%642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd Bidder Low Low % of Bidder Bidder Bid % of % of Bid Bid 2013 JNU - Riverside Drive 642 (1) Lump 1 20,000.00 20,000.00 20,000.00 1,444,140 11 Resurfacing & Sidewalk Construction Surveying Sum 50,000.00 20,000.00 0.00 0.00 Construction 3.40% 1.38% 0.00% 0.00% (31553/69527/1141) 1 Bids Tendered 2013 Richardson Hwy MP 18 642 (1) Lump 1 1,000.00 3,000.00 5,000.00 333,965 06 Sheep Creek Bridge Construction Surveying Sum 5,000.00 5,000.00 1,000.00 0.00 Asphalt Surface Repairs 1.79% 1.50% 0.26% 0.00% (39814/62381/1141) 2 Bids Tendered 2014 Dalton Highway M P 642 (1) Lump 1 171,386.00 295,564.33 500,000.00 26,731,479 12 401-414 Reconstruction Construction Surveying Sum 200,000.00 500,000.00 210,000.00 500,000.00 (43191/64035/1141) 0.70% 1.87% 0.75% 1.61% 6 Bids Tendered 2013 Sitka-Harbor Drive 642 (1) Lump 1 30,000.00 30,000.00 30,000.00 2,104,176 12 Pavement Rehabilitation Construction Surveying Sum 25,000.00 30,000.00 0.00 0.00 (38715/67572/1141) 1.32% 1.43% 0.00% 0.00% 1 Bids Tendered 2015 Dalton Highway MP 642 (1) Lump 1 200,000.00 310,000.00 500,000.00 30,973,940 11 379-397 Reconstruction Construction Surveying Sum 200,000.00 230,000.00 200,000.00 500,000.00 (44982/63818/1141) 0.58% 0.74% 0.61% 1.52% 3 Bids Tendered 2014 Sterling Highway MP 173 642 (1) LUMP 1 52,500.00 84,166.67 100,000.00 6,769,000 05 to 174 Pavement CONSTRUCTION SUM 120,000.00 52,500.00 100,000.00 100,000.00 Preservation SURVEYING 1.77% 0.78% 1.44% 1.33% Sterling Highway MP 174 to 179 Pavement Preservation (42821/56176 55260/1141) 3 Bids Tendered 2015 Auke Bay Ferry Terminal 642 (1) LUMP 1 5,000.00 7,838.33 13,000.00 1,516,735 02 Improvements CONSTRUCTION SUM 5,000.00 13,000.00 5,000.00 5,515.00 (43412/67463/1141) SURVEYING 0.56% 0.86% 0.33% 0.36% 3 Bids Tendered 2014 D O T & P F Peger Road 642 (1) LUMP 1 15,000.00 28,373.47 37,950.00 1,381,059 09 Complex Plug- Ins ( C M A CONSTRUCTION SUM 8,100.00 15,674.80 27,000.00 36,592.50 Q 2013) SURVEYING 0.38% 1.13% 1.94% 2.27% (43229/63493/1141) 7 Bids Tendered 2014 IFA Hollis/clark Bay Ferry 642 (1) LUMP 1 50,000.00 54,166.67 60,000.00 6,921,230 07 Terminal Improvements CONSTRUCTION SUM 25,000.00 50,000.00 52,500.00 60,000.00 (41619/67449/0) SURVEYING 0.40% 0.72% 0.64% 0.73% 3 Bids Tendered 2017 Clark Bay Ferry Terminal & 642 (1) LUMP 1 22,900.00 30,300.00 40,000.00 1,419,192 11 Seaplane Float Expanded CONSTRUCTION SUM 27,500.00 22,900.00 40,000.00 28,000.00 Parking (47533//1141) SURVEYING 1.89% 1.61% 2.74% 1.76% 3 Bids Tendered

dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 JNU - Riverside Drive 642 (1) Lump 1 20,000.00 20,000.00 20,000.00 1,444,140 11 Resurfacing & Sidewalk Construction Surveying Sum 50,000.00 20,000.00 0.00 0.00

Construction 3.40% 1.38% 0.00% 0.00%

(31553/69527/1141) 1 Bids Tendered

2013 Richardson Hwy MP 18 642 (1) Lump 1 1,000.00 3,000.00 5,000.00 333,965 06 Sheep Creek Bridge Construction Surveying Sum 5,000.00 5,000.00 1,000.00 0.00

Asphalt Surface Repairs 1.79% 1.50% 0.26% 0.00%

(39814/62381/1141) 2 Bids Tendered

2014 Dalton Highway M P 642 (1) Lump 1 171,386.00 295,564.33 500,000.00 26,731,479 12 401-414 Reconstruction Construction Surveying Sum 200,000.00 500,000.00 210,000.00 500,000.00

(43191/64035/1141) 0.70% 1.87% 0.75% 1.61%

6 Bids Tendered

2013 Sitka-Harbor Drive 642 (1) Lump 1 30,000.00 30,000.00 30,000.00 2,104,176 12 Pavement Rehabilitation Construction Surveying Sum 25,000.00 30,000.00 0.00 0.00

(38715/67572/1141) 1.32% 1.43% 0.00% 0.00%

1 Bids Tendered

2015 Dalton Highway MP 642 (1) Lump 1 200,000.00 310,000.00 500,000.00 30,973,940 11 379-397 Reconstruction Construction Surveying Sum 200,000.00 230,000.00 200,000.00 500,000.00

(44982/63818/1141) 0.58% 0.74% 0.61% 1.52%

3 Bids Tendered

2014 Sterling Highway MP 173 642 (1) LUMP 1 52,500.00 84,166.67 100,000.00 6,769,000 05 to 174 Pavement CONSTRUCTION SUM 120,000.00 52,500.00 100,000.00 100,000.00

Preservation SURVEYING 1.77% 0.78% 1.44% 1.33%

Sterling Highway MP 174 to 179 Pavement Preservation (42821/56176 55260/1141) 3 Bids Tendered

2015 Auke Bay Ferry Terminal 642 (1) LUMP 1 5,000.00 7,838.33 13,000.00 1,516,735 02 Improvements CONSTRUCTION SUM 5,000.00 13,000.00 5,000.00 5,515.00

(43412/67463/1141) SURVEYING 0.56% 0.86% 0.33% 0.36%

3 Bids Tendered

2014 D O T & P F Peger Road 642 (1) LUMP 1 15,000.00 28,373.47 37,950.00 1,381,059 09 Complex Plug- Ins ( C M A CONSTRUCTION SUM 8,100.00 15,674.80 27,000.00 36,592.50

Q 2013) SURVEYING 0.38% 1.13% 1.94% 2.27%

(43229/63493/1141) 7 Bids Tendered

2014 IFA Hollis/clark Bay Ferry 642 (1) LUMP 1 50,000.00 54,166.67 60,000.00 6,921,230 07 Terminal Improvements CONSTRUCTION SUM 25,000.00 50,000.00 52,500.00 60,000.00

(41619/67449/0) SURVEYING 0.40% 0.72% 0.64% 0.73%

3 Bids Tendered

2017 Clark Bay Ferry Terminal & 642 (1) LUMP 1 22,900.00 30,300.00 40,000.00 1,419,192 11 Seaplane Float Expanded CONSTRUCTION SUM 27,500.00 22,900.00 40,000.00 28,000.00

Parking (47533//1141) SURVEYING 1.89% 1.61% 2.74% 1.76%

3 Bids Tendered

Page 2: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 2 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 Kake Ferry Terminal 642 (1) LUMP 1 6,000.00 22,866.67 42,600.00 3,224,740 12 Improvements CONSTRUCTION SUM 20,000.00 6,000.00 20,000.00 42,600.00

(43446/68238/0) SURVEYING 0.66% 0.19% 0.57% 1.04%

3 Bids Tendered

2014 Homer Ferry Terminal 642 (1) Lump 1 5,000.00 14,533.33 21,600.00 2,434,115 12 Improvements CONSTRUCTION Sum 10,000.00 21,600.00 17,000.00 5,000.00

(43414/68223/7546) SURVEYING 0.37% 0.89% 0.63% 0.16%

3 Bids Tendered

2013 HSIP: Northern Lights Blvd 642 (1) LUMP 1 12,800.00 28,990.00 55,000.00 2,488,685 10 At UAA Drive CONSTRUCTION SUM 22,000.00 35,000.00 37,700.00 13,440.00

Channelization SURVEYING 1.02% 1.41% 1.37% 0.49%

Improvements (41670/52119/1141) 6 Bids Tendered

2013 Richardson Highway M P 642 (1)A Lump 1 8,990.00 23,051.60 50,000.00 592,478 08 266-341 Centerline/ Construction Surveying Sum 20,000.00 8,990.00 9,268.00 23,000.00

Shoulder Rumble Strips & 1.44% 1.52% 1.48% 3.35%

Parks Highway M P 305-356 Centerline Rumble Strips (41137/62476 & 62478/1141) 5 Bids Tendered

2013 Richardson Highway M P 642 (1)B Lump 1 8,990.00 15,651.60 25,000.00 592,478 08 266-341 Centerline/ Construction Surveying Sum 15,000.00 8,990.00 9,268.00 19,000.00

Shoulder Rumble Strips & 1.08% 1.52% 1.48% 2.76%

Parks Highway M P 305-356 Centerline Rumble Strips (41137/62476 & 62478/0) 5 Bids Tendered

2013 HSIP: Northern Lights Blvd 642 (10) EACH 1 350.00 528.00 1,000.00 2,488,685 10 At UAA Drive MONUMENT CASE 1,000.00 450.00 500.00 368.00

Channelization 0.05% 0.02% 0.02% 0.01%

Improvements (41670/52119/1142) 6 Bids Tendered

2013 JNU - Riverside Drive 642 (11) Each 5 500.00 500.00 500.00 1,444,140 11 Resurfacing & Sidewalk Adjust Existing 500.00 500.00 0.00 0.00

Construction Monument Case 0.17% 0.17% 0.00% 0.00% (31553/69527/1648) 1 Bids Tendered

2013 Sitka-Harbor Drive 642 (11) Each 17 600.00 600.00 600.00 2,104,176 12 Pavement Rehabilitation Adjust Existing 500.00 600.00 0.00 0.00

(38715/67572/1648) Monument Case 0.45% 0.48% 0.00% 0.00% 1 Bids Tendered

Page 3: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 3 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 Sterling Highway MP 173 642 (16) STATION 448 8.00 9.50 10.50 6,769,000 05 to 174 Pavement PASSING SIGHT 10.00 10.50 8.00 10.00

Preservation DISTANCE 0.07% 0.07% 0.05% 0.06% Sterling Highway MP 174 MEASUREMENT to 179 Pavement Preservation (42821/56176 55260/6976)

2013 JNU - Riverside Drive 642 (3) Hour 40 300.00 300.00 300.00 1,444,140 11 Resurfacing & Sidewalk Three Person Survey 350.00 300.00 0.00 0.00

Construction Party 0.95% 0.83% 0.00% 0.00% (31553/69527/1645) 1 Bids Tendered

2013 HSIP: Northern Lights Blvd 642 (3) HOUR 50 285.00 307.57 340.00 2,488,685 10 At UAA Drive THREE PERSON 275.00 336.00 340.00 299.35

Channelization SURVEY PARTY 0.64% 0.68% 0.62% 0.54% Improvements (41670/52119/1143) 6 Bids Tendered

2014 Sterling Highway MP 173 642 (3) HOUR 110 300.00 316.67 350.00 6,769,000 05 to 174 Pavement THREE PERSON 300.00 350.00 300.00 300.00

Preservation SURVEY PARTY 0.49% 0.57% 0.48% 0.44% Sterling Highway MP 174 to 179 Pavement Preservation (42821/56176 55260/1143) 3 Bids Tendered

2015 Dalton Highway MP 642 (3A) Contingent 1 100,000.00 100,000.00 100,000.00 30,973,940 11 379-397 Reconstruction Three Person Survey Sum 100,000.00 100,000.00 100,000.00 100,000.00

(44982/63818/1645) Party 0.29% 0.32% 0.30% 0.30%

3 Bids Tendered

2014 Dalton Highway M P 642 (3A) Contingent 1 30,000.00 30,000.00 30,000.00 26,731,479 12 401-414 Reconstruction Three Person Survey Sum 30,000.00 30,000.00 30,000.00 30,000.00

(43191/64035/1645) Party 0.11% 0.11% 0.11% 0.10%

6 Bids Tendered

2014 KTN South Tongass 642 (8) Each 1 500.00 662.50 825.00 3,069,946 12 Paving/ Collins Road Adjust Existing 300.00 500.00 825.00 0.00

Guardrail HSIP Monument 0.01% 0.02% 0.02% 0.00% (43547/67674/68412/0) 2 Bids Tendered

2013 JNU - Riverside Drive 642 (9) Each 5 1,000.00 1,000.00 1,000.00 1,444,140 11 Resurfacing & Sidewalk Reference And 500.00 1,000.00 0.00 0.00

Construction Replace Existing 0.17% 0.35% 0.00% 0.00%

(31553/69527/1140) Monument 1 Bids Tendered

2013 Sitka-Harbor Drive 642 (9) Each 17 500.00 500.00 500.00 2,104,176 12 Pavement Rehabilitation Reference Existing 500.00 500.00 0.00 0.00

(38715/67572/1140) Monument 0.45% 0.40% 0.00% 0.00% 1 Bids Tendered

Page 4: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 4 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2017 Clark Bay Ferry Terminal & 642 (9) Each 10 200.00 543.33 1,000.00 1,419,192 11 Seaplane Float Expanded REFERENCE 1,000.00 430.00 1,000.00 200.00

Parking (47533//1141) EXISTING 0.69% 0.30% 0.69% 0.13%

3 Bids Tendered MONUMENT

2009 Gustavus Causeway 642(01) Lump 1 65,000.00 105,000.00 150,000.00 16,952,310 03 Replacement Construction Surveying Sum 50,000.00 100,000.00 65,000.00 150,000.00

(19772/67599/1141) 0.27% 0.59% 0.36% 0.81%

3 Bids Tendered

2010 GLENN HWY: EKLUTNA 642(1) Lump 1 30,000.00 41,750.00 50,000.00 5,859,876 03 TO PARKS HWY Construction Surveying Sum 28,000.00 50,000.00 45,000.00 30,000.00

RESURFACING/CULVERT 0.35% 0.85% 0.70% 0.45%

MP 13.0(FARM AVE)

(27674/52110 52385/1141)

4 Bids Tendered

2009 Glenn Hwy Mp34-42, 642(1) Lump 1 10,000.00 15,250.00 22,000.00 1,697,995 05 Parks To Palmer Construction Surveying Sum 45,000.00 10,000.00 15,000.00 14,000.00

Resurfacing 1.72% 0.59% 0.82% 0.69%

(23312/52015/1141) 4 Bids Tendered

2010 Glenn Hwy: Airport Heights 642(1) Lump 1 25,000.00 40,750.00 48,000.00 11,052,764 01 To Hiland Resurfacing Construction Surveying Sum 32,000.00 45,000.00 48,000.00 25,000.00

(25119/51945/1141) 0.23% 0.41% 0.43% 0.21%

4 Bids Tendered

2009 Seward Highway MP 69 To 642(1) Lump 1 10,000.00 19,100.00 29,600.00 1,145,189 07 MP 75 Pavement Construction Surveying Sum 15,000.00 16,800.00 20,000.00 10,000.00

Refurbishment 0.98% 1.47% 1.73% 0.79%

(23972/52027/1141) 4 Bids Tendered

2009 Glenn Highway: Hiland to 642(1) Lump 1 35,000.00 36,250.00 40,000.00 12,676,055 05 Eklutna Resurfacing/Glenn Construction Surveying Sum 180,000.00 35,000.00 35,000.00 35,000.00

Highway Emergency 0.99% 0.28% 0.27% 0.27%

Bridge Repair, 2009 (21792/52000 51777/1141) 4 Bids Tendered

2012 Kipnuk Boardwalk 642(1) AA1 Lump 1 0.00 10,134.27 15,000.00 11,975,883 06 Improvements Phase II Construction Surveying Sum 8,000.00 15,000.00 12,000.00 10,000.00

Final PS&E 0.07% 0.13% 0.09% 0.07%

(38038/57181/1141) 6 Bids Tendered

2012 Kipnuk Boardwalk 642(1) AA2 Lump 1 0.00 13,119.51 22,000.00 11,975,883 06 Improvements Phase II Construction Surveying Sum 10,000.00 22,000.00 20,000.00 16,500.00

Final PS&E 0.09% 0.18% 0.15% 0.12%

(38038/57181/1141) 6 Bids Tendered

Page 5: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 5 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 HSIP Johns Rd & Klatt Rd 642(1) B Lump 1 16,000.00 17,666.67 21,000.00 4,196,232 03 Intersection Construction Surveying Sum 15,000.00 16,000.00 17,000.00 18,000.00

Improvements, Klatt Rd 0.36% 0.38% 0.40% 0.42%

Sight Distance

Improvements, and HSIP

Bragaw St at 16th Ave

(45607/54599&52120/1141)

6 Bids Tendered

2012 Kipnuk Boardwalk 642(1) BB Lump 1 75,000.00 86,765.61 115,000.00 11,975,883 06 Improvements Phase II Construction Surveying Sum 54,000.00 83,350.00 115,000.00 75,000.00

Final PS&E 0.49% 0.70% 0.83% 0.53%

(38038/57181/1141) 6 Bids Tendered

2016 HSIP Johns Rd & Klatt Rd 642(1) K Lump 1 30,000.00 32,550.00 35,000.00 4,196,232 03 Intersection Construction Surveying Sum 85,000.00 34,000.00 30,300.00 33,000.00

Improvements, Klatt Rd 2.04% 0.81% 0.72% 0.77%

Sight Distance

Improvements, and HSIP

Bragaw St at 16th Ave

(45607/54599&52120/1141)

6 Bids Tendered

2009 Yak-Area wide Paving 642(1) Lump 1 56,000.00 72,000.00 100,000.00 5,317,010 10 (25013/68345/1141) Construction Survey Sum 30,000.00 100,000.00 56,000.00 60,000.00

3 Bids Tendered 0.43% 1.88% 0.91% 0.86%

2009 Yak-Area wide Paving 642(1) Hour 715.0 78.32 100.70 139.86 5,317,010 10 (25013) Construction Survey (Alt) 41.96 139.86 78.32 83.92

3 Bids Tendered 0.43% 1.88% 0.91% 0.86%

2009 Dalton Highway Culverts, 642(1) Lump 1 95,000.00 206,666.67 500,000.00 17,738,224 12 M P 260-321 Construction Surveying Sum 187,000.00 95,000.00 500,000.00 135,000.00

(25514/62622/1141) 0.87% 0.54% 2.56% 0.62%

9 Bids Tendered

2011 Sand Point School Loop 642(1) Lump 1 75,000.00 89,000.00 134,000.00 4,599,790 02 Road (33007/52408/1141) Construction Surveying Sum 50,000.00 90,000.00 75,000.00 80,000.00

7 Bids Tendered 0.80% 1.96% 1.61% 1.19%

2011 Nome - Council M P 642(1) Lump 1 40,000.00 120,909.09 200,000.00 4,359,365 01 62-73.6 Construction Surveying Sum 200,000.00 150,500.00 126,500.00 84,000.00

(29073/60400/1141) 3.30% 3.45% 2.64% 1.59%

11 Bids Tendered

2018 Chena Ridge Cripple 642(1) Lump 1 10,000.00 23,285.71 38,000.00 1,950,325 04 Creek Culvert Construction Surveying Sum 15,000.00 10,000.00 38,000.00 18,000.00

Replacement 0.85% 0.51% 1.77% 0.76%

(46349/60624/1141) 7 Bids Tendered

2010 Seward Highway MP 642(1) Lump 1 50,000.00 50,000.00 50,000.00 7,310,434 10 115-124 Resurfacing Construction Surveying Sum 60,000.00 50,000.00 50,000.00 0.00

(32033/52491/1141) 0.64% 0.68% 0.65% 0.00%

2 Bids Tendered

Page 6: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 6 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2011 Dalton Hwy MP 274-289 642(1) Lump 1 140,000.00 234,428.57 321,000.00 27,690,520 04 Rehabilitation Construction Surveying Sum 150,000.00 300,000.00 321,000.00 300,000.00

(26934/67018/1141) 0.45% 1.08% 1.09% 0.98%

7 Bids Tendered

2009 Richardson Highway MP 642(1) Lump 1 3,500.00 10,705.00 15,000.00 228,000 09 210 & MP 216 Curve Construction Surveying Sum 15,000.00 12,500.00 3,500.00 11,025.00

Reconstruction 4.01% 5.48% 1.34% 3.98%

(25114/77237/1141) 5 Bids Tendered

2010 Huslia Landfill Road 642(1) Lump 1 32,000.00 54,000.00 70,000.00 1,496,225 01 (14652/62628/1141) Construction Surveying Sum 40,000.00 32,000.00 70,000.00 60,000.00

3 Bids Tendered 1.93% 2.14% 3.51% 2.09%

2009 Parks Highway MP 72-83, 642(1) Lump 1 220,000.00 284,285.71 350,000.00 20,758,919 09 Willow to Kashwitna Construction Surveying Sum 250,000.00 250,000.00 220,000.00 245,000.00

(24913/54985/1141) 0.91% 1.20% 1.03% 1.09%

7 Bids Tendered

2011 Glacier Highway Extension 642(1) Lump 1 70,000.00 86,000.00 96,000.00 2,556,698 04 (32937/69583/1141) Construction Surveying Sum 50,000.00 70,000.00 92,000.00 96,000.00

3 Bids Tendered 1.65% 2.74% 3.16% 2.12%

2018 AMATS: Abbott Road 642(1) Lump 1 60,000.00 71,250.00 75,000.00 5,167,568 05 Rehab - Phase II Construction Surveying Sum 40,000.00 60,000.00 75,000.00 75,000.00

(48404//7546) 0.79% 1.16% 1.43% 1.42%

4 Bids Tendered

2009 Phillips Field Road 642(1) Lump 1 30,000.00 33,750.00 38,000.00 1,588,185 09 Upgrade Construction Surveying Sum 30,000.00 34,000.00 30,000.00 33,000.00

(23832/65199/1141) 1.06% 2.14% 1.81% 1.81%

4 Bids Tendered

2017 AMATS: Bicycle Plan 642(1) Lump 1 14,100.00 17,050.00 20,000.00 745,846 11 Implementation Eagle Construction Surveying Sum 25,000.00 20,000.00 14,100.00 0.00

River 2.88% 2.68% 1.70% 0.00%

AMATS: Bicycle Plan Implementation Peterkin Ave, Meyer to N. Bunn Eagle River and Peterkin Avenue, Meyer to N. Bunn (47512//1141) 2 Bids Tendered

2011 Richardson Hwy MP 642(1) Lump 1 48,000.00 62,666.67 90,000.00 7,389,044 04 340-346 Resurfacing ( Construction Surveying Sum 50,000.00 48,000.00 90,000.00 50,000.00

Moose Creek) 0.66% 0.65% 1.21% 0.64%

(33145/63362/1141) 3 Bids Tendered

Page 7: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 7 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2010 Weigh-in-Motion Rehab: 642(1) Lump 1 14,700.00 16,838.33 18,815.00 3,851,734 01 Minnesota Dr. Near Construction Surveying Sum 40,000.00 18,815.00 14,700.00 17,000.00

Raspberry Rd., Sterling 1.82% 0.49% 0.36% 0.40%

Hwy MP 88.4, Glenn Hwy MP 53.3 (26218/51059/1141) 3 Bids Tendered

2018 FMATS Area Surface 642(1) Lump 1 50,000.00 55,000.00 60,000.00 2,540,774 04 Upgrades FFY2018 Construction Surveying Sum 100,000.00 60,000.00 55,000.00 50,000.00

(47333/90243/1141) 3.34% 2.36% 2.13% 1.80%

3 Bids Tendered

2009 HOONAH FERRY 642(1) Lump 1 6,450.00 21,483.33 38,000.00 1,720,852 12 TERMINAL TO AIRPORT Construction Surveying Sum 20,000.00 38,000.00 20,000.00 6,450.00

PAVEMENT 0.78% 2.21% 1.11% 0.29%

REHABILITATION (23195/68909/1141) 3 Bids Tendered

2009 Hoonah Ferry Terminal 642(1) Lump 1 7,000.00 27,833.33 45,000.00 3,127,459 12 Improvements Construction Surveying Sum 40,000.00 31,500.00 45,000.00 7,000.00

(25535/67813/1141) 1.21% 1.01% 1.38% 0.20%

3 Bids Tendered

2018 FMATS Yukon Drive 642(1) Lump 1 45,000.00 59,375.00 82,500.00 2,077,001 05 Improvements Construction Surveying Sum 40,000.00 55,000.00 55,000.00 82,500.00

(46581//1141) 1.62% 2.65% 2.64% 3.86%

4 Bids Tendered

2017 Ktn: Front, Mill, And 642(1) Lump 1 250,000.00 250,000.00 250,000.00 9,681,105 11 Stedman Streets Construction Surveying Sum 200,000.00 250,000.00 0.00 0.00

Reconstruction 2.41% 2.58% 0.00% 0.00%

(47761/Z681600000/1141) 1 Bids Tendered

2009 Chena Pump Road/Roland 642(1) Lump 1.0 5,000.00 8,020.00 13,200.00 96,927 12 Road Right Turn Lane Construction Surveying Sum 2,500.00 5,000.00 5,900.00 6,000.00

(19832) (Alt) 2.05% 5.16% 5.91% 5.07%

5 Bids Tendered

2010 Richardson Highway M P 642(1) Lump 1 31,000.00 48,000.00 100,000.00 2,980,832 02 265-267 Rehabilitation & Construction Surveying Sum 25,000.00 34,000.00 38,000.00 31,000.00

