1
1. INTRODUCTION
This report is a partial contribution from Iceland to the
International Energy Agency Geothermal Implementing
Agreement (IEA-GIA), Annexes VII and XI and the
Lower Cost Drilling Annex of the International Partner-
ship for Geothermal Technology (IPGT).
After successful development of the Nesjavellir Field in
the Hengill Geothermal Area (first plant commissioned
in 1990, generating 120 MWe of electricity and 300
MWth of hot water), Reykjavik Energy decided to ex-
plore other prospects in the area for new plants. In the
period 2001-2011 the company drilled 55 exploration
and production wells as well as 17 reinjection wells in
the Hengill Area, and 5 make-up wells in the Nesjavellir
Field. The Hellisheidi Geothermal Plant, about 20 km
east of Reykjavík, was commissioned in four stages
2006-2011. It generates now 303 MWe of electricity in
two units and 133 MWth of hot water for district heating.
This intensive drilling activity in the same geothermal
area provided a unique source of data to obtain statistical
estimates of the cost and effectiveness of geothermal
drilling. The number of working days to complete each
of four depth sections of the well (surface, anchor, pro-
duction casings and the slotted liner) was analyzed and
the results were grouped according to which well design
was used and technology applied. Cost calculations in
this study are based on assumed market prices for servic-
es and material, as the real cost was not made available.
The drilling was done by Iceland Drilling Ltd. after int-
ernational tendering. The majority of the wells were dr-
illed with modern drill rigs, up to four at the same time.
The rigs are all-hydraulic with a top-drive and the large
ones with automatic pipe handling. The time breakdown
in this study was worked out from the geological daily
reports prepared by Iceland GeoSurvey as the daily rig
reports are confidential.
Former efforts to analyze this data were undertaken by
Sveinbjornssonand Thorhallsson 1,2,3. This paper re-
ports selected topics from these references, with emphas-
is on the frequency of problems which led to excessive
additional cost. The study compares workdays in drilling
holes with two different casing diameter programs, for
vertical and directional drilling. Completion tests at the
end of drilling provide an Injectivity Index which serves
as a preliminary estimate of future flow rates from the
well. Such tests are of importance for deciding whether
to drill deeper, drill a sidetrack or to apply well stimula-
tion before moving the drilling rig off the well. To ob-
tain reliable predictions of steam mass flow on the basis
of the Injectivity Index one must, however, consider re-
servoir conditions and enthalpy of the expected inflow
ARMA 13-386
Drilling performance and productivity of geothermal wells - Case history from Hengill Geothermal Area in Iceland
Sveinbjornsson, B.M.
Iceland GeoSurvey, Reykjavik, Iceland
Thorhallsson, S.
Iceland GeoSurvey, Reykjavik, Iceland
Copyright 2013 ARMA, American Rock Mechanics Association
This paper was prepared for presentation at the 47th US Rock Mechanics / Geomechanics Symposium held in San Francisco, CA, USA, 23-26
June 2013.
This paper was selected for presentation at the symposium by an ARMA Technical Program Committee based on a technical and critical review of the paper by a minimum of two technical reviewers. The material, as presented, does not necessarily reflect any position of ARMA, its officers, or members. Electronic reproduction, distribution, or storage of any part of this paper for commercial purposes without the written consent of ARMA is prohibited. Permission to reproduce in print is restricted to an abstract of not more than 200 words; illustrations may not be copied. The abstract must contain conspicuous acknowledgement of where and by whom the paper was presented.
ABSTRACT: Drilling performance of 77 production and reinjection wells in the Hengill Geothermal Area in Iceland is analyzed.
The study compares workdays, and time spent on seven different drilling activities, in drilling holes with two casing diameter pro-
grams, both vertical and directional. The Monte Carlo method was applied to obtain a statistical estimate of the number of work-
days and the cost of a 2235 m deep directional reference hole. On average this hole needed 45 workdays with a standard deviation
of 7.2 days. The cost was inferred from time and usage data as the actual costs were not available for the study. The average cost
for a large diameter reference well is 4.3 million USD or about 2000 USD/m. Drilling problems due to loss of circulation or coll-
apsing geological formations led to higher drilling costs for 24 wells but the majority of holes were drilled according to the origin-
al schedule. The risk of drilling such holes in terms of cost and output is not as high as often alledged. To predict steam mass flow
on the basis of the Injectivity Index, determined at the end of drilling, one must consider reservoir conditions and enthalpy of the
expected inflow into wells. About 80% of the drilled wells are productive. The average generating capacity is ~5.9 MWe per drill-
ed well. Injection of waste water from the power plant resulted in thousands of earthquakes, of magnitude up to Ml 4.
