Units 10 & 11 Merlin's Court Winch Lane Tel: +44 (0) 1437 76 27 95 Email: [email protected] Website: http://www.rca-eng.co.uk Haverfordwest Pembrokeshire SA61 1SB Ty Mansel 6 Mansel Street Carmarthen Carmarthenshire SA31 1PX Tel: +44 (0) 1267 22 26 46 Consulting Civil & Structural Engineers Roger Casey Associates DRAINAGE STRATEGY REPORT RESIDENTIAL DEVELOPMENT AT FORMER INFANT SCHOOL, BRODOG LANE, FISHGUARD, PEMBROKESHIRE SA65 9NF JOB No.: 20092 VERSION: 01 REPORT REF.: 20092/001/RCA/CE/RP/001

DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: [email protected]. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

Units 10 & 11 Merlin's Court Winch Lane

Tel: +44 (0) 1437 76 27 95

Email: [email protected]: http://www.rca-eng.co.uk

Haverfordwest Pembrokeshire SA61 1SB

Ty Mansel 6 Mansel Street CarmarthenCarmarthenshire SA31 1PXTel: +44 (0) 1267 22 26 46

Co

nsu

ltin

g C

ivil

& S

tru

ctu

ral E

ng

inee

rs

Ro

ger

Ca

sey A

sso

cia

tes

DRAINAGE STRATEGY REPORT RESIDENTIAL DEVELOPMENT AT FORMER INFANT SCHOOL, BRODOG LANE, FISHGUARD, PEMBROKESHIRE SA65 9NF JOB No.: 20092 VERSION: 01 REPORT REF.: 20092/001/RCA/CE/RP/001

Page 2: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

M:\RCA Job Files\200 job\20092 - Former Infant School, Brodog Lane, Fishguard, Pembrokeshire SA65 9NF\C - Outgoing Correspondence\Drainage Strategy Report\20092-v01_Drainage Strategy Report.docx

DRAINAGE STRATEGY REPORT

FOR

RESIDENTIAL DEVELOPMENT AT

FORMER INFANT SCHOOL

BRODOG LANE

FISHGUARD

PEMBROKESHIRE

SA65 9NF

Job No.: 20092

Prepared By: Date:

September 2018 Checked By: Date:

September 2018 Approved By: Date:

September 2018

Consulting Civil & Structural Engineers

Roger Casey Associates

Ty Mansel 6 Mansel Street Carmarthen Carmarthenshire SA31 1PX

Tel: +44 (0) 1267 22 26 46

Fax: +44 (0) 1267 22 13 77

Email: [email protected]

Page 3: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER INFANT SCHOOL, BRODOG LANE, FISHGUARD, PEMBROKESHIRE SA65 9NF SEPTEMBER 2018

Page 3 of 8

DOCUMENT REVISION RECORD

Version Description Date Originator Approver

01 Initial draft issue. PWJL RSC

CONTENTS 1.0 Introduction

2.0 Site Description and Topography

3.0 Flood Risk

4.0 Existing Drainage and Site Investigations

5.0 Proposed Drainage Strategy and Summary Appendix A - Site Location Plan Appendix B - Topographical Survey Plan Appendix C - Proposed Architectural Site Plan Appendix D - Natural Resources Wales Flood Risk Map and Welsh Government TAN 15

Development Advice Map Appendix E - Dwr Cymru Welsh Water Mapping Appendix F - Foul & Surface Water Drainage Strategy Site Plan Appendix G - Initial Surface Water Infiltration Calculations

Page 4: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER INFANT SCHOOL, BRODOG LANE, FISHGUARD, PEMBROKESHIRE SA65 9NF SEPTEMBER 2018

Page 4 of 8

1.0 Introduction

Roger Casey Associates has been instructed to prepare a Drainage Strategy Report in respect

of the construction of a new residential development on a former Infant School brownfield area

of land at Brodog Lane, Fishguard, Pembrokeshire SA65 9NF.

This report has been prepared on behalf of ateb group who the Applicant and Developer of the

proposed development. The Report is intended to support the Pre-Application Consultation

(PAC) and in turn the Planning Application process only to inform Planning Condition scope

relating to proposed drainage solutions.

The purpose of this report is to describe the existing site and associated drainage infrastructure

and to identify a sustainable solution for the proposed foul and surface water drainage to serve

the new development.

The National Grid Reference of the approximate centre point of the proposed development site

is SM 95590 37388, Easting 195590, Northing 237388.

This document relies upon geotechnical and geoenvironmental site investigations undertaken

by Terra Firma (Wales) Ltd acting as Geotechnical Consultants on behalf of the Applicant.

This Drainage Strategy Report is purely for information only and outlines the proposals to

ensure all foul and surface water drainage design and management is carried out in accordance

with current best practice and statutory guidelines and inform the detail drainage design stage.

Page 5: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER INFANT SCHOOL, BRODOG LANE, FISHGUARD, PEMBROKESHIRE SA65 9NF SEPTEMBER 2018

Page 5 of 8

2.0 Site Conditions and Topography

The site is located to the north of the centre of the town of Fishguard. The site is currently

occupied by the redundant Infant School building, external metalled play and parking areas

with the remaining site area laid out in soft landscaping and vegetation. The site is bounded

by residential premises to all boundaries with the site access off Brodog Lane to the southeast

corner.

The total site area is approximately 0.7022 hectares.

A copy of the site location plan is included in Appendix A.

The ground profile of the land generally slopes downwards in level in a north-easterly direction.

The site survey, to Ordnance Survey Datum, shows a maximum level difference of (60.2-57.3)

= 2.9 m over an approximate distance of 137 m. The drop in level equates to an approximate

gradient of 1:47 or 2.117%.

A copy of the topographical site survey is included in Appendix B.

Page 6: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER INFANT SCHOOL, BRODOG LANE, FISHGUARD, PEMBROKESHIRE SA65 9NF SEPTEMBER 2018

Page 6 of 8

3.0 Flood Risk

The proposed use of the site being for a residential development will classify the risk as being

a ‘Highly Vulnerable Development’ (TAN 15, Figure 2). However, in accordance with Natural

Resources Wales Flood and Welsh Government TAN 15 Development Advice Maps the site

is located within an area designated being in Flood Zone A.

A copy of the proposed architectural site plan is included in Appendix C.

In accordance with guidance contained within TAN 15, Figure 1, further flood risks and

justification tests are not required to sites located within Zone A and sound drainage design

incorporating aspects of Sustainable Urban Drainage Systems (SuDS) is applicable to the

development.

National Resources Wales Flood Risk Map and Welsh Government TAN 15 Development

Advice Map are included in Appendix D.

Planning Policy and Technical Advice Note (TAN) 15 lists six sources of flooding which need

to be considered in the assessment of flood risk and the probability of flooding at the Site

Location.

Flooding from Rivers or Fluvial

Not applicable due to Site Location and demonstrated on Flood Maps in Appendix D.

Flooding from the Sea or Tidal Flooding

Not applicable due to Site Location and demonstrated on Flood Maps in Appendix D.

Flooding from Land

Not applicable due to surface water management within the proposed drainage strategy

leading to detail design. Proposed external ground formation/levels must form appropriate

informal overland flow routes within the landscaping and external area design to safely transfer

any flood water away from the proposed dwellings and any other existing premises.

Flooding from Groundwater

No groundwater was observed during the trial pit investigations by Terra Firma (Wales) Ltd.

Flooding from Sewers

Not applicable due to foul and surface water management within drainage design.

Notwithstanding blockage or catastrophic failure of drainage systems upstream of

development site resulting in overland flows not being contained within kerb upstand heights,

surface gradients, etc.

Flooding from Reservoirs, Canals and Other Artificial Sources

Not applicable due to Site Location and demonstrated on Flood Maps in Appendix D.

Page 7: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER INFANT SCHOOL, BRODOG LANE, FISHGUARD, PEMBROKESHIRE SA65 9NF SEPTEMBER 2018

Page 7 of 8

4.0 Existing Drainage and Site Investigations

Foul Water Drainage

Pre-Planning Advice has been sought from Dwr Cymru Welsh Water (DCWW) by RCA on

behalf of the Developer. DCWW have advised by their response referenced PPA0002947 and

dated 24 April 2018 that enough capacity exists within their networks to serve the proposed

development. A copy of DCWW PPA response is included in Appendix E.

Surface Water Drainage

Considering the Welsh Government (WG), recommended non-statutory standards for

sustainable drainage (SuDS) in Wales – designing, constructing, operating and maintaining

surface water drainage systems. Where surface water runoff destination is considered in five

priority levels:

Priority Level Flow Destination

1 Surface water run-off is collected for use;

2 Surface water runoff is infiltrated to ground;

3 Surface water runoff is discharged to a surface water body;

4 Surface water runoff is discharged to a surface water sewer, highway

drainage, or another drainage system;

5 Surface water runoff is discharged to a combined sewer.

Following investigations and in response to each of the Priority Levels:

1. The Client has advised that they do not wish to install a formal rainwater harvesting system

to collect all the roof water runoff for reuse due to capital installation costs and passing

whole life costs of a collection system including its maintenance on to their tenants. There

is a likelihood, to comply with WG Standards, that rainwater harvesting butts will be

provided to one rainwater downpipe per Plot. These butts will have an overflow provision

into the general rainwater collection pipework. For the purposes of design, these butts are

considered as being full.

2. Geotechnical site investigations were undertaken by Terra Firma (Wales) Ltd in January

and June 2018. Part of these works included successful soakaway testing within trial pits.

Therefore, infiltration to ground is available as a surface water disposal option at this site

location.

3. Not considered due to available surface water drainage destination at Priority Level 2.

4. Not considered due to available surface water drainage destination at Priority Level 2.

5. Not considered due to available surface water drainage destination at Priority Level 2.

Page 8: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER INFANT SCHOOL, BRODOG LANE, FISHGUARD, PEMBROKESHIRE SA65 9NF SEPTEMBER 2018

Page 8 of 8

5.0 Proposed Drainage Strategy and Summary

The site will be served by new separate foul and surface water drainage systems discharging

as follows based on existing drainage and site investigations outlined above (Refer to

Appendix F for Proposed Drainage Strategy Engineering Site Plan and Appendix G for Initial

Surface Water Infiltration Calculations):

Foul Water Drainage

All foul water only drainage flows will be collected from the proposed residential development

via a new gravity sealed pipe system and connected into the existing public combined water

sewer network. The point of connection is envisaged to the one of the final lengths of existing

150 mm diameter foul water pipe on site which communicates with the public sewer in Brodog

Lane.

Where the new foul water drainage system lies outside of the legal curtilage of each proposed

dwelling, it will need to be adopted by Dwr Cymru Welsh Water under a Water Industry Act

Section 104 Adoption Agreement between DCWW and the Developer.

Surface Water Drainage

From a surface water drainage point of view, the proposed site area is constrained by its width,

existing public sewer rising main with easement along the east boundary and the proposed

dwelling density. Due to the constraints it will not be possible to use soakaway pits located

minimum 5 m away from buildings. Therefore, it is proposed to construct all road and parking

areas in permeable surfaces to allow infiltration through clean sub base material into the

underlying ground strata. Roof water flows will be drained into the clean sub base layer.

Permeable surfaces also have the added benefit of pollution removal properties. The sub base

storage depth is designed to accommodate 6 hour 1:100-year return storm with +30%

allowance for climate change and half empty within 24 hours.

Positive early discussions have been held between RCA and Pembrokeshire County Council

(PCC) Highways Adoption in relation to the permeable road becoming a public asset and

constructed as part of a Highways Act 1980 Section 38 Agreement between PCC and the

Developer.

Flooding

The site is generally located in a low flood risk location considered by TAN 15.

Philip Lawrence MCIHT GMICE Technical Director – Civil Engineering for Roger Casey Associates

Page 9: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER INFANT SCHOOL, BRODOG LANE, FISHGUARD, PEMBROKESHIRE SA65 9NF SEPTEMBER 2018

Page 1 of 1

Appendix A - Site Location Plan

Page 10: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

CLIENT:

PROJECT:

DRAWING TITLE:

DRAWN BY:

DESIGN BY:

DATE: SCALES:

CHECKED BY:

DRAWING No.: REVISION:

ORIGINAL DRAWING A4DO NOT SCALE

© Roger Casey Associates Limited 2018STATUS:

Ty Mansel, 6 Mansel Street,

Carmarthen,

Carmarthenshire SA31 1PX

T: 01267 222 646

Units 10 & 11, Merlin's Court,

Winch Lane, Haverfordwest,

Pembrokeshire SA61 1SB

T: 01437 762 795

E: [email protected]

W: www.rca-eng.co.uk

Roger Casey

Associates

Consulting Civil &

Structural Engineers

RESIDENTIAL DEVELOPMENT AT

ateb group limited

former Infant School, Brodog Lane,

Fishguard, Pembrokeshire SA65 9NF

SITE LOCATION PLAN

PWJL

-

RSC

27/09/18 1:1250

20092/02

OS

AutoCAD SHX Text
Glanmor
AutoCAD SHX Text
Talar Wen
AutoCAD SHX Text
Cil
AutoCAD SHX Text
Head
AutoCAD SHX Text
Y Garth
AutoCAD SHX Text
Seawards
AutoCAD SHX Text
Maes Y Meillion
AutoCAD SHX Text
The Lodge
AutoCAD SHX Text
Garage
AutoCAD SHX Text
White
AutoCAD SHX Text
Heather
AutoCAD SHX Text
Frondeg
AutoCAD SHX Text
Rostrevor
AutoCAD SHX Text
County Primary
AutoCAD SHX Text
Infants School
AutoCAD SHX Text
LAMPIT WAY
AutoCAD SHX Text
Fishguard
AutoCAD SHX Text
12
AutoCAD SHX Text
24
AutoCAD SHX Text
5
AutoCAD SHX Text
17
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
4
AutoCAD SHX Text
Carreg y
AutoCAD SHX Text
Wylan
AutoCAD SHX Text
Newpark
AutoCAD SHX Text
St Lawrence
AutoCAD SHX Text
Corrymore
AutoCAD SHX Text
Springfield
AutoCAD SHX Text
Mooncoyne
AutoCAD SHX Text
Saddle
AutoCAD SHX Text
The
AutoCAD SHX Text
Eastlands
AutoCAD SHX Text
Llys Gan
AutoCAD SHX Text
Pencraig
AutoCAD SHX Text
Llys Aber
AutoCAD SHX Text
BRODOG TERRACE
AutoCAD SHX Text
Lynwood
AutoCAD SHX Text
Pol Sta
AutoCAD SHX Text
Police
AutoCAD SHX Text
House
AutoCAD SHX Text
El Sub Sta
AutoCAD SHX Text
1
AutoCAD SHX Text
Club
AutoCAD SHX Text
Govt
AutoCAD SHX Text
Offices
AutoCAD SHX Text
BRYN ELFED
AutoCAD SHX Text
MARCHGAE
AutoCAD SHX Text
PADDOCK
AutoCAD SHX Text
Priorswood
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
Crug-y-werydd
AutoCAD SHX Text
1
AutoCAD SHX Text
1a
AutoCAD SHX Text
Min-y-mor
AutoCAD SHX Text
Garden
AutoCAD SHX Text
Cottage
AutoCAD SHX Text
Victoria House
AutoCAD SHX Text
1 to 4
AutoCAD SHX Text
9
AutoCAD SHX Text
Carreg Lwyd
AutoCAD SHX Text
THE PROPERTY OF THIS DRAWING AND DESIGN IS VESTED IN ROGER CASEY ASSOCIATES AND MUST NOT BE COPIED OR REPRODUCED IN ANY WAY WITHOUT THE WRITTEN CONSENT OF ROGER CASEY ASSOCIATES. THE CONTRACTOR IS TO CHECK ALL LEVELS AND DIMENSIONS BEFORE WORK COMMENCES, AND ANY DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THE CONSULTANTS. WORK TO FIGURED DIMENSIONS IN PREFERENCE TO SCALING. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER ROGER CASEY ASSOCIATES DRAWINGS AND SPECIFICATIONS AND ALL OTHER CONSULTANTS DRAWINGS AND SPECIFICATIONS RELATING TO THIS PROJECT.
AutoCAD SHX Text
M:\RCA Job Files\200 job\20092 - Former Infant School, Brodog Lane, Fishguard, Pembrokeshire SA65 9NF\F - RCA Civil Drawings\20092-02.dwg
AutoCAD SHX Text
28/09/2018 09:12:23
AutoCAD SHX Text
RCA A4 Portrait Version 1
Page 11: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER INFANT SCHOOL, BRODOG LANE, FISHGUARD, PEMBROKESHIRE SA65 9NF SEPTEMBER 2018