Resurfacing 0.69% 1.14% 1.22% 0.97%

(25033/63146/1141) 6 Bids Tendered

2010 N R R R - Hwy Crossing 642(1) Lump 1.0 2,500.00 9,392.86 21,000.00 329,700 11 Appurtenances Construction Surveying Sum 2,500.00 2,500.00 6,250.00 12,000.00

Crashworthiness (Alt) 0.54% 0.76% 1.64% 2.78%

Upgrades ( H S I P) (23833) 7 Bids Tendered

2010 Steese Hwy M P 62-81 642(1) Lump 1 167,000.00 221,400.00 270,000.00 20,807,850 11 Surface Treatment Construction Surveying Sum 273,000.00 200,000.00 250,000.00 167,000.00

(30374/60916/1141) 1.22% 0.96% 1.17% 0.78%

5 Bids Tendered

Page 8: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 8 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2010 N R R R - Hwy Crossing 642(1) Lump 1 2,500.00 9,392.86 21,000.00 329,700 11 Appurtenances Construction Surveying Sum 2,500.00 2,500.00 6,250.00 12,000.00

Crashworthiness 0.54% 0.76% 1.64% 2.78%

Upgrades ( H S I P) (23833/62141/1141) 7 Bids Tendered

2009 Central Region Rumble 642(1) Lump 1 2,500.00 26,500.00 50,000.00 1,447,224 08 Strips Phase II Construction Surveying Sum 20,000.00 25,000.00 2,500.00 30,000.00

(23672/51047/1141) 1.09% 1.73% 0.16% 1.63%

5 Bids Tendered

2010 Richardson Highway M P 642(1) Lump 1.0 31,000.00 48,000.00 100,000.00 2,980,832 02 265-267 Rehabilitation & Construction Surveying Sum 25,000.00 34,000.00 38,000.00 31,000.00

Resurfacing (25033) (Alt) 0.69% 1.14% 1.22% 0.97%

6 Bids Tendered

2010 Steese Hwy M P 62-81 642(1) Lump 1.0 167,000.00 221,400.00 270,000.00 20,807,850 11 Surface Treatment (30374) Construction Surveying Sum 273,000.00 200,000.00 250,000.00 167,000.00

5 Bids Tendered (Alt) 1.22% 0.96% 1.17% 0.78%

2010 JNU-North Douglas 642(1) Lump 1 20,000.00 91,166.67 148,500.00 4,884,352 11 Highway Pavement Construction Surveying Sum 50,000.00 20,000.00 148,500.00 105,000.00

Rehabilitation 0.80% 0.41% 2.15% 1.42%

(26855/69633/1141) 3 Bids Tendered

2010 Illinois Street 642(1) Lump 1 30,000.00 43,000.00 50,000.00 4,191,814 02 Reconstruction - Barnette Construction Surveying Sum 10,000.00 49,000.00 30,000.00 50,000.00

Bridge Construction 0.25% 1.17% 0.62% 0.95%

(23473/62317/1141) 3 Bids Tendered

2009 Glenn Highway MP 63.5, 642(1) Lump 1 6,000.00 8,002.00 12,000.00 758,238 08 Erosion Construction Surveying Sum 15,000.00 6,500.00 11,000.00 6,922.00

(24836/51881/1141) 1.66% 0.86% 1.44% 0.87%

11 Bids Tendered

2017 Glenn Highway: Eklutna to 642(1) Lump 1 40,000.00 40,000.00 40,000.00 5,541,578 12 Parks Highway Pavement Construction Surveying Sum 70,000.00 40,000.00 40,000.00 40,000.00

Preservation 1.14% 0.72% 0.72% 0.72%

(47863/58534/1141) 3 Bids Tendered

2011 Mitkof Forest Highway 642(1) Lump 1 10,000.00 16,333.33 24,000.00 376,002 04 Fish Passage Mp 25.4 & Construction Surveying Sum 1,500.00 24,000.00 10,000.00 15,000.00

MP 28.0 0.41% 6.38% 2.37% 3.40%

(32796/68025/1141) 3 Bids Tendered

2010 Nome Roads 642(1) Lump 1 35,000.00 72,050.33 120,000.00 3,014,506 04 (27855/62067/1141) Construction Surveying Sum 200,000.00 35,000.00 50,000.00 100,000.00

6 Bids Tendered 4.59% 1.16% 1.41% 2.53%

2010 Tustumena Lake, Crooked 642(1) Lump 1 50,000.00 56,779.17 72,000.00 2,880,645 05 Creek and Johnson Lake Construction Surveying Sum 45,000.00 72,000.00 50,000.00 50,000.00

Roads Paving 1.18% 2.50% 1.73% 1.57%

(28553/51670/1141) 6 Bids Tendered

Page 9: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 9 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2018 C St, 40th Ave to 642(1) Lump 1 48,300.00 52,766.67 60,000.00 8,532,028 03 Minnesota Pavement Construction Surveying Sum 175,000.00 48,300.00 50,000.00 60,000.00

Preservation and AMATS: 1.76% 0.57% 0.54% 0.58%

Anchorage Area Wide Trails Rehabilitaion - C Street Pathway (48136//1141) 3 Bids Tendered

2010 Kenai: Various Road 642(1) Lump 1 10,000.00 13,700.00 18,000.00 574,593 08 Improvements, 2009 Construction Surveying Sum 24,000.00 11,000.00 18,000.00 13,500.00

(30275/59774/1141) 3.09% 1.91% 2.91% 2.04%

5 Bids Tendered

2010 KTN Water Street 642(1) Lump 1 15,000.00 18,333.33 20,000.00 1,752,375 04 Sidewalk Construction Surveying Sum 20,000.00 20,000.00 20,000.00 15,000.00

(26238/69345/1141) 0.97% 1.14% 1.00% 0.58%

3 Bids Tendered

2010 Northway Road Repairs 642(1) Lump 1.0 9,500.00 27,900.00 65,000.00 1,617,250 08 (28793) Construction Surveying Sum 20,000.00 9,500.00 20,000.00 15,000.00

5 Bids Tendered (Alt) 0.76% 0.59% 1.00% 0.74%

2010 Northway Road Repairs 642(1) Lump 1 9,500.00 27,900.00 65,000.00 1,617,250 08 (28793/63629/1141) Construction Surveying Sum 20,000.00 9,500.00 20,000.00 15,000.00

5 Bids Tendered 0.76% 0.59% 1.00% 0.74%

2018 HSIP: Sterling Highway 642(1) Lump 1 198,472.88 236,895.48 372,900.00 29,100,627 03 Shoulder Widening MP 97 Construction Surveying Sum 50,000.00 250,000.00 200,000.00 200,000.00

to MP 118 0.18% 0.86% 0.68% 0.67%

(48174/58980/7546) 6 Bids Tendered

2010 Nelson Road Resurfacing 642(1) Lump 1 5,000.00 7,333.33 10,000.00 1,055,870 08 (25633/63459/1141) Construction Surveying Sum 5,000.00 10,000.00 5,000.00 7,000.00

3 Bids Tendered 0.34% 0.95% 0.46% 0.56%

2010 Nelson Road Resurfacing 642(1) Lump 1.0 5,000.00 7,333.33 10,000.00 1,055,870 08 (25633) Construction Surveying Sum 5,000.00 10,000.00 5,000.00 7,000.00

3 Bids Tendered (Alt) 0.34% 0.95% 0.46% 0.56%

2010 Hoonah Ferry Terminal 642(1) Lump 1 10,000.00 21,070.00 33,210.00 3,717,260 09 Marine Structures Construction Surveying Sum 20,000.00 20,000.00 33,210.00 10,000.00

(29793/69311/ARA-0918(9)/1141) 0.39% 0.54% 0.89% 0.27%

3 Bids Tendered

2010 Klw Causeway Fish 642(1) Lump 1 14,100.00 14,350.00 14,600.00 705,731 09 Passage (27434/ 69319 & Construction Surveying Sum 5,000.00 14,600.00 14,100.00 0.00

79070 ECONOMIC 0.76% 2.07% 1.58% 0.00%

STIMULUS/1141) 2 Bids Tendered

2010 Richardson Highway Shaw 642(1) Lump 1 23,000.00 32,242.86 50,000.00 5,363,762 04 Creek Bridge No. 525 Construction Surveying Sum 75,000.00 32,700.00 35,000.00 50,000.00

(20032/62077/1141) 1.23% 0.61% 0.64% 0.88%

7 Bids Tendered

2011 Kenai Pen Flood Oct 02, 642(1) Acre 1.633 367.42 3,686.47 8,573.18 453,209 04 CONSENT DECREE Construction Surveying (Alt) 2,449.48 2,755.66 367.42 3,674.22

MITIGATION (GF) (33215) 0.94% 0.99% 0.13% 1.25%

5 Bids Tendered

Page 10: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 10 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2010 Port MacKenzie Access 642(1) Lump 1 20,000.00 36,744.55 60,650.00 5,025,609 12 Road (32453/58168/1141) Construction Surveying Sum 75,000.00 42,800.00 20,000.00 58,500.00

11 Bids Tendered 1.23% 0.85% 0.39% 1.01%

2010 Japonski Island Utility And 642(1) Lump 1 5,500.00 8,000.00 11,000.00 1,576,571 02 Road Improvements Construction Surveying Sum 5,000.00 5,500.00 7,500.00 11,000.00

(11912/68790/1141) 0.30% 0.35% 0.47% 0.65%

3 Bids Tendered

2011 Richardson Highway MP 642(1) Lump 1 120,000.00 236,937.50 339,500.00 27,434,902 03 148-159 Reconstruction Construction Surveying Sum 200,000.00 175,000.00 120,000.00 300,000.00

(1642/76727/1141) 0.64% 0.64% 0.42% 1.02%

8 Bids Tendered

2018 Parks Hwy MP 99-123.5 642(1) Lump 1 75,000.00 96,250.00 120,000.00 13,727,979 05 Pavement Preservation Construction Surveying Sum 60,000.00 75,000.00 120,000.00 90,000.00

HSIP: Parks Hwy: 0.45% 0.55% 0.80% 0.57%

Systemic Passing Lanes MP 99-123.5 (48390//1141) 4 Bids Tendered

2009 Muldoon Rd. Resurfacing, 642(1) Lump 1 35,000.00 42,250.00 54,000.00 3,673,329 11 36th to Glenn Hwy & Construction Surveying Sum 65,000.00 40,000.00 40,000.00 35,000.00

HSIP: 6th Avenue at 1.22% 1.09% 0.98% 0.84%

Muldoon Road Safety Improvements (25455/50810 57254/1141) 4 Bids Tendered

2011 Yakutat Area Wide Paving, 642(1) Lump 1 70,000.00 73,333.33 80,000.00 6,821,536 04 Yakutat Airport Runway Construction Surveying Sum 60,000.00 70,000.00 70,000.00 80,000.00

11-29 Pavement Repairs, 0.86% 1.03% 0.98% 1.09%

CBY Utilities RE-BID (26973//1141) 3 Bids Tendered

2009 Johansen Expressway 642(1) Lump 1 5,000.00 8,500.00 12,000.00 232,500 09 Offset Lighting Construction Surveying Sum 7,800.00 5,000.00 12,000.00 0.00

(24015/77241/1141) 2.04% 2.15% 3.73% 0.00%

2 Bids Tendered

2009 Ktn- N. Tongass Hwy 642(1) Lump 1 9,548.00 13,231.67 19,147.00 495,324 09 Emergency Slope Construction Surveying Sum 10,000.00 11,000.00 9,548.00 19,147.00

Stabilization 1.61% 2.22% 1.91% 3.67%

(24392/69086/1141) 3 Bids Tendered

2009 TUDOR ROAD & LAKE 642(1) Lump 1 50,000.00 65,500.00 77,000.00 7,489,670 12 OTIS PARKWAY Construction Surveying Sum 80,000.00 50,000.00 75,000.00 60,000.00

INTERSECTION 0.86% 0.67% 0.92% 0.71%

IMPROVEMENTS (25576/58890/1141) 4 Bids Tendered

Page 11: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 11 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2009 Parks Hwy MP 287-305 642(1) Lump 1 60,000.00 103,500.00 171,000.00 7,091,346 09 Rehabilitation And Construction Surveying Sum 60,000.00 110,000.00 70,000.00 60,000.00

Resurface 0.61% 1.55% 0.90% 0.75%

(20492/77137/1141) 6 Bids Tendered

2017 Haines Highway 642(1) Lump 1 200,000.00 323,500.00 454,000.00 36,149,513 11 Reconstruction Milepost Construction Surveying Sum 800,000.00 454,000.00 200,000.00 300,000.00

3.9 to 12.2, Phase 1 2.16% 1.26% 0.54% 0.74%

(47539//1141) 4 Bids Tendered

2011 Richardson Highway MP 642(1) Mile 10.0 12,000.00 23,693.75 33,950.00 27,434,902 03 148-159 Reconstruction Construction Surveying (Alt) 20,000.00 17,500.00 12,000.00 30,000.00

(1642) 0.64% 0.64% 0.42% 1.02%

8 Bids Tendered

2018 AMATS: Abbott Road 642(1) 40000 1.0 60,000.00 71,250.00 75,000.00 5,167,568 05 Rehab - Phase II (48404) Construction Surveying (Alt) 40,000.00 60,000.00 75,000.00 75,000.00

4 Bids Tendered 0.79% 1.16% 1.43% 1.42%

2009 Nome Storm E R 642(1) Lump 1 20,000.00 60,100.00 200,000.00 4,091,282 10 Permanent Repairs Construction Surveying Sum 28,500.00 30,600.00 30,000.00 50,000.00

2004-2005 Stage I I 0.72% 0.75% 0.56% 0.93%

(20312/61866/1141) 6 Bids Tendered

2009 Hyder Harbor 642(1) Lump 1 3,000.00 3,666.67 5,000.00 579,500 10 Rehabilitation Construction Surveying Sum 5,000.00 5,000.00 3,000.00 3,000.00

(23872/67802/1141) 0.86% 0.86% 0.44% 0.39%

3 Bids Tendered

2009 Dalton Highway MP 175 to 642(1) Lump 1 230,000.00 319,714.29 400,000.00 25,642,513 10 197 Rehabilitation Construction Surveying Sum 450,000.00 230,000.00 300,000.00 350,000.00

(5722/62860/1141) 1.68% 0.90% 1.17% 1.35%

7 Bids Tendered

2009 Alaska Highway M P 642(1) Lump 1 15,000.00 24,928.57 65,000.00 3,747,075 10 1412-1422 Rehabilitation Construction Surveying Sum 50,000.00 15,000.00 17,500.00 15,000.00

(17052/61777/1141) 1.12% 0.40% 0.44% 0.37%

7 Bids Tendered

2011 Huffman Road 642(1) Lump 1 95,750.00 105,867.60 115,000.00 12,332,894 02 Reconstruction - Old Construction Surveying Sum 200,000.00 106,000.00 95,750.00 112,088.00

Seward Hwy to Lake Otis 1.34% 0.86% 0.71% 0.82%

Parkway to Pintail Street (33102/53933 51920/1141) 5 Bids Tendered

2017 Parks Hwy: MP 83-99 642(1) Lump 1 130,000.00 174,471.43 301,300.00 18,937,555 11 Rehabilitation, Pedestrian, Construction Surveying Sum 210,000.00 130,000.00 150,000.00 130,000.00

and Passing Lane 0.96% 0.69% 0.73% 0.61%

Improvements (47720/ /1141) 7 Bids Tendered

Page 12: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 12 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 POW: Hydaburg Highway 642(1) Lump 1 10,000.00 12,750.00 15,500.00 388,512 04 Fish Passage Construction Surveying Sum 5,000.00 15,500.00 10,000.00 0.00

Improvements 1.05% 3.99% 2.19% 0.00%

(41388/68026/1141) 2 Bids Tendered

2011 Nome Highway Bridge 642(1) Lump 1 25,000.00 37,020.00 50,000.00 2,234,047 02 Improvements Construction Surveying Sum 35,000.00 25,000.00 28,100.00 32,000.00

(24432/62630/1141) 1.41% 1.12% 1.19% 1.03%

5 Bids Tendered

2016 Denali Highway Seattle 642(1) Lump 1.0 30,000.00 39,294.89 65,000.00 3,617,128 01 Creek Bridge Construction Surveying Sum 45,000.00 65,000.00 35,000.00 33,000.00

Replacement (45226) (Alt) 1.30% 1.80% 0.95% 0.87%

9 Bids Tendered

2016 Denali Highway Seattle 642(1) Lump 1 30,000.00 39,294.89 65,000.00 3,617,128 01 Creek Bridge Construction Surveying Sum 45,000.00 65,000.00 35,000.00 33,000.00

Replacement 1.30% 1.80% 0.95% 0.87%

(45226/61912/1141) 9 Bids Tendered

2014 5th and 6th Avenue 642(1) Lump 1 75,000.00 107,500.00 140,000.00 8,696,000 05 Paving, L Street To Ingra Construction Surveying Sum 160,000.00 75,000.00 140,000.00 0.00

L & I Couplet Pavement 1.75% 0.86% 1.41% 0.00%

Preservation: Phase 1 (42905/57835 58003/1141) 2 Bids Tendered

2014 Petersville Road 642(1) Lump 1 50,000.00 60,200.00 78,000.00 4,322,551 06 Preventive Maintenance, Construction Surveying Sum 100,000.00 78,000.00 58,000.00 50,000.00

MP 0-9.2 1.71% 1.80% 1.26% 1.08%

(42965/52471/1141) 5 Bids Tendered

2015 Egan Drive Pavement 642(1) Lump 1 65,000.00 109,500.00 154,000.00 16,614,244 12 rehabilitation - 10th Street Construction Surveying Sum 91,000.00 65,000.00 154,000.00 0.00

to Mendenhall Loop Road 0.45% 0.39% 0.86% 0.00%

Project Number

NH-0932(049)~Z681290000

Salmon Creek Intersection

Safety Improvements Project

Number

EBL-0932(051)~Z69575

(45232/68129/1141)

2 Bids Tendered

2014 Seward Highway MP 54.5 642(1) Lump 1 150,000.00 176,000.00 195,000.00 15,157,512 06 to 75 Pavement Construction Surveying Sum 150,000.00 195,000.00 175,000.00 150,000.00

Preservation 0.65% 1.29% 1.11% 0.94%

(42893/58080/1141) 5 Bids Tendered

2014 Doyle Road Improvements 642(1) Lump 1 30,000.00 32,500.00 35,000.00 1,691,090 06 (42055/61669/1141) Construction Surveying Sum 30,000.00 35,000.00 30,000.00 0.00

2 Bids Tendered 2.13% 2.07% 1.67% 0.00%

2016 Lucus Road Improvements 642(1) Lump 1 50,000.00 70,411.82 100,000.00 4,639,288 01 (45390/55007/1141) Construction Surveying Sum 75,000.00 50,000.00 61,500.00 50,000.00

10 Bids Tendered 1.37% 1.08% 1.28% 1.01%

Page 13: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 13 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 Central Region Highway 642(1) Lump 1 40,000.00 97,500.00 155,000.00 4,551,390 09 Data Equipment 2012 Construction Surveying Sum 50,000.00 155,000.00 40,000.00 0.00

(43114/52809/1141) 1.25% 3.41% 0.68% 0.00%

2 Bids Tendered

2014 Parks Hwy MP 237 Riley 642(1) Lump 1 133,650.00 135,011.25 136,372.50 10,727,261 08 Creek Bridge Construction Surveying Sum 92,000.00 136,372.50 0.00 0.00

Replacement 0.79% 1.27% 0.00% 0.00%

(42954/63763/1141) 2 Bids Tendered

2014 ANC Postmark Storm 642(1) Lump 1 7,700.00 8,566.67 10,000.00 2,568,324 07 Drain Outfall Repairs Construction Surveying Sum 20,000.00 8,000.00 10,000.00 7,700.00

(43054/57348/1141) 0.96% 0.31% 0.31% 0.22%

3 Bids Tendered

2014 FY10 SER HWY DM 642(1) Lump 1 5,000.00 5,000.00 5,000.00 197,200 07 Culvert Repair/Replace Construction Surveying Sum 3,000.00 5,000.00 0.00 0.00

(41075/69645/1141) 2.55% 2.54% 0.00% 0.00%

1 Bids Tendered

2014 Sterling Hwy Mp 57 642(1) Lump 1 6,250.00 7,812.50 10,000.00 1,699,250 07 Erosion Protection Construction Surveying Sum 20,000.00 10,000.00 8,000.00 7,000.00

(43116/57729/1141) 1.34% 0.59% 0.36% 0.30%

4 Bids Tendered

2014 Tenakee Springs Harbor 642(1) Lump 1 5,000.00 21,850.00 32,000.00 1,331,475 01 Float Replacement Construction Surveying Sum 8,000.00 5,000.00 28,550.00 32,000.00

(41872/67664/1141) 0.55% 0.38% 1.84% 1.80%

3 Bids Tendered

2015 Sterling Highway: Soldotna 642(1) Lump 1 25,000.00 29,625.00 35,500.00 3,688,652 12 Urban Pavement Construction Surveying Sum 60,000.00 28,000.00 30,000.00 35,500.00

Preservation 1.50% 0.76% 0.80% 0.85%

(45376/58524/7546) 4 Bids Tendered

2014 HSIP: STERLING 642(1) Lump 1 76,600.00 105,533.33 150,000.00 6,527,698 01 HIGHWAY: SOLDOTNA Construction Surveying Sum 155,970.00 76,600.00 90,000.00 150,000.00

TO HOMER HILL 1.71% 1.17% 1.32% 2.00%

SLOW VEHICLE TURNOUTS (42017/52997/1141) 3 Bids Tendered

2017 FMATS Area Surface 642(1) Lump 1 10,000.00 22,320.00 45,000.00 1,290,111 06 Upgrades FFY 2017 Construction Surveying Sum 35,000.00 11,960.00 10,000.00 45,000.00

(46184//7546) 2.53% 0.93% 0.75% 2.96%

3 Bids Tendered

2013 Potter Road Surfacing 642(1) Lump 1 15,000.00 15,000.00 15,000.00 835,888 08 (40474/63517/1141) Construction Surveying Sum 30,000.00 15,000.00 15,000.00 15,000.00

3 Bids Tendered 3.17% 1.79% 1.67% 1.46%

2013 Selawik Utility Crossing 642(1) Man-Day 30.0 500.00 595.83 716.67 616,937 10 Repair (41058) Construction Surveying (Alt) 2,000.00 500.00 716.67 666.67

4 Bids Tendered 6.67% 2.43% 2.73% 2.47%

Page 14: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 14 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 JNU - Stephen Richards 642(1) Lump 1 26,690.00 28,695.00 30,700.00 1,214,605 08 Safety And Capacity Construction Surveying Sum 20,000.00 26,690.00 30,700.00 0.00

Improvements - REBID 1.95% 2.20% 2.28% 0.00%

(40112/68740/1141) 2 Bids Tendered

2013 Richardson Highway 642(1) Lump 1 15,000.00 26,400.00 30,000.00 338,567 09 Speed Disparity - H S I P Construction Surveying Sum 50,000.00 30,000.00 15,000.00 30,000.00

(41513/62463/1141) 6.34% 8.86% 3.58% 7.00%

5 Bids Tendered

2013 Aleknagik Wood River 642(1) Lump 1 64,500.00 114,050.00 221,700.00 19,515,005 09 Bridge Construction - Construction Surveying Sum 260,000.00 100,000.00 70,000.00 221,700.00

Phase I 1.72% 0.51% 0.35% 1.01%

(41612/52972/1141) 4 Bids Tendered

2013 Selawik Utility Crossing 642(1) Lump 1 15,000.00 17,875.00 21,500.00 616,937 10 Repair Construction Surveying Sum 60,000.00 15,000.00 21,500.00 20,000.00

(41058/62656/1141) 6.67% 2.43% 2.73% 2.47%

4 Bids Tendered

2013 North Pole Interchange 642(1) Lump 1 32,000.00 37,700.00 40,000.00 1,766,369 10 Pedestrian Facilities Construction Surveying Sum 10,000.00 40,000.00 38,500.00 32,000.00

(39051/76719/1141) 0.55% 2.26% 2.15% 1.78%

5 Bids Tendered

2013 Sterling Highway Mp 79 - 642(1) Lump 1 60,000.00 67,500.00 77,500.00 4,789,467 10 82.5 Pavement Construction Surveying Sum 40,000.00 77,500.00 65,000.00 60,000.00

Preservation 0.75% 1.62% 1.34% 1.16%

(41786/54151/1141) 3 Bids Tendered

2013 Richardson Highway M P 642(1) Lump 1 60,000.00 112,250.00 200,000.00 10,388,566 10 345 Moose Creek R R Construction Surveying Sum 80,000.00 110,000.00 92,000.00 60,000.00

Overpass 0.70% 1.06% 0.84% 0.51%

(17152/66566/1141) 8 Bids Tendered

2013 Airport Way Preventive 642(1) Lump 1 50,000.00 66,000.00 80,000.00 5,388,089 10 Maintenance - Stage I Construction Surveying Sum 50,000.00 50,000.00 68,000.00 80,000.00

(41617/60921/1141) 0.89% 0.93% 1.24% 1.45%

3 Bids Tendered

2016 Goldhill Road Bicycle And 642(1) Lump 1 50,000.00 82,811.50 98,246.00 2,864,888 04 Pedestrian Facility Construction Surveying Sum 60,000.00 85,000.00 50,000.00 98,000.00

(45033/63293/1141) 1.84% 2.97% 1.67% 3.20%

4 Bids Tendered

2013 52765 Ninilchik Village 642(1) Lump 1 25,000.00 29,595.00 32,725.00 2,199,212 10 Bridge Replacement Construction Surveying Sum 20,000.00 32,725.00 28,250.00 25,000.00

(41877/52765/1141) 0.86% 1.49% 1.26% 1.06%

5 Bids Tendered

2016 Sterling Highway MP 642(1) Lump 1 90,000.00 110,000.00 150,000.00 15,712,283 04 114-135 Pavement Construction Surveying Sum 90,000.00 100,000.00 150,000.00 90,000.00

