18
27/09/2010 Ignacio Redondo CIEMAT 1 DT DAQ status and plans Cristina Fernández Bedoya , Ignacio Redondo Fernández

DT DAQ status and plans

Embed Size (px)

DESCRIPTION

DT DAQ status and plans. Cristina Fernández Bedoya , Ignacio Redondo Fernández. Intro/Outline. Present status is sound Permanently blocked channels 0-1ROB (down from 1) Downtime: 0 % (down from 1%) News Suppression of TS debug data Automatic TTSResync enabled Plans: Alarm Automation - PowerPoint PPT Presentation

Citation preview

Page 1: DT DAQ status and plans

27/09/2010 Ignacio Redondo CIEMAT 1

DT DAQ status and plans

Cristina Fernández Bedoya , Ignacio Redondo Fernández

Page 2: DT DAQ status and plans

27/09/2010 Ignacio Redondo CIEMAT 2

Intro/Outline• Present status is sound

• Permanently blocked channels 0-1ROB (down from 1) • Downtime: 0 % (down from 1%)

• News– Suppression of TS debug data – Automatic TTSResync enabled

• Plans:– Alarm Automation– Analysis of TestPulse runs taken– 904 teststand

Page 3: DT DAQ status and plans

27/09/2010 Ignacio Redondo CIEMAT 3

Trigger “zero”-supression Cristina,Luigi,Gianni

• TS data (20 bxs) only readout if trigger primitive present in the sector.

• Otherwise send a 32 bit word. • Event size of emtpy event reduced by 6 from

1176 bytes/FED to

192 bytes/FED

Eve

nts

Bytes

Mean

±RMS

YB-2 YB-1 YB0 YB+1 YB+2

FEDs

770-4

1123 ±325

1120

±331

1127

±311

1122

±316

1117

±325

0ed 245

±42

245

±43

245

±37

245

±40

245

±39

FEDs

775-9

1134

±322

1118

±323

1119

±327

1120

±321

1125

±320

0ed 245

±37

245

±36

245

±41

244

±35

245

±35

Page 4: DT DAQ status and plans

27/09/2010 Ignacio Redondo CIEMAT 4

Enables the switch to <10 DDU system

• Required to beaf-up spares pool – Symmetric configuration (5 DDU)– External wheels configuration (7 DUU: 2,1,1,1,2)

• How and when to be decided:

• Probably during Christmas stop after Heavy Ion run.

Page 5: DT DAQ status and plans

27/09/2010 Ignacio Redondo CIEMAT 5

Automatic resync enabled• Automatic resync enabled since August 26• At present, DDU goes into OOS if more than 15

ROBs (2.5 Minicrates) are blocked (programmable). Already implemented in April.

• DDU OOS is answered automatically by a resync from cDAQ

• Being monitored: – 83 times, – 5 out of access

• DT DAQ hasdisappeared from downtime reports (0.8 % => 0 %)

Downtime before 08/26/2010

Page 6: DT DAQ status and plans

27/09/2010 Ignacio Redondo CIEMAT 6

DAQ Alarm Automation• DAQ alarm automation status:

– Blocked channels above threshod =>TTSResync– SC crate off =>PVSS alarm to DCS shifter (SMS?) 

• In general, only catched by expert look at DQM/DCS dashboard

– DDU input channel blocked =>VME command? SMS? (or GOLROS not working) – QPLL unlocks  => Need to know the clock status– FPGA not programmed =>  TTS signal? (most frequent SEU) VME command?– VME access problem =>Probably will have to power

(now reported in the config phase) cycle manually, SMS PVSS alarm?

• As luminosity increases we will start to be sensitive to SEU failures at the ROS that are rare now

Page 7: DT DAQ status and plans

27/09/2010 Ignacio Redondo CIEMAT 7

Error Report to cDAQ• In any of the errors in the previous list, as a

first step, the central shifter should get an alarm/warning and call the DT field manager. 

• Communications channels where to implement these alarms in our FM/DAQ xdaq are already in place

• We should be able to mask this alarms to cope with persistent errors.

Page 8: DT DAQ status and plans

27/09/2010 Ignacio Redondo CIEMAT 8

Firmware upgrades

• By the end of the year in order to improve various aspects we plan to upgrade:

• DDU firmware– Internal mapping of the number of ROS errors for

Out-Of-Synch.