2
into wells. About 80% of the drilled production and
make-up wells turned out to be productive. The power
output of the large diameter wells is 30-40% higher than
that of the regular diameter wells.
Injection of waste water from the Hellisheidi power
plant led to an intense swarm of induced earthquakes
which gradually declined in frequency and magnitude.
While the results obtained in the Hengill field may not
apply in fields with different geology and reservoir char-
acteristics, the approach in this paper could lead to valu-
able comparisons.
2. DRILLING PERFORMANCE
2.1 Drilling in the Hengill Area A recent description of the conceptual model of the
Hengill geothermal system was given by Franzson et al.
4. The drill fields are shown in Fig. 1.
Fig. 1. Prospective fields in Hengill Geothermal Area. Most of
the wells drilled in the years 2001-2011 were in the Hellis-
heidi, Grauhnukar and Hverahlid Fields. Figure from Iceland
GeoSurvey.
Fig. 2 shows the location and trajectories of wells and
the formation temperature in the drill fields.
Two types of casing designs for high temperature wells
were used. The wells of both programs were either drill-
ed vertical or directional. The most common type is a
directional well with a “large diameter” casing program.
The pre-drilling (Section 0) is done by a small rig with a
26" bit down to 90 m for a 22½" surface casing, follow-
ed by Section 1 drilled by a larger rig with a 21" bit to
300 m for the 18⅝" anchor casing. Inclined drilling
starts with a kick-off point (KOP) in Section 2, where
the inclination is gradually built up by 2.5-3.0° per 30 m.
The section is drilled with a 17½" bit to 800 m for 13⅜"
production casing. The open hole in Section 3 is drilled
with a 12¼" bit to a depth of 1800 to maximum of 3300
m for 9⅝" slotted production liner. The other design is
narrower, each casing one size smaller, and called the
“regular diameter” casing program. The sections are the
same but the diameters 18⅝" of the surface casing, 13⅜"
anchor casing, 9⅝" production casing, and 7" slotted
production liner. Fig. 3 shows examples of the design of
a vertical well of regular diameter and a directional well
of large diameter.
Fig. 2. Formation temperature in the Hellisheidi, Grauhnukar
and Hverahlid Fields of the Hengill Area at 1000 m below sea
level, about 1400 m depth. Blue dots and lines indicate well-
heads and trajectories of directional wells. A red star on the
trajectory indicates where the well reaches the depth of the
map. Figure from Bessason et al. 5 .
Fig. 3. Examples of the design of a vertical well of regular dia-
meter and a directional large diameter well. On left, the four
depth intervals for the reference well, Sections 0, 1, 2 and 3.
The same section numbers are used in Tables 1 to 4. Figure
from Iceland GeoSurvey.
3
The pre-drilling to about 90 m was performed with air
hammer and foam, or with tricone insert bits, using mud
and water as circulation fluids. Rotary drilling techniq-
ues with tricone insert bits were applied in Section 1, but
in Section 2 a mud motor was used to rotate the bit and a
Measurement While Drilling (MWD) tool inserted in the
drill string to monitor direction (azimuth) and inclination
(degrees) of the well. In Section 3 until total depth no
mud was used but drilling was carried out with only wat-
er as long as there were no circulation losses. After loss-
es were encountered the circulation was in most wells
switched over to aerated water by compressed air for
pressure balance drilling.
Seven drill rigs were used to carry out the drilling. Two
small rigs with a hook-load capacity of 50 tonnes were
often used for the pre-drilling to 90 m depth. An inter-
mediate rig (100 t) was sometimes used for the sections
to 300 m to meet the tight schedule and fully utilize the
rig fleet. The four large rigs (180, 200, 300 t) were used
in all sections, and always in the deepest one (Fig. 4).
Fig. 4. A drilling rig with 200 tonnes hook-load capacity on
site at Hellisheidi field. Photo from Iceland Drilling Ltd.
2.2. Time Analysis of Drilling Data To compare the drilling time for different wells, the re-
spective numbers of workdays were normalized for a
reference well of that design and the average depth of
the group which was 2235 m. The frequency distribution
of workdays for each section was found to be asymmetr-
ic with the most frequent value lower than the average.