Appendix B - Topographical Survey Plan

Page 12: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

SCALES: DRAWING No.:

DRAWN BY:

REVISION:

DATE:CHECKED BY:DESIGN BY:

DRAWING TITLE:

PROJECT:

CLIENT:

NOTES:

DO NOT SCALE

REV. DESCRIPTION

C

H

E

C

K

D

A

T

E

D

R

A

W

N

ORIGINAL DRAWING A1

© Roger Casey Associates Limited 2018

DRAWING STATUS:

Ty Mansel, 6 Mansel Street,

Carmarthen,

Carmarthenshire SA31 1PX

T: 01267 222 646

Units 10 & 11, Merlin's Court,

Winch Lane, Haverfordwest,

Pembrokeshire SA61 1SB

T: 01437 762 795

E: [email protected]

W: www.rca-eng.co.uk

Roger Casey

Associates

Consulting Civil &

Structural Engineers

PWJL - RSC 13/06/18

1:200

20092/01

EXISTING SITE SURVEY PLAN

Fishguard, Pembrokeshire SA65 9NF

RESIDENTIAL DEVELOPMENT AT

former Infant School, Brodog Lane,

ateb group limited

SURVEY

ARCHITECT:

AutoCAD SHX Text
Z 57.585
AutoCAD SHX Text
9002
AutoCAD SHX Text
E 195621.061
AutoCAD SHX Text
N 237354.405
AutoCAD SHX Text
Z 61.269
AutoCAD SHX Text
9004
AutoCAD SHX Text
E 195587.070
AutoCAD SHX Text
N 237405.670
AutoCAD SHX Text
Z 59.275
AutoCAD SHX Text
9005
AutoCAD SHX Text
E 195564.963
AutoCAD SHX Text
N 237362.406
AutoCAD SHX Text
Z 57.818
AutoCAD SHX Text
9003
AutoCAD SHX Text
E 195602.160
AutoCAD SHX Text
N 237368.975
AutoCAD SHX Text
Z 58.015
AutoCAD SHX Text
9006
AutoCAD SHX Text
E 195574.573
AutoCAD SHX Text
N 237350.745
AutoCAD SHX Text
Z 57.894
AutoCAD SHX Text
9007
AutoCAD SHX Text
E 195575.442
AutoCAD SHX Text
N 237338.030
AutoCAD SHX Text
Z 57.532
AutoCAD SHX Text
9001
AutoCAD SHX Text
E 195614.099
AutoCAD SHX Text
N 237329.323
AutoCAD SHX Text
57.28
AutoCAD SHX Text
57.23
AutoCAD SHX Text
57.89
AutoCAD SHX Text
57.59
AutoCAD SHX Text
57.96
AutoCAD SHX Text
58.16
AutoCAD SHX Text
58.33
AutoCAD SHX Text
58.19
AutoCAD SHX Text
58.32
AutoCAD SHX Text
58.23
AutoCAD SHX Text
58.15
AutoCAD SHX Text
58.03
AutoCAD SHX Text
58.88
AutoCAD SHX Text
58.08
AutoCAD SHX Text
59.66
AutoCAD SHX Text
60.31
AutoCAD SHX Text
60.28
AutoCAD SHX Text
60.00
AutoCAD SHX Text
59.93
AutoCAD SHX Text
59.74
AutoCAD SHX Text
59.68
AutoCAD SHX Text
60.38
AutoCAD SHX Text
60.45
AutoCAD SHX Text
60.47
AutoCAD SHX Text
60.52
AutoCAD SHX Text
60.46
AutoCAD SHX Text
60.32
AutoCAD SHX Text
60.35
AutoCAD SHX Text
60.40
AutoCAD SHX Text
57.15
AutoCAD SHX Text
57.24
AutoCAD SHX Text
59.92
AutoCAD SHX Text
60.03
AutoCAD SHX Text
58.05
AutoCAD SHX Text
58.57
AutoCAD SHX Text
58.92
AutoCAD SHX Text
58.99
AutoCAD SHX Text
59.10
AutoCAD SHX Text
58.85
AutoCAD SHX Text
58.28
AutoCAD SHX Text
58.32
AutoCAD SHX Text
58.26
AutoCAD SHX Text
58.19
AutoCAD SHX Text
59.01
AutoCAD SHX Text
59.01
AutoCAD SHX Text
59.01
AutoCAD SHX Text
59.22
AutoCAD SHX Text
59.30
AutoCAD SHX Text
59.39
AutoCAD SHX Text
59.16
AutoCAD SHX Text
59.23
AutoCAD SHX Text
60.97
AutoCAD SHX Text
61.06
AutoCAD SHX Text
60.92
AutoCAD SHX Text
61.00
AutoCAD SHX Text
61.04
AutoCAD SHX Text
60.98
AutoCAD SHX Text
61.11
AutoCAD SHX Text
61.75
AutoCAD SHX Text
61.57
AutoCAD SHX Text
57.48
AutoCAD SHX Text
57.54
AutoCAD SHX Text
57.64
AutoCAD SHX Text
57.79
AutoCAD SHX Text
59.09
AutoCAD SHX Text
59.07
AutoCAD SHX Text
58.94
AutoCAD SHX Text
59.33
AutoCAD SHX Text
59.18
AutoCAD SHX Text
RAILING HT 1.2M
AutoCAD SHX Text
59.08
AutoCAD SHX Text
58.73
AutoCAD SHX Text
58.10
AutoCAD SHX Text
58.01
AutoCAD SHX Text
58.00
AutoCAD SHX Text
57.79
AutoCAD SHX Text
57.77
AutoCAD SHX Text
58.02
AutoCAD SHX Text
58.04
AutoCAD SHX Text
58.10
AutoCAD SHX Text
58.00
AutoCAD SHX Text
57.95
AutoCAD SHX Text
FENCE W/M HT:1.8M
AutoCAD SHX Text
57.93
AutoCAD SHX Text
58.24
AutoCAD SHX Text
58.73
AutoCAD SHX Text
59.13
AutoCAD SHX Text
59.25
AutoCAD SHX Text
59.64
AutoCAD SHX Text
60.21
AutoCAD SHX Text
60.46
AutoCAD SHX Text
60.66
AutoCAD SHX Text
60.09
AutoCAD SHX Text
60.06
AutoCAD SHX Text
60.16
AutoCAD SHX Text
60.00
AutoCAD SHX Text
60.09
AutoCAD SHX Text
60.05
AutoCAD SHX Text
59.91
AutoCAD SHX Text
60.05
AutoCAD SHX Text
60.19
AutoCAD SHX Text
60.23
AutoCAD SHX Text
60.22
AutoCAD SHX Text
60.06
AutoCAD SHX Text
60.09
AutoCAD SHX Text
60.03
AutoCAD SHX Text
59.93
AutoCAD SHX Text
60.81
AutoCAD SHX Text
60.53
AutoCAD SHX Text
FENCE W/M HT:1.2M
AutoCAD SHX Text
58.18
AutoCAD SHX Text
FENCE W/M HT1.2M
AutoCAD SHX Text
57.90
AutoCAD SHX Text
57.87
AutoCAD SHX Text
58.00
AutoCAD SHX Text
57.72
AutoCAD SHX Text
57.63
AutoCAD SHX Text
57.55
AutoCAD SHX Text
57.58
AutoCAD SHX Text
57.39
AutoCAD SHX Text
57.58
AutoCAD SHX Text
METAL RAIL HT1M
AutoCAD SHX Text
57.46
AutoCAD SHX Text
METAL HT1M
AutoCAD SHX Text
57.91
AutoCAD SHX Text
57.91
AutoCAD SHX Text
57.87
AutoCAD SHX Text
57.88
AutoCAD SHX Text
57.75
AutoCAD SHX Text
57.97
AutoCAD SHX Text
58.07
AutoCAD SHX Text
58.11
AutoCAD SHX Text
57.98
AutoCAD SHX Text
57.96
AutoCAD SHX Text
58.28
AutoCAD SHX Text
58.32
AutoCAD SHX Text
58.14
AutoCAD SHX Text
58.13
AutoCAD SHX Text
57.98
AutoCAD SHX Text
58.01
AutoCAD SHX Text
57.88
AutoCAD SHX Text
57.87
AutoCAD SHX Text
57.83
AutoCAD SHX Text
57.79
AutoCAD SHX Text
57.77
AutoCAD SHX Text
57.84
AutoCAD SHX Text
58.00
AutoCAD SHX Text
58.16
AutoCAD SHX Text
57.91
AutoCAD SHX Text
57.93
AutoCAD SHX Text
58.41
AutoCAD SHX Text
59.20
AutoCAD SHX Text
59.40
AutoCAD SHX Text
59.43
AutoCAD SHX Text
59.44
AutoCAD SHX Text
59.79
AutoCAD SHX Text
59.80
AutoCAD SHX Text
59.64
AutoCAD SHX Text
59.47
AutoCAD SHX Text
59.11
AutoCAD SHX Text
59.38
AutoCAD SHX Text
59.29
AutoCAD SHX Text
60.00
AutoCAD SHX Text
61.00
AutoCAD SHX Text
59.95
AutoCAD SHX Text
59.89
AutoCAD SHX Text
59.98
AutoCAD SHX Text
60.04
AutoCAD SHX Text
60.10
AutoCAD SHX Text
60.15
AutoCAD SHX Text
60.02
AutoCAD SHX Text
60.26
AutoCAD SHX Text
60.37
AutoCAD SHX Text
59.87
AutoCAD SHX Text
60.45
AutoCAD SHX Text
60.40
AutoCAD SHX Text
60.02
AutoCAD SHX Text
59.94
AutoCAD SHX Text
60.09
AutoCAD SHX Text
60.29
AutoCAD SHX Text
60.37
AutoCAD SHX Text
60.29
AutoCAD SHX Text
60.07
AutoCAD SHX Text
57.14
AutoCAD SHX Text
57.20
AutoCAD SHX Text
57.28
AutoCAD SHX Text
57.34
AutoCAD SHX Text
57.17
AutoCAD SHX Text
57.41
AutoCAD SHX Text
57.56
AutoCAD SHX Text
57.54
AutoCAD SHX Text
60.44
AutoCAD SHX Text
57.89
AutoCAD SHX Text
58.03
AutoCAD SHX Text
57.84
AutoCAD SHX Text
57.54
AutoCAD SHX Text
57.55
AutoCAD SHX Text
57.58
AutoCAD SHX Text
57.73
AutoCAD SHX Text
57.83
AutoCAD SHX Text
57.91
AutoCAD SHX Text
57.94
AutoCAD SHX Text
57.58
AutoCAD SHX Text
57.39
AutoCAD SHX Text
57.91
AutoCAD SHX Text
PAVED AREA
AutoCAD SHX Text
57.90
AutoCAD SHX Text
MH FOUL
AutoCAD SHX Text
COV:57.93
AutoCAD SHX Text
MH FOUL
AutoCAD SHX Text
COV:57.23
AutoCAD SHX Text
RG
AutoCAD SHX Text
58.10
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.91
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.16
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.20
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.75
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.45
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.44
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.79
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.77
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.83
AutoCAD SHX Text
57.81
AutoCAD SHX Text
57.79
AutoCAD SHX Text
57.84
AutoCAD SHX Text
57.73
AutoCAD SHX Text
57.61
AutoCAD SHX Text
57.81
AutoCAD SHX Text
60.08
AutoCAD SHX Text
60.07
AutoCAD SHX Text
60.15
AutoCAD SHX Text
60.09
AutoCAD SHX Text
60.05
AutoCAD SHX Text
59.91
AutoCAD SHX Text
60.04
AutoCAD SHX Text
60.19
AutoCAD SHX Text
60.23
AutoCAD SHX Text
60.23
AutoCAD SHX Text
60.07
AutoCAD SHX Text
WALL HT1.9
AutoCAD SHX Text
60.08
AutoCAD SHX Text
59.92
AutoCAD SHX Text
60.03
AutoCAD SHX Text
59.89
AutoCAD SHX Text
59.81
AutoCAD SHX Text
59.63
AutoCAD SHX Text
59.53
AutoCAD SHX Text
59.58
AutoCAD SHX Text
60.03
AutoCAD SHX Text
59.90
AutoCAD SHX Text
60.81
AutoCAD SHX Text
60.57
AutoCAD SHX Text
60.68
AutoCAD SHX Text
59.16
AutoCAD SHX Text
59.16
AutoCAD SHX Text
59.10
AutoCAD SHX Text
WALL HT:1.7M
AutoCAD SHX Text
59.21
AutoCAD SHX Text
59.23
AutoCAD SHX Text
WALL HT:1.6M
AutoCAD SHX Text
59.34
AutoCAD SHX Text
WALL HT:2.3M
AutoCAD SHX Text
59.28
AutoCAD SHX Text
58.89
AutoCAD SHX Text
58.89
AutoCAD SHX Text
58.68
AutoCAD SHX Text
58.24
AutoCAD SHX Text
58.28
AutoCAD SHX Text
58.14
AutoCAD SHX Text
57.35
AutoCAD SHX Text
57.36
AutoCAD SHX Text
HT1M
AutoCAD SHX Text
57.43
AutoCAD SHX Text
57.32
AutoCAD SHX Text
57.40
AutoCAD SHX Text
57.40
AutoCAD SHX Text
57.39
AutoCAD SHX Text
57.46
AutoCAD SHX Text
57.44
AutoCAD SHX Text
57.45
AutoCAD SHX Text
57.45
AutoCAD SHX Text
57.46
AutoCAD SHX Text
57.45
AutoCAD SHX Text
57.42
AutoCAD SHX Text
57.41
AutoCAD SHX Text
WALL HT1M
AutoCAD SHX Text
PLINTH HT.300
AutoCAD SHX Text
57.85
AutoCAD SHX Text
57.86
AutoCAD SHX Text
WALL HT1M
AutoCAD SHX Text
57.85
AutoCAD SHX Text
STEP
AutoCAD SHX Text
58.01
AutoCAD SHX Text
IC
AutoCAD SHX Text
COV:57.27
AutoCAD SHX Text
MH FOUL
AutoCAD SHX Text
COV:57.13
AutoCAD SHX Text
57.07
AutoCAD SHX Text
MH FOUL
AutoCAD SHX Text
COV:57.50
AutoCAD SHX Text
MH FOUL
AutoCAD SHX Text
COV:58.04
AutoCAD SHX Text
MH FOUL
AutoCAD SHX Text
COV:57.86
AutoCAD SHX Text
MH FOUL
AutoCAD SHX Text
COV:57.83
AutoCAD SHX Text
MH FOUL
AutoCAD SHX Text
COV:57.57
AutoCAD SHX Text
MH FOUL
AutoCAD SHX Text
COV:57.92
AutoCAD SHX Text
MH FOUL
AutoCAD SHX Text
COV:57.58
AutoCAD SHX Text
57.10
AutoCAD SHX Text
57.16
AutoCAD SHX Text
57.28
AutoCAD SHX Text
57.04
AutoCAD SHX Text
57.17
AutoCAD SHX Text
57.31
AutoCAD SHX Text
57.04
AutoCAD SHX Text
57.93
AutoCAD SHX Text
57.96
AutoCAD SHX Text
57.93
AutoCAD SHX Text
57.34
AutoCAD SHX Text
57.33
AutoCAD SHX Text
57.24
AutoCAD SHX Text
57.25
AutoCAD SHX Text
57.04
AutoCAD SHX Text
57.14
AutoCAD SHX Text
57.12
AutoCAD SHX Text
57.20
AutoCAD SHX Text
57.28
AutoCAD SHX Text
57.30
AutoCAD SHX Text
57.62
AutoCAD SHX Text
57.57
AutoCAD SHX Text
57.48
AutoCAD SHX Text
57.45
AutoCAD SHX Text
57.41
AutoCAD SHX Text
57.38
AutoCAD SHX Text
58.14
AutoCAD SHX Text
58.12
AutoCAD SHX Text
57.94
AutoCAD SHX Text
57.55
AutoCAD SHX Text
57.63
AutoCAD SHX Text
57.56
AutoCAD SHX Text
57.50
AutoCAD SHX Text
57.46
AutoCAD SHX Text
57.44
AutoCAD SHX Text
57.51
AutoCAD SHX Text
57.52
AutoCAD SHX Text
57.55
AutoCAD SHX Text
57.57
AutoCAD SHX Text
57.58
AutoCAD SHX Text
57.59
AutoCAD SHX Text
57.60
AutoCAD SHX Text
57.67
AutoCAD SHX Text
RS
AutoCAD SHX Text
57.51
AutoCAD SHX Text
RS
AutoCAD SHX Text
57.39
AutoCAD SHX Text
57.39
AutoCAD SHX Text
EP
AutoCAD SHX Text
WM
AutoCAD SHX Text
57.23
AutoCAD SHX Text
WM
AutoCAD SHX Text
57.08
AutoCAD SHX Text
57.41
AutoCAD SHX Text
57.44
AutoCAD SHX Text
57.53
AutoCAD SHX Text
57.75
AutoCAD SHX Text
57.83
AutoCAD SHX Text
57.97
AutoCAD SHX Text
57.91
AutoCAD SHX Text
57.83
AutoCAD SHX Text
57.84
AutoCAD SHX Text
57.88
AutoCAD SHX Text
57.84
AutoCAD SHX Text
57.91
AutoCAD SHX Text
57.93
AutoCAD SHX Text
57.84
AutoCAD SHX Text
57.70
AutoCAD SHX Text
57.59
AutoCAD SHX Text
57.57
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
62.25
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
61.34
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
61.34
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
63.74
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
63.75
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
63.73
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
61.16
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
66.99
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
67.13
AutoCAD SHX Text
61.52
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
63.49
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
63.48
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
64.35
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
64.33
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
67.48
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
61.49
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
61.49
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
61.37
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
61.36
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
61.35
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
61.35
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
63.45
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
62.27
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
62.28
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
62.28
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
61.39
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
61.36
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
61.18
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
63.51
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
61.37
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
61.38
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
61.38
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
62.27
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
62.27
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
EAVES
AutoCAD SHX Text
63.37
AutoCAD SHX Text
EAVES
AutoCAD SHX Text
63.34
AutoCAD SHX Text
EAVES
AutoCAD SHX Text
64.99
AutoCAD SHX Text
EAVES
AutoCAD SHX Text
63.88
AutoCAD SHX Text
EAVES
AutoCAD SHX Text
63.85
AutoCAD SHX Text
SYC
AutoCAD SHX Text
58.05
AutoCAD SHX Text
SYC
AutoCAD SHX Text
58.33
AutoCAD SHX Text
SYC
AutoCAD SHX Text
60.09
AutoCAD SHX Text
SYC
AutoCAD SHX Text
60.25
AutoCAD SHX Text
SYC
AutoCAD SHX Text
57.94
AutoCAD SHX Text
59.68
AutoCAD SHX Text
59.13
AutoCAD SHX Text
58.60
AutoCAD SHX Text
57.94
AutoCAD SHX Text
57.76
AutoCAD SHX Text
57.61
AutoCAD SHX Text
57.55
AutoCAD SHX Text
57.47
AutoCAD SHX Text
57.43
AutoCAD SHX Text
CONFER TREES
AutoCAD SHX Text
ASH
AutoCAD SHX Text
59.94
AutoCAD SHX Text
ASH
AutoCAD SHX Text
60.23
AutoCAD SHX Text
ASH
AutoCAD SHX Text
60.05
AutoCAD SHX Text
ASH
AutoCAD SHX Text
59.99
AutoCAD SHX Text
ASH
AutoCAD SHX Text
61.00
AutoCAD SHX Text
ASH
AutoCAD SHX Text
59.81
AutoCAD SHX Text
ASH
AutoCAD SHX Text
60.62
AutoCAD SHX Text