Preservation 0.48% 0.64% 0.89% 0.53%

(45711/56698/1141) 4 Bids Tendered

Page 15: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 15 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 HSIP: STERLING 642(1) Each 1.0 76,600.00 105,533.33 150,000.00 6,527,698 01 HIGHWAY: SOLDOTNA Construction Surveying (Alt) 155,970.00 76,600.00 90,000.00 150,000.00

TO HOMER HILL 1.71% 1.17% 1.32% 2.00%

SLOW VEHICLE TURNOUTS (42017) 3 Bids Tendered

2009 Sterling Highway: Ninilchik 642(1) Lump 1 10,000.00 12,800.00 18,500.00 943,974 12 Intersection Improvements Construction Surveying Sum 30,000.00 10,500.00 10,000.00 10,000.00

and Illumination 3.08% 1.11% 1.02% 0.96%

(25977/56634/1141) 5 Bids Tendered

2014 JNU-Mendenhall Valley 642(1) Lump 1 40,000.00 40,000.00 40,000.00 1,494,155 08 Dust Control (Paving) Construction Surveying Sum 25,000.00 40,000.00 0.00 0.00

(40993/69549/1141) 1.70% 2.68% 0.00% 0.00%

1 Bids Tendered

2014 Portage Glacier Road 642(1) Lump 1 14,000.00 21,000.00 27,000.00 1,782,765 08 Embankment Stabilization Construction Surveying Sum 20,000.00 20,000.00 23,000.00 14,000.00

(43186/53726/1141) 1.61% 1.12% 0.90% 0.52%

4 Bids Tendered

2011 Richardson Highway MP 642(1) Lump 1 45,000.00 95,439.15 150,000.00 9,722,159 10 228 One Mile Creek Construction Surveying Sum 100,000.00 45,000.00 150,000.00 121,750.00

Bridge Replacement & 0.79% 0.46% 1.50% 1.21%

Richardson Highway MP 228 Flood Permanent Repairs (Oct '06) (25917/61870/76791/1141) 9 Bids Tendered

2015 FMATS Area Surface & 642(1) Lump 1 10,500.00 20,166.67 30,000.00 541,111 07 Approach Upgrades Construction Surveying Sum 10,000.00 10,500.00 20,000.00 30,000.00

FFY2015 1.74% 1.94% 3.23% 4.03%

(44227/64103/7546) 3 Bids Tendered

2014 88th Ave Upgrade, Spruce 642(1) Lump 1 32,730.00 38,752.78 50,000.00 2,773,227 04 Brook St To Elmore Rd Construction Surveying Sum 35,000.00 34,045.00 35,000.00 38,000.00

(GF) (42655/54601/1141) 1.24% 1.23% 1.23% 1.27%

9 Bids Tendered

2014 AMATS: A St Resurfacing: 642(1) Lump 1 32,000.00 53,500.00 75,000.00 5,686,743 05 Northern Lights Blvd to 9th Construction Surveying Sum 40,000.00 75,000.00 32,000.00 0.00

Ave and HSIP: 16th Ave at 0.88% 1.32% 0.54% 0.00%

A Street Channelization Improvements (42707/56000 51331/1141) 2 Bids Tendered

2016 Parks Highway Bridge 642(1) Lump 1 530.00 6,762.25 15,000.00 3,099,899 01 Deck Rehabilitation Construction Surveying Sum 10,000.00 15,000.00 530.00 6,519.00

(44362/62966/1141) 0.18% 0.48% 0.02% 0.16%

4 Bids Tendered

Page 16: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 16 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2011 Copper River Highway MP 642(1) Lump 1 25,000.00 46,714.29 82,000.00 4,102,329 09 0-6 Resurfacing Construction Surveying Sum 50,000.00 40,000.00 45,000.00 45,000.00

(32933/63804/1141) 0.91% 0.98% 1.04% 1.03%

7 Bids Tendered

2009 Alaska Highway M P 642(1) Lump 1 75,000.00 107,500.00 125,000.00 11,696,889 12 1222-1235 Rehabilitation Construction Surveying Sum 144,518.02 120,000.00 100,000.00 125,000.00

(26075/60519/1141) 0.87% 1.03% 0.84% 1.01%

6 Bids Tendered

2018 AMATS: Anchorage 642(1) Lump 1 12,200.00 15,080.00 18,000.00 672,850 05 Areawide Trails Construction Surveying Sum 25,000.00 12,200.00 14,000.00 14,000.00

Rehabilitation - Benson 3.17% 1.81% 1.87% 1.77%

Boulevard Pathway (48256//1141) 5 Bids Tendered

2009 Chena Pump Road/Roland 642(1) Lump 1 5,000.00 8,020.00 13,200.00 96,927 12 Road Right Turn Lane Construction Surveying Sum 2,500.00 5,000.00 5,900.00 6,000.00

(19832/77246/1141) 2.05% 5.16% 5.91% 5.07%

5 Bids Tendered

2010 Leasure Subdivision Area 642(1) Lump 1.0 12,000.00 36,925.00 51,700.00 1,064,236 11 Street Improvements - Construction Surveying Sum 15,000.00 39,000.00 45,000.00 12,000.00

Stage I (30138) (Alt) 1.45% 3.66% 4.18% 0.95%

4 Bids Tendered

2010 HSIP: NHS Warning & 642(1) Lump 1 29,350.00 39,333.52 77,000.00 1,404,195 11 Delineation Construction Surveying Sum 15,000.00 30,000.00 29,350.00 77,000.00

(30713/51289/1141) 0.84% 2.14% 1.80% 4.70%

6 Bids Tendered

2010 Leasure Subdivision Area 642(1) Lump 1 12,000.00 36,925.00 51,700.00 1,064,236 11 Street Improvements - Construction Surveying Sum 15,000.00 39,000.00 45,000.00 12,000.00

Stage I 1.45% 3.66% 4.18% 0.95%

(30138/60747/1141) 4 Bids Tendered

2009 Ktn - South Tongass 642(1) Lump 1 10,000.00 20,000.00 30,000.00 1,328,050 12 Highway Guardrail Construction Surveying Sum 2,500.00 10,000.00 20,000.00 30,000.00

Replacement 0.11% 0.75% 1.49% 2.22%

(17976/67422/1141) 3 Bids Tendered

2016 Tok Cutoff MP 17 Tulsona 642(1) Lump 1 15,823.00 43,293.67 72,620.00 4,094,773 01 Creek Bridge #1250 Construction Surveying Sum 25,000.00 50,000.00 35,100.00 40,000.00

Replacement 0.63% 1.22% 0.83% 0.90%

(45044/64270/1141) 9 Bids Tendered

2014 Cordova Point Whitshed 642(1) Lump 1 50,000.00 66,666.67 75,000.00 2,180,349 08 Road M P 0-3 Asphalt Construction Surveying Sum 15,000.00 75,000.00 75,000.00 50,000.00

Surface Repairs 0.80% 3.44% 3.26% 2.01%

(41879/64020/1141) 3 Bids Tendered

2016 Parks Highway Bridge 642(1) Calendar 10.0 53.00 676.23 1,500.00 3,099,899 01 Deck Rehabilitation Construction Surveying Day 1,000.00 1,500.00 53.00 651.90

(44362) (Alt) 0.18% 0.48% 0.02% 0.16%

4 Bids Tendered

Page 17: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 17 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 Seward Highway: 92nd 642(1) Lump 1 85,000.00 104,494.90 182,700.00 9,982,120 02 Avenue Connector Construction Surveying Sum 62,000.00 95,000.00 90,000.00 87,550.00

(45465/59770/1141) 0.59% 0.95% 0.89% 0.85%

7 Bids Tendered

2014 HSIP: Central Region 642(1) Lump 1 4,066.00 10,736.00 17,500.00 1,169,103 01 Railroad/Highway Grade Construction Surveying Sum 3,000.00 5,000.00 13,350.00 7,500.00

Crossing Guardrail 0.21% 0.43% 1.11% 0.49%

Replacement HSIP: CR Guardrail Delineation Enhancements (42191/52113 55750/1141) 6 Bids Tendered

2014 Parks Highway M P 194 642(1) Lump 1 45,000.00 114,000.00 200,000.00 20,669,482 04 Broad Pass RR Construction Surveying Sum 150,000.00 200,000.00 130,000.00 100,000.00

Overcrossing 0.68% 0.97% 0.63% 0.48%

(42228/61277/1141) 6 Bids Tendered

2014 Birch Road: Whispering 642(1) Lump 1 9,675.00 16,706.43 32,670.00 734,400 05 Spruce Intersection Construction Surveying Sum 5,000.00 32,670.00 12,500.00 12,000.00

Improvements 0.66% 4.45% 1.57% 1.50%

(42792/55627/1141) 7 Bids Tendered

2015 Badger Road 642(1) Lump 1 15,000.00 24,750.00 35,000.00 1,257,111 12 Bike/pedestrian Path Construction Surveying Sum 20,000.00 15,000.00 35,000.00 22,000.00

Resurfacing 1.52% 1.19% 2.55% 1.48%

(44891/60820/1141) 4 Bids Tendered

2014 Parks Highway 642(1) Lump 1 100,000.00 136,000.00 180,000.00 25,973,241 06 MP123.5-146 Construction Surveying Sum 147,000.00 100,000.00 140,000.00 130,000.00

Rehabilitation 0.49% 0.39% 0.52% 0.48%

(42801/57700/1141) 5 Bids Tendered

2014 Palmer-Wasilla Highway: 642(1) Lump 1 30,000.00 53,333.33 100,000.00 2,798,426 04 Parks Highway to Knik Construction Surveying Sum 40,000.00 30,000.00 30,000.00 100,000.00

Goose Bay Road 1.31% 1.07% 1.05% 3.37%

Pavement Preservation (42652/55270/1141) 3 Bids Tendered

2016 Jim River Restoration 642(1) Lump 1 12,000.00 30,388.11 60,000.00 1,321,590 01 Project 2015 Construction Surveying Sum 10,000.00 12,000.00 28,000.00 18,000.00

(45322//1141) 0.64% 0.91% 2.01% 1.26%

9 Bids Tendered

2016 Northern Region 642(1) Lump 1 3,000.00 14,220.81 30,000.00 476,707 02 Avalanche Gates - HSIP Construction Surveying Sum 10,000.00 9,000.00 30,000.00 3,000.00

(45224/62491/1141) 1.42% 1.89% 5.78% 0.55%

10 Bids Tendered

2014 Edgerton Highway MP 642(1) Lump 1 60,000.00 89,166.67 150,000.00 7,445,892 04 0-19 Resurfacing Construction Surveying Sum 125,000.00 75,000.00 60,000.00 80,000.00

(42129/63909/1141) 1.35% 1.01% 0.81% 0.98%

6 Bids Tendered

Page 18: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 18 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 Parks Highway MP 642(1) Lump 1 135,000.00 165,214.00 200,000.00 15,967,622 01 43.5-44.5 Reconstruction, Construction Surveying Sum 82,000.00 180,000.00 135,000.00 150,000.00

Lucus Road To Church 0.55% 1.13% 0.73% 0.81%

Road (42230/52914/1141) 5 Bids Tendered

2014 Thane Road Slope Repair 642(1) Lump 1 1,000.00 3,440.00 5,000.00 79,100 02 (42289/69331/1141) Construction Surveying Sum 2,000.00 5,000.00 4,320.00 1,000.00

3 Bids Tendered 2.32% 6.32% 4.76% 0.87%

2016 Snug Harbor Road 642(1) Lump 1 6,436.97 16,075.33 28,015.00 276,989 02 Improvements Advanced Construction Surveying Sum 10,000.00 6,436.97 15,000.00 15,000.00

Utility Relocation 3.18% 2.32% 5.39% 5.12%

(45462/56810/1141) 6 Bids Tendered

2014 Homer: East End Road 642(1) Lump 1 115,000.00 153,666.67 225,000.00 11,749,902 02 MP 3.75-5.5, Kachemak Construction Surveying Sum 150,000.00 121,000.00 225,000.00 115,000.00

Drive to Waterman Road 1.42% 1.03% 1.76% 0.87%

Rehabilitation Homer: East End Road MP 12.5 to MP 19.6 and Old East End Road MP 0.0 to MP 1.9 Pavement Preservation (42246/53164 55261/1141) 3 Bids Tendered

2010 Nordale Road Pavement 642(1) Lump 1 15,000.00 20,666.67 27,000.00 1,748,183 05 Rehabilitation - FMATS Construction Surveying Sum 115,000.00 20,000.00 27,000.00 15,000.00

(Badger Road to Chena 4.64% 1.14% 1.47% 0.79%

River) (28033/63158/1141) 3 Bids Tendered

2018 Rex Trail Seven Mile Lake 642(1) Lump 1 7,000.00 22,916.67 75,000.00 612,164 02 Reroute (46224//1141) Construction Surveying Sum 10,000.00 25,000.00 37,300.00 15,000.00

12 Bids Tendered 1.46% 4.08% 5.53% 1.84%

2010 Tok Cut Off M P 0-2 and M 642(1) Lump 1 26,000.00 74,600.00 150,000.00 9,258,998 10 P 5-24 Resurfacing Construction Surveying Sum 75,000.00 26,000.00 150,000.00 35,000.00

(28413/63364/1141) 0.60% 0.28% 1.58% 0.34%

7 Bids Tendered

2010 23rd Avenue 642(1) Lump 1 55,000.00 57,500.00 60,000.00 2,405,270 07 Improvements Construction Surveying Sum 75,000.00 55,000.00 57,500.00 60,000.00

(28375/60745/1141) 2.60% 2.29% 2.16% 2.10%

3 Bids Tendered

2009 Kotzebue Roads - Shore 642(1) Lump 1 10,000.00 58,500.00 130,000.00 33,010,932 04 Avenue Construction Surveying Sum 102,000.00 28,000.00 25,000.00 10,000.00

(20872/60788/1141) 0.29% 0.08% 0.07% 0.03%

9 Bids Tendered

2011 Kenai Pen Flood Oct 02, 642(1) Lump 1 600.00 6,020.00 14,000.00 453,209 04 CONSENT DECREE Construction Surveying Sum 4,000.00 4,500.00 600.00 6,000.00

MITIGATION (GF) 0.94% 0.99% 0.13% 1.25%

(33215/52992/1141) 5 Bids Tendered

Page 19: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 19 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2011 Hyder-Salmon River Road 642(1) Lump 1 100,000.00 170,333.33 250,000.00 7,440,684 08 Rehabilitation Construction Surveying Sum 120,000.00 100,000.00 161,000.00 250,000.00

(11216/68602/1141) 1.88% 1.34% 1.80% 2.38%

3 Bids Tendered

2018 AMATS: Anchorage 642(1) Lump 1 40,000.00 44,260.61 50,000.00 2,706,436 06 Areawide Trails Construction Surveying Sum 100,000.00 40,584.88 43,000.00 45,000.00

Rehabilitation Fish Creek 3.14% 1.50% 1.41% 1.40%

Trail AMATS: Fish Creek Trail Rehabilitation Turnagain Blvd to Kona Ln (TAP) (48417//7546) 8 Bids Tendered

2011 EAGLE RIVER LOOP 642(1) Lump 1 35,000.00 52,925.00 100,000.00 2,599,433 07 ROAD RESURFACING: Construction Surveying Sum 20,000.00 40,000.00 100,000.00 36,700.00

GLENN HWY TO EAGLE 0.71% 1.54% 3.50% 1.25%

RIVER RD (GF) (33695/52881/1141) 4 Bids Tendered

2009 Trunk Road 642(1) Lump 1 250,000.00 324,375.00 500,000.00 22,945,463 05 Reconstruction, Phase I. Construction Surveying Sum 325,000.00 260,000.00 300,000.00 400,000.00

Parks Highway to 1.00% 1.13% 1.24% 1.61%

Palmer-Wasilla Highway (22872/59301/1141) 8 Bids Tendered

2009 Tenakee Springs Harbor 642(1) Lump 1 1,000.00 3,715.00 7,145.00 603,920 05 Float Replacement Construction Surveying Sum 10,000.00 1,000.00 3,000.00 7,145.00

(21655/67719/1141) 0.00% 0.17% 0.48% 0.87%

3 Bids Tendered

2011 Richardson Highway 642(1) Lump 1 5,000.00 10,150.71 16,000.00 1,157,909 05 Flooding Permanent Construction Surveying Sum 15,000.00 9,500.00 5,000.00 10,000.00

Repairs - 12.8 Mile Dike 1.17% 0.82% 0.41% 0.78%

(31854/63627/1141) 7 Bids Tendered

2009 Alaska Highway: Tanana 642(1) Lump 1 108,000.00 207,750.00 500,000.00 30,650,414 02 River Bridge #505: Bids Construction Surveying Sum 600,000.00 164,000.00 140,000.00 150,000.00

Opened 02/26/2009 1.96% 0.54% 0.44% 0.46%

(18134/61637/61253/1141) 8 Bids Tendered

2017 Old Nenana/Ester Hill 642(1) Lump 1 170,000.00 183,333.33 200,000.00 12,499,865 09 Rehabilitation Construction Surveying Sum 200,000.00 180,000.00 170,000.00 200,000.00

(46580/60455/1141) 1.65% 1.44% 1.23% 1.39%

3 Bids Tendered

2011 Van Horn Road West ( 642(1) Lump 1.0 20,000.00 20,000.00 20,000.00 1,198,184 05 Cartwright Road) Construction Surveying Sum 40,000.00 20,000.00 20,000.00 20,000.00

Improvements (2484) (Alt) 2.13% 1.67% 1.52% 1.50%

3 Bids Tendered

2017 Old Nenana/Ester Hill 642(1) Each 1.0 170,000.00 183,333.33 200,000.00 12,499,865 09 Rehabilitation (46580) Construction Surveying (Alt) 200,000.00 180,000.00 170,000.00 200,000.00

3 Bids Tendered 1.65% 1.44% 1.23% 1.39%

Page 20: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 20 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2009 KTN-Tremont Street 642(1) Each 1.0 4,000.00 14,000.00 24,000.00 405,615 03 Drainage Improvements Construction Surveying (Alt) 7,500.00 4,000.00 24,000.00 14,000.00

(1622) 1.69% 0.99% 5.40% 2.94%

3 Bids Tendered

2017 Kalifornsky Beach Road, 642(1) Lump 1 45,900.00 70,350.00 115,500.00 8,695,855 07 MP 16 to 22.2 Resurfacing Construction Surveying Sum 35,000.00 50,000.00 70,000.00 45,900.00

& Signalization 0.31% 0.57% 0.74% 0.46%

(47186/59778/1141) 4 Bids Tendered

2011 Van Horn Road West ( 642(1) Lump 1 20,000.00 20,000.00 20,000.00 1,198,184 05 Cartwright Road) Construction Surveying Sum 40,000.00 20,000.00 20,000.00 20,000.00

Improvements 2.13% 1.67% 1.52% 1.50%

(2484/Project No. 62056/1141) 3 Bids Tendered

2018 Northern Region River 642(1) Lump 1 52,000.00 60,125.00 65,000.00 3,612,284 06 Encroachment Repairs - Construction Surveying Sum 65,000.00 62,000.00 65,000.00 52,000.00

Richardson Highway MP 1.26% 1.72% 1.30% 0.99%

1-16 (47740//1141) 4 Bids Tendered

2011 KTN-South Tongass 642(1) Lump 1 10,000.00 10,000.00 10,000.00 1,219,195 07 Pavement Rehabilitation Construction Surveying Sum 10,000.00 10,000.00 0.00 0.00

(30814/69571/1141) 0.84% 0.82% 0.00% 0.00%

1 Bids Tendered

2018 AMATS: Westchester 642(1) Lump 1 11,000.00 11,000.00 11,000.00 506,884 07 Lagoon Nature Trail Construction Surveying Sum 17,500.00 11,000.00 11,000.00 11,000.00

Rehabilitation 3.75% 2.17% 1.83% 1.67%

(48449//1141) 3 Bids Tendered

2009 Kotzebue Roads - Shore 642(1) Lump 1 115,000.00 227,962.78 450,000.00 33,010,932 04 Avenue Construction Surveying Sum 272,000.00 115,000.00 200,000.00 200,000.00

(20872/60788/1141) 0.78% 0.35% 0.57% 0.54%

9 Bids Tendered

2011 Valdez Airport Access 642(1) Lump 1 10,000.00 10,000.00 10,000.00 657,440 08 Road Resurfacing Construction Surveying Sum 5,000.00 10,000.00 10,000.00 0.00

(31994/63465/1141) 0.96% 1.52% 1.29% 0.00%

2 Bids Tendered

2009 KTN-Tremont Street 642(1) Lump 1 4,000.00 14,000.00 24,000.00 405,615 03 Drainage Improvements Construction Surveying Sum 7,500.00 4,000.00 24,000.00 14,000.00

(1622/68905/1141) 1.69% 0.99% 5.40% 2.94%

3 Bids Tendered

2018 Northern Region River 642(1) Lump 1.0 52,000.00 60,125.00 65,000.00 3,612,284 06 Encroachment Repairs - Construction Surveying Sum 65,000.00 62,000.00 65,000.00 52,000.00

Richardson Highway MP (Alt) 1.26% 1.72% 1.30% 0.99%

1-16 (47740) 4 Bids Tendered

2017 Dalton Highway MP 642(1) Lump 1 115,000.00 234,643.43 410,000.00 20,984,015 06 209-222 Reconstruction Construction Surveying Sum 260,000.00 130,000.00 255,384.00 115,000.00

(45785//1141) 0.97% 0.62% 1.08% 0.46%

7 Bids Tendered

Page 21: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 21 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2011 Seward Hwy: Trail RV, 642(1) Lump 1 81,600.00 201,526.67 500,000.00 17,817,902 08 Falls CR, & Ptarmigan Construction Surveying Sum 230,000.00 81,600.00 150,000.00 150,000.00

Bridge Replacement 1.16% 0.46% 0.83% 0.75%

(33825/52035/1141) 6 Bids Tendered

2009 Tok Cutoff Gakona River 642(1) Lump 1 30,000.00 77,200.00 220,000.00 6,488,641 05 Bridge Replacement #646 Construction Surveying Sum 50,000.00 45,000.00 40,000.00 51,000.00

(19852/61713/1141) 0.79% 0.69% 0.57% 0.68%

5 Bids Tendered

2018 Cordova City Street 642(1) Lump 1 28,762.00 28,762.00 28,762.00 614,692 06 Improvements - Adams Construction Surveying Sum 25,000.00 28,762.00 0.00 0.00

Avenue (ATAP) 5.66% 4.68% 0.00% 0.00%

(48266//1141) 1 Bids Tendered

2011 F M A T S Area Surface 642(1) Lump 1 5,000.00 5,033.33 5,100.00 677,767 07 Upgrades FFY2011 Construction Surveying Sum 15,000.00 5,000.00 5,100.00 5,000.00

(33057/63814/1141) 1.54% 0.74% 0.68% 0.53%

3 Bids Tendered

2009 Kenai Area Roads 642(1) Lump 1 5,000.00 10,000.00 15,000.00 1,194,692 05 Resurfacing, 2009 (Gas Construction Surveying Sum 15,000.00 15,000.00 5,000.00 0.00

Well Road & Wendy Lane) 0.92% 1.26% 0.42% 0.00%

(21492/51595/1141) 2 Bids Tendered

2018 HSIP: Jewel Lake Road 642(1) Lump 1 54,000.00 58,695.11 65,000.00 5,719,942 07 Widening, 88th Avenue to Construction Surveying Sum 77,480.00 60,000.00 56,000.00 60,000.00

Strawberry Road 1.20% 1.05% 0.94% 0.96%

(48484/57310/1141) 9 Bids Tendered

2009 Galena Road Resurfacing 642(1) Lump 1 21,000.00 35,921.67 46,000.00 1,220,000 05 Bid Opened: 05/12/2009 Construction Surveying Sum 14,000.00 45,000.00 21,030.00 40,000.00

(17119/62060/1141) 1.25% 3.69% 1.68% 2.89%

6 Bids Tendered

2011 FMATS ADA Curb Corner 642(1) Lump 1 5,000.00 29,166.67 48,000.00 722,520 07 & Sidewalk Upgrades - Construction Surveying Sum 5,800.00 8,500.00 38,500.00 5,000.00

Stage 1 0.87% 1.18% 4.29% 0.51%

(33280/60439/1141) 6 Bids Tendered

2011 JNU - Bridge Repair, Basin 642(1) Lump 1 1,000.00 10,719.93 16,100.00 1,256,788 05 Road Trestle Construction Surveying Sum 5,000.00 16,100.00 1,000.00 16,000.00

(33038/68979/1141) 0.41% 1.28% 0.07% 1.06%

4 Bids Tendered

2009 HAINES HIGHWAY - Front 642(1) Lump 1 30,900.00 30,900.00 30,900.00 1,833,512 07 Street To Union Street Construction Surveying Sum 10,000.00 30,900.00 0.00 0.00

Rehabilitation 0.43% 1.69% 0.00% 0.00%

(20894/68948/1141) 1 Bids Tendered

2011 Taylor Highway MP 70 642(1) Lump 1 10,000.00 27,622.22 54,000.00 1,656,700 05 Lost Chicken Slide Construction Surveying Sum 100,000.00 24,000.00 22,000.00 30,000.00

(32215/63379/1141) 3.88% 1.45% 1.16% 1.54%

9 Bids Tendered

Page 22: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 22 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2017 Richardson Highway MP 642(1) Lump 1 25,000.00 26,804.33 28,413.00 1,364,112 06 337 Eielson AFB Construction Surveying Sum 30,000.00 28,413.00 27,000.00 25,000.00

Intersection Improvements 1.75% 2.08% 1.96% 1.59%

(46282//1141) 3 Bids Tendered

2009 Mertarvik Barge Facility 642(1) Lump 1 18,700.00 34,583.33 75,000.00 2,442,000 03 (20456/50850/1141) Construction Surveying Sum 5,000.00 22,400.00 28,400.00 18,700.00

