54
FO T ME ORMA &LA TALUK OPP. N D ELAMIN ALDEH AMINA M SURV KA: LIM [ [NA GANES KARGIL NABET A RAF NE FOR HYDE R ATED M/S. VEY NO BDI, DI BASEL [DECEM T. ABET A SH MERI L PETRO EMA C ACCRED FT E PR RMAL RESIN, SHEET NN O.: 1458, ISTRIC CAT LINE M MBER 2PRE . R. A ACCRED IDIAN, B OL PUMP AIL: adm CONTAC DITATIO SEPT EIA FOR ROPOS DEHY UREA TS MAOF N PO AT , VILLA T: SURTEGORY MONITO 016 TO EPARE ASSO DITED E BLOCK N P, S. G. H m.trassoci CT NO.: ON NO.: N EMBE RE R SED DE RE FORM NUFAC OLYM AGE: PA ENDRA Y: 5 (F) ORING FEBRU ED BY CIAT EIA CONO.: C, O HIGHWA ates@gm 09825371 NABET/E ER 201 POR SIN, PH MALDE CTURI MER ANSHIN ANAGA PERIOD ARY 20 TES NSULT OFFICE N Y, AHMail.com 1099 EIA/161917 RT HENO EHYDE ING URS NA, AR, GUJ D 017] TANT] NO. 605EDABAD /RA0033 OL E RESIN NIT JARAT. A, D380060 N 0

DRAFT E IA REPOR T

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DRAFT E IA REPOR T

FO

   T

ME

ORMA

& LA

TALUK

OPP. 

             N

D

ELAMIN

ALDEH

AMINA

M

SURV

KA: LIM

[

 

 

 

[NAGANES

KARGIL

NABET A

RAF

NE FOR

HYDE R

ATED 

M/S. 

VEY NO

BDI, DI

BASEL

[DECEM

T.ABET ASH MERI

L PETRO

EMA

C

ACCRED

FT E

PR

RMAL

RESIN, 

SHEET

NN

O.: 1458,

ISTRIC

CAT

LINE M

MBER 20

PRE

. R. AACCREDIDIAN, B

OL PUMP

AIL: adm

CONTAC

DITATIO

SEPT

 

EIA  

 

FOR  

ROPOS

DEHY

UREA

TS MAN 

OF 

N PO 

AT 

, VILLA

T: SURE 

TEGORY

MONITO

016 TO  

EPARE

ASSODITED EBLOCK N

P, S. G. H

m.trassoci

CT NO.:  

ON NO.: N 

EMBE

RER 

SED 

DE RE

 FORM

NUFAC

OLYM

AGE: PA

ENDRA

Y: 5 (F)

ORING 

FEBRU

ED BY

CIATEIA CONNO.:  C, O

HIGHWA

ates@gm

09825371

NABET/E

ER 201

POR

SIN, PH

MALDE

CTURI

MER

ANSHIN

ANAGA

PERIOD

ARY 20

TES NSULTOFFICE N

Y, AHME

ail.com 

1099 

EIA/1619/

17 

RT 

HENO

EHYDE

ING UN

RS 

NA, 

AR, GUJ

017] 

TANT] NO. 605‐A

EDABAD

/RA0033 

OL 

E RESIN

NIT 

JARAT.

A, 

D‐380060

Page 2: DRAFT E IA REPOR T

DECLARATION BY

EXPERTS

Page 3: DRAFT E IA REPOR T
Page 4: DRAFT E IA REPOR T
Page 5: DRAFT E IA REPOR T
Page 6: DRAFT E IA REPOR T
Page 7: DRAFT E IA REPOR T

EXECUTIVE SUMMARY

Page 8: DRAFT E IA REPOR T

Environmental Impact Assessment Report  

 

M/s. NN Polymers

Survey No. 1458, Village: Panshina,

Taluka: Limbdi, District: Surendranagar, Gujarat. 

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 1

EXECUTIVE SUMMARY – ENGLISH & GUJARATI

Executive Summary – ENGLISH 

 

1. INTRODUCTION 

M/s.  NN  Polymers  is  proposing  to  manufacture  Melamine  Formaldehyde  Resin, 

Phenol Formaldehyde Resin & Urea Formaldehyde Resin as well as Laminated Sheets 

at  Survey  No.:  1458,  Village:  Panshina,  Taluka:  Limbdi,  District:  Surendranagar, 

Gujarat. Details of proposed products are as given below: 

 

Details of Proposed Products  

Sr. No.  Name of Product  Production Capacity 

1  Melamine Formaldehyde Resin  300 MT/Month 

2  Phenol Formaldehyde Resin  300 MT/Month 

3  Urea Formaldehyde Resin  300 MT/Month 

4  Laminated Sheets  1,50,000 Nos./Month  

Note:  Please note that above stated Resins will be used for captive consumption   (for manufacturing of laminates sheets) as well as for sell purpose. 

 

M/s. NN Polymers has a total  land area of 17,705 m2. Out of the above stated  land 

area approximately 6,915 m2  is green belt area (approx. 39 % of the total  land area). 

Non Agriculture  (NA) permission has been already obtained by  the  land owner  from 

the concerned authority.  

Proposed manufacturing unit is a Medium Scale Unit having total investment of about 

Rs. 8.5 Crores out of which resin plant cost will be approx. Rs 1.1 Crore. Approximately 

Rs. 75 Lakhs will be allocated towards environmental management facilities.  

M/s. T. R. Associates (NABET Accredited EIA Consultant) was appointed by M/s. NN 

Polymers to carry out the Environmental Impact Assessment study for their proposed 

project.  

The  proposed  products  like Melamine  Formaldehyde  Resin,  Phenol  Formaldehyde 

Resin  &  Urea  Formaldehyde  Resin  (being  synthetic  organic  chemicals)  falls  under 

Category 5(f) as stated  in Environment  Impact Assessment Notification Published on 

14th September, 2006. Further, the location of proposed project is outside the notified 

industrial  estate  and  not  fall  in  Small  Scale  Industrial  Unit  criteria  as  per  the 

Notification  dated  25th  June  2014.  Hence,  project  proponent  has  to  obtain  the 

Page 9: DRAFT E IA REPOR T

Environmental Impact Assessment Report  

 

M/s. NN Polymers

Survey No. 1458, Village: Panshina,

Taluka: Limbdi, District: Surendranagar, Gujarat. 

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 2

Environmental Clearance from the Ministry of Environment, Forests & Climate Change 

(MoEFCC), New Delhi. As  a part of  this procedure, Public Hearing  is  required  to be 

carried out as per the notification as well as the TOR granted to the unit by the Expert 

Appraisal Committee (Industry‐2). 

 

This  study  of  Environment  Impact  assessment  (EIA)  is  based  on  studies  carried  out 

during the month of December 2016 to February 2017. The environmental parameters 

(ambient air, water,  soil, noise,  flora and  fauna)  selected  for  study are  those, which 

are  likely  to be most  affected by  the project.  The  study  area  is defined  as  an  area 

within 10 km. radius from centre of the project site.  

Salient Features within 10 km radius surroundings area as follows: 

Sr. 

No. Important Features  Description 

1  Location  Survey No. : 1458, Village: Panshina,  

Taluka: Limbdi, District: Surendranagar, Gujarat. 

2  Project Site Co‐ordinates  Latitude: 22°34'9.72"N  

Longitude: 71°59'38.10"E 

3  Temperature Range   21˚C to 34.4˚C (average) 

4  Mean Sea Level  14 m 

5  Annual Rain Fall  750.9 mm (average) 

6  Ground Water Depth  25.36 m to 611 m 

7  Soil Type  Medium black soils, Red Sandy soils and Silty soils 

8  Nearest Railway Station  Limbdi railway station – 21 km in West direction 

9  Nearest Airport  Ahmedabad airport –  85 km in NE direction 

10  Nearest Village  Kanpara – 0.65 km in SW direction 

Panshina ‐ 3 km in SW direction 

11  Nearest State Highway  SH 38 ‐ 18.5 km in West direction. 

12  Nearest National Highway  NH 8A – 0.19 km in North direction 

13  Nearest River/Water body  Bhogavo River ‐ 2.2 km in SW direction        

Narmada Canal – 1.2 km in South direction 

14  National Parks / Sanctuary / Eco 

Sensitive Zone/ Reserved Forest 

None within 10 km radius. 

Page 10: DRAFT E IA REPOR T

Environmental Impact Assessment Report  

 

M/s. NN Polymers

Survey No. 1458, Village: Panshina,

Taluka: Limbdi, District: Surendranagar, Gujarat. 

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 3

2. AIR ENVIRONMENT 

The  base  line  Ambient  Air Quality  (AAQ)  status within  10  km  study  area  has  been 

assessed through a monitoring network of 8 AAQ sampling stations during December 

2016  to  February 2017.   Map  showing 10  km  radius  area  is  shown here. Design of 

network for Ambient Air Quality monitoring locations were decided on meteorology & 

available  infrastructure facilities. The base‐line Ambient Air Quality of the study area 

was  monitored  for  Particulate  Matter  (PM10  &  PM2.5),  Sulphur  Dioxide  (SO2)  and 

Nitrogen Dioxide (NO2), CO & VOC. The result for the same is given as below: 

 

Location Results (98th Percentile) 

PM2.5 PM10 SO2 NO2 

Village: Kanpara 33.96 78.46 18.55 25.54 

Village: Panshina  31.39 77.34 21.00 26.08 

Village: Katariya 32.07 71.01 16.95 24.72 

Village: Ralol  29.89 81.46 18.39  28.11 

Village: Jasmatpar  33.27 79.54 17.94 27.21 

Village: Devpara 32.56 80.45 20.36 29.12 

Village: Bajarda 30.81 75.91 19.04 26.44 

Project Site  34.90 83.81 21.89 30.80 

Permissible limit [NAAQ standards‐2009] 

60 µg/m3  100 µg/m3  80 µg/m3  80 µg/m3 

  Note: CO: Below Detectable Limit; VOC: Below Detectable Limit 

 

Analysis of ambient air samples revealed that the Air quality is found well within the 

prescribed limits of National Ambient Air Quality standards. 

 

The main  source  of  gaseous  emission  is  flue  gas  emission  from  stack  attached  to 

Steam Boiler & TFH and D. G. set & process gas emission from laminated sheet dryer. 

 

Agro‐Waste / Briquettes will be used as a fuel & the requirement shall be 7 MT/Day. 

Adequate stack height will be provided for proper atmosphere dispersion of pollutant. 

The probable emitted pollutants will be PM, SO2 & NO2. Cyclone separator followed by 

bag  filter will be provided as APCM. Since Diesel will be used as a  fuel  for D. G. Set 

(back–up system) the flue gas emission will also be well within prescribed norms and 

there is no need of any air pollution control measures for D. G. Set. Condenser System 

will be provided at stack attached with laminated sheet dryer for Methanol recovery.   

3. WATER ENVIRONMENT  

Analysis of  ground water  and  surface water  samples  revealed  that  it  is  suitable  for 

domestic  activity  including  agricultural  activity.  Ground  water  and  surface  water 

Page 11: DRAFT E IA REPOR T

Environmental Impact Assessment Report  

 

M/s. NN Polymers

Survey No. 1458, Village: Panshina,

Taluka: Limbdi, District: Surendranagar, Gujarat. 

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 4

quality  in  the area meets  the Water Quality Standards  (IS 10500)  for drinking water 

except for Turbidity, E. Coli. and Coliforms at some locations. 

 

Water Requirement 

The  total water  requirement  for  the proposed project will be 51 kl/day. Out of  this 

said fresh water quantity 4.5 kl/day will be used for domestic purpose, 37 kl/day will 

be used for industrial activities and 9.5 kl/day will be used for greenbelt development 

purpose. The required water will be obtained through Borewell. 

 

Wastewater Generation and its Disposal 

The  total  generation  of  domestic  wastewater  will  be  4  kl/day  from  the  proposed 

project  activity.  The  domestic  wastewater  generated  will  be  disposed  off  through 

septic tank/soak pit system. 

 

The  total  industrial  effluent  generation  from  proposed  project  activity will  be  15.7 

kl/day, which will be from boiler blow down, cooling tower purge, RO reject, process 

and washing. Industrial wastewater from resin mfg. process & washing activity will be 

1.6 kl/day, which will be given primary treatment by chemical oxidation.   RO1 reject, 

boiler blow down, cooling tower purge will be approx. 14.1 kl/day, which will be taken 

to RO2, permeate will be reused for RO1 & reject will be mixed with primary treated 

effluent  in holding tank. Finally  it will be evaporated  in evaporator & condensate will 

be  recycled  in RO1. Therefore no effluent will be  required  to be discharged and  the 

stated process would be a ZERO DISCHARGE process.  

 

4. LAND / SOIL ENVIRONMENT 

During  operation  activity  the  impact  of  air, water  and  solid waste  pollution  on  soil 

causes direct / indirect effect on soil.   

As all necessary air pollution control steps will be provided and based on the results of 

the dispersion model for the Ground Level Concentrations of various pollutants after 

commissioning of  the proposed project,  there will not be any adverse  impact of air 

pollution on soil.  

It may be noted that there will be no disposal of untreated effluent on land. So, there 

will be no adverse effect on land / soil due to water.  

All  necessary  control  steps  will  be  provided  for  handling,  storage  and  disposal  of 

solid/hazardous  waste  generated  from  the  plant.  Thus,  there  will  not  be  any 

significant impact of solid/hazardous waste on the soil environment. 

 

Page 12: DRAFT E IA REPOR T

Environmental Impact Assessment Report  

 

M/s. NN Polymers

Survey No. 1458, Village: Panshina,

Taluka: Limbdi, District: Surendranagar, Gujarat. 

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 5

5. NOISE ENVIRONMENT 

Noise  level  was  recorded  at  eight  locations  within  the  study  area  to  provide  the 

baseline data to describe the existing situations. 

 

Sr. 

No.  

Location  Noise Level (Leq) in dBA (Day Time)  

Noise Level (Leq) in dBA (Night Time)  

Measured  Permissible Limit Measured  Permissible Limit

1  Project Site  63.4 75 57.4 70 

2  Kanpara 47.4 55 43.0 45 

3  Panshina  49.4 55 39.1 45 

4  Bajarda 52.8 55 38.1 45 

5  Katariya 50.7 55 42.2 45 

6  Ralol 46.7 55 40.6 45 

7  Jasmatpar  51.1 55 41.7 45 

8  Devpara  45.4 55 44.0 45 

 

6. SOCIO‐ECONOMIC ENVIRONMENT 

An assessment of socio‐economic environment forms an integral part of an EIA study. 

Socio‐economic  environment  –  demographic  &  related  socio‐economic  data  was 

collected from District Census Handbook to assess socio‐economic status of the study 

area.  

For proposed project activity, total 65 nos. of skilled and unskilled employees/ workers 

will be required. The indirect employment will be generated by way of transportation, 

shopkeepers and other casual employment for many people. 

 

Local people will be given preference wherever  found suitable  for all the  jobs  in the 

plant. Economic status of the local people will improve due to the increased business 

opportunities,  thereby, making  a  positive  impact.  Educational, medical  and  housing 

facilities in the study area will considerably improve. 

 

7. ECOLOGY & BIODIVERSITY 

The study area was dominated by agriculture landscape. The floral and faunal diversity 

was very less.  

 

Domestic  tree  species  found  in  the  study area are Baval, Neem, Arduso, Gulmohar, 

Karanj, Khijado and Kesudo. Major  crops  in  the  study area are Cotton, Castor, Rice, 

Wheat, and Jowar.  

 

Page 13: DRAFT E IA REPOR T

Environmental Impact Assessment Report  

 

M/s. NN Polymers

Survey No. 1458, Village: Panshina,

Taluka: Limbdi, District: Surendranagar, Gujarat. 

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 6

The  commonly  spotted  bird  species  of  this  area  were  House  Sparrow,  Blue  Rock 

Pigeon,  Ring Dove, Asian  Koel, Common Myna,  Rose‐ringed  Parakeet, House  Crow, 

Peacock, Cattle Egret, Black Headed Ibis and Common Kingfisher.  

