1 Schnat zR 04 May 2009 C:\Daten\Vom_Net z \Ind i e n \Gre en Ce m en te c h2 0 0 9\GCT 2 0 0 9 -0 5 -07 .p p t Page 1 Green Ce ment ech 2 00 9, 7 th & 8 th of M ay, No votel H yde rab ad Upgrading of Ball Mill Cement Grinding Systems with POLYCOM ® by Dr.-Ing. Robert Schnatz Schnat zR 02 Mrz 2005SchnatzR D:\Daten\Vom_Net z\ta iwan-02-04\grind ing-all.ppt04 May2009 C:\Daten\Vom_Netz\Ind ien\Green Cem e n tec h 20 0 9 \GCT 2 0 0 9 - 05-07.ppt Page 2 Green Ce ment ech 2 00 9, 7 th & 8 th of M ay, No votel H yde rab ad Scope of Polysius - Cement Grinding Technology Ball mills High-pressure grinding rolls POLYCOM ® Vertical mills: Dynamic separator SEPOL ® DOROL QUADROPOL ® Cement cooler Static dynamic separator SEPOL ® HR

Dr Robert Schnatz- Polysius

Embed Size (px)

Citation preview

Page 1: Dr Robert Schnatz- Polysius

1

Sc hnatz R 04 M ay 2009 C:\Daten\Vom _Netz \Ind ien\Green Cem entec h2009\GCT 2009-05-07.pptPage 1

Green Cement ech 2009, 7t h & 8 th of M ay, No votel Hyderab ad

Upgrading of Ball Mill Cement GrindingSystems with POLYCOM®

by Dr. -Ing. Robert Schnatz

Sc hnatz R 02 M rz 2005 Sc hnatz R D:\Daten\Vom _Netz \taiwan-02-04\grinding-al l .ppt04 M ay 2009 C:\Daten \Vom _Netz \Indien\Green Cem entec h2009\GCT 2009-05-07.pptPage 2

Green Cement ech 2009, 7t h & 8 th of M ay, No votel Hyderab ad

Scope of Polysius - Cement Grinding TechnologyBall mills

High-pressure grinding rollsPOLYCOM ®

Vertical mills:

Dynamic separator SEPOL®

DOROLQUADROPOL®

Cement cooler

Static dynamicseparatorSEPOL ®HR

Page 2: Dr Robert Schnatz- Polysius

2

Sc hnatz R 04 M ay 2009 C:\Daten\Vom _Netz \Ind ien\Green Cem entec h2009\GCT 2009-05-07.pptPage 3

Green Cement ech 2009, 7t h & 8 th of M ay, No votel Hyderab ad

Ball Mill Combined Grin-ding Plant

Rollermill

+ proven technology + proven technology + proven technology

+ simple maintenance + high flexibility + high drying capability

+ Cement quality ac-cepted by clients

+ Cement quality ac-cepted by clients

+ lowest energy demand

+ lowest Investment cost

+ low energy cost + for blast-furnace slag: leading technology at the market

+ high throughput rates possible

- lowest flexibility! - more complex layout - higher investment cost

- low drying capacity! - higher investment cost - high cement finenesses not possible

- highest energy cost - more complex maintenance

- cement quality not accepted overall

Assets and Drawbacks of the Grinding Systems

Sc hnatz R 04 M ay 2009 C:\Daten\Vom _Netz \Ind ien\Green Cem entec h2009\GCT 2009-05-07.pptPage 4

Green Cement ech 2009, 7t h & 8 th of M ay, No votel Hyderab ad

Ball Mill w/ Separator (ZemSi)

Page 3: Dr Robert Schnatz- Polysius

3

Sc hnatz R 02 M rz 2005 Sc hnatz R D:\Daten\Vom _Netz \taiwan-02-04\grinding-al l .ppt04 M ay 2009 C:\Daten \Vom _Netz \Indien\Green Cem entec h2009\GCT 2009-05-07.pptPage 5

Green Cement ech 2009, 7t h & 8 th of M ay, No votel Hyderab ad

Combined Grinding Plant, Example

Sc hnatz R 04 M ay 2009 C:\Daten\Vom _Netz \Ind ien\Green Cem entec h2009\GCT 2009-05-07.pptPage 6

Green Cement ech 2009, 7t h & 8 th of M ay, No votel Hyderab ad

Case studyBall mill

– current production 120 tph @ 3000 cm²/g– specific power consumption of total system 40 kWh/t– grinding media consumption 80 g/t– liner life time compartment 1 = 30.000h; 2 = 50.000h