WALL HT2
AutoCAD SHX Text
TP
AutoCAD SHX Text
60.42
AutoCAD SHX Text
TP
AutoCAD SHX Text
WILLOW TREE
AutoCAD SHX Text
59.18
AutoCAD SHX Text
TREE
AutoCAD SHX Text
59.11
AutoCAD SHX Text
DEAD TREE
AutoCAD SHX Text
57.69
AutoCAD SHX Text
TREE
AutoCAD SHX Text
57.61
AutoCAD SHX Text
57.98
AutoCAD SHX Text
TRIAL HOLE
AutoCAD SHX Text
57.99
AutoCAD SHX Text
57.99
AutoCAD SHX Text
57.96
AutoCAD SHX Text
57.96
AutoCAD SHX Text
57.95
AutoCAD SHX Text
57.95
AutoCAD SHX Text
57.92
AutoCAD SHX Text
57.93
AutoCAD SHX Text
57.94
AutoCAD SHX Text
58.02
AutoCAD SHX Text
57.97
AutoCAD SHX Text
57.93
AutoCAD SHX Text
57.97
AutoCAD SHX Text
57.95
AutoCAD SHX Text
57.95
AutoCAD SHX Text
57.93
AutoCAD SHX Text
57.99
AutoCAD SHX Text
58.00
AutoCAD SHX Text
58.00
AutoCAD SHX Text
57.99
AutoCAD SHX Text
57.99
AutoCAD SHX Text
57.93
AutoCAD SHX Text
57.75
AutoCAD SHX Text
58.00
AutoCAD SHX Text
57.88
AutoCAD SHX Text
57.84
AutoCAD SHX Text
57.70
AutoCAD SHX Text
57.59
AutoCAD SHX Text
57.59
AutoCAD SHX Text
57.55
AutoCAD SHX Text
57.93
AutoCAD SHX Text
57.97
AutoCAD SHX Text
IGNL
AutoCAD SHX Text
57.85
AutoCAD SHX Text
57.74
AutoCAD SHX Text
57.73
AutoCAD SHX Text
57.61
AutoCAD SHX Text
57.90
AutoCAD SHX Text
57.90
AutoCAD SHX Text
57.58
AutoCAD SHX Text
57.55
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.83
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.90
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.91
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.89
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.90
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.88
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.93
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.92
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.94
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.89
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.92
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.86
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.86
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.80
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.63
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.66
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.68
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.64
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.94
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.76
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.79
AutoCAD SHX Text
RG
AutoCAD SHX Text
57.59
AutoCAD SHX Text
RG
AutoCAD SHX Text
POST
AutoCAD SHX Text
57.92
AutoCAD SHX Text
POST
AutoCAD SHX Text
57.90
AutoCAD SHX Text
POST
AutoCAD SHX Text
57.97
AutoCAD SHX Text
POST
AutoCAD SHX Text
57.99
AutoCAD SHX Text
POST
AutoCAD SHX Text
57.96
AutoCAD SHX Text
POST
AutoCAD SHX Text
57.81
AutoCAD SHX Text
POST
AutoCAD SHX Text
57.80
AutoCAD SHX Text
POST
AutoCAD SHX Text
57.80
AutoCAD SHX Text
POST
AutoCAD SHX Text
57.82
AutoCAD SHX Text
FFL
AutoCAD SHX Text
58.10
AutoCAD SHX Text
FFL
AutoCAD SHX Text
58.05
AutoCAD SHX Text
57.91
AutoCAD SHX Text
57.94
AutoCAD SHX Text
ELM
AutoCAD SHX Text
58.03
AutoCAD SHX Text
57.60
AutoCAD SHX Text
57.61
AutoCAD SHX Text
BIRCH
AutoCAD SHX Text
57.51
AutoCAD SHX Text
GATE
AutoCAD SHX Text
57.41
AutoCAD SHX Text
GATE
AutoCAD SHX Text
57.91
AutoCAD SHX Text
GATE
AutoCAD SHX Text
57.90
AutoCAD SHX Text
57.90
AutoCAD SHX Text
GATE
AutoCAD SHX Text
57.89
AutoCAD SHX Text
57.89
AutoCAD SHX Text
GATE
AutoCAD SHX Text
57.63
AutoCAD SHX Text
57.63
AutoCAD SHX Text
LP
AutoCAD SHX Text
57.46
AutoCAD SHX Text
CONF
AutoCAD SHX Text
57.44
AutoCAD SHX Text
CONF
AutoCAD SHX Text
57.44
AutoCAD SHX Text
CONF
AutoCAD SHX Text
57.65
AutoCAD SHX Text
CONF
AutoCAD SHX Text
57.67
AutoCAD SHX Text
CONF
AutoCAD SHX Text
57.77
AutoCAD SHX Text
CONF
AutoCAD SHX Text
57.86
AutoCAD SHX Text
CONF
AutoCAD SHX Text
57.88
AutoCAD SHX Text
CONF
AutoCAD SHX Text
57.93
AutoCAD SHX Text
CONF
AutoCAD SHX Text
57.54
AutoCAD SHX Text
CONF
AutoCAD SHX Text
57.56
AutoCAD SHX Text
CONF
AutoCAD SHX Text
57.63
AutoCAD SHX Text
57.81
AutoCAD SHX Text
OHT WIRE
AutoCAD SHX Text
57.73
AutoCAD SHX Text
OHT WIRE
AutoCAD SHX Text
STEP
AutoCAD SHX Text
57.65
AutoCAD SHX Text
57.76
AutoCAD SHX Text
57.77
AutoCAD SHX Text
STEP
AutoCAD SHX Text
57.60
AutoCAD SHX Text
STEP
AutoCAD SHX Text
57.57
AutoCAD SHX Text
57.91
AutoCAD SHX Text
STEP
AutoCAD SHX Text
57.90
AutoCAD SHX Text
57.52
AutoCAD SHX Text
57.58
AutoCAD SHX Text
58.10
AutoCAD SHX Text
57.92
AutoCAD SHX Text
57.90
AutoCAD SHX Text
OHE WIRE
AutoCAD SHX Text
57.43
AutoCAD SHX Text
SEAT
AutoCAD SHX Text
57.95
AutoCAD SHX Text
SEAT
AutoCAD SHX Text
57.95
AutoCAD SHX Text
TANK
AutoCAD SHX Text
57.92
AutoCAD SHX Text
57.93
AutoCAD SHX Text
57.94
AutoCAD SHX Text
SHRUB
AutoCAD SHX Text
58.64
AutoCAD SHX Text
WALL HT:1.8M
AutoCAD SHX Text
57.45
AutoCAD SHX Text
CONCRETE PANEL FENCE HT2.3M
AutoCAD SHX Text
57.45
AutoCAD SHX Text
57.54
AutoCAD SHX Text
57.53
AutoCAD SHX Text
57.63
AutoCAD SHX Text
57.47
AutoCAD SHX Text
57.47
AutoCAD SHX Text
57.55
AutoCAD SHX Text
57.57
AutoCAD SHX Text
57.55
AutoCAD SHX Text
57.52
AutoCAD SHX Text
57.54
AutoCAD SHX Text
56.99
AutoCAD SHX Text
57.07
AutoCAD SHX Text
57.26
AutoCAD SHX Text
57.21
AutoCAD SHX Text
57.27
AutoCAD SHX Text
57.35
AutoCAD SHX Text
57.33
AutoCAD SHX Text
57.26
AutoCAD SHX Text
57.31
AutoCAD SHX Text
57.36
AutoCAD SHX Text
57.45
AutoCAD SHX Text
57.36
AutoCAD SHX Text
57.32
AutoCAD SHX Text
57.35
AutoCAD SHX Text
57.38
AutoCAD SHX Text
57.38
AutoCAD SHX Text
57.42
AutoCAD SHX Text
57.48
AutoCAD SHX Text
57.54
AutoCAD SHX Text
57.45
AutoCAD SHX Text
57.58
AutoCAD SHX Text
57.48
AutoCAD SHX Text
57.47
AutoCAD SHX Text
57.48
AutoCAD SHX Text
57.46
AutoCAD SHX Text
57.48
AutoCAD SHX Text
57.44
AutoCAD SHX Text
57.41
AutoCAD SHX Text
57.45
AutoCAD SHX Text
57.51
AutoCAD SHX Text
57.55
AutoCAD SHX Text
57.58
AutoCAD SHX Text
57.78
AutoCAD SHX Text
57.93
AutoCAD SHX Text
57.86
AutoCAD SHX Text
58.08
AutoCAD SHX Text
58.10
AutoCAD SHX Text
58.11
AutoCAD SHX Text
58.12
AutoCAD SHX Text
58.05
AutoCAD SHX Text
58.01
AutoCAD SHX Text
58.01
AutoCAD SHX Text
57.96
AutoCAD SHX Text
58.00
AutoCAD SHX Text
58.15
AutoCAD SHX Text
58.25
AutoCAD SHX Text
58.34
AutoCAD SHX Text
58.36
AutoCAD SHX Text
58.39
AutoCAD SHX Text
58.19
AutoCAD SHX Text
57.98
AutoCAD SHX Text
57.97
AutoCAD SHX Text
57.96
AutoCAD SHX Text
57.98
AutoCAD SHX Text
58.04
AutoCAD SHX Text
58.01
AutoCAD SHX Text
57.93
AutoCAD SHX Text
57.89
AutoCAD SHX Text
57.72
AutoCAD SHX Text
57.66
AutoCAD SHX Text
57.59
AutoCAD SHX Text
57.63
AutoCAD SHX Text
57.55
AutoCAD SHX Text
57.52
AutoCAD SHX Text
57.46
AutoCAD SHX Text
57.44
AutoCAD SHX Text
57.64
AutoCAD SHX Text
57.67
AutoCAD SHX Text
57.77
AutoCAD SHX Text
57.85
AutoCAD SHX Text
57.90
AutoCAD SHX Text
57.89
AutoCAD SHX Text
58.12
AutoCAD SHX Text
58.18
AutoCAD SHX Text
58.15
AutoCAD SHX Text
58.00
AutoCAD SHX Text
58.00
AutoCAD SHX Text
58.06
AutoCAD SHX Text
WALL HT:1.2M
AutoCAD SHX Text
58.28
AutoCAD SHX Text
58.60
AutoCAD SHX Text
60.89
AutoCAD SHX Text
61.03
AutoCAD SHX Text
61.02
AutoCAD SHX Text
60.80
AutoCAD SHX Text
60.99
AutoCAD SHX Text
61.15
AutoCAD SHX Text
60.91
AutoCAD SHX Text
60.45
AutoCAD SHX Text
61.09
AutoCAD SHX Text
60.50
AutoCAD SHX Text
60.16
AutoCAD SHX Text
60.86
AutoCAD SHX Text
60.99
AutoCAD SHX Text
60.95
AutoCAD SHX Text
60.55
AutoCAD SHX Text
60.52
AutoCAD SHX Text
59.94
AutoCAD SHX Text
59.85
AutoCAD SHX Text
59.13
AutoCAD SHX Text
57.74
AutoCAD SHX Text
57.34
AutoCAD SHX Text
57.28
AutoCAD SHX Text
59.0
AutoCAD SHX Text
58.5
AutoCAD SHX Text
60.0
AutoCAD SHX Text
60.0
AutoCAD SHX Text
59.5
AutoCAD SHX Text
58.0
AutoCAD SHX Text
58.0
AutoCAD SHX Text
57.5
AutoCAD SHX Text
57.5
AutoCAD SHX Text
SHED
AutoCAD SHX Text
PAVING
AutoCAD SHX Text
PAVING
AutoCAD SHX Text
CENTRE LINE OF HEDGE
AutoCAD SHX Text
RAILING
AutoCAD SHX Text
CENTRE LINE OF HEDGE
AutoCAD SHX Text
CENTRE LINE OF HEDGE
AutoCAD SHX Text
FENCE W/M HT:1.8M
AutoCAD SHX Text
FENCE W/M HT:1.8M
AutoCAD SHX Text
CENTRE LINE OF HEDGE
AutoCAD SHX Text
SPOIL HEAP
AutoCAD SHX Text
SPOIL HEAP
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
WM
AutoCAD SHX Text
RAILING
AutoCAD SHX Text
FENCE W/M HT:1.8M
AutoCAD SHX Text
CENTRE LINE OF PEMBROKESHIRE HEDGE BANK
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
FOOT PATH
AutoCAD SHX Text
FOOT PATH
AutoCAD SHX Text
FOOT PATH
AutoCAD SHX Text
INVT:57.27
AutoCAD SHX Text
DIA.100
AutoCAD SHX Text
INVT:57.58
AutoCAD SHX Text
DIA.100
AutoCAD SHX Text
INVT:57.50
AutoCAD SHX Text
INVT:57.36
AutoCAD SHX Text
DIA.100
AutoCAD SHX Text
DIA.100
AutoCAD SHX Text
INVT:57.04
AutoCAD SHX Text
DIA.100
AutoCAD SHX Text
DIA.100
AutoCAD SHX Text
DIA.100
AutoCAD SHX Text
INVT:56.64
AutoCAD SHX Text
DIA.150
AutoCAD SHX Text
DIA.150
AutoCAD SHX Text
INVT:56.59
AutoCAD SHX Text
GATE
AutoCAD SHX Text
INVT:55.84
AutoCAD SHX Text
INVT:56.73
AutoCAD SHX Text
INVT:55.43
AutoCAD SHX Text
INVT:55.88
AutoCAD SHX Text
DIA.150
AutoCAD SHX Text
DIA.150
AutoCAD SHX Text
DIA.100
AutoCAD SHX Text
DIA.150
AutoCAD SHX Text
DIA.100
AutoCAD SHX Text
INVT:56.53
AutoCAD SHX Text
DIA.225
AutoCAD SHX Text
CONCRETE PANEL FENCE HT2.3M
AutoCAD SHX Text
LANE
AutoCAD SHX Text
FFL
AutoCAD SHX Text
58.07
AutoCAD SHX Text
57.25GL
AutoCAD SHX Text
57.28GL
AutoCAD SHX Text
57.28GL
AutoCAD SHX Text
57.40GL
AutoCAD SHX Text
57.63GL
AutoCAD SHX Text
57.86GL
AutoCAD SHX Text
58.26GL
AutoCAD SHX Text
59.36GL
AutoCAD SHX Text
59.90GL
AutoCAD SHX Text
60.31GL
AutoCAD SHX Text
60.32GL
AutoCAD SHX Text
60.28GL
AutoCAD SHX Text
60.16GL
AutoCAD SHX Text
60.16GL
AutoCAD SHX Text
59.99GL
AutoCAD SHX Text
57.56GL
AutoCAD SHX Text
57.62GL
AutoCAD SHX Text
57.66GL
AutoCAD SHX Text
57.83GL
AutoCAD SHX Text
57.88GL
AutoCAD SHX Text
END OF LINE
AutoCAD SHX Text
57.87GL
AutoCAD SHX Text
57.92GL
AutoCAD SHX Text
57.21 GL
AutoCAD SHX Text
57.30GL
AutoCAD SHX Text
57.38 GL
AutoCAD SHX Text
57.49GL
AutoCAD SHX Text
57.59GL
AutoCAD SHX Text
57.62GL
AutoCAD SHX Text
59.87GL
AutoCAD SHX Text
59.92GL
AutoCAD SHX Text
59.98GL
AutoCAD SHX Text
60.04GL
AutoCAD SHX Text
60.01GL
AutoCAD SHX Text
MH
AutoCAD SHX Text
COV:57.95
AutoCAD SHX Text
MH FOUL
AutoCAD SHX Text
COV:57.60
AutoCAD SHX Text
MH
AutoCAD SHX Text
COV:59.98
AutoCAD SHX Text
INVT:56.77
AutoCAD SHX Text
59.02 TOP OF PIPE
AutoCAD SHX Text
58.92 TOP OF PIPE
AutoCAD SHX Text
58.58 TOP OF PIPE
AutoCAD SHX Text
58.84 TOP OF PIPE
AutoCAD SHX Text
58.84 TOP OF PIPE
AutoCAD SHX Text
58.84 TOP OF PIPE
AutoCAD SHX Text
59.76 TOP OF PIPE
AutoCAD SHX Text
59.66 TOP OF PIPE
AutoCAD SHX Text
59.88 TOP OF PIPE
AutoCAD SHX Text
59.82 TOP OF PIPE
AutoCAD SHX Text
59.91TOP OF PIPE
AutoCAD SHX Text
59.10 TOP OF PIPE
AutoCAD SHX Text
58.56 TOP OF PIPE
AutoCAD SHX Text
57.76 TOP OF PIPE
AutoCAD SHX Text
57.41 TOP OF PIPE
AutoCAD SHX Text
57.23 TOP OF PIPE
AutoCAD SHX Text
56.90 TOP OF PIPE
AutoCAD SHX Text
56.78 TOP OF PIPE
AutoCAD SHX Text
56.88TOP OF PIPE
AutoCAD SHX Text
56.75 TOP OF PIPE
AutoCAD SHX Text
56.12 INVERT
AutoCAD SHX Text
56.14 INVERT
AutoCAD SHX Text
56.28 INVERT
AutoCAD SHX Text
56.45 INVERT
AutoCAD SHX Text
56.79 INVERT
AutoCAD SHX Text
57.02 INVERT
AutoCAD SHX Text
56.87 INVERT
AutoCAD SHX Text
57.54 INVERT
AutoCAD SHX Text
57.36 INVERT
AutoCAD SHX Text
57.52 INVERT
AutoCAD SHX Text
57.59 INVERT
AutoCAD SHX Text
57.40 INVERT
AutoCAD SHX Text
ASSUMED MH
AutoCAD SHX Text
UNDER FALLEN TREES
AutoCAD SHX Text
DIA.150
AutoCAD SHX Text
DIA.100
AutoCAD SHX Text
RISING MAIN DIA.300
AutoCAD SHX Text
RISING MAIN DIA.300
AutoCAD SHX Text
RISING MAIN DIA.300
AutoCAD SHX Text
UNABLE TO LIFT
AutoCAD SHX Text
Electronic measurement and setting out.
AutoCAD SHX Text
Elm House, Templeton, Narberth, Pembs. SA67 8RY
AutoCAD SHX Text
Land and Engineering Surveyors
AutoCAD SHX Text
M.W. SURVEYS
AutoCAD SHX Text
Tel. (01834) 861241 Mob: 07811 321440 Email: [email protected]
AutoCAD SHX Text
CLIENT
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
DATUM USED
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
NUMBER
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
SMWW JEM
AutoCAD SHX Text
15/05/2018
AutoCAD SHX Text
TOPOGRAPHICAL SURVEY OF FORMER INFANT SCHOOL,
AutoCAD SHX Text
JONATHAN COLE
AutoCAD SHX Text
BRODOG LANE, FISHGUARD, PEMBROKESHIRE.
AutoCAD SHX Text
OSTN15 G.P.S. ORDNANCE SURVEY GRID & DATUM.
AutoCAD SHX Text
PEMBROKESHIRE HOUSING,
AutoCAD SHX Text
MEYLER HOUSE,
AutoCAD SHX Text
ST. THOMAS GREEN,
AutoCAD SHX Text
HAVERFORDWEST,
AutoCAD SHX Text
PEMBROKESHIRE,
AutoCAD SHX Text
SA61 1QP
AutoCAD SHX Text
230118
AutoCAD SHX Text
1130518/A
AutoCAD SHX Text
22/01/2018
AutoCAD SHX Text
REVISION A = ADDITION SURVEY INFORMATION ON RISING MAIN AND GRAVITY SEWER. 15/05/2018.
AutoCAD SHX Text
GRID N
AutoCAD SHX Text
THE PROPERTY OF THIS DRAWING AND DESIGN IS VESTED IN ROGER CASEY ASSOCIATES AND MUST NOT BE COPIED OR REPRODUCED IN ANY WAY WITHOUT THE WRITTEN CONSENT OF ROGER CASEY ASSOCIATES. THE CONTRACTOR IS TO CHECK ALL LEVELS AND DIMENSIONS BEFORE WORK COMMENCES, AND ANY DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THE CONSULTANTS. WORK TO FIGURED DIMENSIONS IN PREFERENCE TO SCALING. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER ROGER CASEY ASSOCIATES DRAWINGS AND SPECIFICATIONS AND ALL OTHER CONSULTANTS DRAWINGS AND SPECIFICATIONS RELATING TO THIS PROJECT.
AutoCAD SHX Text
M:\RCA Job Files\200 job\20092 - Former Infant School, Brodog Lane, Fishguard, Pembrokeshire SA65 9NF\F - RCA Civil Drawings\20092-01a.dwg
AutoCAD SHX Text
27/09/2018 17:24:06
AutoCAD SHX Text
RCA Document Reference: RCA A1 Landscape Version 1
AutoCAD SHX Text
D
AutoCAD SHX Text
L I M I T E D
AutoCAD SHX Text
P
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
B
AutoCAD SHX Text
M
AutoCAD SHX Text
E
AutoCAD SHX Text
K
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
E
Page 13: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER INFANT SCHOOL, BRODOG LANE, FISHGUARD, PEMBROKESHIRE SA65 9NF SEPTEMBER 2018

