Drainage Design Report for
Indiana Masonic Home Community Center Parking Lots Franklin, Indiana Prepared for: Indiana Masonic Home 690 State Street Franklin, Indiana 46131 March 17, 2015 Certified By:
David A. Lach, P.E., LEED, AP INDIANA PE 10000126
DRAINAGE DESIGN SUMMARY MASONIC HOME COMMUNITY CENTER PARKING LOTS
TABLE OF CONTENTS
1.0 Introduction .......................................................................................................... 1
1.1 Project Description ................................................................................................ 1 1.2 Existing Conditions ................................................................................................ 1
2.0 Post-Developed Drainage .................................................................................... 1 2.1 Storm Sewer Network ........................................................................................... 2
3.0 Water Quality Analysis ........................................................................................ 2 4.0 Conclusion ............................................................................................................ 2
APPENDICIES Appendix A – Master Stormwater Drainage Design Report Appendix B – IMH Community Center Drainage Report Appendix C - Post-Developed Drainage Analysis Appendix D – Water Quality
1.0 Introduction This drainage report outlines the storm water management system that will serve the Masonic Home Community Center parking lots located south of the Masonic Home Community Center currently under construction. 1.1 Project Description The proposed improvements will include new parking areas, carport, driveways, utilities, water quality BMPs and landscaping. The proposed improvements are in compliance with the previously approved Master Drainage Plan associated with the Assisted Living Facility addition (Master Drainage Plan) 1.2 Existing Conditions The project site existing conditions includes green space, playground area and picnic facilities as well as proposed drives associated with the Community Center that will be realigned to better transition into the proposed parking areas and drives. The north portion of the existing site currently sheet drains directly to Young’s Creek. The south portion of the site drains to the existing storm sewer system that outlets to the existing detention pond south that outlets to Young’s Creek. The project site is located in the South watershed of the campus in accordance with the Master Drainage Plan. The site stormwater and drainage system discharges to the existing detention pond that drains to Young’s Creek. The Firm map panel numbers 18081C0231D and 18081C0233D, effective date August 2, 2007, indicates that the watershed lies within Zone X, “Areas determined to be outside of the 0.2% annual chance floodplain.” 2.0 Post-Developed Drainage The proposed project consists of a series of parking and internal drives that extend from a point southwest of the Community Center currently under construction, runs east along the south side of the Center and then runs south to tie into the loop road. A carport is proposed west of the south leg of the propose parking. The stormwater runoff from the proposed parking will be collected and directed to the existing stormwater network. A new stormwater quality BMP has been designed to treat the flow from the new parking areas as well as the Community Center runoff prior to discharging into the existing storm sewer detention facility. The site has been designed in accordance with the previously approved Master Drainage Plan. As noted previously, the existing storm water detention pond detailed in the Master Plan is located south of the local improvements. The revised proposed
03/16/2015 1
impervious and pervious areas that include the proposed parking lot improvements are in accordance with the Curve Number used in the design of the detention system. 2.1 Storm Sewer Network Hydroflow was utilized to size the storm sewers for the proposed pipe networks for the Community Center Parking Lots using the Rational Method. The proposed parking lots storm sewers will tie into the storm sewer trunk line that was sized and installed as part of the Community Center project with the anticipation of future projects. Please refer to Appendix B for the storm sewer calculations and basin map. 3.0 Water Quality Analysis The post-developed site has been designed with the provision of water quality to remove 80% TSS. For the Community Center Parking Lots, a new water quality structure has been sized to treat the runoff from the new lots as well as handle flow from the Community Center currently under construction. The proposed treatment BMP shall be an Aqua-swirl hydro dynamic separator (used elsewhere on site). Model AS-4 is proposed to treat the parking additions as well as the Community Center and will replace the AS-2 unit previously proposed with the Community Center project.. Please refer to Appendix C for the water quality calculations. 4.0 Conclusion The proposed Community Center Parking Lots have been designed in accordance with the previously approved Master Drainage Plan as part of the Assisted Living Facility project. The proposed stormwater runoff is treated for water quality and the resulting stormwater runoff to the pond is within the parameters of the Master Plan. Therefore, no adverse impacts are anticipated by these site improvements.
03/16/2015 2
Appendix A
Master Stormwater Drainage Design Report
03/16/2015 3
3939 Priority Way South Drive, Suite 400 Indianapolis, Indiana 46240 Telephone 317 844 6777 Facsimile 317 706 6464 www.cripe.biz
PIC: 080420-20010
Drainage Design Report for
Masonic Home Assisted Living Facility and Regional Detention Pond Franklin, Indiana Prepared for: Masonic Home April 8, 2010 Certified By:
David A. Lach, P.E., LEED, AP INDIANA PE 10000126
03/16/2015 4
MASTER STORMWATER MANAGEMENT REPORT FOR MASONIC HOME SITE IMPROVEMENTS
TABLE OF CONTENTS
1.0 Introduction......................................................................................................... 1
1.1 Project Description ................................................................................................1 1.2 Existing Conditions................................................................................................1
2.0 Hydrologic Method ............................................................................................. 1 2.1 Rainfall Distribution ...............................................................................................1 2.2 Software ................................................................................................................2
3.0 Pre-developed Conditions ................................................................................. 2 3.1 Pre-developed Conditions .....................................................................................2
4.0 Post-Developed Drainage Analysis .................................................................. 3 4.1 Post-Developed Site Conditions Peak Flow Rates at Discharge Points ...............3 4.2 Storm Sewer Network............................................................................................3 4.3 Emergency Spillway ..............................................................................................3
5.0 Water Quality Analysis....................................................................................... 4 6.0 Conclusions........................................................................................................ 4
APPENDICIES Appendix A – Pre-Developed Drainage Analysis Appendix B - Post-Developed Drainage Analysis Appendix C – Storm Sewer Design Calcs and Basin Map Appendix D – Water Quality Calculations
03/16/2015 5
O:\2009\090364\20010\docs\Engr\Reports\Drainage Report\Drainage Report 04-08-10.DOC
1
1.0 Introduction This drainage report outlines the storm water management system that will serve the Masonic Home Assisted Living Facility (ALF). The report will also outline the proposed regional detention pond that is being installed with the Assisted Living Facility (ALF) to provide storage capacity for the current improvements as well as provide additional storage capacity for future site improvements for the Masonic Home. 1.1 Project Description The proposed initial improvements to the Masonic Home site consist of the ALF building addition, new parking areas, driveways, the reconstruction of an existing internal road and landscaping. 1.2 Existing Conditions There are three watersheds being analyzed in this report. The West watershed contains 2.55 acres. The South watershed contains 22.98 acres. The East watershed contains 12.42 acres. All three watersheds drain to Young’s Creek. The proposed improvements are contained within the South Watershed. The soils maps from the US Department of Agriculture, Soil Conservation Service identifies the tributary watershed to contain six soils classifications. These are: Brookston silty clay loam (Br), Crosby Silt loam 0-2 percent slopes (CrA), Genesee loam (Ge), Hennepin loam 25-50 percent slopes (HeF), Miami clay loam 6-12 percent slopes, severely eroded (MtC3), Miami clay loam 12-18 percent slopes, severely eroded (MtD3), Ockley loam, 0-2 percent slopes (OcA), Ockley loam, 2-6 percent slopes, eroded (OcB2). The Firm map panel numbers 18081C0231D and 18081C0233D, effective date August 2, 2007, indicates that the watershed lies within Zone X, “Areas determined to be outside of the 0.2% annual chance floodplain.” 2.0 Hydrologic Method The method used to generate runoff from the existing and proposed watersheds is the Soil Conservation Service (SCS) Hydrograph Method. This method calculates the peak storm flows for the 2-year, 10-year, and the 100-year storm event, which are used to determine the required storage volume to be provided by the detention pond. 2.1 Rainfall Distribution The HUFF II Quartile Rainfall Distribution was used to calculate the storm water runoff for the pre- and post-developed conditions for the 1, 2, 3, 6, 12 and 24 hour storm durations.
