COUNCI LAPPROVAL
desi g n
15mingastreetrydensw2112 Alterations
andAdditions
Title Scale Current Issue DateRevisionICOVER SHEET NTS Friday, 6 November 2020
DWG No.
DA-000
DA-001
DA-002
DA-003
DA-004
DA-005
DA-006
DA-007
DA-008
DA-009
DA-010
DA-011
DA-012
DA-013
DA-014
DA-015
DA-016
DA-017
DA-018
DA-019
DA-020
DA-021
DA-022
DA-023
DA-024
DA-025
DA-026
DA-027
DA-028
DA-029
DA-030
DA-031
DA-032
DA-033
DA-034
DA-035
DA-036
DESCRIPTION
COVER SHEET
CURRENT SURVEY PLAN
EXISTING FLOOR PLAN
EXISTING ROOF PLAN
EXISTING ELEVATIONS 1
EXISTING ELEVATIONS 2
DEMOLITION PLAN
DEMOLITION PHOTOS - EXTERNAL
DEMOLITION PHOTOS - INTERNAL WALLS
PROPOSED SITE PLAN
SITE ANALYSIS PLAN
CONCEPT LANDSCAPING PLAN
PROPOSED FOUNDATION PLAN
PROPSOED GROUND FLOOR PLAN
PROPOSED FIRST FLOOR PLAN
PROPOSED CEILING PLAN
PROPOSED ROOF PLAN
EARTHWORKS PLAN
PROPOSED ELEVATIONS 1
PROPOSED ELEVATIONS 2
PROPOSED SECTIONS
3D COMPARISON 1
3D COMPARISON 2
MATERIALS/FINISHES
GLAZING SCHEDULE
SOFT ELEVATIONS
SOFT SECTIONAL VIEW
SHADOW DIAGRAMS (1)
SHADOW DIAGRAMS (2)
SHADOW DIAGRAMS (3)
SHADOW DIAGRAMS (4)
3D IMAGES 1
3D IMAGES 2
3D IMAGES 3
HEIGHT LIMIT ANALYSIS
NEIGHBOURING 2-STOREYS CHARACTER ASSESSMENT
NOTIFICATION PLAN
SCALE
1:1
1:0.98
1:100
1:100
1:100
1:100
1:100
1:100
1:100
1:200
1:200
1:200
1:100
1:100, 1:1.47
1:100, 1:1.38
1:100
1:100, 1:1.19
1:100
1:100
1:100
1:100
1:130.00
1:125
1:133.33
1:1, 1:1.67
1:100
1:50
1:200
1:200
1:200
1:200
1:150
1:200
1:200
1:250
1:400, 1:200, 1:...
PLOT
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
420 / 297
297 / 210
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
1:200
NOT TO SCALE
VARIOUS
NOT TO SCALE
NOT TO SCALE
1:100
1:100
1:100
separatesheets
separatesheet
separatesheet
C O U N C I L A
PP
RO
VAL
de
si
g
n
C O U N C I L A
PP
RO
VAL
de
si
g
n
N
p: 1300 008138e: [email protected]: www.councilapprovaldesign.com.au
ABN 89 104 442 337Bradax Pty Ltd
Nominated Architect: Giuseppe Calabrese 8079
Client:
Peter Brennan
Project:
Alterations and Additions
15 Minga Street Ryde NSW 2112
Figured dimensions take precedence over scaledimensions. Contractors must verify all dimensions on sitebefore commencing any work or making shop drawings.
Town Planner:
Drawn By:
Checked By:
Revision:
Scale:
Drawing Name:
Drawing Number:
JH
JA
GC
1:200 @ A3
PROPOSED SITE PLAN
I
DA-009
Rev Description Drft Issued
B Client's Changes JA 23/09/19
C Client's Changes_2 JA 03/10/19
D DA Plans JA 13/10/19
E BASIX Commitments JA 16/10/19
F Glazing + Site Analysis JA 11/11/19
G Resubmission JA 07/04/20
H Client's Changes on RFI 1 JA 19/09/20
Client's Changes on RFI 2 JA 06/11/20I
69.26 m2
103.86 m2
26.61 m2
27.17 m
2
1,75
0
1,809
3,738
1,673
12,863
905
1,43
6
22.98 m2
CENTRELINEOF BITUMEN
TOP
KERB
CONCRETEPATH
CONC.CROSSING
TIM
BER
RET
WAL
L
ARC 4.58
10.3
6513
0° 5
8'
32.57
192°34'20''
EASEMENT
TELSTRA
WATER
9.14
513
0°58
'
33.22540°58'10''
34.745130°58'
CO
NC
RET
E
DR
IVEW
AY
BRICKCARPORT
TILED ROOFF.F.L.43.30
SHED
#15 BRICK DWELLING
TILED ROOF
F.F.L. = 44.45
PERG.
#17 BRICKDWELLING
TILED ROOF
SANDSTONE
RET.
WALL
BRIC
KR
ET . WALL
BRICK RET.WALL
BRICK RET. WALL
CONC. FENCE
CO
NC
. F
ENC
E
LOT 28643.2m2 DEED
TIMBER
RETAINING
WATERCOURSE
WALLS
GRATE DRAIN
SEWER
SEWER
SEWER
EXTE
NSION O
F SITE
COVER
AGE
EXIST.
EXIST.
M I N G A S T R E E T
setb
ack
setback
setback
setback
setback
PROPO
SED PA
TIO setback
setb
ack
SITE COVERAGE SITE AREA
GARAGE EXIST. FOOTPRINT
643.20 m2
31.05% of the site area
26.61 m2
DWELLING EXIST. FOOTPRINT
GARAGE EXTENSIONS (DELETED)
DWELLING EXTENSIONS
103.86 m2
69.26 m2
TOTAL 199.73 m2
NEW G
ARDEN
BED
C O U N C I L A
PP
RO
VAL
de
si
g
n
C O U N C I L A
PP
RO
VAL
de
si
g
n
N
p: 1300 008138e: [email protected]: www.councilapprovaldesign.com.au
ABN 89 104 442 337Bradax Pty Ltd
Nominated Architect: Giuseppe Calabrese 8079
Client:
Peter Brennan
Project:
Alterations and Additions
15 Minga Street Ryde NSW 2112
Figured dimensions take precedence over scaledimensions. Contractors must verify all dimensions on sitebefore commencing any work or making shop drawings.
Town Planner:
Drawn By:
Checked By:
Revision:
Scale:
Drawing Name:
Drawing Number:
JH
JA
GC
1:200 @ A3
CONCEPT LANDSCAPING PLAN
I
DA-011
Rev Description Drft Issued
B Client's Changes JA 23/09/19
C Client's Changes_2 JA 03/10/19
D DA Plans JA 13/10/19
E BASIX Commitments JA 16/10/19
F Glazing + Site Analysis JA 11/11/19
G Resubmission JA 07/04/20
H Client's Changes on RFI 1 JA 19/09/20
Client's Changes on RFI 2 JA 06/11/20I
CENTRELINEOF BITUMEN
TOP
KERB
CONCRETEPATH
CONC.CROSSING
TIM
BER
RET
WAL
L
ARC 4.58
10.3
6513
0° 5
8'
32.57
192°34'20''
EASEMENT
TELSTRA
WATER
9.14
513
0°58
'
33.22540°58'10''
34.745130°58'
CO
NC
RET
E
DR
IVEW
AY
BRICKCARPORT
TILED ROOFF.F.L.43.30
SHED
#15 BRICK DWELLING
TILED ROOF
F.F.L. = 44.45
PERG.