Appendix C - Proposed Architectural Site Plan

Page 14: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

P

P

P

P

P

P

60.09

60.66

60.95

60.10

60.02

A

A

B

C

C

D

D

E

E

60.45

59.18

58.39

58.32

57.98

57.96

58.28

58.08

58.33

57.34

58.00

57.84

57.84

57.60

57.58

57.54

57.51

57.55

57.54

57.85

57.83

57.90

58.25

58.30

59.43

59.89

60.09

60.05

61.05

57.52

57.48

57.59

57.75

57.98

58.11

59.38

59.87

60.00

B

LP

LP

LP

LP

LP

P

P

P

P

SCALE IN METRES

20151050

1.8M HIGH BOARDED GATE

1.8M HIGH BOARDED FENCE

1.2M POST AND RAIL FENCE

COMPOST BIN

ROTARY DRYING LINE

RAINWATER BUTT

SHED AND CYCLE STORE

RECYCLING BIN

WASTE BIN

PARKING SPACE

NEW TREE, NORTHERN RED OAK (TBC)

EXISTING TREE RETAINED

EXISTING TREE REMOVED

REAR GARDEN LAWN

3.0 X 3.0 PATIO AND PAVED PATHS

DEMOLISHED BUILDING

KEY:

LP STREET LIGHT

RETAINING WALL

1.2M HIGH BOARDED FENCE

WITH 600MM HIGH TRELLIS ABOVE

GRASSED SERVICE STRIP

MACADAM TO SHARED WAY AND

SERVICE STRIP

AWARENESS STRIP

NEW TREE, SHADBUSH (TBC)

BLOCK PAVER ROADWAY

PROPOSED SITE PLAN

PROPOSED RESIDENTIAL DEVELOPMENT

AT FORMER INFANT'S SCHOOL SITE,

BRODOG LANE, FISHGUARD

PEMBROKESHIRE HOUSING ASSOCIATION

MCW

DME/CJM

1:500

JUN 18

A3 8975

PSP01F

These drawings and the copyright thereof are the

sole property of the consultants and must not be

reproduced without their written consent.

The contractor is to check all levels and dimensions

before work commences, and any discrepancies to

be reported immediately to the consultants.

Work to figured dimensions. Do not scale.

The contractor is expected to supply and do

everything necessary for the proper execution of he

works that may be reasonably inferred from the

drawings and specification, whether referred to in

detail or not, without extra payment in respect thereof.

The finished building will require service maintenance

in accordance with custom and practice and the

manufacturers recommendations.

The architects drawings are to be read in conjunction

with the engineers and all specialist manufacturers /

suppliers drawings.

FOR PLANNING

PURPOSES ONLY

EXISTING

TREE

EXISTING

TREE

EXISTING

TREE

SCHEDULE OF ACCOMMODATION:

10 X 3 PERSON BUNGALOW - UNITS

1, 2, 3, 4, 5, 6, 7, 8, 11, 12

8 X 2 PERSON BUNGALOW - UNITS

9, 10, 13, 14, 15, 16, 17, 18

EXISTING

TREE

DRAFT

TURNING

AREA

OPEN

AREA

NOTE:

EACH UNIT TO HAVE 2 CAR

PARKING SPACES EACH.