03/16/2015 6
O:\2009\090364\20010\docs\Engr\Reports\Drainage Report\Drainage Report 04-08-10.DOC
2
2.2 Software After the input data and rainfall have been estimated, PondPack v9, a hydraulic modeling program, is used to determine the peak flows and volumes using the SCS Unit Hydrograph Method. PondPack v9 generates an individual hydrograph for each basin. The hydrographs are then added to generate runoff flows for ponds or to specific points of interest. 3.0 Pre-developed Conditions 3.1 Pre-developed Conditions For all pre-developed analysis, the Masonic Home facilities were analyzed in the current state as of the date of the most recent topographic survey. This date is June 1, 2009. The impervious surface is modeled as impervious surface (CN=98), the pervious surface (open space) is modeled in the calculations as pasture, meadow, brush or woods ground cover types in good hydrologic condition as noted in the Subdivision Control Ordinance (S.C.O.). The allowable release rates are determined as follows: 10yr. post <= 2yr. pre 100yr. post <= 10yr. pre The existing peak runoff rates from the three existing watersheds are as follows: West Basin South Basin East Basin 2yr. = 0.47 cfs 2yr. = 3.90 cfs 2yr. = 2.54 cfs 10yr. = 1.50 cfs 10yr. = 11.62 cfs 10yr. = 8.10 cfs For the pond analysis, the allowable release rates for the site are the sum of the West and South Basin peak runoff rates. This is due to the future collection of the West Basin in future build out. The East Basin is not included because it currently drains through an existing storm sewer south, then east along the north side of the treatment, discharges to a roadside ditch, then travels south to a tributary to Young’s Creek prior to discharging to Young’s Creek 2500’ downstream of the proposed outlet location. The allowable release rates for the site are as follows: 10yr. post allowable = 4.37 cfs 100yr. post allowable = 13.12 cfs Please refer to Appendix A for the pre-developed drainage analysis calculations and basin map.
03/16/2015 7
O:\2009\090364\20010\docs\Engr\Reports\Drainage Report\Drainage Report 04-08-10.DOC
3
4.0 Post-Developed Drainage Analysis The post-developed drainage analysis consists of one regional detention pond to control the amount of runoff releasing from the proposed ALF site and associated improvements. Additional storage is maintained in the pond for future development of the Masonic Home property. The master planned detention pond is being proposed in the South basin to account for as much of the increases in the impervious surface as possible in the master plan. The West watershed will be taken to the South Watershed by future storm sewer network through the master planned detention pond. This is shown on the post-developed basin map (Appendix B) as future storm sewer conveyance. A large portion of the East basin will also be taken to the master planned detention pond as future development occurs. A stub has been provided for future connection. It is a wet detention facility with a normal pool area of 0.87 acres. It will be built with the incorporation of the ALF to the Masonic Home. It is designed to release the 10yr. and 100yr. post-developed peak discharges at lower rates that the allowable 2yr. and 10yr. pre-developed peak discharges, respectively. 4.1 Post-Developed Site Conditions Peak Flow Rates at Discharge Points The following summarizes the peak flow rates released from the site in the proposed condition for the fully master planned detention basin. The results are as follows: South Basin 10yr. = 3.16 cfs 100yr. = 9.23 cfs These results show that the post developed release rates for the master planned detention pond are lower than the allowable release rates. Please refer to Appendix B for the post-developed drainage analysis calculations and basin map. 4.2 Storm Sewer Network Stormcad was utilized to size the storm sewers for the proposed pipe networks for the ALF using the Rational Method. Please refer to Appendix C for the storm sewer calculations and basin map. 4.3 Emergency Spillway An emergency spillway has been designed for the pond in the event that the outlet structure gets completely clogged and is unable to discharge the rainfall. It has been designed to pass 1.25 times the peak discharge into the pond.
03/16/2015 8
O:\2009\090364\20010\docs\Engr\Reports\Drainage Report\Drainage Report 04-08-10.DOC
4
Please refer to Appendix B for the emergency spillway sizing calculation. 5.0 Water Quality Analysis The post-developed site has been designed with the provision of water quality to remove 80% TSS. For the Assisted Living Facility and proposed future East basin watershed areas being routed through proposed storm sewer network, a hydrodynamic separator was chosen as the appropriate post-construction best management practice (BMP). The water quality treatment flow from the first inch of runoff from the proposed ALF site and future east basin areas has been calculated to be 9.49 cfs. An Aqua-swirl AS-8 has been chosen to provide treatment to the stormwater prior to discharging into the pond. The AS-8 can accommodate up to 11.2 cfs. When the future West basin area is developed and future conveyance is run, an additional hydrodynamic separator will be designed and incorporated in the site to provide adequate stormwater treatment prior to discharging into the wet pond detention facility. Please refer to Appendix D for the water quality calculations. 6.0 Conclusions The proposed regional detention facility has been designed to provide adequate storage for the proposed ALF improvements for the Masonic Home as well as for future improvements. Any further developments outside of the watershed presented will need to provide detention and be designed in accordance with City of Franklin standards. Therefore, no adverse impacts are anticipated by these site improvements.
