Upload
varzukf
View
219
Download
0
Embed Size (px)
Citation preview
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
1/36
DMCI GLOBAL, LTD
Palm Jumeirah Monorail
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
2/36
DMCI GLOBAL, LTD
Palm Jumeirah Monorail
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
3/36
DMCI GLOBAL, LTD
Aerial View ofPalm Jumeirah
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
4/36
DMCI GLOBAL, LTD
Aerial View of Atlantis Station
(Atlantis Hotel in the
background)
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
5/36
DMCI GLOBAL, LTD
Aerial View of Atlantis Station
(Atlantis Aquaventure water
park at left)
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
6/36
DMCI GLOBAL, LTD
Atlantis Station
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
7/36
DMCI GLOBAL, LTD
Atlantis Station
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
8/36
DMCI GLOBAL, LTD
Atlantis Switch
Bridge
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
9/36
DMCI GLOBAL, LTD
Village CenterStation
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
10/36
DMCI GLOBAL, LTD
Village Center Station
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
11/36
DMCI GLOBAL, LTD
Trump TowerStation
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
12/36
DMCI GLOBAL, LTD
Trump Tower Station
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
13/36
DMCI GLOBAL, LTD
Rebar Fabrication
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
14/36
DMCI GLOBAL, LTD
Inner Form Fabrication
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
15/36
DMCI GLOBAL, LTD
Soffit Form Setting
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
16/36
DMCI GLOBAL, LTD
End F orm Setting
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
17/36
DMCI GLOBAL, LTD
R ebar Assembly
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
18/36
DMCI GLOBAL, LTD
Rebar Assembly
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
19/36
DMCI GLOBAL, LTD
Inner Form and SheathInstallation
inner form
sheath
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
20/36
DMCI GLOBAL, LTD
Side Form Preparation beforeinserting rebar cage
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
21/36
DMCI GLOBAL, LTD
Side Form Setting
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
22/36
DMCI GLOBAL, LTD
Concrete Placing
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
23/36
DMCI GLOBAL, LTD
Concrete Placing
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
24/36
DMCI GLOBAL, LTD
Curing
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
25/36
DMCI GLOBAL, LTD
Stressing
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
26/36
DMCI GLOBAL, LTD
Lifting to Stock Area
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
27/36
DMCI GLOBAL, LTD
Retouching
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
28/36
DMCI GLOBAL, LTD
Stocking Area
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
29/36
DMCI GLOBAL, LTD
CHALLENGESPlacing ofStitching Concrete
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
30/36
l h l
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
31/36
DMCI GLOBAL, LTD
Palm Jumeirah MonorailGuideway BeamProduction & Stitching
Precasting of 428 beamseach beam is 28m long x 1m wide x 2m high and weighs 80 tons
Joining of beams to columns at sitebeams are stitched to other beams and columns by concrete
Contract Amount: AED 11.3 Million
l i h il
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
32/36
DMCI GLOBAL, LTD
Palm Jumeirah MonorailAtlantis Station
3 floors
2100 sq mContract Amount (Structural): AED 3.6 MillionContract Amount (Finishing): AED 11.0 Million
P l J i h M il
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
33/36
DMCI GLOBAL, LTD
Palm Jumeirah MonorailVillage Center Station
5 floors2200 sq m
Contract Amount (Structural): AED 3.9 Milli onContract Amount (Finishing): AED 7.9 Million
P l J i h M il
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
34/36
DMCI GLOBAL, LTD
Palm Jumeirah MonorailTrump Tower Station
3 floors1700 sq m
Contract Amount (Structural): AED 2.6 MillionContract Amount (Finishing): AED 9.5 Million
P j F
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
35/36
DMCI GLOBAL, LTD
Project FeaturesMonorail Guideway Beams32 cu m concrete per beam (typical)80 tons beam weight (typical)
2 beams per day average productionHollow sectionPre-stressed, post-tensionedVertically & horizontally curved and canted beamsCurved soffit
Monorail StationsStructural:
Concrete: 5900 cu mRebar: 1160 tons
Finishes:(1) Custom glass and aluminum external envelope(2) Spray tile finish to exterior concrete surfaces
(3) Granite interior walls and floors(4) Perforated aluminum ceiling finish
8/11/2019 Dubaimonorail r r Elepao 111208042821 Phpapp02
36/36