DSC Delivery Sub-Group
05/03/2018
Agenda
Defect dashboard
Release 2.0 update
XRN4249 – Data Migration Approach
XRN4449 – Customer Testing – High Level Plan, pre-requisites and
responsibilities
PSR report delivery mechanism
Customer Engagement Plan
Volume of CNC updates
Release 3.0 update
XRN4431 - Reads failing market breaker tolerance to be accepted for correct
date following AQ Correction – Solution options - Recommendation for
Release 3
XRN4453 File Format Should Have changes – Walkthrough, discussion and
recommendation on inclusion of change items within Release 3
Update on actions
AOB
Defect Dashboard
Defect Summary Stats Stats as per HPQC extract taken at
8am on Monday 5th March 2018
R1.17 – 2nd March
Defect Number Summary Fix Priority
785 SAP - Corona Files_PN980363.UBR D3 - High priority defect fix
806 AQ Tracker - exception date 071217 D3 - High priority defect fix
834 SAP - Unable to process CDA - with adjustment reason 'DUPLICATE' D5 – Low priority defect fix
843 SAP - FSI file sequence not getting updated D4 – Medium priority defect fix
845 SPA- CYM values - (original fix for defect 777 not working) D3 - High priority defect fix
857 Unique Sites Work Item D3 - High priority defect fix
858 SAP-Overlapping MPRN range for UIPs D3 - High priority defect fix
870 SAP- Update Notification service faulted D3 - High priority defect fix
877 SAP - MPRN 75071103 - Meter & Corrector Exchange (RGMA) profile issues D3 - High priority defect fix
882 SAP - Portal- Meter point status update failed due to device validations D3 - High priority defect fix
888 Inbound - SAP BW- Data load issue - 0FCCMDS01 D4 – Medium priority defect fix
890 SAP - AQ Tracker-exception date 05022018 D3 - High priority defect fix
891 Incorrect rejection code is sending in CAO file D3 - High priority defect fix
893 Outbound - SAP-BW - DRG Meter Status not consistent with Meter Removal Date D3 - High priority defect fix
897 Inbound - SAP-Price change for NTS Optional Rate formula loaded via PCD file D3 - High priority defect fix
901 T2 - RAT file overrunning D3 - High priority defect fix
904 SAP - Portal- Meter point status update failed due to device validations D3 - High priority defect fix
R1.18 – 16th March
Defect Number Summary Fix Priority
98 PGL - 13849 - MTR - N/A - N/A - SAP ISU - ASP - Penny difference in total amount in K42 record compared to K88 D3 - High priority defect fix
213 PGL - 6476 - ONJOB_AMT_REJECTIONS_issue with FUTURE DATE header D4 – Medium priority defect fix
575 Credit invoice issue D3 - High priority defect fix
720 Prime and Sub - Billing Changes D3 - High priority defect fix
731 JOB file routed to destination even after raising REJFL rejection code. D4 – Medium priority defect fix
747 Reads - Issue with Class 4 Check to Check Reconciliation triggered by SFN D4 – Medium priority defect fix
761 Billing and Invocing - Unable to perform rec billing on Prime Sub sites without coterminous read D3 - High priority defect fix
802 SAP - UK energy values updated at D+6 D5 – Low priority defect fix
835 Contract Information Incorrect in the Rec header D4 – Medium priority defect fix
837 SAP - Class 3 Re-Rec not done when next read available D3 - High priority defect fix
838 FINX and O (22 and 06) on same date and shipper sends replacement read for shipper transfer date D4 – Medium priority defect fix
848 Short haul Energy calculation - ASP File Issue In J42 D3 - High priority defect fix
853 T2A_ISU_NDM_PRIM_C2C_REC process issue D3 - High priority defect fix
856 Outbound - Billing/Invoicing refund Erroneous Confirmation D3 - High priority defect fix
860 Outbound - SAP - DNE File sending incorrect (Original) D3 - High priority defect fix
861 SAP - UDQI File - Unable to calculate UQQI for SSMP Child Sites D3 - High priority defect fix
863 SAP - Incorrect volume & energy following replacement read - Through Read entry screen D4 – Medium priority defect fix
872 SAP - EXZ not triggered D3 - High priority defect fix
874 Inbound - NOM File - Auto confirmation issue D3 - High priority defect fix
875 Outbound - SAP -New Formula Year AQ/SOQ value is ZERO - NRL/NNL File D3 - High priority defect fix
878 Inbound - Fault not removed via SFN file D4 – Medium priority defect fix
879 Metering - Meter reads not displayed in Meter read enquiry D4 – Medium priority defect fix