An example of this distribution is presented in Fig. 5 for
the workdays in drilling Section 3 from 800-2235 m in
46 large diameter directional wells. The data is best fitt-
ed by a Beta-PERT distribution, defined by the lowest,
most likely and the highest value observed.
Table 1 shows the lowest, most likely and highest values
of normalized workdays in drilling the four sections of
directional large diameter wells. Average and standard
deviation are calculated for the respective Beta-PERT
distribution. The number of wells analyzed for each sect-
ion varies as fewer reports were available from Section 0
of pre-drilling and Section 1 drilling for the anchor cas-
ing. The most complete set of geological reports is avail-
able from drilling Section 2 for the production casing
and Section 3 drilling of the open hole.
Fig. 5. Frequency distribution of normalized workdays in drill-
ing Section 3 from 800-2235 m in 46 large diameter direct-
ionally drilled wells.
Table 1. Normalized workdays for directional, large diameter
reference wells.
Section Drilled Number Lowest Most likely Highest Average(m) (days) (s) (%)
0 0-90 38 3 4 14 5.5 1.8 331 90-300 44 4 8.5 29 11.2 4.2 372 300-800 46 6 9 20 10.3 2.3 233 800-2,235 46 8 16 36 18.0 4.7 26
Total 2,235 45.0 6.9
Wells Workdays Beta-PERTSt. deviation
To obtain an estimate of the variance in total cost Monte
Carlo simulations with 50,000 trials were carried out
using the Beta-PERT probability distributions in Table 1
for the number of workdays. Fig. 6 shows the distribut-
ion of the resulting total of workdays in drilling of large
diameter wells.
Fig. 6. Monte Carlo simulation of the distribution of total
workdays of a large diameter directional reference well to
2235 m. The mean is 45.0 days and the standard deviation
7.23 days. With 95% confidence the workdays lie between
32.1 and 60.1 days as indicated by arrows.
The workdays were also analysed for each of the four
sections of drilling and the time used for seven different
activities such as actual drilling, running and cementing
casing, delays due to drilling problems, logging, install-
ation of wellhead, repairs of equipment and other reas-
ons for delays. The results are shown in Table 2.
4
Table 2. Percentages of total workdays used in different activ-
ities of drilling a directional, large diameter reference well.
WorkdaysSection Drilled Number Average Drilling Casing Problems Logging Completion Repairs Other
(m) (n) (d) (%) (%) (%) (%) (%) (%) (%)0 0-90 38 5.5 47.0 28.1 9.5 0.0 11.0 1.7 2.71 90-300 44 11.2 36.6 26.3 10.0 9.9 12.5 2.9 1.72 300-800 46 10.3 46.6 21.7 5.1 11.2 11.0 3.9 0.63 800-2,235 46 18.0 54.4 5.8 11.1 15.8 7.5 4.8 0.6
Total 45.0
Wells Percentage in different activities
Table 3 compares the number of workdays for large dia-
meter directional and vertical wells, and Table 4 shows
the same comparison for “regular” diameter wells. The
number of wells varies according to the number of each
type drilled and the availability of reports. The average
and the standard deviation are calculated assuming a
Beta-PERT distribution for the workdays. The total
workdays for the large diameter directional wells are
45.0 days compared to 45.8 days for much fewer vertical
wells.
Table 3. Workdays for large diameter directional and vertical
wells. The first two sections of all wells to 300 m are drilled
vertically. The rest of the well, Sections 2 and 3, are then eith-
er drilled directionally or vertically.
Section Depth Diameter Number Days St. dev. Number Days St. dev. Number Days St. dev.
(m) (") of wells (d) (s) of wells (d) (s) of wells (d) (s)0 0-90 26 38 5.5 1.81 90-300 21 44 11.2 4.22 300-800 17½ 51 10.3 2.3 46 10.3 2.3 5 9.8 0.83 800-2,235 12¼ 53 18.0 4.7 46 18.0 4.7 7 19.3 3.7
Total/Average 45.0 6.9 45.0 6.9 45.8 5.9
Large diameter program All wells Directional wells Vertical wells
The directional regular diameter wells take 43.5 days on
average but fewer vertical wells 48.3 days. Considering
the numbers in each group and the respective standard
deviations the difference in total workdays is not signifi-
cant. It is of interest to note that for directional wells the
average for 17 narrower program wells is 43.5 days
compared to 45.0 days for 46 wells of the large diameter
program.
Table 4. Workdays for regular diameter directional and verti-
cal wells.