6 Bids Tendered 0.23% 0.92% 0.95% 0.61%

2017 Farmers Loop Resurfacing 642(1) Lump 1.0 150,000.00 168,333.33 180,000.00 12,656,111 06 and Signal Interconnect Construction Surveying Sum 100,000.00 175,000.00 150,000.00 180,000.00

(47065) (Alt) 0.66% 1.38% 1.11% 1.32%

3 Bids Tendered

2018 Bethel Ridgecrest Drive 642(1) Lump 1 50,000.00 50,000.00 50,000.00 2,415,196 07 Rehabilitation; Construction Surveying Sum 50,000.00 50,000.00 0.00 0.00

HSIP: 15CN01 Bethel 2.27% 2.07% 0.00% 0.00%

Ridgecrest Drive School Zone Upgrades; HSIP: 15CR01 Akakeek Street and Ridgecrest Drive Intersection Improvements (48470//1141) 1 Bids Tendered

2018 Dalton Hwy MP 89-90 642(1) Lump 1 25,000.00 49,166.67 75,000.00 2,085,850 07 Embankment Stabilization Construction Surveying Sum 25,000.00 75,000.00 25,000.00 45,000.00

(48451//1141) 0.99% 3.60% 1.13% 1.98%

6 Bids Tendered

2018 Chicken Airport Access 642(1) Lump 1 10,000.00 14,750.00 19,500.00 518,974 06 Road Resurfacing Construction Surveying Sum 15,000.00 19,500.00 10,000.00 0.00

(48004//1141) 3.53% 3.76% 1.70% 0.00%

2 Bids Tendered

2009 JNU - Glacier Highway * 642(1) Lump 1 130,000.00 199,666.67 269,000.00 9,793,198 06 Trailhead Stage II - Construction Surveying Sum 170,000.00 130,000.00 269,000.00 200,000.00

Amalga Harbor to Kayak 1.71% 1.33% 2.72% 1.89%

Launch (19996/68832/1141) 3 Bids Tendered

2017 HSIP: Sterling Hwy MP 642(1) Lump 1 30,000.00 39,900.00 50,000.00 1,980,177 08 89.8 Left Turn Lanes Construction Surveying Sum 10,000.00 43,000.00 35,000.00 30,000.00

(47285/CFHWY00155/1141) 0.35% 2.17% 1.57% 1.28%

5 Bids Tendered

2009 JNU- Mendenhall Loop to 642(1) Lump 1 10,000.00 10,000.00 10,000.00 2,878,170 07 Ferry Terminal Construction Surveying Sum 30,000.00 10,000.00 10,000.00 0.00

(23372/68901/1141) 0.90% 0.35% 0.31% 0.00%

2 Bids Tendered

2009 JNU- Mendenhall Loop to 642(1) Each 1.0 10,000.00 10,000.00 10,000.00 2,878,170 07 Ferry Terminal (23372) Construction Surveying (Alt) 30,000.00 10,000.00 10,000.00 0.00

2 Bids Tendered 0.90% 0.35% 0.31% 0.00%

Page 23: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 23 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2011 Jnu - Glacier Hwy - North 642(1) Lump 1 105,000.00 160,000.00 200,000.00 10,369,300 09 Eagle Beach Kayak Construction Surveying Sum 200,000.00 175,000.00 200,000.00 105,000.00

Launch to Bessie Creek 1.58% 1.69% 1.76% 0.85%

(32656/67526/1141) 3 Bids Tendered

2017 Galena Campion Road 642(1) Lump 1 20,000.00 22,500.00 30,000.00 1,222,355 08 Beaver Creek Culvert Construction Surveying Sum 40,000.00 20,000.00 30,000.00 25,000.00

Replacement May 2013 2.24% 1.64% 2.33% 1.79%

ER Flooding (46438/64066/1141) 6 Bids Tendered

2017 Richardson Highway MP 642(1) Lump 1 24,000.00 34,083.33 55,000.00 3,030,526 06 80-82 Resurfacing & Construction Surveying Sum 25,000.00 40,000.00 25,500.00 24,000.00

Drainage Improvemnts 0.83% 1.32% 0.69% 0.62%

(46367/60613/1141) 6 Bids Tendered

2009 Sawmill Creek Road - 642(1) Lump 1 24,800.00 26,100.00 27,000.00 1,983,405 03 Halibut Point Road Construction Surveying Sum 50,500.00 26,500.00 24,800.00 27,000.00

Roundabout 2.28% 1.34% 1.23% 1.29%

(19212/68999/1141) 3 Bids Tendered

2009 Chena Hot Springs Road 642(1) Lump 1 62,000.00 77,520.00 100,000.00 9,525,695 03 MP 24-56 Rehabilitation: Construction Surveying Sum 75,000.00 85,000.00 62,000.00 65,000.00

Bids Opened 03/12/2009 0.67% 0.89% 0.64% 0.66%

(17952/61425/1141) 7 Bids Tendered

2017 Fairview Loop Realign 642(1) Lump 1 30,000.00 39,388.17 60,000.00 2,151,595 06 at Knik Goose Bay Road Construction Surveying Sum 60,000.00 32,000.00 35,000.00 47,000.00

(47194/Z548000000/1141) 2.05% 1.49% 1.51% 1.93%

7 Bids Tendered

2011 Gustavus Public Dock and 642(1) Lump 1 5,000.00 7,983.33 10,000.00 1,377,485 09 Floats Construction Surveying Sum 7,500.00 8,950.00 10,000.00 5,000.00

(32573/69909/69475/1141) 0.43% 0.65% 0.59% 0.29%

3 Bids Tendered

2009 Emmonak Flood 642(1) Lump 1 35,000.00 53,405.00 100,000.00 1,945,115 07 Permanent Repairs Construction Surveying Sum 20,000.00 100,000.00 39,360.00 35,000.00

(May'05): Airport/Clinic 0.86% 5.14% 1.80% 1.53%

Road Bid Opened: 07/23/2009 (16392/62754/1141) 6 Bids Tendered

2009 JNU Floyd Dryden 642(1) Lump 1 3,500.00 3,657.03 3,814.06 213,090 07 Pedestrian Activated Construction Surveying Sum 4,000.00 3,814.06 3,500.00 0.00

(Hawk) Signal 1.80% 1.79% 1.53% 0.00%

(23392/79080/1141) 2 Bids Tendered

2017 Palmer-Wasilla Highway 642(1) Lump 1 4,000.00 39,972.50 52,800.00 4,648,330 06 Eastern Terminus, Phase I Construction Surveying Sum 215,000.00 42,000.00 46,000.00 35,750.00

(47145/51363/1141) 3.86% 0.90% 0.96% 0.72%

9 Bids Tendered

Page 24: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 24 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2009 Chena Hot Springs Road 642(1) Mile 30.0 2,066.67 2,584.00 3,333.33 9,525,695 03 MP 24-56 Rehabilitation: Construction Surveying (Alt) 2,500.00 2,833.33 2,066.67 2,166.67

Bids Opened 03/12/2009 0.67% 0.89% 0.64% 0.66%

(17952) 7 Bids Tendered

2018 AMATS: Brayton Dr: 642(1) Lump 1 15,500.00 17,093.75 19,375.00 1,109,658 05 DeArmoun Rd - O'Malley Construction Surveying Sum 15,000.00 16,000.00 15,500.00 17,500.00

Rd Pavement Preservation 1.09% 1.44% 1.31% 1.45%

(48413/58575/1141) 4 Bids Tendered

2018 Glenn Hwy: S. Inner 642(1) Lump 1 240,000.00 261,250.00 280,000.00 36,616,095 05 Springer Loop to W. Arctic Construction Surveying Sum 500,000.00 250,000.00 275,000.00 240,000.00

Avenue 1.24% 0.68% 0.72% 0.60%

Glenn Hwy: S. Inner Springer Loop to W. Arctic Avenue Pathway (48402//1141) 4 Bids Tendered

2009 PSG - Mitkof HWY - Scow 642(1) Lump 1 25,000.00 76,333.33 104,000.00 4,592,240 06 Bay to Crystal Lake Construction Surveying Sum 60,000.00 25,000.00 104,000.00 100,000.00

Hatchery Road 1.01% 0.54% 1.81% 1.45%

(18612/68819/1141) 3 Bids Tendered

2009 CR: Bridge Repair - Trail 642(1) Lump 1 20,000.00 29,928.57 84,000.00 4,964,043 08 Rv, Falls Cr, Ptarmigan Construction Surveying Sum 30,000.00 20,000.00 20,000.00 20,000.00

(GO), Phase III 0.58% 0.40% 0.37% 0.37%

(24133/51967/1141) 7 Bids Tendered

2017 Sterling Highway Beluga 642(1) Lump 1 10,000.00 14,829.50 23,120.00 1,094,150 10 Lake Dam Improvements Construction Surveying Sum 10,000.00 12,000.00 18,112.50 23,120.00

(47427/58672/1141) 1.16% 1.10% 1.37% 1.73%

5 Bids Tendered

2011 Marshall Airport Access 642(1) Lump 1 14,500.00 30,137.50 50,000.00 4,140,477 05 Road Bridge Replacement Construction Surveying Sum 35,000.00 31,000.00 20,325.00 14,500.00

(33095/62219/1141) 0.92% 0.75% 0.44% 0.31%

6 Bids Tendered

2018 (67509 & 00057) Hns Hwy 642(1) LUMP 1 88,000.00 88,000.00 88,000.00 6,157,603 07 & Old Haines Hwy Construction Surveying SUM 15,000.00 88,000.00 0.00 0.00

Resurface, Hns Airport 0.26% 1.43% 0.00% 0.00%

Access Rd. (48265/00057/67509/1141) 1 Bids Tendered

2009 Seward Hwy MP 43-50 642(1) Lump 1 40,000.00 57,000.00 75,000.00 8,862,510 02 Pvmt Refurbishment Construction Surveying Sum 50,000.00 50,000.00 65,000.00 75,000.00

(19472/59296/1141) 0.50% 0.56% 0.71% 0.78%

5 Bids Tendered

Page 25: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 25 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2009 CR: Bridge Repair - Trail 642(1) Lump 1 20,000.00 21,500.00 26,000.00 3,583,367 02 Rv, Falls Cr, Ptarmigan Construction Surveying Sum 35,000.00 20,000.00 20,000.00 20,000.00

(GO), Phase II 0.90% 0.56% 0.54% 0.49%

(18933/51931/1141) 4 Bids Tendered

2018 Ktn - Airport Creek Bridge 642(1) Lump 1 20,000.00 42,083.33 80,000.00 1,878,256 08 (USFS) Construction Surveying Sum 25,000.00 30,000.00 40,000.00 41,500.00

(47167/68226/1141) 1.15% 1.60% 2.13% 1.85%

6 Bids Tendered

2009 North Pole Homestead Rd 642(1) Lump 1 44,000.00 50,200.00 60,000.00 1,250,518 01 / North Pole HS Blvd. Construction Surveying Sum 22,500.00 50,000.00 52,000.00 45,000.00

Ext.-AK146: Bids Opened 1.87% 4.00% 4.07% 3.48%

01/22/2009 (6183/63025//1141) 5 Bids Tendered

2010 Kalifornsky Beach Road, 642(1) Lump 1 30,000.00 45,800.00 60,000.00 1,195,515 05 Pedestrian Pathway (GF) Construction Surveying Sum 15,000.00 35,000.00 54,000.00 60,000.00

(28634/51482/1141) 1.39% 2.93% 3.95% 4.06%

5 Bids Tendered

2009 Valdez Areawide Bike & 642(1) Lump 1 5,000.00 11,666.67 20,000.00 796,170 06 Ped Trail Pavement Construction Surveying Sum 20,000.00 5,000.00 10,000.00 20,000.00

Refurbishment 1.77% 0.63% 0.82% 1.60%

(22952/62422/1141) 3 Bids Tendered

2009 KTN- North Tongass 642(1) Labor 100.0 200.00 273.33 370.00 1,129,532 04 Safety Improvements Construction Surveying Hour 150.00 200.00 370.00 250.00

(13373) (Alt) 0.89% 1.77% 3.19% 1.87% 3 Bids Tendered

2010 Kalifornsky Beach Rd; 642(1) Lump 1 4,000.00 10,641.88 30,401.25 1,953,352 02 Coal Creek Fish Passage Construction Surveying Sum 15,000.00 30,401.25 8,000.00 4,500.00

(26835/51170/1141) 0.91% 1.56% 0.41% 0.22%

6 Bids Tendered

2010 CENTRAL REGION 642(1) Lump 1 0.00 25,327.03 38,000.00 2,390,565 04 SCHOOL ZONE Construction Surveying Sum 20,000.00 31,750.00 38,000.00 26,985.14

UPGRADES 1.22% 1.33% 1.58% 0.97%

(28093/58298/1141) 5 Bids Tendered

2010 AMHS SW Warehouse 642(1) Lump 1 8,472.00 14,460.00 24,508.00 639,474 10 (28695/69054/1141) Construction Surveying Sum 4,715.00 8,472.00 10,400.00 24,508.00

3 Bids Tendered 0.65% 1.32% 1.53% 3.58%

2010 Chester Creek Trail 642(1) Lump 1 40,000.00 49,034.46 55,000.00 2,874,171 03 Connection Project Construction Surveying Sum 40,000.00 47,880.00 47,960.00 51,842.50

(27113/55066/1141) 1.20% 1.67% 1.61% 1.73%

9 Bids Tendered

2018 Portage Glacier Rd 642(1) Lump 1 12,240.00 17,310.00 22,000.00 2,253,083 01 Resurfacing; MP 4.7 to Construction Surveying Sum 40,000.00 12,240.00 20,000.00 22,000.00

Whittier Tunnel 1.46% 0.54% 0.83% 0.90%

(47989//1141) 4 Bids Tendered

Page 26: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 26 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2010 Tok Bike Path 642(1) Lump 1 50,000.00 75,000.00 155,000.00 2,034,860 10 Rehabilitation Construction Surveying Sum 50,000.00 60,000.00 60,000.00 50,000.00

(26935/63501/1141) 1.86% 2.95% 2.86% 2.38%

5 Bids Tendered

2010 Japonski Island Utility And 642(1) Lump 1 20,000.00 25,000.00 30,000.00 1,576,571 02 Road Improvements Construction Surveying Sum 35,000.00 25,000.00 20,000.00 30,000.00

(11912/68790/1141) 2.12% 1.59% 1.26% 1.79%

3 Bids Tendered

2010 AMATS: Jewel Lake Road 642(1) Lump 1 18,000.00 19,333.33 20,000.00 1,977,927 02 Resurfacing, Dimond Construction Surveying Sum 15,000.00 18,000.00 20,000.00 20,000.00

Boulevard To West 63rd 0.62% 0.91% 0.85% 0.81%

Ave (27034/51987/1141) 3 Bids Tendered

2018 WRG - Evergreen Ave. 642(1) Lump 1 100,000.00 115,000.00 130,000.00 4,674,097 04 Improvements and Construction Surveying Sum 160,000.00 130,000.00 100,000.00 0.00

Pedestrian Access 3.38% 2.78% 2.10% 0.00%

(43122/Z680290000/1141) 2 Bids Tendered

2018 Alaska Highway MP 1309 642(1) Lump 1 44,000.00 63,166.67 100,000.00 9,911,534 04 Tok River Bridge Construction Surveying Sum 60,000.00 65,000.00 44,000.00 50,000.00

Replacement 0.53% 0.66% 0.43% 0.45%

(47902//1141) 6 Bids Tendered

2010 KTN-Totem Bight To 642(1) Lump 1 85,000.00 92,500.00 100,000.00 8,744,515 03 Whipple Creek Construction Surveying Sum 112,000.00 100,000.00 85,000.00 0.00

(17733/67443/1141) 1.16% 1.14% 0.96% 0.00%

2 Bids Tendered

2018 Mat-Su Area Roads 642(1) Lump 1 100,000.00 107,249.71 120,000.00 7,494,743 04 Pavement Preservation Construction Surveying Sum 176,000.00 100,000.00 120,000.00 108,600.00

(Group C) 1.97% 1.33% 1.59% 1.42%

(48242/58977/1141) 7 Bids Tendered

2010 Glenn Highway MP 109 to 642(1) Lump 1 65,000.00 75,107.25 90,429.00 9,874,455 10 118 Resurfacing Construction Surveying Sum 100,000.00 75,000.00 70,000.00 65,000.00

(31573/52095/1141) 0.98% 0.76% 0.68% 0.61%

4 Bids Tendered

2013 Ktn - White River Road 642(1) Lump 1 7,000.00 13,333.33 18,000.00 542,185 09 Gravel Surfacing Construction Surveying Sum 10,000.00 18,000.00 15,000.00 7,000.00

(41403/68254/1141) 1.27% 3.32% 2.71% 1.03%

3 Bids Tendered

2018 Nenana Little Goldstream 642(1) Lump 1 9,950.00 17,550.00 28,000.00 936,532 01 Bridge Replacement Construction Surveying Sum 30,000.00 15,000.00 28,000.00 11,000.00

(#2080) (45491//1141) 1.84% 1.60% 2.97% 1.10%

9 Bids Tendered

2010 Angoon Ferry Terminal 642(1) Lump 1 28,000.00 47,666.67 65,000.00 6,298,762 03 Improvements Construction Surveying Sum 50,000.00 65,000.00 50,000.00 28,000.00

(14272/68502/1141) 0.74% 1.03% 0.79% 0.42%

3 Bids Tendered

Page 27: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 27 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2010 Japonski Island Utility And 642(1) Lump 1 4,500.00 6,166.67 8,000.00 1,576,571 02 Road Improvements Construction Surveying Sum 5,000.00 4,500.00 6,000.00 8,000.00

(11912/68790/1141) 0.30% 0.29% 0.38% 0.48%

3 Bids Tendered

2018 Seward Highway, MP 642(1) Lump 1.0 149,895.90 293,723.98 650,000.00 51,418,510 02 75-90 Road and Bridge Construction Surveying Sum 400,000.00 175,000.00 200,000.00 650,000.00

Rehabilitation, Phase I (Alt) 0.56% 0.34% 0.38% 0.87%

(48081) 4 Bids Tendered

2010 F N S B Surface Upgrades 642(1) Lump 1 500.00 1,666.67 3,000.00 298,437 07 F F Y 2010 Construction Surveying Sum 10,000.00 500.00 1,500.00 3,000.00

(27995/63444/1141) 2.29% 0.17% 0.49% 0.67%

3 Bids Tendered

2010 Wendell Avenue ADA 642(1) Lump 1 25,000.00 28,500.00 32,000.00 1,573,111 07 Improvements Construction Surveying Sum 27,000.00 25,000.00 32,000.00 0.00

(29033/60827/1141) 1.75% 1.59% 1.79% 0.00%

2 Bids Tendered

2010 F N S B Surface Upgrades 642(1) Each 1.0 500.00 1,666.67 3,000.00 298,437 07 F F Y 2010 (27995) Construction Surveying (Alt) 10,000.00 500.00 1,500.00 3,000.00

3 Bids Tendered 2.29% 0.17% 0.49% 0.67%

2010 23rd Avenue 642(1) Lump 1.0 55,000.00 57,500.00 60,000.00 2,405,270 07 Improvements (28375) Construction Surveying Sum 75,000.00 55,000.00 57,500.00 60,000.00

3 Bids Tendered (Alt) 2.60% 2.29% 2.16% 2.10%

2010 JNU-Glacier Spur Road 642(1) Lump 1 2,000.00 2,000.00 2,000.00 1,135,309 06 (Pavement Rehabilitation) Construction Surveying Sum 10,000.00 2,000.00 0.00 0.00

(20472/69348/1141) 0.88% 0.18% 0.00% 0.00%

1 Bids Tendered

2018 HSIP: Phillips Field Road 642(1) Lump 1 30,000.00 32,500.00 35,000.00 3,244,574 02 Safety Improvements and Construction Surveying Sum 85,000.00 35,000.00 30,000.00 0.00

Phillips Field Road - 2.32% 1.08% 0.92% 0.00%

Automated Vehicle Classification (46888//7546) 2 Bids Tendered

2010 FMATS Bike Path 642(1) Lump 1 4,000.00 6,666.67 10,000.00 266,787 06 Rehabilitation Construction Surveying Sum 10,000.00 6,000.00 4,000.00 10,000.00

(27075/63448/1141) 4.75% 2.25% 1.31% 3.11%

3 Bids Tendered

2010 Glenn Highway Lighting, 642(1) Lump 1 31,655.00 53,515.04 117,140.26 9,162,250 09 S. Birchwood To Eklutna Construction Surveying Sum 135,000.00 45,000.00 33,416.00 31,655.00

(30933/51970/1141) 1.02% 0.49% 0.36% 0.33%

7 Bids Tendered

2018 SEA - SR Regionwide 642(1) Lump 1 1,850.00 9,016.25 27,880.00 373,425 02 Non-NHS Culvert Construction Surveying Sum 2,000.00 5,000.00 3,500.00 27,880.00

Repair/Replace 0.53% 1.34% 0.92% 7.23%

(44957/68659/7546) 8 Bids Tendered

Page 28: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 28 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2010 Parks Hwy MP 349 Alder 642(1) Lump 1.0 23,700.00 26,850.00 30,000.00 3,383,525 07 Creek Culvert Construction Surveying Sum 10,000.00 30,000.00 23,700.00 0.00

Replacement (30093) (Alt) 0.52% 0.89% 0.68% 0.00%

2 Bids Tendered

2010 Parks Hwy MP 349 Alder 642(1) Lump 1 23,700.00 26,850.00 30,000.00 3,383,525 07 Creek Culvert Construction Surveying Sum 10,000.00 30,000.00 23,700.00 0.00

Replacement 0.52% 0.89% 0.68% 0.00%

(30093/63306/1141) 2 Bids Tendered

2010 Angoon Ferry Terminal 642(1) Lump 1 31,000.00 50,333.33 70,000.00 6,116,315 06 Improvements, Re-Bid Construction Surveying Sum 50,000.00 50,000.00 70,000.00 31,000.00

(27733/68502/1141) 0.74% 0.82% 1.09% 0.48%

3 Bids Tendered

2010 Dillingham Wood River 642(1) Lump 1 80,000.00 96,000.00 110,000.00 9,994,028 03 Road Reconstruction Construction Surveying Sum 125,000.00 100,000.00 80,000.00 90,000.00

(27513/55130/1141) 1.23% 1.00% 0.74% 0.80%

5 Bids Tendered

2010 JNU-FFY09 Areawide 642(1) Lump 1 2,000.00 7,000.00 12,000.00 1,068,730 03 Paving Construction Surveying Sum 25,000.00 2,000.00 12,000.00 0.00

(24834/68837/1141) 1.93% 0.19% 0.96% 0.00%

2 Bids Tendered

2010 Sterling Highway MP 642(1) Lump 1 25,000.00 27,750.00 35,000.00 3,750,509 09 90-82 Resurfacing Construction Surveying Sum 36,000.00 26,000.00 25,000.00 25,000.00

(29634/52493/1141) 0.65% 0.69% 0.63% 0.63%

4 Bids Tendered

2010 AMATS: Old Glenn Hwy S. 642(1) Lump 1 125,000.00 169,200.00 190,000.00 12,682,497 03 Birchwood Loop to Peters Construction Surveying Sum 150,000.00 125,000.00 190,000.00 166,000.00

Creek (27774/50946/1141) 0.83% 0.99% 1.32% 1.13%

5 Bids Tendered

2009 Craig-Klawock Highway 642(1) Lump 1 10,000.00 15,833.33 20,000.00 3,113,538 06 Resurfacing Construction Surveying Sum 60,000.00 20,000.00 10,000.00 17,500.00

(18872/68784/1141) 1.49% 0.64% 0.31% 0.45%

3 Bids Tendered

2011 Northern Region Deferred 642(1) Lump 1 6,000.00 9,333.33 12,000.00 634,448 06 Maintenance F Y11: Construction Surveying Sum 10,000.00 6,000.00 12,000.00 10,000.00

Dawson, Lineman & 1.23% 0.95% 1.81% 1.32%

Newby Resurfacing (33271/63639/1141) 3 Bids Tendered

2009 Blueberry Lake Road 642(1) Lump 1 5,000.00 9,166.67 12,500.00 872,308 06 Improvements Construction Surveying Sum 20,000.00 10,000.00 5,000.00 12,500.00

(22953/62424/1141) 2.86% 1.15% 0.55% 1.13%

3 Bids Tendered

2011 Kasaan Harbor 642(1) Lump 1 5,000.00 10,700.00 17,100.00 1,372,534 06 Improvements Construction Surveying Sum 5,000.00 17,100.00 5,000.00 10,000.00

(33308/67953/1141) 0.34% 1.25% 0.34% 0.67%

3 Bids Tendered

Page 29: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 29 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2011 Seward Meridian Prkwy 642(1) Lump 1 100,000.00 128,160.00 150,000.00 11,989,291 06 Rd Imprvmnts, Ph I Parks Construction Surveying Sum 130,000.00 130,000.00 100,000.00 150,000.00

to Palmer-Wasilla Hwy 0.87% 1.08% 0.82% 1.07%

(33646/51184/1141) 5 Bids Tendered

2017 Birch Hill Bicycle and 642(1) Lump 1 35,000.00 44,500.00 63,000.00 1,634,123 07 Pedestrian Facility Construction Surveying Sum 55,000.00 40,000.00 40,000.00 35,000.00

(46027/63768/1141) 3.42% 2.45% 2.23% 1.87%

4 Bids Tendered

2017 Elliott Highway MP 642(1) Lump 1 25,000.00 111,443.86 183,307.00 2,798,511 07 107.7-120.5 Surfacing - Construction Surveying Sum 75,000.00 151,800.00 100,000.00 183,307.00

2nd Contract 2.42% 5.42% 2.80% 5.00%

(47051//1141) 7 Bids Tendered

2011 McCarthy Rd & Edgerton 642(1) Lump 1 8,200.00 19,368.75 35,500.00 967,365 05 Hwy Flood Permanent Construction Surveying Sum 50,000.00 35,500.00 8,200.00 21,000.00