881 Variance energy calculated as zero though variance volume value is non zero for shipper transfer case D3 - High priority defect fix
886 Read Screen issue for FINX read D3 - High priority defect fix
895 Inbound - Last check read date not updated in SFN table for class change scenario D4 – Medium priority defect fix
896 Inbound - SAP- UPD/JOB - Missing profile MPRN 52413605 D3 - High priority defect fix
899 SAP - US01 Exception Duplication D4 – Medium priority defect fix
905 ONJOB Back Billing - SAP -MOD424 asset installation is not allowed on incorrect date D3 - High priority defect fix
Release 2 Update
XRN4361 – UK Link Release 2 - Delivery
26th February
2018
Overall Project RAG Status G
Plan/Time Risks and Issues Cost Resources
RAG Status G A G G
Status Explanation
Objective Full project delivery of UK Link Future Release 2 Scope
Plan/Time
Primary Scope (PS) Update • The additional request for XRN4449 (Priority Services Code - PSR) has had impact assessment completed and a plan
defined to design, build and test the 2 reports. There are no additional costs to the R2 project to deliver this change
• XRN4449 (PSR) customer testing approach - following the DSG meeting on 19th February 18 the preferred approach is
Option 3 – files provided to customers. Plan to be developed and shared via DSG
• Primary Scope System Testing in progress and is tracking to plan
Secondary Scope (SS) Update
• XRN4249 – Address Management • Change Pack representation comments closed out on 14/02. ChMC approval to be sought on 07th March 18
• Change is to develop a UK Link solution to apply monthly GB Mailing address updates
• Data Migration plan to load files since service was stopped continues to be defined through design; options will be
presented to DSG
• A replan of DD & build for XRN4249 & 4316 (Meter Point Details & Sector Breakdown) has been completed and there is no
impact to AT, PT & RT phases (see page 2)
• R2 Implementation approach/plan options to be defined and discussed at DSG on 05th March 18
• R2 Customer Training Requirements discussed at DSG and baselined for approval at 07th March 18 ChMC
Risks and
Issues
• Risk that the scope of R2 may change that could result in impacts to the project plan and costs
• Risk that XRN4249 - Address Management CR may be delayed or descoped from R2
Cost • Project delivery costs are tracking to approved budgets
Resources • Weekly monitoring of SME resources supporting multiple demands (e.g. Future Releases, UIG etc)
UK Link Release 2 - Plan
Primary
Scope Scoping Initiation Delivery Realisation
Stage Scope
Prioritisation
Scope
Defined Funding Initiation
Analysis
and HLD
Detailed
Design Build
Acceptance
Test
Performance
Test
Regression
Test Imp. PIS
Baseline
Plan 07/06/17 25/07/17 09/08/17 Aug 17 Aug 17 20/11/17 29/01/18 18/05/18 18/05/18 22/06/18
29/06/18
(TBC) 30/07/18
Current Plan 07/06/17 11/10/17 10/01/18 13/12/17 16/01/18 29/01/18
(12/01/18) 16/02/18 18/05/18 18/05/18 22/06/18
29/06/18
(TBC) 08/08/18
Secondary
Scope Scoping Initiation Delivery Realisation
Stage Scope
Prioritisation
Scope
Defined Funding Initiation
Analysis
and HLD
Detailed
Design Build
Acceptance
Test
Performance
Test
Regression
Test Imp. PIS
Baseline
Plan 07/06/17 25/07/17 07/02/18 NA NA 09/02/18 09/03/18 18/05/18 18/05/18 22/06/18
29/06/18
(TBC) 30/07/18
Current Plan 07/06/17 27/11/17 07/02/18 NA NA 16/02/18
09/03/18
09/03/18
30/03/18 18/05/18 18/05/18 22/06/18
29/06/18
(TBC) 08/08/18
RAG Key – Milestones are end dates:
Milestone date forecast to be missed Milestone date forecast to be at risk Milestone date forecast to be met Milestone completed Planning/Milestone date to be confirmed
XRN4249 –
Data Migration Approach
XRN4249 - Change Brief
• This change reinstates the PAF updates in order to receive and apply
address updates from a central source which stopped prior to Project
Nexus implementation
• Monthly files will be received from GB Group that will be processed in UK
Link for addresses that have GB Mailing I.D. (To be noted - iGT data does
not have GB Mailing ID so iGT data will not undergo any updates)
• As this change is reintroducing processes that were previously available in
legacy UK Link, we do not foresee any impacts to external User systems
• The delivery of this CR will improve address data and accuracy in line with
PAF
DSG Action – 05th February 2018
BC provided a scenario of an address update and questioned whether the update would work. What
