DOTD letter re: new I-49 refinement

Embed Size (px)

Citation preview

  • 8/16/2019 DOTD letter re: new I-49 refinement

    1/1

     The Department of Transportation and Development (DOTD) is continuing to moveforward with the Tier 1 analysis evaluation. The June 3rd deadline to receiveevaluation scores on the 19 concept renement options has not changed.

     The DOTD reali!es that a signicant community involvement process regardingneigh"orhood revitali!ation strategies in corridor #evels $ and 3 led to the

    development of potential revisions to two series of concept renement options (%and & series) that were presented "y the 'vangeline orridor nitiative (') team tothe mem"ers of the community on *riday+ ,ay $-. e also reali!e that there isinterest within some parts of the community to further e/plore those potentialrevisions. 0lease eep in mind that potential revisions to a concept do not create anew concept which must then "e evaluated under Tier 1. e already have anum"er of renement concept options that are di2cult to distinguish from oneanother. To treat every revision as a new concept+ particularly given the need torespect our agreed upon schedule+ could lead to an unmanagea"le num"er ofconcept renements and continual delays in moving through the process. Thewor completed during the ' design charrette+ more specically+ the potentialmodications to the & series option 4 &'+ can "e evaluated within the consideration

    of the & series options5 & 64'+ provided those concept renements advance in thisprocess. The same holds true for the potential modications to the % series option.

    t is important to note that the '7s potential revisions to concept renementoptions (% and & series)+ which were a "yproduct of developing neigh"orhoodrevitali!ation strategies in corridor #evels $ and 3+ have not "een technically vetted"y the DOTD or the *ederal 8ighway dministration (*8). 'ven though theproposed revisions were not consistent with the stated goals of the T:'; grant andwere outside of the responsi"ilities of the ' as outlined in the ' pu"licinformation hy?+ the DOTD@#afayetteonnector 0artners (#0) Team will "e investigating the feasi"ility of these ideas inthe coming wees should one or more of the % or & series options advance in theprocess.