03/16/2015 9
O:\2009\090364\20010\docs\Engr\Reports\Drainage Report\Drainage Report 04-08-10.DOC
5
Appendix A
Pre-Developed Drainage Analysis
03/16/2015 10
GIS
LAN
D S
URV
EYIN
G
INTE
RIO
R D
ESIG
NC
IVIL
/ TR
AN
SPO
RTA
TION
EN
GIN
EERS
LAN
D P
LAN
NIN
G(3
17)
844-
6777
FA
X (3
17) 7
06-6
464
IND
IAN
APO
LIS, I
ND
IAN
A 4
6240
3939
PRI
ORI
TY W
AY
SOUT
H D
RIVE
, SUI
TE 4
00
E-M
ail c
ripe@
crip
e.bi
zO
WN
ER'S
REPR
ESEN
TATIO
N
R
CPa
ul I.
Crip
e, In
c.
EQUI
PMEN
T PL
AN
ING
ARC
HIT
ECTU
REA
RCH
ITEC
TURE
ASS
ISTE
D L
IVIN
G F
AC
ILITY
00-00-00
EXIS
TING
DRA
INA
GE
AN
ALY
SIS
03/16/2015 11
03/16/2015 12
03/16/2015 13
03/16/2015 14
03/16/2015 15
03/16/2015 16
03/16/2015 17
03/16/2015 18
03/16/2015 19
03/16/2015 20
03/16/2015 21
03/16/2015 22
03/16/2015 23
03/16/2015 24
03/16/2015 25
03/16/2015 26
03/16/2015 27
03/16/2015 28
03/16/2015 29
03/16/2015 30
03/16/2015 31
03/16/2015 32
03/16/2015 33
03/16/2015 34
03/16/2015 35
03/16/2015 36
03/16/2015 37
03/16/2015 38
03/16/2015 39
O:\2009\090364\20010\docs\Engr\Reports\Drainage Report\Drainage Report 04-08-10.DOC
6
Appendix B
Post-Developed Drainage Analysis for Master Planned Detention Pond
03/16/2015 40
GIS
LAN
D S
URV
EYIN
G
INTE
RIO
R D
ESIG
NC
IVIL
/ TR
AN
SPO
RTA
TION
EN
GIN
EERS
LAN
D P
LAN
NIN
G(3
17)
844-
6777
FA
X (3
17) 7
06-6
464
IND
IAN
APO
LIS, I
ND
IAN
A 4
6240
3939
PRI
ORI
TY W
AY
SOUT
H D
RIVE
, SUI
TE 4
00
E-M
ail c
ripe@
crip
e.bi
zO
WN
ER'S
REPR
ESEN
TATIO
N
R
CPa
ul I.
Crip
e, In
c.
EQUI
PMEN
T PL
AN
ING
ARC
HIT
ECTU
REA
RCH
ITEC
TURE
ASS
ISTE
D L
IVIN
G F
AC
ILITY
00-00-00
PRO
POSE
D D
RAIN
AG
E A
NA
LYSI
S
03/16/2015 41
03/16/2015 42
03/16/2015 43
03/16/2015 44
03/16/2015 45
03/16/2015 46
03/16/2015 47
03/16/2015 48
03/16/2015 49
03/16/2015 50
03/16/2015 51
03/16/2015 52
03/16/2015 53
03/16/2015 54
03/16/2015 55
03/16/2015 56
O:\2009\090364\20010\docs\Engr\Reports\Drainage Report\Drainage Report 04-08-10.DOC
7
Appendix C
Storm Sewer Design Calcs and Map
03/16/2015 57
MULTCH
DECK
DECK
MULTCH
GRAVEL
MULTCH
TBM 2
TBM 3
4155BOLLARD
4156BOLLARD
4157MON WELL
4207MON WELL
4802MON WELL
10173MB
0
CPa
ul I.
Crip
e, In
c.
0
GIS
LAN
D S
URV
EYIN
G
INTE
RIO
R D
ESIG
NC
IVIL
/ TR
AN
SPO
RTA
TION
EN
GIN
EERS
LAN
D P
LAN
NIN
G(3
17)
844-
6777
FA
X (3
17) 7
06-6
464
IND
IAN
APO
LIS, I
ND
IAN
A 4
6240
3939
Prio
rity
Wa
y So
uth
Driv
e, S
uite
400
E-M
ail c
ripe@
crip
e.bi
zO
WN
ER'S
REPR
ESEN
TATIO
N
R
EQUI
PMEN
T PL
AN
ING
ARC
HIT
ECTU
REA
RCH
ITEC
TURE
03/16/2015 58
03/16/2015 59
03/16/2015 60
03/16/2015 61
03/16/2015 62
03/16/2015 63
03/16/2015 64
03/16/2015 65
03/16/2015 66
03/16/2015 67
03/16/2015 68
03/16/2015 69
03/16/2015 70
03/16/2015 71
03/16/2015 72
03/16/2015 73
03/16/2015 74
03/16/2015 75
03/16/2015 76
03/16/2015 77
03/16/2015 78
03/16/2015 79
03/16/2015 80
03/16/2015 81
O:\2009\090364\20010\docs\Engr\Reports\Drainage Report\Drainage Report 04-08-10.DOC
8
Appendix D
Water Quality Calculations
03/16/2015 82
03/16/2015 83
03/16/2015 84
03/16/2015 85
03/16/2015 86
03/16/2015 87
03/16/2015 88
03/16/2015 89
03/16/2015 90
03/16/2015 91
03/16/2015 92
03/16/2015 93
03/16/2015 94
03/16/2015 95
Appendix B
IMH Community Center Drainage Report
03/16/2015 96
Drainage Design Report for
Indiana Masonic Home Community Center Franklin, Indiana Prepared for: Indiana Masonic Home 690 State Street Franklin, Indiana 46131 May 15, 2014 Certified By:
David A. Lach, P.E., LEED, AP INDIANA PE 10000126
03/16/2015 97
DRAINAGE DESIGN SUMMARY MASONIC HOME COMMUNITY CENTER
TABLE OF CONTENTS
1.0 Introduction .......................................................................................................... 1
1.1 Project Description .............................................................................................. 1 1.2 Existing Conditions ............................................................................................. 1
2.0 Post-Developed Drainage .................................................................................... 1 2.1 Storm Sewer Network ......................................................................................... 1
3.0 Water Quality Analysis ........................................................................................ 1 4.0 Conclusion ............................................................................................................ 2
APPENDICIES Appendix A – Master Stormwater Drainage Design Report Appendix B - Post-Developed Drainage Analysis Appendix C – Water Quality
03/16/2015 98
1.0 Introduction This drainage report outlines the storm water management system that will serve the Masonic Home Community Center. 1.1 Project Description The proposed initial improvements to the Masonic Home site consist of the Community Center building addition, new parking areas, driveways, utility relocations and landscaping. 1.2 Existing Conditions The project site is located in the South watershed of the campus in accordance with the Master Drainage Plan that was approved with the Assisted Living Facility (ALF) addition. The site and drainage system to the existing detention pond drain to Young’s Creek. The Firm map panel numbers 18081C0231D and 18081C0233D, effective date August 2, 2007, indicates that the watershed lies within Zone X, “Areas determined to be outside of the 0.2% annual chance floodplain.” 2.0 Post-Developed Drainage The site has been designed in accordance with the previously approved Master Drainage Plan utilizing the existing storm water detention pond located south of the local improvements. The proposed impervious and pervious areas are in accordance with the Curve Number used in the design of the detention system. 2.1 Storm Sewer Network Hydroflow was utilized to size the storm sewers for the proposed pipe networks for the Community Center Addition using the Rational Method. As part of the project design, the master storm drain trunk sewer is being installed to convey the runoff from the future development portion of the western watershed as well as the drainage from the Community Center Addition. Please refer to Appendix B for the storm sewer calculations and basin map. 3.0 Water Quality Analysis The post-developed site has been designed with the provision of water quality to remove 80% TSS. For the Community Center Addition, the water quality structure has
03/16/2015 99
been sized for the local project improvements only. The future projects will be required to supply their own water quality treatment as those areas develop. The proposed treatment BMP is an Aqua-swirl concentrator, Model AS-2. Please refer to Appendix C for the water quality calculations. 4.0 Conclusion The proposed Community Center Addition has been designed in accordance with the previously approved Master Drainage Plan as part of the Assisted Living Facility project. Therefore, no adverse impacts are anticipated by these site improvements.