Section Depth Diameter Number Days St. dev. Number Days St. dev. Number Days St. dev.
(m) (") of wells (d) (s) of wells (d) (s) of wells (d) (s)0 0-90 21 25 5.8 2.21 90-300 17½ 25 8.3 2.02 300-800 12¼ 23 11.5 2.8 17 10.7 2.0 6 12.2 2.83 800-2,235 8½ 22 21.3 6.3 17 18.7 3.0 5 22.0 6.3
Total/Average 47.0 7.5 43.5 4.7 48.3 7.5
Regular diameter program All wells Directional wells Vertical wells
2.3. Drilling Cost and Problems Although most wells were drilled close to the original
time schedule, some wells encountered difficulties re-
sulting in workdays exceeding considerably the average
for the respective activity. The drilling reports were exa-
mined to find the causes for the excess workdays. Most
common were problems due to loss of circulation or
collapsing geological formations where the rig got stuck.
The time analysis identified such incidences in 24 wells
or 31% of the 77 wells drilled. The additional cost was
though low in most cases. Problems due to geological
formations were the primary cause of problems in 18 of
the 24 wells. They led to other problems such as diffi-
culties in running the casing in three wells and excessive
cement loss into the formation. In five wells the rig got
stuck and had to cut the drill string by explosives, losing
the bottom hole assembly, collars and part of the drill
pipes in the well. This occurred twice in one well. Four
wells were sidetracked due to a stuck drill string and two
because of a wrong direction. Two wells were abandon-
ed because of a collapse and a stuck drill string. Repairs
on the top drive were necessary during drilling four
wells, sometimes due to excessive strain in attempts to
free a stuck string. In two wells the section of initial
drilling had to be divided into two steps due to over-
pressure in shallow boiling aquifers.
Caves due to the collapse of walls often presented severe
problems for continued drilling and demanded large
quantities of cement to fill. Such caves remain as poorly
cemented sections and increase the risk of casing dam-
age when the well is subjected to large variations in
temperature. An example is given in Figs. 7 and 8.
Fig. 7. A view from side on the upper end of the ruptured pro-
duction casing. Photo from Iceland GeoSurvey.
Fig. 8. A view from side on the lower end of the ruptured pro-
duction casing. Note the coupling thread grooves. In the back-
ground fractured rock filled with cement. Photo from Iceland
GeoSurvey.
5
There a 50 cm break was found at 310 m depth in the
production casing of well HE-53, 4 m below the end of
the anchor casing.
The additional cost due to drilling problems was estimat-
ed on the basis of workdays that were required to solve
the problem beyond the average number of workdays re-
quired in the respective section. Also taken into account
was the cost of cement, bentonite-mud and other suppli-
es in excess of what is accounted for in a reference well.
Sections that were abandoned by sidetracking were
counted as additional cost in workdays and material us-
ed. Thirdly the cost of lost equipment and drill string in
the hole that could not be recovered, was included as lost
in hole charge. Fig. 9 shows the cost above the average,
for the 24 problem wells.
Fig. 9. Additional cost due to drilling problems in individual
wells, total 24 wells.
The additional cost was compared to the estimated cost
of drilling the reference well of the large diameter pro-
gram. That cost was calculated on the basis of the numb-
er of workdays required for each section of the drilling,
using a weighted average of the day rates for different
activities. The material costs on the other hand depend
on commodity prices of steel, cement, fuel oil etc. They
are relatively predictable because the quantities needed
are known. A breakdown of cost for different sections is
shown in Table 5.
Table 5. Breakdown of cost for a large diameter directional
reference well to 2235 m.
To obtain an estimate of the variance in total cost Monte
Carlo simulations with 50,000 trials were carried out
using probability distributions for the number of work-
days, the unit costs of material, and day rates for the
drilling rigs. The results are in Fig. 10. Considering the
standard deviation s of $450,000 for the reference well,
18 of the wells have an additional cost less than 3 s
To obtain a view in terms of the s the additional cost
was divided by the s and the frequency calculated as
Fig. 10. Monte Carlo simulation of the total cost of a large
diameter directional reference well to 2235 m. The mean is
$4,317,588 and the standard deviation $451,229. The cost lies
with 95% confidence within the limits $3,517,000 and
$5,262,000 as indicated by arrows.
percentage of the total wells drilled. Fig. 11 shows the
result. For 77 wells drilled the additional cost was larger
than one s in 18 wells or about 23%. It exceeded 2 s in
10 wells or 13% and 3 s in 6 wells or nearly 8% of the
total. This distribution can be of aid in estimating additi-
onal risk due to problems on top of the risk included in
the statistical distribution of the reference well.
