5
Wyndham Grand Chelsea Harbour Hotel Address: Chelsea Harbour Dr, Fulham, London SW10 0XG, UK

e eers - sut.org

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Wyndham Grand Chelsea Harbour Hotel

Address: Chelsea Harbour Dr, Fulham, London SW10 0XG,

UK

ain en erson Senior Electrical Engineer

ecom

le auntt Founder and MD Water to Water

Ewan Brown naly i anager

Oceaneering

ngeli a rohmann rle Team Leader Large Projects Offshore

ennet

Elisabeth Gjølmesli Senior Principal Engineer DNVGL

le ealElectrical Engineer Uniper

Moya Cahill PresidentPanGeo Subsea

rian O ee e Senior Consultant Engineer

oo

e e ers

Dr. Chas Spradbery Manager-Special Projects Petrofac

ul it Singh BD Manager O taSense

Daniele Petrone General Manager Subsea Schlumberger

Participants Companies Including

Media Partners

Conference e essions

ANNUAL GLOBAL FORUM ON SUBSEA POWER CABLES FOR

THE O&G, ENERGY AND RENEWABLE INDUSTRY

L O N D O N ,U N I T E D K I N G D O M

19th - 20th of November 2018

-Reduce O&M costs with SMART Sensing Optics distributed Acoustic-Sensing Technology.-Get Familiar with Ultra Light-weight design cables for optimum performance-Application of 66kv cables for O&G / Energy Markets-Explore Advancements, Trends and Challenges in Subsea Projects (Oil&Gas/Renewables) -Implement Risk-based approach and complete strategies for offshore support Vehicle and Wind projects-Exchange ideas and opinions to advance scientific and technical knowledge for offshore resources and environmental aspects.

John Davies Director - Seabed Intervention Canyon Offshore

Keed de Ruiter Regional Project ManagerVan Oord Offshore Wind Projects

Andrew PageHead Of Energy Intertek Energy & Water

David Brookes DirectorSt Jules(Rtd. BP)

ANNUAL GLOBAL FORUM ON SUBSEA POWER CABLES FOR

THE O&G, ENERGY AND RENEWABLE INDUSTRY

L O N D O N ,U N I T E D K I N G D O M

19th - 20th of November 2018

un h i e

Case tudy

Chair an s pening e ar s

egistration and orning Coffee

Chair an s pening e ar

u sea ro e ts ast and uture Challengesd an ed Ca le esign e hnology and uture ppli ations for nergy

ndustry

n o nnalysis anager

e nee n

pening ddress Case tudy

C Corrosion re ention on u sea o er U ili als

ntegrating po er in su sea u ili als pro es to e an attra ti e solution in

any s enarios here po er for su sea pu ping and pro essing is re uired

he addition of a les ithin the u ili al undle rings ultiple design

hallenges i e higher te perature ele tri al interferen e ethe ris of C orrosion on pipelines is ell no n and do u ented ut

had ne er een o ser ed in su sea u ili als tu es re ent failure in a su sea u ili al has een asso iated ith the C orrosion pheno ena

eaneering has een tas ed y a usto er to assess and itigate this ris in a re ent ro e t his or sho s the pro ess follo ed and the solution e e uted

Case tudy

orning Coffee and et or ing

Case tudy

Case tudy

fternoon ea and et or ing

anel is ussion

u of 1o n e f o the h n n of ne

u ne et o n nne 1 00 - 22 00

Case tudy

Fax: +44 203 0311 467 OPEX GROUP tel. + 44 203 6083 505

n en e on

enior le tri al ngineer rans ission and istri ution nergy

Aecom

he ono i n iron ental and o ial pa t of

rote ting u arine istri ution Ca les

ra e or to anage the o peting e ono i en iron ental and so ial de ands pla ed on otland s natural arine en iron ent C tool to assess the holisti i pa ts of a le prote tion in onetary ter s

ele tion of the est alue prote tion ethod for indi idual a les Case tudy on ottish and outhern le tri ity et or s

e untt Founder and managing Director Water to Water

edu ing ris during the installation of array a les in offshore ind far sessons learnt fro years of a le installationedu ing eather do nti e hile in reasing effi ien y and safety

