9
Downtown Traffic + Planning Analysis Corpus Christi TX Presentation to the TIRZ #3 Board of Directors February 27, 2017

Downtown Traffic + Planning Analysiswebcctx-cms-01.usgovcloudapp.net/sites/default/files/2018-02-27... · Downtown Traffic + Planning Analysis. Corpus Christi TX. Presentation to

Embed Size (px)

Citation preview

Downtown Traffic + Planning AnalysisCorpus Christi TX

Presentation to the TIRZ #3 Board of DirectorsFebruary 27, 2017

2

I. Downtown Traffic + Planning Analysis Investment Strategy

II. One- to Two-Way Conversion Projects in Other Texas Cities

III. The Benefits

IV. The Scope of the First Phase Two-way Conversion Proposal

Overview

3

Town Hall Community Feedback

4

• Dallas– Portions of Houston, Akard, Federal, Field, and Patterson Streets

• Direction from City leaders to convert to two-way back in 2005• Houston street segment between Young and Elm Streets was last and completed in 2014

– North Houston Street and Victory Avenue conversions approved in 2012, completed 2015

– 2012 Approval to convert Elm and Commerce St.

• San Antonio– Main and Soledad Streets (Bond 2012)

• Austin– Completed Cesar Chavez (2006), Brazos (2015),& Fifth Street (2017)– Approved Bond 2012 for Colorado and Bond 2016 for Nueces St.

Texas Two-Way Conversion Examples

5

• Louisville, KY Case Study:– Two one-way streets converted to two-way streets in 2011

– Between 2011 and 2013:

↓ Collisions Decreased (36% and 60%)

↓ Crime Decreased 23% (Citywide slight increase 2011-2013)

↓ Slower/Calmer Traffic

↑ Increased Traffic Volumes

↑ Increased Pedestrian and bike traffic

↑ Increased Business Revenues

↑ Increased Property Improvements (2x)

↑ Increased Property Values (39% on just one street)

↑ Increased Tax Revenues

Source: Gilderbloom, John and Riggs, William et. al.: “Two-ways to Fix Our Downtown Neighborhoods,” University of Louisville Center for Sustainable Neighborhoods. www.sun.louisville.edu

Benefits of Conversion

Current Conditions

6

Two Way Conversion Proposal

7

Two Way Conversion – 1st Phase

8

Chaparral – Under Construction

Lawrence Segment - Completed

9

• Scope of Work:

– Surface Treatment (Fog Seal)

– Restriping

– Traffic Signal Updates

– Street Signs

• Street Segments between Water St. and Shoreline Blvd.– Starr

– Peoples

– Schatzell

– William

– John Sartain

• Example: Recent segment of Lawrence Streetbetween Water Street and Shoreline Boulevard

Project Scope