03/16/2015 100
Appendix B
Post-Developed Drainage Analysis
03/16/2015 101
03/16/2015 102
03/16/2015 103
03/16/2015 104
03/16/2015 105
03/16/2015 106
03/16/2015 107
Appendix C
Water Quality
03/16/2015 108
03/16/2015 109
03/16/2015 110
Appendix C
Post-Developed Drainage Analysis
03/16/2015 111
COVERINGSTORMWATER POLLUTION
PREVENTION PLANDESIGN
EX-130'
BASI
N M
AP
Revi
sions
Des
crip
tion
Dat
eM
ark
CERTIFIED BY:
Drawn By:
Checked By:
Quality Assurance:
Scale:
Sheet
Date
Project Number
GIS
LAN
D S
URV
EYIN
G
INTE
RIO
R D
ESIG
NC
IVIL
/ T
RAN
SPO
RTA
TION
EN
GIN
EERS
LAN
D P
LAN
NIN
G(3
17) 8
44-6
777
FAX
(317
) 706
-646
4IN
DIA
NA
POLI
S, IN
DIA
NA
462
4039
39 P
RIO
RITY
WA
Y SO
UTH
DRI
VE,
SUI
TE 4
00
E-M
ail c
ripe@
crip
e.bi
z
Scale: 1" =0
OW
NER
'S R
EPRE
SEN
TATIO
N
R
CPa
ul I.
Crip
e, In
c.
Date
EQUI
PMEN
T PL
AN
NIN
GA
RCHI
TEC
TURE
ARC
HITE
CTU
RE
FOR CALLS IN INDIANA CALL TOLL FREE
O:\
2009
\090
364\
2001
2\ca
d\E
ngr\
Xref
s\09
3642
0012
_bas
ins.d
wg
, Mar
ch 1
1, 2
015
12:5
1 PM
, JUS
TIN O
LASH
UK, ©
Pau
l I. C
ripe,
Inc.
IND
IAN
A M
ASO
NIC
HO
ME
CO
MM
UNITY
CEN
TER
PARK
ING
LO
TS
02-25-2015
090364-20013
02-24-2015
03/16/2015 112
COVERINGSTORMWATER POLLUTION
PREVENTION PLANDESIGN
EX-230'
BASI
N M
AP
Revi
sions
Des
crip
tion
Dat
eM
ark
CERTIFIED BY:
Drawn By:
Checked By:
Quality Assurance:
Scale:
Sheet
Date
Project Number
GIS
LAN
D S
URV
EYIN
G
INTE
RIO
R D
ESIG
NC
IVIL
/ T
RAN
SPO
RTA
TION
EN
GIN
EERS
LAN
D P
LAN
NIN
G(3
17) 8
44-6
777
FAX
(317
) 706
-646
4IN
DIA
NA
POLI
S, IN
DIA
NA
462
4039
39 P
RIO
RITY
WA
Y SO
UTH
DRI
VE,
SUI
TE 4
00
E-M
ail c
ripe@
crip
e.bi
z
Scale: 1" =0
OW
NER
'S R
EPRE
SEN
TATIO
N
R
CPa
ul I.
Crip
e, In
c.
Date
EQUI
PMEN
T PL
AN
NIN
GA
RCHI
TEC
TURE
ARC
HITE
CTU
RE
FOR CALLS IN INDIANA CALL TOLL FREE
O:\
2009
\090
364\
2001
2\ca
d\E
ngr\
Xref
s\09
3642
0012
_bas
ins.d
wg
, Mar
ch 1
1, 2
015
12:5
3 PM
, JUS
TIN O
LASH
UK, ©
Pau
l I. C
ripe,
Inc.