S:\PDL LIVE JOBS FOR DFS SHARE\8900 JOBS\8975 - OLD INFANTS SCHOOL, BRODOG TERRACE, FGUARD\PDL DRAWINGS\8975 PLANNING SEPT 18.dwg

AutoCAD SHX Text
Glanmor
AutoCAD SHX Text
Maes Y Meillion
AutoCAD SHX Text
The Lodge
AutoCAD SHX Text
White
AutoCAD SHX Text
Heather
AutoCAD SHX Text
12
AutoCAD SHX Text
24
AutoCAD SHX Text
Newpark
AutoCAD SHX Text
BRODOG TERRACE
AutoCAD SHX Text
Lynwood
AutoCAD SHX Text
Pol Sta
AutoCAD SHX Text
Police
AutoCAD SHX Text
House
AutoCAD SHX Text
Club
AutoCAD SHX Text
Govt
AutoCAD SHX Text
Offices
AutoCAD SHX Text
MARCHGAE
AutoCAD SHX Text
PADDOCK
AutoCAD SHX Text
Priorswood
AutoCAD SHX Text
1
AutoCAD SHX Text
Carreg Lwyd
AutoCAD SHX Text
EBN
AutoCAD SHX Text
HB2
AutoCAD SHX Text
BN
AutoCAD SHX Text
DL1
AutoCAD SHX Text
DR1
AutoCAD SHX Text
BN
AutoCAD SHX Text
EBN
AutoCAD SHX Text
DKT
AutoCAD SHX Text
DKT
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
HB2
AutoCAD SHX Text
BN
AutoCAD SHX Text
DL1
AutoCAD SHX Text
DR1
AutoCAD SHX Text
BN
AutoCAD SHX Text
DL1
AutoCAD SHX Text
BN
AutoCAD SHX Text
HB2
AutoCAD SHX Text
DK
AutoCAD SHX Text
DR1
AutoCAD SHX Text
DL1
AutoCAD SHX Text
HB2
AutoCAD SHX Text
BN
AutoCAD SHX Text
BN
AutoCAD SHX Text
DR1
AutoCAD SHX Text
DL1
AutoCAD SHX Text
HB2
AutoCAD SHX Text
BN
AutoCAD SHX Text
BN
AutoCAD SHX Text
DR1
AutoCAD SHX Text
DL1
AutoCAD SHX Text
HB2
AutoCAD SHX Text
BN
AutoCAD SHX Text
BN
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DR1
AutoCAD SHX Text
DL1
AutoCAD SHX Text
HB2
AutoCAD SHX Text
BN
AutoCAD SHX Text
BN
AutoCAD SHX Text
DR1
AutoCAD SHX Text
DL1
AutoCAD SHX Text
HB2
AutoCAD SHX Text
BN
AutoCAD SHX Text
BN
AutoCAD SHX Text
DR1
AutoCAD SHX Text
DL1
AutoCAD SHX Text
HB2
AutoCAD SHX Text
BN
AutoCAD SHX Text
BN
AutoCAD SHX Text
DR1
AutoCAD SHX Text
DL1
AutoCAD SHX Text
HB2
AutoCAD SHX Text
BN
AutoCAD SHX Text
BN
AutoCAD SHX Text
tp
AutoCAD SHX Text
tp
AutoCAD SHX Text
tp
AutoCAD SHX Text
tp
AutoCAD SHX Text
tp
AutoCAD SHX Text
tp
AutoCAD SHX Text
tp
AutoCAD SHX Text
tp
AutoCAD SHX Text
Date
AutoCAD SHX Text
Drawn
AutoCAD SHX Text
SA31 1LQ
AutoCAD SHX Text
AutoCAD SHX Text
TEL: 01267 233612
AutoCAD SHX Text
FAX: 01267 233471
AutoCAD SHX Text
CARMARTHEN
AutoCAD SHX Text
26 SPILMAN STREET
AutoCAD SHX Text
Checked by
AutoCAD SHX Text
Original Size
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
Scale
AutoCAD SHX Text
Designed
AutoCAD SHX Text
SA61 2LE
AutoCAD SHX Text
FAX: 01437 764471
AutoCAD SHX Text
TEL: 01437 764135
AutoCAD SHX Text
5/7 PICTON PLACE
AutoCAD SHX Text
HAVERFORDWEST
AutoCAD SHX Text
16 MEYRICK STREET
AutoCAD SHX Text
PEMBROKE DOCK
AutoCAD SHX Text
TEL: 01646 683439
AutoCAD SHX Text
SA72 6UT
AutoCAD SHX Text
FAX: 01646 681563
AutoCAD SHX Text
Rev
AutoCAD SHX Text
Drwg No
AutoCAD SHX Text
Job No
AutoCAD SHX Text
S U R V E Y O R S
AutoCAD SHX Text
Q U A N T I T Y
AutoCAD SHX Text
S U R V E Y O R S
AutoCAD SHX Text
C H A R T E R E D
AutoCAD SHX Text
A R C H I T E C T S
AutoCAD SHX Text
B U I L D I N G
AutoCAD SHX Text
G
AutoCAD SHX Text
L I M I T E D
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
K
AutoCAD SHX Text
E
AutoCAD SHX Text
I
AutoCAD SHX Text
P
AutoCAD SHX Text
E
AutoCAD SHX Text
M
AutoCAD SHX Text
R
AutoCAD SHX Text
B
AutoCAD SHX Text
O
AutoCAD SHX Text
Client
AutoCAD SHX Text
N
AutoCAD SHX Text
Project
AutoCAD SHX Text
c
AutoCAD SHX Text
Drwg
AutoCAD SHX Text
Pembroke Design Ltd 2018
AutoCAD SHX Text
C D M C O-O R D I N A T O R S
AutoCAD SHX Text
PLOT 13 CAR PARKING SPACES AMENDED
AutoCAD SHX Text
13.03.18
AutoCAD SHX Text
RISING FOUL MAIN AMENDED
AutoCAD SHX Text
14.05.18
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
ROAD LAYOUT AMENDED ACCORDING TO RCA PLAN
AutoCAD SHX Text
02.08.18
AutoCAD SHX Text
C
AutoCAD SHX Text
LANDSCAPING AMENDED
AutoCAD SHX Text
13.08.18
AutoCAD SHX Text
D
AutoCAD SHX Text
LANDSCAPING AMENDED AS CLIENT'S EMAIL
AutoCAD SHX Text
29.08.18
AutoCAD SHX Text
E
AutoCAD SHX Text
21.08.18
AutoCAD SHX Text
PARKING AMENDED
AutoCAD SHX Text
18.09.18
AutoCAD SHX Text
F
AutoCAD SHX Text
F
Page 15: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER INFANT SCHOOL, BRODOG LANE, FISHGUARD, PEMBROKESHIRE SA65 9NF SEPTEMBER 2018

Appendix D - Natural Resources Wales Flood Risk Map and Welsh Government TAN 15 Development Advice Map

Page 16: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

Ceir rhestr lawn o delerau ac amondau yn https://naturalresources.wales/rhybuddsafonol neu drwy gysylltu ag [email protected]. A full list of terms and condiitions is available from the https://naturalresources.wales/StandardNotice or by contacting [email protected] © Crown copyright and database rights 2017 Ordnance Survey 100019741. Geological Mapping: British Geological Survey ©NERC. Centre for Ecology & Hydrology © NERC (CEH). Defra and Met Office © Crown copyright. © Cranfield University. © James Hutton Institute. Land & Property Services © Crown copyright and database right.

1:

28/09/2018

Dyddiad / Date

Former Infant School Site, Brodog Lane, Fishguard, Pembrokeshire

5,001

Map Perygl Llifogydd / Flood Risk Map

Graddfa / Scale

0.13

Kilometers

0.3

British_National_Grid

00.3

Allwedd / Map KeyZone C1

Zone C2

Zone B

Zone A

philiplawrence
Polygon
Page 17: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

Ceir rhestr lawn o delerau ac amondau yn https://naturalresources.wales/rhybuddsafonol neu drwy gysylltu ag [email protected]. A full list of terms and condiitions is available from the https://naturalresources.wales/StandardNotice or by contacting [email protected] © Crown copyright and database rights 2017 Ordnance Survey 100019741. Geological Mapping: British Geological Survey ©NERC. Centre for Ecology & Hydrology © NERC (CEH). Defra and Met Office © Crown copyright. © Cranfield University. © James Hutton Institute. Land & Property Services © Crown copyright and database right.

1:

28/09/2018

Dyddiad / Date

Former Infant School Site, Brodog Lane, Fishguard, Pembrokeshire

5,001

Map Perygl Llifogydd / Flood Risk Map

Graddfa / Scale

0.13

Kilometers

0.3

British_National_Grid

00.3

Allwedd / Map KeyMain Rivers

Flood Defences

Areas Benefiting from Flood Defences

Shoreline Management Plan & Coastal Erosion

Flood Storage Areas

Floodmap Flood Zone 3

Floodmap Flood Zone 2

Reservoir Depths

0 - 0.3m

0.3 - 2.0m

Greater than 2.0m

High Surface Water Flood Risk - Extent

Medium Surface Water Flood Risk - Extent

Low Surface Water Flood Risk - Extent

philiplawrence
Polygon
Page 18: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER INFANT SCHOOL, BRODOG LANE, FISHGUARD, PEMBROKESHIRE SA65 9NF SEPTEMBER 2018

Appendix E - Dwr Cymru Welsh Water Pre-Planning Advice

Page 19: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

Developer Services PO Box 3146 Cardiff CF30 0EH Tel: +44 (0)800 917 2652 Fax: +44 (0)2920 740472 E.mail: [email protected]

Gwasanaethau Datblygu Blwch Post 3146 Caerdydd CF30 0EH Ffôn: +44 (0)800 917 2652 Ffacs: +44 (0)2920 740472 E.bost: [email protected]

Welsh Water is owned by Glas Cymru – a ‘not-for-profit’ company. Mae Dŵr Cymru yn eiddo i Glas Cymru – cwmni ‘nid-er-elw’.

We welcome correspondence in Welsh and English Dŵr Cymru Cyf, a limited company registered in Wales no 2366777. Registered office: Pentwyn Road, Nelson, Treharris, Mid Glamorgan CF46 6LY

Rydym yn croesawu gohebiaeth yn y Gymraeg neu yn Saesneg Dŵr Cymru Cyf, cwmni cyfyngedig wedi’i gofrestru yng Nghymru rhif 2366777. Swyddfa gofrestredig: Heol Pentwyn Nelson, Treharris, Morgannwg Ganol CF46 6LY.

Mr Jonathan Cole Ateb group limited Roger Casey Associates 6 Mansel Street Carmarthen Carmarthenshire SA31 1PX

Date: 24/04/2018 Our Ref: PPA0002947

Dear Mr Cole Grid Ref: 195591 237383 Site Address: Former Fishguard County Primary Infants School, Brodog Lane, Fishguard, Pembrokeshire, SA65 9NF Development: 18 dwellings I refer to your pre-planning enquiry received relating to the above site, seeking our views on the capacity of our network of assets and infrastructure to accommodate your proposed development. Having reviewed the details submitted I can provide the following comments which should be taken into account within any future planning application for the development. SEWERAGE The foul flows only from the proposed development can be accommodated within the public sewerage system. We advise that the flows should be communicated with to the foul/combined sewer between manholes SM95375302 and SM95375301 located south of the development site. Should a planning application be submitted for this development we will seek to control these points of communication via appropriate planning conditions and therefore recommend that any drainage layout or strategy submitted as part of your application takes this into account. However, should you wish for an alternative connection point to be considered please provide further information to us in the form of a drainage strategy, preferably in advance of a planning application being submitted. With reference to the surface water flows from the proposed development, surface water should be discharged by sustainable means. We refer you to the Welsh Government 'Recommended non-statutory standards for sustainable drainage (SuDS)' of which there are four levels of sustainable surface water disposal methods outlined in a hierarchal approach (including rain water harvesting, infiltration, watercourses etc). Any future drainage scheme for the development site should include the

Page 20: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

Welsh Water is owned by Glas Cymru – a ‘not-for-profit’ company. Mae Dŵr Cymru yn eiddo i Glas Cymru – cwmni ‘nid-er-elw’.

We welcome correspondence in Welsh and English Dŵr Cymru Cyf, a limited company registered in Wales no 2366777. Registered office: Pentwyn Road, Nelson, Treharris, Mid Glamorgan CF46 6LY

Rydym yn croesawu gohebiaeth yn y Gymraeg neu yn Saesneg Dŵr Cymru Cyf, cwmni cyfyngedig wedi’i gofrestru yng Nghymru rhif 2366777. Swyddfa gofrestredig: Heol Pentwyn Nelson, Treharris, Morgannwg Ganol CF46 6LY.

implementation, where possible, of these sustainable drainage methods for surface water disposal. Please also refer to further detailed advice relating to surface water management included in our attached Advice & Guidance note. In addition, please note that no highway or land drainage run-off will be permitted to discharge directly or indirectly into the public sewerage system. You may need to apply to Dwr Cymru Welsh Water for any connection to the public sewer under Section 106 of the Water industry Act 1991. However, if the connection to the public sewer network is either via a lateral drain (i.e. a drain which extends beyond the connecting property boundary) or via a new sewer (i.e. serves more than one property), it is now a mandatory requirement to first enter into a Section 104 Adoption Agreement (Water Industry Act 1991). The design of the sewers and lateral drains must also conform to the Welsh Ministers Standards for Foul Sewers and Lateral Drains, and conform with the publication "Sewers for Adoption"- 7th Edition. Further information can be obtained via the Developer Services pages of www.dwrcymru.com You are also advised that some public sewers and lateral drains may not be recorded on our maps of public sewers because they were originally privately owned and were transferred into public ownership by nature of the Water Industry (Schemes for Adoption of Private Sewers) Regulations 2011. The presence of such assets may affect the proposal. In order to assist you may contact Dwr Cymru Welsh Water on 0800 085 3968 to establish the location and status of the apparatus in and around your site. Please be mindful that under the Water Industry Act 1991 Dwr Cymru Welsh Water has rights of access to its apparatus at all times. The proposed development site is crossed by a public sewer with the approximate positions being marked on the attached Statutory Public Sewer Record. Under the Water Industry Act 1991 Dwr Cymru Welsh Water has rights of access to its apparatus at all times. No part of any building will be permitted within 3 metres either side of the centreline of the 300mm rising main. Our strong recommendation is that your site layout takes into account the location of the assets crossing the site and should be referred to in any master-planning exercises or site layout plans submitted as part of any subsequent planning application. Further information regarding Asset Protection is provided in the attached Advice & Guidance note. SEWAGE TREATMENT No problems are envisaged with the Waste Water Treatment Works for the treatment of domestic discharges from this site. WATER SUPPLY A water supply can be made available to service this proposed development. However, this would require the installation of off-site mains from our water main. Under Sections 40 - 41 of the Water Industry Act 1991 the above cost is requisitionable and, subject to us receiving your detailed site layout plan and your

Page 21: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

Welsh Water is owned by Glas Cymru – a ‘not-for-profit’ company. Mae Dŵr Cymru yn eiddo i Glas Cymru – cwmni ‘nid-er-elw’.

We welcome correspondence in Welsh and English Dŵr Cymru Cyf, a limited company registered in Wales no 2366777. Registered office: Pentwyn Road, Nelson, Treharris, Mid Glamorgan CF46 6LY

Rydym yn croesawu gohebiaeth yn y Gymraeg neu yn Saesneg Dŵr Cymru Cyf, cwmni cyfyngedig wedi’i gofrestru yng Nghymru rhif 2366777. Swyddfa gofrestredig: Heol Pentwyn Nelson, Treharris, Morgannwg Ganol CF46 6LY.

programme for construction, we would be able to provide a more accurate assessment of the developer's contribution. These details should be sent to the above address. I trust the above information is helpful and will assist you in forming water and drainage strategies that should accompany any future planning application. I also attach copies of our water and sewer extract plans for the area, and a copy of our Planning Guidance Note which provides further information on our approach to the planning process, making connections to our systems and ensuring any existing public assets or infrastructure located within new development sites are protected. Please note that our response is based on the information provided in your enquiry and should the information change we reserve the right to make a new representation. Should you have any queries or wish to discuss any aspect of our response please do not hesitate to contact our dedicated team of planning officers, either on 0800 917 2652 or via email at [email protected] Please quote our reference number in all communications and correspondence. Yours faithfully,

Owain George Planning Liaison Manager Developer Services

Please Note that demands upon the water and sewerage systems change continually; consequently the information given above should

be regarded as reliable for a maximum period of 12 months from the date of this letter.

Page 22: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

A

6

6

?

?

?

?

?

?

??

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

? ??

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

??

?

?

?

?TT

HH

HH

HH

HH

HH

HH

HH

HH

HH

HH

HH

HH

HH

HHHHHH

HHHH

HHHH

HHHH

HHHH

HHHH

HH

HH

HH

HH

HH

HH

HH

HH

HH

HH

HH

?

????

?

?

?TS

?TS?TS

?

TTT

?TT ?TT

?

?TT

?TT

?T

?TT

?T

?TT?

TTTT?T

?

?

?

?TTT

?T T?T

?

?

?

?

?

TTTTTTTTTT

?T

?

TTT

?

TTTT

?T

?TT

?TT

?TT ?T T

?T

P?

?

?

?

?P

PL

L

?

?

?

