e2e <-> EVLA Observation Scheduling (EVLA M&C SW PDR) 5/15/2002 Boyd Waters <[email protected]> 1 EVLA Monitor & Control Software PDR E2E Interfaces: Observation Scheduling Complaints to: Boyd Waters John Benson, Barry Clark, Tim Cornwell, Rich Moeser, PeggyPerley , Bruce Rowen, Kevin Ryan, Bill Sahr, Ken Sowinski, Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes sense to have an e2e person do it. The material discussed in this presentation is the result of the work of the EVLA M&C Computing group, and the e2e Team. But I probably got some stuff wrong and left some stuff out, so complaints to Boyd Waters.

E2E Interfaces: Observation SchedulingSoftware PDR E2E Interfaces: Observation Scheduling ... Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: E2E Interfaces: Observation SchedulingSoftware PDR E2E Interfaces: Observation Scheduling ... Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes

e2e <-> EVLA Observation Scheduling (EVLA M&C SW PDR)

5/15/2002

Boyd Waters <[email protected]> 1

EVLA Monitor & Control Software PDR

E2E Interfaces: Observation Scheduling

Complaints to: Boyd Waters

John Benson, Barry Clark, Tim Cornwell, Rich Moeser, Peggy Perley , Bruce Rowen, Kevin Ryan, Bill Sahr, Ken Sowinski, Boyd Waters

Originally, Bill Sahr was going to present this topic, but it really makes sense to have an e2e person do it.

The material discussed in this presentation is the result of the work of the EVLA M&C Computing group, and the e2e Team. But I probably got some stuff wrong and left some stuff out, so complaints to Boyd Waters.

Page 2: E2E Interfaces: Observation SchedulingSoftware PDR E2E Interfaces: Observation Scheduling ... Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes

e2e <-> EVLA Observation Scheduling (EVLA M&C SW PDR)

5/15/2002

Boyd Waters <[email protected]> 2

May 15, 2002 EVLA Monitor & Control Software PDR

Boyd Waters 2

What is “e2e”?

• End-to-End Data Management– Capture and Preserve data… – …in a computer-useable format…– THROUGHOUT THE PROJECT LIFECYCLE!

• Motivation:– Automate where possible– Make Radio Interferometry EASIERPOSSIBLE

Also, there’s been lots of talk about the traditional, “roach motel” model of data archival: data checks in, but never checks out! So we’d like to provide meaningful access to the data that we (NRAO) already have.

Page 3: E2E Interfaces: Observation SchedulingSoftware PDR E2E Interfaces: Observation Scheduling ... Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes

e2e <-> EVLA Observation Scheduling (EVLA M&C SW PDR)

5/15/2002

Boyd Waters <[email protected]> 3

e2e Architectural Diagrams

5. Observation Scripting Toolkit

Real-TimeScheduler

ControlScripts

10. Archive Toolkit

11. Pipeline Toolkit

3. Proposal Submission Toolkit

Submit Proposal

SubmitterIntentionalProposal

Generate

ObservingScripts

Test

Engineer

ObservingSystem

Monitor Data

Visibility Data

ArrayOperator

ImagePipeline

Visibility Data

Data

Bus

&

Storage

Observation

M o n i t o r

Search

Archive

?Query

!Results

Monday, November 26, 2001 bwaters - page:1 of 1

End-to-End: More Detail

9. Real-TimeObserving

Toolkit

NormalizedProposal

Scenarios

project

Control

Scripts

4. Proposal Management Toolkit

$

VISIOCORPORATION

PrioritizedProposal

-or-

PrioritizeProposals

$

V I S I OCORPORATION

PrioritizedProposal

NormalizedProposal

NormalizeProposals

NormalizedProposal

Intentional

Proposal

Scriptor

TAC

Data

Wrangler

7. Observation Evaluation Toolkit

EvaluateObservation

ObservationEval. ReportEvaluator

Researcher

ImagesVisibilities

Ancillary data reportsetc.

13. Calibration Source Toolkit

CalibrationData

Calibration

Editing

Moni tor Data

Visibility Data

CalibrationScientist

6. Telescope Simulation Toolkit

Simulate

Telescope

ProposalModeller

conditions

CalibrationData

Monitor Data

Visibility Data

Observ ing

Scripts

ObservingConditions conditions

8. Observation Scheduling Toolkit

Dynamic

Scheduler

conditions

Scenarios

project

Calibration Data is aspecific kind of

“conditions” data.CalibrationData

Scheduler

Visibility Data

CalibrationData

CalibrationData

Monitor Data

ImageControl Scripts -“as observed”

A “Scenario” is anordered list of Projects

The Real-TimeScheduler produces aQueue of Control

Scripts (e.g. crd files)from a Scenario.