IND
IAN
A M
ASO
NIC
HO
ME
CO
MM
UNITY
CEN
TER
PARK
ING
LO
TS
02-25-2015
090364-20013
02-24-2015
03/16/2015 113
Job Title
Basin # 709C Area (acres) C*Area
0.85 0.09 0.080.90 0.00 0.000.15 0.07 0.010.85 0.01 0.01
Total 0.17 0.10
0.56 1
Basin # 710C Area (acres) C*Area
0.85 0.09 0.070.90 0.00 0.000.15 0.01 0.000.85 0.024 0.02
Total 0.12 0.10
0.79 1
Basin # 712C Area (acres) C*Area
0.85 0.035 0.030.90 0.54 0.490.15 0.02 0.000.85 0.01 0.01
Total 0.61 0.53
0.87 1
Basin # 713C Area (acres) C*Area
0.85 0.09 0.080.90 0.00 0.000.15 0.03 0.000.85 0.01 0.01
Total 0.13 0.09
0.69 1
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
Composite C
Composite Runoff Coefficient
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
O:\2009\090364\20012\calcs\Engr\Detention\Prelim\CN_C_TC Calcs 2015.xls03/16/2015 114
Job Title
Basin # 714C Area (acres) C*Area
0.85 0.08 0.070.90 0.00 0.000.15 0.01 0.000.85 0.01 0.01
Total 0.10 0.08
0.78 1
Basin # 715C Area (acres) C*Area
0.85 0.089 0.080.90 0.00 0.000.15 0.07 0.010.85 0.02 0.02
Total 0.18 0.10
0.57 1
Basin # 716C Area (acres) C*Area
0.85 0.000 0.000.90 0.07 0.060.15 0.21 0.030.85 0.13 0.11
Total 0.41 0.21
0.50 1
Basin # 717C Area (acres) C*Area
0.85 0.086 0.070.90 0.00 0.000.15 0.29 0.040.85 0.02 0.02
Total 0.39 0.13
0.34 0
Basin # 718C Area (acres) C*AreaSurface Description
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
O:\2009\090364\20012\calcs\Engr\Detention\Prelim\CN_C_TC Calcs 2015.xls03/16/2015 115
Job Title
0.85 0.066 0.060.90 0.00 0.000.15 0.11 0.020.85 0.01 0.01
Total 0.19 0.08
0.44 0
Basin # 719C Area (acres) C*Area
0.85 0.148 0.130.90 0.00 0.000.15 0.40 0.060.85 0.03 0.02
Total 0.57 0.21
0.36 0
Basin # Ex South RoadC Area (acres) C*Area
0.85 0.407 0.350.90 0.00 0.000.15 0.47 0.070.85 0.13 0.11
Total 1.01 0.53
0.52 1
Basin # 721C Area (acres) C*Area
0.85 0.241 0.200.90 0.00 0.000.15 0.07 0.010.85 0.02 0.02
Total 0.33 0.23
0.70 1
Q 1.616652
Basin # 722C Area (acres) C*AreaSurface Description
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
PavementRoofLawn Clay SoilsConcrete
Composite C
O:\2009\090364\20012\calcs\Engr\Detention\Prelim\CN_C_TC Calcs 2015.xls03/16/2015 116
Job Title
0.85 0.000.90 0.00 0.000.15 0.08 0.010.85 0.01 0.01
Total 0.10 0.02
0.25 0
Q 0.167185
Basin # Future NWC Area (acres) C*Area
0.85 1.077 0.920.90 0.60 0.540.20 0.97 0.190.85 0.00
Total 2.64 1.65
0.62 1
Q 11.51867
Basin # Future South LotC Area (acres) C*Area
0.85 0.950 0.810.90 0.15 0.140.20 1.10 0.220.85 0.00
Total 2.20 1.16
0.53 1
Q 8.125875
Basin # 726 (Existing Bldg Roof Drainage)C Area (acres) C*Area
0.85 0.000 0.000.90 0.45 0.410.20 0.00 0.000.85 0.00
Total 0.45 0.41
0.90 1
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
PavementRoofLawn Clay SoilsConcrete
Composite C
O:\2009\090364\20012\calcs\Engr\Detention\Prelim\CN_C_TC Calcs 2015.xls03/16/2015 117
Job Title
Q 2.83095
Basin # 733C Area (acres) C*Area
0.85 0.14 0.120.90 0.00 0.000.20 0.03 0.010.85 0.00
Total 0.17 0.13
0.74 1
Basin # 734C Area (acres) C*Area
0.85 0.16 0.140.90 0.00 0.000.20 0.10 0.020.85 0.00
Total 0.26 0.16
0.60 1
Basin # 735C Area (acres) C*Area
0.85 0.09 0.080.90 0.00 0.000.20 0.08 0.020.85 0.00
Total 0.17 0.09
0.54 1
Basin # 736C Area (acres) C*Area
0.85 0.12 0.100.90 0.00 0.000.20 0.05 0.010.85 0.00
Total 0.17 0.11
0.66 1
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
O:\2009\090364\20012\calcs\Engr\Detention\Prelim\CN_C_TC Calcs 2015.xls03/16/2015 118
Job Title
Basin # 737C Area (acres) C*Area
0.85 0.18 0.150.90 0.00 0.000.20 0.04 0.010.85 0.00
Total 0.22 0.16
0.73 1
Basin # 739C Area (acres) C*Area
0.85 0.12 0.100.90 0.02 0.020.20 0.08 0.020.85 0.00
Total 0.22 0.14
0.62 1
Basin # 740C Area (acres) C*Area
0.85 0.11 0.090.90 0.07 0.060.20 0.14 0.030.85 0.00
Total 0.32 0.18
0.58 1
Basin # 741C Area (acres) C*Area
0.85 0.015 0.010.90 0.00 0.000.20 0.005 0.000.85 0.00
Total 0.02 0.01
0.69 1
Basin # 742
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
O:\2009\090364\20012\calcs\Engr\Detention\Prelim\CN_C_TC Calcs 2015.xls03/16/2015 119
Job Title
C Area (acres) C*Area0.85 0.05 0.040.90 0.00 0.000.20 0.00 0.000.85 0.00
Total 0.05 0.04
0.85 1
Basin # 743C Area (acres) C*Area
0.85 0.09 0.080.90 0.03 0.030.20 0.26 0.050.85 0.00
Total 0.38 0.16
0.41 0
Basin # 744C Area (acres) C*Area
0.85 0.025 0.020.90 0.00 0.000.20 0.095 0.020.85 0.00
Total 0.12 0.04
0.34 0
Basin # FUTURE 747C Area (acres) C*Area
0.85 0.27 0.230.90 0.00 0.000.20 0.30 0.060.85 0.00
Total 0.57 0.29
0.51 1
Basin # FUTURE 748C Area (acres) C*Area
0.85 0.44 0.37
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
Surface DescriptionPavement
Surface DescriptionPavementRoofLawn Clay SoilsConcrete
Composite C
O:\2009\090364\20012\calcs\Engr\Detention\Prelim\CN_C_TC Calcs 2015.xls03/16/2015 120
Job Title
0.90 0.43 0.390.20 0.43 0.090.85 0.00
Total 1.30 0.85
0.65 1
RoofLawn Clay SoilsConcrete
Composite C
O:\2009\090364\20012\calcs\Engr\Detention\Prelim\CN_C_TC Calcs 2015.xls03/16/2015 121
BASIN 734
0.150072.50 ft2.6600 in0.0250 ft/ft
0.1267 hrs
Equation->
67.50 ft0.0110 ft/ft
y
2.13 ft/sec
Equationif paved ->