• ROS firmware– Better event size monitoring.  – Reduce GOL power on/off cycles – Possibility to remap TTSHardReset (now eq. to TTSResync)

to FPGA reloading – Improve ROS start-up procedure

• All this things are still under development, hopefully all of them are doable.

Vincenzo/Cristina

Page 9: DT DAQ status and plans

27/09/2010 Ignacio Redondo CIEMAT 9

Checked in the Online DQM various MiniDAQ TP runs taken aprox once/month in 2010:

130036 132842 135501 138869 143456 145353 1464694-march-10 08-apr-10 15-may-10 28-jun-10 20-aug-10 09-sep-10 23-sep-10

Things checked: - data integrity, - event size, - occupancies, - TP time position, - TP L1A BXid, - noisy cells

Some conclusions:-Not all known read-out errors appear in these runs, but most of them (the sample is quite representative)

-All known FE (FEB, SLs, etc) errors appear in these runs

-Noisy cells in TP have a very low noise frequency (<500 Hz) and do not correspond with the noisy cells seen with HV on

-Some trigger problems are also visible when reading with DCC

MiniDAQ Test Pulse

Cristina

Page 10: DT DAQ status and plans

27/09/2010 Ignacio Redondo CIEMAT 10

Some anomalous behaviours:

-Some TDC fatal errors in March and April runs that were probably due to a wrong configuration (solved afterwards).

-Two chambers in which the TP is largely shifted (and not related with any other problem). Looks also like a configuration problem (never happened afterwards)

Run 130036 YB+1 S10 MB2

Run 132842 YB+1 S10 MB2 OK, peak in 680 TDC counts

BAD, peak in 1250 TDC counts

Page 11: DT DAQ status and plans

27/09/2010 Ignacio Redondo CIEMAT 11Cristina

• One thing to remark is that this year we have 3 FEB death.• Last time such problems have been seen:

– January 2008: YB+1 S9 MB3 SL1 FEB 13 (short in VCC HV discharges)– January 2008: YB-1 S8 MB4 SL1 FEB 20 (short in VDD capacitor)

• Test Pulse trainining during next Oncall Training? • Offline shifter please check known problem list/browser (

https://twiki.cern.ch/twiki/bin/view/CMS/DTshiftFAQ2010x08x19) before submitting report to elog.

TP error Summary

Page 12: DT DAQ status and plans

27/09/2010 Ignacio Redondo CIEMAT 12

RO test stand in 904 Cristina,Vincenzo,Ignacio

•“Good” LHC Clock•TTC (BG-O commands)•DDU:

•DDU prototype•CAEN VME bridge•TTCvi, TTCex

•SC:•Linco•Tim •1 ROS

•Able to test ROS-DDU link (GOL)and debug DDU board.

Page 13: DT DAQ status and plans

27/09/2010 Ignacio Redondo CIEMAT 13

Cristina,Vincenzo,Ignacio

•“Micro”-crate (CCB+ROB)

installed by Cristina. •Provides Minicrate data

• Labview linco driver nearly ready,• Will enable to replicate Madrid ROS tests.• Decoupled DDU and ROS control• Ready to install local DT DAQ software

RO test stand in 904

Page 14: DT DAQ status and plans

27/09/2010 Ignacio Redondo CIEMAT 14

More

Page 15: DT DAQ status and plans

27/09/2010 Ignacio Redondo CIEMAT 15

Testpulses runs are not suited to make a thorough study of the local trigger chain due to Superlayer shifts. In particular, MB4s (2 cells shift) will never give HH triggers.Still, some “larger” problems can be spotted:

Empty (DTTF YB-2 S4 MB4 masked)

Cristina

Page 16: DT DAQ status and plans

27/09/2010 Ignacio Redondo CIEMAT 16

DDU trigger data wrong, too many pre-triggering

Page 17: DT DAQ status and plans

27/09/2010 Ignacio Redondo CIEMAT 17

DDU trigger data OK but DCC sees only HL and 1 bx later

Page 18: DT DAQ status and plans

27/09/2010 Ignacio Redondo CIEMAT 18

How these plots should look like: