00 $0 $0 $39,600

Wongan-Ballidu Wheatbelt $0.00 $2,288 $1,300 $480

Woodanilling Great Southern $0.00 $350 $0 $0

Wyaalkatchem Wheatbelt $103.00 $210 $2,785 $3,089

Wyndham-East Kimberley Kimberley $1,030.00 $5,376 $17,180 $5,015

Yalgoo - Administrator for Cue Mid West $0.00 $0 $0 $0

Yilgarn Wheatbelt $238.99 $1,646 $2,402 $4,304

York Wheatbelt $3,823.00 $7,483 $11,581 $7,510 [Supplementary Information No B52.] Question: Mr P.B. Watson: Would like the current balance of the sports lotteries account as of 10 June and estimated expenditure for 2015-16 to 2018-19 of the sports lotteries account.

SPORTS LOTTERIES ACCOUNT SUMMARY 2014/15

FUTURE YEARS

as @ 10 June 2015

Treasury

Forecast

2015/16

Treasury

Forecast

2016/17

Treasury

Forecast

2017/18

Treasury Forecast 2018/19

Treasury Forecast Appropriation - 2014/15

15,456,000

16,192,000

16,965,000

17,774,000

18,627,000

Previous years unallocated funds 2,397,218

523,234

1,129,131

3,455,906

14,006,202

TOTAL FUNDS AVAILABLE FOR ALLOCATION

17,853,218

16,715,234

18,094,131

21,229,906

32,633,202

TOTAL YEARS APPROVALS 17,329,984

15,586,104

14,638,225

7,223,704

7,303,289

Unallocated will be carried forward to

NEXT YEAR FOR ALLOCATION 523,234

1,129,131

3,455,906

14,006,202

25,329,913

DSR would expect the majority of funds would be allocated in the years they are available. Funding

allocation for 2016/17, 2017/18 and 2018/19 to be determined through needs assessment, planning

and budget processes.

Page 126:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E734 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

Division 23: Education —

[Supplementary Information No B53.]

Question: Mr D.A. Templeman asked if the Minister could provide the percentage of students in Western Australian schools, particularly public schools, who are undertaking an ATAR pathway and the comparison with other states.

Answer:

School

2013 2014

Students ATAR Students % ATAR Students ATAR Students % ATAR

ALBANY SENIOR HIGH SCHOOL 179 100 55.9 113 52 46.0

APPLECROSS SENIOR HIGH SCHOOL 231 171 74.0 153 105 68.6

ARMADALE SENIOR HIGH SCHOOL 73 7 9.6 22 1 4.5

ASHDALE SECONDARY COLLEGE 102 46 45.1 106 37 34.9

ATWELL COLLEGE 114 34 29.8 74 22 29.7

AUSTRALIND SENIOR HIGH SCHOOL 124 46 37.1 112 41 36.6

BALCATTA SENIOR HIGH SCHOOL 85 37 43.5 48 17 35.4

BALGA SENIOR HIGH SCHOOL 55 0 0.0 31 0 0.0

BALLAJURA COMMUNITY COLLEGE 266 111 41.7 114 51 44.7

BELMONT CITY COLLEGE 74 15 20.3 64 20 31.3

BELRIDGE SECONDARY COLLEGE 132 34 25.8 61 18 29.5

BROOME SENIOR HIGH SCHOOL 75 20 26.7 47 15 31.9

BULLSBROOK COLLEGE 47 13 27.7 21 4 19.0

BUNBURY SENIOR HIGH SCHOOL 102 57 55.9 82 39 47.6

BUSSELTON SENIOR HIGH SCHOOL 93 35 37.6 46 10 21.7

CANNING VALE COLLEGE 209 85 40.7 107 43 40.2

CAPE NATURALISTE COLLEGE 82 27 32.9 44 19 43.2

CARINE SENIOR HIGH SCHOOL 245 159 64.9 118 65 55.1

CECIL ANDREWS SENIOR HIGH SCHOOL 32 9 28.1 23 4 17.4

CENTRAL MIDLANDS SENIOR HIGH SCHOOL 28 5 17.9

Page 127:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E735

School

2013 2014

Students ATAR Students % ATAR Students ATAR Students % ATAR

CHURCHLANDS SENIOR HIGH SCHOOL 286 218 76.2 141 110 78.0

CLARKSON COMMUNITY HIGH SCHOOL

88 5 5.7 43 4 9.3

COLLIE SENIOR HIGH SCHOOL 60 15 25.0 38 11 28.9

COMET BAY COLLEGE 176 40 22.7 126 40 31.7

COMO SECONDARY COLLEGE 126 70 55.6 80 43 53.8

COODANUP COLLEGE 34 0 0.0 20 0 0.0

CYRIL JACKSON SENIOR CAMPUS 48 24 50.0 52 22 42.3

DALYELLUP COLLEGE 47 19 40.4 24 7 29.2

DARLING RANGE SPORTS COLLEGE

127 28 22.0 75 14 18.7

DENMARK SENIOR HIGH SCHOOL

33 23 69.7 25 11 44.0

DUNCRAIG SENIOR HIGH SCHOOL

205 112 54.6 118 66 55.9

EASTERN GOLDFIELDS COLLEGE

146 37 25.3 119 33 27.7

EASTERN HILLS SENIOR HIGH SCHOOL

126 64 50.8 62 33 53.2

EATON COMMUNITY COLLEGE

38 16 42.1 24 7 29.2

ELLENBROOK SECONDARY COLLEGE

174 63 36.2 103 32 31.1

ESPERANCE SENIOR HIGH SCHOOL

137 55 40.1 90 30 33.3

GERALDTON SENIOR COLLEGE

207 44 21.3 141 25 17.7

GILMORE COLLEGE 107 13 12.1 54 7 13.0

GIRRAWHEEN SENIOR HIGH SCHOOL

63 17 27.0 40 8 20.0

GOVERNOR STIRLING 67 13 19.4 52 10 19.2

Page 128:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E736 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

