Cleveland National Forest
SVO-3.1
Cleveland National Forest
Sweetwater River
Modified Route DSubstation Alternative
���8
Road
Palo Verde Lake
SVO-2
SVO-3
SVO-1
SVO-0
I8-71MRD-36
MRD-35
MRD-34
I8-74
Alpine Road
Bell Bluff Truck Trail
OLD RANCH
FARLINS
tar V
alle
y
Vie
jas C
ree
k R
oa
d
V ia Palo V e rde Lago
Sunrise Powerlink Project
Figure E.4.1-3
October 2008 Final EIR/EIS
Modified Route D Alternative:
Star Valley Option and Revision
0 2,000
Feet
Environmental Planning Inc.
ÆN
Sunrise Powerlink ProjectE.4 MODIFIED ROUTE D LTERNATIVEA
SA
N D
IEG
O C
OU
NT
Y
IMP
ER
IAL
CO
UN
TY
500 kV Proposed Project230 kV Proposed ProjectAlternative Routes
Figure Extent
Modified Route D Alternative: Star Valley Option, Overhead Portion
Modified Route D Alternative: Star Valley Option, Underground Portion
Modified Route D Alternative
Western Modified Route D Alternative Reroute
Interstate 8 Alternative, Underground Portion
Substation
Major Stream/River
Major Water Body
U.S. Forest Service Land
Tribal Land
Major Road
Alternative Structures!(
Overhead-Underground Alternative Transition Structures
#*
Milepost�)
Star Valley Option Revision