SM95374301

SM95374201

SM95374206

SM95374205

SM95374204

SM95374202

SM95374203

SM95374304

SM95374303SM95374305

SM95374307

SM95374306

SM95374302

SM95375206

SM95374309

SM95374207

SM95376104

SM95376301

SM95377202

SM95377201

SM95377301

SM95375202

SM95375203

SM95375204

SM95375205

SM95375301

SM95375302

SM95375303

SM95375209

SM95374308

SM95375201

SM95374251

SM95374250

SM95373354

SM95373353

SM95374401

SM95374402

SM95374403

SM95374404

SM95374405SM953

74406

SM95374407

SM95374408

SM95374409

SM95374410

SM95374411

SM95374412

SM95374413

SM95374414

SM95374415

SM9537

4416

SM9537

3402

SM95373401

SM95373404

SM95373406

SM95373411SM95373412

SM95373413

SM95373414

SM95374419

SM95374426

SM95374423

SM95375555

SM95375554

SM95374372SM95374370

SM95376210

SM95373470

SM95373570SM95373571

SM95373572

SM95376273

SM95376270

SM95377260

SM95374562

SM95374561

SM95373560

SM95374460

SM95374461

SM95374565

SM95374563

SM95374564

SM95376572

SM95376571

SM95376570

SM95376574

SM95374310SM95374311

SM95374312SM95374313

SM95374501

SM95374505

SM95374504

100] VERGA

F6

F5F4

S6

S5

S4F3F3a

S3

F2

S/O 22 VIC

160] SLADE

Burried

156] PENSL

c 58.566i 57.086

c 58.41i 57.03

c 57.782i 56.412

c 58.555i 57.215

c 58.471i 57.431<

<

<

<

<<

<

<

<

<

<

<

<<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

<

!!

<<

<

<

<

<

,

,

,

!

!

,

,

,

!

<<

,

,

<<<

!

,,,!

,

<

<

!

!

!

< <

<

!

!!!

<<

<

<

!

!

!

!!

!

!!

!

!!

!

< <

<<

<

!

!

B

B

B

B

B

B

B

B

B

B

B

B

B

BB

f

#

#

f

f

f

E

E

f

E

B

B

DI 300 m m .

VC 225 m m .

UNKNOWN 150 m m .

VC 150 m m .

CONC 300 m m .

VC 100 mm .

P F 150 m m .

UNKNOWN 225 m m.

uP VC 150 m m .

VC 300 m m .

UNKNOWN 150 m m .

VC 225 m m .

VC 150 m m .

VC 225 m m .

VC 150 m m .

VC 225 m m .

VC 150 m m .

VC 150 m

m .

UNKNOWN 150 m m .

VC 100 m m .

VC 150 mm .

VC 100 m m.

VC 150 m m .

VC 150 m m .

VC 100 m

m .

VC 100 m m .

VC 150 m

m .

VC 150 m m .

VC 150 m m

.

VC 150 m m .VC 150 m m .

VC 150 m m .

VC 150 mm .

VC 150 m m .

Fis hg ua rd

Infa nt SchoolCounty P rim a ry

Office s

Office

LBTCB

CR

Te l

59.1m

P olice

P ond

ED BdyHous e

Coa sta l Slope

Ex

Govt

Sorting

P ol Sta

El Sub Sta

Brodog

P ADDOCK

Coe dmor

The Lodg e

LAMPIT WAY

Saddle

BRODOG LANE

White

Spring fie ld

P riors wood

Cres s elly

BRYN ELFED Cotta g e

Ros tre vor

MARCHGAE

BRYN ROAD

Corrym ore

Lynwood

Crug -y-We rydd

Club

P encra ig

Mooncoyne

Mooring s

HEOL EM

RYS

Mole End

Ga rde n

News te a d

P encowrw

Bentley House

Eas tlands

St Lawre nce

P oint

Ty De wi

HEOL CYNAN

Hig h Cre s t

Wyla nCa rre g y

Nantga redigThe Ha ven

P e n Gwaun

Ma e s Ara ul

P orth Ewyn

Ce una nt

Ne wpa rk

Ma e s y Me illion

P a rk

Hig h

Y Gorla n

Lla m pit Mawr

St Hila ire

Ga rn Y Mor

Manda l

Llys ab er

Llys -y-g an

a to d

44 to 50

Glanym or

Min-y-mor

Nurs e rySea wa rds

Garth

Tala r We n

9

1

8

6

3

2

4

5

Ha wthorns

15

24

12

26

70

14

5452

13

73

56

19

17

25

5860

71

Cilhedd

77

23

1

1

2

2

1

14

Hous e

1

1

15

8

1

Cotta g e

1

98

1

1

13

2

13

3

2

Brodog

1

2

1

9

14

P P A0002947

Notes:

Re produce d b y pe rm is s ion of the Ordna nce Surve y on b e ha lf ofHMSO. © Crown copyrig ht a nd da ta b a s e rig ht 2017.

All rig hts re s e rve d .Ordna nce Surve y Lice nce num b e r 100019534

EXACT LOCATIONS OF ALL APPARATUSTO BE DETERMINED ON SITE.

P rinte d on:P rinte d by:Ma p s ca le :Ma p Re f: 195591,237379

Ha rris Ce ria nne 24 Apr 2018

LEGEND(Representative of most common features)

Private Sewer Transfer

Inspection ChamberLateral Drain

Whils t e ve ry re a s ona b le e ffort ha s b e e n ta ke n to corre ctly re cord the pipe m a te ria l of DCWW a s s e ts , the re is a pos s ib ility that in s om e ca s e s pipe m a te ria l (othe r tha n As b e s tos Ce m e nt or P itch Fib re ) m ay b e found to b e a s b e s tos ce m e nt (AC) or P itch Fib re (P F) . It is the re fore a dvis a b le tha t the pos s ib le pre s e nce of AC or P F pipe s b e a nticipa te d a nd cons ide re d a s pa rt of a ny ris k a s s e s s m e nt prior to e xca va tion

1:1250

Dŵr Cym ru Cyfyng e dig (‘the Com pa ny’) g ive s this inform a tion a s to the pos ition of its unde rg round a ppa ra tus by way of g e ne ra l g uida nce only a nd on the strict unde rs ta nding that it is b a s e d on the b e s t inform a tion ava ila b le a nd no wa rra nty a sto its corre ctne s s is re lie d upon in the e ve nt of e xcava tions or othe r works m a de in the vicinity of the com pa ny’s a ppa ra tus. The onus of locating a ppa ra tus b e fore ca rrying out a ny e xcava tions re s ts e ntire ly on you. The inform a tion which is supplie d by the Com pa ny, is done s o in a ccorda nce with s tatutory re quire m e nts of s e ctions 198 a nd 199 of the Wate r Industry Act 1991 which is b a s e d upon the b e s t Inform a tion ava ila b le a nd, in pa rticula r, but without pre judice to the g e ne ra lity of thefore g oing , it should b e note d that the re cords that a re a va ila b le to the Com pa ny m a y not disclos e the e xis te nce of a wate r m a in, s e rvice pipe , s e we r, la te ra l dra in or dis pos a l m a in a nd a ny a s s ocia te d a ppa ra tus la id b e fore 1 Se pte m b e r 1989, or, if the y do, the pa rticula rs the re of including the ir pos ition unde rg round m ay not b e a ccurate . It m ust b e unde rs tood that thefurnis hing of this inform a tion is e ntire ly without pre judice to the provis ion of the Ne w Roads a nd Stre e t Works Act 1991 a nd the Com pa ny’s rig ht to b e com pe ns a te d for a ny da m a g e to its a ppa ra tus.Se rvice pipe s a re not g e ne ra lly shown but the ir pre s e nce should b e a nticipa te d.

Page 23: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

A

6

6

2.8

1.5

2.6

4

4.2

3.2

1.8

4.8

1.9

1.3

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

!WO

!FH

!FH

!FH

!FH

!FH

!FH

!FH

!FH

!FH

!FH/WO

!FH

!FH

!FH

!FH

!FH

!FH

!FH

!FH

!FH

SU|SU|ð

ð

ð

ð

#

#

#D D

DD

#

"

"

D

DD

D

"

)

)

A

A

C

A

A

AAC

A

Añ_ A

A A

Añ _

A

A

A AA

AC

A

A

A A

C

A

C

A

A

C

A

A

C

A

A

A

AA

A

A

3IN. uPVC 1994

3IN. AC 1960

110m m . MO PVC 1996

90m m. PROFUSE PE 2001

90m m. PRO

FUSE PE 2

011 ()

3IN. CI 1900 (ER 2002)

63m m . MDPE 1996

160m m . HPPE 2002

90m m . HPPE 2007

90m m . MO PVC 1998

3IN. AC 1960 ()

4IN. uPVC 1960 ()

90mm . PRO FUSE PE 2002 ()

90m m . HPPE 2007 ()

90mm . PRO FUSE PE 2002

90m m. PRO

FUSE PE 2

001

160m m . HPPE 2002

90m m . PRO FUSE PE 2001

160m m . HPPE 2002

3IN. AC 1960 ()

3IN. AC 1960 ()

6IN. CI 1900 (CM)

AC Debris

Fishg ua rd

Infa nt SchoolCounty Prim a ry

O ffice s

O ffice

CR

Te l

59.1m

Police

Pond

ED Bd yHouse

Coa sta l Slope

Ex

Govt

Gara ge

Sorting

Pol Sta

F Sta

El Sub Sta

Brod og

PADDOCK

Coe d mor

The Lod g e

BRO DO G TERRACE

Fronde g

VICTORIA A

VENUE

Sad d le

White

Spring fie ld

Priorswood

Cresselly

Cotta g e

Rostre vor

MARCHGAE

BRY N RO AD

Corrym ore

Lynwood

Crug -y-We ryd d

Club

Pencra ig

Tre m y

Mooncoyne

Mooring s

Mole End

Ga rd e n

Newste a d

Pencowrw

Bentley House

Eastlands

St Lawre nce

Wa wr

Point

Ty Dewi

HEOL CYNAN

Hig h Crest

Wyla nCa rre g y

Nantga red igThe Ha ven

Pe n Gwaun

Ma e s Ara ul

Porth Ewyn

Ce una nt

Ne wpa rk

Ma e s y Me illion

Pa rk

Hig h

Y Gorla n

Lla m pit Mawr

St Hila ire

Ga rn Y Mor

Manda l

Llysaber

Llys-y-g an

a to d

Glanym or

Min-y-mor

Nurse rySea wa rds

Garth

Tala r We n

9

1

8

6

3

2

4

5

Ha wthorns

15

2412

26

70

85

14

54

13

73

19

1a

17

25

5860

71

Cilhed d

77

23

8

14

12 24

2

13

1

414

1

Cotta g e

15

13

1

6

1

2

2

1

8

1

1

2

12

9

9

Brod og

1

1

House

3

24

1

1

2

PPA0002947

Notes:

Dŵr Cym ru Cyfyng e d ig (‘the Com pa ny’) g ives this inform a tion a s to the position of its und e rg round a ppa ra tus by wa y of g e ne ra l g uid a nce only a nd on the strict und e rsta nd ing tha t it is base d on the best inform a tion ava ila ble a nd no wa rra nty asto its corre ctne ss is re lie d upon in the eve nt of excava tions or othe r works m a d e in the vicinity of the com pa ny’s a ppa ra tus. The onus of locating a ppa ra tus be fore ca rrying out a ny excava tions re sts e ntire ly on you. The inform a tion which is supplie d by the Com pa ny, is d one so in a ccord a nce with statutory re quire m e nts of sections 198 a nd 199 of the Wate r Ind ustry Act 1991 which is base d upon the best Inform a tion ava ila ble a nd , in pa rticula r, but without pre jud ice to the g e ne ra lity of thefore g oing , it should be note d tha t the re cord s that a re a va ila ble to the Com pa ny m a y not d isclose the existe nce of a wate r m a in, se rvice pipe , sewe r, la te ra l d ra in or d isposa l m a in a nd a ny associa te d a ppa ra tus la id be fore 1 Se pte m be r 1989, or, if the y d o, the pa rticula rs the re of includ ing the ir position und e rg round m a y not be accura te. It m ust be und e rstood tha t thefurnishing of this inform a tion is e ntire ly without pre jud ice to the provision of the New Roa d s a nd Stre e t Works Act 1991 a nd the Com pa ny’s rig ht to be com pe nsate d for a ny d a m a g e to its a ppa ra tus.Se rvice pipe s a re not g e ne ra lly shown but the ir pre se nce should be a nticipa te d .

Re prod uce d by pe rm ission of the O rd na nce Surve y on be ha lf ofHMSO . © Crown copyrig ht a nd d a taba se rig ht 2017.

All rig hts re se rve d .O rd na nce Surve y Lice nce num be r 100019534

EXACT LOCATIONS OF ALL APPARATUSTO BE DETERMINED ON SITE.

Printe d on:Printe d by:Ma p sca le :Ma p Re f: 195591,237379

LEGEND

Ha rris Ce ria nne 24 Apr 2018

Whilst eve ry re a sonable e ffort has be e n ta ke n to corre ctly re cord the pipe m ate ria l of DCWW asse ts, the re is a possibility that in som e ca se s pipe m ate ria l (othe r tha n Asbestos Ce m e nt or Pitch Fibre) m a y be found to be asbe stos ce m e nt (AC) or Pitch Fibre (PF) . It is the re fore a d visable that the possible pre se nce of AC or PF pipe s be a nticipate d a nd consid e re d a s pa rt of a ny risk asse ssm e nt prior to e xcavation

1:1250

Page 24: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

www.dwrcymru.com [email protected] 0800 917 2652

Dŵr Cymru Welsh Water has a key role to play in the town and country planning process as the services provided are at the forefront of public health and protection of the environment.

Our engagement in the planning process allows us to ensure that we can suitably service new development from a clean water and sewerage treatment perspective, but also provides us with the controls to enable us to mitigate any potential negative impact that new development is likely to have on the performance of our infrastructure, the service we provide to customers, and the wider environment. Crucially, the planning process also enables us to identify where new development and growth is planned so that we are able to target investment in our existing infrastructure within these areas.

Our Pre Planning Advice to youYou have now received our pre-planning advice which will provide you with information regarding the impact of your proposed development upon our assets and apparatus. Our letter will advise whether the local network can support the proposal, whether off-site water mains and/or sewers will need to be provided, and whether there are any apparatus located within the land you wish to develop and the requirements for these apparatus.

However, in some circumstances we may require further information from you to fully evaluate the impact of your development. If this is the case please proceed to submit the required detail as requested in the letter. Upon receipt of the

information we can consider our position and provide you with an updated pre-planning response.

Please note that the advice provided is valid for a period of 12 months from the date of issue and will help us inform our response to the planning application for the development.

Next Steps….You may now be proceeding to submit your planning application to the Local Planning Authority. Our preference is to see that drainage matters are resolved at pre-planning stage which will allow us to provide positive comments at planning consultation stage. In light of our pre-planning advice to you, it may therefore be in your interest to:

— Consider the drainage requirements and how the installation of new water mains/sewers shapes the layout of your development. You will need to ensure that the design of the drainage layout will (where relevant) meet the appropriate standards for formal adoption by us (see further advice provided overleaf regarding Connecting to our Networks)

— Consider how your site layout ensures that any assets/apparatus that may be located at the site are protected in line with the requirements set out in our letter

— Submit further information and/or drainage plans so that we can review your proposal in greater detail

— Where further assessments are recommended, to commission those before the planning

PlANNiNg ANd New develOPmeNtPre-Planning Advice & Next Steps

application is submitted to avoid any delays (see further advice provided overleaf on Network Modelling/WwTW Feasibility Studies)

— Provide a copy of our pre-planning enquiry response to the Local Planning Authority as part of your planning application submission to demonstrate you have considered drainage aspects of your development at pre-application stage, and that we are aware of your proposal.

Our involvement in the Planning Application ProcessWe provide Local Planning Authorities with advice on the ability of our assets to accommodate proposed development. Our comments are crucial in providing comfort to the Local Authority that new development sites can be effectively drained and can be supplied with clean water.

