1
FINAL DESIGN APPROVAL REQUEST Dubai World Central Corporation Version: 2.0 / JAN-2018 / Rev: 1 DS/DC/F-005 DEVELOPMENT CONTROL FORMS DATE Project Name: Project Owner: Plot No: Consultant: REQUIRED INFORMATION AND SUBMITTALS: Copy of Consultant’s Registration (Copy of Consultants Professional License to be enclosed) Copy of Preliminary Design Approval Copy of Consultant’s Appointment Letter from owner Project Details Sheet (Updated) NOC from Department of Civil Aviation (If not in compliance) NOC from DEWA for Utilities (Water and Electricity)/ sub-station room location approval NOC from Etisalat for Telecommunications Design NOC from DS for Sewerage and Drainage Design NOC from DS for District Cooling ( if Applicable) Design approval from Civil Defense Structural Calculations with Soil Investigation Report Final Design Drawings (2 Hardcopy sets signed by the owner + 1 DWG. format set) AWQAF Approval for Religious use (If Applicable) FEE: Submission Fee*: AED _____________ , Cheque payable to Dubai Aviation City Corporation. *Warehouses: (AED 3 per m 2 of TBUA for Initial Submission or AED 1 per m 2 of BUA for Resubmission. *Residential: (AED 4 per m 2 of TBUA for Initial Submission or AED 1 per m 2 of BUA for Resubmission. SUBMISSION DETAILS: Initial Submission Resubmission PROJECT CONSULTANT STAMP Contact Person: Email: Mobile: Date: Signature: For Official use only Document Receiving TN- File: DLC RC AC EC GC Received By Signature Date Comments: Approved Approved With Comments Resubmit Name, Signature & Date Reviewed By Architect Reviewed By Snr. Engineer - Civil Approved By VP – Development Control Total **: AED **- VAT applies @ 5% + AED 20 (Knowledge & Innovation Fee)

Dubai World Central Corporation DS/DC/F -005 FINAL …dqpgtzxn0wn4l.cloudfront.net/docs/LPD/F005- FINAL... · NOC from DEWA for Utilities ... / sub -station room location approval

Embed Size (px)

Citation preview

Page 1: Dubai World Central Corporation DS/DC/F -005 FINAL …dqpgtzxn0wn4l.cloudfront.net/docs/LPD/F005- FINAL... · NOC from DEWA for Utilities ... / sub -station room location approval

FINAL DESIGN APPROVAL REQUEST

Dubai World Central Corporation

Version: 2.0 / JAN-2018 / Rev: 1

DS/DC/F-005

DEVELOPMENT CONTROL FORMS

DATE

Project Name:

Project Owner: Plot No:

Consultant:

REQUIRED INFORMATION AND SUBMITTALS:

Copy of Consultant’s Registration (Copy of Consultants Professional License to be enclosed) Copy of Preliminary Design Approval Copy of Consultant’s Appointment Letter from owner Project Details Sheet (Updated) NOC from Department of Civil Aviation (If not in compliance) NOC from DEWA for Utilities (Water and Electricity)/ sub-station room location approval NOC from Etisalat for Telecommunications Design NOC from DS for Sewerage and Drainage Design NOC from DS for District Cooling ( if Applicable) Design approval from Civil Defense Structural Calculations with Soil Investigation Report Final Design Drawings (2 Hardcopy sets signed by the owner + 1 DWG. format set) AWQAF Approval for Religious use (If Applicable)

FEE:

Submission Fee*: AED _____________ , Cheque payable to Dubai Aviation City Corporation.

*Warehouses: (AED 3 per m2 of TBUA for Initial Submission or AED 1 per m2 of BUA for Resubmission. *Residential: (AED 4 per m2 of TBUA for Initial Submission or AED 1 per m2 of BUA for Resubmission.

SUBMISSION DETAILS: Initial Submission Resubmission

PROJECT CONSULTANT

STAMP

Contact Person:

Email: Mobile:

Date:

Signature:

For Official use only Document Receiving TN- File: DLC RC AC EC GC

Received By Signature Date

Comments:

Approved Approved With Comments Resubmit

Name, Signature & Date

Reviewed By Architect

Reviewed By Snr. Engineer - Civil

Approved By VP – Development Control

Total**: AED **- VAT applies @ 5% + AED 20 (Knowledge & Innovation Fee)