Fig. 11. Percentage of the total of 77 drilled wells with additi-
onal cost due to drilling problems larger than a multiple of the
standard deviation s of the reference well.
3. PRODUCTIVITY OF WELLS
3.1. Injectivity
Grant 6 addressed the relationship between injectivity
and productivity of wells and optimization of decision
criteria whether to accept a well, sidetrack it or to dis-
miss the drilling rig and undertake a full well test. The
Injectivity Index (II), (kg/s)/bar, is determined at the end
of drilling by logging the downhole pressure response
near the dominating feeder to different rates of pumping
water onto the well (e.g. 20, 40 and 60 kg/s), each step
lasting approximately 3 hours. It serves as the first indi-
cator of the well productivity. Injectivity normally incr-
eases with continued injection due to thermal stimulat-
ion. To compare wells one must therefore use values ob-
tained in completion tests before any extended injection
period. Fig. 12 shows the relative frequency distribution
of the Injectivity Index in 73 production and injection
wells in the Hengill Area.
6
Fig. 12. Relative frequency of Injectivity Index for 73 product-
ion and injection wells in the Hengill Area.
The distribution is asymmetric with a longer tail to high-
er values. The logarithm of the Injectivity Index is, how-
ever, normally distributed as demonstrated in Fig. 13,
showing fit of the data with the cumulative probability
of a lognormal distribution with a mean of log10(II)=
0.78 and a standard deviation of log10(II) = 0.35.
Fig. 13. Cumulative probability of the Injectivity Index for 73
production and injection wells in the Hengill Area. The proba-
bility is calculated using a lognormal distribution for the loga-
rithm of the Injectivity Index.
The cumulative probability denotes the probability that
the Injectivity Index (II) is less or equal to the corre-
sponding value. The mean (50%) corresponds to II = 6.0
(kg/s)/bar which is the most likely value for the Injectiv-
ity Index while the average equals 8.7 (kg/s)/bar.
3.2. Productivity Extensive data on the flow test of wells is available from
Sigfusson et al. 7. Figs. 14 and 15 show the relative
frequency distribution of the total mass flow rate (kg/s)
and the steam mass flow rate for 43 production wells in
the Hellisheidi Field of the Hengill Area. The distribut-
ion of both the total flow and the steam flow is lognorm-
al as that of the Injectivity Index. Fig. 16 shows a fit of
the total mass flow data with the cumulative probability
of a lognormal distribution with a mean of log10 (Qtotal) =
1.50 and a standard deviation of log10 (Qtotal) = 0.33.
Fig. 14. Relative frequency of total mass flow rate (kg/s) at 8
bar-g separation pressure for 43 production wells in the Hellis-
heidi Field.
Fig. 15. Relative frequency of steam mass flow at 8 bar-g
separation pressure for 43 production wells in the Hellisheidi
Field.
The mean corresponds to Qtotal = 31.6 kg/s which is the
most likely value for the obtained total mass flow in a
productive well while the average equals 39.2 kg/s.
Fig. 16. Cumulative probability of total mass flow at 8 bar-g
separation pressure for 43 production wells in the Hellisheidi
Field. The probability is calculated using a lognormal distri-
bution for the logarithm of the total mass flow.
Fig. 17 shows the fit for the steam mass flow data with a
mean of log10 (Qsteam) = 1.07 and a standard deviation of
log10 (Qsteam) = 0.40. The mean corresponds to Qsteam =
11.7 kg/s which is the most likely value for the obtained
steam mass flow in a productive well although the aver-
age equals 16.4 kg/s.
7
Fig. 17. Cumulative probability of steam mass flow at 8 bar-g
separation pressure for 43 wells in the Hellisheidi Field. The
probability is calculated using a lognormal distribution for the
logarithm of the steam mass flow.
The steam ratio x = Qsteam/Qtotal is the steam fraction, re-
ferred to as quality, at 8 bar-g separation pressure which
for the wells ranges from 0.08 to 0.99 and has an aver-
age of 0.44. For a water inflow at a temperature of 220-
340°C the steam ratio at 8 bar-g should be in the range
of 0.09-0.42. This indicates that for most of the wells the
inflow is a two phase mixture of steam and water where
the steam dominates in volume.