Repairs ( Oct '06 ) 5.10% 3.67% 0.84% 2.07%

(29893/77083/1141) 8 Bids Tendered

2009 Denali Highway Wayside 642(1) Lump 1 7,500.00 14,013.09 28,350.00 330,126 06 MP 7 Bid Opened: Construction Surveying Sum 22,400.00 8,000.00 8,200.00 10,000.00

06/23/09 5.87% 2.42% 2.05% 2.36%

(19974/60930/1141) 11 Bids Tendered

2011 Girdwood Streets And 642(1) Lump 1 40,000.00 52,940.00 120,000.00 2,834,021 09 Drainage Improvements Construction Surveying Sum 40,000.00 40,000.00 41,000.00 45,400.00

(34095/57057/1141) 1.14% 1.41% 1.33% 1.39%

10 Bids Tendered

2009 Williamsport - Pile Bay 642(1) Lump 1 100,000.00 169,955.11 345,000.00 4,645,000 03 Road (20012/51651/1141) Construction Surveying Sum 100,000.00 145,021.50 118,000.00 135,000.00

14 Bids Tendered 1.51% 3.12% 2.41% 2.60%

2017 Farmers Loop Resurfacing 642(1) Lump 1 150,000.00 168,333.33 180,000.00 12,656,111 06 and Signal Interconnect Construction Surveying Sum 100,000.00 175,000.00 150,000.00 180,000.00

(47065//7546) 0.66% 1.38% 1.11% 1.32%

3 Bids Tendered

2018 HSIP: OLD GLENN & 642(1) Lump 1 24,000.00 32,250.00 45,000.00 3,970,421 07 KGB: WIDER LANE Construction Surveying Sum 18,514.96 45,000.00 30,000.00 30,000.00

LINES, PH I: KGB MP 8.1 0.45% 1.13% 0.75% 0.73%

- 20 (48468//1141) 4 Bids Tendered

2011 Persinger Drive/Chena 642(1) Lump 1 2,600.00 7,165.00 14,000.00 295,820 08 Slough Culvert Construction Surveying Sum 10,000.00 3,000.00 2,600.00 10,000.00

Replacement 2.71% 1.01% 0.82% 2.97%

(33779/63847/1141) 8 Bids Tendered

Page 30: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 30 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2018 AMATS: Rabbit Creek 642(1) Lump 1 31,000.00 35,333.33 40,000.00 5,068,928 06 Road Pavement Construction Surveying Sum 50,000.00 35,000.00 31,000.00 40,000.00

Preservation 0.97% 0.69% 0.60% 0.78%

(48393/58511/1141) 3 Bids Tendered

2009 Minnesota Drive 642(1) Lump 1 24,000.00 25,500.00 27,000.00 6,809,020 04 Resurfacing (22032/51135 Construction Surveying Sum 80,000.00 24,000.00 24,000.00 27,000.00

51340/1141) 0.92% 0.35% 0.35% 0.35%

4 Bids Tendered

2009 KTN- North Tongass 642(1) Lump 1 20,000.00 27,333.33 37,000.00 1,129,532 04 Safety Improvements Construction Surveying Sum 15,000.00 20,000.00 37,000.00 25,000.00

(13373/67423/1141) 0.89% 1.77% 3.19% 1.87%

3 Bids Tendered

2010 Stevens Village Sanitation 642(1) Lump 1 27,000.00 64,100.00 100,000.00 1,250,601 09 Road (26373/61532/1141) Construction Surveying Sum 75,000.00 27,000.00 50,000.00 60,000.00

5 Bids Tendered 2.84% 2.16% 2.33% 2.50%

2018 Williamsport-Pile Bay 642(1) Lump 1 30,000.00 54,584.17 95,000.00 7,065,003 01 Road: Iliamna River Bridge Construction Surveying Sum 32,000.00 95,000.00 40,000.00 60,000.00

Replacement 0.50% 1.34% 0.54% 0.75%

(47969/55110/7546) 6 Bids Tendered

2010 Geist Road Rehabilitation 642(1) Lump 1 35,000.00 40,000.00 50,000.00 2,139,893 09 (28993/63360/1141) Construction Surveying Sum 30,000.00 35,000.00 35,000.00 50,000.00

3 Bids Tendered 1.18% 1.64% 1.53% 2.02%

2018 Nenana Little Goldstream 642(1) Each 1.0 9,950.00 17,550.00 28,000.00 936,532 01 Bridge Replacement Construction Surveying (Alt) 30,000.00 15,000.00 28,000.00 11,000.00

(#2080) (45491) 1.84% 1.60% 2.97% 1.10%

9 Bids Tendered

2010 HSIP:13th Avenue At 642(1) Lump 1 5,460.00 7,302.58 12,000.00 697,735 03 Gambell Street Construction Surveying Sum 10,000.00 5,600.00 5,638.09 5,460.00

Channelization 1.26% 0.80% 0.72% 0.69%

ImprovementS (27854/52416/1141) 7 Bids Tendered

2010 North Pole Citywide 642(1) Lump 1 12,500.00 13,833.33 15,000.00 532,373 10 Pavement Rehabilitation Construction Surveying Sum 40,000.00 14,000.00 12,500.00 15,000.00

(25477/62023/1141) 4.77% 2.63% 1.81% 1.77%

3 Bids Tendered

2017 Tudor Road, Minnesota to 642(1) Lump 1 82,000.00 83,500.00 85,000.00 9,986,105 06 E. 36th, Pavement Construction Surveying Sum 150,000.00 82,000.00 85,000.00 0.00

Preservation 1.42% 0.82% 0.79% 0.00%

(47192/58507/1141) 2 Bids Tendered

2010 North Pole Citywide 642(1) Labor 16.0 781.25 864.58 937.50 532,373 10 Pavement Rehabilitation Construction Surveying Hour 2,500.00 875.00 781.25 937.50

(25477) (Alt) 4.77% 2.63% 1.81% 1.77% 3 Bids Tendered

Page 31: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 31 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2011 Port Alexander Inner 642(1) Lump 1 1,500.00 2,833.33 5,000.00 462,720 04 Harbor Improvements Construction Surveying Sum 5,000.00 1,500.00 5,000.00 2,000.00

(33142/69588/1141) 0.72% 0.32% 1.01% 0.35%

3 Bids Tendered

2009 Craig-Klawock Highway 642(1) Each 1.0 10,000.00 15,833.33 20,000.00 3,113,538 06 Resurfacing (18872) Construction Surveying (Alt) 60,000.00 20,000.00 10,000.00 17,500.00

3 Bids Tendered 1.49% 0.64% 0.31% 0.45%

2018 HSIP: OLD GLENN & 642(1) Lump 1.0 24,000.00 32,250.00 45,000.00 3,970,421 07 KGB: WIDER LANE Construction Surveying Sum 18,514.96 45,000.00 30,000.00 30,000.00

LINES, PH I: KGB MP 8.1 (Alt) 0.45% 1.13% 0.75% 0.73%

- 20 (48468) 4 Bids Tendered

2011 Richardson Highway 642(1) Lump 1 40,000.00 109,191.67 140,000.00 8,965,263 07 Flooding Permanent Construction Surveying Sum 65,000.00 120,000.00 140,000.00 40,000.00

Repairs (Oct. 06) 0.58% 1.34% 1.37% 0.37%

(33068/76783/1141) 6 Bids Tendered

2018 Seward Highway, MP 642(1) Lump 1 149,895.90 293,723.98 650,000.00 51,418,510 02 75-90 Road and Bridge Construction Surveying Sum 400,000.00 175,000.00 200,000.00 650,000.00

Rehabilitation, Phase I 0.56% 0.34% 0.38% 0.87%

(48081//1141) 4 Bids Tendered

2009 F N S B Surface and 642(1) Lump 1 3,500.00 7,875.00 12,000.00 632,852 09 Approach Upgrades Construction Surveying Sum 10,000.00 8,000.00 8,000.00 12,000.00

(23693/63172/1141) 1.39% 1.26% 1.25% 1.77%

4 Bids Tendered

2018 Kenai Spur Highway 642(1) Lump 1 60,000.00 116,773.51 286,000.00 12,869,962 03 Rehabilitation: Sports Lake Construction Surveying Sum 100,000.00 286,000.00 120,000.00 80,000.00

Road To Swires Road - 0.72% 2.22% 0.90% 0.59%

Phase I (48214/54594/1141) 6 Bids Tendered

2013 HSIP: Minnesota Dr. 642(1) Each 1.0 0.00 7,741.73 85,159.00 116,500 11 Moose-Vehicle Crash Construction Surveying (Alt) 80,000.00 0.00 0.00 0.00

Mitigation (41883) 2.36% 0.00% 0.00% 0.00%

11 Bids Tendered

2016 Baranof Warm Springs 642(1) Lump 1 6,600.00 18,120.00 30,000.00 1,551,135 02 Harbor Improvements Construction Surveying Sum 15,000.00 6,600.00 10,000.00 30,000.00

(45099/68353/1141) 0.92% 0.43% 0.60% 1.81%

5 Bids Tendered

2013 Tanacross Road 642(1) Lump 1.0 14,000.00 24,285.71 38,000.00 934,999 09 Improvements (36322) Construction Surveying Sum 60,000.00 25,000.00 14,000.00 38,000.00

7 Bids Tendered (Alt) 5.64% 2.67% 1.16% 3.08%

2012 Holt-Lamplight Road 642(1) Lump 1 40,000.00 83,333.33 110,000.00 4,646,626 04 Resurfacing Construction Surveying Sum 95,000.00 100,000.00 110,000.00 40,000.00

(37466/52638/1141) 1.96% 2.15% 2.32% 0.72%

3 Bids Tendered

Page 32: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 32 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2012 Seward Hwy Mp 89 To 642(1) Lump 1 30,000.00 30,333.33 31,000.00 4,436,195 05 96.6 Resurfacing Construction Surveying Sum 45,000.00 30,000.00 30,000.00 31,000.00

(37470/52991/1141) 0.91% 0.68% 0.64% 0.62%

3 Bids Tendered

2012 Nome - Council Road M P 642(1) Lump 1 100,000.00 161,034.09 210,000.00 11,967,372 04 4-16 (36424/66166/1141) Construction Surveying Sum 100,000.00 165,375.00 100,000.00 100,000.00

11 Bids Tendered 0.80% 1.38% 0.83% 0.81%

2017 Seward Road 642(1) Lump 1 5,000.00 8,050.00 11,500.00 2,946,524 03 Improvements Construction Surveying Sum 17,060.00 11,500.00 5,700.00 10,000.00

(46779/N/A/1141) 0.58% 0.39% 0.18% 0.30%

4 Bids Tendered

2017 Seward Road 642(1) Lump 1 50,000.00 58,750.00 73,000.00 2,946,524 03 Improvements Construction Surveying Sum 74,660.00 52,000.00 60,000.00 73,000.00

(46779/N/A/1141) 2.55% 1.76% 1.89% 2.20%

4 Bids Tendered

2017 Ktn Roosevelt Dr & 642(1) Lump 1 42,000.00 43,500.00 45,000.00 1,624,145 03 Franklin Rd Pavement Construction Surveying Sum 5,000.00 45,000.00 42,000.00 0.00

Rehab. 0.30% 2.77% 2.10% 0.00%

(44698/68663/1141) 2 Bids Tendered

2017 Douglas Sidewalk 642(1) Lump 1 7,300.00 13,433.33 18,000.00 414,118 05 Extension - Gastineau Construction Surveying Sum 5,000.00 15,000.00 7,300.00 18,000.00

School To Lawson Creek 1.12% 3.62% 1.68% 3.86%

Rd./Crow Hill Dr.

(47019/SRMBS00024/2501000002/7546)

3 Bids Tendered

2012 South Cushman Street - 642(1) Lump 1 50,000.00 60,625.00 70,000.00 3,098,636 01 Mitchell Expressway To Construction Surveying Sum 30,000.00 70,000.00 52,500.00 50,000.00

Sanduri Street 0.86% 2.26% 1.59% 1.47%

(33536/63289/1141) 4 Bids Tendered

2011 Hyder-Causeway 642(1) Lump 1 65,000.00 88,333.33 100,000.00 7,842,000 10 Reconstruction & Construction Surveying Sum 70,000.00 65,000.00 100,000.00 100,000.00

Extention (Concrete 0.79% 0.83% 1.15% 1.14%

Trestle) (33912/69070/1141) 3 Bids Tendered

2017 Soldotna: Funny River 642(1) Lump 1 20,000.00 24,000.00 28,000.00 1,964,337 05 Road Improvements Construction Surveying Sum 40,000.00 20,000.00 28,000.00 0.00

(47045/53750/1141) 1.66% 1.02% 1.43% 0.00%

2 Bids Tendered

2011 Rezanof Drive Resurfacing 642(1) Lump 1 29,000.00 41,333.33 60,000.00 4,704,798 11 - Kodiak Wye - Monashka Construction Surveying Sum 150,000.00 60,000.00 29,000.00 35,000.00

Bay Road 3.51% 1.28% 0.55% 0.64%

(35118/52105/1141) 3 Bids Tendered

Page 33: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 33 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2011 West Dowling Road - 642(1) Lump 1 100,000.00 105,892.00 117,676.00 13,486,059 11 Phase I, Old Seward Construction Surveying Sum 170,000.00 100,000.00 117,676.00 100,000.00

Highway to C Street & 1.00% 0.74% 0.85% 0.71%

Cordova Street Extension (35201/50898 53454/1141) 3 Bids Tendered

2017 Sterling Highway 58 - 79, 642(1) Lump 1 250,000.00 327,500.00 360,000.00 53,907,758 05 Skilak Lake Road to Construction Surveying Sum 640,000.00 250,000.00 350,000.00 360,000.00

Sterling, Rehabilitation & 1.00% 0.46% 0.60% 0.61%

Passing Lanes; Sterling Highway MP 58-79 Rehabilitation Skilak Lake Road to Sterling, Sterling Highway MP 60-79 (WFLHD) Skilak Lake Road to Sterling; Sterling Highway Kenai NWR Visitor Enhancements (47023/54990, 58431, 58533/1141) 4 Bids Tendered

2012 Parks Highway M P 642(1) Lump 1 50,000.00 115,714.29 150,000.00 12,580,165 05 252-263 Rehabilitation Construction Surveying Sum 100,000.00 100,000.00 150,000.00 135,000.00

(33781/63655/1141) 0.73% 0.79% 1.18% 1.05%

7 Bids Tendered

2011 Seward Hwy 642(1) Lump 1 230,000.00 322,500.00 453,000.00 39,452,755 10 Reconstruction: Dowling Construction Surveying Sum 447,000.00 250,000.00 230,000.00 453,000.00

Rd to Tudor Rd 0.95% 0.63% 0.56% 1.02%

(34838/50816/1141) 4 Bids Tendered

2012 Nome Snake River Bridge 642(1) Lump 1 44,000.00 55,900.00 83,000.00 8,584,329 05 Replacement Construction Surveying Sum 100,000.00 44,000.00 54,000.00 48,500.00

(19492/76745/1141) 1.09% 0.51% 0.62% 0.54%

5 Bids Tendered

2016 Richardson Highway MP 642(1) Lump 1 0.00 0.00 0.00 327,000 11 235 Ruby Creek Bridge Construction Surveying Sum 65,000.00 0.00 0.00 0.00

#0594 MESSED UP 0.96% 0.00% 0.00% 0.00% (44549/60262/1141) 8 Bids Tendered

2012 Egan/yandukin 642(1) Hour 25.0 400.00 400.00 400.00 643,875 04 Intersection Safety Construction Surveying (Alt) 400.00 400.00 0.00 0.00

Enhancements (33662) 1.79% 1.55% 0.00% 0.00% 1 Bids Tendered

2012 Dalton Hwy 9 Mile Hill 642(1) Lump 1 35,000.00 69,089.00 150,000.00 5,342,262 02 North (31053/64899/1141) Construction Surveying Sum 130,000.00 35,000.00 39,000.00 85,000.00

6 Bids Tendered 1.76% 0.66% 0.69% 1.35%

Page 34: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 34 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2017 Fairbanks Area Signal 642(1) Lump 1 99,788.00 103,977.00 109,250.00 14,143,690 04 Upgrades-Stage 1 Construction Surveying Sum 75,000.00 100,000.00 109,250.00 106,870.00

(46308//7546) 0.44% 0.71% 0.75% 0.71%

4 Bids Tendered

2012 Kodiak: Chiniak Road MP 642(1) Lump 1 28,750.00 57,337.50 100,000.00 4,277,730 10 23.7 Improvements Construction Surveying Sum 50,000.00 50,600.00 100,000.00 28,750.00

(38695/58107/1141) 1.32% 1.18% 2.04% 0.53%

4 Bids Tendered

2016 Richardson Highway MP 642(1) Lump 1 55,000.00 67,835.88 85,000.00 5,769,321 11 235 Ruby Creek Bridge Construction Surveying Sum 65,000.00 57,500.00 61,455.00 60,000.00

#0594 0.96% 1.00% 0.93% 0.88%

(46302/60262/1141) 8 Bids Tendered

2017 Port Alexander Outer 642(1) Lump 1 2,000.00 10,870.00 22,000.00 974,910 04 Harbor Improvements Construction Surveying Sum 10,000.00 10,000.00 10,000.00 10,000.00

(46780/83504/1141) 0.74% 1.03% 0.95% 0.94%

7 Bids Tendered

2017 Richardson Highway 642(1) Lump 1 10,000.00 10,000.00 10,000.00 947,919 04 Valdez Glacier Stream Construction Surveying Sum 15,000.00 10,000.00 10,000.00 0.00

Bridge #556 and Lowe 1.43% 1.05% 0.96% 0.00%

River Bridge #558 (46314//1141) 2 Bids Tendered

2012 University Ave Asphalt 642(1) Lump 1 15,000.00 25,000.00 40,000.00 1,368,111 04 Surface Repairs Construction Surveying Sum 50,000.00 20,000.00 15,000.00 40,000.00

(33592/60762/1141) 2.56% 1.46% 0.98% 2.57%

3 Bids Tendered

2017 Homer: East End Road 642(1) Lump 1 37,500.00 43,125.00 50,000.00 6,096,324 04 MP 5.5-12.6 Pavement Construction Surveying Sum 80,000.00 37,500.00 50,000.00 45,000.00

Preservation 1.01% 0.62% 0.78% 0.64%

(46938/58514/1141) 4 Bids Tendered

2012 Egan/yandukin 642(1) Lump 1 10,000.00 10,000.00 10,000.00 643,875 04 Intersection Safety Construction Surveying Sum 10,000.00 10,000.00 0.00 0.00

Enhancements 1.79% 1.55% 0.00% 0.00%

(33662/69402/1141) 1 Bids Tendered

2017 September 2012 and May 642(1) Lump 1 20,000.00 68,222.22 120,000.00 2,359,224 04 2013 ER Denali Hwy Construction Surveying Sum 20,000.00 54,000.00 61,000.00 89,000.00

Corridor Flood Repairs 0.76% 2.29% 2.28% 3.08%

(46834/62699 / 62914 / 62283/1141) 9 Bids Tendered

2012 Parks Highway, MP 52 to 642(1) Lump 1 30,000.00 38,333.33 45,000.00 6,379,578 02 57, Big Lake Road to Construction Surveying Sum 75,000.00 30,000.00 45,000.00 40,000.00

Houston Resurfacing 0.93% 0.47% 0.67% 0.58%

(36625/53469/1141) 3 Bids Tendered

Page 35: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 35 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2012 68688 - Klw To Hollis Pvmt 642(1) Lump 1 80,000.00 101,300.00 134,000.00 12,913,532 02 Rehab - Final Estimate Construction Surveying Sum 40,250.00 134,000.00 80,000.00 89,900.00

(35641/68688/1141) 0.26% 1.04% 0.62% 0.62%

3 Bids Tendered

2017 Seward Road 642(1) Lump 1 5,000.00 7,625.00 12,500.00 2,946,524 03 Improvements Construction Surveying Sum 8,280.00 12,500.00 5,000.00 8,000.00

(46779/N/A/1141) 0.28% 0.42% 0.16% 0.24%

4 Bids Tendered

2012 Copper River Highway 642(1) Lump 1 10,250.00 27,877.88 40,000.00 1,137,720 01 Flooding Permanent Construction Surveying Sum 20,000.00 40,000.00 30,000.00 25,417.26

Repairs (Oct. 06) 1.37% 3.52% 2.05% 1.54%

(33773/76787/1141) 6 Bids Tendered

2011 Haines-2nd Ave. - Union 642(1) Lump 1 30,000.00 37,500.00 45,000.00 2,482,181 10 St. to Main St. & Allen Rd. Construction Surveying Sum 30,000.00 30,000.00 45,000.00 0.00

& Main St. Pavement 1.29% 1.21% 1.45% 0.00%

Rehabilitation (34343/69565/69568/1141) 2 Bids Tendered

2017 Aleknagik Lake Road MP 642(1) Lump 1 90,000.00 117,500.00 150,000.00 5,393,658 06 0-5 Pavement Construction Surveying Sum 92,000.00 130,000.00 100,000.00 90,000.00

Preservation 1.23% 2.41% 1.63% 1.46%

Aleknagik Wood River Bridge Construction - Phase III (47068/CFHWY00169 & CFHWY00107/1141) 4 Bids Tendered

2012 Valdez Tidal Flats Culvert 642(1) Lump 1 35,000.00 46,333.33 64,000.00 1,574,686 09 Replacement AK122 Construction Surveying Sum 20,000.00 40,000.00 35,000.00 64,000.00

(38113/63765/1141) 0.55% 2.54% 1.49% 1.36%

3 Bids Tendered

2012 N R Bicycle / Pedestrian 642(1) Lump 1 3,500.00 9,250.00 18,000.00 233,690 09 Facilities Rehabilitation & Construction Surveying Sum 5,000.00 10,000.00 3,500.00 5,500.00

Improvements 2.25% 4.28% 1.50% 2.10%

(38027/63575/1141) 4 Bids Tendered

2016 Rink Creek Bridge 642(1) Lump 1 0.00 16,176.52 25,000.00 916,825 12 Replacement Construction Surveying Sum 25,000.00 20,000.00 10,000.00 19,000.00

(46407/68064/1141) 2.51% 2.18% 1.00% 1.66%

9 Bids Tendered

2012 Emmonak Landfill Road & 642(1) Lump 1 35,000.00 61,045.13 125,000.00 6,748,620 10 Community Roads Construction Surveying Sum 25,000.00 125,000.00 35,000.00 50,000.00

(36449/61179 & 0.26% 1.85% 0.51% 0.73%

61307/1141) 8 Bids Tendered

Page 36: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 36 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2012 HSIP: Bogard Rd & Peck 642(1) Lump 1 24,600.00 47,120.00 78,000.00 2,530,822 09 St Intersection Construction Surveying Sum 53,000.00 48,000.00 24,600.00 30,000.00

Improvements 2.00% 1.90% 0.96% 1.11%

(38637/51847/1141) 5 Bids Tendered

2012 F M A T S A D A Curb 642(1) Lump 1 5,000.00 13,250.00 25,000.00 598,900 09 Corner & Sidewalk Construction Surveying Sum 4,200.00 5,000.00 5,000.00 18,000.00

Upgrades - Stage 2 0.92% 0.83% 0.82% 2.62%

(37644/63151/1141) 4 Bids Tendered

2012 Steese Highway MP 5-11 642(1) Lump 1 35,000.00 59,333.33 75,000.00 7,189,147 10 Resurfacing Construction Surveying Sum 150,000.00 68,000.00 75,000.00 35,000.00

(38319/63915/1141) 1.74% 0.95% 1.04% 0.45%

3 Bids Tendered

2016 Tok Cutoff MP 0 - 24 642(1) Lump 1 75,000.00 97,873.00 170,000.00 6,367,197 11 Culvert Replacement Construction Surveying Sum 75,000.00 75,000.00 93,500.00 100,000.00

(45784/63017/1141) 1.03% 1.18% 1.24% 1.26%

9 Bids Tendered

2012 Glenn Highway M P 642(1) Lump 1 100,000.00 212,037.11 581,000.00 20,669,751 10 172-189 Rehabilitation Construction Surveying Sum 200,000.00 120,000.00 150,000.00 250,000.00

(38155/60922/1141) 0.88% 0.58% 0.73% 1.11%

9 Bids Tendered

2016 HSIP: Dalton, Elliott and 642(1) Lump 1 35,000.00 50,785.71 60,000.00 942,635 11 Steese Highways Signing Construction Surveying Sum 100,000.00 60,000.00 60,000.00 56,500.00

and Striping 5.44% 6.37% 5.54% 4.92%

(45586/64252/1141) 7 Bids Tendered

2012 Kanakanak Rd: Squaw Cr 642(1) Lump 1 70,000.00 71,833.33 75,000.00 5,598,065 11 Rd To Hospital Construction Surveying Sum 100,000.00 70,000.00 75,000.00 70,500.00

Resurfacing 1.43% 1.25% 1.27% 1.09%

(38959/52458/1141) 3 Bids Tendered

2016 HSIP: Eastern Alaska 642(1) Lump 1 35,000.00 63,000.00 100,000.00 1,231,193 11 Named Highways Signing Construction Surveying Sum 80,000.00 35,000.00 60,000.00 100,000.00

and Striping 3.84% 2.84% 3.88% 6.46%

(46345/64257/1141) 6 Bids Tendered

2012 Sterling Highway MP 45 to 642(1) Lump 1 100,000.00 100,000.00 100,000.00 10,891,541 10 58 Resurfacing Construction Surveying Sum 53,000.00 100,000.00 100,000.00 0.00

Kenai Pen Flood Oct 02, 0.45% 0.92% 0.77% 0.00%

Permanent Repairs, Ph II (38812/52081 56938/1141) 2 Bids Tendered

2012 Emmonak Landfill Road & 642(1) Lump 1 22,000.00 58,964.00 95,000.00 6,748,620 10 Community Roads Construction Surveying Sum 25,000.00 95,000.00 22,000.00 50,000.00