School

2013 2014

Students ATAR Students % ATAR Students ATAR Students % ATAR SENIOR HIGH SCHOOL

GREENWOOD COLLEGE 153 52 34.0 82 24 29.3

HALLS HEAD COLLEGE 58 13 22.4 43 6 14.0

HAMILTON SENIOR HIGH SCHOOL

96 19 19.8 43 6 14.0

HAMPTON SENIOR HIGH SCHOOL

125 57 45.6 58 21 36.2

HARVEY SENIOR HIGH SCHOOL

29 5 17.2

HEDLAND SENIOR HIGH SCHOOL

63 12 19.0 46 18 39.1

JOHN CURTIN COLLEGE OF THE ARTS

170 124 72.9 132 80 60.6

JOHN FORREST SECONDARY COLLEGE

107 35 32.7 51 17 33.3

JOHN TONKIN COLLEGE 279 38 13.6 130 22 16.9

KALAMUNDA SENIOR HIGH SCHOOL

117 45 38.5 70 32 45.7

KARRATHA SENIOR HIGH SCHOOL

103 20 19.4 56 15 26.8

KATANNING SENIOR HIGH SCHOOL

58 22 37.9 37 12 32.4

KELMSCOTT SENIOR HIGH SCHOOL

183 80 43.7 166 65 39.2

KENT STREET SENIOR HIGH SCHOOL

166 75 45.2 110 53 48.2

KIARA COLLEGE 47 15 31.9 30 11 36.7

LAKELAND SENIOR HIGH SCHOOL

61 24 39.3 34 9 26.5

LEEMING SENIOR HIGH SCHOOL

142 85 59.9 65 29 44.6

LESMURDIE SENIOR HIGH SCHOOL

142 76 53.5 89 41 46.1

LYNWOOD SENIOR HIGH SCHOOL

198 53 26.8 126 26 20.6

Page 129:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E737

School

2013 2014

Students ATAR Students % ATAR Students ATAR Students % ATAR MANEA SENIOR COLLEGE

179 58 32.4 192 81 42.2

MANJIMUP SENIOR HIGH SCHOOL

112 28 25.0 61 24 39.3

MARGARET RIVER SENIOR HIGH SCHOOL

104 49 47.1 53 31 58.5

MELVILLE SENIOR HIGH SCHOOL

163 67 41.1 85 37 43.5

MERREDIN COLLEGE 33 12 36.4 26 5 19.2

MINDARIE SENIOR COLLEGE

416 131 31.5 313 107 34.2

MIRRABOOKA SENIOR HIGH SCHOOL

73 29 39.7 62 17 27.4

MORLEY SENIOR HIGH SCHOOL

130 76 58.5 100 59 59.0

MOUNT BARKER COMMUNITY COLLEGE

47 14 29.8 28 10 35.7

MOUNT LAWLEY SENIOR HIGH SCHOOL

253 192 75.9 195 136 69.7

NARROGIN SENIOR HIGH SCHOOL

93 35 37.6 62 15 24.2

NEWMAN SENIOR HIGH SCHOOL

39 12 30.8

NEWTON MOORE SENIOR HIGH SCHOOL

86 32 37.2 57 23 40.4

NORTH ALBANY SENIOR HIGH SCHOOL

53 19 35.8 34 8 23.5

NORTH LAKE SENIOR CAMPUS

51 21 41.2 69 20 29.0

NORTHAM SENIOR HIGH SCHOOL

98 26 26.5 45 10 22.2

OCEAN REEF SENIOR HIGH SCHOOL

220 124 56.4 135 65 48.1

PERTH MODERN 189 189 100.0 176 175 99.4

Page 130:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E738 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

School

2013 2014

Students ATAR Students % ATAR Students ATAR Students % ATAR SCHOOL

PINJARRA SENIOR HIGH SCHOOL

82 19 23.2 42 3 7.1

ROCKINGHAM SENIOR HIGH SCHOOL

103 26 25.2 64 19 29.7

ROSSMOYNE SENIOR HIGH SCHOOL

356 293 82.3 239 192 80.3

SAFETY BAY SENIOR HIGH SCHOOL

145 32 22.1 88 26 29.5

SCHOOL OF ISOLATED & DISTANCE EDUCATION

34 14 41.2

SEVENOAKS SENIOR COLLEGE

202 46 22.8 129 28 21.7

SHENTON COLLEGE 236 185 78.4 214 178 83.2

SOUTH FREMANTLE SENIOR HIGH SCHOOL

56 26 46.4 26 4 15.4

SOUTHERN RIVER COLLEGE

41 3 7.3 33 2 6.1

SWAN VIEW SENIOR HIGH SCHOOL

51 6 11.8 26 2 7.7

THORNLIE SENIOR HIGH SCHOOL

135 43 31.9 104 22 21.2

TOM PRICE SENIOR HIGH SCHOOL

21 13 61.9 22 8 36.4

WA COLLEGE OF AGRICULTURE - CUNDERDIN

60 12 20.0 52 13 25.0

WA COLLEGE OF AGRICULTURE - DENMARK

41 18 43.9 25 5 20.0

WA COLLEGE OF AGRICULTURE - HARVEY

37 14 37.8

WA COLLEGE OF AGRICULTURE - NARROGIN

52 7 13.5 21 5 23.8

WANNEROO 117 28 23.9 98 19 19.4

Page 131:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E739

School

2013 2014

Students ATAR Students % ATAR Students ATAR Students % ATAR SECONDARY COLLEGE

WARNBRO COMMUNITY HIGH SCHOOL

166 36 21.7 100 21 21.0

WARWICK SENIOR HIGH SCHOOL

76 26 34.2 41 10 24.4

WILLETTON SENIOR HIGH SCHOOL

364 251 69.0 255 185 72.5

WOODVALE SECONDARY COLLEGE

277 157 56.7 153 80 52.3

Notes

Data are provided for public schools as published in Schools Online based on those with 20 or more full-time eligible students in Year 12. Excludes Canning and Tuart Colleges.

Data for both 2014 and 2013 are provided, as 2014 was the half cohort, which may limit a school being included with 20 or more students and may not be ‘typical’.

The Department of Education does not have comparative data with public schools in other States and Territories.

ATAR proportion of student population

In Western Australia, there are multiple means by which students can apply to university. The Tertiary Institutions Service Centre (TISC) processes the applications from students following the Australian Tertiary Admission Rank (ATAR) pathway.