#17 BRICKDWELLING
TILED ROOF
SANDSTONE
RET.
WALL
BRIC
KR
ET . WALL
BRICK RET.WALL
BRICK RET. WALL
CONC. FENCE
CO
NC
. F
ENC
E
LOT 28643.2m2 DEED
TIMBER
RETAINING
WATERCOURSE
WALLS
GRATE DRAIN
SEWER
SEWER
SEWER
M I N G A S T R E E T
prop
osed
patio
propo
sed ex
tensio
ns
SURFACES SITE AREA
FEATURE GARDENS
643.20 m2
65.56 m2
NATURAL DEEP SOIL AREA
CONCRETE
BLOCK PAVING
120.66 m2
57.98 m2
163.62 m2
10.19 %
18.76 %
11.36 %
25.43 %
remain
der of e
xistin
g paving
new gard
en bed
new garden bed
CO
UN
CI L A P P R O V
AL
d e s i g
n
CO
UN
CI L A P P R O V
AL
d e s i g
n
NTo
wn
Plan
ner:
Dra
wn
By:
Che
cked
By:
Revi
sion
:
Scal
e:
Dra
win
g N
ame:
Dra
win
g N
umbe
r:JH JA GC
1:10
0 @
A3
EARTH
WO
RKS
PLA
N
I
DA
-017
Clie
nt:
Pet
er B
rennan
Proj
ect:
Alter
atio
ns
and A
dditio
ns
15 M
inga
Str
eet
Ryde
NSW
211
2
Figu
red
dim
ensi
ons
take
pre
cede
nce
over
sca
ledi
men
sion
s. C
ontr
acto
rs m
ust
verif
y al
l dim
ensi
ons
on s
itebe
fore
com
men
cing
any
wor
k or
mak
ing
shop
dra
win
gs.
p: 1
300
0081
38e:
info
@co
unci
lapp
rova
ldes
ign.
com
.au
w: w
ww
.cou
ncila
ppro
vald
esig
n.co
m.a
uA
BN 8
9 10
4 44
2 33
7Br
adax
Pty
Ltd
Nom
inat
ed A
rchitec
t: G
iuse
ppe
Cal
abre
se 8
079
Rev
Des
crip
tion
Drf
tIs
sued
BC
lient
's C
hang
esJA
23/0
9/19
CC
lient
's C
hang
es_2
JA03
/10/
19
DD
A P
lans
JA13
/10/
19
EBA
SIX
Com
mitm
ents
JA16
/10/
19
FG
lazi
ng +
Site
Ana
lysi
sJA
11/1
1/19
GRe
subm
issi
onJA
07/0
4/20
HC
lient
's C
hang
es o
n RF
I 1JA
19/0
9/20
Clie
nt's
Cha
nges
on
RFI 2
JA06
/11/
20I
43.8
2
43.2
843
.29
43.2
8
43.10
43.10
P.O
.S 1
P.O
.S 2
gaze
bo/
bbq
gar
age
stora
ge
shed
wate
rcours
e
livin
gdi
ning
fam
ily
kitche
n
butle
rs
pant
ry
laun
dry
wc
vera
ndah
car parking 1 car parking 2
new
dee
p s
oil
area
entry
new cov
ered
pat
io
42.30
42.51
42.42
43.32
42.19
40.66
42.01
41.96
43.88
43.8843.32
43.57 43.90
43.30
new g
arde
n be
d
new g
arde
n be
d43
.23
43.31
43.17
43.18
43.31
43.20
42.91
42.93
42.42
42.37
38.95
41.32
43.51
42.25
42.25
42.25
42.16
43.81
43.11
43.80
42.20
gard
en b
ed #
1
(par
t B)
gard
en b
ed #
1
(par
t A)
gard
en b
ed #
2
(par
t A)
garden
bed #2 (
part B)
natu
ral g
roun
d lev
el
(par
t A)
natu
ral g
roun
d lev
el
(par
t B)
exist
ing ex
tent
of d
welling
thick
das
hed
cut e
xist
ing
pavi
ngto
allo
w s
pace
for
new
sta
irs
prev
ious
tim
ber
step
s +
land
ing
adde
d vo
lum
e to
leve
l gar
age
from
outs
ide
adde
d vo
lume f
or
stairs
cons
tructi
on
gard
en b
ed #
3 new g
arde
n
area
XX.X
X
XX.XX
XX.XX
EXIS
TIN
G L
EVEL
REM
AIN
ED
NEW
/PRO
POSE
D L
EVEL
EXIS
TIN
G L
EVEL
TH
AT IS
MO
DIF
IED
FILL
(TO
EN
GIN
EERS
DET
AIL)
CUT
AND
EXC
AVAT
ION
RETA
ININ
G W
ALLS
LEG
END
READ
APT/
REC
YCLE
EXIS
TIN
G G
ARD
EN S
OIL
RE-U
SED
EXIS
TIN
G G
ARD
EN S
OIL
SCH
EDU
LE O
F CU
T A
ND
FIL
L
Gar
den
Bed
1 (A
)
Gar
den
Bed
2 (A
)
Gar
den
Bed
3
EART
HW
ORK
S
Cut
AREA
MAX
. HEI
GH
TVO
LUM
E
NG
L fro
nt (A
)
Tim
ber S
teps
Rear
of G
arag
e
New
Ste
ps
Fron
t of G
arag
e
Cut
Cut
Fill
Fill
0.54
2 m
3
1.973
m3
0.35
4 m
3
2.11
m3
1.04
m3
0.12
0 m
0.48
0 m
0.42
3 m
0.89
2 m
0.03
2 m
Gar
den
Bed
1 (B
)
Gar
den
Bed
2 (B
)
NG
L fro
nt (B
)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
C O U N C I L A
PP
RO
VAL
de
si
g
n
C O U N C I L A
PP
RO
VAL
de
si
g
n
N
p: 1300 008138e: [email protected]: www.councilapprovaldesign.com.au
ABN 89 104 442 337Bradax Pty Ltd
Nominated Architect: Giuseppe Calabrese 8079
Client:
Peter Brennan
Project:
Alterations and Additions
15 Minga Street Ryde NSW 2112
Figured dimensions take precedence over scaledimensions. Contractors must verify all dimensions on sitebefore commencing any work or making shop drawings.