Overview

Case tudy

Typical challenges in design of a global configurationCritical issues to consider in design of cables and accessoriesAcceptance criteriaQualification of cable system

Design and qualification of Dynamic Power cables

Andrew PageHead Of Energy Intertek Energy & Water

Interteks Experience with Projects (Onshore/Offshore) Example and Best Practices

New trends and innovations towards setting up large windfarm project

Understanding the site survey and complex instalation challenges Survey and Sediment Analysis techniques.Hazard risk assessment – natural and manmade hazards The importance of spatial planning for windfarm layout and cable design. Cable installation techniques – ploughing, jetting and ROV trenching. Conclusion and Future Outlook

Keed de Ruiter Regional Project Manager Van Oord Offshore Wind Projects

Elisabeth Gjølmesli Senior Principal Engineer DNVGL

Seabed Power Systems - Experience sharing between the Oil/Gas and the Renewables Energy sectors

The roles of the operator and contractors in systems design and specificationsComplexity v SimplicityInstallation Techniques and the drive for lower costsGoing deeper – the floating wind challengesIMR for the future

David Brookes Director St Jules (Rtd. BP)

ANNUAL GLOBAL FORUM ON SUBSEA POWER CABLES FOR L O N D O N , U N I T E D K I N D O M

egistration and orning Coffee

Case tudy

Case tudy

pening ddress

Chair an s pening e ar s

atest esear h and e elop ent in us ea o er yste s

orning Coffee and et or ing

ra ti al Case tudies u sea o er Ca les ro nstallation to aintenan e and epair

u t n husiness e elop ent anager

t en e

John DaviesDirector Seabed Intervention,

Canyon Offshore

edu ing ost ith nline ntegrated ensing using i re pti s istri uted ousti ensing e hnology

Trenching Subsea Power Cables - Bringing years of R&D expertise

d an ed ngineering for Ca le rote tion

Case tudy

enne perien e ith ational and ransnational

rid Conne tions

Who is Canyon OffshoreWhat have we done in cables in and outside O&GWhat are the seabed conditions that are encounteredWhat equipment is there to burial cablesWho sets and how do you achieve the DOB requiredWhat happens if you don’t

his session is an open dis ussion here delegates ill e di ided into groups ea h group ill in lude representati es fro o eCo panies Cs ser i e pro iders and the su it s spea ers and

ill get to e hange their thoughts dis uss and as uestions in regards as on lusion of the onferen e and e t teps

Case tudy

Case tudy

fternoon ea and et or ing

pen roup is ussion

Closing e ar s fro the Chair and nd of ay o

19th - 20th of November 2018

un h e

offee n et o n

Fax: +44 203 0311 467 OPEX GROUP tel. + 44 203 6083 505

he uropean ar et e ti ese hni al e iure entsulti ultural pro e t and per it anage ent

ddressing offshore hallenges hort ir uit dete tion and lo alisation n hor drags uried and un uried Ca le onitoring a e height onitoring using e hnology

enefiting operators and the opportunity for ost sa ings y edu ing the ost plus insuran e further pro ing the lifeti e of operation

Case tudy

u of 2

Mitigate risk in offshore installations using Acoustic Technology

n eeffe enior Consultant ngineer oo

Power Cable Challenges & Solutions

Exposing Power Cable to Dynamic Environments Whats are the Design Challenges involved?Proposed Solutions Best Practices.

h e anager pe ial pro e ts

et of

perations anage ent of u sea Ca les Using i er

pti e hnologies

he opti al a elength has any features that an pro ide i portant operating status infor ation

esigning the easure ent to apture the pheno enaata supports ontinuous and instant dyna i e ent dete tion and asset

status hangea age identifi ation a ility assists ith effi ient fault lo ation and repair

pro eduresn e e et one

eneral anager u sea ne u e

er itting ra e ore hni al Conse uen es olutions

onitoring and aintenan e e uire ents

n e oh nn- eea anager arge ro e ts/Licensing ffshore enne

THE O&G, ENERGY AND RENEWABLE INDUSTRY

How to improve poroject efficiency -Importance of identifying geohazards in the seabed De-risking offshore foundation installationUsing HD stratigraphic imaging and mapping as a toolfor Cable setup-layout

Moya CahillPresidentPan Geo Subsea

REGISTRATION DETAILSPLEASE COMPLETE THE FORM USING BLOCK CAPITAL

LETTERS AND FAX BACK TO +44 203 031 1467

pleasecompleteaseparateregistrationFormforeachdelegate.youcanmakephotocopiesofthisformifnecessary.