Western Australian universities have a range of pathways and intake processes, only one of which is using a student’s ATAR, so the statistics regarding applications from students with an ATAR are a fraction of the total applications received for university entry. Such alternative pathways are through gaining a Vocational Education and Training (VET) Certificate IV or Diploma; portfolio pathways (based on grades achieved and level of courses studied); or university preparation bridging or enabling courses, which can be accessed by direct application.

Context for the data provided by Professor Andrew Taggart

• Up to and including 2014, Western Australia was the only state/territory in which Year 12 students were required to remain at school until the end of Year 12, apart from those students engaged in approved alternatives. In the other states/territories with a leaving age during Year 12, the students are permitted to leave on or after their birthday. This reduces the Year 12 student population in every other state/territory being considered.

• Applicants for private, interstate and overseas universities are also not included in the ATAR TISC applicant measure.

[Supplementary Information No B54.]

Page 132:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E740 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

Question: Dr A.D. Buti asked if the Minister could provide the number of students for whom schools have sought an official review, and the names of the schools. Answer: The table below lists the name of each school and the number of students for which an appeal of the individual disability funding level allocated for an eligible student has been lodged, as at 11 June 2015.

Appeals processed by Schools Resourcing and Support up to 10 June 2015

School Total School Total

Attadale PS 1 Leda ESC 2

Australind PS 1 Malvern Springs PS 1

Belridge ESC 2 Melville PS 1

Bunbury PS 1 Merredin College 3

Cable Beach PS 1 Mirrabooka PS 1

Camboon PS 1 Mount Tarcoola PS 1

Carine SHS 1 Osborne PS 1

Clifton Park PS 1 Pemberton DHS 1

College Row School 1 Quairading DHS 1

Creaney PS 1 Richmond PS 1

East Maddington PS 1 Roseworth ESC 1

Ellenbrook Secondary College 5 Singleton PS 2

Esperance PS 2 South Bunbury ESC 5

Fairview PS 2 Success PS 8

Glen Huon PS 1 Two Rocks PS 1

Goollelal PS 1 Wandina PS 1

Gwynne Park ESC 3 Wanneroo PS 1

Kalamunda ESC 2 Wembley PS 1

Karratha SHS 2 West Northam PS 2

Kensington PS 2 Westminster ESC 2

Kensington Secondary School 2 Winterfold PS 1

Kenwick School 1 Winthrop PS 1

Kununurra DHS 3 Woodanilling PS 1

Lathlain PS 1 Woodbridge 1

[Supplementary Information No B55.] Question: Mr P.B. Watson asked if the Minister could provide the location of the behaviour centre in Albany. Answer: Behaviour Centres will no longer operate after 2015. They will be replaced by Engagement Centres. An Engagement Centre will be located in Albany. The Department of Education is considering potential sites for the centre. Once potential sites are identified, consultation with local schools and stakeholders will commence through the Southwest Regional Education Office. A final decision on the location of the Albany Engagement Centre will be made by the end of Term 3, 2015

[Supplementary Information No B56.] Question: Mr P.C. Tinley asked if the Minister could provide information about the standards in relation to services provided in schools required through the PPP requests for proposals. Answer: The attached document provides information about the services, the objectives and scope. The Department of Education has been advised by the Department of Treasury that the detailed specification should not be released at this stage as it forms part of the confidential tender documentation for the project and its release may compromise the State’s position in future negotiations

Page 133:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E741

A copy of the final services specification detailing standards in relation to services will be made available within six months of financial close, in line with the Department of Treasury’s Disclosure Policy for Public Private Partnerships (as detailed on its website). ATTACHMENT Facilities Management Services 1 OVERVIEW The Facilities Management Services comprise the following: (a) Grounds and Gardens Services; (b) Security Services; (c) Utilities Management Services; (d) Cleaning Services; (e) Waste Management Services; (f) Pest Control Services; (g) Help Desk Services; and (h) Caretaker Services. (together the Facilities Management Services). 2 Grounds and Gardens Services 2.1 Overview The Grounds and Gardens Services consist of the management and maintenance of: (a) irrigated grassed areas; (b) non-irrigated grassed areas; (c) artificial grass and synthetic surfaces; (d) flower and garden beds; (e) trees, shrubs and hedges; (f) Site Circulation Routes and Hard Landscaping; (g) litter; (h) sports pitches; and (i) Verge Infrastructure,

within the Site. For the avoidance of doubt, Project Co is not required to maintain shared use ovals external to the Site.

2.2 Key objectives

The key objectives for the Grounds and Gardens Services are to:

(a) ensure the Grounds and Gardens at the School Facilities are aesthetically pleasing, functional and complementary to each School Facility and the local environment;

(b) maintain User safety and security;

(c) ensure the Grounds and Gardens at the School Facilities meet the FFP Warranty for the duration of the Term;

(d) maintain the Grounds and Gardens at the School Facilities in a way that will facilitate the carrying out of the School Activities and School Third Party Use by ensuring that the School Facilities are Available at all times; and

(e) provide and enhance a positive image of the School Facilities and the State, particularly to Users, potential Users and the general public.

3 Security Services

3.1 Overview

The Security Services consist of:

(a) Scheduled Security Services; and

Page 134:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E742 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

(b) Unscheduled Security Services,

at the School Facilities.

3.2 Key objectives

The key objectives of the Security Services are to:

(a) provide comprehensive, fully operational and effective Security Services;

(b) protect the School Facilities from damage, vandalism and graffiti; and

(c) implement security control measures in a manner that does not interfere with or impede the School Activities or School Third Party Use.

3.3 Scope

(a) Project Co must provide the Security Services:

(i) to meet the key objectives;

(ii) to meet the Service Standards;

(iii) in accordance with the Management and Integration Services of these Services Specifications; and

(iv) otherwise in accordance with this Deed.

(b) Project Co must provide the Security Services 24 hours per day, 7 days a week throughout the Operating Year.

4 UTILITIES MANAGEMENT SERVICES

4.1 Overview

The Utilities Management Services consist of:

(a) ensuring the continuous supply of Utilities to the School Facilities; and

(b) cooperating with the State and the Principals to promote the efficient consumption of Utilities at the School Facilities.