(36449/61179 & 0.26% 1.41% 0.32% 0.73%

61307/1141) 8 Bids Tendered

Page 37: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 37 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2012 F M A T S - Palo Verde 642(1) Lump 1 7,850.00 10,950.00 15,000.00 536,334 10 Ave & North Pole East 5th Construction Surveying Sum 15,000.00 7,850.00 15,000.00 10,000.00

Ave Resurfacing 1.73% 1.46% 2.74% 1.56%

(36425/61905/1141) 3 Bids Tendered

2012 F M A T S Surface & 642(1) Lump 1 5,000.00 25,125.00 60,500.00 1,243,112 10 Approach Upgrades F F Y Construction Surveying Sum 10,000.00 15,000.00 5,000.00 20,000.00

2012 (38236/61888/1141) 0.67% 1.21% 0.40% 1.52%

4 Bids Tendered

2012 JNU Trout Street Bridge 642(1) Lump 1 11,000.00 12,324.44 14,025.00 684,226 06 Replacement BR # 1786 Construction Surveying Sum 17,500.00 11,948.31 14,025.00 11,000.00

(36645/69561/1141) 2.00% 1.75% 1.77% 1.27%

3 Bids Tendered

2017 Seward Highway MP 13.5 642(1) Lump 1 4,200.00 11,057.14 25,000.00 688,678 05 Snow River Erosion Construction Surveying Sum 20,000.00 8,000.00 4,200.00 18,000.00

Prevention (GF) 2.18% 1.16% 0.54% 2.30%

(46973/n/a/1141) 7 Bids Tendered

2017 ANC Postmark Drive 642(1) Lump 1 3,000.00 3,250.00 3,500.00 490,599 05 Repairs 2017 Construction Surveying Sum 16,100.00 3,500.00 3,000.00 0.00

(47002/CSAPT00198/1141) 3.02% 0.71% 0.60% 0.00%

2 Bids Tendered

2011 Glenn Hwy Signing Anch 642(1) Lump 1 20,500.00 43,765.40 80,000.00 3,177,820 11 To Palmer (gf) Construction Surveying Sum 80,000.00 43,000.00 27,000.00 20,500.00

(35463/52334/1141) 1.80% 1.35% 0.81% 0.51%

9 Bids Tendered

2011 Glenn Hwy Signing Anch 642(1) Lump 1.0 20,500.00 43,765.40 80,000.00 3,177,820 11 To Palmer (gf) (35463) Construction Surveying Sum 80,000.00 43,000.00 27,000.00 20,500.00

9 Bids Tendered (Alt) 1.80% 1.35% 0.81% 0.51%

2011 JNU-Thane Road 642(1) Lump 1 50,000.00 50,000.00 50,000.00 4,059,696 10 Pavement Rehabilitation Construction Surveying Sum 20,000.00 50,000.00 0.00 0.00

(28053/69340/1141) 0.46% 1.23% 0.00% 0.00%

1 Bids Tendered

2012 Dalton Highway MP 11-18 642(1) Lump 1 115,000.00 144,857.33 200,000.00 16,424,452 01 Reconstruction Construction Surveying Sum 300,000.00 115,000.00 150,000.00 136,000.00

(35478/62196/1141) 1.35% 0.70% 0.89% 0.69%

9 Bids Tendered

2012 Sawmill Creek Road 642(1) Lump 1 200,000.00 228,533.33 270,000.00 11,789,167 11 Upgrade Construction Surveying Sum 175,000.00 200,000.00 270,000.00 215,600.00

(37924/68216/1141) 1.42% 1.70% 2.12% 1.64%

3 Bids Tendered

2011 Trunk Road 642(1) Lump 1 150,000.00 231,428.57 530,000.00 13,969,176 11 Reconstruction, Phase II Construction Surveying Sum 300,000.00 150,000.00 150,000.00 225,000.00

Palmer-Wasilla Highway to 1.59% 1.07% 0.94% 1.38%

Palmer-Fishhook Rd (35222/51132/1141) 7 Bids Tendered

Page 38: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 38 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2011 Pelican Ferry Terminal 642(1) Lump 1 10,000.00 26,666.67 40,000.00 2,260,860 12 Renovation Construction Surveying Sum 35,000.00 10,000.00 40,000.00 30,000.00

(34072/69433/1141) 1.23% 0.44% 1.66% 1.13%

3 Bids Tendered

2012 Sgy - Pedestrian 642(1) Lump 1 12,000.00 15,194.24 18,582.73 404,660 06 Improvements Construction Surveying Sum 3,000.00 18,582.73 15,000.00 12,000.00

(30593/69304/1141) 0.70% 4.59% 3.58% 2.72%

3 Bids Tendered

2012 Sterling Hwy MP 37-45 642(1) Lump 1 32,000.00 34,000.00 35,000.00 4,799,276 06 Pavement Preservation Construction Surveying Sum 45,000.00 35,000.00 35,000.00 32,000.00

(38025/54128/1141) 0.76% 0.73% 0.68% 0.60%

3 Bids Tendered

2011 Dalton Highway MP 642(1) Lump 1 190,000.00 242,070.00 400,000.00 23,953,284 11 197-209 Rehabilitation Construction Surveying Sum 275,000.00 225,000.00 222,000.00 250,000.00

(33732/61214/1141) 1.15% 0.94% 0.89% 0.94%

7 Bids Tendered

2017 Keku Road 642(1) Lump 1 80,000.00 101,666.67 130,000.00 4,654,967 05 (42702/Z695390000/1141) Construction Surveying Sum 75,000.00 80,000.00 130,000.00 0.00

3 Bids Tendered 1.55% 1.72% 1.76% 0.00%

2011 Gambell Evacuation Road 642(1) Lump 1 60,593.00 127,715.89 300,000.00 6,878,072 11 (33613/63825/1141) Construction Surveying Sum 340,000.00 150,000.00 70,000.00 73,000.00

9 Bids Tendered 2.59% 2.18% 0.95% 0.86%

2017 HSIP: Anchorage Area 642(1) Lump 1 23,000.00 49,014.03 115,000.00 3,554,978 05 Safety Improvements Construction Surveying Sum 55,000.00 39,554.20 41,200.00 35,330.00

HSIP: Lake Otis Parkway 1.27% 1.11% 1.10% 0.92%

at 68th Ave Channelization (46974/58197/56644/1141) 6 Bids Tendered

2016 YAK - Fish Passage 642(1) Lump 1 0.00 18,964.71 48,753.00 588,799 11 Improvements Construction Surveying Sum 10,000.00 24,000.00 10,000.00 25,000.00

(45726/Z680270000/1141) 1.68% 4.08% 1.67% 3.93%

7 Bids Tendered

2013 FMATS Area Surface 642(1) Lump 1 9,800.00 19,700.00 30,000.00 1,159,171 05 Upgrades FFY2013 Construction Surveying Sum 10,000.00 9,800.00 15,000.00 24,000.00

(40871/62358/1141) 0.71% 0.85% 1.28% 1.95%

4 Bids Tendered

2016 AMATS: Bicycle Plan 642(1) Lump 1 18,000.00 22,825.00 27,650.00 564,961 07 Implementation (DOT&PF Construction Surveying Sum 21,500.00 27,650.00 18,000.00 0.00

Owned-Group 1) 3.41% 4.89% 2.91% 0.00%

AMATS: Bicycle Plan Implementation (MOA Owned-Group 1) (45936//1141) 2 Bids Tendered

2013 POW Big Salt Lake Road 642(1) Lump 1 12,500.00 20,350.00 28,200.00 2,620,072 01 Pavement Rehabilitation Construction Surveying Sum 40,000.00 12,500.00 28,200.00 0.00

(38069/67439/1141) 1.19% 0.48% 0.82% 0.00%

2 Bids Tendered

Page 39: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 39 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 Taylor Highway MP 642(1) Lump 1 50,000.00 75,923.41 100,000.00 8,683,260 10 64-Canadian Border (MP Construction Surveying Sum 40,000.00 75,000.00 50,000.00 70,000.00

67 Construction) & Taylor 0.45% 0.86% 0.51% 0.61%

Highway New Waysides (FLAP) (45184/66446 & 60410/1141) 6 Bids Tendered

2012 Juneau-FFY12 Areawide 642(1) Lump 1 20,000.00 20,000.00 20,000.00 1,678,831 11 Paving Construction Surveying Sum 20,000.00 20,000.00 0.00 0.00

(38026/67432/1141) 1.16% 1.19% 0.00% 0.00%

1 Bids Tendered

2012 SGY- Dyea Road 642(1) Lump 1 64,800.00 68,266.67 75,000.00 2,559,735 11 Improvements (Realign) Construction Surveying Sum 50,000.00 75,000.00 65,000.00 64,800.00

(34159/67424/1141) 1.38% 2.93% 1.55% 1.44%

3 Bids Tendered

2016 North Fork Road Bridge 642(1) Lump 1 16,000.00 32,237.50 56,000.00 1,126,215 10 Erosion Repair Construction Surveying Sum 20,000.00 40,000.00 16,000.00 40,000.00

(46238/57908/1141) 1.60% 3.55% 1.30% 3.17%

8 Bids Tendered

2013 CR Hwy Safety Corridor 642(1) Lump 1 22,000.00 24,621.25 31,875.00 1,197,783 07 Near Term Improvements Construction Surveying Sum 20,000.00 31,875.00 22,500.00 22,000.00

(GF) and Parks Hwy & 1.72% 2.66% 1.65% 1.50%

Pittman Rd Signal Modifications (GF) (41206/53425 54602/1141) 4 Bids Tendered

2012 HSIP: Seward Hwy 642(1) Lump 1 150,000.00 153,333.33 160,000.00 10,713,734 11 Turnagain Pass - Potter Construction Surveying Sum 65,000.00 160,000.00 150,000.00 150,000.00

Slow Vehicle Turnouts & 0.58% 1.49% 1.40% 1.37%

Passing Lanes/HSIP: Seward Hwy Milepost 88 Safety Improvements (39059/52451 52121/1141) 3 Bids Tendered

2016 HSIP: Eklutna Overpass 642(1) Lump 1 5,400.00 11,385.71 25,000.00 412,688 09 Bridge Warning 2015 Construction Surveying Sum 19,500.00 25,000.00 6,400.00 10,000.00

(46219/58099/1141) 3.20% 6.06% 1.49% 2.28%

7 Bids Tendered

2013 JNU - Thane Road HSIP 642(1) Lump 1 20,000.00 20,000.00 20,000.00 1,298,675 06 (33305/69331/1141) Construction Surveying Sum 30,000.00 20,000.00 0.00 0.00

1 Bids Tendered 2.69% 1.54% 0.00% 0.00%

2013 Parks Highway MP 240 642(1) Lump 1 5,000.00 19,200.00 49,000.00 486,565 06 Repairs 2013 Construction Surveying Sum 5,000.00 5,000.00 11,000.00 21,000.00

(39953/62283/1141) 0.81% 1.03% 1.57% 2.86%

5 Bids Tendered

Page 40: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 40 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 Kenai Spur Highway MP 642(1) Lump 1 40,000.00 45,000.00 50,000.00 3,872,478 06 0-3 Pavement Construction Surveying Sum 28,000.00 40,000.00 50,000.00 0.00

Preservation 0.78% 1.03% 1.29% 0.00%

(40631/54142/1141) 2 Bids Tendered

2016 HSIP: Eklutna Overpass 642(1) Lump 1.0 5,400.00 11,385.71 25,000.00 412,688 09 Bridge Warning 2015 Construction Surveying Sum 19,500.00 25,000.00 6,400.00 10,000.00

(46219) (Alt) 3.20% 6.06% 1.49% 2.28%

7 Bids Tendered

2012 Sterling Hwy MP 150-169 642(1) Lump 1 73,000.00 89,666.67 116,000.00 11,698,675 11 Pavement Preservation & Construction Surveying Sum 90,000.00 80,000.00 73,000.00 116,000.00

Sterling Hwy MP 169-173 0.78% 0.68% 0.62% 0.96%

Pavement Preservation (39053/54140 54130/1141) 3 Bids Tendered

2012 Juneau-Yandukin Drive / 642(1) Lump 1 25,000.00 25,000.00 25,000.00 1,896,296 11 Shell Simmons Drive Construction Surveying Sum 20,000.00 25,000.00 0.00 0.00

(36724/68045/1141) 1.07% 1.32% 0.00% 0.00%

1 Bids Tendered

2013 Kalifornsky Beach Rd 642(1) Lump 1 38,000.00 43,825.00 56,000.00 1,230,669 07 Pedestrian Pathway (GF) Construction Surveying Sum 25,000.00 38,000.00 39,900.00 40,000.00

(41205/54633/1141) 2.06% 3.09% 3.18% 3.13%

5 Bids Tendered

2016 DELETE THIS ONE. 642(1) Lump 1 4,310.00 18,436.67 46,000.00 294,844 08 Copper River Hwy MP Construction Surveying Sum 5,000.00 4,310.00 46,000.00 5,000.00

20.1 Goose Meadow 3.30% 1.46% 6.73% 0.71%

Culvert (45477//1141) 3 Bids Tendered

2012 Dalton Hwy M P 267 642(1) Lump 1 25,000.00 42,357.14 55,000.00 3,964,939 12 Holden Creek Bridge Construction Surveying Sum 60,000.00 55,000.00 50,000.00 25,000.00

(#1520) 0.95% 1.39% 1.02% 0.50%

(38951/63571/1141) 7 Bids Tendered

2012 KTN North Tongass 642(1) Lump 1 10,000.00 25,000.00 40,000.00 2,232,313 11 Pavement Rehabilitation Construction Surveying Sum 10,000.00 10,000.00 40,000.00 0.00

(38072/67477/1141) 0.34% 0.45% 1.35% 0.00%

2 Bids Tendered

2016 Point MacKenzie Road 642(1) Lump 1 1.00 3,335.75 6,000.00 419,951 05 Improvement: MP 21.8 to Construction Surveying Sum 1,500.00 500.00 3,000.00 3,000.00

23 (45643/58211/1141) 0.18% 0.12% 0.67% 0.65%

8 Bids Tendered

2016 Copper River Hwy MP 642(1) Lump 1 4,310.00 18,436.67 46,000.00 295,344 08 20.1 Goose Meadow Construction Surveying Sum 5,000.00 4,310.00 46,000.00 5,000.00

Culvert (46173//1141) 3.30% 1.46% 6.73% 0.69%

3 Bids Tendered

2016 Gravina Mill Access Road 642(1) Lump 1 30,000.00 56,250.00 125,000.00 1,695,525 04 (44786/Z699220000/1141) Construction Surveying Sum 24,457.12 40,000.00 30,000.00 30,000.00

4 Bids Tendered 1.23% 2.36% 1.75% 1.56%

Page 41: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 41 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2012 Angoon Areawide Paving 642(1) Lump 1 7,000.00 13,600.00 20,000.00 1,209,315 11 (38070/67460/1141) Construction Surveying Sum 10,000.00 7,000.00 20,000.00 13,800.00

3 Bids Tendered 0.69% 0.58% 1.44% 0.78%

2012 Dalton Hwy M P 267 642(1) Calendar 20.0 1,250.00 2,117.86 2,750.00 3,964,939 12 Holden Creek Bridge Construction Surveying Day 3,000.00 2,750.00 2,500.00 1,250.00

(#1520) (38951) (Alt) 0.95% 1.39% 1.02% 0.50%

7 Bids Tendered

2013 Seward Hwy: MP 642(1) Lump 1 50,000.00 60,000.00 70,000.00 2,924,423 06 17.5-22.5 Pavement Construction Surveying Sum 20,000.00 70,000.00 50,000.00 0.00

Preservation 0.63% 2.39% 1.52% 0.00%

(41146/55256/1141) 2 Bids Tendered

2012 False Pass Airport Access 642(1) Lump 1 24,000.00 35,680.00 49,900.00 1,655,094 12 Road Resurfacing and Construction Surveying Sum 50,000.00 35,000.00 42,000.00 27,500.00

Bridge Repair 3.96% 2.11% 2.17% 1.40%

(39295/57109/1141) 5 Bids Tendered

2016 U.S Creek Road 642(1) Lump 1 22,000.00 38,270.50 65,000.00 1,424,518 08 Resurfacing Construction Surveying Sum 75,000.00 45,000.00 22,000.00 30,000.00

(46118/60634/1141) 5.00% 3.16% 1.50% 1.68%

6 Bids Tendered

2012 Parks Hwy Mp 146-163 642(1) Lump 1 30,000.00 56,250.00 80,000.00 14,495,924 12 Pavement Preservation Construction Surveying Sum 56,900.00 80,000.00 50,000.00 65,000.00

(39194/54147/1141) 0.32% 0.55% 0.34% 0.41%

4 Bids Tendered

2013 Elliott Hwy Livengood 642(1) Lump 1 15,000.00 29,714.29 40,000.00 2,330,539 06 Creek Bridge (#0229) Construction Surveying Sum 25,000.00 40,000.00 25,000.00 15,000.00

AK090 1.06% 1.72% 1.01% 0.59%

(39153/63579/1141) 7 Bids Tendered

2016 Nome Council Road MP 642(1) Lump 1 40,000.00 56,408.33 73,450.00 3,133,045 08 15-33 Emergency Repairs Construction Surveying Sum 40,000.00 40,000.00 60,000.00 73,450.00

November 2013 / Nome 0.88% 1.28% 1.83% 2.23%

Sea Storm Permanent Repairs (November 2011) (46093/64095 / 61968/1141) 6 Bids Tendered

2016 JNU Glacier Highway 642(1) Lump 1 2,500.00 2,500.00 2,500.00 316,162 08 Safety Improvements Construction Surveying Sum 5,000.00 2,500.00 0.00 0.00

(HSIP) (44879//1141) 1.46% 0.79% 0.00% 0.00%

1 Bids Tendered

2016 Valdez River 642(1) Lump 1 30,000.00 42,000.00 60,000.00 2,739,467 04 Encroachment Repairs Construction Surveying Sum 50,000.00 30,000.00 60,000.00 55,000.00

(44838/64121/7546) 1.74% 1.10% 2.19% 1.63%

5 Bids Tendered

Page 42: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 42 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 CR Hwy Safety Corridor 642(1) 20000 1.0 22,000.00 24,621.25 31,875.00 1,197,783 07 Near Term Improvements Construction Surveying (Alt) 20,000.00 31,875.00 22,500.00 22,000.00

(GF) and Parks Hwy & 1.72% 2.66% 1.65% 1.50%

Pittman Rd Signal Modifications (GF) (41206) 4 Bids Tendered

2013 Halibut Point Road 642(1) Lump 1 150,000.00 190,000.00 220,000.00 19,292,860 01 Pavement Rehab Construction Surveying Sum 150,000.00 220,000.00 150,000.00 200,000.00

(38459/69351/1141) 0.76% 1.14% 0.76% 0.97%

3 Bids Tendered

2016 Ktn - Trollers Creek Bridge 642(1) Lump 1 5,000.00 14,428.57 30,000.00 1,549,850 07 #0864 Replacement Construction Surveying Sum 33,000.00 10,000.00 5,000.00 6,000.00

2.60% 0.65% 0.26% 0.30%

(45314/Z694200000/1141) 7 Bids Tendered

2013 North Slope Borough Road 642(1) Lump 1 50,000.00 50,000.00 50,000.00 1,995,598 02 Improvements AK048 Construction Surveying Sum 34,000.00 50,000.00 0.00 0.00

(39253/76972/1141) 1.72% 2.51% 0.00% 0.00%

1 Bids Tendered

2013 Nordale Road 642(1) Lump 1 42,500.00 56,500.00 70,000.00 4,442,893 02 Rehabilitation Construction Surveying Sum 165,000.00 57,000.00 42,500.00 70,000.00

(39751/62166/1141) 3.63% 1.28% 0.95% 1.50%

3 Bids Tendered

2016 Richardson Highway MP 642(1) Lump 1 40,000.00 64,000.00 100,000.00 8,986,166 07 24-35 Resurfacing Construction Surveying Sum 75,000.00 100,000.00 85,000.00 45,000.00

(45918/n/a/1141) 0.72% 1.11% 0.81% 0.42%

5 Bids Tendered

2013 WRG Zimovia Pavement 642(1) Lump 1 40,000.00 65,000.00 80,000.00 7,822,574 01 Rehabilitation Construction Surveying Sum 35,000.00 40,000.00 75,000.00 80,000.00

(38064/67425/1141) 0.38% 0.51% 0.93% 0.96%

3 Bids Tendered

2013 Ambler Bridge #1552 642(1) Lump 1 17,500.00 48,166.67 75,000.00 1,931,426 06 Replacement (AKA Construction Surveying Sum 35,000.00 17,500.00 52,000.00 75,000.00

Grizzlies Bridge) 3.29% 0.91% 2.47% 2.16%

(40536/62251/1141) 3 Bids Tendered

2016 HSIP: Copper River 642(1) Lump 1 5,000.00 9,500.00 15,000.00 90,663 07 Highway Signing and Construction Surveying Sum 10,000.00 15,000.00 7,500.00 8,000.00

Striping 8.15% 16.54% 7.73% 8.22%

(45832/64254/1141) 5 Bids Tendered

2016 Point MacKenzie Road 642(1) Lump 1 6,000.00 8,929.38 12,000.00 419,951 05 Improvement: MP 21.8 to Construction Surveying Sum 3,000.00 6,000.00 8,200.00 8,500.00

23 (45643/58211/1141) 0.37% 1.43% 1.84% 1.84%

8 Bids Tendered

2013 Hns-Old Haines Highway 642(1) Lump 1 30,100.00 30,100.00 30,100.00 993,567 06 Sidewalk 3rd Ave To Allen Construction Surveying Sum 15,000.00 30,100.00 0.00 0.00

Rd (39072/67555/1141) 1.86% 3.03% 0.00% 0.00%

1 Bids Tendered

Page 43: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 43 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 KTN- North Tongass 642(1) Labor 100.0 950.00 1,025.00 1,100.00 9,118,342 03 Highway (Ward Cove to Construction Surveying Hour 1,000.00 950.00 1,100.00 0.00

Refuge Cove) (29055) (Alt) 1.20% 1.04% 1.14% 0.00%

2 Bids Tendered

2016 Richardson Hwy MP 642(1) Lump 1 3,500.00 17,256.83 40,000.00 503,450 10 110-Tazlina Wayside Construction Surveying Sum 5,000.00 3,500.00 15,000.00 8,000.00

Improvements 0.53% 0.70% 2.77% 1.25%

(46051/61076/1141) 12 Bids Tendered

2013 University Avenue 642(1) Lump 1 3,060.00 4,339.00 6,000.00 335,460 05 Rehabilitation & Widening: Construction Surveying Sum 15,000.00 6,000.00 3,957.00 3,060.00

Building Demolition Stage 2.95% 1.79% 0.92% 0.71%

1 (38457/63213/1141) 3 Bids Tendered

2013 Tanacross Road 642(1) Lump 1 14,000.00 24,285.71 38,000.00 934,999 09 Improvements Construction Surveying Sum 60,000.00 25,000.00 14,000.00 38,000.00

(36322/63790/1141) 5.64% 2.67% 1.16% 3.08%

7 Bids Tendered

2013 Old Glenn Highway: MP 642(1) Lump 1 4,000.00 10,737.50 24,000.00 543,900 06 15 Erosion Protection (GF) Construction Surveying Sum 15,000.00 5,000.00 19,000.00 24,000.00

(39952/55912/1141) 2.36% 0.92% 2.87% 3.38%

8 Bids Tendered

2013 Birch Road: O'Malley to 642(1) Lump 1 5,000.00 6,166.67 8,000.00 611,591 05 Huffman Resurfacing (GF) Construction Surveying Sum 7,000.00 5,000.00 5,500.00 8,000.00

(40551/55432/1141) 1.19% 0.82% 0.79% 1.09%

3 Bids Tendered

2013 KTN- North Tongass 642(1) Lump 1 95,000.00 102,500.00 110,000.00 9,118,342 03 Highway (Ward Cove to Construction Surveying Sum 100,000.00 95,000.00 110,000.00 0.00

Refuge Cove) 1.20% 1.04% 1.14% 0.00%

(29055/68973/1141) 2 Bids Tendered

2013 Johns Road 642(1) each 1.0 32,500.00 34,987.50 39,000.00 3,496,801 05 Improvements, Klatt To Construction Surveying (Alt) 100,000.00 32,500.00 34,450.00 34,000.00

High View (GF) (40515) 2.04% 0.93% 0.99% 0.97%

4 Bids Tendered

2016 ANC Paving and Drainage 642(1) Lump 1 5,000.00 10,685.53 23,000.00 341,075 06 Improvements 2016 Construction Surveying Sum 8,000.00 9,319.76 9,000.00 8,700.00

(45805/58341/1141) 2.23% 2.73% 2.54% 2.41%

9 Bids Tendered

2013 Richardson Hwy MP 201 642(1) Lump 1 16,000.00 24,666.67 40,000.00 3,915,515 04 Phelan Creek Bridge Construction Surveying Sum 70,000.00 16,000.00 16,000.00 40,000.00

#0579 (40312/63519/1141) 1.53% 0.41% 0.37% 0.89%

6 Bids Tendered

Page 44: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 44 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 Glenn Highway: Hiland 642(1) Lump 1 65,000.00 78,750.00 90,000.00 10,696,233 06 Road to Eklutna Pavement Construction Surveying Sum 35,000.00 80,000.00 80,000.00 65,000.00

Preservation 0.26% 0.75% 0.71% 0.53%

Glenn Highway: Median Crossover (45880/59028/1141) 4 Bids Tendered

2013 Johns Road 642(1) Lump 1 32,500.00 34,987.50 39,000.00 3,496,801 05 Improvements, Klatt To Construction Surveying Sum 100,000.00 32,500.00 34,450.00 34,000.00

High View (GF) 2.04% 0.93% 0.99% 0.97%

(40515/52783/1141) 4 Bids Tendered

2013 Steese Highway Birch 642(1) Lump 1 10,000.00 26,489.25 85,000.00 588,125 04 Creek Boat Launch Construction Surveying Sum 25,000.00 10,000.00 18,000.00 10,000.00