Equationif unpaved ->
0.0088 hrs
Equation->
0.1355 hrs8.13 min
TOTAL TIME OF CONCENTRATION
Average Velocity (V)
V = 20.3282*s0.5
V = 16.1345*s0.5
Time of Concentration
Tc = L / 3600*V
Time of Concentration
Tc = (0.007(nL)0.8) / (P20.5s0.4)
SCS TR-55 SHALLOW CONCENTRATED FLOWHydraulic Length (L)Slope (S)Paved (Y or N)
TIME OF CONCENTRATION WORKSHEET
SCS TR-55 SHEET FLOWManning's n (n)Hydraulic Length (max. of 300 ft) (L)2-yr 24-hour rainfall (P2)Slope (s)
03/16/2015 122
BASIN 735
0.150070.67 ft2.6600 in0.0250 ft/ft
0.1241 hrs
Equation->
64.33 ft0.0110 ft/ft
y
2.13 ft/sec
Equationif paved ->
Equationif unpaved ->
0.0084 hrs
Equation->
0.1325 hrs7.95 min
TOTAL TIME OF CONCENTRATION
Average Velocity (V)
V = 20.3282*s0.5
V = 16.1345*s0.5
Time of Concentration
Tc = L / 3600*V
Time of Concentration
Tc = (0.007(nL)0.8) / (P20.5s0.4)
SCS TR-55 SHALLOW CONCENTRATED FLOWHydraulic Length (L)Slope (S)Paved (Y or N)
TIME OF CONCENTRATION WORKSHEET
SCS TR-55 SHEET FLOWManning's n (n)Hydraulic Length (max. of 300 ft) (L)2-yr 24-hour rainfall (P2)Slope (s)
03/16/2015 123
BASIN 739
0.150056.00 ft2.6600 in0.0250 ft/ft
0.1030 hrs
Equation->
20.00 ft0.0110 ft/ft
y
2.13 ft/sec
Equationif paved ->
Equationif unpaved ->
0.0026 hrs
Equation->
0.1056 hrs6.34 min
TOTAL TIME OF CONCENTRATION
Average Velocity (V)
V = 20.3282*s0.5
V = 16.1345*s0.5
Time of Concentration
Tc = L / 3600*V
Time of Concentration
Tc = (0.007(nL)0.8) / (P20.5s0.4)
SCS TR-55 SHALLOW CONCENTRATED FLOWHydraulic Length (L)Slope (S)Paved (Y or N)
TIME OF CONCENTRATION WORKSHEET
SCS TR-55 SHEET FLOWManning's n (n)Hydraulic Length (max. of 300 ft) (L)2-yr 24-hour rainfall (P2)Slope (s)
03/16/2015 124
BASIN 740
0.1500100.00 ft2.6600 in0.0250 ft/ft
0.1638 hrs
Equation->
39.00 ft0.0110 ft/ft
y
2.13 ft/sec
Equationif paved ->
Equationif unpaved ->
0.0051 hrs
Equation->
0.1689 hrs10.13 min
TOTAL TIME OF CONCENTRATION
Average Velocity (V)
V = 20.3282*s0.5
V = 16.1345*s0.5
Time of Concentration
Tc = L / 3600*V
Time of Concentration
Tc = (0.007(nL)0.8) / (P20.5s0.4)
SCS TR-55 SHALLOW CONCENTRATED FLOWHydraulic Length (L)Slope (S)Paved (Y or N)
TIME OF CONCENTRATION WORKSHEET
SCS TR-55 SHEET FLOWManning's n (n)Hydraulic Length (max. of 300 ft) (L)2-yr 24-hour rainfall (P2)Slope (s)
03/16/2015 125
BASIN 743
0.1500100.00 ft2.6600 in0.0250 ft/ft
0.1638 hrs
Equation->
97.00 ft0.0110 ft/ft
n
1.69 ft/sec
Equationif paved ->
Equationif unpaved ->
0.0159 hrs
Equation->
0.1797 hrs10.78 min
TOTAL TIME OF CONCENTRATION
Average Velocity (V)
V = 20.3282*s0.5
V = 16.1345*s0.5
Time of Concentration
Tc = L / 3600*V
Time of Concentration
Tc = (0.007(nL)0.8) / (P20.5s0.4)
SCS TR-55 SHALLOW CONCENTRATED FLOWHydraulic Length (L)Slope (S)Paved (Y or N)
TIME OF CONCENTRATION WORKSHEET
SCS TR-55 SHEET FLOWManning's n (n)Hydraulic Length (max. of 300 ft) (L)2-yr 24-hour rainfall (P2)Slope (s)
03/16/2015 126
BASIN 744
0.1500100.00 ft2.6600 in0.0250 ft/ft
0.1638 hrs
Equation->
50.00 ft0.0300 ft/ft
n
2.79 ft/sec
Equationif paved ->
Equationif unpaved ->
0.0050 hrs
Equation->
0.1688 hrs10.13 min
TOTAL TIME OF CONCENTRATION
Average Velocity (V)
V = 20.3282*s0.5
V = 16.1345*s0.5
Time of Concentration
Tc = L / 3600*V
Time of Concentration
Tc = (0.007(nL)0.8) / (P20.5s0.4)
SCS TR-55 SHALLOW CONCENTRATED FLOWHydraulic Length (L)Slope (S)Paved (Y or N)
TIME OF CONCENTRATION WORKSHEET
SCS TR-55 SHEET FLOWManning's n (n)Hydraulic Length (max. of 300 ft) (L)2-yr 24-hour rainfall (P2)Slope (s)
03/16/2015 127
03/16/2015 128
03/16/2015 129
03/16/2015 130
03/16/2015 131
03/16/2015 132
03/16/2015 133
03/16/2015 134
03/16/2015 135
03/16/2015 136
03/16/2015 137
03/16/2015 138
03/16/2015 139
03/16/2015 140
03/16/2015 141
03/16/2015 142
03/16/2015 143
03/16/2015 144
03/16/2015 145
03/16/2015 146
03/16/2015 147
03/16/2015 148
03/16/2015 149
03/16/2015 150
Appendix D
Water Quality
03/16/2015 151
Scenario: Johnson2,10,100 - Synthetic Curve, 2 yrs
Proposed 1
BMP 746
Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666
3/11/2015
Bentley PondPack V8i[08.11.01.51]
Bentley Systems, Inc. Haestad Methods Solution Center09036420012-2015-03-11 combined WQ.ppc
03/16/2015 152
Masonic Amenities
Project Summary
Masonic Amenities and Additional
ParkingTitle
JEOEngineer
CripeCompany
3/11/2015Date
Sizing revised to include Community Center and North and South parking lotsNotes
Page 1 of 827 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666
3/11/2015
Bentley PondPack V8i[08.11.01.51]
Bentley Systems, Inc. Haestad Methods Solution Center09036420012-2015-03-11 combined WQ.ppc
03/16/2015 153
Table of Contents
7Runoff CN-AreaProposed 1
5Time of Concentration Calculations
Proposed 1
3Time-Depth CurveJohnson2,10,100
2Master Network Summary
03/16/2015 154
Masonic Amenities
Subsection: Master Network Summary
Catchments Summary
Peak Flow(ft³/s)
Time to Peak(hours)
Hydrograph Volume(ac-ft)
Return Event(years)
ScenarioLabel
2.2812.0500.1572
Johnson2,10,100 - Synthetic Curve, 2 yrs
Proposed 1
Node Summary
Peak Flow(ft³/s)
Time to Peak(hours)
Hydrograph Volume(ac-ft)
Return Event(years)
ScenarioLabel
2.2812.0500.1572