would happen if an address change is received for an address that did not exist in the system in April
2017 – this would be rejected?
DT responded that this is a good question regarding sequencing.
The reinstatement of the Monthly PAF File updates is not reliant on the need to have processed a
previous month(s) edition. The update we perform is based on a one off notification that a change
to an address has occurred and we then locate the pertinent target address by virtue of a unique
number that is attributed to that address. This unique number is known as the GB Mailing I.D.
In response to the specific point raised, if an address (a meter supply point) didn’t exist in April
2017 but did get created in, say, October 2017; the address would be updated if we receive a
subsequent notification of an address update in any monthly edition post the re-establishment of
the Monthly PAF update process.
Address Update Sequencing
The address update process was stopped in April 2017, key question is do we apply
the updated from when this services was stopped until it is reinstated?
To reinstate the update from June 2018 does this require the sequencing of updates
from April 2017 through to June 2018?
There are approximately 7k records that are updated on a monthly basis. This means
for the 14 month period this equates to approximately 100k records to be updated
It is considered a low risk if updates from April 2017 - June 2018 are not applied. This
would equate to a <1% degradation of addresses for 22M GT specific MPRNs held on
the UK Link System
Reinstating updates from June 2018 can be planned without considering the need to
apply updates for the period April 2017 to June 2018. To be agreed with Customers
Migration Options
Options Benefits Risk Mitigation
1 Do not perform migration
– just reinstate the
process from June 2018
- Will not result in bulk address
updates
- Reinstating of the process will
be seamless to the Industry
- Improves address quality from
June 2018
- There will be <1% of
degradation of address data
from April 2017 - June 2018
- Agree with
Industry on the
approach
2 Perform migration as a
bulk update for the 14
months data to be
applied
- There will be continuity on the
process from when it was stopped
in April 2017
- There will be very minimal
degradation of address
information
- Shippers will receive
proportional number of
address updates via NAC
files
- Implementation window
might be potentially
extended, depending on
the performance of bulk
address update
- Less time to rectify issues
- We could
stagger the
NAC files at an
agreed pace
or suspend the
NAC files if the
Shippers do
not want to
receive these
files
3 Perform migration in
phases to cover the 14
months data across the
whole month of June
2018 (eg at weekends
outside of core business
day processing)
- There will be continuity to apply
address updates in sequence from
when the service was stopped in
April 2017
- There will be minimal
degradation of address
information
- Controlled implementation
- Shippers will receive
proportional number of
address updates via NAC
files
- Suspend the
NAC files if the
Shippers do
not want to
receive these
files
UK Link Release 2
XRN4449 - Customer Testing – High
Level Plan, pre-requisites and
responsibilities
Agenda
Industry Outcome
High level Testing Plan
Test Reporting
Customer Decision/Information Needed
Industry Outcome Based on the 3 options presented at the 05th February 18 DSG, the
following is the list of responses received (some Customers opted for
options 2 or 3):
Option 1 : 1
Option 2 : 6
Option 3 : 6
Following assessment of responses from 9 customers we will progress with Option
3 – All customers wishing to participate in testing can do so but will require controls
around the number of transactions and MPRNs to be tested. This will be to ensure
all testing is completed within the defined testing window
High Level Testing Plan
Test Reporting
Xoserve will share a test report that will be based on the
report that was shared during UK Link Programme to the
DRG
The test report will indicate the processes/scenarios, the
number of test cases that have been executed with a status
of pass/fail on a weekly basis
Customer Decision/Information Needed
Decision 1 – Agreement that Customer testing plans will be
aligned to Xoserve’s test plan?