4.2 Key objectives

The key objectives for the Utilities Management Services are to:

(a) facilitate and enhance the carrying out of the School Activities and School Third Party Use;

(b) ensure that the Utilities Management Services do not conflict with the provision of School Activities or School Third Party Use;

(c) optimise the efficient use of Utilities within the School Facility and the reliability of the engineering services;

(d) provide a cost effective Utilities Management Service that maximises energy and water efficiency in the School Facilities and minimises the energy and water costs of the School Facilities during the Operating Phase;

(e) provide environmentally sustainable outcomes wherever practicable and economical; and

(f) ensure that the provision of all Utilities to the School Facilities is continuously maintained throughout the Operating Phase.

4.3 Scope

(a) Project Co must provide the Utilities Management Services at the School Facilities:

(i) to meet the key objectives;

(ii) to meet the Service Standards;

(iii) in accordance with the Management and Integration Services of these Services Specifications; and

(iv) otherwise in accordance with this Deed.

(b) Project Co must provide the Utilities Management Services so that Utilities are available 24 hours per day throughout the Operating Year.

(c) Without limiting this Specific Service Specification, Project Co must perform the Utilities Management Services in accordance with the Utility Services Contingency Plan and the Utility Services Conservation Plan.

Page 135:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E743

5 Cleaning Services

5.1 Overview

The Cleaning Services consist of:

(a) Scheduled Cleaning Services; and

(b) Emergency Cleaning Services,

at the School Facilities.

5.2 Key objectives

The key objectives of the Cleaning Services are to:

(a) deliver a comprehensive Cleaning Service that provides a level of cleanliness at the School Facilities which ensures the health, safety and well being of all Users;

(b) implement Cleaning Service measures that do not interfere with or impede on the School Activities, School Third Party Use or User access of the School Facilities; and

(c) provide an environmentally friendly Cleaning Service.

5.3 Scope

(a) Project Co must provide the Cleaning Services:

(i) to meet the key objectives;

(ii) to meet the Service Standards;

(iii) in accordance with the Management and Integration Services of these Services Specifications; and

(iv) otherwise in accordance with this Deed. (b) Project Co must provide the Cleaning Services at times necessary to ensure that there is no disruption to

School Activities or School Third Party Use and otherwise at any time requested by the Principal.

(c) Project Co must provide environmentally friendly and economically feasible solutions in delivering the Cleaning Services wherever reasonably practicable including minimising water usage and maximising the use of daily use cleaning chemicals and products that are non-toxic and non hazardous to Safe Work Australia/WorkSafe WA Standards.

(d) Without limiting this Specific Services Specification, Project Co must perform the Cleaning Services in accordance with the Cleaning Services Plan.

(e) (Cleaning audits): Project Co must conduct cleaning audits of the Daily Cleaning Services and the Periodic Cleaning Services in accordance with the Department of Education’s standard service requirements.

(f) (Project Co Materials & equipment):

(i) (Project Co to supply): Project Co must provide, maintain, safely and securely store, replace and clean all materials, equipment and cleaning consumables and chemicals required to be used by Project Co in the delivery of the Cleaning Services. All daily use cleaning chemicals must be non-toxic and non-hazardous in accordance with OHS.

(ii) (Project Co's obligations): Project Co must ensure that all cleaning equipment and materials are stored to avoid any disruption to the School Activities or School Third Party Use when not in use.

(g) (Waste): Project Co must collect all waste and dispose of such waste in the centralised waste collection location.

(h) (Security): Project Co must:

(i) ensure heating and cooling devices (where applicable) are turned off upon leaving any Functional Unit;

(ii) must close all internal doors of the School Facility upon leaving any Functional Unit;

(iii) ensure all lights are to be turned off on completion of cleaning each Functional Unit;

(iv) ensure all lockable internal doors of the School Facility are securely locked upon leaving any Functional Unit; and

(v) Prior to vacating the School Facility:

Page 136:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E744 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

(a) ensure that all external doors, windows and gates of the School Facility are securely locked;

and

(b) arm any applicable security system.

6 Waste Management Services

6.1 Overview

The Waste Management Services consist of:

(a) Scheduled Waste Management Services; and

(b) Unscheduled Waste Management Services,

at the School Facilities including the collection, treatment (where applicable), porterage and disposal of the following categories of waste:

(c) confidential waste – waste designated as confidential by the Principal;

(d) domestic waste – general rubbish from offices, Student areas and kitchens that is not recyclable;

(e) office waste – computers and associated equipment (screens, keyboards, etc.) and electronic equipment such as copiers, printers, and fax machines;

(f) green waste – garden waste such as plant cuttings, branches, leaves, lawn clippings;

(g) solid/hard waste – generally bulky waste material (e.g. unwanted furniture) that is not general rubbish (food scraps, plastic wrapping etc.) or recyclable (paper, cardboard, glass etc.);

(h) recyclable waste – paper; non-waxed cardboard; and glass, metal, plastic, liquid paperboard containers and polystyrene;

(i) sanitary and nappy waste – incontinence pads, sanitary towels/pads, urine containers, stoma bags and disposable nappies; and

(j) prescribed/hazardous waste – wastes that must be managed in accordance with strict mandated requirements.

6.2 Key objectives

The key objectives of the Waste Management Services are:

(a) to ensure the efficient, effective, timely, cost effective and safe management of handling, transport and disposal of waste from the School Facilities to the point of final disposal;

(b) to ensure the clean and tidy presentation of the School Facilities to Users;

(c) to implement an end-to-end waste solution for the School Facilities by appropriately supporting the State’s day-to-day waste management requirements; and

(d) to support environmental sustainability, such as recycling and other green initiatives.

6.3 Scope

(a) Project Co must provide the Waste Management Services:

(i) to meet the key objectives;

(ii) to meet the Service Standards;

(iii) in accordance with the Management and Integration Services of these Services Specifications; and

(iv) otherwise in accordance with this Deed.

(b) Project Co must provide the Waste Management Services at times necessary to ensure that there is no disruption to School Activities or School Third Party Use and otherwise at any time requested by the Principal.

(c) (Waste Management Services areas): Project Co must provide the Waste Management Services to the entire Site.