When sites can be accommodated in our networks we will recommend drainage related planning conditions which may seek to control the point of communication with our networks and the type of discharges that we may permit. We may also recommend conditions to secure the submission of further details, such as drainage plans and strategies (please note that we will resist the physical communication to our networks until drainage related conditions have been discharged)

However, there are instances where further assessments are required and we will seek to work collaboratively with you and the Local Planning Authority to establish a positive outcome for all parties.

Page 25: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

www.dwrcymru.com [email protected] 0800 917 2652

Our pre-planning response will provide advice dedicated to your development. However, we also offer the following general advice around drainage matters and communicating to our networks.

managing Surface water at your development SiteAs with all new development sites, you will need to consider how to deal with the surface water runoff from new buildings and hard standings. Traditionally, surface water has been managed by installing new pipes and large storage tanks to take flow away from land as quickly as possible. However, Dŵr Cymru actively encourage the use of Sustainable Urban Drainage Systems (SUDS), which is an approach to managing surface water run-off by imitating natural drainage systems and retaining water on or near the site.

SUDS involve a range of techniques including green roofs, rainwater harvesting, permeable pavements, etc. SUDS offer significant advantages over conventional piped drainage systems in reducing flood risk by attenuating the rate and quantity of surface water run-off from a site, promoting groundwater recharge, and improving water quality and amenity. The variety of SUDS techniques available means that virtually any development should be able to include a scheme based around these principles. Good justification would be required not to incorporate a SUDS scheme on the site.

All new developments will therefore be expected to consider surface water management techniques and

fully exhaust all technical options outlined under Sections 3.2 and 3.4 of Part H of the publication 'Building Regulations 2000’. These regulations ensure that disposal should be made through the hierarchical approach, preferring infiltration and, where infiltration is not possible, disposal to watercourses in liaison with the Land Drainage Authority and/or Natural Resources Wales or the Evironment Agency in England. Discharge of surface water to the public sewer is only to be made as a last resort. The management of highway or land drainage run off will also need to be considered as these flows will not be allowed to discharge directly or indirectly into the public sewerage system.

Network Hydraulic modelling/wwtw Feasibility StudiesOur pre-planning advice will provide you with an indication of whether our networks can accommodate your development. However there may be instances where our assets cannot at present service your site.

Our aim is to support economic development and growth within our operational area and we do not want to resist new development where possible. However we must be mindful of our assets, existing customers and the environment. In areas where there are issues either on our network or at the Wastewater Treatment Works (WwTW), we may already have proposals in place to address these concerns and to create capacity within the network for new developments.

However, there may be instances where you intend to develop your site in advance of Dwr Cymru

undertaking improvements. If this is the case, to ensure there is no detriment to our existing customers you may be required to implement solutions identified by an assessment of either the network or Wastewater Treatment Works. Please note that you will not be expected to resolve any operational issues that exist.

Where further assessments are recommended, please be advised that you will need to allow sufficient time in your development program for these studies to be undertaken and for any improvements to be implemented, as in some circumstances we will not permit a communication to our networks until these works are completed.

Where possible, we will seek to control the delivery of any solutions as part of the planning process. Dependent on the progress of the assessment, we may be in a position to recommend appropriate planning conditions so that the outcomes of the assessment can be delivered as part of any planning permission. This approach allows us to support the progression of the site through the planning process, however in the absence of a completed assessment and known solutions we may need to work with you and the Local Planning Authority until the assessment is completed and the outcomes are known.

PlANNiNg ANd New develOPmeNtGeneral Advice and Guidance

Page 26: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

www.dwrcymru.com [email protected] 0800 917 2652

installing Your drainage System and Making Connecti ons to the Public SewerYou will need to apply to us to make a connection to the public sewer, and depending on the layout of the drainage system you are proposing for your site, you may also be required to enter into an Adoption Agreement with us.

If your connection to the public sewer network is either via a lateral drain (i.e. a drain which extends beyond the connecting property boundary) or via a new sewer (i.e. serves more than one property), it is now a mandatory requirement to fi rst enter into a Section 104 Adoption Agreement (Water Industry Act 1991) with us.

The design of the sewer and lateral drain must also conform to the Welsh Ministers Standards for Gravity Foul Sewers and Lateral Drains, and conform with the publication "Sewers for Adoption"- 7th Edition.

Please be advised that we will not enter into a sewer adoption agreement for any sewer or lateral drain which is constructed in advance of the adoption agreement being in place. Further information on whether you will require a Section 104 Adoption Agreement and the adoption process can be obtained by contacting us.

To make the physical communication to the public sewer you will need to apply under Section 106 of the Water Industry Act 1991. An application pack can be obtained from our website and as part of the submission you will need to demonstrate that an adoption

agreement (if applicable) is in place, and that you have the relevant planning permissions in place for your development. Please be advised that if your site is subject to an Adoption Agreement we will not permit your communication until the agreement is in place.

Your New water SupplyOur pre-planning advice will indicate whether your site can be adequately serviced by our clean water network. If new connections are required, we would invite you to submit an application to us at www.dwrcymru.com under Developer Services. Here you will fi nd information about the services we have available and all

our application forms and guidance notes. You can complete forms online and also make payments via our website.

Upon approval of your Application and Water Regulations Notifi cation we will notify you accordingly, send you a quotation for our estimated cost of your connection and a plan advising you of the work you need to carry out.

Our quotation is valid for 6 months. If payment is not received during this period you will need to re-submit a new application plus application fee if you wish to continue.

PlANNiNg ANd New develOPmeNtMaking Connecti ons to our Networks

Page 27: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

www.dwrcymru.com [email protected] 0800 917 2652

Requisition a Water Main or Public Sewer As the Statutory Water and Sewerage Undertaker we have a duty under the Water Industry Act 1991 to comply with a Requisition Notice served on us for the provision of a water main and/or public sewer to serve the development site.

Two main reasons exist for the person(s) exercising the rights to serve Notice. The first is where a person(s) wishes us to lay water mains and/or sewers in private land (by us serving Notice under Section 159 (WIA91) so that a communication with an existing watermain or public sewer can be achieved; the second is where, as a consequence of the provision of the new watermain/public sewer, reinforcement of the existing network is required to ensure that the development, and the local area, has an effective system (refer to Section 37 (water) and Section 94 (sewers) of the Water Industry Act 1991)

Under the provisions of the WIA 1991, we are entitled to recover the costs we incur in providing a requisitioned watermain or sewer. This includes, among other things, the reasonable costs of design, labour, plant, materials, reinstatement, land purchase (if applicable), compensation, and quality testing, inspection, supervision, administration and overhead costs.

Further information on the Requisition process can be obtained by contacting our team of dedicated Engineers or by visiting the Developer Services pages of our

website.

Assets located at your development SiteOur pre-planning advice letter may have drawn your attention to assets and/or apparatus located within your development site. It is important to note that under section 159 of the Water Industry Act 1991, Welsh Water has rights of access in order to inspect, maintain adjust repair or alter any asset or apparatus at all times.

Locating an AssetOur pre-planning letter will be accompanied by water main and sewer extract plans, providing you with an indication of the asset location within the site. However, we provide this information as general guidance only and on the strict understanding that it is on the best information available (see notes within our plans for further information). The onus of locating the apparatus before carrying out any excavation rests entirely with you. To accurately locate any assets, please contact our team of planning officers for further guidance.

Protecting an AssetThe presence of an asset within the development site will have an impact on the layout and general arrangement of the site. Our pre-planning advice letter will provide you with the requirements for the protection of the asset(s) and you will need to ensure that the layout incorporates these requirements. Our recommendation is that our assets are incorporated into any site layout plan that is submitted as part of any planning application, so that

we and the Local Planning Authority can be satisfied that you have acknowledged the presence of such assets and have taken the necessary steps to protect them at the site.

Diverting a Water Main or Public SewerIf you have concluded that the asset located within the site could not be incorporated within the layout of the new development, or our rights of access to the asset may be hindered by your proposal, you may request the alteration or removal, including diversion of that apparatus to accommodate a proposed improvement of that land (e.g. development or change of use). This provision is provided under Section 185 of the Water Industry Act 1991. Further information on diverting an asset can be obtained by contacting our team of dedicated Engineers or by visiting the Developer Services pages of our website.

Contact UsFor more information, contact Welsh Water's Planning team:

Email: [email protected]

Visit: www.dwrcymru.com

Tel: 0800 917 2652

PlANNiNg ANd New develOPmeNtRequisitions and Asset Protection

Page 28: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER INFANT SCHOOL, BRODOG LANE, FISHGUARD, PEMBROKESHIRE SA65 9NF SEPTEMBER 2018

Appendix F - Foul & Surface Water Drainage Strategy Site Plan

Page 29: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

B

R

O

D

O

G

L

A

N

E

SCALES: DRAWING No.:

DRAWN BY:

REVISION:

DATE:CHECKED BY:DESIGN BY:

DRAWING TITLE:

PROJECT:

CLIENT:

NOTES:

DO NOT SCALE

REV. DESCRIPTION

C

H

E

C

K

D

A

T

E

D

R

A

W

N

ORIGINAL DRAWING A1

© Roger Casey Associates Limited 2018

DRAWING STATUS:

Ty Mansel, 6 Mansel Street,

Carmarthen,

Carmarthenshire SA31 1PX

T: 01267 222 646

Units 10 & 11, Merlin's Court,

Winch Lane, Haverfordwest,

Pembrokeshire SA61 1SB

T: 01437 762 795

E: [email protected]

W: www.rca-eng.co.uk

Roger Casey

Associates

Consulting Civil &

Structural Engineers

PWJL PWJL RSC 28/09/18

1:200

20092/DS1

DRAINAGE STRATEGY SITE PLAN

Fishguard, Pembrokeshire SA65 9NF

RESIDENTIAL DEVELOPMENT AT

former Infant School, Brodog Lane,

ateb group limited

PLANNING

ARCHITECT:

NEW GRAVITY FOUL WATER

COLLECTION SYSTEM DRAINING

DWELLING FOUL WATER ONLY FLOWS

TO EXISTING FOUL WATER DRAINAGE

MANHOLE CHAMBER PREVIOUSLY

SERVING INFANT SCHOOL

FOOTPATHS AND CROSSOVERS

LAID IN IMPERMEABLE MACADAM

LAID TO 1:40 CROSSFALL ON TO

PERMEABLE CARRIAGEWAY

GRASS VERGE AREAS TO

BREAK UP CROSSOVERS

1.8m WIDE FOOTPATHS AT SITE ENTRY

TO ALLOW UNDERGROUND UTILITY

COMPANY MAINS LAY IN ACCORDANCE

WITH NRSWA REQUIREMENTS

TRACED ALIGNMENT OF EXISTING

DCWW PUBLIC SEWER RISING MAIN

AND ASSOCIATED 6m WIDE EASEMENT

TO BE RETAINED AND PROTECTED

DWELLING ROOF WATER ONLY

FLOWS DRAINED INTO CLEAN SUB

BASE LAYER OF PERMEABLE

SURFACED PARKING AREAS

DWELLING ROOF WATER ONLY

FLOWS DRAINED INTO CLEAN SUB

BASE LAYER OF PERMEABLE

SURFACED PARKING AREAS

ALL PARKING AREAS LAID IN

PERMEABLE PAVING WITH SURFACE

WATER INFILTRATING INTO

UNDERLYING GROUND STRATA

ALL ADOPTABLE CARRIAGEWAY

AREAS LAID IN PERMEABLE PAVING

WITH SURFACE WATER INFILTRATING

INTO UNDERLYING GROUND STRATA

ALL ADOPTABLE CARRIAGEWAY

AREAS LAID IN PERMEABLE PAVING

WITH SURFACE WATER INFILTRATING

INTO UNDERLYING GROUND STRATA

GRASS VERGE AREAS TO

BREAK UP CROSSOVERS

AutoCAD SHX Text
IC
AutoCAD SHX Text
COV:57.27
AutoCAD SHX Text
CONFER TREES
AutoCAD SHX Text
LANE
AutoCAD SHX Text
GRID N
AutoCAD SHX Text
THE PROPERTY OF THIS DRAWING AND DESIGN IS VESTED IN ROGER CASEY ASSOCIATES AND MUST NOT BE COPIED OR REPRODUCED IN ANY WAY WITHOUT THE WRITTEN CONSENT OF ROGER CASEY ASSOCIATES. THE CONTRACTOR IS TO CHECK ALL LEVELS AND DIMENSIONS BEFORE WORK COMMENCES, AND ANY DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THE CONSULTANTS. WORK TO FIGURED DIMENSIONS IN PREFERENCE TO SCALING. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER ROGER CASEY ASSOCIATES DRAWINGS AND SPECIFICATIONS AND ALL OTHER CONSULTANTS DRAWINGS AND SPECIFICATIONS RELATING TO THIS PROJECT.
AutoCAD SHX Text
M:\RCA Job Files\200 job\20092 - Former Infant School, Brodog Lane, Fishguard, Pembrokeshire SA65 9NF\F - RCA Civil Drawings\20092-03.dwg
AutoCAD SHX Text
28/09/2018 15:16:24
AutoCAD SHX Text
RCA Document Reference: RCA A1 Landscape Version 1
AutoCAD SHX Text
D
AutoCAD SHX Text
L I M I T E D
AutoCAD SHX Text
P
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
B
AutoCAD SHX Text
M
AutoCAD SHX Text
E
AutoCAD SHX Text
K
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
E
Page 30: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER INFANT SCHOOL, BRODOG LANE, FISHGUARD, PEMBROKESHIRE SA65 9NF SEPTEMBER 2018

Appendix G - Initial Surface Water Infiltration Calculations

Page 31: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

Job No. :Sheet :Made by :Date :Checked :Revision :

RESIDENTIAL DEVELOPMENT AT FORMER INFANT SCHOOL,

BRODOG LANE, FISHGUARD, PEMBROKESHIRE SA65 9NF

Client: ateb group limited

RCA Brief: Private and Adoptable Permeable Paving for infiltration

Design Data: 1 Percolation Test Results.

2 BRE 365.

3 Building Regulations Approved Document Part H.

4 Sewers for Adoption 7th Edition.

5 Site Location Co-Ordinates:

E

N

6 Site Grid Reference: SM 95590 37388

7 Time of Entry = 4 minutes.

8 Welsh Ministers Standards.

Information

Provided: Architectural Site Plan.

Percolation Test Result.

Land Survey.

Drainage

Design By: Micro Drainage Network - Version 2017.1.2

Micro Drainage Source Control - Version 2017.1.2

Micro Drainage Simulation- Version 2017.1.2

Revisions:

Revision Version: Description: Date:

Calculations Prepared By: Calculations Checked By:

Philip Lawrence Roger Casey

Signed: Date: Signed: Date:

Template Issue Date:

M:\RCA Job Files\200 job\20092 - Former Infant School, Brodog Lane, Fishguard, Pembrokeshire SA65 9NF\H - RCA Calculations\Drainage\[20092-S1.xlsx]S1 v1.0

Ref: Output.

RSC

-

CALCULATIONS

F12

21/03/2016

20092

S1

PWJL

11-Jul-18

11/07/2018 11/07/2018

195590

237388

Ty Mansel, 6 Mansel Street, Carmarthen,

Carmarthenshire SA31 1PX

T: 01267 222 646

Units 10 & 11, Merlin's Court, Winch Lane,

Haverfordwest, Pembrokeshire SA61 1SB

T: 01437 762 795

E: [email protected]

W: www.rca-eng.co.uk

Ty Mansel 6 Mansel Street Carmarthen

Tel: +44 (0) 1267 22 26 46

Fax: +44 (0) 1267 22 13 77

Email: [email protected]

Consulting Civil & Structural Engineers

Roger Casey Associates

Website: http://www.rca-eng.co.uk

Carmarthenshire SA31 1PX

Page 32: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

Figure 1: Soakaway Test Locations

Table 1 Soakaway Test Results

Test Location Infiltration Rate (m/s) Test Location Result

SA1 SA5

Fill 1 1.09 x 10-5 Fill 1 7.74 x 10-5

Fill 2 6.26 x 10-6 Fill 2 4.78 x 10-5

Fill 3Insufficient time to complete thirdfill

Fill 3 3.46 x 10-5

SA2 SA6

Fill 1 3.69 x 10-5 Fill 1 6.51 x 10-5

Fill 2 3.42 x 10-5 Fill 2 4.8 x 10-5

Fill 3 3.49 x 10-5 Fill 3 3.41 x 10-5

SA3 SA7

Fill 1 Infiltration too quick tomeasure. Pit emptied oneach fill within 2 minutes.