(40077/76591/1141) 3.10% 1.70% 2.87% 1.54%

10 Bids Tendered

2016 C Street Paving and 642(1) Lump 1 128,000.00 132,666.67 140,000.00 10,998,774 07 Anchorage Curb Ramps Construction Surveying Sum 250,000.00 128,000.00 140,000.00 130,000.00

2016 2.27% 1.16% 1.22% 1.10%

(46058/ANCPAV2016/1141)

3 Bids Tendered

2013 Dimond Blvd Resurfacing: 642(1) Lump 1 30,000.00 47,500.00 65,000.00 7,227,267 03 Jewel Lake Rd To Seward Construction Surveying Sum 125,000.00 30,000.00 65,000.00 0.00

Highway 1.40% 0.42% 0.83% 0.00%

(40291/53801/1141) 2 Bids Tendered

2016 Aleknagik Wood River 642(1) Lump 1 48,000.00 100,000.00 200,000.00 6,391,456 05 Bridge Construction - Construction Surveying Sum 85,000.00 48,000.00 67,000.00 200,000.00

Phase II 1.06% 0.75% 0.99% 2.70%

(45783/54627/1141) 5 Bids Tendered

2016 F M A T S Area Surface 642(1) Lump 1 11,000.00 13,666.67 15,000.00 782,631 07 Upgrades F F Y 2016 Construction Surveying Sum 20,000.00 15,000.00 11,000.00 15,000.00

(45472//7546) 2.24% 1.92% 1.38% 1.50%

3 Bids Tendered

2013 Goldstream Road 642(1) Mile 10.5 15,238.10 15,952.38 16,666.67 16,585,844 04 Improvements & Fairbanks Construction Surveying (Alt) 19,047.62 16,666.67 15,238.10 15,238.10

Area Spot Intersection 1.16% 1.06% 0.95% 0.90%

Improvements (39958) 4 Bids Tendered

2013 Anchorage Asphalt 642(1) Lump 1 15,000.00 28,506.67 46,000.00 1,793,675 05 Surface Repairs, 2013 Construction Surveying Sum 57,000.00 15,000.00 24,520.00 46,000.00

(40314/54396/1141) 2.82% 0.84% 1.31% 2.20%

3 Bids Tendered

2013 Debarr Road Resurfacing 642(1) Lump 1 25,000.00 40,333.33 50,000.00 4,590,728 05 (GF) (40444/53433/1141) Construction Surveying Sum 50,000.00 25,000.00 50,000.00 0.00

3 Bids Tendered 1.11% 0.54% 1.02% 0.00%

Page 45: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 45 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 City of Fairbanks 642(1) Lump 1 15,000.00 34,666.67 61,000.00 2,311,182 05 Pedestrian Facilities Construction Surveying Sum 15,000.00 15,000.00 61,000.00 28,000.00

Upgrade and Aurora & 0.54% 0.65% 2.35% 1.03%

Auburn Drive Resurfacing (45744/62127/N/A/7546) 3 Bids Tendered

2013 Goldstream Road 642(1) Lump 1 160,000.00 167,500.00 175,000.00 16,585,844 04 Improvements & Fairbanks Construction Surveying Sum 200,000.00 175,000.00 160,000.00 160,000.00

Area Spot Intersection 1.16% 1.06% 0.95% 0.90%

Improvements (39958/63513 & 60264/1141) 4 Bids Tendered

2013 Knik-Goose Bay Road & 642(1) Lump 1 32,000.00 51,000.00 70,000.00 3,172,129 05 Fern Street Intersection Construction Surveying Sum 50,000.00 32,000.00 70,000.00 50,000.00

Improvements Fern Street 1.36% 1.01% 2.06% 1.43%

to Palmer-Wasilla Highway MP 0.738 to MP 1.753 (40791/51896/1141) 6 Bids Tendered

2013 Steese Highway Birch 642(1) Acre 2.0 5,000.00 13,244.63 42,500.00 588,125 04 Creek Boat Launch Construction Surveying (Alt) 12,500.00 5,000.00 9,000.00 5,000.00

(40077) 3.10% 1.70% 2.87% 1.54%

10 Bids Tendered

2016 HSIP: Eastern Alaska 642(1) Lump 1 0.00 0.00 0.00 11 Named Highways Signing Construction Surveying Sum 80,000.00 0.00 0.00 0.00

and Striping 3.84% 0.00% 0.00% 0.00% (45588/64257/1141) 6 Bids Tendered

2013 Combined: Gustavus Ferry 642(1) Lump 1 55,000.00 57,500.00 60,000.00 3,598,291 05 Terminal AK139/ Gustavus Construction Surveying Sum 26,313.00 60,000.00 55,000.00 0.00

Areawide Paving 0.58% 1.67% 1.25% 0.00%

(39353/69139/ 67416/1141) 2 Bids Tendered

2012 West Dowling Road Phase 642(1) Lump 1 7,200.00 21,386.92 45,000.00 1,048,926 10 IIa: C Street to Minnesota Construction Surveying Sum 15,000.00 7,946.44 28,562.00 7,200.00

Drive (38771/55280/1141) 1.27% 0.76% 2.56% 0.62%

7 Bids Tendered

2015 SGY- Klondike Highway 642(1) Lump 1 14,000.00 19,500.00 25,000.00 1,549,720 10 Repairs Construction Surveying Sum 15,000.00 14,000.00 25,000.00 0.00

(43123/Z684800000/1141) 1.12% 0.90% 1.60% 0.00%

2 Bids Tendered

2015 AMATS: Eagle River Road 642(1) Lump 1 50,000.00 55,000.00 65,000.00 6,887,552 03 Mp 0.0-5.3 Pavement Construction Surveying Sum 40,000.00 50,000.00 65,000.00 50,000.00

Preservation 0.54% 0.73% 0.88% 0.66%

(44413/56185/1141) 3 Bids Tendered

Page 46: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 46 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Airport Way Preventive 642(1) Lump 1 57,750.00 77,583.33 105,000.00 8,240,476 05 Maintenance - Stage II, Construction Surveying Sum 50,000.00 70,000.00 57,750.00 105,000.00

Northern Region Signal 0.70% 0.85% 0.68% 1.19%

Interconnect - Airport

Way/Peger Road &

Northern Region

Pedestrian Improvements

(44455/63278/62489/60520/1141)

2015 Ingra and Gambell Phase 642(1) Lump 1 46,260.00 48,130.00 50,000.00 5,296,083 06 1 Paving, 5th to 36th Construction Surveying Sum 80,000.00 46,260.00 50,000.00 0.00

(44515/57858/1141) 1.47% 0.87% 0.93% 0.00%

2 Bids Tendered

2015 Richardson Highway 642(1) Lump 1 50,000.00 54,000.00 58,000.00 3,271,889 09 Milepoint 0-3.6 Asphalt Construction Surveying Sum 45,000.00 58,000.00 50,000.00 0.00

Surface Repairs 0.98% 1.77% 1.47% 0.00%

(45127/60435/1141) 2 Bids Tendered

2015 HSIP: Municipality of 642(1) Lump 1 32,839.80 37,889.96 49,600.00 4,631,344 09 Anchorage Flashing Yellow Construction Surveying Sum 38,000.00 49,600.00 33,510.00 33,500.00

Arrow Project 0.92% 1.07% 0.72% 0.72%

Anchorage Signal Upgrades, Phase I (45174/52797 53728/1141) 5 Bids Tendered

2015 Elfin Cove Outer Harbor 642(1) Lump 1 2,000.00 16,500.00 37,500.00 1,193,782 05 Improvements Construction Surveying Sum 8,000.00 2,000.00 37,500.00 10,000.00

(43668/83982/1141) 0.98% 0.17% 3.09% 0.70%

3 Bids Tendered

2015 Alaska Highway MP 642(1) Lump 1 120,000.00 139,000.00 150,000.00 9,525,913 09 1354-1365 Rehabilitation Construction Surveying Sum 100,000.00 120,000.00 125,000.00 150,000.00

(41425/61271/1141) 0.93% 1.26% 1.23% 1.32%

5 Bids Tendered

2015 Richardson Hwy M P 295 642(1) Mile 0.5 59,600.00 82,317.71 120,000.00 6,419,604 04 Banner Creek Bridge Construction Surveying (Alt) 160,000.00 66,000.00 120,000.00 60,000.00

#0526 Replacement 1.16% 0.51% 0.82% 0.40%

(43350) 7 Bids Tendered

2015 Plack Road 642(1) Lump 1 49,000.00 73,500.00 95,000.00 2,329,969 02 Bicycle/Pedestrian Facility Construction Surveying Sum 10,000.00 65,000.00 85,000.00 95,000.00

(43167/77248/1141) 0.41% 2.79% 3.40% 3.72%

4 Bids Tendered

2015 Seward Highway MP 642(1) Lump 1 48,000.00 54,000.00 60,000.00 7,497,210 02 99-100 Improvements Construction Surveying Sum 70,000.00 60,000.00 48,000.00 0.00

(44337/58822/7546) 1.08% 0.80% 0.57% 0.00%

2 Bids Tendered

2015 Glenn Highway: MP 49 642(1) Lump 1 30,253.71 40,477.96 55,000.00 2,836,370 10 (45214/50994/1141) Construction Surveying Sum 40,000.00 55,000.00 40,000.00 42,000.00

13 Bids Tendered 1.10% 1.94% 1.39% 1.45%

Page 47: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 47 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Northern Lights Blvd: 642(1) Lump 1 75,000.00 75,000.00 75,000.00 8,572,860 03 Forest Park Dr. To Lake Construction Surveying Sum 100,000.00 75,000.00 75,000.00 0.00

Otis Pavement 1.12% 0.87% 0.78% 0.00%

Preservation, Phase 1 Benson Blvd.: Lois Dr. to LaTouche St. Pavement Preservation, Phase 1 (44280/58496 58497/1141) 2 Bids Tendered

2015 West Anchorage Roads 642(1) Lump 1 11,000.00 11,812.50 12,625.00 2,243,416 06 Pavement Preservation Construction Surveying Sum 2,500.00 11,000.00 12,625.00 0.00

(44709/58795/1141) 0.10% 0.49% 0.42% 0.00%

2 Bids Tendered

2015 Richardson Hwy M P 295 642(1) Lump 1 29,800.00 41,158.86 60,000.00 6,419,604 04 Banner Creek Bridge Construction Surveying Sum 80,000.00 33,000.00 60,000.00 30,000.00

#0526 Replacement 1.16% 0.51% 0.82% 0.40%

(43350/61767/1141) 7 Bids Tendered

2015 International Airport Road 642(1) Lump 1 39,260.00 39,630.00 40,000.00 6,487,960 06 Pavement Preservation Construction Surveying Sum 70,000.00 39,260.00 40,000.00 0.00

South Aircraft Drive to 1.04% 0.61% 0.62% 0.00%

Homer Drive (44768/56729/7546) 2 Bids Tendered

2015 Parks Hwy: MP 35-40 642(1) Lump 1 85,000.00 117,500.00 150,000.00 13,943,673 07 Pavement Preservation Construction Surveying Sum 70,000.00 150,000.00 110,000.00 85,000.00

Glenn Hwy - Parks Hwy 0.44% 1.08% 0.76% 0.57%

Interchange Ramps (44802/56703 58571/1141) 4 Bids Tendered

2015 Pittman Road MP 0.0 to 642(1) Lump 1 1,400.00 1,950.00 2,500.00 1,125,191 05 2.1 Pavement Construction Surveying Sum 3,000.00 1,400.00 2,500.00 0.00

Preservation 0.21% 0.12% 0.21% 0.00%

(44645/58763/1141) 2 Bids Tendered

2015 Tok Cutoff M P 24-30 642(1) Lump 1 55,000.00 73,375.00 90,000.00 4,112,844 05 Resurfacing Construction Surveying Sum 55,000.00 70,000.00 55,000.00 90,000.00

(43646/62188/1141) 1.17% 1.70% 1.31% 1.92%

4 Bids Tendered

2015 Parks Highway MP 642(1) Lump 1 10,000.00 17,500.00 25,000.00 2,089,539 09 192-194 Resurfacing Construction Surveying Sum 10,000.00 10,000.00 25,000.00 0.00

(43411/60741/1141) 0.45% 0.48% 1.01% 0.00%

2 Bids Tendered

2015 Pittman Road MP 0.0 to 642(1) Lump 1 1,000.00 1,500.00 2,000.00 1,125,191 05 2.1 Pavement Construction Surveying Sum 3,000.00 1,000.00 2,000.00 0.00

Preservation 0.21% 0.09% 0.17% 0.00%

(44645/58763/1141) 2 Bids Tendered

Page 48: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 48 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Pittman Road MP 0.0 to 642(1) Lump 1 10,800.00 13,900.00 17,000.00 1,125,191 05 2.1 Pavement Construction Surveying Sum 12,000.00 10,800.00 17,000.00 0.00

Preservation 0.83% 0.96% 1.44% 0.00%

(44645/58763/1141) 2 Bids Tendered

2015 Fairview Loop Road 642(1) Lump 1 45,000.00 68,333.33 110,000.00 3,839,935 05 Pavement Preservation Construction Surveying Sum 80,000.00 50,000.00 110,000.00 45,000.00

(44583/51774/1141) 2.08% 1.30% 2.83% 1.15%

3 Bids Tendered

2015 HSIP: 36th Avenue Arctic 642(1) Lump 1 20,520.00 32,445.52 50,000.00 1,990,576 05 Blvd to C Street 5 Lane Construction Surveying Sum 50,000.00 25,000.00 45,153.14 28,000.00

Conversion 2.72% 1.26% 2.27% 1.33%

(44656/55730/1141) 6 Bids Tendered

2015 Edgerton Highway Lakina 642(1) Lump 1 51,680.00 62,339.00 70,000.00 7,766,987 05 River Bridge Replacement Construction Surveying Sum 40,000.00 61,958.00 65,718.00 70,000.00

(44157/63905/1141) 0.68% 0.80% 0.77% 0.74%

4 Bids Tendered

2015 HSIP: CR Tree Removal 642(1) Lump 1 325,000.00 467,700.00 600,000.00 1,894,100 07 And Sight Distance Construction Surveying Sum 118,000.00 435,000.00 600,000.00 478,500.00

Enhancement 4.75% 22.97% 31.21% 20.06%

(44783/58351/1141) 5 Bids Tendered

2015 Parks Highway MP 642(1) Lump 1 200,000.00 276,375.10 425,000.00 42,094,598 08 44.5-48.8 Reconstruction Construction Surveying Sum 600,000.00 270,000.00 200,000.00 425,000.00

Church Road to Pittman 1.29% 0.64% 0.46% 0.93%

Road (44808/52929/1141) 5 Bids Tendered

2015 HSIP: Muldoon Road 642(1) Lump 1 30,000.00 54,000.00 92,000.00 2,499,849 06 Channelization, 11th Court Construction Surveying Sum 30,000.00 92,000.00 30,000.00 40,000.00

to Boundary Avenue 1.36% 3.68% 1.19% 1.47%

(44665/57341/1141) 3 Bids Tendered

2015 Baranof Warm Springs 642(1) Lump 1 14,000.00 25,066.67 42,000.00 1,827,200 08 Harbor Improvements Construction Surveying Sum 10,000.00 19,200.00 14,000.00 42,000.00

(44860/68353/1141) 0.53% 1.05% 0.73% 2.16%

3 Bids Tendered

2015 Old Seward Highway: 642(1) Lump 1 10,000.00 22,600.00 35,200.00 4,114,208 06 O'Malley Rd to Dimond Construction Surveying Sum 50,000.00 10,000.00 35,200.00 0.00

Blvd Pavement 0.95% 0.24% 0.75% 0.00%

Preservation (44609/56712/1141) 2 Bids Tendered

2015 West Anchorage Roads 642(1) Lump 1 25,000.00 25,812.50 26,625.00 2,243,416 06 Pavement Preservation Construction Surveying Sum 12,500.00 25,000.00 26,625.00 0.00

(44709/58795/1141) 0.51% 1.11% 0.89% 0.00%

2 Bids Tendered

2015 H S I P: Parks Hwy Rest 642(1) Lump 1 15,000.00 23,800.00 30,000.00 1,113,107 04 Areas (44045/61074/7546) Construction Surveying Sum 30,000.00 15,000.00 30,000.00 29,000.00

5 Bids Tendered 1.89% 1.35% 2.23% 2.09%

Page 49: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 49 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Raspberry Road: Jewel 642(1) Lump 1 73,000.00 74,000.00 75,000.00 6,769,856 09 Lake - Minnesota Construction Surveying Sum 315,000.00 75,000.00 73,000.00 0.00

Pavement Preservation 3.83% 1.11% 1.06% 0.00%

HSIP: Jewel Lake Rd At Raspberry Rd. East - West Left Turn Lanes (45141/56727 58760/1141) 2 Bids Tendered

2015 College Road Pavement 642(1) Lump 1 80,000.00 96,666.67 125,000.00 7,090,895 04 Rehabilitation & College Construction Surveying Sum 60,000.00 125,000.00 85,000.00 80,000.00

Rd/Antoinette 0.87% 1.76% 1.15% 1.01%

Ave/Margaret Ave Intersection Reconstruction (44449/62164 / 62854/1141) 3 Bids Tendered

2013 Ketchikan-Waterfront 642(1) Lump 1 10,000.00 14,850.00 19,700.00 759,170 12 Promenade - Phase III Construction Surveying Sum 15,000.00 10,000.00 19,700.00 0.00

(41422/68162/1141) 2.41% 1.32% 2.11% 0.00%

2 Bids Tendered

2016 AMATS: Abbott Rd. 642(1) Lump 1 74,501.80 79,437.73 85,000.00 8,348,321 03 Rehab-Phase I Construction Surveying Sum 87,500.00 80,000.00 78,000.00 80,000.00

(45647/59190/7546) 0.93% 0.96% 0.91% 0.92%

8 Bids Tendered

2013 West Dowling Road Phase 642(1) Lump 1 200,000.00 225,000.00 250,000.00 36,856,108 12 II: C St to Minnesota Drive Construction Surveying Sum 200,000.00 200,000.00 250,000.00 0.00

& 0.54% 0.54% 0.67% 0.00%

Alaska's Best Place: Raspberry Road to Ressel Avenue (42058/51030 54823/1141) 2 Bids Tendered

2014 Chena Small Tracts 642(1) Lump 1 18,249.00 29,562.25 35,000.00 1,063,885 09 Improvements Construction Surveying Sum 20,000.00 35,000.00 30,000.00 35,000.00

(41972/60260/1141) 1.70% 3.29% 2.69% 2.97%

4 Bids Tendered

2013 JNU-Glacier Highway 642(1) Lump 1 200,000.00 207,093.33 215,000.00 25,154,532 12 Brotherhood Bridge Construction Surveying Sum 250,000.00 215,000.00 206,280.00 200,000.00

Replacement 1.11% 0.85% 0.75% 0.68%

(34037/67987/1141) 3 Bids Tendered

2013 JNU-North Douglas 642(1) Lump 1 30,000.00 47,500.00 65,000.00 4,522,796 12 Highway Pavement Construction Surveying Sum 25,000.00 30,000.00 65,000.00 0.00

Rehabilitation 0.45% 0.66% 1.16% 0.00%

(40794/67531/1141) 2 Bids Tendered

Page 50: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 50 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 Kanakanak Rd: D St To 642(1) Lump 1 110,000.00 116,750.00 120,250.00 9,109,265 12 Squaw Cr Rd Resurfacing Construction Surveying Sum 70,000.00 120,000.00 110,000.00 120,250.00

(41942/52799/2119) 0.79% 1.32% 1.08% 1.16%

3 Bids Tendered

2013 Amalga Harbor Rd & 642(1) Lump 1 20,280.00 27,376.67 36,500.00 2,927,828 12 Bridges Reconstruction & Construction Surveying Sum 25,000.00 25,350.00 36,500.00 20,280.00

Replacement 0.88% 0.87% 1.24% 0.60%

(34598/69684/1141) 3 Bids Tendered

2013 HSIP: Glenn Highway 642(1) Lump 1 16,000.00 31,666.67 55,000.00 688,095 07 Speed Limit Evaluation, Construction Surveying Sum 20,000.00 16,000.00 25,000.00 22,000.00

Palmer to Glennallen 2.60% 2.33% 3.50% 2.95%

(41317/55103/1141) 6 Bids Tendered

2013 HSIP: Minnesota Dr. 642(1) Lump 1 0.00 7,741.73 85,159.00 116,500 11 Moose-Vehicle Crash Construction Surveying Sum 80,000.00 0.00 0.00 0.00

Mitigation 2.36% 0.00% 0.00% 0.00%

(41883/53455/1141) 11 Bids Tendered

2013 HSIP: Minnesota Dr. 642(1) Each 1.0 11,190.00 43,395.04 85,159.00 1,122,851 11 Moose-Vehicle Crash Construction Surveying (Alt) 80,000.00 85,159.00 36,000.00 35,000.00

Mitigation (41866) 2.36% 7.58% 2.73% 2.50%

11 Bids Tendered

2013 HSIP: Minnesota Dr. 642(1) Lump 1 11,190.00 43,395.04 85,159.00 1,122,851 11 Moose-Vehicle Crash Construction Surveying Sum 80,000.00 85,159.00 36,000.00 35,000.00

Mitigation 2.36% 7.58% 2.73% 2.50%

(41866/53455/1141) 11 Bids Tendered

2016 Glenn Highway MP 63 and 642(1) Lump 1 9,120.00 14,874.67 22,000.00 2,643,730 03 64 Erosion Protection Construction Surveying Sum 30,000.00 10,000.00 12,000.00 11,000.00

(45592/N/A/1141) 0.73% 0.38% 0.42% 0.33%

15 Bids Tendered

2016 Alyeska Hwy Resurfacing: 642(1) Lump 1 55,000.00 98,087.50 130,000.00 5,198,107 03 Seward Hwy to Arlberg Construction Surveying Sum 60,000.00 55,000.00 90,000.00 117,350.00

Ave and Alyeska Hwy: 1.17% 1.06% 1.66% 2.14%

Pathway Rehabiliation

(GF)

(45618/58526&58509/1141)

4 Bids Tendered

2013 Blowback Creek Bridge 642(1) Lump 1 35,000.00 41,200.00 50,000.00 2,251,300 11 Replacement Construction Surveying Sum 35,000.00 40,000.00 36,000.00 45,000.00

(41512/62616/1141) 2.08% 1.78% 1.57% 1.81%

5 Bids Tendered

2013 Ak Peninsula Hwy: King 642(1) Lump 1 72,000.00 78,000.00 80,000.00 10,295,938 11 Salmon Naknek Pavement Construction Surveying Sum 80,000.00 80,000.00 72,000.00 80,000.00

Preservation 0.65% 0.78% 0.68% 0.74%

(41790/55244/1141) 4 Bids Tendered

Page 51: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 51 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 Backloop Shared Use 642(1) Lump 1 15,000.00 17,500.00 20,000.00 817,820 11 Path Rehabilitation Construction Surveying Sum 15,000.00 15,000.00 20,000.00 0.00

(40997/69917/1141) 2.07% 1.83% 2.25% 0.00%

2 Bids Tendered

2015 Seward Highway MP 50 to 642(1) Lump 1 50,000.00 61,250.00 80,000.00 6,906,885 04 54.5 Pavement Construction Surveying Sum 50,000.00 65,000.00 50,000.00 50,000.00

Preservation and Cooper 0.79% 0.94% 0.72% 0.67%

Landing Walkable Community Project (44488/56685 54575/1141) 4 Bids Tendered

2015 POW Craig-Klawock 642(1) Lump 1 27,000.00 28,500.00 30,000.00 1,494,563 04 Highway Guardrail Construction Surveying Sum 20,000.00 30,000.00 27,000.00 0.00

Improvement REBID 1.52% 2.01% 1.68% 0.00%

(43967/67832/1141) 2 Bids Tendered

2015 Richardson Hwy Milepoint 642(1) Lump 1 15,000.00 15,000.00 15,000.00 961,510 09 2 Improvements Construction Surveying Sum 39,750.00 15,000.00 0.00 0.00

(43385/62125/1141) 3.23% 1.56% 0.00% 0.00%

1 Bids Tendered

2015 Elfin Cove Outer Harbor 642(1) Lump 1 2,000.00 7,500.00 18,500.00 1,045,145 09 Improvements Construction Surveying Sum 5,000.00 18,500.00 2,000.00 2,000.00

(44979/83982/1141) 0.47% 1.77% 0.19% 0.17%

3 Bids Tendered

2015 Raspberry Road: Jewel 642(1) Hour 350.0 208.57 211.43 214.29 6,769,856 09 Lake - Minnesota Construction Surveying (Alt) 900.00 214.29 208.57 0.00

Pavement Preservation 3.83% 1.11% 1.06% 0.00% HSIP: Jewel Lake Rd At Raspberry Rd. East - West Left Turn Lanes (45141) 2 Bids Tendered

2014 Parks Highway M P 642(1) Mile 2.0 35,000.00 41,958.33 52,500.00 5,284,485 09 163-305 Passing Lanes - Construction Surveying (Alt) 22,500.00 35,000.00 40,000.00 35,000.00

Stage I I I (43265) 0.58% 1.32% 1.26% 1.05%

6 Bids Tendered

2015 Bennett Road Resurfacing 642(1) Lump 1 40,000.00 41,666.67 45,000.00 961,036 02 (44212/63911/7546) Construction Surveying Sum 90,000.00 40,000.00 45,000.00 40,000.00

3 Bids Tendered 5.36% 4.16% 4.23% 3.34%

2014 F M A T S Area Surface 642(1) Lump 1 35,000.00 41,250.00 60,000.00 1,642,460 09 Upgrades F F Y 2014 Construction Surveying Sum 10,000.00 35,000.00 60,000.00 35,000.00