3.3. Injectivity, Mass Flow and Steam Yield In search of a relation between the Injectivity Index and
the total mass flow a log/log-graph of total mass flow of
wells at 8 bar-g separation pressure was drawn against
the Injectivity Index (Fig. 18).
Fig. 18. Total mass flow at 8 bar-g separation pressure in 43
wells drawn against the Injectivity Index using bilogarithmic
scales. The data points and shading indicate groups of antici-
pated reservoir temperatures of the dominating feeders of indi-
vidual wells in the range of 220-250°C, 250-280°C, 280-
300°C and 300-320°C.
The range of mass flow lies between 10-100 kg/s and the
Injectivity Index between 2-35 (kg/s)/bar. Fig. 18 indi-
cates a relation of the kind suggested by Grant and Bix-
ley 8 but the data points are scattered due to different
reservoir temperatures of the dominating feeders and
boiling inflow into wells. Approximate curves are drawn
through the corresponding data points. For a known
Injectivity Index and reservoir temperature this graph
can be used to estimate the future mass flow. To obtain
reliable predictions of steam yield on the basis of the In-
jectivity Index one must, however, consider reservoir
conditions and enthalpy of the expected inflow into
wells. In view of the excess steam in inflow the relation
between the Injectivity Index and the total mass flow
will only give a minimum estimate for the expected st-
eam yield. Most of the wells do yield more than that
minimum as evidenced by the mean steam ratio of 0.44.
3.4. Power Output of Wells The overall economics of a geothermal power project is
strongly influenced by the power output per well, or how
much can be reinjected, which is also considered in eval-
uating the drilling effectiveness. Table 6 shows the aver-
age power output per drilled geothermal production well
and a productive well in the Hellisheidi Field of the
Hengill Area.
Table 6. Average megawatts of electricity (MWe) that can be
generated per drilled well and per productive well in the Hell-
isheidi Field.
Diameter Number of drilled Number of drilled
production wells productive wells
Large 37 29 6.4 8.2Regular 17 14 4.9 5.9Total/Average 54 43 5.9 7.5
Power per drilled
well (MWe)
Power per productive
well (MWe)
To generate 1 MWe the turbine alone requires a steam
flow rate of 1.9 kg/s but considering parasitic consumpt-
ion a conservative rate of 2.2 kg/s is used in this article.
The average power output per drilled well amounts to
5.9 MWe but 7.5 MWe per productive well. The large
diameter wells yield 30-40% more steam. To evaluate
the advantage of drilling large diameter wells instead of
regular diameter one must also consider the cost. The
material cost of a large diameter well is about 30% high-
er than that of a regular diameter well, but as shown in
Chapter 2.2 the time cost for a large diameter well was
not significantly higher than that of a regular diameter.
Considering the ratio of time cost versus material cost
the total cost of a large diameter well in the Hengill
Field is thus only 10% higher than that of a regular dia-
meter well.
4. INDUCED SEISMICITY
The Hengill Area is at the intersection of the South Ice-
landic Seismic Zone (SISZ) with the Western Rift Zone
(WRZ). The WRZ is characterized by northeasterly er-
uptive fissures and normal faults. The SISZ has an und-
erlying sinistral EW transform fault but the surface
breaks in dextral NS and conjugated sinistral ENE strike
slip faults. Both systems have been active in the Hengill
Area as shown on Fig. 19.
The Hengill Area is noted for swarms of earthquake act-
ivity with events reaching magnitude Ml 6 every 30
years. Induced seismicity occurred during drilling of
8
Fig. 19. Blue lines are eruptive fissures and faults in the Heng-
ill Area. Green lines indicate seismic faults. Red dots are sur-
face manifestations of geothermal activity. Figure adapted
from Arnason and Magnusson, 9.
some wells in the Hellisheidi Field. This was clearly
demonstrated while drilling the reinjection wells HN-12
and HN-17 at Husmuli near the western rim of the field
(Fig. 20). The following description of induced seismic-
ity at Husmuli is based on an extensive report by Bessa-
son et al. 5.
Fig. 20. Location of reinjection wells (gray lines) at Husmuli
on the western rim of the Hellisheidi Field. The red stars indi-
cate distribution of earthquakes with magnitude Ml >1.5 that
occurred while drilling HN-17. Orange lines are eruptive fiss-
ures. Red lines with ticks are normal faults. Figure from
Bessason et al. 5.
Fig. 21 shows how loss of circulation in drilling HN-17
led to intense swarms of earthquakes.