 

The wild mammals found other than domesticated ones from study area were Nilgai, 

Golden Jackal, Grey Mongoose, Hare and Wild Boar. 

 

8. SOLID WASTE MANAGEMENT  

The main hazardous waste generation will be ETP Sludge + Evaporation Residue, Used 

Oil, Discarded Plastic Bags/Drums, Edge Cutting Waste and Spent Carbon.  

 

ETP Sludge + Evaporation Residue will be disposed off at approved TSDF site. Used Oil 

will be reused within premises as a lubricant or sold to registered recycler. Discarded 

Plastic Bags/Drums will be sold to authorized vendor. Edge Cutting Waste and Spent 

Carbon will be disposed off to CHWIF site.  

 

The  unit  will  provide  isolated  area  for  the  storage  of  hazardous  waste.  Thus, 

hazardous waste management system provided by the unit will be adequate and there 

will not be any major impact on the environment due to hazardous waste. 

 

9. ENVIRONMENTAL MANAGEMENT PLAN 

An Environmental Management Plan has been prepared for mitigation of the adverse 

impacts. 

 

The Environmental Management Plan describes  in brief,  the management’s plan  for 

proper and adequate  implementation of treatment and control system for pollutants 

and  for maintaining  the  environment.  It  also  includes  development  of  green  belt, 

proper safety of workers, environmental monitoring plan,  rain water harvesting,  fire 

protection system and measures etc.  

 

An Environmental Management Cell will be  formed  for effective  implementation of 

Environmental Management Plan. 

 

10. ENVIRONMENT MONITORING PROGRAME 

Monitoring  of  environmental  factors will  enable  us  to  identify  the  changes  in  the 

environmental  impacts at various  locations and their mitigative measures. To ensure 

the  effective  implementation  of  the  EMP, monitoring  of  ambient  air  quality,  stack 

emissions, analysis & monitoring of water environment and noise level will be carried 

out as required / specified by statutory authority. 

Page 14: DRAFT E IA REPOR T

Environmental Impact Assessment Report  

 

M/s. NN Polymers

Survey No. 1458, Village: Panshina,

Taluka: Limbdi, District: Surendranagar, Gujarat. 

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 7

11. RISK ASSESSMENT 

Risk analysis and study have been carried out for identification of hazards, selection of 

maximum  credible  scenarios,  risk  mitigation  measures  etc.  All  the  hazardous 

chemicals will  be  stored  and  handled  as  per MSDS  guidelines.  Personal  protective 

equipments will be provided to the workers.  

 

12. GREEN BELT DEVELOPMENT  

A  greenbelt  of  approximately  6,915  m2  is  developed  within  the  project  site  to 

minimize the air pollution, noise pollution, balancing eco‐environment, soil erosion / 

protection etc. Greenbelt area is 39 % of the total plot area. 

 

13. PROJECT BENEFITS: 

The proposed project will become beneficial to the surrounding area or community in 

terms  of  infrastructural  development,  social  development,  employment  and  other 

benefits. 

 

The  proposed  project  has  a  potential  for  employment  of  skilled,  semi‐skilled  and 

unskilled employees during construction phase as well as operation phase. A total 65 

nos. of person  is  likely  to get employment due to  the proposed project. The project 

will  earmarked  2.5 %  of  project  cost  for  socio‐economic  development  activities  in 

surrounding villages.  

 

14. CONCLUSION: 

Negligible  impacts  will  occur  on  air  quality.  However,  all  the  necessary  air 

pollution control measures will be provided. 

No ecological damage will occur. 

No adverse impacts will occur on water environment. 

Local employment opportunities will increase. 

Various other environment parameters  like Forest/ National Park/ Sanctuary and 

Religious / Historical Places will not be affected. 

Environment Management Plan has been  formulated to control all the pollutant 

parameters and Environment Management Cell has been  set‐up  to ensure  that 

these parameters do not exceed the norms set out by the concerned authorities. 

After commissioning of the proposed project the Environmental Management Cell 

will take care of all the pollution control measures. 

 

It can be concluded on a positive note that after the  implementation of the mitigation 

measures and environmental management plan during  the construction & operational 

phase, there will be negligible impact on the environment.  

Page 15: DRAFT E IA REPOR T

Environ

 

 

 

૧.

મેસસર્ એ

ગામ:-

ફોમાર્ ડી

લેમીનેટે

મ ં૧૨

૪ 

ન ધ: ઉપ

માટે થશે

પ્ર તાિવ

૬,૯૧૫

બીનખેત

પ્ર તાિવ

પ્ર થાિપ

આશરે

nmental Impa

 

T. R. AssoNABET A

તાવના:-

એન એન પ

પાણશીણા,

ીહાઈડ રેઝી

ટડ શી સનુ ં

ાકં મે

પરોક્ત રેઝીન

િવત એન એ

ચો.મી. (આ

તી માટેની મ

િવત એકમને

િપત કરવાની

િપયા ૭૫

act Assessmen

ociates (AhmeAccredited

EXECU

પોલીમર એ

તાલકુા:- લ

ીન, િફનોલ

ઉ પાદન ક

ોડમેલેમાઈન ફોિફનોલ ફોમ

યરુીયા ફોમ

લેમીન

ન નો ઉપયોગ

એન પોલીમ

આશરે કુલ

મજૂંરી અગાઉ

પ્ર થાિપત

ની િકંમત િ

લાખ ફાળવ

nt Report  

edabad)

UTIVE SU

સં ી

એ પ્ર તાિવત

લીંબડી, જી

ફોમાર્ ડીહા

રવા માટેની

તાિવત ોડ

ડ ટ ુ ંનામ ોમાર્ ડીહાઈડમાર્ ડીહાઈડ ે

માર્ ડીહાઈડ ે

નેટેડ શી સ

કે ટીવ વપર

ર એકમનો

િવ તારના

ઉથી સબંિધ

કરવાની િક

િપયા ૧.૧

વવામા ંઆવ

UMMAR

ી ત અહ

ત એકમ છે.

લો:- સરેુ

ાઈડ રેઝીન

ી દરખા ત

ડ ટ (ઉ પાદ

ડ રેઝીન રેઝીન

રેઝીન

રાશ માટે (લેમ

કુલ િવ તા

૩૯%) જમ

ધત સ ા પાસ

િકંમત િપય

કરોડ અને

વશે

Taluka: Li

RY – GU

વાલ

આ પ્ર તાિ

દ્રનગર, ગજુ

અને યરુીય

કરેલ છે.

દન) ની િવગ

૩૩

મીનેટેડ શીટન

ર આશરે ૧

મીન ગ્રીન બે

સેથી જમીન

યા ૮.૫ કરો

પયાર્વરણી

Survey No

imbdi, District

Execut

JARATI

િવત એકમે

જરાત રાજય

યા ફોમાર્ ડી

ગત

મત૩૦૦ મેટ્રીક ૩૦૦ મેટ્રીક

૩૦૦ મેટ્રીક

૧,૫૦,૦૦૦ ન

ના ઉ પાદન મ

૧૭,૭૦૫ ચો

બે ટ માટે ફ

ન માિલક ાર

ોડ થશે. મ

ીય યવ થ

M/s. N

o. 1458, Villag

t: Surendranag

tive Summary

સવેર્ ન.ં -

ય ખાતે મે

ીહાઈડ રેઝી

તા ટન/માસ ટન/માસ

ટન/માસ

નગં/માસ

માટે) તેમજ વે

ો. મીટર છે.

ફાળવવામા ં

રા મેળવેલ

માથંી રેઝીન

થાપન પ ધ

NN Polymers

ge: Panshina,

gar, Gujarat. 

y - Gujarati 8

૧૪૫૮,

લેમાઈન

ીન તથા

વેચાણ હતે ુ

માથંી

આવશે.

છે.

ન લા ટ

ધિત માટે

Page 16: DRAFT E IA REPOR T

Environ

 

 

 

મેસસર્

પયાર્વર

અતે્ર ન

યરુીયા

નોટીફીકે

ઓ ોિગ

નાના પ

Environ

(Enviro

પયાર્વર

એ યિુન

પયાર્વર

૨૦૧૬

(આસપ

અસર પ

૧૦ િકમ

આસપા

માકં ૧

૩ ૪ ૫

nmental Impa

 

T. R. AssoNABET A

એન એન

રણીય પ ૃ થ

ન ધનીય છે

ફોમાર્ ડીહા

કેશન-૨૦૦૬

િગક િવ તારન

પાયાના ઓ

nment, Fo

onmental C

રણીય લોકસુ

નટને આપેલ

રણ ૃ થકર

થી ફે આુ

પાસ ની હવા

પામી શકે તે

મી. િત્ર યાન

સના ૧૦ ક

ુ યપ્ર તાિવત

અક્ષાશં – તાપમાન સમદુ્રી તરવાિષર્ક વર

act Assessmen

ociates (AhmeAccredited

પોલીમર

થકરણ અસ

કે મેલામા

ઈડ રેઝીન

૬ ના િવભ

ની બહાર છે

ઓ ોિગક એ

rest & C

Clearance)

સનુાવણી એ

ા TOR પ્રમ

ણ અસર અ

આરી ૨૦૧૭

ા, પાણી, જ

તેમ છે, તેનો

ના વતુર્ળાકાર

કમી િ યાન

ય લા ણ તએકમનુ ં થ

રેખાશં

રના સરેરાશરસાદ

nt Report  

edabad)

ારા મેસસ

ર અ યાસ

ાઇન ફોમાર્

(સી થેટીક

ભાગ-૫(એફ)

અને સિૂચત

એકમ અંતગર્

Climate Ch

મેળવવાન

જાહરેનામા

ાણે કરવામાં

અ યાસ (En

દરિમયાન

જમીન, વિન

ો અ યાસ ક

ર િવ તારને

ના િવ તારન

તાઓ થાન

સર્ ટી. આ

સ (EIA) કર

ડીહાઈડ રેઝ

ક ઓગેર્નીક

)મા ં આવે

ત પરીયોજન

ગર્ત આવતો

hange), ન

ની જ રીયા

ા પ્રમાણે તથ

ા ંઆવશે.

nvironment

કરવામા ં

િન, વન પિત

કરવામા ંઆ

અ યાિસત

ની ુ ય લા

સવેર્ ન:ં- ૧તાલકુા:- લરા ય:- ગુઅક્ષાશં:- રેખાશં:- ૭૨૧.૦°સે. ૧૪ મીટર૭૫૦.૯ મી

Taluka: Li

આર. એસોસી

રવા માટે

ઝીન, િફનો

ક કેિમકલ)

છે. તદ્ઉપ

ના ૨૫ જૂન

ો નથી તેથ

નવી િદ હી

ાત રહલે

થા એ પટર્ એ

tal Impact

આવેલ છે.

તઓ અને પ્ર

આ યો છે. પ્ર

કે્ષત્ર તરીકે

ા ણકતાઓ

વ૧૪૫૮, ગામલીંબડી, જીગજુરાત. ૨૨0૩૪’૦૯૭૧0૫૯’૩૮.૧થી ૩૪.૪°સે

મી.મી (સરેરા

Survey No

imbdi, District

Execut

ીએ સની પ્ર

િનમણ ૂકં કર

લ ફોમાર્ ડી

નુ ં પ્ર તાિવ

પરાતં એકમ

૨૦૧૪ના ન

થી MoEF&

પાસેથી પ

છે. આ પ્ર

એપ્રાઈઝલ

Assessmen

પયાર્વરણી

પ્રાણીઓ)

તાિવત એક

નક્કી કરવ

ઓ નીચે મા

વણન મ:- પાણશીણલો:- સરેુ દ્ર

.૭૨”N ૧૦”E સે. (સરેરાશ

ાશ)

M/s. N

o. 1458, Villag

t: Surendranag

tive Summary

પ્ર તાિવત

રવામા ં આ

ીહાઈડ રેઝી

િવત ઉ પાદ

મની જગ્યા

નોટીફીકેશન

&CC (Mini

પયાર્વરણીય

પ્રકીયાના ભ

કમીટી (ઇ

nt Study)

ણીય ઘટકો

પ્ર તાિવત

કમને કે દ્રમ

વામા ંઆવેલ

ાણે છે.

ણા, દ્રનગર,

)

NN Polymers

ge: Panshina,

gar, Gujarat. 

y - Gujarati 9

એકમનો

વેલ છે.

ીન અને

દન EIA

સિૂચત

ન પ્રમાણે

istry Of

ય મજૂંરી

ભાગ પે

ડ ટ્રી-૨)

િડસે બર

વા કે

એકમથી

મા ંલઈને

લ છે.

Page 17: DRAFT E IA REPOR T

Environ

 

 

 

માકં ૬ ૭ ૮ ૯ ૧૦

૧૧ ૧૨ ૧૩

૧૪

૨. હવ

પ્રવતર્મ

થળથી

થી ફે ુ

ગણુવ

પ્રા ત સ

(PM10 &

ની ચકા

ના પિ

કાનપપાણ

nmental Impa

 

T. R. AssoNABET A

ુ યભગૂભર્ જળજમીન પ્રકનજીક નુ ંરેનજીક નુ ંએનજીક નુ ંગ

નજીકનો રનજીકનો રનજીકના જોત

રા ટ્રીય પ્રાણીઓ મ

વા ુ ંપયાવ

માન આસપા

ી ૧૦ િકમી

આરી ૨૦૧

ા નક્કી કર

સિુવધાઓના

& PM2.5), સ

ાસણી કરવા

િરણામો નીચે

થળ

પરા ણશીણા

act Assessmen

ociates (AhmeAccredited

ય લા ણ તળની ઉડાઈં કાર રે વે ટેશન એરપોટર્ ગામ

રા ય ધોરીમરા ટ્રીય ધોરીજમીન પરન

ઉપવન -માટેનુ ંઅ ય

વરણ (Air

ાસની હવાન

િત્ર યાના વ

૧૭ દરિમયા

વા માટેના

ા આધારે ન

સ ફર ડાયો

ામા ંઆવી હ

ચેના ટેબલમ

PM૩૩.

૩૧.

nt Report  

edabad)

તાઓ

માગર્ ીમાગર્ ના પાણીના

- જગંલી યાર ય

Environm

ની (Ambie

વતુર્ળાકાર િવ

ાન નમનૂા

થળની પસ

ક્કી કરેલ હ

કસાઈડ (SO

હતી.

મા ંદશાર્ યા

M2.5 .૯૬

.૩૯

૨૫.૩૬ મીકાળી જમીલીંબડી રેઅમદાવાદકાનપરા -પાણશીણાટેટ હાઈવેનેશનલ હભોગાવો નનમર્દા કેન૧૦ િકમી

ment) :-

nt Air) ગણુ

િવ તારમા ં૮

લઈને તેની

સદંગી વાયશુ

હતી. હવાની

O2), નાઈટ્રો

મજુબ છે.

પ રણામPM10 ૭૮.૪૬

૭૭.૩૪

Taluka: Li

વમીટર થી ૬૧ીન, લાલ રેવે ટેશન -દ એરપોટર્- ૦.૬૫ િકમા - ૩ િકમી વે ૩૮ - ૧૮હાઈવે ૮ એનદી – ૨.૨નાલ – ૧.૨ િત્રજયામા ંન

ણવ ા જાણ

૮ અલગ અ

ની ચકાસણી

શા , CPCB

ગણુવ ા ન

ોજન ડાયોક

મ (98thટકાવ

Survey No

imbdi, District

Execut

વણન ૧૧ મીટર તાળ, કાપંવ- ૨૧ િકમી - ૮૫ િકમી મી દિક્ષણ-પદિક્ષણ-પિ.૫ િકમી પિ- ૦.૧૯ િકમિકમી દિક્ષણિકમી દિક્ષણનથી

ણવા માટે પ્ર

અલગ થળેથ

કરવામા ંઆ

B ની માગર્દ

નક્કી કરવા

કસાઈડ (NO

વાર ) SO2 ૧૮.૫૫ 

૨૧.૦૦ 

M/s. N

o. 1458, Villag

t: Surendranag

tive Summary

વાળી જમીનપિ મ ઉ ર-પવૂર્ પિ મ િ મ િ મ મી ઉ ર ણ-પિ મ ણ

પ્ર તાિવત

થી ડીસે બર

આવી હતી.