(d) (Costs): For the avoidance of doubt, Project Co will be responsible for the costs of all third party collection, removal and disposal of Waste.

7 Pest Control Services

7.1 Overview

Page 137:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E745

The Pest Control Services consist of:

(a) Scheduled Pest Control Services; and

(b) Unscheduled Pest Control Services,

at the Sites.

7.2 Key objectives

The key objectives for the Pest Control Services are to:

(a) deliver a comprehensive, technical, safe, fully operational and effective Pest Control Service;

(b) implement Pest control measures in a safe manner and which does not interfere with or impede the School Activities or School Third Party Use; and

(c) minimise Pests and Pest infestations and any:

(i) impact on safety and food hygiene;

(ii) damage to the environment, land and Building Fabric; and

(iii) disruption to School Activities or School Third Party Use.

7.3 Scope (a) Project Co must provide the Pest Control Services:

(i) to meet the key objectives;

(ii) to meet the Service Standards;

(iii) in accordance with the Management and Integration Services of these Services Specifications; and otherwise in accordance with this Deed.

(b) Project Co must provide the Pest Control Services at times necessary to ensure that there is no disruption to the School Activities or School Third Party Use and otherwise at any time requested by the Principal.

(c) Project Co must provide, manage and operate a comprehensive system of Pest control management in accordance with these Services Specifications, for all Pests.

8 Help Desk Services

8.1 Overview

The Help Desk Services consist of:

(a) actioning and monitoring the progress of all requests and reported Issues relating to the Services provided by Project Co; and

(b) communicating progress back to Help Desk Users in respect of all requests and Issues.

8.2 Key objectives

The key objectives for the Help Desk Services are:

(a) to ensure that the Services Help Desk is fully integrated and acts as a communication hub for all matters relating to the Services;

(b) to provide a Services Help Desk which is effective, flexible and efficient in coping with varying demands;

(c) to facilitate responses to Service requests and reported Issues in accordance with Make Safe, Remedy and Rectification requirements, as applicable;

(d) to provide Services Help Desk reports to the State and Principal in accordance with the requirements of this Deed or on an as required basis;

(e) to provide a high level of customer care to all Users; and

(f) to provide Help Desk Services that utilise resources to the maximum benefit of the State and with minimal disruption to the School Activities or School Third Party Use.

Page 138:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E746 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

8.3 Scope

(a) Project Co must provide the Help Desk Services:

(i) to meet the key objectives in Section;

(ii) to meet the Service Standards;

(iii) in accordance with the Management and Integration Services of these Services Specifications; and

(iv) otherwise in accordance with this Deed.

(b) Project Co must provide the Help Desk Services so that they are available 24 hours per day throughout the Operating Year.

(c) The Services Help Desk must form the day-to-day notification interface between the State and Project Co, in relation to the following matters:

(i) the reporting of all queries and requests relating to the Services, including requests made for Minor Works in accordance with the terms of this Deed;

(ii) the notification of complaints from the State or any of the Help Desk Users relating to the Services;

(iii) the notification of Issues by the State or by a Help Desk User and classification of Issues;

(iv) any requests for temporary changes to the delivery and scope of the Services by the State;

(v) the monitoring of alarms, security systems and the BMS (as appropriate);

(vi) the issue of instructions and notices by the State or Principal in relation to this Deed;

(vii) any requests for information relating to the operation of the Services Help Desk;

(viii) the update of progress in relation to any Issues notified to the Services Help Desk; and

(ix) the direction of all calls not relating to the Services as instructed by the State from time to time.

(d) The Services Help Desk must comprise a staffed facility for receiving, logging and responding appropriately to direct verbal, telephone, letter, facsimile, e-mail, web-based applications and other forms of communications, including by automatically notifying each Help Desk User when a job is logged and liaising with Help Desk Users on the progress of the job.

9 Caretaker Services

9.1 Overview

(a) Project Co must provide Caretaker Services comprising:

(b) carrying out of minor moves;

(c) carrying out of major moves;

(d) general duties; and

(e) recording duties and materials handling duties;

9.2 Key objectives

Project Co must:

(a) provide a range of Caretaker Services to assist in the provision of the School Activities and School Third Party Use and minimise the time the School Staff spend on non-core activities;

(b) implement and operate an effective and user friendly system to manage services requests for Caretaker Services through the Services Help Desk; and

(c) develop roles and assign personnel with appropriate skills and abilities to provide a comprehensive client interface.

9.3 Scope of service

Page 139:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E747

(a) Project Co must provide the Caretaker Services:

(i) to meet the key objectives;

(ii) to meet the Service Standards;

(iii) in accordance with the Management and Integration Services of these Services Specifications; and

(iv) otherwise in accordance with this Deed.

(b) Project Co must perform all necessary manual handling risk assessments, as required by all relevant Laws in relation to the Caretaker Services activities.

(c) Project Co must be responsible for replacing any items, including Group 2 FF&E and Group 3 FF&E, which are damaged as a result of the performance of Caretaker Services.

[Supplementary Information No B57.]

Question: Dr A.D. Buti asked if the Minister could provide the number of deputy principal positions that have been advertised at 0.8 or less—in other words, as part-time—in public schools in 2014 and 2015.

Answer: In 2014, 31 part-time (less than 1.0) Deputy Principal positions were filled: 13 from individually advertised positions and 18 from previously advertised appointment pools. To date in 2015, 35 part-time (less than 1.0) Deputy Principal positions have been filled: 28 from individually advertised positions and seven from previously advertised appointment pools

Metropolitan Redevelopment Authority —

[Supplementary Information No B58.]

Question:

Mr K. Kinsella: We will provide a basic floor plan that shows the square metreage for each of those areas, the length and width of the promenade sizes, the space that the stairs take and the boardwalk to give the member a clear understanding of how large they are.

Answer:

Based on design software for the construction of Elizabeth Quay, the public realm is approximately 21,000m2

(please refer to the attached map). This comprises:

• The Landing – 5,583m2

• William Street Landing – 991m2

• Western Promenade – 4,107m2

• Eastern Promenade – 4,418m2

• Station Park – 5,577m2

• Landing timber decking – 506m2

Note: these figures exclude the land for the food and beverage outlets.