Town Planner:
Drawn By:
Checked By:
Revision:
Scale:
Drawing Name:
Drawing Number:
JH
JA
GC
1:100 @ A3
PROPOSED ELEVATIONS 1
I
DA-018
Rev Description Drft Issued
B Client's Changes JA 23/09/19
C Client's Changes_2 JA 03/10/19
D DA Plans JA 13/10/19
E BASIX Commitments JA 16/10/19
F Glazing + Site Analysis JA 11/11/19
G Resubmission JA 07/04/20
H Client's Changes on RFI 1 JA 19/09/20
Client's Changes on RFI 2 JA 06/11/20I
G.F.L. 44.450
G.C.L. 47.100
U.F.L. 47.350
APEX 51.710
U. LOWEST PT. 49.750
B.C.L. 44.300
B.F.L. 42.280
2,02
015
02,
650
250
2,40
01,
960
1,00
0
#17 minga street#4 burke street
9.5m max height limit on the foreground
G.F.L. 44.450
G.C.L. 47.100
U.F.L. 47.350
APEX 51.710
U. LOWEST PT. 49.750
B.C.L. 44.300
B.F.L. 42.280
2,02
015
02,
650
250
2,40
01,
960
#4 burke street
9.5m max height limit on the foreground
WEST ELEVATION
NORTH ELEVATION
selected timber cladding
feature fibre cement cladding
new garden beds
heater flue 1m higher thanridge of #17minga st.
timber framed glazing
colorbond roof (evening haze)
photovoltaic solar panels
feature fibre cement cladding
skylights
outline of previous retaining wallsoutline of previous shed
outline of previousretaining walls
colorbond roof (evening haze)
feature fibrecement cladding
awning windows
new garden beds
C O U N C I L A
PP
RO
VAL
de
si
g
n
C O U N C I L A
PP
RO
VAL
de
si
g
n
N
p: 1300 008138e: [email protected]: www.councilapprovaldesign.com.au
ABN 89 104 442 337Bradax Pty Ltd
Nominated Architect: Giuseppe Calabrese 8079
Client:
Peter Brennan
Project:
Alterations and Additions
15 Minga Street Ryde NSW 2112
Figured dimensions take precedence over scaledimensions. Contractors must verify all dimensions on sitebefore commencing any work or making shop drawings.
Town Planner:
Drawn By:
Checked By:
Revision:
Scale:
Drawing Name:
Drawing Number:
JH
JA
GC
1:100 @ A3
PROPOSED ELEVATIONS 2
I
DA-019
Rev Description Drft Issued
B Client's Changes JA 23/09/19
C Client's Changes_2 JA 03/10/19
D DA Plans JA 13/10/19
E BASIX Commitments JA 16/10/19
F Glazing + Site Analysis JA 11/11/19
G Resubmission JA 07/04/20
H Client's Changes on RFI 1 JA 19/09/20
Client's Changes on RFI 2 JA 06/11/20I
G.F.L. 44.450
G.C.L. 47.100
U.F.L. 47.350
APEX 51.710
U. LOWEST PT. 49.750
B.C.L. 44.300
B.F.L. 42.280
2,02
015
02,
650
250
2,40
01,
960
#17
min
ga
stre
et
9.5m max height limit on the foreground
G.F.L. 44.450
G.C.L. 47.100
U.F.L. 47.350
APEX 51.706
U. LOWEST PT. 49.750
B.C.L. 44.300
B.F.L. 42.280
2,02
015
02,
650
250
2,40
01,
956
1,00
0
#17 minga street
#4 burkestreet
9.5m max height limit on the foreground
SOUTH ELEVATION
EAST ELEVATION
selected timber cladding
feature fibre cement cladding
feature fibre cement cladding
rendered blockwork
outline of previousretaining walls
colorbond roof (evening haze)
frosted window to stairwell
outdoor roofing
selected infill
heater flue 1m higher thanridge of #17minga st.
C O U N C I L A
PP
RO
VAL
de
si
g
n
C O U N C I L A
PP
RO
VAL
de
si
g
n
N
p: 1300 008138e: [email protected]: www.councilapprovaldesign.com.au
ABN 89 104 442 337Bradax Pty Ltd
Nominated Architect: Giuseppe Calabrese 8079
Client:
Peter Brennan
Project:
Alterations and Additions
15 Minga Street Ryde NSW 2112
Figured dimensions take precedence over scaledimensions. Contractors must verify all dimensions on sitebefore commencing any work or making shop drawings.
Town Planner:
Drawn By:
Checked By:
Revision:
Scale:
Drawing Name:
Drawing Number:
JH
JA
GC
1:100 @ A3
PROPOSED SECTIONS
I
DA-020
Rev Description Drft Issued
B Client's Changes JA 23/09/19
C Client's Changes_2 JA 03/10/19
D DA Plans JA 13/10/19
E BASIX Commitments JA 16/10/19
F Glazing + Site Analysis JA 11/11/19
G Resubmission JA 07/04/20
H Client's Changes on RFI 1 JA 19/09/20
Client's Changes on RFI 2 JA 06/11/20I
G.F.L. 44.450
G.C.L. 47.100
U.F.L. 47.350
APEX 51.710
U. LOWEST PT. 49.750
B.C.L. 44.300
B.F.L. 42.280
2,02
015
02,
650
250
2,40
01,
960
9.5m max height limit on the cutting plane section
VOID
dining(living beyond)
wc
hallwaybed 4
boun
dary
line
on
the
cutt
ing
plan
e se
ctio
n
boun
dary
line
on
the
cutt
ing
plan
e se
ctio
n
G.F.L. 44.450
G.C.L. 47.100
U.F.L. 47.350
APEX 51.710
U. LOWEST PT. 49.750
B.C.L. 44.300
B.F.L. 42.280
2,02
015
02,
650
250
2,40
01,
960
9.5m max height limit on the cutting plane section
family dining kitchen
bed 2bed 3bed 1
boun
dary
line
on
the
cutt
ing
plan
e se
ctio
n
existing garden beds remainder
VOID
SECTION 02
SECTION 01
outline of previous dwelling
outline of previous dwelling's roof ridge
outline of previous dwelling's roof ridge
C O U N C I L A
PP
RO
VAL
de
si
g
n
C O U N C I L A
PP
RO
VAL
de
si
g
n
NTown Planner:
Drawn By:
Checked By:
Revision:
Scale:
Drawing Name:
Drawing Number:
JH
JA
GC
1:1, 1:1.67 @A3
GLAZING SCHEDULE
I
DA-024
Client:
Peter Brennan
Project:
Alterations and Additions
15 Minga Street Ryde NSW 2112
Figured dimensions take precedence over scaledimensions. Contractors must verify all dimensions on sitebefore commencing any work or making shop drawings.
p: 1300 008138e: [email protected]: www.councilapprovaldesign.com.au
ABN 89 104 442 337Bradax Pty Ltd
Nominated Architect: Giuseppe Calabrese 8079Rev Description Drft Issued
B Client's Changes JA 23/09/19
C Client's Changes_2 JA 03/10/19
D DA Plans JA 13/10/19
E BASIX Commitments JA 16/10/19
F Glazing + Site Analysis JA 11/11/19
G Resubmission JA 07/04/20
H Client's Changes on RFI 1 JA 19/09/20
Client's Changes on RFI 2 JA 06/11/20I
ID W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-07A W-08 W-09Height 1,000 600 1,500 1,500 1,500 1,500 2,100 2,100 2,100 450Width 800 4,000 1,200 1,200 1,200 1,200 1,000 1,000 1,000 2,000
3D Front View
Area 0.80 2.40 1.80 1.80 1.80 1.80 2.10 2.10 2.10 0.90
New Windows List
W-10 W-11 W-12 W-13 W-14 W-15 W-16 W-17 W-18 W-19 W-20450 1,200 1,200 450 900 900 450 1,200 1,200 450 450
2,000 1,200 1,200 2,000 900 900 2,000 1,800 1,800 1,740 1,740
0.90 1.44 1.44 0.90 0.81 0.81 0.90 2.16 2.16 0.78 0.78
New Windows List
W-21 W-22 W-23450 450 5171,740 2,000 6,413
0.78 0.90 3.31
New Windows ListID D-01 D-02 D-03
Height 2,100 2,100 2,100Width 3,600 800 3,600
3D Front View
Area 7.56 1.68 7.56
Glazing requirements Show onDA Plans
Show onCC/CDCPlans &specs
CertifierCheck
Windows and glazed doors
The applicant must install the windows, glazed doors and shading devices, in accordance with the specifications listed in the table below.Relevant overshadowing specifications must be satisfied for each window and glazed door.