The Observing System providesfeedback to the Real-Time Scheduler

by reporting the Control Scripts “asobserved”. The Observing Systemmay also raise events via Monitor

Data. TBD.

5/15/2002 Boyd Waters <[email protected]> Boyd Waters 3

Here is our obligatory e2e architectural diagram.

I don’t expect you to follow this; the point here is that we have thought about the process of observing with NRAO instruments as data work-flow. We have identified major steps along the work flow, and are building toolkits for many of these major steps.

The next two slides are slightly larger versions of this diagram.

(You can get a (theoretically) printable version of this diagram in a larger format from the e2e web site at http://www.nrao.edu/e2e )

Page 4: E2E Interfaces: Observation SchedulingSoftware PDR E2E Interfaces: Observation Scheduling ... Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes

e2e <-> EVLA Observation Scheduling (EVLA M&C SW PDR)

5/15/2002

Boyd Waters <[email protected]> 4

5. Observation Scripting Toolkit

Real-Time

3. Proposal Submission Toolkit

Submit Proposal

SubmitterIntentionalProposal

GenerateObserving

Scripts

Data

Bus

&

St

NormalizedProposal

Scenarios

project

4. Proposal Management Toolkit

$

VISIO

CORPORATION

PrioritizedProposal

-or-

PrioritizeProposals

$

VISIOCORPORATIO

N

PrioritizedProposal

NormalizedProposal

NormalizeProposals

NormalizedProposal

IntentionalProposal

Scriptor

TAC

DataWrangler

7. Observation Evaluation Toolkit

EvaluateObservation

ObservationEval. ReportEvaluator

13. Calibration Source Toolkit

CalibrationData

CalibrationEditing

Monitor Data

Visibility Data

CalibrationScientist

6. Telescope Simulation Toolkit

SimulateTelescope

ProposalModeller

conditions

CalibrationData

Monitor Data

Visibility Data

ObservingScripts

ObservingConditions conditions

8. Observation Scheduling Toolkit

DynamicScheduler

conditions

Scenarios

project

Calibration Data is aspecific kind of“conditions” data.Calibration

Data

Scheduler

Visibility Data

A “Scenario” is anordered list of Projects

Here’s the top half of the e2e Architecture Diagram.

Roughly, the right side of the diagram models interactions with hardware (e.g., the telescope, a weather station), and the left side of the diagram models interactions with people.

The data flow starts at the top-right of the diagram, with the Proposal Submission; Submissions turn into Approved Proposals, which are processed to obtain a Project that contains observation instructions (in a scripting language).

Sets of Projects are examined by the Dynamic Scheduler, which orders the Projects according to observing logic based on current conditions and observation constraints (e.g., good weather for high-frequency observing).

An ordered set of observing instructions – called a Scenario – is passed to a “Real-Time Scheduler” that turns the observing instructions (which areexpressed in a human-readable scripting language) into more-detailed instrument instructions to be executed by the telescope. I’ll talk about this more in a later slide.

Page 5: E2E Interfaces: Observation SchedulingSoftware PDR E2E Interfaces: Observation Scheduling ... Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes

e2e <-> EVLA Observation Scheduling (EVLA M&C SW PDR)

5/15/2002

Boyd Waters <[email protected]> 5

Real-TimeScheduler

ControlScripts

10. Archive Toolkit

11. Pipeline Toolkit

TestEngineer

ObservingSystem

Monitor Data

Visibility Data

ArrayOperator

ImagePipeline

Visibility Data

&

Storage

ObservationMonitor

SearchArchive

?Query

!Results

Monday, November 26, 2001 bwaters - page:1 of 1

End-to-End: More Detail

9. Real-TimeObserving

Toolkit

Scenarios

ControlScripts

Researcher

ImagesVisibilitiesAncillary data reportsetc.

13. Calibration Source Toolkit

CalibrationData

CalibrationEditing

Monitor Data

Visibility Data

CalibrationScientist

8. Observation Scheduling Toolkit

DynamicScheduler

Scenarios

projectScheduler

CalibrationData

CalibrationData

Monitor Data

ImageControl Scripts -“as observed”

A “Scenario” is anordered list of Projects

The Real-TimeScheduler produces aQueue of ControlScripts (e.g. crd files)from a Scenario.

