13
7 Martin, Robert From: Sent: To: Cc: Subject: Attachments: Khanna, Meena - '• Wednesday, September 14, 2011 3:25 PM Boyle, Patrick Kulesa, Gloria; Martin, Robert North Anna Earthquake Issue Commissioner Briefing MK ppt (3) (2).pptx North Anna Earthquake Issue Commissioner Briefing MK ppt (3) (2).pptx I V) 'L, I

E-mail from M. Khanna, NRR to P. Boyle, NRR; re North Anna ... · North Anna Earthquake Issue Commissioner Briefing MK ppt (3) (2).pptx I V) 'L, I. North Anna Nuclear Power Plant

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: E-mail from M. Khanna, NRR to P. Boyle, NRR; re North Anna ... · North Anna Earthquake Issue Commissioner Briefing MK ppt (3) (2).pptx I V) 'L, I. North Anna Nuclear Power Plant

7

Martin, Robert

From:Sent:To:Cc:Subject:Attachments:

Khanna, Meena - '•Wednesday, September 14, 2011 3:25 PMBoyle, PatrickKulesa, Gloria; Martin, RobertNorth Anna Earthquake Issue Commissioner Briefing MK ppt (3) (2).pptxNorth Anna Earthquake Issue Commissioner Briefing MK ppt (3) (2).pptx

I V) 'L,I

Page 2: E-mail from M. Khanna, NRR to P. Boyle, NRR; re North Anna ... · North Anna Earthquake Issue Commissioner Briefing MK ppt (3) (2).pptx I V) 'L, I. North Anna Nuclear Power Plant

North Anna Nuclear PowerPlant Se ismic Event

Presentation to the CommissionersAugust 30 and September 1, 2011

Page 3: E-mail from M. Khanna, NRR to P. Boyle, NRR; re North Anna ... · North Anna Earthquake Issue Commissioner Briefing MK ppt (3) (2).pptx I V) 'L, I. North Anna Nuclear Power Plant

* North Anna Nuclear Power Plant (NANPP) has twoDesign Basis Earthquake (DBE) ground motion,one for structures, systems, and components(SSCs) founded on top of rock, which is anchoredat 0.12 g, and the other is for SSCs founded ontop of soil, which is anchored at 0.18 g.

* NANPP has two corresponding Operating BasisEarthquake (OBE) ground motion, anchored at0.06 g for rock and 0.09 g for soil.

2

Page 4: E-mail from M. Khanna, NRR to P. Boyle, NRR; re North Anna ... · North Anna Earthquake Issue Commissioner Briefing MK ppt (3) (2).pptx I V) 'L, I. North Anna Nuclear Power Plant

. On August 23, 2011,, North Anna Power Station declared an Alertdue to significant seismic activity onsite from an earthquakewhich had a measured magnitude of 5.8.

" The licensee conducted the 1st general walkdown of the plant asrequired by the North Anna Power Station abnormal procedurefor seismic event.

" The licensee conducted the 2nd walkdown after the magnitude4.5 aftershock.

" Seismic Response Spectrum Recorder (scratch plate) readingsidentified that the Design Basis Earthquake had been exceeded.

" On August 26, the licensee declared all safety-related SSCs ofUnits 1 and 2 inoperable

:3

Page 5: E-mail from M. Khanna, NRR to P. Boyle, NRR; re North Anna ... · North Anna Earthquake Issue Commissioner Briefing MK ppt (3) (2).pptx I V) 'L, I. North Anna Nuclear Power Plant

n This is a first of a kind event

* NRC staff performed independent analysis(See Figure 1)

4

Page 6: E-mail from M. Khanna, NRR to P. Boyle, NRR; re North Anna ... · North Anna Earthquake Issue Commissioner Briefing MK ppt (3) (2).pptx I V) 'L, I. North Anna Nuclear Power Plant

~ft Y

2.0 -& . . . a-

C-)

C-)

CL)

C/3

1.5

1.0

0.5

NA Unit 1&2 Rock SSE (Newmark at 0.12g)

OBE (1/2 SSE)

NA Unit 3 COL GMRS

0 USGS (ShakeCast Report Version 7)/

EPRI GMPE(2004, 2006) MW5.8 at 19km /0 o median and _ I sd

II

I/

//

/

\

I./

/./

0.0 -"0.1 1 10

frequency (Hz)100 5

Page 7: E-mail from M. Khanna, NRR to P. Boyle, NRR; re North Anna ... · North Anna Earthquake Issue Commissioner Briefing MK ppt (3) (2).pptx I V) 'L, I. North Anna Nuclear Power Plant

I

* Appendix A to Part 100-Paragraph V(a)(2),"Determination of Operating Basis Earthquake"(this regulation does not address beyond designbasis events.)

