1

Dublin Institute of Technology...New Wall Extension: the prefabricated wall panels are built using the Promatect B system. They are 60 min Fire Resistant and load bearing. The timber

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Dublin Institute of Technology...New Wall Extension: the prefabricated wall panels are built using the Promatect B system. They are 60 min Fire Resistant and load bearing. The timber