The following requirements must also be satisfied in relation to each window and glazed door:
Each window or glazed door with standard aluminium or timber frames and single clear or toned glass may either match the description, or,have a U-value and a Solar Heat Gain Coefficient (SHGC) no greater than that listed in the table below. Total system U-values and SHGCsmust be calculated in accordance with National Fenestration Rating Council (NFRC) conditions.
For projections described in millimetres, the leading edge of each eave, pergola, verandah, balcony or awning must be no more than 500 mmabove the head of the window or glazed door and no more than 2400 mm above the sill.
For projections described as a ratio, the ratio of the projection from the wall to the height above the window or glazed door sill must be atleast that shown in the table below.
Pergolas with polycarbonate roof or similar translucent material must have a shading coefficient of less than 0.35.
External louvres and blinds must fully shade the window or glazed door beside which they are situated when fully drawn or closed.
Pergolas with fixed battens must have battens parallel to the window or glazed door above which they are situated, unless the pergola alsoshades a perpendicular window. The spacing between battens must not be more than 50 mm.
Overshadowing buildings or vegetation must be of the height and distance from the centre and the base of the window and glazed door, asspecified in the 'overshadowing' column in the table below.
Windows and glazed doors glazing requirementsWindow / doorno.
Orientation Area ofglassinc.frame(m2)
Overshadowing Shading device Frame and glass type
Height(m)
Distance(m)
W1 E 0.8 1.3 2.9 external louvre/blind (adjustable) standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W2 S 2.4 0.65 12.47 none standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
BASIX Certificate number: A374289 page 4 / 8
Planning, Industry & Environment Building Sustainability Index www.basix.nsw.gov.au
Glazing requirements Show onDA Plans
Show onCC/CDCPlans &specs
CertifierCheck
Window / doorno.
Orientation Area ofglassinc.frame(m2)
Overshadowing Shading device Frame and glass type
Height(m)
Distance(m)
W3 W 2.52 5 3.8 external louvre/blind (adjustable) standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W4 W 2.52 5 3.8 external louvre/blind (adjustable) standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W5 W 2.52 5 3.8 external louvre/blind (adjustable) standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W6 W 2.52 5 3.8 external louvre/blind (adjustable) standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W7 W 2.1 0 0 eave/verandah/pergola/balcony>=900 mm
timber or uPVC, single clear, (or U-value:5.71, SHGC: 0.66)
W8 W 2.1 0 0 eave/verandah/pergola/balcony>=900 mm
timber or uPVC, single clear, (or U-value:5.71, SHGC: 0.66)
D1 E 7.56 2.54 4.25 awning (fixed) >=900 mm timber or uPVC, single clear, (or U-value:5.71, SHGC: 0.66)
D2 E 1.68 2.54 4.65 awning (fixed) >=900 mm timber or uPVC, single clear, (or U-value:5.71, SHGC: 0.66)
W9 E 0.9 0 0 external louvre/blind (adjustable) standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W10 E 0.9 0 0 external louvre/blind (adjustable) standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W11 E 1.44 0 0 external louvre/blind (adjustable) standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W12 E 1.44 0.58 7.9 external louvre/blind (adjustable) standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W13 S 0.9 0 0 projection/height above sill ratio>=0.43
standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
BASIX Certificate number: A374289 page 5 / 8
Planning, Industry & Environment Building Sustainability Index www.basix.nsw.gov.au
Glazing requirements Show onDA Plans
Show onCC/CDCPlans &specs
CertifierCheck
Window / doorno.
Orientation Area ofglassinc.frame(m2)
Overshadowing Shading device Frame and glass type
Height(m)
Distance(m)
W14 S 0.81 0 0 eave/verandah/pergola/balcony>=450 mm
standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W15 S 0.81 0 0 eave/verandah/pergola/balcony>=450 mm
standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W16 S 0.9 0 0 projection/height above sill ratio>=0.43
standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W17 W 3.24 2.5 3.8 external louvre/blind (adjustable) standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W18 W 3.24 2.5 3.8 external louvre/blind (adjustable) standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
D3 W 7.56 1 2.09 eave/verandah/pergola/balcony>=900 mm
timber or uPVC, single clear, (or U-value:5.71, SHGC: 0.66)
W22 N 0.9 0 0 projection/height above sill ratio>=0.36
standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W23 S 3.31 0 0 projection/height above sill ratio>=0.43
timber or uPVC, single clear, (or U-value:5.71, SHGC: 0.66)
W7A W 2.1 0 0 eave/verandah/pergola/balcony>=900 mm
timber or uPVC, single clear, (or U-value:5.71, SHGC: 0.66)
Skylights
The applicant must install the skylights in accordance with the specifications listed in the table below.
The following requirements must also be satisfied in relation to each skylight:
Each skylight may either match the description, or, have a U-value and a Solar Heat Gain Coefficient (SHGC) no greater than that listed inthe table below.
BASIX Certificate number: A374289 page 6 / 8
Planning, Industry & Environment Building Sustainability Index www.basix.nsw.gov.au
Glazing requirements Show onDA Plans
Show onCC/CDCPlans &specs
CertifierCheck
Window / doorno.
