© Chevron 2005 20090422, AADE Emerging Technologies Forum Dual Gradient Drilling: Has Its Time Finally Come? AADE Emerging Technologies Forum Ken Smith Chevron Deepwater BU Project Manager, Dual Gradient Drilling Implementation April 22, 2009

Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

Embed Size (px)

Citation preview

Page 1: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

© Chevron 2005 20090422, AADE Emerging Technologies Forum

Dual Gradient Drilling:

Has Its Time Finally Come?

AADE Emerging Technologies Forum

Ken Smith

Chevron Deepwater BU Project Manager, Dual Gradient Drilling Implementation

April 22, 2009

Page 2: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

2© Chevron 1/2008 20090422, AADE Emerging Technologies Forum

Key Messages

• Deepwater Gulf of Mexico drilling is extraordinarily challenging

• Dual gradient drilling is the solution to the water depth-related challenges, and

• The Managed Pressure Drilling capabilities of the technology can solves a number of downhole problems related to annular pressure changes.

• What is DGD and why does it work?

• It’s been done before.

• We’re considering it again!

Page 3: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

3© Chevron 1/2008 20090422, AADE Emerging Technologies Forum

Deepwater Gulf of Mexico Situation Today

We routinely drill nearly “un-drillable”wells

>30,000’ deep

> 6,000’ water depth

> 9,000 MRI’s

Narrowing of the PP/FG window and ECD’s lead to MANY tight tolerance casings

New rigs capable of drilling to 40,000’ to enable industry’s large portfolio of deepwater projects

We’re just about against “The Wall”

Conventional Casing Program

Deepwater Casing Program

We’re nostalgic for the past!

Page 4: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

4© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 4

The Solution

Dual Gradient Drilling is a Form of Managed Pressure Drilling

It Removes the Impact of Water Depth

Page 5: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

5© Chevron 1/2008 20090422, AADE Emerging Technologies Forum

1996 through

2001

1996 1996 through through

20012001

Page 6: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

6© Chevron 1/2008 20090422, AADE Emerging Technologies Forum

Single vs. Dual-Gradient Drilling

Dual Gradient

Heavier Mud w/ Seawater Above

Mudline

Same Bottom Hole

Pressure

SingleMud

Weight

Conventional

Page 7: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

7© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 7

Seabed

SeawaterHydrostatic

Depth

Dual Gradient MudHydrostatic

Conventional Mud Hydrostatic

RKB

Why Does It Work?

Pressure, psi

Density

Page 8: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

8© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 8

Seawater Hydrostatic

Single Gradient Density at TD

Casing Points – Conventional

Seafloor

Depth

Pressure

Fracture Pressure

5 Casing Points

TDPore Pressure

Page 9: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

9© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 9

Fracture Pressure

Seawater Hydrostatic

Casing Points – Dual Gradient

Seafloor

Depth

Dual Gradient Density at TD

Pressure

TD

4 Casing Points

Pore Pressure

Page 10: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

10© Chevron 1/2008 20090422, AADE Emerging Technologies Forum

Fracture Pressure

Seawater Hydrostatic

Seafloor

Depth

Casing Points – Dual Gradient

Pore Pressure

Pressure

3 Casing Points

10

TD

Dual Gradient Density at TD

Page 11: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

11© Chevron 1/2008 20090422, AADE Emerging Technologies Forum

Application of Dual Gradient Drilling: Potential for Elimination of Casing Strings in Complex Wells

Potential Well Planwith DGD Application

Actual Casing Program

6 casing strings (yellow) potentially could have been eliminated had DGD technology been available

Page 12: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

12© Chevron 1/2008 20090422, AADE Emerging Technologies Forum

Simplified Well Design Allows More Completion Opportunities

Simplified Well Design Allows More Completion Opportunities

13-3/8

(Conventional)5-1/2"

Tubing

36 3626 20

(SubSea MudLift)

9-5/8

7-5/8

7" Tubing

5-1/2

11-3/4

9-5/8

22

16

13-3/8

SWF Zone

Page 13: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

13© Chevron 1/2008 20090422, AADE Emerging Technologies Forum

How Will DGD Improve the Deepwater Business?

ENHANCE SAFETY AND ENVIRONMENTAL PERFORMANCE AND RISK

• Much better detection, reaction and control of kicks, which WILL be smaller

• Inherently safer wells

• Better environmental footprint

REDUCE DRILLING COST AND RISK

• Fewer strings of casing to reach TD

• Virtual elimination of lost circulation due to ballooning formations

• Significant reduction in “hidden downtime”

• Better cement jobs/fewer squeezes

IMPROVE WELL INTEGRITY

• Reduced casing loads

• Greater completion integrity

IMPROVE WELL PRODUCTIVITY

• Designer completions will become possible

IMPROVE EXPLORATION PERFORMANCE

• Easier geological sidetracks

• More effective reaction to formation “surprises”

IMPROVE PREDICTABILITY

• Improved reliability/reduced downtime, leading to

• More predictable outcomes

• Lower $/BOE Cost• Lower Minimum Economic Field Size

Page 14: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

14© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 14

MudLift Pump (MLP)

Mud Return Line

Drill String Valve (DSV)

SubSea MudLift Drilling Defined Major Components

Subsea Rotating Device (SRD)

Page 15: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

15© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 15

The Hydril MudLift Pump is Driven by Seawater

Displacing Mud to Rig

Seawater Pumped from RigSeawater Discharged to Sea

Mud Enters From Well

Page 16: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

16© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 16

Test System Pumped for Nearly 2 Years

Page 17: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

17© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 17

Solids Pumping Capabilities

Page 18: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

18© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 18

Drill String Valve (DSV ) was Tested for LCM and MWD Signal Throughput

Page 19: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

19© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 19

Subsea Rotating Device Testing

SRD HousingSRD Housing

Stripper Element TestingStripper Element Testing

Purpose: Provide a mechanical interface between the drilling mud in the well and the seawater in the riser. Also minimizes gas ingress to the riser. Insert below retrieves on drill string every trip.