Information 1 – Customers to provide testing lead contacts to
set up sessions to plan testing phase
Appendix 1
XRN4449 – PSR Requirements Customer Testing Approach presented at
05th February 2018 DSG Meeting
PSR – one off Shipper report
Background
The migration of existing needs codes categories to the new
needs codes categories, as defined in SPAA CP 16/370A, will
be undertaken by Xoserve.
Shipper Users have expressed a view that they would benefit
from a one off report detailing the migrated needs codes
categories for comparison purposes within their own
businesses.
This would be provided following the implementation of
change UKLP273.
The report requirements are clear, however no clear view has
been provided by industry regarding the transfer mechanism
The objective of this presentation is to consider feasible transfer
mechanism options again and make recommendations to DSC
Change Management Committee.
Report requirement
The one off Shipper report will be provided at Shipper shortcode level and
will consist of Shipper User’s entire portfolios in relation to Priority Service
Register customers. The following data items will be provided:
MPRN
New needs code category value (separated by comma)
Start date
MPRNs that have undergone the migration activity will have the
Release 2.0 implementation date of Friday 29th June 2018
MPRNs that will not be remapped will have the start date of the
confirmation go live date as originally provided by the Shipper
This report will be provided post 30 business days following
implementation of change UKLP273, to allow for any inflight changes (i.e.
pending confirmations) to become live with the new needs codes.
Transfer mechanism
The one off Shipper report will contain sensitive personal data
and therefore will need to be provided in a secure method.
Industry options for transferring this report are;
An un-configured file provided via the IX
A configured file provided via the IX
Reps for change 1839.4 – ER – SN found there are mixed
views in regards to the transfer mechanism.
There has been support for a configured file provided via the IX
Some parties would like other options to be considered
An un-configured file via the IX has not been supported by industry
Transfer mechanism questions
If a configured file is provided via the IX would parties waive
the 6 months notice period?
This report is provided to enable parties to reconcile data
between central systems and individual organisation systems.
Having this data months after migration activities are
undertaken, seems to be of limited value?
Xoserve believe this adhoc report could be provided via
secure, encrypted email via a stringent quality assured
process - would this be acceptable for parties?
Considering the data being passed is sensitive personal data this
option would need to be a stringent quality assured process, however
this option is signed off to be feasible and is considered the most cost
friendly option.
Volume of CNC updates
Release 3 Update
XRN4431 - Reads failing market
breaker tolerance to be accepted for
correct date following AQ Correction
– Solution options - Recommendation
for Release 3
XRN4453 File Format Should Have
changes – Walkthrough, discussion
and recommendation on inclusion of
change items within Release 3
DSG Actions
Open Actions Title
Meeting
Date Action Owner Status Update
0109 22/01/2018 XRN3656 -Read Validation Tolerances - Analysis
from across the industry / Xoserve analysis needs to
be completed prior to the 5th February meeting.