The Observing System providesfeedback to the Real-Time Schedulerby reporting the Control Scripts “asobserved”. The Observing Systemmay also raise events via MonitorData. TBD.

Here’s the bottom half of the architecture diagram, which shows the punch-line: the Image Pipeline and the Archive Query.

Page 6: E2E Interfaces: Observation SchedulingSoftware PDR E2E Interfaces: Observation Scheduling ... Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes

e2e <-> EVLA Observation Scheduling (EVLA M&C SW PDR)

5/15/2002

Boyd Waters <[email protected]> 6

May 15, 2002 EVLA Monitor & Control Software PDR

Boyd Waters 6

e2e/AIPS++ pipeline results

Tim Cornwell wrote this prototype Image Pipeline as a production-rule system implemented as GNU Makefiles driving AIPS++.

This is what we want: every observation from the VLA (and other NRAO instruments) will result in a set of images that have been built automatically. Instead of a Radio-Astronomy Interferometer “black belt” sitting down at an AIPS++ workstation and reducing the data, the image pipeline will try to do the same thing. Can a computer be as smart as Chris Carilli? No. But if the system is supplied with sufficient information about the observation, it can make reasonable choices about the data-reduction process to produce these default datasets.

Page 7: E2E Interfaces: Observation SchedulingSoftware PDR E2E Interfaces: Observation Scheduling ... Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes

e2e <-> EVLA Observation Scheduling (EVLA M&C SW PDR)

5/15/2002

Boyd Waters <[email protected]> 7

May 15, 2002 EVLA Monitor & Control Software PDR

Boyd Waters 7

e2e:Calibrator Selection

• Prototyped Java interface• Will do user testing very

soon• Expect to deploy soon• Make catalog available in

AIPS++ for processing• Also make available as an

NVO cone search – more later

Honglin Ye wrote this Calibrator Selection Tool prototype with the help of John Benson, input from Greg.

The point here is that we are building tools all along the workflow chain, from proposal submission all the way to data reduction, to ensure that well- formed, complete data is entered into our data archive. A unified data model makes automated pipeline processing possible.

Page 8: E2E Interfaces: Observation SchedulingSoftware PDR E2E Interfaces: Observation Scheduling ... Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes

e2e <-> EVLA Observation Scheduling (EVLA M&C SW PDR)

5/15/2002

Boyd Waters <[email protected]> 8

May 15, 2002 EVLA Monitor & Control Software PDR

Boyd Waters 8

e2e:Proposal Submission…

Example:

Gemini Proposal

Tool

This is NOAO’s Gemini Telescope “Phase I” Proposal Submission Tool. It’s an example of the kind of submission tool we’re thinking about.

The point here is that, with a some sort of forms-based editor, we can prompt the user for information about the observing proposal such that we obtain complete, structured information. We hope. In theory. Well, the editor will help…

In this screenshot, you can see the Gemini proposal tool as a Java application in the upper-left window. In the window on the right side of the screen, I’veopened the resulting proposal in Notepad (a Windows text editor). You can see that the proposal is simply an XML file. In the bottom-middle window, I’ve opened this same proposal in a popular XML editor to emphasize the document structure.

Writing the proposal as XML allows computer systems to interpret the structured data. We could use some other form like structured ASCII tables; XML is the fun thing to use at the moment. There are plenty of XML parsing tools available.

Page 9: E2E Interfaces: Observation SchedulingSoftware PDR E2E Interfaces: Observation Scheduling ... Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes

e2e <-> EVLA Observation Scheduling (EVLA M&C SW PDR)

5/15/2002

Boyd Waters <[email protected]> 9

May 15, 2002 EVLA Monitor & Control Software PDR

Boyd Waters 9

e2e-EVLA Interaction Observation

SchedulingSoftware

Monitor &ControlSystem

This is the data-flow diagram that was in the documentation submitted to the National Science Foundation.

I don’t expect you to read all the labels here. The point is that the green stuff is the primary responsibility of the Data Management Group (mostly the e2e Project), while the red stuff is the responsibility of the EVLA Project.

The major interaction between these teams, discussed in this presentation, is between the “Observing layer” and the “Monitor and Control” systems.