Orientation Area ofglassinc.frame(m2)
Overshadowing Shading device Frame and glass type
Height(m)
Distance(m)
W3 W 2.52 5 3.8 external louvre/blind (adjustable) standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W4 W 2.52 5 3.8 external louvre/blind (adjustable) standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W5 W 2.52 5 3.8 external louvre/blind (adjustable) standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W6 W 2.52 5 3.8 external louvre/blind (adjustable) standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W7 W 2.1 0 0 eave/verandah/pergola/balcony>=900 mm
timber or uPVC, single clear, (or U-value:5.71, SHGC: 0.66)
W8 W 2.1 0 0 eave/verandah/pergola/balcony>=900 mm
timber or uPVC, single clear, (or U-value:5.71, SHGC: 0.66)
D1 E 7.56 2.54 4.25 awning (fixed) >=900 mm timber or uPVC, single clear, (or U-value:5.71, SHGC: 0.66)
D2 E 1.68 2.54 4.65 awning (fixed) >=900 mm timber or uPVC, single clear, (or U-value:5.71, SHGC: 0.66)
W9 E 0.9 0 0 external louvre/blind (adjustable) standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W10 E 0.9 0 0 external louvre/blind (adjustable) standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W11 E 1.44 0 0 external louvre/blind (adjustable) standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W12 E 1.44 0.58 7.9 external louvre/blind (adjustable) standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
W13 S 0.9 0 0 projection/height above sill ratio>=0.43
standard aluminium, single clear, (orU-value: 7.63, SHGC: 0.75)
BASIX Certificate number: A374289 page 5 / 8
Planning, Industry & Environment Building Sustainability Index www.basix.nsw.gov.au
CO
UN
CI L A P P R O V
AL
d e s i g
n
CO
UN
CI L A P P R O V
AL
d e s i g
n
NTo
wn
Plan
ner:
Dra
wn
By:
Che
cked
By:
Revi
sion
:
Scal
e:
Dra
win
g N
ame:
Dra
win
g N
umbe
r:JH JA GC
1:10
0 @
A3
PRO
PO
SED
FO
UN
DA
TIO
N P
LAN
I
DA
-012
Clie
nt:
Pet
er B
rennan
Proj
ect:
Alter
atio
ns
and A
dditio
ns
15 M
inga
Str
eet
Ryde
NSW
211
2
Figu
red
dim
ensi
ons
take
pre
cede
nce
over
sca
ledi
men
sion
s. C
ontr
acto
rs m
ust
verif
y al
l dim
ensi
ons
on s
itebe
fore
com
men
cing
any
wor
k or
mak
ing
shop
dra
win
gs.
p: 1
300
0081
38e:
info
@co
unci
lapp
rova
ldes
ign.
com
.au
w: w
ww
.cou
ncila
ppro
vald
esig
n.co
m.a
uA
BN 8
9 10
4 44
2 33
7Br
adax
Pty
Ltd
Nom
inat
ed A
rchitec
t: G
iuse
ppe
Cal
abre
se 8
079
Rev
Des
crip
tion
Drf
tIs
sued
BC
lient
's C
hang
esJA
23/0
9/19
CC
lient
's C
hang
es_2
JA03
/10/
19
DD
A P
lans
JA13
/10/
19
EBA
SIX
Com
mitm
ents
JA16
/10/
19
FG
lazi
ng +
Site
Ana
lysi
sJA
11/1
1/19
GRe
subm
issi
onJA
07/0
4/20
HC
lient
's C
hang
es o
n RF
I 1JA
19/0
9/20
Clie
nt's
Cha
nges
on
RFI 2
JA06
/11/
20I
63.4
2 m2
5,162
2,601
3,480
13,5
01
250
4,709
sign
ifica
nt t
ree
stum
pssh
own
gree
n ci
rcle
s
sign
ifica
nt t
ree
stum
pssh
own
gree
n ci
rcle
s
cleara
nce to
exist.
trunk
cleara
nce to
exist.
trunk
outli
ne o
f exi
stin
g ga
rage
outli
ne o
fex
istin
g sh
ed
outli
ne o
f exis
ting
hous
e fo
otin
gs
outli
ne o
f P.O
.S. 1
outli
ne o
fga
zebo
outli
ne o
f P.O
.S. 2
outli
ne o
f ret
aini
ng w
alls
exist
ing
hous
e su
bflo
or w
alls
heat
er fl
ue a
bove
rem
ainde
r of
reta
inin
g wall
s
rem
ainde
r of
reta
inin
g wall
s
prop
osed
subf
loor
wall
s of e
xten
sion
prop
osed
new
gar
den
bed
prop
osed
new
gar
den
bed
VOID
UNDE
R TI
MBE
R FR
AMED
FLO
OR
S-02
DA-020
S-01
DA-020
CO
UN
CI L A P P R O V
AL
d e s i g
n
CO
UN
CI L A P P R O V
AL
d e s i g
n
NTo
wn
Plan
ner:
Dra
wn
By:
Che
cked
By:
Revi
sion
:
Scal
e:
Dra
win
g N
ame:
Dra
win
g N
umbe
r:JH JA GC
1:10
0, 1
:1.4
7@
A3
PRO
PSO
ED G
RO
UN
D F
LOO
RPLA
N
I
DA
-013
Clie
nt:
Pet
er B
rennan
Proj
ect:
Alter
atio
ns
and A
dditio
ns
15 M
inga
Str
eet
Ryde
NSW
211
2
Figu
red
dim
ensi
ons
take
pre
cede
nce
over
sca
ledi
men
sion
s. C
ontr
acto
rs m
ust
verif
y al
l dim
ensi
ons
on s
itebe
fore
com
men
cing
any
wor
k or
mak
ing
shop
dra
win
gs.
p: 1
300
0081
38e:
info
@co
unci
lapp
rova
ldes
ign.
com
.au
w: w
ww
.cou
ncila
ppro
vald
esig
n.co
m.a
uA
BN 8
9 10
4 44
2 33
7Br
adax
Pty
Ltd
Nom
inat
ed A
rchitec
t: G
iuse
ppe
Cal
abre
se 8
079
Rev
Des
crip
tion
Drf
tIs
sued
BC
lient
's C
hang
esJA
23/0
9/19
CC
lient
's C
hang
es_2
JA03
/10/
19
DD
A P
lans
JA13
/10/
19
EBA
SIX
Com
mitm
ents
JA16
/10/
19
FG
lazi
ng +
Site
Ana
lysi
sJA
11/1
1/19
GRe
subm
issi
onJA
07/0
4/20
HC
lient
's C
hang
es o
n RF
I 1JA
19/0
9/20
Clie
nt's
Cha
nges
on
RFI 2
JA06
/11/
20I
250
3,000
90
9,000
250
250
8,17
1
90
2,50
0
90
2,40
0
250
2,090
250
10,000
250
250
8,18
1
250
4,82
0
250
2,601
3,480
1,80
9
1,750
1,673
3,738
2,435
905
1,436
9,34
0
2,909
+44,450
+44,300
+43,820
+43,323
+44,450
+42,403
142.
60 m
2
184.
70 m
2D-
01
D-02
W-0
1
W-02
W-0
3
W-0
4
W-0
5
W-0
6W
-07
W-0
8
W-0
7A
P.O
.S 1
P.O
.S 2
gaze
bo/
bbq
gar
age
stora
ge
shed
wate
rcours
e
conc
rete
driv
eway
garden bed on timber retaining walls
gard
en b
eds
on li
mes
tone
reta
inin
g w
alls
gard
en b
eds
onm
ason
ry r
etai
ning
wal
ls
garden beds onmasonry retaining
walls
high
mas
onry
fenc
e
high masonry fence
sign
ifica
nt t
ree
stum
pssh
own
gree
n ci
rcle
s
sign
ifica
nt t
ree
stum
pssh
own
gree
n ci
rcle
s
grate drain
UP
UP
UP
livin
gdi
ning
fam
ily
kitche
n
butle
rs
pant
ry
laun
dry
wc
vera
ndah
UP
exte
nt o
f new
tim
ber f
loor
cons
truct
ion
to m
atch
exis
ting
conc
rete
ext
ensio
n to
allow
for f
ootp
ath
exte
nt o
f hou
se to
dem
olish
new wall
cladding to
be insta
lled
(see e
levati
ons)
relo
cate
d ho
t wat
er
tank
und
er la
ndin
g
heat
er fl
umed
to
exte
rnal
air
inte
rnal
floor
spac
e
cleara
nce to
exist.
trunk
cleara
nce to
exist.
trunk
exist
ing
setb
ack
to re
main
exist
ing
setb
ack
to re
main
car parking 1 car parking 2
new
dee
p s
oil
area
entry
setback
timbe
r ret
ainin
g wall
s
timbe
r ret
aini
ng w
alls
island ben
ch
UP
F.S.