Page 20: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

20© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 20

Factory Acceptance Testing Began Feb 28, 2001

Page 21: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

21© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 21

Test Well Drilled in Aug/Sept, 2001

Diamond OffshoreOcean New Era

2nd Generation,Built in 1975

Texaco WellGC 136 #8

Shasta Prospect

Page 22: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

22© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 22

Driller’s Subsea Controls

Page 23: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

23© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 23

Control / Monitoring Screens

Page 24: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

24© Chevron 1/2008 20090422, AADE Emerging Technologies Forum

Equipment is Only Half the Challenge

Page 25: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

25© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 25

12 to 15 Man-Years Required to Develop DGD Operations and Well Control Procedures

Drilling Operations Unchanged Changedw/SMD Test

1. Circulation

2. Drilling ahead

3. Connections

4. Tripping

5. Displacing drilling fluids

6. Lost circulation treatment

7. Wireline logging

8. Running casing

9. Running liner

10. Cementing casing

11. Cementing liner

12. Balanced plug

13. High pressure squeeze

14. Stuck pipe procedures

15. Use and installation of packers

Page 26: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

26© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 26

ALL Well Control Operations Change

Well Control Operations Unchanged Changedw/SMD Test

1. Kick detection2. Basic well control with DSV

(Driller's Kill)3. Basic well control w/o DSV: NO

shut-in4. Basic well control w/o DSV: WITH

shut-in5. Kick detection during tripping

6. Shut-in while tripping

7. Trapped pressure management

8. Volumetric well control

9. Lubrication kill

10. Stripping

11. Bullheading

12. Shut-in while running casing

13. Test casing seat

14. Dynamic kill

Page 27: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

27© Chevron 1/2008 20090422, AADE Emerging Technologies Forum

SMD Drilling Simulator

27

Page 28: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

28© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 28

Training Materials and Process

Basic SMD Training (DGD)

Pre-Spud Materials

Drilling Program

Procedures Training

Well Control Training

Page 29: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

29© Chevron 1/2008 20090422, AADE Emerging Technologies Forum

Training Matrix

Advanced A

Intermediate I

Basic B

Position Wel

l Des

ign

Wel

l Con

trol

Wel

l Ope

ratio

ns

Rig

Ope

ratio

ns

Equi

pmen

t Mai

nten

ance

Position Wel

l Des

ign

Wel

l Con

trol

Wel

l Ope

ratio

ns

Rig

Ope

ratio

ns

Equi

pmen

t Mai

nten

ance

Operator OthersDrilling Manager I I I B Subsea Engineer I I A ADrilling Superintendent I I I B B Mudlogger I B BDrilling Engineer A A A B B Mud Engineer I I I IRig Supervisor I A A A I Cementer B B B B

Hydril Personnel B B B ADrilling Contractor Regulatory Agencies B A B I IRig Manager A I I I I DGD Consultant A A A A AToolpusher I A A A A Partners I I I I BDrilling Engineer I A A A ADriller I I A AAssistant Driller B B A ARig Mechanic I ADerrickhand B B B BFloorhand B B B

Training LevelsComprehensive understanding of all facets of DGD; ability to formulate, design and communicate DGD procedures and techniquesWorking understand of DGD concepts and relational impacts to drilling operations; ability to use knowledge to make real-time decisions regarding well and equipmentPractical understanding of DGD as related to his/her job functions

Page 30: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

30© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 30

Pre-spud and Training Included Rig Crews, Service Personnel, MMS, Operator Representatives

and Engineers

Page 31: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

31© Chevron 1/2008 20090422, AADE Emerging Technologies Forum

Hoisting the MLP Through the Moonpool

Page 32: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

32© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 32

Driller’s Main Panel

Page 33: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

33© Chevron 1/2008 20090422, AADE Emerging Technologies Forum

Moving in BOP

Page 34: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

34© Chevron 1/2008 20090422, AADE Emerging Technologies Forum

Landing SMD/ LMRP on BOP Landing SMD/ LMRP on BOP

Page 35: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

35© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 35

Heading Down with the MLP

Page 36: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

36© Chevron 1/2008 20090422, AADE Emerging Technologies Forum

Field Test SMD System and Riser

•Auxiliary Lines on riser

Page 37: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

37© Chevron 1/2008 20090422, AADE Emerging Technologies Forum

Running Mud Line

Page 38: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

38© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 38

Gumbo Drilling

Gumbo Dogs

Page 39: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

39© Chevron 1/2008 20090422, AADE Emerging Technologies Forum 39

All Important Objectives Met

• Manage Bottom Hole Pressure at All Times

Constant inlet pressure mode (Drill)

Constant rate mode ( Kick or Kill)

• Cuttings to Surface

• Verify Dual Gradient Operation Procedures

• “Kick” detected/shut-in <2 bbls

• All Equipment Operated as Designed

• Personnel adapted quickly, training paid off

• 90% of Field Test Objectives met

Page 40: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

40© Chevron 1/2008 20090422, AADE Emerging Technologies Forum

Page 41: Dual Gradient Drilling: Has Its Time Finally Come?cargos-paquebots.net/Revue de presse/0000_IMAGES-05/524...Advanced A Intermediate I Basic B Position Well Design Well Control Well

41© Chevron 1/2008 20090422, AADE Emerging Technologies Forum

The Clear Leader