Xoserve
(RH) Open
This information is currently not available from SAP-BW
until after R2. Request for the industry to share any
analysis undertaken by 5th March DSG meeting
0110 22/01/2018 XRN4484 - Remove restriction on nominated SOQ
(as per MOD 445)- To issue within a Change Pack for
ratifying at ChMC Xoserve Open
This is an internal impact to Xoserve. A CP will be issued
when the change is being delivered
0114 22/01/2018 XRN4482 - SAP Meter Read Entry Screen - To define
the outputs of the reads - how will Shipper Users
know of the reads that have been entered manually Xoserve Open
This activity can be completed through a minor
enhancement. The Change Pack to be issued will inform
Users of how to identify these reads
0115 22/01/2018 XRN4503 - Late Meter Attached resolution - Further
analysis to be completed Xoserve Open
Change not within scope of R3. Potential closure of
change TBC.
0201 05/02/2018 EL to check with Matt Smith and advise KB regarding
2 defects Xoserve Open
EL has provided an explanation to KB regarding the
difference in defect and Service Desk priority scoring.
Awaiting confirmation from KB that this has answered the
query before closure.
0203 05/02/2018 LC to consider the question around sequencing and
provide DSG members with an update Xoserve Open
Data Migration plan to load files since service was
stopped continues to be defined through design; options
will be presented to DSG on 5th March. XRn4249 plan
will have a DM phase within the plan and be tracked
0208 19/02/2018 XRN4449 - PSR reports - Xoserve to issue an
anonymised example report within the minutes of the
DSG meeting on 19th Feb. Xoserve Open Example report issued within the DSG minutes
0209 19/02/2018 XRN4449 - PSR - Xoserve to issue the final version
of PSR mapping rules via the [email protected]
box account. Xoserve Open
Require confirmation from Tahera regarding the latest
mapping rules.
0211 19/02/2018
XRN4431 - Reads failing market breaker tolerance to
be accepted for correct date following AQ Correction -
Xoserve to update the Option slides and present
again at DSG on Monday 5th March
Xoserve Open Slides to be updated and issued ahead of meeting.
0213 19/02/2018 DSG members to provide feedback on the Xoserve
website. DSG Open
Feedback to be provided to the [email protected] box
account
Closed Actions (for info, to be removed 19/03) Title
Meeting
Date Action Owner Status Update
0101 22/01/2018 XRN4273 - Installed Status of Failed MOD614 - To consider
impacted reports if known through the impact assessment. Xoserve Closed Part of Release 3.0 impact assessment.
0102 22/01/2018 XRN4381 - The Updating of the ZDT_AQ_OPER table - Share the
change that this links to with DSG Xoserve Closed
Confirmed no link to other change and removed from R3. To be
delivered by Minor Enhancements.
0103 22/01/2018 XRN4431 - Reads failing market breaker tolerance to be accepted
for correct date following AQ Correction - Xoserve to add to the
agenda on 5th February and bring solution options.
Xoserve
(ES) Closed
Options provided as part of 19th Feb DSG agenda. New action
(0211) associated to this XRN.
0104 22/01/2018
XRN4477 -Response file for (AIR) the request to bill (RTB)
submission from Networks are not getting generated for the
originator. The change is to be issued to the Networks and the
Networks to confirm that it can be closed.
Xoserve
(RH) Closed
Action closed as the change has been issued within Change Pack
(1856.1) on 31st Jan as 'proposed to close'
0105 22/01/2018 XRN4453 - File format should have changes - Xoserve to release
the list containing the 270 changes and DSG to confirm if there are
functional changes that need to be considered within R3.0.
Xoserve
(RH) Closed
Issued in a Change Pack (1856.3) on 31st January. Open for
representation comments until 21st Feb. Extended f2f DSG meeting
arranged on 5th March to discuss these changes.
0106 22/01/2018 XRN4436 -Change number of occurances for K13 record for
SSMP’s - Xoserve to write out to all Shippers who manage shared
supply point contracts to seek views
Xoserve
(RH) Closed
As there is no distribution list for SSMP Shippers and to solicit views
of the change for other Shippers who will be impacted we issued in
CP 1866.4 on 9th February. Representation period open untl 23rd
February.