દિશર્કા અને

માટે પાિટર્ક

O2), CO અ

NO2 ૨૫.૫૪

૨૬.૦૮

NN Polymers

ge: Panshina,

gar, Gujarat. 

y - Gujarati 10

એકમના

ર ૨૦૧૬

હવાની

નજીકની

કલ મેટર

અને VOC

૪ 

૮ 

Page 18: DRAFT E IA REPOR T

Environ

 

 

 

કટારરળોલજશમદવપબાજોવી

 

ન ધ 

આસપા

એર ક્વો

હવાના

અને થિ

એગ્રો વે

રહશેે. સ

ફેલાવ

િનયતં્રક

પાવ

ઉ સ ન

જ રી ન

િસ ટમ

૩. જળ

ભગૂભર્ જ

શકાય

nmental Impa

 

T. R. AssoNABET A

થળ

ર યા લ મતપર પરા જરડા

ટ સાઈટ કાય મયાદા

ધ: CO: Below

સની હવાન

વોલીટીના ધ

પ્રદૂષણનો

િમર્ક યડુ હ

વે ટ/િબ્રકેટસ

સભંિવત બ

માટે ચીમની

તરીકે સાય

વર કટ વખ

ન પણ િનય

નથી. મીથેન

લગાવવામ

ળ પયાવર

જળ તેમજ

કે અ યાિસ

act Assessmen

ociates (AhmeAccredited

PM૩૨.

૨૯.

૩૩.

૩૨.

૩૦.

૩૪.

ા ૬૦ µ

w  Detectable

ના પિરણામ

ધારાધોરણ મુ

મખુ્ય ોત

હીટર, D. G

સ બળતણ

હાર િનકળત

ની ની પયાર્

યક્લોન સેપ

તે વપરાશે

યત ધારાધોર

નોલની રીક

મા ંઆવશે.

ણ (Water

જમીન પર

સત િવ તાર

nt Report  

edabad)

M2.5 .૦૭ 

.૮૯ 

.૨૭ 

.૫૬ 

.૮૧ 

.૯૦ 

µg/m3

e  Limit; VOC

પરથી તાર

મજુબ છે.

ચીમની મ

G. Set અને

તરીકે વાપ

તા પ્રદૂષકો

ત ઉંચાઈ

પરેટર અને બે

તેમા ંબળત

રણો મજુબ

કવરી માટે

r Environ

ના પાણીન

નુ ંભગૂભર્

પ રણામPM10 ૭૧.૦૧

૮૧.૪૬

૭૯.૫૪

૮૦.૪૫

૭૫.૯૧

૮૩.૮૧

૧૦૦ µg/m

C: Below  Det

ણ કાઢી શક

માથંી નીકળત

લેમીનેટેડ શ

પરવામા ંઆ

PM, SO2

રાખવામા ંઆ

બેગ-િફ ટર

તણ તરીકે

રહશેે તેથી

લેમીનેટેડ શ

ment):-

ના નમનૂાઓ

જળ તેમજ

Taluka: Li

મ (98thટકાવ

m3 ૮૦

tectable  Lim

કાય કે હવાન

તા લ ૂગેસ

શી સના ડ્રા

આવશે ની

& NO2

આવશે ટીમ

લગાવવામ

ડીઝલ વાપ

ી D. G. S

શી સના ડ્રા

ઓની ગણુવ

જ જમીન પ

Survey No

imbdi, District

Execut

વાર ) SO2 ૧૬.૯૫ 

૧૮.૩૯ 

૧૭.૯૪ 

૨૦.૩૬ 

૧૯.૦૪ 

૨૧.૮૯ 

૦ µg/m3

mit 

ની ગણુવતા

સ ઉ સ ન કે

યરમાથંી િન

જ િરયાત

હશે ના વ

મ બોઈલર

મા ંઆવશે.

પરવામા ંઆ

et માટે હવ

ાયરની િચમ

ા પરીક્ષણ

પરનુ ંપાણી

M/s. N

o. 1458, Villag

t: Surendranag

tive Summary

NO2 ૨૪.૭૨

૨૮.૧૧

૨૭.૨૧

૨૯.૧૨

૨૬.૪૪

૩૦.૮૦

૮૦ µg/

ા નેશનલ એ

કે ટીમ

િનકળતો ધમુ

૭ મે. ટન

વાતાવરણમ

સાથે હવા

યારે D. G.

આવશે અને

વા પ્રદૂષણ

મની સાથે

પરથી તાર

કૃિષ પ્રવિૃ

NN Polymers

ge: Panshina,

gar, Gujarat. 

y - Gujarati 11

૨ 

૧ 

૧ 

૨ 

૪ 

૦ 

m3

એ બીયટં

બોઈલર

માડો છે.

ન/િદવસ

મા ંયોગ્ય

પ્રદૂષણ

. SET કે

લ ૂ ગેસ

િનયતં્રક

ક ડે સર

રણ કાઢી

િ સિહત

Page 19: DRAFT E IA REPOR T

Environ

 

 

 

થાિનક

નમનૂાઓ

પરનુ ંપ

પાણીની

પ્ર તાિવ

ઘરગ થુ

માટે ૩૭

િદવસ

મેળવવ

ગદંાપાણ

પ્ર તાિવ

ઘરગ થુ

પ્ર તાિવ

લોડાઉ

માથંી િન

ગદું પા

ઓ - ૧

િકલોલી

૧મા ંફર

મા ંભેળ

અને કં

પાણી ઉ

nmental Impa

 

T. R. AssoNABET A

પ્રવિૃ મા

ઓ મા ંડહોળ

પાણી પીવાલ

ી જ ર યાત

િવત પરીયોજ

થ ુવપરાશ મ

૭ િકલોલીટર

ટલુ ં પાણ

વામા ંઆવશે

ણીનો ઉદભવ

િવત પરીયોજ

થ ુગદંા પાણી

િવત પરીયોજ

ઉન, કુલીંગ

િનકળશે. રેઝી

ણી િનકળશે

૧ રી ક્ટ,

ીટર/િદવસ

રીથી વાપર

ળવવામા ંઆ

ડે સેટને આ

ઉદભવશે નિ

act Assessmen

ociates (AhmeAccredited

ાટે યોગ્ય છે

ળાશ અને બ

લાયક પાણી

:-

જના માટે

માટે ૪.૫ િક

ર/ િદવસ

ણી વપરાશે

.

વ અને ગદં

જના માથંી

ણીનો િનકાલ

જનામા ં કુલ

ટાવર પ ,

ઝીન ઉ પાદન

શ તેનુ ંપ્રાથિ

બોઈલર

રહશેે ને આ

વામા ંઆવ

આવશે. અંતમ

આર.ઓ. -૧

િહં અને એક

nt Report  

edabad)

છે. કેટલાક

બૅક્ટેરીયા જો

ીની ગણુવ

પાણીનો કુ

કલોલીટર/ િ

ટલુ ંપાણી

શે. પ્ર તાિવ

ાપાણીનો િન

૪ િકલોલીટ

લ સે ટીંક ટક

૧૫.૭ િકલો

આર.ઓ. રી

ન પ્રિકયા અ

િમક શિુ કર

લો ડાઉન,

આર.ઓ. -

શે અને રી

મા ંઆ ગદંા

મા ંરીસાયક

મ ઝીરો ડી

થળોના ભ

જોવા મળેલ

ાના ધારાધો

કુલ વપરાશ

િદવસ ટલુ

તેમજ ગ્રીન

િવત પરીયોજ

િનકાલ:-

ટર/િદવસ

ક/સોક્પીટ સ

લોલીટર/િદવ

રી કટ, ઉ પ

અને વોશીંગન

ણ કેમીકલ

કુલીંગ ટાવ

૨ મા ંલઈ

ક્ટ ને પ્રાય

પાણીને ઈ

કલ કરવામ

ચા રહશેે

Taluka: Li

ભગૂભર્ જળ

લ છે તે િસવ

ધોરણો (આઇ

શ ૫૧ િકલ

લુ ંપાણી વપ

ન બે ટ ડેવલ

જના માટે

ટલુ ંઘરગ

સી ટમ ારા

વસ ટલુ ં

પાદન પ્રિકય

નુ ં૧.૬ િકલો

ઓકસીડેશન

વર પ નું

જવામા ંઆ

યમરી ટ્રીટેડ

ઈવોપરેટરમાં

મા ંઆવશે

.

Survey No

imbdi, District

Execut

તેમજ જમી

વાય ભગૂભર્

.એસ. ૧૦૫

લોલીટર/િદ

પરાશે યારે

લોપમે ટ મા

જ રી પા

ગ થ ુગદું પ

ા કરવામા ંઆ

ઓ ોિગક ગ

યા અને વોશ

લોલીટર/િદવ

ન ારા કરવ

નુ ંઓ ોગીક

આવશે, પરમી

ડ ગદંાપાણી

ા બા પીભવ

થી આ પ્રિ

M/s. N

o. 1458, Villag

t: Surendranag

tive Summary

મીન પરના

જળ તેમજ

૫૦૦) ની મજુ

વસ રહશેે

ર ઓ ોિગક

ાટે ૯.૫ િકલો

ાણી બોરવે

પાણી ઉદભવ

આવશે.

ગદું પાણી

શીંગ વી પ્ર

વસ ટલુ ંઓ

વામા ંઆવશે

ક ગદું પાણી

મીએટ ને આ

ી સાથે હો

વન કરવામાં

િકયામાથંી ક

NN Polymers

ge: Panshina,

gar, Gujarat. 

y - Gujarati 12

પાણીના

જ જમીન

જબ છે.

માથંી

વપરાશ

લોલીટર/

લ ારા

વશે. આ

બોઈલર

પ્રિકયાઓ

ઓ ોિગક

શે. આર.

ણી ૧૪.૧

આર.ઓ. -

ડીંગ ટક

ા ંઆવશે

કોઈ ગદું

Page 20: DRAFT E IA REPOR T

Environ

 

 

 

૪. જમ

કામગીર

આડકત

હવાના

આડઅસ

મા ં લ

માત્રા (

ન ધનીય

અતે્ર ન

આડઅસ

ઘન કચ

લેવામા ં

૫. વ

અ યાિસ

ચકાસણ

માકં

૧ 

૨ 

૩ 

૪ 

nmental Impa

 

T. R. AssoNABET A

મીન પયાવ

રી તબક્કા

તરી અસરો થ

પ્રદૂષણને ર

સર થશે નિ

લા ટના કામ

(Ground Le

ય આડઅસર

ન ધનીય છે

સર થશે નિહ

ચરાને સભંા

આવશે થ

િન પયાવ

િસત કે્ષત્રમા ં

ણી કરવામા ં

ક  થળ 

ો ટ સ

કાનપરા

પાણશીણ

બાજરડા

act Assessmen

ociates (AhmeAccredited

વરણ

દર યાન હ

થાય છે.

રોકવા માટે

િહં. હવાના

મગીરી તબ

evel Conce

ર થશે નિહ.ં

કે ગદું પા

િહં.

ાળવા, સગં્ર

થી ઘન કચર

વરણ :-

પ્રવતર્માન

આવી હતી.

સાઈટ  

ણા

nt Report  

edabad)

હવા, પાણી,

જ રી બધ

પ્રદૂષણથી

બક્કા દર યા

entration) ન

ાણી જમીન

હ કરવા અ

રાને કારણે જ

વિનનુ ંમા

ના પરીણ

ઘ ઘાટ ુ ત( દવસ

માપન 

૬૩.૪ 

૪૭.૪ 

૪૯.૪ 

૫૨.૮ 

, ઘનકચરા

ધાજ પગલા

જમીન પર

ાન જમીન ન

ના પરીણામ

પર છોડવ

અને તેના િ

જમીન પર

ાપદંડ કાઢવ

ણામો નીચે

તર (Leq) in સ દર યાન)

વીકાય મ

૭૫

૫૫

૫૫

૫૫

Taluka: Li

ના પ્રદૂષણ

લેવામા ંઆ

સીધી અથ

ની સપાટી

મો પરથી ક

વામા ંઆવતુ

િનકાલ માટે

કોઈ આડઅ

વા માટે ૮ અ

પ્રમાણે છે.

dBA  ઘ

મયાદા મ

Survey No

imbdi, District

Execut

ણથી જમીન

આવશે થી

થવા આડકત

પર હવાના

કહી શકાય

તુ ંનથી થી

ટના દરેક િ

અસર થશે ન

અલગ- અલ

ઘ ઘાટ ુ ત(રા ી

માપન 

૫૭.૪ 

૪૩.૦ 

૩૯.૧ 

૩૮.૧ 

M/s. N

o. 1458, Villag

t: Surendranag

tive Summary

પર સીધી

જમીન પર

તરી અસરો

ા િવિવધ પ્ર

કે જમીન પ

થી જમીન પ

િનયતં્રીત પ

નિહં.

લગ થળે ઘ

તર (Leq) in dદર યાન) વીકાય મય

૭૦ 

૪૫ 

૪૫ 

૪૫ 

NN Polymers

ge: Panshina,

gar, Gujarat. 

y - Gujarati 13

અથવા

કોઈ જ

થાય છે

પ્રદૂષકોની

પર કોઈ

પર કોઈ

પગલાઓ

ઘ ઘાટની

dBA 

યાદા

Page 21: DRAFT E IA REPOR T

Environ

 

 

 

માકં

૫ 

૬ 

૭ 

૮ 

ઘ ઘાટન

મજુબ છે

૬. સામ

સામાજી

મહ વની

વ તીનુ ં

પ્ર તાિવ

રોજગાર

દુકાનોમ

આ લ

પસદંગી

થાિનક

આજુબા

nmental Impa

 

T. R. AssoNABET A

ક  થળ 

કટાર યા

રળોલ

જશમતપ

દવપરા

ની ચકાસણી

છે.

મા ક-આ

ક અથર્ ય

ની િવગત છે

પ્રમાણ, કા

િવત પરીયોજ

રી પ્રા ત થ

મા ંવગેરેમા ં

લા ટની કામ

ી કરવામા ં

લોકોની આ

ાજુના િવ તા

act Assessmen

ociates (AhmeAccredited

પર

ીના પિરણામ

િથક પયાવ

થાનો અ

છ. આ કારણ

મગીરીનો પ્ર

જનાને કારણે

થશે. પ્ર તાિવ

રોજગારીની

મગીરી માટે

આવશે. આ

આિથર્ક પિરિ

ારમા ંસાક્ષર

nt Report  

edabad)

ઘ ઘાટ ુ ત( દવસ

માપન 

૫૦.૭

૪૬.૭ 

૫૧.૧ 

૪૫.૪ 

મ પરથી તા

વરણ:-

યાસ એ પ

ણસર અ યા

પ્રકાર વગેરે

ણે કુલ ૬૫

િવત પરીયોજ

ી તકો ઉભી

જ ર લાગે

આજુબાજુના

િ થતી સધુર

તા, આરોગ્ય

તર (Leq) in સ દર યાન)

વીકાય મ

૫૫

૫૫

૫૫

૫૫

ારણ કાઢી શ

પયાર્વરણ ૃ

ાિસત કે્ષત્રમ

જી લા વ ત

ટલા કુશ

જનાને કારણે

થશે.

ગે યા ં થા

િવ તારમાં

રશે અને તે

ય અને રહણે

Taluka: Li

dBA  ઘ

મયાદા મ

શકાય કે ઘ

ૃ થકરણ અ

મા ંસામાજીક

તીગણતરી પ

શળ અને અ

ણે આડકતરી

ાિનક લોકોન

ા ધધંાની ઉ

તથી એકમને

ણીકરણીમા ંસ

Survey No

imbdi, District

Execut

ઘ ઘાટ ુ ત(રા ી

માપન 

૪૨.૨ 

૪૦.૬ 

૪૧.૭ 

૪૪.૦ 

ઘાટ ુ તર

અસર અ યા

અથર્ ય થ

પિુ તકામાથંી

ધર્કુશળ કાર

રી રીતે વી

ની તેમની

ઉ વળ ત

ન કારણે હકા

સધુારો થશે.