* RG 1.166, "Pre-earthquake Planning andImmediate Nuclear Power Plant Operator Post-earthquake Actions"

* RG1.Down

167, "Restart Of A Nuclear Power Plant ShutBy A Seismic Event"

6

Page 8: E-mail from M. Khanna, NRR to P. Boyle, NRR; re North Anna ... · North Anna Earthquake Issue Commissioner Briefing MK ppt (3) (2).pptx I V) 'L, I. North Anna Nuclear Power Plant

* The staff will confirm that the licensee is performing plantwalk downs in accordance with RG 1.166, "Pre-earthquakePlanning and Immediate Nuclear Power Plant OperatorPost-earthquake Actions"

* Information from NANPP's seismic recordings will providethe basis for the staff's assessment of the licensee'soperability determination of the affected structures andcomponents.* The staff will confirm that the licensee is following the

guidance in RG 1.167, "Restart of a Nuclear Power PlantShutdown by a Seismic Event," regarding the exceptions tothe EPRI NP-6695 document prior to recommending plantrestart.

7

Page 9: E-mail from M. Khanna, NRR to P. Boyle, NRR; re North Anna ... · North Anna Earthquake Issue Commissioner Briefing MK ppt (3) (2).pptx I V) 'L, I. North Anna Nuclear Power Plant

* Region II with NRR/NRO support will beconducting an AIT at the North Anna site, inaccordance with MD 8.3, "NRC IncidentInvestigation Program."

* Objectives of the AIT include:" Collect, analyze and document factual information and

evidence to determine probable cause" Assess licensee's actions and plant equipment response

during the earthquake and aftershocks" Identify generic issues associated with the event" Conduct independent extent of condition review" Collect information to support final determination of risk

significance of event 8

Page 10: E-mail from M. Khanna, NRR to P. Boyle, NRR; re North Anna ... · North Anna Earthquake Issue Commissioner Briefing MK ppt (3) (2).pptx I V) 'L, I. North Anna Nuclear Power Plant

* Appendix A to Part 100-Paragraph V(a)(2) states, "If vibratoryground motion exceeding that of the Operating Basis Earthquakeoccurs, shutdown of the nuclear power plant will berequired. Prior to resuming operations, the licensee will berequired to demonstrate to the Commission that nofunctional damage occurred to those features necessary forcontinued operation without undue risk to the health andsafety of the public."

Staff will utilize RG and EPRI guidance to assess whetherAppendix A to Part 100 criteria are met.

9

Page 11: E-mail from M. Khanna, NRR to P. Boyle, NRR; re North Anna ... · North Anna Earthquake Issue Commissioner Briefing MK ppt (3) (2).pptx I V) 'L, I. North Anna Nuclear Power Plant

* Staff will utilize appropriate regulatory actions toensure that the licensee takes adequate actionsto ensure all systems meet the provisions of RG1.167." Confirmatory Order" Order/Adequate Protection

10

Page 12: E-mail from M. Khanna, NRR to P. Boyle, NRR; re North Anna ... · North Anna Earthquake Issue Commissioner Briefing MK ppt (3) (2).pptx I V) 'L, I. North Anna Nuclear Power Plant

m The list below provides the plants and theassociated distance from the Epicenter:" North Anna is 18 km from the Epicenter

" Surry is 139 km from the Epicenter

" Calvert Cliffs is 141 km from the Epicenter

m NRR will confirm that the OBE was not exceededat Surry and Calvert Cliffs.

11

Page 13: E-mail from M. Khanna, NRR to P. Boyle, NRR; re North Anna ... · North Anna Earthquake Issue Commissioner Briefing MK ppt (3) (2).pptx I V) 'L, I. North Anna Nuclear Power Plant

* The potential for the occurrence of an earthquakelarger than the recent event is within the scopeof GI-199 Generic Letter.

12