Combi grinding upgra de– new production 230 tph @ 3000 cm²/g– specific power consumption of total system of 28 kWh/t– grinding media consumption < 20 g/t– liner life time single compartment: > 80.000h

Finish grinding operation– capacity of 100 tph @ 3000 cm²/g– specific power consumption of total system of 19 kWh/t

Page 4: Dr Robert Schnatz- Polysius

4

Sc hnatz R 02 M rz 2005 Sc hnatz R D:\Daten\Vom _Netz \taiwan-02-04\grinding-al l .ppt04 M ay 2009 C:\Daten \Vom _Netz \Indien\Green Cem entec h2009\GCT 2009-05-07.pptPage 7

Green Cement ech 2009, 7t h & 8 th of M ay, No votel Hyderab ad

Finish Grinding, Example

Sc hnatz R 04 M ay 2009 C:\Daten\Vom _Netz \Ind ien\Green Cem entec h2009\GCT 2009-05-07.pptPage 8

Green Cement ech 2009, 7t h & 8 th of M ay, No votel Hyderab ad

Finish -Grinding Plant

Combined Gri n-ding Plant

Rollermill

+ proven technology + proven technology + proven technology

+ simple maintenance + high flexibility + high drying capability

+ lowest energy demand + Cement quality ac-cepted by clients

+ low energy demand

+ lowest Investment cost

+ lower energy demand + for blast-furnace s lag: leading technology at the market

+ high flexibility + high throughput rates possible

- limited throughput - more complex layout - higher investment cost

- high cement f ineness dif-ficult to obtain

- higher investment cost - high cement finenesses not possible

- more complex maintenance

- cement quality not accepted overall

Assets and Drawbacks of the Grinding Systems

Page 5: Dr Robert Schnatz- Polysius

5

Sc hnatz R 29 J u l 2004 Schnatz R D:\Daten\Vom _Netz \Kesov er\Static_Dy nam ic _Separator.ppt04 M ay 2009 C:\Daten\Vom_Netz \Ind ien\Green Cementec h2009\GCT 2009-05-07.pptPage 9

Green Cement ech 2009, 7t h & 8 th of M ay, No votel Hyderab ad

Separator too small!Replacement or addition of a 2nd one

Long Plant Downtime during Erection

Plant up-grade with Static Separator

Static separator

POL YCOM®

Sc hnatz R 29 J u l 2004 Schnatz R D:\Daten\Vom _Netz \Kesov er\Static_Dy nam ic _Separator.ppt04 M ay 2009 C:\Daten\Vom_Netz \Ind ien\Green Cementec h2009\GCT 2009-05-07.pptPage 10

Green Cement ech 2009, 7t h & 8 th of M ay, No votel Hyderab ad

• Compact De sign - lowBuilding Height

• High intermediate Fineness -High Blaine cements

• Finished Product Extraction -no 2nd separator needed(Plant Upgrades)

• High Separation Efficiency• Robu stness against Wear -

easy and cheap lining

SEPOLθ HR + POLYCOMθ for Cement and Raw Grinding

Page 6: Dr Robert Schnatz- Polysius

6

Sc hnatz R 04 M ay 2009 C:\Daten\Vom _Netz \Ind ien\Green Cem entec h2009\GCT 2009-05-07.pptPage 11

Green Cement ech 2009, 7t h & 8 th of M ay, No votel Hyderab ad

Intermediate productand air

Aeration floor

Air supply duct

Aeration floor

Separating air

Feed material

Grit I

• Modular design

• Wear resistance

• Heat resistance

Demands:

SEPOLθ HR – The Concept

Sc hnatz R 04 M ay 2009 C:\Daten\Vom _Netz \Ind ien\Green Cem entec h2009\GCT 2009-05-07.pptPage 12

Green Cement ech 2009, 7t h & 8 th of M ay, No votel Hyderab ad

Outlet bend

Intermediate productand air

Grit II

Air

Product

SEPOLθ HR – The Concept

Page 7: Dr Robert Schnatz- Polysius

7

Sc hnatz R 04 M ay 2009 C:\Daten\Vom _Netz \Ind ien\Green Cem entec h2009\GCT 2009-05-07.pptPage 13