Fig. 21. Earthquake swarms while drilling the reinjection well
HN-17. Red bars indicate occurrence and magnitude of earth-
quakes. The blue line shows accumulated number of earth-
quakes. Figure from Bessason et al. 5.
Geothermal waste water and condensed steam from the
first unit of the Hellisheidi Plant was reinjected into
wells at Grauhnukar some 4 km SSW of Husmuli. No
earthquake activity occurred during drilling of these
wells and the injection of 200-300 l/s induced no seism-
icity either.
Reinjection from the second unit of the plant into four
wells at Husmuli started in early September 2011. Since
September 23 the reinjection has been 400-600 l/s of 80-
100°C hot water. The wellhead pressure is about 7 bar-g
and the pressure at the receiving formation is about 28
bars higher than before the injection. This overpressure
is not sufficient to create new but may open existing
fractures. The acceptance of wells improves with lower
temperature of the injected water. This may indicate that
thermal contraction aids in opening the existing fract-
ures.
On September 8 a swarm of earthquakes started near
Husmuli. In view of the earthquakes that occurred dur-
ing drilling the wells this was not unexpected but the
number of earthquakes and their magnitude was larger
than anticipated. From September 2011 to May 2012,
4600 earthquakes of magnitude M l > -0.4 were recorded.
About 150 earthquakes exceeded Ml 2.0, about 40 Ml
2.5, and 8 were in the range Ml 3.0-4.0. The two largest
events of Ml 4.0 occurred on October 15. They may have
been associated with a temporary break of several hours
in the reinjection, followed by a sudden increase in pore
pressure as the reinjection began again. This break was
due to loss of electric power in bad weather. Sudden
changes in pore pressure are known to trigger induced
seismicity (Majer10). Fig. 22 shows the rate of rein-
jection and the associated earthquake activity.
9
Fig. 22. (a) Rate of reinjection of waste water into wells at
Husmuli (red curve) and temperature of the water (blue curve)
from early September 2011 to end of April 2012. (b) Recorded
earthquakes: Red bars indicate occurrence and magnitude of
earthquakes. The blue line shows accumulated number of
earthquakes. Figure from Bessason et al. 5.
Fig. 23 shows relative location of the earthquakes from
the beginning of September 2011 to the end of April
2012. During those months the activity spread 2-3 km
northwest delineating parallel northerly striking fracture
zones. The dominating focal mechanism in the earth-
quakes is strike slip with some component of normal
slip. It is noteworthy that the earthquakes do not corre-
late with normal faults in Husmuli but delineate norther-
ly fracture zones similar to those found in larger earthqu-
akes of the SISZ. The reinjection of 500 l/s has been
continued without sudden interruptions since April 2012
and the induced seismicity is still declining, no events
larger than Ml 1.5. The areal distribution of the induced
earthquakes and the decreasing intensity indicate that the
tectonic regime is approaching a new equilibrium with
the injected water.
5. CONCLUSIONS
No significant difference was found in the time required
to drill holes of the wider 13⅜" production casing or the
regular narrower casing of 9⅝" diameter. No difference
either was found in the time used to drill vertical or in-
clined directional wells. The average power output per
drilled well amounts to 5.9 MWe but 7.5 MWe per pro-
ductive well. The wider wells cost 10% more than the
narrower wells but yield 30-40% more steam.
The results of this analysis of drilling performance clear-
ly indicate that the perceived high risk in geothermal
drilling is less than often alledged. The standard deviat-
ion of the total cost of a well is about 10% of the average
cost. Only 6 wells, or 8% of the total 77 wells drilled,
had costs exceeding 3 standard deviations. The risk lies
mainly in the nature of the geological formation, prob-
lems due to loss of circulation or collapsing walls where
the rig gets stuck.
Fig. 23. Relative location of earthquakes associated with rein-
jection at Husmuli. (Upper figure) Earthquakes in September
(dark blue) and October 2011 (blue-green). The stars show
location of the two largest earthquakes of Ml 4 that occurred
on October 15. (Lower figure) Earthquakes from September
2011 to April 2012. The colors for each month are different.
The diamonds are GPS-stations. Figure from Bessason et al.
5.
10
Comparison of injectivity and productivity of wells indi-
cates that to obtain reliable predictions of steam mass
flow on the basis of the Injectivity Index one must also
consider reservoir conditions and enthalpy of the expect-
ed inflow into wells. In a reservoir where a boiling mix-
ture of steam and water enters the well the injectivity test
can only predict the total mass flow and the correspond-
ing minimum steam mass flow.