The above sites can accommodate approximately 10,000 people for events.

The MRA also has the ability to close Geoffrey Bolton Avenue and other roads within the precinct to accommodate crowds for major events such as the annual Skyworks show. This provides another 6,500m2 of public space, will which increase the crowd capacity to approximately 16,000 people.

For more information please refer to the brochure titled Elizabeth Quay Event Venues available on MRA’s website www.mra.wa.gov.au.

Page 140:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E748 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

[Supplementary Information No B59.]

Page 141:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E749

Question: Mr B.S. Wyatt asked: Could the Minister for Planning provide a breakdown of what is driving the figures on page 63 of the Economic and Fiscal Outlook, table 8, “Net Debt of the Total Public Sector at 30 June” under the heading “Less proceeds from sale of non-financial assets”, for the MRA of $1 million for 2015, $7.6 million for 2016, negative $9.1 million for 2017 and $5.6 million for 2018.

Answer: The proceeds from the sale of non-financial assets for the years 2015, 2016 and 2017 shown in the table reflect the new timing of the sale of land in the Midland Redevelopment Area. At the time the 2014/15 Mid-year Review was prepared, this sale was forecast to settle in 2017. The sale has now been brought forward and proceeds are forecast in 2015 and 2016.The proceeds from the sale of non-financial assets for the 2018 year represent the expected proceeds from the sale of commercial property in the MRA’s New Northbridge precinct.

[Supplementary Information No B60.]

Question: Mr J.H.D. Day: We will provide information about the expected return to the Metropolitan Redevelopment Authority from Lend Lease over the life of the project as we understand it at the moment, subject to any commercial considerations that need to be taken into account.

Mr B.S. Wyatt asked: Can I follow up on that. This answer may need to be also supplied as supplementary information, but while we are on the topic, is the yield arrangement with Lend Lease done on the total project or is it done on an arrangement per apartment?

Mr J.H.D. Day: We will clarify that in the same supplementary information.

Answer:

• The agreement between the MRA and Lend Lease for the delivery of Waterbank precinct provides for both parties to contribute to the upfront cost of infrastructure and public domain works and to share revenue from the sale of private development sites.

• The contract executed between the MRA and Lend Lease in February 2013 stipulates the agreed proportion of revenue and costs, but it remains subject to all relevant conditions precedent being met.

• Lend Lease’s Waterbank Master Plan provides for nine buildings, which in accordance with the Waterbank Design Guidelines allows for between 6600m2 and 30,000 m2 of commercial space and between 650 and 1000 residential dwellings.

Division 29: Planning —

[Supplementary Information No B61.] Question: Mr B.S. Wyatt asked for figures on the total number of applications to DAPS that have been approved either with or without modification and the number that have been refused for 2013-14 and 2014-15 to date.

Answer:

2013/14

Form 1 - Notice of development application to be determined by a Development Assessment Panel

Form 2 - Application for amendment or cancellation of a Development Assessment Panel determination

State Administrative Tribunal – section 31 reconsideration

Approved 187 60 23

Refused 19 1 1

TOTAL 206 61 24

% Approved 91 98 96

2014/15* Form 1 - Notice of development application to be determined by a Development Assessment Panel

Form 2 - Application for amendment or cancellation of a Development Assessment Panel

State Administrative Tribunal – section 31 reconsideration

Page 142:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E750 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

Approved 185 100 15

Refused 24 2 2

TOTAL 209 102 17

% Approved 89 98 88

*2014/15 Financial Year data provided to 31 May 2015

[Supplementary Information No B62.]

Question: Mr B.S. Wyatt asked for information on the average lot size over the past decade in the Perth metropolitan region and the Peel region.

Answer: Median residential lot size - Perth & Peel metropolitan area.

Data shows median lot size for residential lots granted final subdivision approval each financial year.

2003/04 2004/05 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14

Annual median lot size (m2) 580 560 558 527 540 482 456 445 430 419 411

Source: WAPC, State Lot Activity

Division 30: Western Australian Planning Commission —

[Supplementary Information No B63.]

Question: Ms R. Saffioti asked for a breakdown of MRIF expenditure for 2014-15.

Answer:

Metropolitan Region Improvement Fund (MRIF) expenditure for the 2014/15 year is expected to be $77.766 million as outlined below:

2014/15 MRIF EXPENDITURE:

RECURRENT EXPENDITURE $’000

Strategic Projects 3,159

Regional Open Space 2,000

Salaries and Overheads 8,547

Operating Expenses 8,452

Area Assistance Schemes 251

Other Planning Projects 16,700

39,109

CAPITAL EXPENDITURE

Land Acquisitions 36,326

Whiteman Park 2,211

Property Services 120

Page 143:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E751

38,657

TOTAL MRIF EXPENDITURE 77,766

Division 31: Culture and the Arts —

[Supplementary Information No B64.]

Question: Mrs M.H. Roberts asked if the Minister provide a breakdown as far as reasonably possible of the expenditure on the new Museum project for 2014–15 and 2015–16.

Answer: The breakdown of the New Museum Project expenditure is as follows: NEW MUSEUM PROJECT EXPENDITURE 2014-15 and 2015-16

Estimated Expenditure Budgeted Expenditure

2014-15 2015-16

$' million $' million

Heritage Works (Perth site – upgrade the site to bring up to the requirements of the new museum building development) 0.705 1.294

Welshpool Site (building of new wet storage, remodelling of existing facilities to service the new museum requirements, new emergency access road between existing and new building and relocate car park) 7.025 9.073

Strategic Projects Delivery Costs (salary costs for Strategic Project staff working on delivering the New Museum project) 0.977 1.865

Strategic Projects Advisors (external expert advisors engaged by Strategic Projects to assist in specialised requirements) 2.797 3.196

Main New Museum Contract Works (main build contract for the New Museum Perth site) 0 10.169

Other Project Costs (Public Art, Exhibition design and WA Museum contracts, project planning salary and support costs) 4.317 6.403

15.821 32.000

[Supplementary Information No B65.]

Question: Mrs M.H. Roberts asked the Minister to provide how many full-time equivalent staff in the Department of Culture and the Arts are currently involved in digital preservation?