R.
GRO
UN
D F
LOO
R
141.
04 m
2
314.
13 m
2
UPP
ER F
LOO
R
OVER
ALL
142.
60 m
2
SITE
ARE
A: 6
41.0
2m2
F.S.
R. =
0.4
4:1
setback
gard
en b
ed o
n m
ason
ry r
etai
ning
wal
ls
setback
case
men
t win
dows
rem
ainde
r of p
aved
foot
path
1m w
idth
new
cla
ddin
g an
d ro
ofco
ver
to g
arag
e an
d sh
ed
new
con
cret
e to
be
inst
alle
dto
exi
stin
g dr
ivew
ay
new
acc
ess
(UP)
new cov
ered
pat
io
setback
setb
ack
exte
nt o
f bas
emen
t und
ernew g
arde
n be
d
new g
arde
n be
d
new g
arde
n
area
S-02
DA-020
S-01
DA-020
Con
stru
ctio
nS
how
onD
AP
lans
Sho
won
CC
/CD
CP
lans
&sp
ecs
Cer
tifie
rC
heck
Insu
latio
nre
quire
men
ts
The
appl
ican
tmus
tcon
stru
ctth
ene
wor
alte
red
cons
truc
tion
(flo
or(s
),w
alls
,and
ceili
ngs/
roof
s)in
acco
rdan
cew
ithth
esp
ecifi
catio
nslis
ted
inth
eta
ble
belo
w,e
xcep
ttha
ta)
addi
tiona
lins
ulat
ion
isno
treq
uire
dw
here
the
area
ofne
wco
nstr
uctio
nis
less
than
2m2,
b)in
sula
tion
spec
ified
isno
treq
uire
dfo
rpa
rts
ofal
tere
dco
nstr
uctio
nw
here
insu
latio
nal
read
yex
ists
.
Con
stru
ctio
nA
dditi
onal
insu
latio
nre
quire
d(R
-val
ue)
Oth
ersp
ecifi
catio
ns
conc
rete
slab
ongr
ound
floor
.ni
l
susp
ende
dflo
orw
ithen
clos
edsu
bflo
or:
conc
rete
(R0.
6).
R0.
70(d
own)
(or
R1.
30in
clud
ing
cons
truc
tion)
floor
abov
eex
istin
gdw
ellin
gor
build
ing.
nil
exte
rnal
wal
l:fr
amed
(wea
ther
boar
d,fib
ro,
met
alcl
ad)
R1.
30(o
rR
1.70
incl
udin
gco
nstr
uctio
n)
rake
dce
iling
,pitc
hed/
skill
ion
roof
:fra
med
ceili
ng:R
2.26
(up)
,roo
f:fo
il/sa
rkin
glig
ht(s
olar
abso
rpta
nce
<0.
475)
BA
SIX
Cer
tific
ate
num
ber:
A37
4289
page
3/8
Pla
nnin
g,In
dust
ry&
Env
ironm
ent
Bui
ldin
gS
usta
inab
ility
Inde
xw
ww
.bas
ix.n
sw.g
ov.a
u
CO
UN
CI L A P P R O V
AL
d e s i g
n
CO
UN
CI L A P P R O V
AL
d e s i g
n
NTo
wn
Plan
ner:
Dra
wn
By:
Che
cked
By:
Revi
sion
:
Scal
e:
Dra
win
g N
ame:
Dra
win
g N
umbe
r:JH JA GC
1:10
0, 1
:1.3
8@
A3
PRO
PO
SED
FIR
ST F
LOO
R P
LAN
I
DA
-014
Clie
nt:
Pet
er B
rennan
Proj
ect:
Alter
atio
ns
and A
dditio
ns
15 M
inga
Str
eet
Ryde
NSW
211
2
Figu
red
dim
ensi
ons
take
pre
cede
nce
over
sca
ledi
men
sion
s. C
ontr
acto
rs m
ust
verif
y al
l dim
ensi
ons
on s
itebe
fore
com
men
cing
any
wor
k or
mak
ing
shop
dra
win
gs.
p: 1
300
0081
38e:
info
@co
unci
lapp
rova
ldes
ign.
com
.au
w: w
ww
.cou
ncila
ppro
vald
esig
n.co
m.a
uA
BN 8
9 10
4 44
2 33
7Br
adax
Pty
Ltd
Nom
inat
ed A
rchitec
t: G
iuse
ppe
Cal
abre
se 8
079
Rev
Des
crip
tion
Drf
tIs
sued
BC
lient
's C
hang
esJA
23/0
9/19
CC
lient
's C
hang
es_2
JA03
/10/
19
DD
A P
lans
JA13
/10/
19
EBA
SIX
Com
mitm
ents
JA16
/10/
19
FG
lazi
ng +
Site
Ana
lysi
sJA
11/1
1/19
GRe
subm
issi
onJA
07/0
4/20
HC
lient
's C
hang
es o
n RF
I 1JA
19/0
9/20
Clie
nt's
Cha
nges
on
RFI 2
JA06
/11/
20I
250
3,910
90
2,005
90
2,005
90
3,900
250
250
3,80
0
90
4,29
1
250
1,000
2,81
0
1,170
1,80
9
1,750
1,673
2,435
3,738
13,75
1
700
9085
058
085
0
905
1,436
141.0
4 m2 W
-12
W-13
W-14
W-15
W-16
W-1
7
W-1
8
D-03
W-22
W-19
W-20
W-21
bed
1
UPwir
ens 1
bed
2
bed
3
ens 2
ens 3
bed
4
ens 4
inte
rnal
floor
spac
ebalcon
y
sam
e se
tbac
k as
grou
nd le
vel
setback
sele
cted
tim
ber r
ailin
gs
heat
er fl
ue e
xter
nally
exte
nt o
f hou
se to
dem
olish
setback
setback
study t
able
study t
able
linen
wc
250
1,631
90
1,000
90
2,78
0
90
2,49
0
90
4,99
0
250
2,090250
3,120
90
2,490
90
4,210
250
S-02
DA-020
S-01
DA-020
W-0
9
W-1
0
W-1
1
stora
ge
shed
gar
age
18.50° fall
34.00° fall
4.00° fall
gaze
bosam
e se
tbac
k as
grou
nd le
vel
skyli
ght
skyli
ght
skyli
ght
skyli
ght
skyli
ght
new
roo
f cov
er(c
olor
bond
roo
f eve
ning
haz
e)
18.50°
fall
18.50°
fall
setb
ack
setback
patio
roof
ing
Fix
ture
san
dsy
stem
sS
how
onD
AP
lans
Sho
won
CC
/CD
CP
lans
&sp
ecs
Cer
tifie
rC
heck
Ligh
ting
The
appl
ican
tmus
tens
ure
am
inim
umof
40%
ofne
wor
alte
red
light
fixtu
res
are
fitte
dw
ithflu
ores
cent
,com
pact
fluor
esce
nt,o
rlig
ht-e
mitt
ing-
diod
e(L
ED
)la
mps
.