0107 22/01/2018
XRN4432 - Amendment to U82 record to include the revised NTS
optional tariff rate - The number of occurrences this has occurred to
be shared. Xoserve to check all the hierarchies have been included
within the change.
Xoserve Closed This will be included within the impact assessment for the change to
be included within Release 3
0108 22/01/2018 XRN4486 - Meter Type O = Orifice to be an acceptable value in file
formats and reports - Impacted records and files to be
communicated. Xoserve Closed Will be considered within the impact assessment for Release 3
0111 22/01/2018 XRN 4465 - Annual Production and notification of LIS-3years read -
The change needs to be communicated - how the reads will be
issued. Update to be provided to DSG on 5th February Xoserve Closed
Will be implemented in early March, will provide reads as estimates
on the MBR file except for any twin stream /uniques/prime, for which
there will be an exceptional process which would require manual
read creation and notification.
0112 22/01/2018 XRN4438 - Contact titles nullified report - Recommended either
requires sponsorship or should be closed as couldn't gauge the
benefit of such a report Xoserve Closed
Issued for industry views within Change Pack 1856.1 on 31st
January. No comments received during the representation period
and it is expected that this change will be closed.
0113 22/01/2018 XRN4528 - The word ‘PLOT’ as a prefix - Confirm this is prior to the
'plot' change within Release 2.0 Xoserve Closed
This is due for delivery on 30th March, being delivered as a defect
and is separate to the change being implemented in R2
0116 22/01/2018
XRN3732 - Capability to replace a sequence of readings - To be
confirmed if required based on RAASP requirements. The industry
wants to consider further scenarios to establish if there is a need to
deliver this change.
DSG Closed No analysis to support the continuation of this change. Industry
parties confirmed they had found no scenarios to support this
change. Agreed by DSG to close this action.
Closed Actions (for info, to be removed 19/03)
Title Meeting
Date Action Owner Status Update
0117 22/01/2018
XRN4541 –Read Design Gaps - Missing Overide Flags In RGMA
and Retro Files - Clarification will the removal of the outer tolerance
validation be included within the change. Potential to introduce new
rejection codes.
Xoserve Closed To be completed within the IA within R4
0118 22/01/2018 XRN4495 - Energy Tolerance Rejection Code - Solution to be
explored and assessment whether it can be in R3.0 Xoserve Closed To be completed as part of the IA within R3
0119 22/01/2018 XRN3667 - Provision of Formula year AQ - Solution to be explored
and assessment whether it can be in R3.0 Xoserve Closed To be completed as part of the IA within R3
0120 22/01/2018 To request the defect drop be added into the bulletin Xoserve Closed Has been completed
0202 05/02/2018 LC to send list of Primary and Secondary Scope items to BC Xoserve Closed Has been completed
0204 05/02/2018 Customers to confirm training requirements at the next DSG meeting
on 19th February DSG Closed DSG members to input to training requirements by 19th.
0205 05/02/2018 Customers to confirm preferred testing option for XRN4449 at next
DSG meeting on 19th February DSG Closed As of today
0206 05/02/2018 Summary document and Change Packs to be sent to BC Xoserve Closed Has been completed
0207 05/02/2018 File format change document to be sent to BC Xoserve Closed Has been completed
0210 19/02/2018 XRN4449 - Xoserve to add 'Volume of CNC updates' to the next
DSG agenda. Xoserve Closed
Added to the agenda on 5th March and issued within the invite on
19th February. Action complete.
0212 19/02/2018 Xoserve arrange and issue invite to face to face DSG meeting on
Monday 5th March. Xoserve Closed Invite has been issued on 19th February. Action completed
0211 19/02/2018 Xoserve to issue the latest version of the R2 Customer Training
Requirments Xoserve Closed
Latest material issued within the minutes for the DSG meeting on
19th February
AOB