Fill 1 1.59 x 10-5

Fill 2 Fill 2 1.39 x 10-5

Fill 3Fill 3

Insufficient time to completethird fillSA4

Fill 1 2.20 x 10-4

Fill 2 6.68 x 10-5

Fill 3 5.80 x 10-5

SA1

SA2

SA3

SA4

SA5

SA6

SA7

Average 10^-5 Soil Infiltration Rate =

4.132 x 10^-5 m/s = 0.148752 m/hr

Page 33: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

Roger Casey Associates Page 3Ty Mansel 6 Mansel Street Residential Development atCarmarthen former Infant School,Wales SA31 1PX Brodog Lane, Fishguard, Pembs.Date 11/07/2018 15:11 Designed by PWJLFile 20092 Permeable Road 10 m.SRCX Checked byMicro Drainage Source Control 2018.1

Summary of Results for 100 year Return Period (+30%)

©1982-2018 Innovyze

Half Drain Time : 20 minutes.

StormEvent

MaxLevel(m)

MaxDepth(m)

MaxInfiltration

(l/s)

MaxVolume(m³)

Status

15 min Summer 9.877 0.177 0.8 1.0 O K30 min Summer 9.901 0.201 0.9 1.3 Flood Risk60 min Summer 9.913 0.213 1.0 1.5 Flood Risk120 min Summer 9.908 0.208 0.9 1.4 Flood Risk180 min Summer 9.896 0.196 0.9 1.3 O K240 min Summer 9.883 0.183 0.8 1.1 O K360 min Summer 9.862 0.162 0.7 0.9 O K480 min Summer 9.846 0.146 0.7 0.7 O K600 min Summer 9.832 0.132 0.6 0.6 O K720 min Summer 9.821 0.121 0.5 0.5 O K960 min Summer 9.804 0.104 0.5 0.4 O K1440 min Summer 9.781 0.081 0.4 0.2 O K2160 min Summer 9.762 0.062 0.3 0.1 O K2880 min Summer 9.750 0.050 0.2 0.1 O K4320 min Summer 9.743 0.043 0.2 0.1 O K5760 min Summer 9.739 0.039 0.1 0.0 O K7200 min Summer 9.736 0.036 0.1 0.0 O K8640 min Summer 9.733 0.033 0.1 0.0 O K10080 min Summer 9.731 0.031 0.1 0.0 O K

15 min Winter 9.891 0.191 0.9 1.2 O K30 min Winter 9.914 0.214 1.0 1.5 Flood Risk60 min Winter 9.922 0.222 1.0 1.6 Flood Risk120 min Winter 9.910 0.210 1.0 1.5 Flood Risk180 min Winter 9.891 0.191 0.9 1.2 O K240 min Winter 9.873 0.173 0.8 1.0 O K

StormEvent

Rain(mm/hr)

FloodedVolume(m³)

Time-Peak(mins)

15 min Summer 100.735 0.0 1530 min Summer 70.415 0.0 2360 min Summer 47.182 0.0 40120 min Summer 30.519 0.0 74180 min Summer 23.240 0.0 106240 min Summer 18.971 0.0 136360 min Summer 14.245 0.0 198480 min Summer 11.606 0.0 258600 min Summer 9.889 0.0 318720 min Summer 8.670 0.0 376960 min Summer 7.036 0.0 4941440 min Summer 5.228 0.0 7362160 min Summer 3.872 0.0 11002880 min Summer 3.123 0.0 14444320 min Summer 2.305 0.0 21885760 min Summer 1.860 0.0 29367200 min Summer 1.576 0.0 35608640 min Summer 1.376 0.0 429610080 min Summer 1.228 0.0 5136

15 min Winter 100.735 0.0 1530 min Winter 70.415 0.0 2560 min Winter 47.182 0.0 44120 min Winter 30.519 0.0 78180 min Winter 23.240 0.0 110240 min Winter 18.971 0.0 142

Page 34: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

Roger Casey Associates Page 4Ty Mansel 6 Mansel Street Residential Development atCarmarthen former Infant School,Wales SA31 1PX Brodog Lane, Fishguard, Pembs.Date 11/07/2018 15:11 Designed by PWJLFile 20092 Permeable Road 10 m.SRCX Checked byMicro Drainage Source Control 2018.1

Summary of Results for 100 year Return Period (+30%)

©1982-2018 Innovyze

StormEvent

MaxLevel(m)

MaxDepth(m)

MaxInfiltration

(l/s)

MaxVolume(m³)

Status

360 min Winter 9.845 0.145 0.7 0.7 O K480 min Winter 9.825 0.125 0.6 0.5 O K600 min Winter 9.809 0.109 0.5 0.4 O K720 min Winter 9.798 0.098 0.4 0.3 O K960 min Winter 9.781 0.081 0.4 0.2 O K1440 min Winter 9.760 0.060 0.3 0.1 O K2160 min Winter 9.748 0.048 0.2 0.1 O K2880 min Winter 9.743 0.043 0.2 0.1 O K4320 min Winter 9.737 0.037 0.1 0.0 O K5760 min Winter 9.733 0.033 0.1 0.0 O K7200 min Winter 9.730 0.030 0.1 0.0 O K8640 min Winter 9.728 0.028 0.1 0.0 O K10080 min Winter 9.727 0.027 0.1 0.0 O K

StormEvent

Rain(mm/hr)

FloodedVolume(m³)

Time-Peak(mins)

360 min Winter 14.245 0.0 202480 min Winter 11.606 0.0 262600 min Winter 9.889 0.0 322720 min Winter 8.670 0.0 378960 min Winter 7.036 0.0 5001440 min Winter 5.228 0.0 7362160 min Winter 3.872 0.0 10962880 min Winter 3.123 0.0 14244320 min Winter 2.305 0.0 21885760 min Winter 1.860 0.0 29047200 min Winter 1.576 0.0 37448640 min Winter 1.376 0.0 446410080 min Winter 1.228 0.0 5088

Page 35: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

Roger Casey Associates Page 5Ty Mansel 6 Mansel Street Residential Development atCarmarthen former Infant School,Wales SA31 1PX Brodog Lane, Fishguard, Pembs.Date 11/07/2018 15:11 Designed by PWJLFile 20092 Permeable Road 10 m.SRCX Checked byMicro Drainage Source Control 2018.1

Rainfall Details

©1982-2018 Innovyze

Rainfall Model FSR Winter Storms YesReturn Period (years) 100 Cv (Summer) 0.750

Region England and Wales Cv (Winter) 0.840M5-60 (mm) 18.000 Shortest Storm (mins) 15

Ratio R 0.279 Longest Storm (mins) 10080Summer Storms Yes Climate Change % +30

Time Area Diagram

Total Area (ha) 0.009

TimeFrom:

(mins)To:

Area(ha)

0 4 0.009

Page 36: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

Roger Casey Associates Page 6Ty Mansel 6 Mansel Street Residential Development atCarmarthen former Infant School,Wales SA31 1PX Brodog Lane, Fishguard, Pembs.Date 11/07/2018 15:11 Designed by PWJLFile 20092 Permeable Road 10 m.SRCX Checked byMicro Drainage Source Control 2018.1

Model Details

©1982-2018 Innovyze

Storage is Online Cover Level (m) 10.000

Porous Car Park Structure

Infiltration Coefficient Base (m/hr) 0.14875 Width (m) 5.5Membrane Percolation (mm/hr) 1000 Length (m) 10.0

Max Percolation (l/s) 15.3 Slope (1:X) 40.0Safety Factor 2.0 Depression Storage (mm) 5

Porosity 0.30 Evaporation (mm/day) 3Invert Level (m) 9.700 Membrane Depth (m) 0

Page 37: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

Roger Casey Associates Page 7Ty Mansel 6 Mansel Street Residential Development atCarmarthen former Infant School,Wales SA31 1PX Brodog Lane, Fishguard, Pembs.Date 11/07/2018 15:12 Designed by PWJLFile 20092 Permeable Car Parking Bay.SRCX Checked byMicro Drainage Source Control 2018.1

Summary of Results for 100 year Return Period (+30%)

©1982-2018 Innovyze

Half Drain Time : 38 minutes.

StormEvent

MaxLevel(m)

MaxDepth(m)

MaxInfiltration

(l/s)

MaxVolume(m³)

Status

15 min Summer 9.798 0.248 1.1 2.4 O K30 min Summer 9.856 0.306 1.1 3.3 O K60 min Summer 9.893 0.343 1.1 3.9 O K120 min Summer 9.902 0.352 1.1 4.1 Flood Risk180 min Summer 9.887 0.337 1.1 3.8 O K240 min Summer 9.865 0.315 1.1 3.5 O K360 min Summer 9.823 0.273 1.1 2.8 O K480 min Summer 9.785 0.235 1.1 2.2 O K600 min Summer 9.755 0.205 1.1 1.8 O K720 min Summer 9.734 0.184 1.1 1.4 O K960 min Summer 9.710 0.160 0.9 1.1 O K1440 min Summer 9.678 0.128 0.8 0.7 O K2160 min Summer 9.650 0.100 0.6 0.4 O K2880 min Summer 9.632 0.082 0.5 0.3 O K4320 min Summer 9.611 0.061 0.4 0.2 O K5760 min Summer 9.600 0.050 0.3 0.1 O K7200 min Summer 9.596 0.046 0.2 0.1 O K8640 min Summer 9.593 0.043 0.2 0.1 O K10080 min Summer 9.590 0.040 0.2 0.1 O K

15 min Winter 9.822 0.272 1.1 2.8 O K30 min Winter 9.889 0.339 1.1 3.9 O K60 min Winter 9.933 0.383 1.1 4.5 Flood Risk120 min Winter 9.936 0.386 1.1 4.6 Flood Risk180 min Winter 9.907 0.357 1.1 4.1 Flood Risk240 min Winter 9.870 0.320 1.1 3.6 O K

StormEvent

Rain(mm/hr)

FloodedVolume(m³)

Time-Peak(mins)

15 min Summer 100.735 0.0 2130 min Summer 70.415 0.0 3260 min Summer 47.182 0.0 50120 min Summer 30.519 0.0 86180 min Summer 23.240 0.0 120240 min Summer 18.971 0.0 152360 min Summer 14.245 0.0 216480 min Summer 11.606 0.0 276600 min Summer 9.889 0.0 332720 min Summer 8.670 0.0 388960 min Summer 7.036 0.0 5061440 min Summer 5.228 0.0 7442160 min Summer 3.872 0.0 11042880 min Summer 3.123 0.0 14684320 min Summer 2.305 0.0 21725760 min Summer 1.860 0.0 28807200 min Summer 1.576 0.0 36088640 min Summer 1.376 0.0 434410080 min Summer 1.228 0.0 4984

15 min Winter 100.735 0.0 2230 min Winter 70.415 0.0 3360 min Winter 47.182 0.0 56120 min Winter 30.519 0.0 92180 min Winter 23.240 0.0 130240 min Winter 18.971 0.0 164

Page 38: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

Roger Casey Associates Page 8Ty Mansel 6 Mansel Street Residential Development atCarmarthen former Infant School,Wales SA31 1PX Brodog Lane, Fishguard, Pembs.Date 11/07/2018 15:12 Designed by PWJLFile 20092 Permeable Car Parking Bay.SRCX Checked byMicro Drainage Source Control 2018.1

Summary of Results for 100 year Return Period (+30%)

©1982-2018 Innovyze

StormEvent

MaxLevel(m)

MaxDepth(m)

MaxInfiltration

(l/s)

MaxVolume(m³)

Status

360 min Winter 9.801 0.251 1.1 2.5 O K480 min Winter 9.749 0.199 1.1 1.7 O K600 min Winter 9.722 0.172 1.0 1.3 O K720 min Winter 9.705 0.155 0.9 1.0 O K960 min Winter 9.680 0.130 0.8 0.7 O K1440 min Winter 9.648 0.098 0.6 0.4 O K2160 min Winter 9.624 0.074 0.4 0.2 O K2880 min Winter 9.609 0.059 0.3 0.2 O K4320 min Winter 9.597 0.047 0.3 0.1 O K5760 min Winter 9.592 0.042 0.2 0.1 O K7200 min Winter 9.589 0.039 0.2 0.1 O K8640 min Winter 9.586 0.036 0.2 0.1 O K10080 min Winter 9.584 0.034 0.1 0.0 O K

StormEvent

Rain(mm/hr)

FloodedVolume(m³)

Time-Peak(mins)

360 min Winter 14.245 0.0 226480 min Winter 11.606 0.0 280600 min Winter 9.889 0.0 334720 min Winter 8.670 0.0 392960 min Winter 7.036 0.0 5101440 min Winter 5.228 0.0 7482160 min Winter 3.872 0.0 11042880 min Winter 3.123 0.0 14724320 min Winter 2.305 0.0 22045760 min Winter 1.860 0.0 28487200 min Winter 1.576 0.0 36408640 min Winter 1.376 0.0 436010080 min Winter 1.228 0.0 5072

Page 39: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

Roger Casey Associates Page 9Ty Mansel 6 Mansel Street Residential Development atCarmarthen former Infant School,Wales SA31 1PX Brodog Lane, Fishguard, Pembs.Date 11/07/2018 15:12 Designed by PWJLFile 20092 Permeable Car Parking Bay.SRCX Checked byMicro Drainage Source Control 2018.1

Rainfall Details

©1982-2018 Innovyze

Rainfall Model FSR Winter Storms YesReturn Period (years) 100 Cv (Summer) 0.750

Region England and Wales Cv (Winter) 0.840M5-60 (mm) 18.000 Shortest Storm (mins) 15

Ratio R 0.279 Longest Storm (mins) 10080Summer Storms Yes Climate Change % +30

Time Area Diagram

Total Area (ha) 0.019

TimeFrom:

(mins)To:

Area(ha)

TimeFrom:

(mins)To:

Area(ha)

TimeFrom:

(mins)To:

Area(ha)

0 4 0.007 4 8 0.006 8 12 0.006

Page 40: DRAINAGE STRATEGY REPORT Ty Mansel 6 Mansel Street … · Fax: +44 (0) 1267 22 13 77 Email: office@rca-eng.co.uk. DRAINAGE STRATEGY REPORT FOR 20092 RESIDENTIAL DEVELOPMENT AT FORMER

Roger Casey Associates Page 10Ty Mansel 6 Mansel Street Residential Development atCarmarthen former Infant School,Wales SA31 1PX Brodog Lane, Fishguard, Pembs.Date 11/07/2018 15:12 Designed by PWJLFile 20092 Permeable Car Parking Bay.SRCX Checked byMicro Drainage Source Control 2018.1

Model Details

©1982-2018 Innovyze

Storage is Online Cover Level (m) 10.000

Porous Car Park Structure

Infiltration Coefficient Base (m/hr) 0.14875 Width (m) 7.1Membrane Percolation (mm/hr) 1000 Length (m) 7.3

Max Percolation (l/s) 14.4 Slope (1:X) 40.0Safety Factor 2.0 Depression Storage (mm) 5

Porosity 0.30 Evaporation (mm/day) 3Invert Level (m) 9.550 Membrane Depth (m) 0