Johnson2,10,100 - Synthetic Curve, 2 yrs
BMP 746
Page 2 of 827 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666
3/11/2015
Bentley PondPack V8i[08.11.01.51]
Bentley Systems, Inc. Haestad Methods Solution Center09036420012-2015-03-11 combined WQ.ppc
03/16/2015 155
Masonic Amenities
Storm Event: TypeII 24hr (1.0 in)Label: Johnson2,10,100
Return Event: 2 yearsSubsection: Time-Depth Curve
Time-Depth Curve: TypeII 24hr (1.0 in)
TypeII 24hr (1.0 in)
Label
hours0.000Start Time
hours0.100Increment
hours24.000End Time
years2Return Event
CUMULATIVE RAINFALL (in)
Output Time Increment = 0.100 hours
Time on left represents time for first value in each row.
Depth(in)
Depth(in)
Depth(in)
Depth(in)
Depth(in)
Time(hours)
0.00.00.00.00.00.000
0.00.00.00.00.00.500
0.00.00.00.00.01.000
0.00.00.00.00.01.500
0.00.00.00.00.02.000
0.00.00.00.00.02.500
0.00.00.00.00.03.000
0.00.00.00.00.03.500
0.10.10.10.00.04.000
0.10.10.10.10.14.500
0.10.10.10.10.15.000
0.10.10.10.10.15.500
0.10.10.10.10.16.000
0.10.10.10.10.16.500
0.10.10.10.10.17.000
0.10.10.10.10.17.500
0.10.10.10.10.18.000
0.10.10.10.10.18.500
0.20.20.20.20.19.000
0.20.20.20.20.29.500
0.20.20.20.20.210.000
0.20.20.20.20.210.500
0.30.30.30.20.211.000
0.60.40.40.30.311.500
0.70.70.70.70.712.000
0.80.80.80.70.712.500
0.80.80.80.80.813.000
0.80.80.80.80.813.500
0.80.80.80.80.814.000
0.90.80.80.80.814.500
0.90.90.90.90.915.000
0.90.90.90.90.915.500
0.90.90.90.90.916.000
Page 3 of 827 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666
3/11/2015
Bentley PondPack V8i[08.11.01.51]
Bentley Systems, Inc. Haestad Methods Solution Center09036420012-2015-03-11 combined WQ.ppc
03/16/2015 156
Masonic Amenities
Storm Event: TypeII 24hr (1.0 in)Label: Johnson2,10,100
Return Event: 2 yearsSubsection: Time-Depth Curve
CUMULATIVE RAINFALL (in)
Output Time Increment = 0.100 hours
Time on left represents time for first value in each row.
Depth(in)
Depth(in)
Depth(in)
Depth(in)
Depth(in)
Time(hours)
0.90.90.90.90.916.500
0.90.90.90.90.917.000
0.90.90.90.90.917.500
0.90.90.90.90.918.000
0.90.90.90.90.918.500
0.90.90.90.90.919.000
1.00.90.90.90.919.500
1.01.01.01.01.020.000
1.01.01.01.01.020.500
1.01.01.01.01.021.000
1.01.01.01.01.021.500
1.01.01.01.01.022.000
1.01.01.01.01.022.500
1.01.01.01.01.023.000
1.01.01.01.01.023.500
(N/A)(N/A)(N/A)(N/A)1.024.000
Page 4 of 827 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666
3/11/2015
Bentley PondPack V8i[08.11.01.51]
Bentley Systems, Inc. Haestad Methods Solution Center09036420012-2015-03-11 combined WQ.ppc
03/16/2015 157
Masonic Amenities
Storm Event: TypeII 24hr (1.0 in)Label: Proposed 1
Return Event: 2 yearsSubsection: Time of Concentration Calculations
Time of Concentration Results
Segment #1: User Defined Tc
hours0.183Time of Concentration
Time of Concentration (Composite)
hours0.183Time of Concentration (Composite)
Page 5 of 827 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666
3/11/2015
Bentley PondPack V8i[08.11.01.51]
Bentley Systems, Inc. Haestad Methods Solution Center09036420012-2015-03-11 combined WQ.ppc
03/16/2015 158
Masonic Amenities
Storm Event: TypeII 24hr (1.0 in)Label: Proposed 1
Return Event: 2 yearsSubsection: Time of Concentration Calculations
==== User Defined
Value entered by userTc =
Tc= Time of concentration, hoursWhere:
Page 6 of 827 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666
3/11/2015
Bentley PondPack V8i[08.11.01.51]
Bentley Systems, Inc. Haestad Methods Solution Center09036420012-2015-03-11 combined WQ.ppc
03/16/2015 159
Masonic Amenities
Storm Event: TypeII 24hr (1.0 in)Label: Proposed 1
Return Event: 2 yearsSubsection: Runoff CN-Area
Runoff Curve Number Data
Adjusted CNUC(%)
C(%)
Area(acres)
CNSoil/Surface Description
98.0000.00.04.81198.000impervious
61.0000.00.00.74861.000Open Space Group B
74.0000.00.02.83374.000Open Space Group C
86.600(N/A)(N/A)8.392(N/A)COMPOSITE AREA & WEIGHTED CN --->
Page 7 of 827 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666
3/11/2015
Bentley PondPack V8i[08.11.01.51]
Bentley Systems, Inc. Haestad Methods Solution Center09036420012-2015-03-11 combined WQ.ppc
03/16/2015 160
Masonic Amenities
Index
Proposed 1 (Time of Concentration Calculations, 2 years)...5, 6
Proposed 1 (Runoff CN-Area, 2 years)...7
P
Master Network Summary...2
M
Johnson2,10,100 (Time-Depth Curve, 2 years)...3, 4
J
Page 8 of 827 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666
3/11/2015
Bentley PondPack V8i[08.11.01.51]
Bentley Systems, Inc. Haestad Methods Solution Center09036420012-2015-03-11 combined WQ.ppc
03/16/2015 161
Aqua-Swirl™ Model
Swirl Chamber Diameter
Water Quality Treatment
Flow2
Oil/Debris Storage Capacity
Sediment Storage Capacity
(ft.) (cfs) (gal) (ft3)On/Offline CFD1
8 12
AS-3 3.25 10 16 1.8 110 20
AS-4 4.25 12 18 3.2 190 32
AS-5 5.00 12 24 4.4 270 45
AS-6 6.00 14 30 6.3 390 65
AS-7 7.00 16 36 8.6 540 90
AS-8 8.00 18 42 11.2 710 115
AS-9 9.00 20 48 14.2 910 145
AS-10 10.0 22 54 17.5 1130 180
AS-12 12.0 24 48 25.2 1698 270
AS-XX Custom -- -- >26 -- --*Higher water quality treatment flow rates can be designed with multiple swirls.