M/s. N

o. 1458, Villag

t: Surendranag

tive Summary

તર (Leq) in dદર યાન) વીકાય મય

૪૫ 

૪૫ 

૪૫ 

૪૫ 

ર િનયત ધા

ાસ માટેની

થાની માિહતી

થી મેળવેલ છે

રીગરોને સી

વી કે વાહન

કુશળતાના

તકોને કારણે

ારા મક અસ

.

NN Polymers

ge: Panshina,

gar, Gujarat. 

y - Gujarati 14

dBA 

યાદા

ારાધોરણ

ખબૂ જ

તી વીકે

છે.

ીધી રીતે

વહાર,

આધારે

ણે યાનંા

સર થશે.

Page 22: DRAFT E IA REPOR T

Environ

 

 

 

૭. વ

અ યાિસ

અને પ્રા

અ યાિસ

કરંજ, ખ

કે્ષત્રના

અ યાિસ

પોપટ,

પાલતુ ંપ્ર

નોળીયો

૮. સોલ

મખુ્ય હે

થેલીઓ

ઈટીપી

આવશે.

નકામી

કાબર્નને

વે ટના

મેનેજમે

નહી.

૯. પય

પયાર્વર

બનાવવ

nmental Impa

 

T. R. AssoNABET A

વ પ ર થત

િસત કે્ષત્રનો

ાણી-પક્ષીઓ

િસત કે્ષત્રમા ં

ખીજડો અને

મખુ્ય ખેતીલ

િસત કે્ષત્રમા ં

કાગડો, મો

પ્રાણીઓ ઉપ

ો, સસલા અ

લીડ વે ટ

હઝેાડર્સ વે ટ

ઓ અને ડ્રમ,

કચરાનો +

વપરાયેલું

થેલીઓ અ

ને કોમન ઈ

સગં્રહ મા

મ ટ પિ ત

યાવરણીય

રણ પર થ

વામા ં આવેલ

act Assessmen

ociates (AhmeAccredited

તી અને

િવ તાર મુ

ઓની િવિવધત

થાિનક વન

ન કેસડુો જોવ

લાયક પાકો

સામા ય

ોર, બગલો,

પરાતં જ ં

અને જગંલી સ

મેનેજમે ટ

ટમા ંઈટીપી

એજ કટીંગ

+ ઈવેપોરેશ

ુ ઓઈલ

અને ડ્રમ મજૂં

સીનરરેશન

ાટે અલગ

પરૂતી હશે

યવ થાપ

તી આડઅસ

લ છે. આ

nt Report  

edabad)

વ િવિવધ

મખુ્ય વે ખેત

તા બહ ુઓછ

ન પિતની પ્ર

વા મળેલ છે

છે.

રીતે દેખાત

, કાકંણસાર

ગલી સ તન

સવુરનો સમ

ટ :-

ી કચરો +

વે ટ અને

શન રેસીડ ુ

યબુ્રીકે ટ ત

જૂર થયેલ વે

ન ફેસીલીટી

જગ્યા ફાળ

અને હઝાડર્

પન યોજન

સરોને રોકવ

આ પયાર્વરણ

ધતા શા :-

તીલાયક જમ

છી જોવા મળે

પ્રજાિતઓ

છે. કપાસ, એ

તા પક્ષીઓમ

ર, કલકલીય

ન પ્રાણીઓ

માવેશ થાય

ઈવેપોરેશન

પે ટ કાબર્ન

નો મજુંર

તરીકે પનુઃ

વે ડર ને વે

ી (CHWIF)

ળવશે આથી

સ વે ટ ના

ના:-

વા/નાથવા

ણીય યવ

Taluka: Li

-

મીન ધરાવે

ળેલ છે.

વીકે બાવળ

એરંડા, ચોખ

મા ંચકલી,

યો જોવા મ

જોવા મળેલ

છે.

ન રેસીડ ,ુ વ

નનો સમાવેશ

થયેલ TS

વપરાશે અ

વચાશે અને

) મા ંમોકલ

થી એકમ

લીધે પયાર્

માટે પયાર્

થાપન યોજ

Survey No

imbdi, District

Execut

વ છે. આ િવ

ળ, લીમડો, અ

ખા, ઘઉં અને

કબતૂર, હો

મળે છે. અ

લ હતા ંતેમાં

વપરાયેલુ ંઓ

શ થાય છે.

DF Site મ

અથવા રીસ

એજ કટીંગ

લવામા ંઆવ

ારા અપાયે

વરણ પર ક

વરણીય ય

જનામા ં પય

M/s. N

o. 1458, Villag

t: Surendranag

tive Summary

િવ તારમા ંવ

અરડસૂો, ગુ

ને જુવાર અ

ોલો, કોયલ

યાિસત િવ

ા િનલગાય,

ઓઈલ અને

મા ં િનકાલ

સાઈકલરને

ગ વે ટ તેમજ

વશે. એકમ

યેલી હઝેાડર્

કોઈ આડઅ

યવ થાપન

યાર્વરણને

NN Polymers

ge: Panshina,

gar, Gujarat. 

y - Gujarati 15

વન પિત

લુમહોર,

અ યાિસત

, કાબર,

િવ તારમા ં

િશયાળ,

ન નકામી

કરવામા ં

વેચાશે,

જ પે ટ

હઝેાડર્સ

સ વે ટ

અસર થશે

યોજના

યથાવત

Page 23: DRAFT E IA REPOR T

Environ

 

 

 

જાળવવ

વા કે

પયાર્વર

ન લાગે

કરવામાં

આ પય

એકમની

૧૦. પ

પયાર્વર

ઓળખવ

આ હતે ુ

ચકાસણ

માપદંડ

૧૧. જો

જોખમ

રસાયણો

રક્ષા મક

૧૨. ી

આશરે

કરવામાં

અ ટકાવ

ગ્રીનબે

nmental Impa

 

T. R. AssoNABET A

વા માટે અને

ક ગ્રીન બે

રણીય ઘટકો

ગ તેવા તકેદ

ા ંઆવે છે.

યાવરણીય ય

ની રચના કર

પયાવરણીય

રણીય પિરબ

વા માટે મદ

થી પયાર્વર

ણી, ચીમનીમ

ની ચકાસણી

જોખમનીઆ

આકારણીનો

ણોનો સગં્રહણ

ક સાધનો ક

ીન બે ટ

કુલ ૬,૯૧

ા ંઆવશે કે

વવા વા

ટ તરીકે િવ

act Assessmen

ociates (AhmeAccredited

ને પ્રદૂષકોને

ટ ડવેલપ

ોની ચકસણી

દારીના પગલ

ય થાપન ય

રવામા ંઆવ

ય ચકાસણ

બળોની ચક

દદ પ થશે.

રણીય યવ

માથંી િનકળ

ણી કાયદામા ં

આકારણી:-

નો અ યાસ

ણ અને િનય

ારીગરો ને આ

ડવલપમે

૫ ચો.મી.

ક વિન

કે્ષત્રોમા ં મદ

િવકસાવવામાં

nt Report  

edabad)

ને િનયતં્રીત

કરવો અને

ી યોજનાનો

લા લેવા અ

યોજનાના અ

વશે.

ણી યોજના:

ાસણી િવિવ

થાપન યોજ

ળતા પ્રદૂષકો

જણા યા મુ

જોખમી ર

યતં્રણ MSDS

આપવામા ંઆ

ટ :-

ટલો ગ્રીન

પ્રદૂષણ ત

દદ પ થશે

ા આવશે.

ત માત્રામા ં ર

ને તેનુ ં જત

અમલ કરવ

અને આગ ન

અસરકારક અ

:-

વધ થળોએ

જનાના પાલ

કો તથાપાણ

મજુબ કરવામ

સાયણો મા

S ની માગર્

આવશે.

ન બે ટ િવ

તથા હવા પ્ર

શ. કુલ પ્રો

Taluka: Li

રાખવા માટે

તન કરવુ,ં

વો, વરસાદ

ાથવાના સા

અમલીકરણ

એ પયાર્વરણી

લન માટે આ

ણીનુ ં પયાર્વ

મા ંઆવશે.

ટે કરવામા ં

ગદિશર્કા હઠેળ

િવ તાર પ્રો

પ્રદૂષણ નાથ

ક્ટ િવ તા

Survey No

imbdi, District

Execut

ટ જ રી અને

કામદારોની

ના પાણીનો

ાધનો રાખવ

માટ પયાવ

ણીય અસરો

આસપાસની

રણની ચકા

આવેલ છે

ળ કરવામા ં

ક્ટ સાઈટ

થવા, જમીન

ારના ૩૯

M/s. N

o. 1458, Villag

t: Surendranag

tive Summary

ને યોગ્ય પ

ની યોગ્ય સ

ો સગં્રહ કરવ

વા વગેરેનો

વરણીય ય

તથા તેના

હવાની ગણુ

ાસણી તેમજ

છે. બધા જ

આવશે. ય

ટની અંદર

નનુ ંપ્રદૂષણ/

% ટલો

NN Polymers

ge: Panshina,

gar, Gujarat. 

y - Gujarati 16

પગલાઓં

સલામતી,

વો, આગ

સમાવેશ

થાપન

ફેરફારો

ણવ ાની

જ વિન

જોખમી

યિક્તગત

ડેવલોપ

/ધોવાણ

િવ તાર

Page 24: DRAFT E IA REPOR T

Environ

 

 

 

૧૩. ો સિૂચત િવકાસ, સિૂચત તબક્કા પ્રો ક્ટ આિથર્ક

૧૪.ઉપ 

 

આથી અપયાર્વરપર થત

nmental Impa

 

T. R. AssoNABET A

ો ટ થી

પ્રો ક્ટ આરોજગાર અ

પ્રો ક્ટ કુશદરિમયાન ારા રોજગિવકાસ માટે

પસહંાર :-

પયાર્વરણ અ હવાની

તમામ કોઈ ઈકો જળ પય થાિનક િવિવધ

ધામીર્ક  પયાર્વર

ઘડવામધારાધોસિુનિ ત

પયાર્વરપગલા ં

અનમુાન કરરણીય ય થતી અસરોને

act Assessmen

ociates (AhmeAccredited

થતા લાભ

આસપાસના અને અ ય ફ

શળ, અધર્કુશરોજગારી આ

ગાર મળી શ ેટ કરાશે.

અસર પ ૃ થગણુવ ા પપગલા લેવકોલોજીકલ નયાર્વરણ પર રોજગારીનપયાર્વરણીતથા ઐતીહરણીય યવમા ં આવી છેરણ કરતા ત કરવામા ંરણ ય થાલેશે. 

રી શકાય કેથાપન  યોજઘટાડી શકા

nt Report  

edabad)

ભો:-

િવ તારના ાયદાઓની

શળ અને િબઆપવાની ક્ષકે છે. આ પ્રો

કરણ અ યપર નજીવી વામા ંઆવશેનકુશાન થશેર કોઈ પ્રિતકૂની તકો વધશય પિરમાણોહાિસક થળોથાપન યોજછે. અને આવધી ના આવે છે.  પન એકમ

ક બાધંકામજના અને શમાશે.

સમદુાયનાદ્રિ ટએ લાભ

બનકુશળ કારક્ષમતા ધરાપ્રો કટ કુલ

યાસ પરથી કઅસર થાય. શે નિહ. કળૂ અસર થશે.  ણો વા કે ો પર કોઈ અજના બધા આ પિરણામોજાય એ મ

સિૂચત પ્રો

મ અને કામગમનના પગલ

Taluka: Li

ા અથવા મભદાયી બન

રીગરો ને બવે છે. કુલનફાના ૨.૫

કહી શકાય કેય છે. જો કે

થશે નિહ. 

જગંલ, રા ટ્રઅસર થશે નપ્રદૂષણ પિમો સબંિધતમાટે  પયાર્વ

કટની શ આ

ગીરી તબક્કલાનંા હકારા

Survey No

imbdi, District

Execut

માળખાકીય શે.

બાધંકામ તબ૬૫ ટલા ૫% ટલો ખ

કે... હવા પ્રદૂષ

ટ્રીય બગીચનિહ. િરમાણોને િનત સ ાિધકાવરણ ય થ

આત પછી

ક્કા દરિમયાના મક અમલી

M/s. N

o. 1458, Villag

t: Surendranag

tive Summary

િવકાસ, સ

બક્કા અને કયિક્તઓને

ખચર્ સામાજી

ષણ િનયતં્રણ

ચા, અ યાર

િનયિંત્રત કરરો ારા થાપન એક

પ્રદૂષણ િન

ન મકૂવામાંલીકરણથી  પ

NN Polymers

ge: Panshina,

gar, Gujarat. 

y - Gujarati 17

સામાજીક

કામગીરી ને સિૂચત જીક તેમજ

ણ માટેના

ય અને

રવા માટે થપાયેલ કમ ારા

યતં્રણના ં

ા આવેલ પયાર્વરણ

Page 25: DRAFT E IA REPOR T

TOR

&

IT’S COMPLIANCE

Page 26: DRAFT E IA REPOR T

Environm

 

 

Point wis

J‐11011/3

manufact

Formalde

Limbdi, D 

A tabula

Sr. 

No. 

1  P

is

m

t

E

t

f

c

2  Z

b

3  R

t

a

b

T

4  Bs

mental Impact

 

T. R. AssocNABET Ac

TERM

se complian

337/2016‐IA

turing  of 

ehyde Resin

District: Sure

ar chart with

TO

Public heari

ssues  raise

made by the

the  same  s

EIA/EMP  Re

tabular char

for  com

commitmen

Zero  Liquid 

be adopted.

Revised  layo

to  be  deve

around  the

boundary w

Trees.  

Briquettes  ssource.  

t Assessment R

ciates (Ahmedccredited

MS OF 

ce to the TO

A  II  (I)  dat

Melamine 

n as well as 

endranagar,

h index for 

OR Conditio

ng to be co

ed  and  co

e project pr

should  be 

eport  in  t

rt with  fina

plying  w

nts made.  

Discharge 

.  

out  in whic

loped  for 

e  periphe

with Neem, S

shall  be  use

Report  

dabad)

REFERE

OR points is

ted  29th  Ap

Formaldeh

Laminated 

, Gujarat. 

point wise c

on 

nducted an

ommitment

roponent o

included  i

he  form  o

ncial budge

with  th

system  wi

ch Greenbe

10  m  widt

ery  of  th

Sesam, Tea

ed  as  a  fue

ENCE (T

ssued by EA

pril,  2017  (

hyde  Resin

Sheets at S

compliance 

Additiona

ts 

of 

et 

We  hav

Minutes

with 

budgeta

be  incor

public c

ll  We will 

is given 

‐ 2.  

lt 

Please  r

for  revis

wide gre

the proj

 

Please a

10  for d

for  gre

Neem, S

el  We  are

and  w

Briquett

Taluka: Limb

TOR) CO

AC, MoEFCC

(attached  a

n,  Phenol 

Survey No.: 

is as given 

Complia

al TOR 

ve  taken 

s  of  public

commitme

ary  allocatio

rporated  in

onsultation

adopt ZLD s

in Section 2

refer  Figure

sed plant  la

eenbelt aro

ject.  

also refer Ta

details of p

enbelt  dev

Shisham and

  agree  to  t

would  only

tes as a fuel

Survey No. 1

bdi, District: Su

OMPLIA

C, New Delh

as  Annexur

Formaldeh

1458, Villag

below: 

nce Status 

note  of  th

c  consultati

ents  mad

on  for  the 

 EIA report

system and

2.11.1 (A) o

e  2.5  of  Ch

ayout  show

ound the pe

able 10.1 of 

lant  species

velopment 

d Teak trees

the  stated 

y  use  Ag

l source.  