Fix
ture
s
The
appl
ican
tmus
tens
ure
new
oral
tere
dsh
ower
head
sha
vea
flow
rate
nogr
eate
rth
an9
litre
spe
rm
inut
eor
a3
star
wat
erra
ting.
The
appl
ican
tmus
tens
ure
new
oral
tere
dto
ilets
have
aflo
wra
teno
grea
ter
than
4lit
res
per
aver
age
flush
ora
min
imum
3st
arw
ater
ratin
g.
The
appl
ican
tmus
tens
ure
new
oral
tere
dta
psha
vea
flow
rate
nogr
eate
rth
an9
litre
spe
rm
inut
eor
min
imum
3st
arw
ater
ratin
g.
BA
SIX
Cer
tific
ate
num
ber:
A37
4289
page
2/8
Pla
nnin
g,In
dust
ry&
Env
ironm
ent
Bui
ldin
gS
usta
inab
ility
Inde
xw
ww
.bas
ix.n
sw.g
ov.a
u
CO
UN
CI L A P P R O V
AL
d e s i g
n
CO
UN
CI L A P P R O V
AL
d e s i g
n
NTo
wn
Plan
ner:
Dra
wn
By:
Che
cked
By:
Revi
sion
:
Scal
e:
Dra
win
g N
ame:
Dra
win
g N
umbe
r:JH JA GC
1:10
0 @
A3
DEM
OLI
TIO
N P
LAN
I
DA
-006
Clie
nt:
Pet
er B
rennan
Proj
ect:
Alter
atio
ns
and A
dditio
ns
15 M
inga
Str
eet
Ryde
NSW
211
2
Figu
red
dim
ensi
ons
take
pre
cede
nce
over
sca
ledi
men
sion
s. C
ontr
acto
rs m
ust
verif
y al
l dim
ensi
ons
on s
itebe
fore
com
men
cing
any
wor
k or
mak
ing
shop
dra
win
gs.
p: 1
300
0081
38e:
info
@co
unci
lapp
rova
ldes
ign.
com
.au
w: w
ww
.cou
ncila
ppro
vald
esig
n.co
m.a
uA
BN 8
9 10
4 44
2 33
7Br
adax
Pty
Ltd
Nom
inat
ed A
rchitec
t: G
iuse
ppe
Cal
abre
se 8
079
Rev
Des
crip
tion
Drf
tIs
sued
BC
lient
's C
hang
esJA
23/0
9/19
CC
lient
's C
hang
es_2
JA03
/10/
19
DD
A P
lans
JA13
/10/
19
EBA
SIX
Com
mitm
ents
JA16
/10/
19
FG
lazi
ng +
Site
Ana
lysi
sJA
11/1
1/19
GRe
subm
issi
onJA
07/0
4/20
HC
lient
's C
hang
es o
n RF
I 1JA
19/0
9/20
Clie
nt's
Cha
nges
on
RFI 2
JA06
/11/
20I
+44,300
+43,820
+43,323
+42,403
93.3
0 m
2
bed
1
bed
2
bed
3
ens
bath
wc
dini
ng
kitche
n
loun
ge ro
omve
rand
ah
P.O
.S 1
P.O
.S 2
laun
dry
gaze
bo/
bbq
stor
age
shed
gar
age
stora
ge
shed
was
te
colle
ctio
n
wate
rcours
e
conc
rete
driv
eway
garden bed on timber retaining walls
garden
bed on lim
estone r
etaining w
alls
gard
en b
ed o
n lim
esto
ne re
taini
ng w
alls
gard
en b
ed o
n lim
esto
ne re
tain
ing
walls
gard
en b
ed o
n lim
esto
ne re
tain
ing
walls
gard
en b
eds
on li
mes
tone
reta
inin
g w
alls
gard
en b
eds
onm
ason
ry r
etai
ning
wal
ls
garden beds onmasonry retaining
walls
high
mas
onry
fenc
e
high masonry fence
sign
ifica
nt t
ree
stum
pssh
own
gree
n ci
rcle
s
sign
ifica
nt t
ree
stum
pssh
own
gree
n ci
rcle
s
grate drain
UP
UP
UP
UP
UP
timbe
r ret
ainin
g wall
s
timbe
r ret
aini
ng w
alls
gard
en b
ed o
n m
ason
ry r
etai
ning
wal
ls
deep
soil a
rea o
n ga
rden
bed
to re
main
show
n
shad
ed
pave
d ar
ea
trim
exis
ting
pavin
g
NO
TE: A
LL R
ED D
ASH
ED L
INES
DEN
OTE
CLE
ARIN
G A
ND
DEM
OLI
TIO
NNOTE: TH
ESE 3 SIDES OF W
ALLS TO REM
AIN
CO
UN
CI L A P P R O V
AL
d e s i g
n
CO
UN
CI L A P P R O V
AL
d e s i g
n
NTo
wn
Plan
ner:
Dra
wn
By:
Che
cked
By:
Revi
sion
:
Scal
e:
Dra
win
g N
ame:
Dra
win
g N
umbe
r:JH JA GC
1:10
0, 1
:1.1
9@
A3
PRO
PO
SED
RO
OF
PLA
NI
DA
-016
Clie
nt:
Pet
er B
rennan
Proj
ect:
Alter
atio
ns
and A
dditio
ns
15 M
inga
Str
eet
Ryde
NSW
211
2
Figu
red
dim
ensi
ons
take
pre
cede
nce
over
sca
ledi
men
sion
s. C
ontr
acto
rs m
ust
verif
y al
l dim
ensi
ons
on s
itebe
fore
com
men
cing
any
wor
k or
mak
ing
shop
dra
win
gs.
p: 1
300
0081
38e:
info
@co
unci
lapp
rova
ldes
ign.
com
.au
w: w
ww
.cou
ncila
ppro
vald
esig
n.co
m.a
uA
BN 8
9 10
4 44
2 33
7Br
adax
Pty
Ltd
Nom
inat
ed A
rchitec
t: G
iuse
ppe
Cal
abre
se 8
079
Rev
Des
crip
tion
Drf
tIs
sued
BC
lient
's C
hang
esJA
23/0
9/19
CC
lient
's C
hang
es_2
JA03
/10/
19
DD
A P
lans
JA13
/10/
19
EBA
SIX
Com
mitm
ents
JA16
/10/
19
FG
lazi
ng +
Site
Ana
lysi
sJA
11/1
1/19
GRe
subm
issi
onJA
07/0
4/20
HC
lient
's C
hang
es o
n RF
I 1JA
19/0
9/20
Clie
nt's
Cha
nges
on
RFI 2
JA06
/11/
20I
1,26
9
1,240
1,309
1,80
9
outli
ne o
f wall
s bel
ow
outli
ne o
f wall
s bel
ow
S-02
DA-020
S-01
DA-020
2,435
3,738
1,750
3,509
S-01
S-02
S-03
S-04
S-05
COLO
RBO
ND RO
OF
(EVE
NING
HAZE)
18.00°
fall
18.50°
fall
8.50
° fall
8.50
fall
photovolta
ic solar
panels
heat
er fl
ue
heig
ht 1m
abo
ve
#17
min
ga st
.