1)
2)
10
Aqua-Swirl™ Sizing Chart (English)
The design and orientation of the Aqua-Filter™ generally entails some degree of customization. Forassistance in design and specific sizing using historical rainfall data, please refer to an AquaShield™representative or visit our website at www.AquaShieldInc.com. CAD details and specifications are availableupon request.
Maximum Stub-Out Pipe
Outer Diameter
(in.)
The Aqua-Swirl™ Conveyance Flow Diversion (CFD) provides full treatment of the"first flush," while the peak design storm is diverted and channeled through the mainconveyance pipe. Please refer to your local representative for more information.
Many regulatory agencies are establishing "water quality treatment flow rates" for theirareas based on the initial movement of pollutants into the storm drainage system. Thetreatment flow rate of the Aqua-Swirl™ system is engineered to meet or exceed thelocal water quality treatment criteria. This "water quality treatment flow rate"typically represents approximately 90% to 95% of the total annual runoff volume.
AS-2 2.50 1.1 37
03/16/2015 162
Culvert ReportHydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Wednesday, Mar 11 2015
Circular Culvert
Invert Elev Dn (ft) = 713.05Pipe Length (ft) = 10.00Slope (%) = 1.00Invert Elev Up (ft) = 713.15Rise (in) = 12.0Shape = CircularSpan (in) = 12.0No. Barrels = 1n-Value = 0.012Culvert Type = Circular ConcreteCulvert Entrance = Square edge w/headwall (C)Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5
EmbankmentTop Elevation (ft) = 718.60Top Width (ft) = 9.00Crest Width (ft) = 9.00
CalculationsQmin (cfs) = 0.00Qmax (cfs) = 2.40Tailwater Elev (ft) = (dc+D)/2
HighlightedQtotal (cfs) = 0.10Qpipe (cfs) = 0.10Qovertop (cfs) = 0.00Veloc Dn (ft/s) = 0.22Veloc Up (ft/s) = 1.69HGL Dn (ft) = 713.61HGL Up (ft) = 713.28Hw Elev (ft) = 713.32Hw/D (ft) = 0.17Flow Regime = Inlet Control
03/16/2015 163
Hydraflow Express - Culvert Report - 03/11/15 1
Q Veloc Depth
Total Pipe Over Dn Up Dn Up
(cfs) (cfs) (cfs) (ft/s) (ft/s) (in) (in)
0.10 0.10 0.00 0.22 1.69 6.77 1.55
0.20 0.20 0.00 0.41 2.03 7.10 2.20
0.30 0.30 0.00 0.59 2.26 7.35 2.71
0.40 0.40 0.00 0.77 2.45 7.57 3.14
0.50 0.50 0.00 0.93 2.61 7.76 3.52
0.60 0.60 0.00 1.09 2.75 7.93 3.86
0.70 0.70 0.00 1.24 2.87 8.09 4.18
0.80 0.80 0.00 1.39 2.99 8.24 4.48
0.90 0.90 0.00 1.54 3.10 8.38 4.77
1.00 1.00 0.00 1.68 3.20 8.52 5.04
1.10 1.10 0.00 1.82 3.30 8.65 5.29
1.20 1.20 0.00 1.95 3.39 8.77 5.54
1.30 1.30 0.00 2.08 3.48 8.89 5.78
1.40 1.40 0.00 2.22 3.56 9.00 6.00
1.50 1.50 0.00 2.34 3.65 9.11 6.22
1.60 1.60 0.00 2.47 3.71 9.22 6.47
1.70 1.70 0.00 2.60 3.79 9.32 6.67
1.80 1.80 0.00 2.72 3.87 9.42 6.88
1.90 1.90 0.00 2.84 3.95 9.52 7.07
2.00 2.00 0.00 2.96 4.02 9.62 7.26
2.10 2.10 0.00 3.08 4.10 9.71 7.45
2.20 2.20 0.00 3.20 4.18 9.80 7.63
2.30 2.30 0.00 3.32 4.25 9.89 7.81
2.40 2.40 0.00 3.44 4.33 9.98 7.98
03/16/2015 164
Hydraflow Express - Culvert Report - 03/11/15 2
HGL
Dn Up Hw Hw/D
(ft) (ft) (ft)
713.61 713.28 713.32 0.17
713.64 713.33 713.39 0.24
713.66 713.38 713.45 0.30
713.68 713.41 713.50 0.35
713.70 713.44 713.55 0.40
713.71 713.47 713.59 0.44
713.72 713.50 713.63 0.48
713.74 713.52 713.67 0.52
713.75 713.55 713.70 0.55
713.76 713.57 713.74 0.59
713.77 713.59 713.77 0.62
713.78 713.61 713.81 0.66
713.79 713.63 713.84 0.69
713.80 713.65 713.87 0.72
713.81 713.67 713.91 0.76
713.82 713.69 713.94 0.79
713.83 713.71 713.97 0.82
713.84 713.72 714.00 0.85
713.84 713.74 714.03 0.88
713.85 713.76 714.07 0.92
713.86 713.77 714.10 0.95
713.87 713.79 714.13 0.98
713.87 713.80 714.16 1.01
713.88 713.82 714.19 1.04
03/16/2015 165