M/s. NN P

1458, Village: P

urendranagar,

TOR Com

ANCE 

hi vide their 

re  ‐  1)  for 

yde  Resin 

ge: Panshin

he  same. 

ion  along 

de  and 

same will 

t after the 

 the same 

of Chapter 

hapter  ‐  2 

wing 10 m 

riphery of 

Chapter ‐ 

s  selected 

including 

s. 

condition 

ro‐waste/ 

Polymers

Panshina,

, Gujarat. 

mpliance 1

letter no. 

proposed 

&  Urea 

na, Taluka: 

Page 

No. 

 

‐‐ 

2.26

2.8      

10.11 ‐ 10.12 

‐‐ 

Page 27: DRAFT E IA REPOR T

Environm

 

 

Sr. 

No. 

5  S

m

c

o

E

b

j

r

t

 

1  E

2  In

  i.

  ii

  ii

3  P

  i.

  ii

  ii

mental Impact

 

T. R. AssocNABET Ac

TO

Source  of  w

mentioned 

concerned 

obtained  pr

EC. Possibilit

be  explo

ustification 

requirement

the EIA/EMP

AN

Executive Su

ntroduction

Details  o

including

. Informat

propone

i. Importan

project  

Project Desc

Cost  of 

completio

. Product  w

proposed

i. If  expans

existing p

and  whe

available 

reference

 

t Assessment R

ciates (Ahmedccredited

OR Conditio

water  shal

and  app

authority 

rior  to  sub

ty of fresh w

ored  and

for  exis

t  to  be  m

P report. 

NNEXURE ‐ 

ummary 

n  

of  the  EIA

g NABET acc

tion  about 

ent.  

nce and be

cription  

project  &

on  

with  capaci

d project  

sion  project

products wit

ther  adequ

for 

e of earlier E

Report  

dabad)

on 

l  be  clearl

proval  from

shall  b

bmission  fo

water use t

d  prope

sting  wate

mentioned  i

I : GENERIC

A  Consultan

creditation.

the  projec

nefits of th

&  time  o

ities  for  th

t,  details  o

th capacitie

uate  land  i

expansion

EC if any 

ly 

or 

er 

er 

We  hav

CGWB 

groundw

same is 

 

Please 

project 

requirem

describe

2. 

C TOR WITH

Executiv

both  En

been inc

nt 

 

Details 

incorpo

report.

is attach

ct  Refer Se

e  Refer Se

of  Refer Se

e  Refer Se

of 

es 

is 

n, 

Not  ap

project.

Taluka: Limb

Complia

ve  already 

for  obtain

water  abstr

attached as

note  that 

and details

ment  for  t

ed in Sectio

H RESPECT T

ve  summar

nglish  &  Gu

corporated 

of  EIA  co

rated in Ch

NABET  acc

hed as Anne

ection 1.3 in

ection 1.4 in

ection 2.4 of

ection 2.5 of

plicable  as 

  

Survey No. 1

bdi, District: Su

nce Status 

made  appl

ning  permi

raction.  Pro

s Annexure 

this  is  a 

s of total  fre

he  entire 

n 2.11.1 of 

TO INDUSTR

ry  of  the  p

ujarati  lang

in the EIA r

onsultant  h

apter – 12 o

reditation  c

exure – 8. 

n Chapter ‐ 1

n Chapter ‐ 1

f Chapter ‐ 

f Chapter ‐ 

this  is  a 

M/s. NN P

1458, Village: P

urendranagar,

TOR Com

ication  to 

ssion  for 

oof  of  the 

– 3. 

proposed 

esh water 

project  is 

Chapter – 

RY SECTOR  

project  in 

guage  has 

report.  

has  been 

of the EIA 

certificate 

1  

2  

proposed 

Polymers

Panshina,

, Gujarat. 

mpliance 2

Page 

No. 

‐‐

 

 

 

 

2.23 ‐

2.25 

‐‐

12.1‐

12.4 

1.2

1.2 ‐1.3

2.7

2.9

‐‐

Page 28: DRAFT E IA REPOR T

Environm

 

 

Sr. 

No. 

  iv

  v

  v

  v

  v

mental Impact

 

T. R. AssocNABET Ac

TO

v. List  of  r

and  thei

mode of t

v. Other  ch

required 

storage ca

vi. Details  o

hazardou

their man

vii. Requirem

with  sour

approval,

diagram, 

requirem

contract) 

viii. Proc

with  ma

machiner

t Assessment R

ciates (Ahmedccredited

OR Conditio

aw  materia

ir  source 

transportati

hemicals  &

with  qua

apacities 

of  emission

s waste gen

nagement. 

ment  of  wa

rce of  supp

  water 

ent  (reg

cess  descri

ajor  equip

ries, process

Report  

dabad)

on 

als  require

along  wit

ion. 

&  material

antities  an

n,  effluents

neration an

ater,  powe

ply,  status o

balanc

man‐powe

gular  an

ption  alon

pments  an

s  flow  shee

Refer Se

ls 

Refer Se

s, 

Details 

flue  gas

2.11.2 o

Details 

effluent

Chapter

Details 

& their 

2.11.3 o

r, 

of 

er 

Refer Se

the  det

water b

 

It may 

made 

obtainin

abstract

attached

 

Refer  Se

the  det

its sourc

 

Refer  Se

the deta

et 

Process 

flow dia

in Sectio

Taluka: Limb

Complia

ection 2.5  a

ection 2.5  a

of air emiss

s  emission 

of Chapter ‐

of  dome

t  is  given  i

r ‐ 2  

of  hazardo

manageme

of Chapter ‐

ection 2.11

ails  of wat

alance diag

be noted  th

application

ng  permissi

tion.  Proof

d as Annexu

ection  2.9.1

ails  of  pow

ce. 

ection  2.9.2

ails of man‐

description

agram and m

on 2.6 of Ch

Survey No. 1

bdi, District: Su

nce Status 

and 2.7 of C

and 2.7 of C

sion  i.e. pro

is  given  i

 2  

estic  and 

in  Section 

us waste  g

nt is given 

2  

.1 of Chapt

er  consump

ram. 

hat we hav

n  to  CG

on  for  gro

f  of  the 

ure – 3. 

1  of  Chapte

wer  requirem

2  of  Chapte

power requ

n along wit

mass balanc

hapter ‐ 2  

M/s. NN P

1458, Village: P

urendranagar,

TOR Com

hapter ‐ 2 

hapter ‐ 2 

ocess and 

n  Section 

industrial 

2.11.1  of 

generation 

in Section 

ter  ‐ 2  for 

ption  and 

ve  already 

GWB  for 

oundwater 

same  is 

er  ‐  2  for 

ment  and 

er  ‐  2  for 

uirement. 

h process 

ce is given 

Polymers

Panshina,

, Gujarat. 

mpliance 3

Page 

No. 

2.9 & 

2.18 

2.9 & 

2.18 – 

2.19 

2.28 –

2.32 

2.23 –

2.27 

2.32 –

2.33 

2.23‐

2.25 

 

 

 

 

 

 

 

 

2.20 

 

 

 

2.20‐

2.21 

2.10 –

2.17 

 

Page 29: DRAFT E IA REPOR T

Environm

 

 

Sr. 

No. 

  ix

  x

mental Impact

 

T. R. AssocNABET Ac

TO

(quantitie

products 

x. Hazard  id

of propos

. Expansion

proposals

a. Copy o

Cleara

Amend

obtain

MOEF/

attach

certifie

Monito

Region

Minist

Forest 

30th M

of  com

stipula

enviro

includi

be  pr

status 

Consen

ongoin

the  pr

be  att

EMO r

b. In  cas

has 

enviro

reason

under 

EIA  No

t Assessment R

ciates (Ahmedccredited

OR Conditio

es) from raw

to be provid

dentification

sed safety sy

n/moderniz

s: 

of all the En

nce(s) 

dments 

ed for the p

/SEIAA 

ed  as  an  A

ed  copy  of

oring  Repo

nal  Office

ry  of  Enviro

as  per  cir

May, 2012 o

mpliance  of

ated  in  all 

nmental 

ing  Amend

rovided.  I

of  com

nt  to  Oper

ng/existing o

roject  from

tached  wit

eport. 

e  the  exis

not 

nmental 

ns  for  not

the  provis

otification  1

Report  

dabad)

on 

w material t

ded. 

n and detail

ystems. 

ation 

nvironmenta

includin

theret

project from

shall  b

Annexure.  A

f  the  lates

ort  of  th

e  of  th

onment  an

rcular  date

on  the statu

f  condition

the  existin

clearance

ments  sha

n  addition

mpliance  o

rate  for  th

operation o

m  SPCB  sha

th  the  EIA

sting  projec

obtaine

clearance

t  taking  E

sions  of  th

1994  and/o

o  Major  e

given in

ls  Refer Se

‐ 7.  

al 

st 

us 

ns 

es 

ll 

n, 

of 

of 

ll 

A‐

ct 

e, 

or 

Not  ap

project 

Taluka: Limb

Complia

equipments

 Section 2.9

ection 7.3.2 

plicable  as 

Survey No. 1

bdi, District: Su

nce Status 

s  &  machin

9.5 of Chapt

and 7.3.3 o

this  is  a 

M/s. NN P

1458, Village: P

urendranagar,

TOR Com

neries  are 

ter ‐ 2  

of Chapter 

proposed 

Polymers

Panshina,

, Gujarat. 

mpliance 4

Page 

No. 

2.21‐

2.22 

7.4‐

7.13 

‐‐

Page 30: DRAFT E IA REPOR T

Environm

 

 

Sr. 

No. 

4  S

  i.

  ii

  ii

  iv

mental Impact

 

T. R. AssocNABET Ac

TO

EIA No

provid

to  Es

Certific

Operat

operat

Notific

CTO 

obtain

be 

compli

condit

the SP

Site Details 

.    Location 

covering

Tehsil,   

Justificat

site, wh

consider

i.  A      topo

area      o

and     

1:50,000

A3/A2 

eco‐sens

environm

places. 

ii.  Details w

selection

v.  Co‐ordin

four corn

t Assessment R

ciates (Ahmedccredited

OR Conditio

otification 2

ed.  Copies 

stablish/No 

cate  and 

te  (in  cas

ting  prior

cation  2006

of  FY 

ed  from  th

submitted.

iance  repo

ions  of  con

CB shall be 

  of  the    p

g    village,

District    a

tion  for  se

ether othe

red. 

osheet     of   

f      radius   

site      loc

0/ 1:25,000 

sheet.  (In

sitive  ar

mentally 

w.r.t. option

n of site. 

nates  (lat‐lo

ners of the s

Report  

dabad)

on 

2006 shall b

of  Consen

Objectio

Consent  t

se  of  unit

r  to  EIA

6,  CTE  an

2005‐2006

e SPCB sha

  Furthe

ort  to  th

nsents  form

submitted.

project  sit

,    Taluka

and    State

electing  th

r sites wer

  the      stud

  of      10 km

ation      o

scale on  a

cluding  a

reas  an

sensitiv

n analysis fo

ong)  of  a

site. 

nt 

ts 

6) 

ll 

r, 

a/ 

e, 

Refer Se

requisite

y  

m  

ll 

A  topos

area  a

incorpo

Report. 

 

or  Refer Se

as Secti

report f

ll  Refer  Fi

EIA repo

 

Taluka: Limb

Complia

ection 2.2 o

e details. 

sheet of  the

along  with

rated  as  Fi

 

ection 1.5 o

on 5.3 of C

or the requ

igure  1.1  o

ort.  

Survey No. 1

bdi, District: Su

nce Status 

of Chapter ‐

e 10 km rad

h  site  loc

igure  2.3  in

of Chapter ‐

hapter ‐ 5 o

isite details

f  Chapter  ‐

M/s. NN P

1458, Village: P

urendranagar,

TOR Com

‐ 2 for the 

dius study 

cation  is 

n  the  EIA 

‐ 1 as well 

of the EIA 

s.  

‐  1  of  the 

Polymers

Panshina,

, Gujarat. 

mpliance 5

Page 

No. 

2.1‐ 2.6

2.4

 

 

 

 

 

1.3 ‐1.6

 

5.1‐5.2 

1.3‐1.4

Page 31: DRAFT E IA REPOR T

Environm

 

 

Sr. 

No. 

  v

  v

  v

  v

  ix

  x

mental Impact

 

T. R. AssocNABET Ac

TO

v.  Google  m

of the pr

vi.  Layout 

existing 

proposed

storage 

greenbe

located 

area/Est

Industria

location 

Industria

vii.  Photogr

and exist

site. 

photogra

greenbe

viii. Land use

of     

{identifi

governm

agricultu

water b

shall be

for indu

x.  A  list  of

name and

{10  km

incorpora

the study 

x. Geologica

hydrolog

area shal

t Assessment R

ciates (Ahmedccredited

OR Conditio

map‐Earth 

roject site. 

  maps 

  unit    as

d    unit 

area,  p

lt  area,  uti

within  an

ate/Comple

al  Area 

of  unit 

al area/Esta

raphs  of  th

ting (if appl

If  existi

aphs  of 

lt, in particu

e break‐up 

the      p

ed  and   

ment/privat

ural,  forest,

odies, settl

  included.(n

strial area).

f  major  ind

d type withi

m  radius} 

ted. Land u

area 

al  features

ical  status  o

l be include

Report  

dabad)

on 

downloade

  indicatin

s    well    a

  indicatin

plant  area

ilities  etc. 

n  Industria

ex,  layout  o

indicatin

within  th

ate. 

he  propose

icable) plan

ng,  show

plantation

ular. 

of total lan

project  sit

  acquired

e‐ 

, wasteland

ements, etc

not  require

 

dustries  wit

n study are

shall  b

use details o

s  and  Geo

of  the  stud

d. 

d  Refer  Fi

EIA repo

as 

a, 

If 

al 

of 

Refer  Fi

EIA  repo

the proj

nt 

n/ 

Refer  Fi

EIA repo

e  

}, 

d, 

c. 

Refer Se

land use

 

 

Refer  Se

the  sali

project 

 

ea 

be 

of 

Refer  Se

the requ

Land  us

given in

o‐

dy 

Refer Se

requisite

Taluka: Limb

Complia

igure  2.2  o

ort.  

igure 2.5 of

ort  for deta

ject.  

igure  1.2  o

ort. 

ection 2.3 o

e break‐up o

ection  2.2.3

ient  feature

site. 

ection  2.2.2

uisite detail

se  details o

 Section 3.7

ection 3.6 o

e details. 

Survey No. 1

bdi, District: Su

nce Status 

f  Chapter  ‐

f Chapter –

ailed Plant 

f  Chapter  ‐

of Chapter ‐

of project si

3  of  Chapte

es  of  the 

2 of  Chapte

s. 

of  the  stud

7 of Chapter

of Chapter –

M/s. NN P

1458, Village: P

urendranagar,

TOR Com

‐  2  of  the 

– 2 of  the 

Layout of 

‐  1  of  the 

‐ 2 for the 

ite. 

er  ‐  2  for 

proposed 

er  ‐  2  for 

dy  area  is 

r ‐ 3 

– 3 for the 

Polymers

Panshina,

, Gujarat. 

mpliance 6

Page 

No. 

2.3

2.8

1.4

2.7

 

 

 

2.6 

 

2.5

3.34 ‐

3.40 

3.28‐

3.33 

Page 32: DRAFT E IA REPOR T

Environm

 

 

Sr. 