rigde
line
outli
ne o
f exis
ting
gara
ge w
ith sh
ed
outli
ne o
f exis
ting
gaze
bo
setb
ack
to r
oof
setback to
roof
setbackto roof
setback to
wall under
setback to wall u
nder
setbackto wall under
setback to roof
setb
ack
tow
all u
nder
exte
nt o
f new
gara
ge ro
of
Gla
zing
requ
irem
ents
Sho
won
DA
Pla
nsS
how
onC
C/C
DC
Pla
ns&
spec
s
Cer
tifie
rC
heck
Ext
erna
law
ning
san
dlo
uvre
sm
ustf
ully
shad
eth
esk
ylig
htab
ove
whi
chth
eyar
esi
tuat
edw
hen
fully
draw
nor
clos
ed.
Sky
ligh
tsg
lazi
ng
req
uir
emen
tsS
kylig
htnu
mbe
rA
rea
ofgl
azin
gin
c.fr
ame
(m2)
Sha
ding
devi
ceF
ram
ean
dgl
ass
type
S1
0.72
exte
rnal
adju
stab
leaw
ning
orbl
ind
alum
iniu
m,m
ould
edpl
astic
sing
lecl
ear,
(or
U-v
alue
:6.
21,S
HG
C:0
.808
)
S2
0.72
exte
rnal
adju
stab
leaw
ning
orbl
ind
alum
iniu
m,m
ould
edpl
astic
sing
lecl
ear,
(or
U-v
alue
:6.
21,S
HG
C:0
.808
)
S3
0.72
exte
rnal
adju
stab
leaw
ning
orbl
ind
alum
iniu
m,m
ould
edpl
astic
sing
lecl
ear,
(or
U-v
alue
:6.
21,S
HG
C:0
.808
)
S4
0.72
exte
rnal
adju
stab
leaw
ning
orbl
ind
alum
iniu
m,m
ould
edpl
astic
sing
lecl
ear,
(or
U-v
alue
:6.
21,S
HG
C:0
.808
)
S5
0.72
exte
rnal
adju
stab
leaw
ning
orbl
ind
alum
iniu
m,m
ould
edpl
astic
sing
lecl
ear,
(or
U-v
alue
:6.
21,S
HG
C:0
.808
)
BA
SIX
Cer
tific
ate
num
ber:
A37
4289
page
7/8
Pla
nnin
g,In
dust
ry&
Env
ironm
ent
Bui
ldin
gS
usta
inab
ility
Inde
xw
ww
.bas
ix.n
sw.g
ov.a
u
HYD
130°58'
130°58'
34.745
40°58'10"
130°58'
9.145
192°34'20"
32.57
Arc 4.58
TEL
TEL
ELEC
SMH
WM
33.225
10.365
CENTRELINE
BITUMENOF
EDGETOP
BITUMEN
KERB
OF
OF
CONCRETE
PATHC
ON
CR
ET
ED
RIV
EW
AY
MINGASTREET
SMH
SMH
B.M.D.H.&W.T.K. r.l.42.55m A.H.D.
37
LP
METAL
SHED
TOP
BANK
OF
PERG
TIM
BE
RW
AL
L
BRICKWALL
BR
ICK
WA
LL
SANDSTONE
WALL
SANDSTONE
WALL
TIM
BE
R
TIM
BE
R
WALL
# 15
BRICK D
WELLING
TILE ROOF
Gutter Le
vel: 46.78m
REND GARAGEFloor Level: 42.80m
# 172 STOREY
RENDERED DWELLINGTILE ROOF
Floor Levels: 45.45m & 48.10mRidge Level: 52.42m
Gutter Level: 50.70m
27
(X)
Ø150 uPVC @1% MIN
IO
Ø150
uPVC
@1%
MIN
RWT
DP
DP
DP
DP
DP
INDICATIVE LOCATION OFPIPE INLET FROM ROOF.
EXACT LOCATION TBC ATCC STAGE
OUTLET PIPE
MAKE CONNECTION TOEXISTING KERB AND GUTTEROUTLET TO CITY OF RYDECOUNCIL REQUIREMENTS
OUTLINE OF ROOF
PROTECT TREES FORDURATION OF WORKS.
TYPICALINSPECTION OPENING
NOTE: CONTRACTOR TOACCURATELY ALLOCATELOCATION AND DEPTH OF ALLEXISTING SERVICES PRIOR TOCONSTRUCTION OF THE PIPE
5,000 LITRE EFFECTIVECAPACITY RAINWATER
TANK BELOW SUSPENDEDVERANDAH SLAB
RHS
@1%
MIN
Ø150mm PIPE CONVERTERTO 200 x 100 RHS
130°58'
130°58'
34.745
40°58'10"
130°58'
9.145
192°34'20"
32.57
Arc 4.58
33.225
10.365
\\192
.168.0
.6\pr
ojects
\SY1
9\SY1
9017
3\Dra
wing
s\CIV
\Dra
wing
s\SY1
9017
3_C3
.01.dw
gFe
b 06,
2020
- 10
:08am
North
Client Architect Project Drawing Title
-1 0 1cm at full size 10cm
Issue Description Date Drawn Approved20cm
This drawing has been assigned an electronic code that signifies the drawing has been checked and approved by:
15 MINGA STREET
ALTERATIONS AND ADDITIONS
RYDE, NSW, 2112 Project No.Designed
Drawn Date Scale Q.A. Check
Dwg. No.
Date
Issue
A1
SY190173ENGINEERS MANAGERS INFRASTRUCTURE PLANNERS DEVELOPMENT CONSULTANTS
COPYRIGHT of this design and plan is the property of ACOR Consultants Pty Ltd, ACN 079 306 246 ABN 40 079 306 246, all rights reserved. It mustnot be used, modified, reproduced or copied wholly or in part without written permission from ACOR Consultants Pty Ltd.
C
ACOR Consultants Pty Ltd
Suite 2, Level 1, 33 Herbert StreetSt Leonards NSW 2065
T +61 2 9438 5098
NOT FOR CONSTRUCTION
PETER BRENNAN
CATCHMENT PLANNTS
AREA 1EXTENSION OF SITE COVERAGE = 69.26m2
AREA 2EXTENSION OF GARAGE = 6.12m2
AREA 3PROPOSED PATIO = 27.12m2 - NOT INCLUDED IN THE CALCULATIONAS IS EXTENDED OVER AN EXISTING IMPERVIOUS AREA
LEGEND
AREA 1
AREA
2AREA 3
STORMWATER MANAGEMENT PLAN AND CATCHMENT PLAN
DK
WS
FEB 2020 1:100
C1.01 A
G.L. 05.02.20
ISSUE FOR DEVELOPMENT APPLICATION 06.02.20 DK WSA
< 80m2 (OSD IS NOT REQUIRED)