Page 144:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E752 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

Answer: The value of full-time equivalents working on digital preservation within the Culture and the Arts portfolio is estimated at 3.9fte. It is difficult to arrive at an exact total as the staff involved in digital preservation also undertake other duties. An additional 3.0fte are currently working within the WA Museum to develop a Collection Management System that will store digital records of the Museum collection.

Division 34: Mental Health Commission —

[Supplementary Information No B66.]

Question: Dr A.D. Buti asked: I refer to “National Perinatal Depression Initiative” on page 394 of the budget papers. I note that there has been quite a substantial reduction in federal government funding from 2014–15 to 2015–16. As a result of that reduction, what initiatives will be affected by the reduction in funding?

Answer: The Commonwealth has not committed to further National Perinatal Depression Initiative (NPDI) funding beyond 30 June 2015, pending the outcome of the National Mental Health Commission Review of national mental health programs.

Negotiations with the Commonwealth are currently underway.

The Mental Health Commission is currently awaiting a response from the Commonwealth indicating acceptance of the second progress report for NPDI for 2014/15 and an estimate of when the second half of 2014/15 funds will be provided – approximately $504,000. These funds are expected to be received late in the financial year, and therefore expenditure of the funds in 2014/15 will be unachievable. The Government has approved expenditure of these unspent funds in 2015/16.

Funds from the final 2014/15 NPDI payment will support six month extensions to services initiated under the original 2008/09-2012/13 NPDI agreement and to support strategic initiatives. These activities are listed in attachments 1 and 2. A decision from the Commonwealth to discontinue support for NPDI will see funding for these initiatives cease on 31 December 2015.

Services initiated during the 2008/09-2012/13 NPDI Agreement receiving six month extensions in 2015/16

Government Organisation Description Amount WACHS, Goldfields Population Health

Employ a specialist (ANF SRN level) worker in perinatal depression in the Goldfields region at 0.5FTE and deliver four BabeEase therapeutic groups

$50,000

Ishar Provide two services for women from culturally and linguistically diverse backgrounds; perinatal “Strength to strength” support group program; and perinatal mental health home visiting

$56,292

Save The Children Deliver a perinatal mental health program for women and children of culturally and linguistically diverse backgrounds in the south-east metropolitan area of Perth

$18,220

Australian Red Cross Provide practical in-home support program for women at high risk of, or experiencing perinatal depression (inclusive of bipolar depression), focussing on psychological health and wellbeing during the perinatal period and based on a family centred approach

$93,938

Women's Health and Family Services

Provide “Making sense of motherhood” and Nurture Program for women and their families in Perth’s Northern suburbs requiring further support following, or complementary to, a clinical intervention for perinatal depression

$23,101

South Coastal Women’s Health Provide postnatal support groups for women at risk of, or experiencing postnatal depression and/or anxiety based on a psycho-educational approach and experiential group process in the Rockingham/Kwinana region

$14,213

Playgroup WA Provide a supported playgroup for women at risk, or $11,847

Page 145:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E753

experiencing perinatal depression in the Warnbro/Port Kennedy area of Perth

$267,611

2015/16 Strategic Initiatives

Government Organisation

Description Amount

St John of God (SJOG), Outreach Services - Aboriginal ‘Circle of Security’ development

Develop an accessible resource for health professionals and Aboriginal health workers addressing parental and child attachment issues in Aboriginal families.

$208,000

Australian Association for Infant Mental Health, Western Australian Branch (AAIMHI WA)-

Employ a project officer for 12 months to support the implementation of the Infant Mental Health Competency Guidelines

$28,389

$236,389

[Supplementary Information No B67.]

Question: Mr R.H. Cook referred to Mental Health Infrastructure, page 395 of the budget papers and asked –

“It would be interesting to see the trajectory of funds that have been withdrawn from the redevelopment of Osborne Park Hospital and Graylands Hospital for mental health beds from 2009–10.”

Answer: There has been no withdrawal of funding for mental health beds. There has been a reallocation of infrastructure funding for the Osborne Park (general health and mental health) and Graylands Hospitals within the capital works program.

The following table indicates the estimated total cost of the projects proposed as published in each year’s Budget Paper 2. As Graylands reconfiguration is currently in the planning stage, funds for development have not been considered by the Government.

Hospitals 2009/10 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016

Osborne Park Hospital

$44.101m $44.101m $44.101m $44.101m nil nil nil

Graylands Hospital planning

$0.600m $0.600m $0.600m $0.600m $0.600m $0.600m $0.600m

Graylands Hospital development

$16.084m nil nil nil nil nil nil

[Supplementary Information No B68.] Question: Dr A.D. Buti referred to Mental Health Infrastructure, page 395 of the budget papers and asked –

“The supplementary information I seek is in three parts: has the number of sexual assaults at Graylands increased since the closure of the Dorrington ward, what is the number of sexual assaults reported this financial year; and what is the number of sexual assaults reported for the two preceding financial years?”

Answer: The table below shows reports of alleged sexual assault received by the Office of the Chief

Psychiatrist.

1 July 2012 to

30 June 2013

1 July 2013 to

30 June 2014

1 July 2014 to

31 December 2014

1 January 2015 to

17 June 2015 (current)

Page 146:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E754 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

2 3 12 16

Notes:

Ministerial Statement to the Parliament on Wednesday 25 March 2015 where I advised the Council of changes to the reporting of serious clinical incidents in mental health to the Chief Psychiatrist in advance of the enactment of the Mental Health Act 2014.

The Minister advised the House that since this new process commenced in February 2015, there has been a significant increase in accuracy of reporting to the Chief Psychiatrist. This increased reporting does not reflect an increase in incidents, but demonstrates a more effective system to capture accurate data on serious clinical incidents in the public mental health sector. More accurate reporting means that public mental health services will better track and consequently reduce risk in the system- this will ultimately make the journey of the patient a safer one.

In the 2014-15 financial year (FY), the Chief Psychiatrist’s monitoring process changed from a dual reporting system to a single entry electronic reporting system, which has increased reporting compliance.

The improved reporting process resulted in up to a 10-fold increase in notifications of clinical incidents in the 2014-15 FY, compared with the previous 2013-14 FY.