Reinjection of geothermal waste water and condensed
steam led to an intense swarm of induced seismicity cul-
minating after 6 weeks in two events of Ml 4. Decreasing
frequency and magnitude over 18 months indicate that
the tectonic regime is approaching a new equilibrium
with the injected water.
ACKNOWLEDGEMENTS
We thank Reykjavik Energy for permission to use the drilling
data from the Hengill Area. Reykjavik Energy and National
Energy Authority (Orkustofnun) gave financial support to
undertake this work. The authors would like to thank the Inter-
national Energy Agency/Geothermal Implementing Agree-
ment and the US Department of Energy for their travel support
to present this paper which we trust encourages international
cooperation on topics being pursued by Annex VII, Advanced
Geothermal Drilling and Logging Technologies. Brynja Jons-
dottir, Iceland GeoSurvey and Gunnar Gunnarsson, Reykjavik
Energy, are thanked for technical drawings. Einar Jon As-
bjornsson, Iceland GeoSurvey and an anonymous reviewer are
thanked for useful comments.
REFERENCES
1. Sveinbjornsson, B.M., 2010. Cost and risk in drilling
high temperature wells in the Hengill Area (In Iceland-
ic). MS thesis, Reykjavik University.
2. Thorhallsson, S. and B.M. Sveinbjornsson, 2012. Geo-
thermal drilling cost and drilling effectiveness. In Pro-
ceedings of a “Short Course on Geothermal Develop-
ment and Geothermal Wells”, organized by UNU-GTP
and LaGeo, in Santa Tecla, El Salvador, March 11-17,
2012.
3. Sveinbjornsson, B.M. and Thorhallsson, S., 2012. Cost
and effectiveness of geothermal drilling. In Proceed-
ings of the Scandinavian Simulation Society 53 rd
Con-
ference in Reykjavik, Iceland, October 4-6, 2012.
4. Franzson, H., E. Gunnlaugsson, K. Arnason, K. Sae-
mundsson, B. Steingrimsson, and B.S Hardarson,
2010. The Hengill Geothermal System, Conceptual
Model and Thermal Evolution. In Proceedings World
Geothermal Congress, Bali, Indonesia, 25-29 April
2010, 9 pp.
5. Bessason, B., E.H. Olafsson, G. Gunnarsson, O. Flo-
venz, S.S. Jakobsdottir, S. Bjornsson, and Th. Arnadott-
ir, 2012. Protocol for addressing induced seismicity in
geothermal systems (In Icelandic). Reykjavik Energy.
Report 2012-24.
6. Grant, M.A., 2009. Optimization of drilling acceptance
criteria. Geothermics 38, 247-253.
7. Sigfusson, B., G. Kjartansson, and E.J. Asbjornsson,
2012. Power output and productivity of steam wells at
Hellisheidi (In Icelandic). Reykjavik Energy. Report
2012-2.
8. Grant, M.A. and P.F. Bixley, 2011. Estimated producti-
on. In: Geothermal Reservoir Engineering, 2nd
ed. New
York: Academic Press, 117-118.
9. Arnason, K. and I. Th. Magnusson, 2001. Geothermal
activity at Hengill and on Hellisheidi. Results of resist-
ivity surveys (In Icelandic). National Energy Authority,
Report OS-2001/091.
10. Majer, E. L., J. Nelson, A. Robertson-Tait, J. Savy, and
I. Young, 2012. Protocol for Addressing Induced Seis-
micity Associated with Enhanced Geothermal Systems.
Report DOE/EE-0662, U. S. Depth. of Energy Techno-
logies Program.
NOMENCLATURE
Bar-g gauge reading of pressure in bar
Beta Greek letter, type of distribution
II Injectivity Index (kg/s)/bar
ISOR Iceland GeoSurvey
KOP Kick Off Point
m meter
MW megawatt
MWD Measurement While Drilling
PERT Program Evaluation Review Technique
Q mass flow (kg/s)
s standard deviation of a distribution
Std. dev. standard deviation of a distribution
t hook lift capacity in tonnes
x steam ratio of total mass flow
Qsteam steam mass flow (kg/s) at 8 bar-g separation
pressure
Qtotal total mass flow (kg/s) at 8 bar-g separation
pressure
Greek letter
s standard deviation of a distribution
Subscripts
e electric
th thermal
total steam and water (kg/s)
Superscripts
" width in inches (25.4 mm)
° degrees
Conversion factor
1 bar 105 Pa