No. 

  x

  x

  x

5  F

  i

  ii

mental Impact

 

T. R. AssocNABET Ac

TO

xi. Details of

upto 5 km

the site i

any   maj

season ri

flood  oc

based on

the    pas

Flood  Le

and maxi

river  sh

(mega  gr

xii. Status  of

acquisitio

stage  of 

and  expe

possessio

xiii. R&R 

land  in

Governm

Forest and  

. Permiss

the use 

clearanc

recomm

Forest 

applicab

 

i. Landuse

resolutio

(GPS)  o

delineat

case  o

forest la

t Assessment R

ciates (Ahmedccredited

OR Conditio

f Drainage o

m radius of s

s within 1 k

jor  river, pe

ver  discharg

ccurrence 

n  peak  rain

t    30    year

evel  of  the 

imum Flood

all  also  b

reen field pr

f  acquisition

on  is  not

the  acquisi

ected  time 

on of the lan

  details  in

n  line  w

ment policy 

Wildlife rela

ion  and  a

of forest  la

ce),  if 

mendations 

Departm

ble) 

e  map  bas

on  satellit

of  the  pro

ting  the  fo

of  projects

and more th

Report  

dabad)

on 

of the projec

study area. 

km  radius o

eak  and  lea

ge as well  a

  frequenc

fall  data   o

rs.  Details  o

project  sit

d Level of th

e  provided

rojects) 

n  of  land. 

t  complete

ition  proces

of  complet

nd. 

n  respect  o

with  stat

lated Issues

approval  fo

and (forestr

any,  an

of  the Stat

ment.  (

ed  on  Hig

te  imager

oposed  sit

orestland  (i

s  involvin

han 40 ha) 

ct 

If 

of 

n  

as 

cy 

of  

of 

te 

d. 

Refer Se

requisite

If 

e, 

ss 

te 

It  may 

lease.  N

copy is a

of 

te 

Not app

  (if applica

or 

ry 

if 

Not App

ry 

Not App

Taluka: Limb

Complia

ection 3.6 o

e details. 

be  noted 

NA  permiss

attached as

plicable 

able):

plicable 

plicable

Survey No. 1

bdi, District: Su

nce Status 

of Chapter –

that  the  la

ion  and  Le

 Annexure –

M/s. NN P

1458, Village: P

urendranagar,

TOR Com

– 3 for the 

and  is  on 

ase  Deed 

– 2. 

Polymers

Panshina,

, Gujarat. 

mpliance 7

Page 

No. 

3.28‐

3.33 

‐‐

‐‐

‐‐

‐‐

Page 33: DRAFT E IA REPOR T

Environm

 

 

Sr. 

No. 

  ii

  iv

  v

  v

6  E

  i

mental Impact

 

T. R. AssocNABET Ac

TO

ii. Status o

for  ob

forestry

latest 

submitte

v. The  pr

within  1

Parks,  S

Reserve

of  Wild

propone

map  d

Chief W

these  f

project 

recomm

commen

Warden

v. Wildlife 

authent

Wildlife 

Governm

of  Sche

exists in

vi. Copy  of

for  cle

Wildlife 

to  the  S

the Nati

Environmen

. Determin

inversion 

and 

meteorol

t Assessment R

ciates (Ahmedccredited

OR Conditio

of Applicatio

btaining  th

  clearance 

status 

ed. 

ojects  to 

10  km  of  t

Sanctuaries

s,  Migrato

d  Animals, 

ent  shall 

uly  authen

Wildlife Ward

features  v

location 

mendations 

nts of the C

n‐thereon 

Conservati

icated  by 

Warden  o

ment  for  c

edule  I  fau

 the study a

f  applicatio

earance 

(Protection

Standing  Co

ional Board 

ntal Status 

nation  of 

level at the

site‐specific

ogical  d

Report  

dabad)

on 

on submitte

he  stage 

along  wit

shall  b

be  locate

the  Nationa

s,  Biospher

ry  Corridor

the  projec

submit  th

nticated  b

den showin

vis‐à‐vis  th

and  th

o

Chief Wildlif

on Plan dul

the  Chie

of  the  Stat

conservatio

una,  if  an

area 

n  submitte

under  th

n) Act, 1972

ommittee  o

for Wildlife

atmospheri

e project sit

c  micro

ata  usin

Not App

al 

re 

rs 

ct 

by 

or 

fe 

Not app

is  locate

project 

 

ly 

ef 

ny 

Not App

2, 

of 

Not App

ic 

te 

o‐

Site  spe

are give

 

 

Taluka: Limb

Complia

plicable 

plicable as n

ed within  1

site. 

plicable 

plicable 

ecific micro‐

en in Annexu

Survey No. 1

bdi, District: Su

nce Status 

no wild life 

10  km  radi

‐meteorolo

ure – 4.  

M/s. NN P

1458, Village: P

urendranagar,

TOR Com

sanctuary 

us  of  the 

gical data 

Polymers

Panshina,

, Gujarat. 

mpliance 8

Page 

No. 

‐‐

‐‐

 

 

 

‐‐

‐‐

‐‐

 

 

 

Page 34: DRAFT E IA REPOR T

Environm

 

 

Sr. 

No. 

  ii

  ii

  iv

  v

mental Impact

 

T. R. AssocNABET Ac

TO

temperat

hourly wi

and rainfa

i. AAQ data

locations 

NOX,  CO 

relevant 

collected.

stations 

guidelines

the  p

direction,

sensitive 

reserved 

ii. Raw  d

measurem

stations  a

in  the  N

Nov.  200

max.,  ave

for each o

from  dat

should 

annexure

v. Surface w

River  (10

downstre

and other

locations 

guidelines

v. Whether 

polluted 

identified

CC, if yes 

t Assessment R

ciates (Ahmedccredited

OR Conditio

ture,  relativ

ind speed a

all. 

a (except mo

for PM10, 

and  other 

to  the  proj

.  The 

shall  be  b

s and take 

pre‐domina

,  populatio

receptors

forests. 

ata  of 

ment for 12

as  per  freq

NAQQM  No

09  along  w

erage  and 

of the AAQ

ta  of  all  A

be  provid

e to the EIA 

water  qualit

00  m  ups

eam of disc

r surface dr

as per CPC

s. 

the  site  f

stretch 

d  by  the  CP

give details

Report  

dabad)

on 

ve  humidity

and directio

onsoon) at 

PM2.5, SO2

parameter

ject  shall  b

monitorin

based  CPC

into accoun

nt  win

n  zone  an

s  includin

all  AAQ

 weeks of a

uency  give

otification  o

with  –  min

98%  value

Q parameter

AAQ  station

ded  as  a

Report. 

ty  of  nearb

stream  an

harge point

rains at eigh

CB/MoEF&C

alls  near  t

of  rive

PCB/MoEF &

s. 

y, 

Refer  Se

requisite

 

2, 

rs 

nt 

Refer  Se

requisite

 

 

 

ll 

of 

., 

es 

rs 

ns 

Refer  T

requisite

 

 

Please r

of all AA

for all se

 

by 

t) 

ht 

Refer  T

surface 

 

 

er 

Not App

Taluka: Limb

Complia

ection  3.2.1

e details. 

ection  3.2.2

e AAQ data

Table  3.6  o

e detail. 

refer Annex

AQ measur

elected sam

Table  3.12 

water quali

plicable 

Survey No. 1

bdi, District: Su

nce Status 

1  of  Chapte

2  of  Chapte

of  Chapter 

xure – 5 for

rement  for 

mpling statio

of  Chapter

ity data.  

M/s. NN P

1458, Village: P

urendranagar,

TOR Com

er  –  3  for 

er  –  3  for 

–  3  for 

r raw data 

12 weeks 

ons. 

r  –  3  for 

Polymers

Panshina,

, Gujarat. 

mpliance 9

Page 

No. 

3.2 ‐

3.6 

 

 

3.7 –

3.11 

 

 

 

3.10‐

3.11 

 

 

‐‐ 

3.22 ‐

3.24 

‐‐

Page 35: DRAFT E IA REPOR T

Environm

 

 

Sr. 

No. 

  v

  v

  v

  ix

  x

  x

7  Im

  i

mental Impact

 

T. R. AssocNABET Ac

TO

vi. Ground 

minimum

included. 

vii. Noiselocations 

viii. Soil 

CPCB guid

x. Traffic stu

vehicles, 

for  trans

additiona

proposed

arrangem

x. Detailed d

fauna  (te

existing  i

be  given 

to  rar

endanger

I  fauna 

study 

Conservat

prepared 

xi. Socio‐eco

study are

mpact and 

. Assessme

concentra

the stack 

specific m

In case th

a  hilly 

Modelling

t Assessment R

ciates (Ahmedccredited

OR Conditio

water  mo

m at 8  locati

e levels mowithin the s

characteris

delines. 

udy of the a

frequency 

portation  o

al  traffic 

d  project

ment etc. 

description 

errestrial  a

n  the  stud

with  speci

re,  ende

red species.

are  found 

area,  a

tion  Plan 

and furnish

onomic  sta

a. 

Environmen

ent  of  gr

ation of pol

emission ba

meteorologi

he project  i

terrain, 

g  shall  be 

Report  

dabad)

on 

onitoring  a

ions shall b

nitoring at study area.

stic  as  pe

area, type o

of  vehicle

of  materials

due  t

t,  parkin

of flora an

and  aquatic

y  area  sha

al  referenc

emic  an

 If Schedule

within  th

a  Wildlif

shall  b

hed. 

atus  of  th

nt Managem

round  leve

lutants from

ased on site

cal features

s  located o

the  AQI

done  usin

at 

Refer  T

ground 

 

8  Refer Ta

Level M

er  Refer Ta

Charact

of 

es 

s, 

Refer  S

traffic st

c) 

ll 

e‐

fe 

Refer  S

ecology 

 

e  Refer  S

socio  e

area. 

ment Plan

el 

e‐

s. 

Please 

Figure 4

4.12 of C

Taluka: Limb

Complia

Table  3.11 

water quali

able 3.9 of C

onitoring D

able 3.14 of

eristic Data

Section  3.10

tudy data. 

ection  3.8 

& biodivers

ection  3.9 

economic  s

refer Sect

4.1, 4.2 & 4.

Chapter – 4

Survey No. 1

bdi, District: Su

nce Status 

of  Chapter

ty data.  

Chapter – 3

Data.  

f Chapter – 

.  

0  of  Chapt

of  Chapte

sity study d

of  Chapte

status  of  t

ion  4.8  as

.3 & Table 4

4 for requisit

M/s. NN P

1458, Village: P

urendranagar,

TOR Com

r  –  3  for 

 for Noise 

3 for Soil 

ter  3  for 

r  –  3  for 

ata. 

r  –  3  for 

the  study 

s  well  as  

4.10, 4.11, 

te details. 

Polymers

Panshina,

, Gujarat. 

mpliance 10

Page 

No. 

3.19 ‐

3.21 

3.14 ‐

3.15 

3.27

3.67‐

3.68 

3.46‐

3.58 

3.54‐

3.66 

4.18 ‐

4.24 

Page 36: DRAFT E IA REPOR T

Environm

 

 

Sr. 

No. 

  ii

  ii

  iv

mental Impact

 

T. R. AssocNABET Ac

TO

inputs  o

character

the  pote

project o

impact 

emissions

transport

the  area

Details  o

the  inp

modelling

The air q

plotted 

showing 

site, habit

receptors

i. Water  Q

case of di

ii. Impact  o

raw mate

on the su

shall  be  a

In  this 

transport

finished 

(large  qu

cum road

cum‐rail 

examined

v. A  note 

wastewat

operation

reused  f

shall  be

t Assessment R

ciates (Ahmedccredited

OR Conditio

f  the  spe

ristics  for 

ential  impa

n  the AAQ.

of  all  s

tation)  on 

a  shall  be

f  the  mode

put  data 

g shall also b

uality conto

on  a  loc

the  locatio

tation near

s, if any. 

Quality  mod

scharge in w

f  the  trans

erials and e

urrounding e

assessed  an

regard,  o

t  of  raw  m

products 

antities)  by

d transport o

transport 

d. 

on  tre

ter  from dif

ns,  extent  r

for  differen

  included

Report  

dabad)

on 

cific  terrai

determinin

acts  of  th

. Cumulativ

sources  o

(includin

the  AAQ  o

e  assessed

el  used  an

used  fo

be provided

ours shall b

cation  ma

n  of  projec

by, sensitiv

delling  – i

water body

sport  of  th

end product

environmen

nd  provided

options  fo

materials  an

and  waste

y  rail  or  rai

or conveyor

shall  b

atment  o

fferent plan

recycled  an

nt  purpose

.  Complet

ve 

of 

of 

d. 

or 

d. 

ct 

ve 

n  Not  ap

discharg

of wate

ts 

nt 

d. 

or 

es 

l‐

r‐

Refer  S

requisite

of 

nt 

es 

te 

Refer Se

the requ

Taluka: Limb

Complia

pplicable, 

ge from the

r body. 

ection  4.9

e data. 

ection 2.11

uisite detail

Survey No. 1

bdi, District: Su

nce Status 

as  no  wa

e industry in

of  Chapte

.1 of Chapt

s. 

M/s. NN P

1458, Village: P

urendranagar,

TOR Com

astewater 

n any type 

r  –  4  for 

ter  ‐ 2  for 

Polymers

Panshina,

, Gujarat. 

mpliance 11

Page 

No. 

‐‐

4.24 ‐

4.25 

2.23 ‐

2.27 

Page 37: DRAFT E IA REPOR T

Environm

 

 

Sr. 

No. 

  v

  v

  v

  v

  ix

mental Impact

 

T. R. AssocNABET Ac

TO

scheme  o

Character

treated  e

prescribe

discharge

v. Details  o

action  p

emissions

 

vi. Measures

control 

 

vii. Details 

generat

utilizatio

Copies 

utilizatio

hazardo

plant  sh

EMP  sh

of 

recycle/

techniqu

conserv

resource

viii. Proper 

shall be 

Notificat

plan  o

provided

x. Action  pl

developm

i.e. land w

trees  per

t Assessment R

ciates (Ahmedccredited

OR Conditio

of  effluent

ristics of un

effluent  to

d  stand

e under E(P)

of  stack  em

plan  for 

s to meet st

s  for  fugiti

of  hazard

ion  and  th

on  and  m

of  MOU

on  of 

ous  waste 

hall  also  b

all  include 

waste‐m

/reuse/recov

ues, 

ation,  an

e conservat

utilization 

ensured as

tion,  2009.

of  action 

d. 

lan  for  the

ment  plan  in

with not les

r  ha.  Givin

Report  

dabad)

on 

t  treatment

ntreated an

o  meet  th

dards  o

 Rules. 

mission  an

control  o

tandards. 

ve  emissio

dous  wast

heir  storage

management

U  regardin

solid  an

in  cemen

be  included

the  concep

minimization

ver 

Energ

nd  natura

ion. 

of  fly  as

s per Fly As

.  A  detaile

shall  b

e  green  be

n  33 %  are

s than 1,50

g  details  o

t. 

of 

of 

Refer Se

the requ

n  Refer Se

the requ

e, 

t. 

nt 

d. 

pt 

n, 

gy 

al 

Refer Se

the requ

 

 

 

Refer  Se

the deta

Refer Se

the EIA 

lt 

ea 

of 

Refer Se

detailed

Taluka: Limb

Complia

ection 2.11

uisite detail

ection 2.11

uisite detail

ection 2.11

uisite detail

ection  10.9

ails of clean

ection 10.4

report. 

ection 10.5

d greenbelt 

Survey No. 1

bdi, District: Su

nce Status 

.2 of Chapt

s. 

.2 of Chapt

s. 

.3 of Chapt

s. 

 of Chapte

er producti

.2 of Chapt

of Chapter

developme

M/s. NN P

1458, Village: P

urendranagar,

TOR Com

ter  ‐ 2  for 

ter  ‐ 2  for 

ter  ‐ 2  for 

r  ‐  10  for 

on. 

er  ‐ 10 of 

r – 10  for 

nt plan. 

Polymers

Panshina,

, Gujarat. 

mpliance 12

Page 

No. 

2.28 ‐

2.31 

2.31‐

2.32 

2.32‐

2.33 

 

 

 

10.23 

10.9

10.11 –

10.12 

Page 38: DRAFT E IA REPOR T

Environm

 

 

Sr. 

