E X P E R I E N C E L I S T
Page 2
FUSION FABRICATION WORKS 2013
CLIENT OWNER DESCRIPTION Total weight
PHOTOGRAPH PROJECT LOCATION
SCOPE YEAR
TIRUCHENDUR VELMURUGAN ENGG, CHENNAI
ETA STAR DEVELOPERS LTD, PADUR, CHENNAI
Fabrication of MS grilles (of various sizes) for the windows of the housing complex at Padur, Chennai.
Approx. 3360 kgs
India Material supply and fabrication
March 2011 (completed) Rs2,32,000/=
DL FAB, SIDCO INDUSTRIAL ESTATE, THIRUMULLAIVOYAL, CHENNAI
NOT KNOWN Fabrication of SS304 hoppers of various sizes for a chemical plant
Approx 2000 kgs
India Only fabrication
March 2011 (completed) Rs60,000/=
ETA STAR DEVELOPERS LTD, PADUR, CHENNAI
ETA STAR DEVELOPERS LTD, CHENNAI
Fabrication of MS grilles (of various sizes) for the windows of the housing complex at Padur, Chennai.
Approx 3500 kgs
India
Material supply and fabrication
April 2011 (completed) Approx Rs2,50,000/=
ETA STAR DEVELOPERS LTD, PADUR, CHENNAI
ETA STAR DEVELOPERS LTD, CHENNAI
Fabrication of MS perforated covers (of various sizes) for the windows of the housing complex at Padur, Chennai.
Approx 110 sqmtrs
India
Material supply and fabrication
May-June 2011 (completed) Rs2,62,018/=
FINE TECH ENGINEERING, CHENNAI
SKN BEARING, CHENNAI
Fabrication of MS tanks of various sizes.
Approx 5000 kgs
India Material supply, fabrication and painting
July-September 2011 (completed) Rs4,00,000/=
E X P E R I E N C E L I S T
Page 3
FUSION FABRICATION WORKS 2013
CLIENT OWNER DESCRIPTION Total weight
PHOTOGRAPH PROJECT LOCATION
SCOPE YEAR
OZONE PROJECTS PRIVATE LTD, CHENNAI
METROZONE PROJECT-CHENNAI
Fabrication of MS temporary doors
80 doors Approx 4500 kgs
India Material supply, fabrication, painting & installation
July-September 2011 (completed) Rs6,00,850/
SUREKA MARCKETERS, CHENNAI
FL-SMIDTH UCIL JARKHAND
Fabrication of MS tanks of various sizes
Approx. 6000 kgs
India Only fabrication
July-September 2011 (Completed)Rs2,00,000/
INDUSTRIAL ENGINEERING CORPORATION CHENNAI
L&T CHENNAI Fabrication of structural members for bottom and top landings of two nos. goods lift for construction purpose including cages.
Approx.10000 kgs
India Material supply and fabrication and painting
July-December 2011 (Completed) 7,14,000/-
FINE TECH ENGINEERING, CHENNAI
GOVERNMENT CLIENT
Fabrication of flue gas duct expansion joints with MS outer casing and SS internal sheet including filling of insulation.
4 Joints
India Fabrication and mineral wool filling
October-December 2011 (completed) Rs51,000/=
OZONE PROJECTS PRIVATE LTD, CHENNAI
METROZONE PROJECT-CHENNAI
Fabrication of MS temporary doors
300 doors Approx 21000 kgs
India Material supply, fabrication, painting & installation
September –January 2012 (Completed) Rs23,79,375
E X P E R I E N C E L I S T
Page 4
FUSION FABRICATION WORKS 2013
CLIENT OWNER DESCRIPTION Total weight
PHOTOGRAPH PROJECT LOCATION
SCOPE YEAR
OZONE PROJECTS PRIVATE LTD, CHENNAI
METROZONE PROJECT-CHENNAI
Fabrication of MS window grilles for 15 towers
Approx 51000 kgs
India Material supply, fabrication, painting & installation
January 2012 to January 2013 (Completed) Approx Rs5,00,000/=
VMW CAR AND CONTAINER PARKING SOLUTIONS, CHENNAI
VMW CAR AND CONTAINER PARKING SOLUTIONS
Prototype development for the key components of the automated car parking system
NA India Design, material supply, fabrication, erection and testing
January 2012 (completed) Rs2,15,382/=
SUREKA MARCKETERS, CHENNAI
HPCL Fabrication of SS tanks for chemical dosing skids, including piping and pumps and skid assembly
Approx. 1500 kgs
India Fabrication and assembly
February 2012 (completed) Rs97,500/=
OZONE PROJECTS PRIVATE LTD, CHENNAI
METROZONE PROJECT-CHENNAI
Supply and erection of ISMB400 beams for material handling purpose for STP and WTP and supply of 5T chain pulley blocks with trolley (1 each for STP ad WTP). Span of the buildings were 10.3 mtrs and 12.4mtrs respectively.
NA India Supply, fabrication and erection
February 2012 (completed) Rs4,15,809/=
TSUBAKI HOOVER INDIA PVT LTD
TSUBAKI HOOVER PVT LTD
Entrance chute for ball bearings
- Chennai-India
Machining of entrance chute
July 2012 (completed) Rs 60,900/=
E X P E R I E N C E L I S T
Page 5
FUSION FABRICATION WORKS 2013
CLIENT OWNER DESCRIPTION Total weight
PHOTOGRAPH PROJECT LOCATION
SCOPE YEAR
FINE TECH ENGINEERING
NOT KNOWN MS bins for ore handling - Hosur- India
Fabrication of MS bins for handling ore
August 2012 (completed) 59,696.87
NATIONAL OILWELL VARCO
NATIONAL OILWELL VARCO
Machine cover - Ambattur-Chennai
Design fabrication and supply of machine cover
September 2012 (completed) Rs 34,893/=
NATIONAL OILWELL VARCO
NATIONAL OILWELL VARCO
Equipment foundation works - Ambattur-Chennai
Design and construction for equipment foundation including pilling work
Nov 2012 Approx (completed) Rs19,55,098/=
UDAY TECHNO MARKETING
UDAY TECHNO MARKETING
Soft Jaws for CNC machines - Korattur-Chennai
Supply of soft jaws- routine production job
September to December 2012 (production job) Rs61,005/=
OZONE PROJECTS PRIVATE LTD, CHENNAI
METROZONE PROJECT-CHENNAI
“L” cover for lift shaft - Annanagar,Chennai
Fabrication and erection of MS “L” cover for lift
Feb 2012 to Feb 2013 Rs2,36,824/= (in progress)