DELEGATE DETAILS

Fullname:..............................................................................

jobtitle:.................................................................................

company:...............................................................................

directtel.:...............................................................................

Mobile:....................................................................................

Fax:.........................................................................................

email:......................................................................................

signature&date:...................................................................

COMPANY DETAILS

Address: .......................................................................................................

City: .........................................................Post Code: ..................................

Country: .......................................................................................................

VAT Reg. Number: .......................................................................................

CONFIRMATIONonceaconferencespacehasbeenallocatedtoyou,wewillwritetoconfirmthedateandreceiptofyourpayment.

date& signature:............................................

ACCommodATIoNhotel accommodatIon and travel expenses are not Included In the regIstratIon fee.

OPEX GROUP

Fax: +44 203 0311 467 OPEX GROUP tel. + 44 203 6083 505

Full PACK   1995  £  

2  Days  of  conference  On Demand ( unlimited access to conference HD full recorded video )   Documentation  (access  to  all  the  conference  presentations  )  

STANDARD  PACK     1795 £  

2  Days  of  conference    Online  Documentation  (access  to  all  the  conference  presentations only PDF  )  

Online  

Documentation   599 £  Access  to  all  the  conference  presentations  with  recorded  questions  and  answers  during  the  panel  discussion  )  

Conference Fee

ANNUAL GLOBAL FORUM ON SUBSEA POWER CABLES FOR L O N D O N , U N I T E D K I N G D O M

19th - 20th of Nov 2018THE O&G, ENERGY AND RENEWABLE INDUSTRY

TERMS & CONDITIONS

PAYMENT:

Fees are inclusive of program materials and refreshments. Payment prior to conference is mandatory for attendance.

Your registration will not be confirmed until payment is received and may be subject to cancellation.Following completion and return of the registration form, full pay-ment is required within

5 days from receipt of invoice.PLEASE NOTE: payment must be received prior to the conference date. A receipt will be issued on payment.Due to limited conference space, we advise early registration to avoid disappointment. We reserve the right to refuse admission if payment is not received on time.

CANCELLATION, POSTPONEMENT AND SUBSTITUTION POLICY:

You may substitute delegates at any time by providing reasonable advance notice to OPEX Group

For any cancellations received in writing not less than eight (8) days prior to the conference, you will receive a 90% credit to be used at another OPEX Group conference which must occur within one year from the date of issuance of such credit. An administration fee of 10%of the contract fee will be retained by OPEX Group for all permitted cancellations. No credit will be issued for any cancellations occurring within seven (7) days (inclusive) of the conference.

In the event that OPEX Group cancels an event for any reason, you will receive a credit for 100% of the contract fee paid. You may use thiscredit for another OPEX Group event to be mutually agreed with OPEX Group , which must occur within one year from the date of cancellation.

In the event that OPEX Group postpones an event for any reason and the delegate is unable or unwilling to attend on the rescheduled date, you will receive a credit for 100% of the contract fee paid. You may use this credit for another OPEX Group event to be mutually agreed with OPEX Group , which must occur within one year from the date of postponement.

Except as specified above, no credits will be issued for cancellations. There are no refunds given under any circumstances.

OPEX Group is not responsible for any loss or damage as a result of a substitution, alteration or cancellation/postponement of an event. OPEX Group shall assume no liability whatsoever in the event this conference is cancelled, rescheduled or postponed due to a fortuitous event, Act of God, unforeseen occurrence or any other event that renders performance of this conference impracticable, illegal or impossible. For purposes of this clause, a fortuitous event shall include, but not be limited to: war, fire, labour strike, extreme weather or other