No. 

  x

  x

  x

  x

mental Impact

 

T. R. AssocNABET Ac

TO

species, 

planning 

included. 

around  t

and  a  sc

the  roads

shall also 

. Action 

harvestin

site  sha

harvest  ra

tops  and 

recharge 

also  to 

activities 

conserve 

the  wat

other sou

xi. Total ca

cost/ann

pollutio

shall be 

xii. Action 

environm

be subm

xiii. Onsite 

(natural

Prepare

Manage

Risk  Ass

control. 

plan  sh

District 

Plan. 

t Assessment R

ciates (Ahmedccredited

OR Conditio

width  of 

schedule  e

The green 

the  projec

cheme  for 

s  used  for 

be incorpo

plan  for 

g  measure

all  be  su

ainwater  fr

storm wat

the  ground

use  for  t

at  the  pro

fresh water

er  require

urces. 

pital cost a

num  for  en

n  control 

included. 

plan  for 

mental mon

mitted. 

and  Offsi

  and 

dness  and 

ement  Plan

sessment  a

Disaster  m

hould  be 

Disaster  M

Report  

dabad)

on 

plantation

etc.  shall  b

belt shall b

ct  boundar

greening  o

the  projec

rated. 

rainwate

es  at  plan

bmitted  t

om  the  roo

ter  drains  t

d water  an

the  variou

oject  site  t

r and reduc

ement  from

nd recurrin

nvironmenta

measure

post‐projec

nitoring sha

ite  Disaste

Man‐made

Emergenc

n  includin

and  damag

managemen

linked  wit

Managemen

n, 

ry 

of 

ct 

er 

nt 

of 

us 

Refer Se

the  det

scheme

al 

es 

Refer Se

the EIA 

ct 

ll 

Refer Se

EIA repo

er 

e) 

cy 

nt 

nt 

Refer Se

7 of the

Taluka: Limb

Complia

ection 10.6 

tail  of  rai

ection 10.10

report. 

ection 6.2 o

ort. 

ection 7.10

 details. 

Survey No. 1

bdi, District: Su

nce Status 

of Chapter

n  water  h

0 of Chapte

of Chapter –

& 7.11 of C

M/s. NN P

1458, Village: P

urendranagar,

TOR Com

r – 10  for 

harvesting 

er – 10 of 

– 6 of the 

Chapter – 

Polymers

Panshina,

, Gujarat. 

mpliance 13

Page 

No. 

10.12‐

10.21 

10.23 –

10.24 

6.2 ‐

6.3 

7.37 –

7.50 

Page 39: DRAFT E IA REPOR T

Environm

 

 

Sr. 

No. 

8  O

  i.

  ii

  ii

  iv

mental Impact

 

T. R. AssocNABET Ac

TO

Occupationa

. Plan  and

ensure  th

&  safety

casual wo

i. Details health  s

worker.  If

being eva

format, 

Audiomet

testing (F

vision  an

defect) 

placemen

examinat

the  same

month  an

mentione

age,  sex, 

and depa

ii. Details  of& Safety 

exposure 

whether 

Permissib

If these a

measures

adopted 

PEL  so 

workers c

v. Annual reworkers 

to  Occu

Safety. 

t Assessment R

ciates (Ahmedccredited

OR Conditio

al Health 

d  fund  al

he  occupat

y  of  all  co

orkers 

of  exposu

status  eva

f the worke

aluated by p

chest 

try,  Spirom

ar & Near v

nd  any  o

ECG,  du

nt  and 

ions give  th

e. Details  re

nalyzed  dat

ed  paramet

  duration 

rtment wise

f  existing  O

Hazards. W

levels  of 

they  a

ble Exposure

re not with

s  the  com

to  keep  t

that  hea

can be prese

eport of hea

with  specia

upational  H

Report  

dabad)

on 

llocation  t

ional  healt

ontract  an

ure  specifi

aluation  o

ers’ health  i

pre designe

x  rays

metry,  Visio

vision, colou

ther  ocula

uring  pre

periodica

he details o

egarding  las

ta  of  abov

ters  as  pe

of  exposur

e. 

Occupationa

What are  th

hazards  an

are  withi

e level (PEL

in PEL, wha

mpany  ha

them  withi

lth  of  th

erved 

alth status o

al  referenc

Health  an

Refer Se

the EIA 

ic 

of 

is 

s, 

ur 

ar 

e‐

al 

of 

st 

ve 

er 

re 

Not  ap

project

al 

). 

at 

as 

It may b

project.

taken 

commis

in the Se

of 

Not  ap

project

Taluka: Limb

Complia

ection 10.10

report. 

plicable  as 

be noted th

  Neverthele

by  the 

ssioning of t

ection 7.9 o

plicable  as 

Survey No. 1

bdi, District: Su

nce Status 

0 of Chapte

this  is  a 

hat this is a 

ess, measu

compan

the project 

of Chapter ‐ 

this  is  a 

M/s. NN P

1458, Village: P

urendranagar,

TOR Com

er – 10 of 

proposed 

proposed 

res  to  be 

ny  after 

are  given 

proposed 

Polymers

Panshina,

, Gujarat. 

mpliance 14

Page 

No. 

10.23 –

10.24 

‐‐

 

7.32‐

7.36 

‐‐

Page 40: DRAFT E IA REPOR T

Environm

 

 

Sr. 

No. 

9  C

  i

  ii

  ii

  iv

10  D

f

r

mental Impact

 

T. R. AssocNABET Ac

TO

Corporate E

. Does  the

laid  dow

approved

Directors?

detailed i

. Does  the

prescribe

process 

into  focu

deviation

environm

condition

detailed i

i. What  is  t

or  Admin

company 

environm

ensuring 

environm

condition

system m

v. Does  the 

of  rep

complianc

environm

Board  o

company 

stakehold

reporting

detailed i

Details  reg

facilities  su

restroom et

t Assessment R

ciates (Ahmedccredited

OR Conditio

Environmen

  company 

wn  Environm

d  by  its 

?  If  so, 

n the EIA re

e  Environm

 for standa

/procedure

us  any  infr

  /  violati

mental or fo

ns?  If  so, 

n the EIA. 

the  hierarc

nistrative  o

to  deal 

mental  issue

complianc

mental 

ns?  Details

may be given

company h

porting 

ces/violatio

mental  norm

of  Directo

and/or sha

ders  at  l

  mechanis

n the EIA re

garding  in

ch  as  sani

c. to be pro

Report  

dabad)

on 

t Policy

have  a we

ment  Polic

Board  o

it  may  b

eport. 

ment  Polic

rd operatin

es  to  brin

ringement 

ion  of  th

rest norms 

it  may  b

hical  system

order  of  th

with  th

es  and  fo

ce  with  th

clearanc

s  of  thi

n. 

have  system

of  non

ons  o

ms  to  th

rs  of  th

reholders o

large?  Thi

m  shall  b

eport 

nfrastructur

tation,  fue

ovided to th

ell 

cy 

of 

At  pres

environ

such  a 

operatio

cy 

Our  u

product

to  it tha

have fro

and  any

environ

or 

is 

Not  app

project 

cell will

the  sam

Chapter

n‐

of 

or 

is 

We  hav

Howeve

system 

partners

re 

l, 

Workers

as  truck

basic  a

Taluka: Limb

Complia

sent,  we  h

ment  policy

policy  on

on. 

unit  has 

tion. Nevert

at Environm

ozen will br

y  future  is

ment. 

plicable  as 

but  enviro

  be  establi

me  is  given 

r – 10 of the

ve  not  yet 

er,  we  shal

to  repor

s. 

s  including 

k  drivers w

amenities 

Survey No. 1

bdi, District: Su

nce Status 

have  not  la

y. We will 

nce  our  u

yet  not 

theless, we

mental Polic

ring things  i

ssues  relate

our  is  the 

nment man

shed  and  d

in  Section 

e EIA Repot.

started  pr

l  definitely 

rt  such  i

casual wor

will  be  prov

like  water

M/s. NN P

1458, Village: P

urendranagar,

TOR Com

aid  down 

lay  down 

nit  is  in 

started 

  shall  see 

y that we 

into  focus 

ed  to  the 

proposed 

nagement 

details  for 

10.3.3  of 

roduction. 

set  up  a 

ssues  to 

rkers  such 

ided with 

r  supply, 

Polymers

Panshina,

, Gujarat. 

mpliance 15

Page 

No. 

‐‐

‐‐

10.3

‐‐

‐‐

Page 41: DRAFT E IA REPOR T

Environm

 

 

Sr. 

No. 

la

w

i

o

11  E

  i

12 

13  A

w

14  T

f

s

 

mental Impact

 

T. R. AssocNABET Ac

TO

abour force

well  as  to

ncluding  t

operation ph

Enterprise S

. Adequate 

the  proj

earmarked

Enterprise

based  on 

and  item‐w

time  boun

included. 

developme

be elabora

Any litigat

project 

direction/o

Court of L

if so, deta

included. 

any notice

Environme

1986  or  r

and  Wate

thereof  a

the  notice

of the case

A tabular ch

wise compli

The TORs pr

for a period 

submission o

t Assessment R

ciates (Ahmedccredited

OR Conditio

e during con

o  the  casu

truck  driv

hase. 

Social Comm

funds (at le

ect  cost) 

d  towa

e  Social  C

Public  He

wise details

nd  action  p

Soc

ent  activiti

ated upon. 

ion pending

and/o

order  pass

Law against 

ils thereof 

Has  the  u

e under the 

ent  (Prote

elevant  Sec

er  Acts?  If 

nd  complia

e(s)  and  pre

e. 

hart with ind

iance of abo

rescribed sh

of three ye

of the EIA‐E

Report  

dabad)

on 

nstruction a

ual  worker

vers  durin

mitment (ES

east 2.5 % o

shall  b

ards  th

Commitmen

aring  issue

s  along wit

plan  shall  b

cio‐economi

es  need  t

g against th

r  an

sed  by  an

the project

shall also b

nit  receive

Section 5 o

ection)  Act

ctions  of  A

f  so,  detail

ance/ATR  t

esent  statu

dex for poin

ove TORs. 

hall be valid 

ars for 

EMP reports

as 

rs 

sanitatio

protecti

roads, c

SC)

of 

nt 

es 

ic 

Refer Se

EIA repo

 

ny 

t, 

of 

t, 

ir 

ls 

us 

Not  ap

project

nt  Complie

s. 

We have

Taluka: Limb

Complia

on  facilities

ive  equip

communicat

ection 8.5 o

ort for requ

plicable  as 

ed

e taken not

Survey No. 1

bdi, District: Su

nce Status 

s,  first  aid, 

pments, 

tion etc. 

of Chapter –

isite details

this  is  a 

e of the sam

M/s. NN P

1458, Village: P

urendranagar,

TOR Com

personal 

approach 

– 8 of the 

proposed 

me 

Polymers

Panshina,

, Gujarat. 

mpliance 16

Page 

No. 

8.3

‐‐

‐‐

‐‐

Page 42: DRAFT E IA REPOR T

 

 

 

INDEX

Page 43: DRAFT E IA REPOR T

Environmental Impact Assessment Report  

 

M/s. NN Polymers

Survey No. 1458, Village: Panshina,

Taluka: Limbdi, District: Surendranagar, Gujarat. 

 

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 1

 

INDEX    

CHAPTER 

NO. 

  CONTENT PAGE NO.

1    INTRODUCTION  1.1‐ 1.9

  1.1  Preamble  1.1

  1.2  Purpose of the report 1.1

  1.3  Promoters and their back ground 1.2

  1.4  Need of the project and its importance in the country 1.2

  1.5  Location of the proposed project and siting criteria 1.3

  1.6  Scope of EIA study 1.6

  1.7  Regulatory frame work 1.8

       

2    PROJECT DESCRIPTION 2.1‐2.33

  2.1  Introduction  2.1

  2.2  Project location  2.1

    2.2.1. Justification of site selection 2.5

    2.2.2. List of major industries within 10 km study area 2.5

    2.2.3. Salient features of the proposed project site 2.6

  2.3  Details of project land & plant lay‐out 2.7

  2.4  Capital cost of the proposed project  2.7

  2.5  Details of product and raw material consumption 2.9

  2.6  Manufacturing Process 2.10

    2.6.1. Melamine Formaldehyde Resin 2.10

    2.6.2. Phenol Formaldehyde Resin 2.12

    2.6.3. Urea Formaldehyde Resin 2.14

    2.6.4. Laminated Sheets 2.16

  2.7  Storage details of raw materials and products 2.18

  2.8  Solvent requirement & recovery system 2.19

  2.9  Requirement of Resources 2.20

    2.9.1. Electricity / Power 2.20

    2.9.2. Manpower  2.20

    2.9.3. Water  2.21

    2.9.4. Fuel  2.21

    2.9.5. Plant, Machineries & Utilities 2.21

  2.10  Energy Balance  2.22

Page 44: DRAFT E IA REPOR T

Environmental Impact Assessment Report  

 

M/s. NN Polymers

Survey No. 1458, Village: Panshina,

Taluka: Limbdi, District: Surendranagar, Gujarat. 

 

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 2

 

CHAPTER 

NO. 

  CONTENT PAGE NO.

  2.11  Pollution Potential & Mitigation Measures 2.23

    2.11.1 Water Pollution 2.23

    2.11.2 Air Pollution 2.28

    2.11.3 Solid / Hazardous Waste    2.32

    2.11.4 Noise & Vibration 2.33

     

3    DESCRIPTION OF ENVIRONMENT 3.1‐3.68

  3.1  Introduction  3.1

 

  3.2  Air Environment  3.2

    3.2.1 Micrometeorological Data 3.2

        3.2.1.1 Meteorological Data from Secondary Sources  3.3

        3.2.1.2 Meteorology ‐ Data Generated at the Project Site   3.5

    3.2.2 Selection of AAQ Stations     3.7

        3.2.2.1 Existing AAQ Status 3.7

        3.2.2.2 Baseline Status of AAQ of Study Area 3.11

     

  3.3  Noise Environment 3.12

    3.3.1  Existing Noise Levels 3.12

    3.3.2  Baseline Status of Ambient Noise Quality 3.15

     

  3.4  Water Environment  3.15

    3.4.1 Water Quality 3.15

       3.4.1.1 Sample Collection and Analysis 3.16

       3.4.1.2 Baseline Status of Ground Water 3.21

       3.4.1.3 Baseline Status of Surface Water 3.24

     

  3.5  Soil Environment  3.25

    3.5.1 Methodology of Sample Collection and Analysis 3.25

    3.5.2 Baseline Status of Soil Quality 3.28

     

  3.6  Geo‐Hydrological Features  3.28

     

  3.7  Land Use Status  3.34

    (A) Data Used  3.35

Page 45: DRAFT E IA REPOR T

Environmental Impact Assessment Report  

 

M/s. NN Polymers

Survey No. 1458, Village: Panshina,

Taluka: Limbdi, District: Surendranagar, Gujarat. 

 

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 3

 

CHAPTER 

NO. 

  CONTENT PAGE NO.

    (B) Methodology  3.35

    (C) Interpretation of Remote Sensing Data 3.36

    3.7.1 Topography  3.41

     

  3.8  Ecology   3.44

    3.8.1 Macro Level Approach: Secondary Data Collection  3.44

    3.8.2 Micro Level Approach‐ Field Data Collection 3.44

       3.8.2.1 Floral Status 3.45

       3.8.2.2 Faunal Status  3.45

    3.8.3 Biodiversity Status 3.45

       3.8.3.1 Biodiversity ‐ Status of Flora   3.46

       3.8.3.2 Biodiversity ‐ Status of Fauna  3.49

    3.8.4 Conclusion   3.53

       

  3.9  Socio Economic Environment 3.54

    3.9.1 Introduction 3.54

    3.9.2 Socioeconomics 3.54

    3.9.3 Households  3.55

    3.9.4 Population  3.55

    3.9.5 Occupational Structure 3.57

    3.9.6 Literacy  3.59

    3.9.7 Amenities   3.61

    3.9.8 Site Specific Studies  3.65

     

  3.10  Traffic Survey  3.67

     

4    ANTICIPATED IMPACTS & MITIGATION MAESURES 4.1‐ 4.25

  4.1  Preamble  4.1

  4.2  Prediction and Evaluation of Impacts 4.2

  4.3  Impact Identification 4.3

  4.4  Assessment of Impacts 4.6

  4.5  Quantification of Impacts 4.9

    4.5.1 Environmental Attributes & Relative Importance 4.9

    4.5.2 Magnitude Criteria 4.10

    4.5.3 Matrix Development 4.11

Page 46: DRAFT E IA REPOR T

Environmental Impact Assessment Report  

 

M/s. NN Polymers

Survey No. 1458, Village: Panshina,

Taluka: Limbdi, District: Surendranagar, Gujarat. 