Green Cement ech 2009, 7t h & 8 th of M ay, No votel Hyderab ad

SEPOLθ HR – The Concept

Sc hnatz R 04 M ay 2009 C:\Daten\Vom _Netz \Ind ien\Green Cem entec h2009\GCT 2009-05-07.pptPage 14

POLYCOM

Page 8: Dr Robert Schnatz- Polysius

8

Sc hnatz R 04 M ay 2009 C:\Daten\Vom _Netz \Ind ien\Green Cem entec h2009\GCT 2009-05-07.pptPage 15

Green Cement ech 2009, 7t h & 8 th of M ay, No votel Hyderab ad

POLYCOM® - Wear Protection

BainiteForged/hardfaced Compound Cast

profiling

Build up welding

Base material

profiling

Base material

profiling

Hard layer

Base material

Sc hnatz R 04 M ay 2009 C:\Daten\Vom _Netz \Ind ien\Green Cem entec h2009\GCT 2009-05-07.pptPage 16

Green Cement ech 2009, 7t h & 8 th of M ay, No votel Hyderab ad

146 roller pairs worldwide

Weight max. 28 t

Roll diameter max. 2,1 m

Roll width max. 1,6 m

Max. Operating time so far > 60.000 h

Worldwide use of bainite (08.2008)

Page 9: Dr Robert Schnatz- Polysius

9

Sc hnatz R 04 M ay 2009 C:\Daten\Vom _Netz \Ind ien\Green Cem entec h2009\GCT 2009-05-07.pptPage 17

Green Cement ech 2009, 7t h & 8 th of M ay, No votel Hyderab ad

87 roller pairs worldwide

Weight max. 12 t

Roll diame ter max. 1,7 m

Roll width max. 1,0 m

Max. Operating time so far > 60.000 h

Worldwide use of compound cast (08.2008)

Sc hnatz R 04 M ay 2009 C:\Daten\Vom _Netz \Ind ien\Green Cem entec h2009\GCT 2009-05-07.pptPage 18

Green Cement ech 2009, 7t h & 8 th of M ay, No votel Hyderab ad

Industrial Applications - Plant Layout

Page 10: Dr Robert Schnatz- Polysius

10

Sc hnatz R 04 M ay 2009 C:\Daten\Vom _Netz \Ind ien\Green Cem entec h2009\GCT 2009-05-07.pptPage 19

Green Cement ech 2009, 7t h & 8 th of M ay, No votel Hyderab ad

Summary• Semi-finish grinding (combi-grinding) plants:

Throughput increase 50 - 200 %• Energy savings combi-grinding plant (cc ball mill system):

20 - 40 %• Energy savings Finish grinding plant: > 50 %• Plant downtime in case of an upgrade is less than a week.• POLYCOM and SEPOL HR – have latest wear protection

materials• Extensive R&D studies resulted in further optimisation of the

ball mill operation. Thus the specific energy consumption is further reduced.

• POLYCOM and SEPOL HR are proven heavy duty equipment for the cement industry.

Sc hnatz R 04 M ay 2009 C:\Daten\Vom _Netz \Ind ien\Green Cem entec h2009\GCT 2009-05-07.pptPage 20

Green Cement ech 2009, 7t h & 8 th of M ay, No votel Hyderab ad

Upgrading of Ball Mill Cement GrindingSystems with POLYCOM®

by Dr. -Ing. Robert Schnatz

Page 11: Dr Robert Schnatz- Polysius

11

Sc hnatz R 04 M ay 2009 C:\Daten\Vom _Netz \Ind ien\Green Cem entec h2009\GCT 2009-05-07.pptPage 21

Ball mill

Grinding aid

SEPOL grits

Inter media te pr oduct

L/D ratio = 2.3 only!

Sc hnatz R 04 M ay 2009 C:\Daten\Vom _Netz \Ind ien\Green Cem entec h2009\GCT 2009-05-07.pptPage 22

Ball mill inlet

Air slide

Fine Ball Charge: 12 – 25 mm, low filling ratio: < 28 %

Page 12: Dr Robert Schnatz- Polysius

12

Sc hnatz R 04 M ay 2009 C:\Daten\Vom _Netz \Ind ien\Green Cem entec h2009\GCT 2009-05-07.pptPage 23

Green Cement ech 2009, 7t h & 8 th of M ay, No votel Hyderab ad

Static dynamic Separator concept

Feed materia l

Hot gas

Grits

Produc t

Process gas

STA

TOSE

PD

ynam

ic S

EPO

L LM

C