Page 10: E2E Interfaces: Observation SchedulingSoftware PDR E2E Interfaces: Observation Scheduling ... Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes

e2e <-> EVLA Observation Scheduling (EVLA M&C SW PDR)

5/15/2002

Boyd Waters <[email protected]> 10

May 15, 2002 EVLA Monitor & Control Software PDR

Boyd Waters 10

e2e-EVLA II

Diagram Design:B. Clark

Barry Clark presented this diagram on the first day of the EVLA M&C PDR. I’ve added the colors consistent with the previous diagram, to emphasize the similarity between these two diagrams.

This diagram emphasizes that the piece of the “observing layer” that interacts with M&C is the Observation Scheduler.

Page 11: E2E Interfaces: Observation SchedulingSoftware PDR E2E Interfaces: Observation Scheduling ... Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes

e2e <-> EVLA Observation Scheduling (EVLA M&C SW PDR)

5/15/2002

Boyd Waters <[email protected]> 11

Scheduling Phases

Real-TimeScheduler

ControlScripts

TestEngineer

ObservingSystem

Monitor Data

Visibility Data

ArrayOperator

ObservationMonitor

9. RemoteObserving

Toolkit

Scenarios

ControlScripts

8. Observation Scheduling Toolkit

DynamicScheduler

conditions

Scenarios

project

Calibration Data is aspecific kind of“conditions” data.

Scheduler

CalibrationData

Control Scripts -“as observed”

5. Observation Scripting Toolkit

GenerateObserving

Scripts

NormalizedProposal

project

$

VISIOCORPORATIO

N

PrioritizedProposal

-or-

Scriptor

Monitor and

Control

The data flow starts at the top-right of the diagram, with the Proposal Submission; Submissions turn into Approved Proposals, which are processed to obtain a Project that contains observation instructions (in a scripting language).

Sets of Projects are examined by the Dynamic Scheduler, which orders the Projects according to observing logic based on current conditions and observation constraints (e.g., good weather for high-frequency observing).

Page 12: E2E Interfaces: Observation SchedulingSoftware PDR E2E Interfaces: Observation Scheduling ... Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes

e2e <-> EVLA Observation Scheduling (EVLA M&C SW PDR)

5/15/2002

Boyd Waters <[email protected]> 12

May 15, 2002 EVLA Monitor & Control Software PDR

Boyd Waters 12

Dynamic Scheduling

Structure the Observation……so that we can…

Respond to Events on a Short Time Scale

Changing conditions (e.g. weather)Targets of Opportunity (e.g. GRBs)

èBlock-Based Scheduling

Page 13: E2E Interfaces: Observation SchedulingSoftware PDR E2E Interfaces: Observation Scheduling ... Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes

e2e <-> EVLA Observation Scheduling (EVLA M&C SW PDR)

5/15/2002

Boyd Waters <[email protected]> 13

May 15, 2002 EVLA Monitor & Control Software PDR

Boyd Waters 13

Observing Block

Preamble– The telescope setup for this

block– Examples:

• Calibrators• LO setup

“Post-amble”– Cleanup, book-keepingObserving BlockObserving Block

Pream

ble

~20(?) minutes nominal“P

ost-amble”

20 minutes is a typical calibration duty cycle. But the blocks can vary in size.

The internal structure used by the observing block is To Be Decided.

Page 14: E2E Interfaces: Observation SchedulingSoftware PDR E2E Interfaces: Observation Scheduling ... Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes

e2e <-> EVLA Observation Scheduling (EVLA M&C SW PDR)

5/15/2002

Boyd Waters <[email protected]> 14

May 15, 2002 EVLA Monitor & Control Software PDR

Boyd Waters 14

Observing Block Constraints

• “Run this block until the calibrations converge”

• “I can’t run unless the previous block has run successfully”

• “I MUST run at 16:42:30 GST on 30 May 2002”– (fixed scheduling is dynamic scheduling with

time-domain constraints)

These are EXAMPLES, not REQUIREMENTS.

Requirements here have yet to be gathered, but we can collect such and use the requirements to get a better idea of what the observing blocks will need to express.