 

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 4

 

CHAPTER 

NO. 

  CONTENT PAGE NO.

  4.6  Mitigation Measures for Impacts on environment during 

Construction Phase  

4.14

  4.7  Mitigation Measures for Impacts on Environment during 

Operational Phase  

4.15

  4.8  Impact on Air Quality 4.18

  4.9  Existing Traffic & Vehicular Pollution 4.24

       

5    ANALYSIS OF ALTERNATIVES  5.1‐5.2

  5.1  Introduction  5.1

  5.2  Project Details   5.1

  5.3  Site Alternatives   5.1

  5.4  Alternative for Technologies 5.2

       

6    ENVIRONMENT MONITORING PROGRAM  6.1‐6.4

  6.1  Introduction   6.1

  6.2  Environment Monitoring Program  6.2

  6.3  Budget for Implementation of Environmental Monitoring Plan  6.3

       

7    ADDITIONAL STUDIES  7.1‐7.50

  A  Public Consultation  7.1

  B  Risk Assessment Study  7.1

  C  Social Impact Assessment, R & R Action Plan 7.1

       

  7.1  Overview of Project 7.2

  7.2   Surrounding Area  7.2

    7.2.1 Objective and Scope 7.2

    7.2.2 Risk Analysis Methodology 7.3

  7.3  Hazard Identification and Risk Analysis 7.3

    7.3.1 Hazard Identification and Risk Analysis 7.4

 

 

7.3.2  Identification  of  Hazardous  Chemicals  used  within  

Premises 

7.4

    7.3.3 Storage Details of Raw Material and Products 7.6

    7.3.4 Hazard Indices 7.13

    7.3.5 Credible Accident Sources/Worst Case Scenarios 7.15

  7.4  Consequence Modeling  7.16

Page 47: DRAFT E IA REPOR T

Environmental Impact Assessment Report  

 

M/s. NN Polymers

Survey No. 1458, Village: Panshina,

Taluka: Limbdi, District: Surendranagar, Gujarat. 

 

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 5

 

CHAPTER 

NO. 

  CONTENT PAGE NO.

    7.4.1 Damage Criteria 7.16

    7.4.2 Details of Model Used for Consequence Analysis 7.19

  7.5  Failure Frequency 7.28

  7.6  Estimation of Effect of Damage / Impact Identification 7.29

  7.7  Summary  7.29

  7.8  Proposed Risk Reduction Measures  7.30

  7.9  Occupational Health Surveillance Program 7.32

    7.9.1  Treatment  Facilities  Provided  to  Workers    affected  by  

accidental Spillage of Chemicals 

7.33

    7.9.2  Minimization  of  the  manual  handling  of  hazardous 

substance 

7.34

    7.9.3 DO’S and DONT’S  7.34

  7.10  Disaster Management Plan 7.37

    7.10.1 Disaster  7.37

    7.10.2 Statutory Provisions 7.37

    7.10.3 On‐Site Emergency Plan 7.37

    7.10.4 Site Plan of the Factory and Surrounding 7.38

    7.10.5 Types of Overall Emergencies 7.38

    7.10.6 Assessment of In‐plant Hazards 7.39

    7.10.7 Emergency Control System 7.39

    7.10.8 General Procedures and responsibilities 7.43

  7.11  Offsite Emergency Preparedness Plan 7.45

     

8    PROJECT BENEFITS 8.1‐8.3

  8.1  Introduction   8.1

  8.2  Employment Potential 8.1

  8.3  Improvement in Physical & Social Infrastructure 8.1

  8.4  Other Tangible Benefits 8.2

  8.5  Corporate Social Responsibility (CSR) 8.3

       

9    ENVIRONMENTAL COST BENEFIT ANALYSIS  9.1

  9.1  Environmental cost benefit analysis  9.1

       

10    ENVIRONMENTAL MANAGEMENT PLAN 10.1‐10.24

  10.1  Introduction  10.1

Page 48: DRAFT E IA REPOR T

Environmental Impact Assessment Report  

 

M/s. NN Polymers

Survey No. 1458, Village: Panshina,

Taluka: Limbdi, District: Surendranagar, Gujarat. 

 

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 6

 

CHAPTER 

NO. 

  CONTENT PAGE NO.

  10.2   Objectives of Environmental Management Plan 10.2

  10.3  Components of Environmental Management Plan 10.2

    10.3.1 Environment Management System (EMS) 10.2

    10.3.2 Environmental Health & Safety (EHS) 10.3

    10.3.3 Environmental Management Cell (EMC) 10.3

  10.4  Environmental Management Plan for Proposed Project 10.4

    10.4.1 Environmental Management during Construction Phase   10.4

    10.4.2 Environmental Management during Operation Phase   10.6

  10.5  Greenbelt Development Plan 10.11

  10.6  Rain Water Harvesting Scheme 10.12

  10.7  Occupational Health Management Plan 10.21

  10.8  Fire & Safety Management Plan 10.22

  10.9  Cleaner Production Technologies 10.23

  10.10  Budget for Environment Protection Measures 10.23

       

11    SUMMARY & CONCLUSION 11.1–11.4

  11.1  Introduction  11.1

  11.2  Air Environment  11.1

  11.3  Water Environment  11.1

  11.4  Noise Environment  11.2

  11.5  Land/Soil Environment  11.2

  11.6  Ecology & Biodiversity 11.3

  11.7  Socio‐Economic Environment 11.3

  11.8  Conclusion  11.3

       

12    DISCLOSURE OF CONSULTANT ORGANIZATION        12.1‐12.4

  12.1  Declaration for Involvement in EIA study 12.1

  12.2  Company Profile   12.3

 

Page 49: DRAFT E IA REPOR T

Environmental Impact Assessment Report  

 

M/s. NN Polymers

Survey No. 1458, Village: Panshina,

Taluka: Limbdi, District: Surendranagar, Gujarat. 

 

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 7

 

LIST OF TABLES

 

TABLE 

NO. LIST OF TABLES  PAGE NO. 

 

1.1  Details of Proposed Product 1.1

1.2  Promoters and their Background 1.2

1.3  General Siting Criteria  1.5

1.4  Scope of the study  1.6

1.5  Regulatory Frame Work 1.8

   

2.1  Salient Features of the Proposed Project Site 2.6

2.2  Area Break‐up of Project Site 2.7

2.3  Break‐up of capital cost for Proposed Project 2.7

2.4  Details of Product  2.9

2.5   Details of Raw Material Consumption 2.9

2.6  Details of Proposed Raw Materials 2.18

2.7  Details of Proposed Products 2.19

2.8  Manpower Requirement 2.21

2.9  Fuel Requirement   2.21

2.10  List of Plant, Machineries and Utilities 2.22

2.11  Energy Balance  2.22

2.12  Stream‐wise Water Requirement & Wastewater Generation 2.23

2.13  Stream‐wise Quality of Effluent 2.27

2.14  Details of Flue Gas Emissions  2.28 

2.15  Details of Air Pollution Control System  2.28 

2.16  Details of Process Gas Emissions  2.31 

2.17  Details of Hazardous Waste Management  2.32 

   

3.1  Period of Meteorological Data Collection  3.2

3.2  Monthly Mean values of Meteorological Data (Secondary Data)  3.3

3.3  Ambient Air Monitoring Locations 3.8

3.4  Air – Parameters Analyzed and Sampling Duration  3.9

3.5  Ambient Air Quality – Methodology  3.9

3.6  Ambient Air Monitoring Results 3.10

3.7  Baseline Status of Ambient Air Quality 3.11

3.8  Noise Monitoring Locations 3.13

Page 50: DRAFT E IA REPOR T

Environmental Impact Assessment Report  

 

M/s. NN Polymers

Survey No. 1458, Village: Panshina,

Taluka: Limbdi, District: Surendranagar, Gujarat. 

 

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 8

 

TABLE 

NO. LIST OF TABLES  PAGE NO. 

3.9  Noise Level Monitoring Data 3.14

3.10  Water Monitoring Locations 3.17

3.11  Water Quality ‐ Physico‐Chemical Analysis of Ground Water 3.19

3.12  Water Quality ‐ Physico‐chemical Analysis of Surface Water 3.22

3.13  Soil Sampling Locations 3.27

3.14  Physico‐Chemical Characteristic of Soil 3.27

3.15  Rainfall Data of the Region 3.29

3.16  Land Use / Land Cover Classification 3.37

3.17  Taxonomic Status of Plant Species 3.46

3.18  Life Form Status of Plant Species 3.46

3.19  Common Tree Species  3.47

3.20  Wild/Forest Tree Species 3.48

3.21  List of Agriculture and Commercial Crop Species Recorded 3.48

3.22  Taxonomical Status of Herpetofauna 3.49

3.23  Overall Status of Terrestrial and Aquatic Birds 3.50

3.24  Overall Status of Mammals 3.52

3.25  List of Villages covered in 10 km Radius Area 3.54

3.26  Population Distribution in the Study Area 3.55

3.27  Occupational Structure in the Study Area 3.58

3.28  Literacy Status in the Study Area 3.60

3.29  Basic amenities detail for study villages covered in 10 km radius  3.61

3.30  Traffic Count Data  3.68

   

4.1  Impact Identification Matrix 4.4

4.2  Assessment of Impacts  4.7

4.3  Environmental Attributes  4.9

4.4  The Activity – Impact Evaluation Matrix 4.11

4.5  Cumulative Impact Matrix  4.13

4.6  Construction Phase: Impacts & its Mitigation Measures 4.14

4.7  Operation Phase: Impacts & its Mitigation Measures 4.15

4.8  Details of Flue Gas Stacks 4.18

4.9  Expected Pollutants and its Emission Rate 4.19

4.10  Predicted 24 Hourly Short term incremental concentration of PM10  4.23

4.11  Predicted 24 hourly short term incremental Concentrations of SO2  4.23

4.12  Predicted 24 hourly short term incremental Concentrations of NO2  4.24

Page 51: DRAFT E IA REPOR T

Environmental Impact Assessment Report  

 

M/s. NN Polymers

Survey No. 1458, Village: Panshina,

Taluka: Limbdi, District: Surendranagar, Gujarat. 

 

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 9

 

TABLE 

NO. LIST OF TABLES  PAGE NO. 

4.13  Assessment of Proposed Traffic Load 4.25

   

5.1  Proposed Technology Alternatives 5.2

   

6.1  Environmental Monitoring Program 6.2

6.2  Budget for Implementation of Environmental Monitoring Plan  6.3

   

7.1  Chemical Properties of Hazardous Chemicals  7.5

7.2  Storage Details of Raw Material 7.6

7.2 (A)  Storage Details of Products 7.7

7.3  Identification Hazard Associated with Storage of Raw Materials  7.7

7.4  Fire & Explosion Index  7.14

7.5  Scenarios Considered for MCA Analysis 7.15

7.6  Damage Due to Incident Radiation Intensities 7.16

7.7  Radiation Exposure and Lethality  7.17

7.8  Damage Due to Peak Over Pressure 7.18

7.9 Consequence  analysis  and  Damage  Distance  (Failure  of  raw 

material storage tanks) 7.21 

7.10  Atmospheric Storage Tank Leak/ Tank Fire Frequencies 7.28

7.11  Estimation of Fatality  7.29

7.12  Types of Emergencies  7.38

7.13  Details of Fire Extinguishers 7.42

7.14  Offsite Action Plan  7.48

   

10.1  Details of Plant Species in Greenbelt 10.11

10.2  Budgetary allocation towards Environmental Management 10.23

   

 

 

 

 

 

 

 

 

Page 52: DRAFT E IA REPOR T

Environmental Impact Assessment Report  

 

M/s. NN Polymers

Survey No. 1458, Village: Panshina,

Taluka: Limbdi, District: Surendranagar, Gujarat. 

 

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 10

 

LIST OF FIGURES

FIGURE 

NO. LIST OF FIGURES  PAGE NO. 

   

1.1  Location of the project site 1.3 

1.2  Photograph of the project site 1.4 

   

2.1  Index Map  2.2 

2.2 Google  Image showing surrounding 1,5,10 km  radius area 

from the project site 2.3 

2.3 Toposheet  showing  surrounding  10  km  radius  area  from 

the project site 2.4 

2.4  Google Map showing nearby Industries 2.5 

2.5  Plant Lay‐out  2.8 

2.6  Methanol Recovery System 2.20 

2.7  Water Balance Diagram 2.25 

2.8  Schematic Flow Diagram of Effluent Treatment Plant 2.26 

     

3.1  Wind Rose Diagram of Entire Year (Secondary Source) 3.4 

3.2  Photograph showing Automatic Weather Station installed 

near project site 

3.5 

3.3  Wind Rose Diagram based on Primary Meteorological Data  3.6 

3.4  Map showing Ambient Air Quality Locations 3.7 

3.5  Photograph showing Ambient Air Monitoring 3.9 

3.6  Map Showing Noise Sampling Locations 3.13 

3.7  Photograph showing Noise Measurement 3.14 

3.8  Photograph  showing  Ground  &  Surface  Water  Sample 

Collection 

3.17 

3.9  Map showing Surface & Ground Water Quality Locations 3.18 

3.10  Photograph showing Soil Sample Collection 3.26 

3.11  Map showing Soil Sampling Locations 3.26 

3.12  Ground Water Prospect Map 3.33 

3.13  Land use  and  Land  cover map of  the 10  km  radius  study 

area 

3.38 

3.14  Satellite Image of the 10 km radius study area 3.39 

3.15  Infrastructure Map of the 10 km radius study area 3.40 

Page 53: DRAFT E IA REPOR T

Environmental Impact Assessment Report  

 

M/s. NN Polymers

Survey No. 1458, Village: Panshina,

Taluka: Limbdi, District: Surendranagar, Gujarat. 

 

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 11

 

FIGURE 

NO. LIST OF FIGURES  PAGE NO. 

3.16  Topography Map of the 10 km radius study area 3.43 

3.17  Photographs showing Surrounding Habitat 3.44 

3.18  Percentage of Total Population Distribution 3.56 

3.19  Percentage Distribution of Workers 3.59 

3.20  Percentage Distribution of Literacy Levels 3.60 

3.21  Photograph showing Socio‐Economic Data Collection 3.64 

3.22  Image showing Traffic Surveying Location 3.67 

     

4.1  Ground Level Concentration of PM10 4.20 

4.2  Ground Level Concentration of SO2 4.21 

4.3  Ground Level Concentration of NO2 4.22 

     

7.1  Methanol Pool Fire (Threat Zone) 7.22 

7.2  Methanol BLEVE Worst Case Scenario (Threat Zone) 7.23 

7.3  Methanol Toxic Dispersion (Threat Zone) 7.24 

7.4 Methanol Toxic Dispersion (1.5 m/s Weather Condition –

Stability Class F) 7.25 

7.5  Formaldehyde (37 %) Toxic Dispersion (Threat Zone) 7.26 

7.6  Phenol Toxic Dispersion (Threat Zone) 7.27 

7.7  Off‐Site Emergency Plan  7.46 

     

10.1  Environmental Management Cell 10.3 

 

 

Page 54: DRAFT E IA REPOR T

Environmental Impact Assessment Report  

 

M/s. NN Polymers

Survey No. 1458, Village: Panshina,

Taluka: Limbdi, District: Surendranagar, Gujarat. 

 

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 12

 

LIST OF ANNEXURES 

ANNEXURE 

NO. 

           LIST OF ANNEXURES

1  TOR Letter issued by MoEFCC, New Delhi

2  Lease Deed Copy including NA permission

3  Proof of CGWB Application 

4  Site Specific Primary Meteorological Data 

5  Raw data of all AAQ measurement for all Sampling Locations 

6  Checklist of Plant Species recorded in and around the Project Site 

7  Material Safety Data Sheets of Raw Materials 

8  Copy of NABET Accreditation Certificate 

9  Copy of NABL Accreditation Certificate