It is likely that a significant component of the increased reporting compliance in the 2014-15 FY accounts for the increased number of allegations of sexual assault reported to the Chief Psychiatrist.

Ongoing monitoring will give a clearer picture of trends in sexual assault allegations.

Current data reporting processes do not differentiate substantiated sexual assault from total allegations.

[Supplementary Information No B69.]

Question: Mr R.H. Cook asked if he could be provided with the number of people who attend the cannabis intervention sessions (a) and information about the evaluation of what they say about the effectiveness of those sessions (b).

Answer:

a) The number of people who attended a Cannabis Intervention Session (CIS) from August 1st 2011 to May 31st 2015.

The Service Information Management System (SIMS) treatment database held by the Drug and Alcohol Office indicates that from proclamation of the Cannabis Intervention Requirement (CIR) Scheme on August 1st 2011 through to May 31st 2015 there have been 4776 CIS attendances state-wide1.

b) Evaluation of CIS - Voluntary Feedback Surveys

CIS participants are provided with the opportunity to complete a voluntary CIS feedback evaluation survey at the close of their CIS.

From August 1st 2011 to May 31st 2015, of all CIS participants who attended a CIS, 3147 participants (approximately 66%) completed evaluation forms. Evaluation results for the 3147 participants indicated:

• The majority (92%) indicated that they were satisfied with the booking system, booking times and treatment locations available.

• Most participants who completed the evaluation indicated attendance at the CIS led to increased knowledge about health (87.2%), social (82.2%), and legal (90.6%) issues associated with cannabis use, and the treatment options available (90.3%).

• Overall, 84.2% of those who completed the evaluation forms found the session mostly or very useful, and 53.8% of those who completed the survey indicated they may consider seeking further assistance for their cannabis use.

• When asked about changes to their use, 82.7% thought about reducing their use, and 73.4% had thought about abstaining from cannabis use following their CIS.

Division 35: Disability Services Commission —

Page 147:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

[ASSEMBLY Estimates Committee B — Supplementary Information 2015] E755

[Supplementary Information No B70.]

Question: Mr D.J. Kelly asked: Exactly how many people are currently within the catchment of the eligibility criteria for [the Disability Justice Centre].

Answer: Eight mentally impaired accused appear to meet the eligibility criteria for the Disability Justice Centre, with one more pending a Disability Services Commission assessment

There are a further two individuals who are not currently under any form of Custody or Community Order but who regularly interface with the justice system and would likely be within the catchment of the eligibility criteria for the Disability Justice Centre.

In addition to the above, there is an indeterminate number of individuals who enter the judicial system who, if appropriately identified and assessed would also fall within the catchment of the eligibility criteria for the Disability Justice centre. This is an area of focus for the Disability Justice Service going forward now that an appropriate facility and supports are available

Division 36: Child Protection and Family Support —

[Supplementary Information No B71.] Question: Mr D.J. Kelly asked the department’s understanding of the number of clients who, in the last 12 months, accessed financial counselling that have been defunded?

Answer: From 1 January – 31 December 2014, a total of 22,608 clients accessed a financial counselling service in Western Australia. Of these clients, 11,259 accessed a financial counselling service in the metropolitan area.

It is expected these and new clients will continue to access services in one of the following ways:

• Continued state funded financial counselling services in the non-metropolitan area;

• Continued existing metropolitan financial counselling services until 30 September 2015;

• The new metropolitan wide service available after 30 September 2015;

• The eighteen Commonwealth funded services across Perth including Lifeline, Centrecare, St Vincent de Paul, Midland Information Debt and Legal Advocacy Service;

• There are also seven metropolitan financial counselling services, which are Commonwealth funded specifically for people on Centrelink income management;

• No interest loans are available for families and individuals on low incomes;

• Centrelink income support enables for the purchase of essential household goods and services;

• The State Government’s Hardship Utility Grant Scheme funding which can be accessed by directly contacting the relevant utility; and

• Financial counselling services funded and provided by local government authorities.

[Supplementary Information No B72.] Question: Mr R Cook asked for the 2014-15 spend on the Signs of Safety program and the 2015-16 spend on the Signs of Safety program.

Answer: The Signs of Safety Child Protection Practice Framework is the Department for Child Protection and Family Support’s (the Department’s) overarching child protection practice framework and as such the precise costs associated with utilising this framework cannot be quantified.

The identifiable 2014-15 Expenditure that can be directly attributable to the Signs of Safety Child Protection Practice Framework is outlined below:

2014-15

(Actual to 31 May 2015)

$

2014 Western Australian Signs of Safety Gathering 100,657

Page 148:  · E612 [ASSEMBLY Estimates Committee A — Supplementary Information 2015] Members invited: Labor Members 21. st. October Luncheon: 8 persons Former Members Executive Committee

E756 [ASSEMBLY Estimates Committee B — Supplementary Information 2015]

(Practice Development Conference including travel costs)

Evaluation of the Department’s framework 2014-15 (University of South Australia) 72,061

Consultancy fees (Resolutions Consultancy) 38,343

Training and development costs (including practice resources, travel and catering) 22,310

Total 233,371

The Department anticipates similar expenditure for training and development costs in2015-16. The Department has a contract with Resolutions Consultancy for consultancy, training and development services in relation to the Department’s practice framework and this contract is on an as needs basis. The estimated contract value in 2015-16 is up to $100,000.

[Supplementary Information No B73.]

Question: Mr D.J. Kelly asked for reconciliation of Component 1 and 2 funding.

Answer:

The State Government provided funding of $600 million over four years in the 2011-12 State budget to support a sustainable not-for-profit sector and ensure that government pays an appropriate price for the services it purchases.

The Department for Child Protection and Family Support (the Department) was allocated $8,610,224. From 1 July 2011 an across the board increase of 15 per cent (Component I) was paid to all eligible services.

A second funding injection of $117 million (Component II) over two years was provided by the State Government in the 2013-14 budget.

The Department was allocated the following Component II funding:

• 2013-14 $6,274,000;

• 2014-15 $7,453,000; and

• 2015-16 $7,770,000.

The Department identified three priority areas for Component II funding which were:

• family and domestic violence services

• youth services, and regional and remote services.