Page 15: E2E Interfaces: Observation SchedulingSoftware PDR E2E Interfaces: Observation Scheduling ... Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes

e2e <-> EVLA Observation Scheduling (EVLA M&C SW PDR)

5/15/2002

Boyd Waters <[email protected]> 15

May 15, 2002 EVLA Monitor & Control Software PDR

Boyd Waters 15

Block-Based Scheduler

Telescope sees ONE BLOCK AT A TIME:Block Queue

Telescope

“ready for next block”“here it is”

Observing BlockObserving Block

Pream

ble

“Post-amble”

Observing BlockObserving Block

Pream

ble

“Post-amble”

Observing BlockObserving Block

Pream

ble

“Post-amble”

Observing BlockObserving Block

Pream

ble

“Post-amble”

Implications:

•Simplifies the telescope state data

•Telescope reports block execution status back to the block queue

•All “observing logic” is maintained by the Block Queue

Page 16: E2E Interfaces: Observation SchedulingSoftware PDR E2E Interfaces: Observation Scheduling ... Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes

e2e <-> EVLA Observation Scheduling (EVLA M&C SW PDR)

5/15/2002

Boyd Waters <[email protected]> 16

May 15, 2002 EVLA Monitor & Control Software PDR

Boyd Waters 16

Block Execution

Observing BlockObserving Block

Pream

ble

“Post-amble”

Observing BlockObserving Block

Pream

ble

“Post-amble”

Input Queue:

Execution:Observing Block

Observing Block

Pream

ble

“Post-amble”

3

Observing BlockObserving Block

Pream

ble

“Post-amble”

1

Observing BlockObserving Block

Pream

ble

“Post-amble”

1

Observing BlockObserving Block

Pream

ble

“Post-amble”

2Observing Block

Observing Block

Pream

ble

“Post-amble”

3

Observing BlockObserving Block

Pream

ble

“Post-amble”

2Observing Block

Observing Block

Pream

ble

“Post-amble”

Observing BlockObserving Block

Pream

ble

“Post-amble”

2Observing Block

Observing Block

Pream

ble

“Post-amble”

Page 17: E2E Interfaces: Observation SchedulingSoftware PDR E2E Interfaces: Observation Scheduling ... Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes

e2e <-> EVLA Observation Scheduling (EVLA M&C SW PDR)

5/15/2002

Boyd Waters <[email protected]> 17

May 15, 2002 EVLA Monitor & Control Software PDR

Boyd Waters 17

Block Execution: Detail

Input Queue:

Execution:Observing Block

Observing Block

Pream

ble

“Post-amble”

3

Observing BlockObserving Block

Pream

ble

“Post-amble”

1

Observing BlockObserving Block

Pream

ble

“Post-amble”

1

Observing BlockObserving Block

Pream

ble

“Post-amble”

2Observing Block

Observing Block

Pream

ble

“Post-amble”

3

Observing BlockObserving Block

Pream

ble

“Post-amble”

2

Archive:

Observing BlockObserving Block

Pream

ble

“Post-amble”

4Observing Block

Observing Block

Pream

ble

“Post-amble”

5Observing Block

Observing Block

Pream

ble

“Post-amble”

Observing BlockObserving Block

Pream

ble

“Post-amble”

MeasurementSet

MeasurementSet

MeasurementSet

MeasurementSet

Observing BlockObserving Block

Pream

ble

“Post-amble”

3

Observing BlockObserving Block

Pream

ble

“Post-amble”

1Observing Block

Observing Block

Pream

ble

“Post-amble”

2Observing Block

Observing Block

Pream

ble

“Post-amble”

3Observing Block

Observing BlockP

reamble

“Post-amble”

4Observing Block

Observing Block

Pream

ble

“Post-amble”

ready ready ready ready

Pream

ble 2Observing Block

Observing BlockObserving Block

Pream

ble

“Post-amble”

Observing BlockObserving Block

Pream

ble

“Post-amble”

2

ok ok ok ok

readyFailed!

?

Page 18: E2E Interfaces: Observation SchedulingSoftware PDR E2E Interfaces: Observation Scheduling ... Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes

e2e <-> EVLA Observation Scheduling (EVLA M&C SW PDR)

5/15/2002

Boyd Waters <[email protected]> 18

May 15, 2002 EVLA Monitor & Control Software PDR

Boyd Waters 18

Block Templates

• Debug blocks• Template blocks• “Default” blocks

Page 19: E2E Interfaces: Observation SchedulingSoftware PDR E2E Interfaces: Observation Scheduling ... Boyd Waters Originally, Bill Sahr was going to present this topic, but it really makes

e2e <-> EVLA Observation Scheduling (EVLA M&C SW PDR)

5/15/2002

Boyd Waters <[email protected]> 19

May 15, 2002 EVLA Monitor & Control Software PDR

Boyd Waters 19

Next Steps

• Gather and Codify Requirements– Observing Block constraints

• M&C óObserving System Interaction– Formal Model

• Observing System Scripting– How instrument commands and observing

constraints are expressed