Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

1

Dutch management of radioactive waste

License application

by

Jeroen Welbergen

22

Content

• Management in practice

• License application

Page 2: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

2

33

COVRA site

4

Waste treatment building (AVG)

Page 3: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

3

55

LLW treatment

5

Solid waste

Counting vials

Carcasses

Liquid waste

666

Storage building for LILW (LOG)

Page 4: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

4

LOG

8

High level waste treatment and storage building (HABOG)

Page 5: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

5

99

HLW in HABOG

Recycling

Uranium,

Plutonium

waste

1010

Content

• Management in practice

– LILW, NORM and HLW

• License application

– Safety Assessment

– Environmental impact assessment

Page 6: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

6

present situation

LOG

AVGKG

HABOGCOG

VOG

KG = office building

AVG= treatment building

LOG= LILW storage building

HABOG = HLW treatment & storage building

VOG =depleted Uranium building

COG = container(NORM) building

Purpose license revision

• New desired situation compared to licensed situation due to:

– extension HLW treatment & storage building (HABOG +)

• life extension NPP (Borssele)

– Extension DUO storage building (VOG2)

• continuing enrichment of Uranium-235 (Urenco)

Page 7: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

7

HABOG+

Vitrified waste in CSDV containers

14

Page 8: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

8

VOG 2

15

1616

U3O8 in DV-70 containers

Page 9: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

9

Desired capacity

License (revision)

December 2011

January 2015

September 2015

February 2014

Page 10: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

10

Environment Impact Assessment (EIA)

• Insight expansion plans

• Effects to environment

– Radiological (SR)

– Non-radiological

• Stakeholders participation

• Underpinning arguments

– positive decisions of requested HABOG+ & VOG2

19

Starting point EIA

20

Page 11: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

11

alternatives

• Reference situation is current situation

– with environmental impacts.

• 1st alternative

– HABOG+ 2 modules for heat-producing waste

– VOG2 in South-East corner (preferred alternative)

• 2nd alternative

– HABOG+ 2 module for heat-producing waste

– VOG2 in North-West corner

Reference situation

22

Page 12: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

12

1st alternative (preferred option)

2e alternative

24

Page 13: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

13

Policy and assessment framework

25

Aspects in Safety assessment

The fundamental element of the safety assessment is the assessment of the radiological impact on humans and the environment in terms of both radiation dose and radiation risks

26

Page 14: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

14

Safety Assessment Report (SAR)

• shall include:

– Testing of initial ideas for safety concepts;

– Site or location selection;

– Demonstration of the safety of the facility;

– Optimization of the facility design;

– Evaluation of clearance and discharge;

– Safety Impact Assessment;

• operational maximum inventory of waste

– Definition of operational limits & controls;

27

Pathways of exposure

28

Page 15: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

15

Points of emissionduring normal operations

29

Disharge of wastewaterduring normal operation

30

Page 16: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

16

ActivityEmissions to air during normal operations (LILW)

31

Contour plots of maximum individual dose (nSv/yr) outside the industrial zone due to maximum disharge to air from LILW building

The maximum individual dose at the fench of COVRA = ~ 270 nSv/year.

ActivityEmissions to air during normal operations (HLW)

32

Contour plot of maximum individual dose (nSv/y) outside the industrial zone due to maximum discharge to air from the HLW building

The maximum individual dose at the fench of COVRA~ 0,1 nSv/year

Page 17: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

17

Emergency situation

33

• e.g. airplane crash + intens kerosine fire

Legal Requirementsindividual dose

Frequency of event per year Maximum allowable Effective dose

Persons ≤ 16 year Persons < 16 year

F ≥ 10-1 0,1 mSv 0,04 mSv

10-1 > F ≥ 10-2 1 mSv 0,4 mSv

10-2 > F ≥ 10-4 10 mSv 4 mSv

10-4 > F ≥ 10-6 100 mSv 40 mSv

34

Page 18: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

18

Legal Requirementsgroup risk

35

1,0,E-09

1,0,E-08

1,0,E-07

1,0,E-06

1,0,E-05

10 100 1000

Fre

qu

ency

pe

r ye

ar

Maximum acute deads

Events

• Anticipated operational occurrences

• Design Basic Accident (DBA)• P > E-6

• Beyond Design Basic Accident (BDBA)• P < E-6

• Source term

• Probabilistic Safety Assessment (PSA-3) • NUDOS2, MACCS, COSYMA, CONDOR

36

Page 19: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

19

Plane crash

37

Beyond Design Basis Accidents (BDBA)

38

Page 20: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

20

contourplots

39

Persons > 16 year) Kids < 1 jaar

SAR is part of license application

40

• License application (7th of Feb. 2014)

Page 21: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

21

Draft license

• The draft license was issued 25/09/2014 for public hearing

41

Extension of public consultation

• Extension of period for public consultation to 24/12/2014

• 130 views submitted

– 81 from Netherlands

– 48 from Germany

– 1 from Austria

42

Page 22: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

22

Cie EIA

• On 30/12/2014 the Commission (Cie EIA) considered that the EIA contains the essential information to take a decision about the revision of the license in which the environment is taken full into account!

43

LICENSE !

• On 7th of January 2015: I (the Minister) have found that the implementation of the proposed changes to the décor is justified and that the planned expansion of the HABOG+ and VOG2 is to be built in a responsible and safe manner !

• However: final decision is by State Council on 8th of September 2015

44

Page 23: Dutch management of radioactive waste · 2016. 1. 26. · –VOG2 in North-West corner Reference situation 22. 11-11-2015 12 1st alternative (preferred option) 2e alternative 24

11-11-2015

23

Appeal of LAKA at State Counsil

• Verdict of State Council is 6 weeks after appeal:

20 October 2015

?

45