(42061/63372/1141) 0.60% 2.13% 3.55% 1.97%

4 Bids Tendered

2013 Kodiak Area Roads 642(1) Hour 300.0 166.67 204.17 216.67 5,696,203 11 Pavement Preservation & Construction Surveying (Alt) 166.67 166.67 216.67 216.67

Kodiak Areawide 0.81% 0.88% 1.10% 0.93% Delineation Improvements (41874) 4 Bids Tendered

Page 52: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 52 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 Hns - Klehini River Bridge 642(1) Lump 1 38,500.00 80,260.00 107,800.00 6,703,504 03 Replacement And Transfer Construction Surveying Sum 70,000.00 38,500.00 90,000.00 100,000.00

(34258/69377/1141) 0.93% 0.57% 1.15% 1.00%

5 Bids Tendered

2013 St. Mary's / Mountain 642(1) 75000 1.0 94,000.00 189,857.14 370,000.00 10,510,726 11 Village Road Construction Surveying (Alt) 75,000.00 190,000.00 195,000.00 94,000.00

Rehabilitation (33343) 0.65% 1.81% 1.83% 0.79%

7 Bids Tendered

2013 St. Mary's / Mountain 642(1) Lump 1 94,000.00 189,857.14 370,000.00 10,510,726 11 Village Road Construction Surveying Sum 75,000.00 190,000.00 195,000.00 94,000.00

Rehabilitation 0.65% 1.81% 1.83% 0.79%

(33343/60240/1141) 7 Bids Tendered

2013 Parks Highway M P 642(1) Lump 1 175,000.00 246,250.00 350,000.00 28,866,904 11 239-252 Rehabilitation Construction Surveying Sum 100,000.00 175,000.00 260,000.00 200,000.00

(41926/61275/1141) 0.37% 0.61% 0.88% 0.68%

4 Bids Tendered

2013 Kodiak Area Roads 642(1) Lump 1 50,000.00 61,250.00 65,000.00 5,696,203 11 Pavement Preservation & Construction Surveying Sum 50,000.00 50,000.00 65,000.00 65,000.00

Kodiak Areawide 0.81% 0.88% 1.10% 0.93%

Delineation Improvements (41874/54149 55966/1141) 4 Bids Tendered

2013 HSIP : CR Traffic Signal 642(1) Lump 1 10,525.00 16,052.50 21,580.00 1,471,817 08 Modifications and OH Construction Surveying Sum 18,500.00 10,525.00 21,580.00 0.00

Beacons, 2013 1.40% 0.72% 1.45% 0.00%

(41304/55753/1141) 2 Bids Tendered

2015 Bennett Road Resurfacing 642(1) ALL 1.0 40,000.00 41,666.67 45,000.00 961,036 02 (44212) Construction Surveying REQ'D 90,000.00 40,000.00 45,000.00 40,000.00

3 Bids Tendered (Alt) 5.36% 4.16% 4.23% 3.34%

2014 Northern Region E R 642(1) Lump 1 10,500.00 10,500.00 10,500.00 2,342,885 04 Galena Ice Jam Flooding Construction Surveying Sum 35,000.00 10,500.00 0.00 0.00

(41787/62697/1141) 2.16% 0.45% 0.00% 0.00%

1 Bids Tendered

2014 HSIP: Glenn Hwy 642(1) 52000 1.0 36,500.00 50,280.05 60,278.00 6,691,146 10 Continuous Lighting, MP Construction Surveying (Alt) 52,000.00 36,500.00 53,000.00 56,743.30

27-31 (43506) 0.94% 0.55% 0.75% 0.79%

6 Bids Tendered

2017 AMATS: O'Malley Road 642(1) Lump 1 75,000.00 85,147.45 105,000.00 21,769,589 01 Reconstruction: Phase I, Construction Surveying Sum 85,000.00 75,000.00 105,000.00 80,000.00

Seward Hwy To Livingston 0.43% 0.34% 0.43% 0.33%

(46522//1141) 5 Bids Tendered

2012 Glenn Highway Path 642(1) Lump 1 45,000.00 113,750.00 240,000.00 5,399,662 07 Rehabilitation: Muldoon Construction Surveying Sum 100,000.00 45,000.00 240,000.00 120,000.00

Rd to North Birchwood 1.95% 0.83% 4.44% 1.92%

(38202/55659/1141) 4 Bids Tendered

Page 53: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 53 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2017 AMATS: O'Malley Road 642(1) Mile 1.09 68,807.34 78,116.92 96,330.28 21,769,589 01 Reconstruction: Phase I, Construction Surveying (Alt) 77,981.65 68,807.34 96,330.28 73,394.50

Seward Hwy To Livingston 0.43% 0.34% 0.43% 0.33%

(46522) 5 Bids Tendered

2017 AMATS: Pedestrian Plan 642(1) Lump 1 7,600.00 10,033.33 15,000.00 684,191 02 Implementation Boniface Construction Surveying Sum 25,000.00 7,600.00 9,000.00 11,000.00

Pkwy: Debarr Rd to Carrs 3.04% 1.11% 1.31% 1.47%

AMATS: Pedestrian Plan Implementation Patterson Street: Debarr Rd to Chester Court (46703//1141) 6 Bids Tendered

2012 Top of the World Highway 642(1) Mile 13.0 15,384.62 18,259.72 21,538.46 15,555,427 07 MP 0-13 Rehab (33395) Construction Surveying (Alt) 15,384.62 15,384.62 16,923.08 21,538.46

5 Bids Tendered 1.04% 1.29% 1.41% 1.65%

2012 Healy Community Roads 642(1) Lump 1 13,722.00 28,574.00 50,000.00 1,078,338 07 Rehabilitation / Surfacing Construction Surveying Sum 30,000.00 22,000.00 50,000.00 13,722.00

(37308/63786/1141) 2.40% 2.04% 3.53% 0.90%

3 Bids Tendered

2013 HSIP: Glenn Highway 642(1) Each 1.0 16,000.00 31,666.67 55,000.00 688,095 07 Speed Limit Evaluation, Construction Surveying (Alt) 20,000.00 16,000.00 25,000.00 22,000.00

Palmer to Glennallen 2.60% 2.33% 3.50% 2.95%

(41317) 6 Bids Tendered

2016 Kenai Spur Highway: MP 642(1) Lump 1 40,000.00 54,250.00 95,000.00 7,898,726 04 8-12.4 Pavement Construction Surveying Sum 100,000.00 40,000.00 95,000.00 40,000.00

Preservation; Kenai Spur 0.97% 0.51% 1.04% 0.43%

Highway: MP 9.8 & MP 10.2 Culvert Replacement; Bicycle-Pedestrian Facilities Rehabilitation and Improvements (45736//1141) 4 Bids Tendered

2014 Fritz Cove Road 642(1) Hour 240.0 208.33 229.17 250.00 3,115,745 11 Rehabilitation And Repair Construction Surveying (Alt) 350.00 208.33 250.00 0.00

(36604) 2.27% 1.60% 1.32% 0.00% 2 Bids Tendered

2014 Fritz Cove Road 642(1) Lump 1 50,000.00 55,000.00 60,000.00 3,115,745 11 Rehabilitation And Repair Construction Surveying Sum 84,000.00 50,000.00 60,000.00 0.00

(36604/69397/1141) 2.27% 1.60% 1.32% 0.00%

2 Bids Tendered

2014 KTN South Tongass 642(1) Lump 1 50,000.00 55,000.00 60,000.00 3,069,946 12 Paving/ Collins Road Construction Surveying Sum 75,000.00 50,000.00 60,000.00 0.00

Guardrail HSIP 1.89% 1.63% 1.74% 0.00%

(43547/67674/68412/1141) 2 Bids Tendered

Page 54: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 54 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 Fairbanks and North Pole 642(1) Lump 1 75,000.00 99,425.00 133,000.00 2,549,551 11 Intersection Striping - Construction Surveying Sum 41,000.00 75,000.00 91,700.00 98,000.00

Interstate and Fairbanks 2.03% 2.94% 3.32% 3.44%

and North Pole Intersection Striping - Non-Interstate and CTP (43239/62414 & 62485/1141) 4 Bids Tendered

2014 Sterling Highway MP 135 642(1) Lump 1 80,000.00 85,000.00 95,000.00 11,961,445 11 - 150 Pavement Construction Surveying Sum 60,000.00 80,000.00 95,000.00 80,000.00

Preservation 0.46% 0.67% 0.76% 0.58%

(43947/56697/1141) 3 Bids Tendered

2017 Dalton Highway MP 642(1) Lump 1 70,000.00 210,320.00 300,000.00 31,994,827 01 362-379 Reconstruction Construction Surveying Sum 200,000.00 221,280.00 70,000.00 250,000.00

(46042/63816/1141) 0.58% 0.69% 0.19% 0.68%

4 Bids Tendered

2015 College Road Right Turn 642(1) Lump 1 18,000.00 22,875.00 33,000.00 947,198 10 Lanes (44899/77227/1141) Construction Surveying Sum 30,000.00 18,375.00 18,000.00 25,000.00

5 Bids Tendered 3.50% 1.94% 1.83% 2.52%

2012 Top of the World Highway 642(1) Lump 1 200,000.00 237,376.40 280,000.00 15,555,427 07 MP 0-13 Rehab Construction Surveying Sum 200,000.00 200,000.00 220,000.00 280,000.00

(33395/62799/1141) 1.04% 1.29% 1.41% 1.65%

5 Bids Tendered

2012 North Pole Bike Trail 642(1) Lump 1 10,000.00 17,500.00 25,000.00 492,497 07 Rehabilitation and Construction Surveying Sum 30,000.00 10,000.00 20,000.00 25,000.00

Connections 4.69% 2.03% 3.23% 3.66%

(35018/60669/1141) 4 Bids Tendered

2017 Bogard Rd. Resurfacing: 642(1) Lump 1 7,500.00 9,500.00 11,000.00 473,904 02 N. Lazy Eight Ct. to E. Construction Surveying Sum 9,000.00 10,000.00 11,000.00 11,000.00

Stoney Hollow Dr. 2.04% 2.11% 2.10% 2.00%

(46673//1141) 5 Bids Tendered

2012 Parks Highway M.P. 83-90, 642(1) Lump 1 60,000.00 148,600.00 250,000.00 10,932,542 06 Weight Restriction Construction Surveying Sum 160,000.00 250,000.00 130,000.00 153,000.00

Elimination Project 1.44% 2.29% 1.01% 1.14%

(38108/51850/1141) 5 Bids Tendered

2017 Glenn Highway: Airport 642(1) Lump 1 35,000.00 35,666.67 37,000.00 9,998,959 03 Heights Drive to Hiland Construction Surveying Sum 70,000.00 35,000.00 37,000.00 35,000.00

Road, Pavement 0.60% 0.35% 0.36% 0.32%

Preservation (46737//1141) 3 Bids Tendered

Page 55: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 55 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 Skagway - Replace 642(1) Lump 1 100,000.00 165,816.00 200,000.00 18,907,426 12 Captain William Henry Construction Surveying Sum 80,000.00 200,000.00 130,000.00 100,000.00

Moore Bridge 0.58% 1.06% 0.64% 0.46%

(46281//1141) 5 Bids Tendered

2012 Northern Region Deep 642(1) Lump 1 30,000.00 48,579.75 78,000.00 2,199,000 08 Culverts Replacement - Construction Surveying Sum 45,000.00 33,568.00 30,000.00 50,000.00

Stage 1 2.01% 1.53% 1.10% 1.56%

(37444/61693/1141) 8 Bids Tendered

2017 Steese Expressway to 642(1) Lump 1 20,000.00 27,375.00 38,500.00 858,231 03 Front Street Construction Surveying Sum 15,000.00 21,000.00 20,000.00 30,000.00

Bicycle/Pedestrian Path 1.65% 2.45% 2.15% 3.02%

(45878/62836/1141) 4 Bids Tendered

2012 ANC East Airpark 642(1) Lump 1 30,000.00 52,224.10 67,000.00 7,589,893 06 Drainage Extension Phase Construction Surveying Sum 70,000.00 67,000.00 55,000.00 30,000.00

II & ANC Postmark Drive 0.78% 0.88% 0.72% 0.39%

Storm Drain Repair (38037/52365 52412/1141) 8 Bids Tendered

2012 Hns - Beach Rd. 642(1) Lump 1 64,500.00 64,500.00 64,500.00 3,934,144 06 Widening & Front St. Construction Surveying Sum 40,000.00 64,500.00 0.00 0.00

Intersection Improvements 1.04% 1.64% 0.00% 0.00%

Hns - Old Haines Highway Sidewalk Construction (36444/69316 & 69178/1141) 1 Bids Tendered

2012 North Pole Bike Trail 642(1) Calendar 14.0 714.29 1,250.00 1,785.71 492,497 07 Rehabilitation and Construction Surveying Day 2,142.86 714.29 1,428.57 1,785.71

Connections (35018) (Alt) 4.69% 2.03% 3.23% 3.66%

4 Bids Tendered

2017 HSIP: Pedestrian Fencing 642(1) Lump 1 5,100.00 9,285.38 30,000.00 821,903 03 (46697/58150/1141) Construction Surveying Sum 10,000.00 5,200.00 5,100.00 8,500.00

7 Bids Tendered 0.72% 0.63% 0.60% 0.98%

2012 Kalifornsky Beach Road 642(1) Lump 1 15,000.00 17,500.00 20,000.00 767,725 06 Asphalt Surface Repairs Construction Surveying Sum 15,000.00 15,000.00 20,000.00 0.00

2012 MP 16 To MP 22 1.47% 1.95% 2.05% 0.00%

(38039/54429/1141) 2 Bids Tendered

2017 Dalton Highway MP 265 642(1) Lump 1 31,000.00 45,834.67 67,260.00 4,903,523 03 Roche Moutonnee Creek Construction Surveying Sum 50,000.00 60,000.00 33,000.00 45,000.00

Bridge #1519 1.07% 1.22% 0.63% 0.78%

(45176/62704/7546) 6 Bids Tendered

2012 Parks Hwy: Stanley Road 642(1) Lump 1 11,650.00 21,041.67 37,300.00 1,573,730 08 Signal (37366/54453/1141) Construction Surveying Sum 25,000.00 37,300.00 14,175.00 11,650.00

3 Bids Tendered 1.39% 2.37% 0.83% 0.53%

Page 56: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 56 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2012 Sawmill Creek Road 642(1) Lump 1 5,000.00 5,000.00 5,000.00 453,550 07 (37484/67427/1141) Construction Surveying Sum 10,000.00 5,000.00 0.00 0.00

1 Bids Tendered 2.12% 1.10% 0.00% 0.00%

2015 HSIP: CR Sign Assembly 642(1) Lump 1 31,000.00 74,250.00 98,000.00 3,319,315 11 Improvements 2015 Construction Surveying Sum 130,000.00 75,000.00 31,000.00 93,000.00

(45259/57587/1141) 3.99% 2.26% 0.83% 2.23%

4 Bids Tendered

2009 Point Hope Evacuation 642(1) Lump 1 33,000.00 51,200.00 75,000.00 2,445,304 01 Road Rehabilitation: Bids Construction Surveying Sum 20,000.00 33,000.00 75,000.00 33,000.00

Opened 01/13/2009 0.98% 1.35% 2.63% 1.16%

(17612/76966/1141) 5 Bids Tendered

2014 Egan Drive Mulit-use Path 642(1) Lump 1 10,000.00 13,941.67 20,825.00 517,494 11 Repair And Bridge #6011 Construction Surveying Sum 10,000.00 20,825.00 11,000.00 10,000.00

Replacement 1.55% 4.02% 1.80% 1.61%

(43237/68092/1141) 3 Bids Tendered

2014 Parks Highway M P 642(1) Lump 1 70,000.00 83,916.67 105,000.00 5,284,485 09 163-305 Passing Lanes - Construction Surveying Sum 45,000.00 70,000.00 80,000.00 70,000.00

Stage I I I 0.58% 1.32% 1.26% 1.05%

(43265/63515/1141) 6 Bids Tendered

2015 HSIP: CR High Friction 642(1) Lump 1 55,000.00 64,500.00 82,500.00 6,778,888 12 Surface Treatment Construction Surveying Sum 120,000.00 65,000.00 82,500.00 55,000.00

(45334/57092/1141) 1.60% 0.96% 1.12% 0.74%

5 Bids Tendered

2015 Hydaburg Highway 642(1) Lump 1 160,000.00 173,250.00 199,750.00 11,859,725 01 Pavement Rehabilitation Construction Surveying Sum 200,000.00 199,750.00 160,000.00 160,000.00

(43422/67576/1141) 1.32% 1.68% 1.24% 1.15%

3 Bids Tendered

2014 Abbott Road Pavement 642(1) Lump 1 15,000.00 17,500.00 20,000.00 1,390,905 10 Preservation New Seward Construction Surveying Sum 15,000.00 15,000.00 20,000.00 0.00

Highway to 88th Avenue 1.19% 1.08% 1.19% 0.00%

(43473/56728/7546) 2 Bids Tendered

2014 Hurst Road Resurfacing 642(1) Lump 1 40,000.00 44,666.67 52,000.00 2,595,968 10 (42903/63037/1141) Construction Surveying Sum 50,000.00 52,000.00 42,000.00 40,000.00

3 Bids Tendered 1.38% 2.00% 1.50% 1.30%

2014 H S I P : Richardson 642(1) Lump 1 20,000.00 27,500.00 35,000.00 987,060 10 Highway Edgeline Rumble Construction Surveying Sum 30,000.00 35,000.00 20,000.00 0.00

Strips (43171/64029/1141) 2.84% 3.55% 2.01% 0.00%

2 Bids Tendered

2014 Soldotna: Birch Street 642(1) Lump 1 15,876.00 16,270.90 16,665.80 1,745,059 10 Signal at Sterling Highway Construction Surveying Sum 31,250.00 16,665.80 15,876.00 0.00

Rebid 1.86% 0.96% 0.66% 0.00%

(43526/59767A/1141) 2 Bids Tendered

Page 57: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 57 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 Annette Bay Ferry 642(1) Lump 1 18,500.00 18,500.00 18,500.00 781,909 11 Terminal Improvements Construction Surveying Sum 5,000.00 18,500.00 0.00 0.00

(43416/68135/1141) 0.67% 2.37% 0.00% 0.00%

1 Bids Tendered

2014 Elliot Highway M P 107.7 642(1) Lump 1 228,000.00 334,991.67 464,125.00 19,656,000 10 To 120.5 Reconstruction Construction Surveying Sum 300,000.00 250,000.00 464,125.00 255,000.00

(42896/62227/1141) 1.19% 1.27% 1.98% 1.02%

9 Bids Tendered

2014 HSIP: Glenn Hwy 642(1) Lump 1 36,500.00 50,280.05 60,278.00 6,691,146 10 Continuous Lighting, MP Construction Surveying Sum 52,000.00 36,500.00 53,000.00 56,743.30

27-31 (43506/55613/1141) 0.94% 0.55% 0.75% 0.79%

6 Bids Tendered

2014 ANC Kulis Transition 642(1) Lump 1 9,180.00 13,335.00 25,000.00 1,178,369 10 Repairs and Modifications Construction Surveying Sum 25,000.00 10,000.00 9,180.00 14,000.00

(43566/54066/1141) 2.05% 0.85% 0.75% 1.11%

8 Bids Tendered

2015 Nome Snake River Bridge 642(1) Lump 1 18,500.00 34,250.00 50,000.00 595,999 11 - Stage II Construction Surveying Sum 20,000.00 18,500.00 50,000.00 0.00

(44634/60759/7546) 3.22% 3.10% 5.36% 0.00%

2 Bids Tendered

2014 HSIP POW Craig-Klawock 642(1) Lump 1 12,000.00 18,500.00 25,000.00 1,437,638 11 Highway Guardrail Construction Surveying Sum 20,000.00 12,000.00 25,000.00 0.00

Improvement 1.46% 0.83% 1.47% 0.00%

(38154/67832/1141) 2 Bids Tendered

2015 HSIP: Alaska Highway 642(1) Lump 1 17,000.00 28,000.00 44,000.00 304,035 11 Signing and Striping Construction Surveying Sum 30,000.00 25,000.00 20,000.00 17,000.00

Upgrades 5.84% 8.22% 4.77% 4.01%

(44784/63978/1141) 7 Bids Tendered

2015 Fairbanks and North Pole 642(1) Lump 1 23,500.00 41,750.00 60,000.00 571,470 11 Intersection Striping - Construction Surveying Sum 18,000.00 23,500.00 60,000.00 0.00

Stage II (44901//1141) 3.90% 4.11% 8.00% 0.00%

2 Bids Tendered

2014 HSIP: Central Region 642(1) Lump 1 19,135.00 35,854.75 65,000.00 1,465,959 11 Overhead Beacons 2014 Construction Surveying Sum 70,000.00 20,100.00 65,000.00 19,135.00

(43589/57081/1141) 4.04% 1.37% 3.80% 0.91%

4 Bids Tendered

2014 Tok Cutoff M P 50-60 642(1) Lump 1 70,000.00 76,833.33 100,000.00 5,671,025 10 Resurfacing Construction Surveying Sum 40,000.00 70,000.00 75,000.00 75,000.00

(41360/62190/1141) 0.50% 1.23% 1.20% 1.13%

6 Bids Tendered

2014 JNU Montana Creek Road 642(1) Lump 1 4,000.00 4,000.00 4,000.00 93,787 10 Intersection Illumination Construction Surveying Sum 2,762.16 4,000.00 0.00 0.00

(38152/67826/1141) 4.03% 4.26% 0.00% 0.00%

1 Bids Tendered

2014 Ktn - Advanced Water 642(1) Lump 1 21,850.00 35,925.00 50,000.00 3,339,290 12 Street Trunk Relocation Construction Surveying Sum 10,000.00 21,850.00 50,000.00 0.00

(43208/69548/1141) 0.24% 0.65% 1.28% 0.00%

2 Bids Tendered

Page 58: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 58 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 HSIP SEA Areawide 642(1) Lump 1 3,100.00 8,633.33 14,300.00 244,050 12 Avalanche Gates Construction Surveying Sum 3,000.00 8,500.00 3,100.00 14,300.00

(38158/67840/7546) 1.41% 3.48% 1.25% 3.72%

3 Bids Tendered

2015 POW-Big Salt Lake Rd 642(1) Lump 1 27,000.00 32,750.00 38,500.00 2,452,963 10 Resurfacing, Steelhead Construction Surveying Sum 30,000.00 38,500.00 27,000.00 0.00

River to Thorne Bay Rd 0.84% 1.57% 1.05% 0.00%

(43175/68084/1141) 2 Bids Tendered

2015 Ketchikan Ferry Terminal 642(1) Lump 1 10,000.00 32,866.67 70,000.00 2,299,710 12 Improvements Construction Surveying Sum 10,000.00 18,600.00 10,000.00 70,000.00

(45362/SAMHS00015/1141) 0.36% 0.81% 0.36% 2.53%

3 Bids Tendered

2014 Sterling Highway Erosion 642(1) Lump 1 18,700.00 26,212.50 45,000.00 3,371,200 10 Response MP 150-157 Construction Surveying Sum 10,000.00 20,000.00 45,000.00 20,000.00

(43583/52472/1141) 0.30% 0.59% 1.30% 0.55%

8 Bids Tendered

2015 Denali Highway MP 120 642(1) Lump 1 2,500.00 15,416.67 35,000.00 382,202 10 River Encroachment Construction Surveying Sum 10,000.00 2,500.00 11,300.00 12,000.00

(44147//1141) 1.53% 0.65% 2.86% 2.91%

12 Bids Tendered

2014 Glenn Highway MP 42-56 642(1) Lump 1 75,000.00 83,666.67 100,000.00 9,998,998 12 Pavement Preservation, Construction Surveying Sum 89,000.00 75,000.00 100,000.00 76,000.00

Glenn Highway MP 56-61 0.66% 0.75% 0.91% 0.63%

Pavement Preservation (44128/56663 56683/1141) 3 Bids Tendered

2015 Olympic Mountain Loop 642(1) Lump 1 31,500.00 38,725.00 51,000.00 2,364,890 01 Improvements - Girdwood Construction Surveying Sum 33,000.00 34,000.00 42,500.00 34,800.00

(44236/59766/1141) 1.74% 1.44% 1.58% 1.25%

8 Bids Tendered

2015 Jnu - Glacier Highway 642(1) Lump 1 61,800.00 95,900.00 130,000.00 3,491,195 10 Pavement Rehabilitation Construction Surveying Sum 85,000.00 61,800.00 130,000.00 0.00

Point Lena To Tee Harbor 1.87% 1.77% 3.55% 0.00%

(44347/67564/7546) 2 Bids Tendered

2015 Glenn Highway and 642(1) Lump 1 200,000.00 270,018.01 450,000.00 40,745,592 11 Muldoon Road Construction Surveying Sum 300,000.00 250,090.03 250,000.00 200,000.00

Interchange Improvements 0.76% 0.61% 0.59% 0.47%

(45321/54625/1141) 5 Bids Tendered

2015 Tok Cutoff MP 75.6 Slana 642(1) Lump 1 45,915.00 60,152.50 75,000.00 7,125,000 11 River Bridge #0654 Construction Surveying Sum 80,000.00 55,000.00 75,000.00 50,000.00

(43476/63567/1141) 1.09% 0.77% 0.86% 0.57%

6 Bids Tendered

2014 Tok Cutoff M P 104 Tok 642(1) Lump 1 75,000.00 119,139.29 300,000.00 11,699,696 11 River Bridge #0663 Construction Surveying Sum 60,000.00 75,000.00 95,175.00 115,000.00

(43365/63565/1141) 0.59% 0.64% 0.77% 0.90%

7 Bids Tendered

Page 59: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 59 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 CR School Zone Upgrades 642(1) Lump 1 23,513.46 24,803.37 25,700.00 1,791,306 12 PH II/ CR UPS Load Construction Surveying Sum 21,990.00 23,513.46 25,700.00 25,000.00

Centers 2014 1.34% 1.31% 1.21% 0.97%

(44005/55500 57689/1141) 4 Bids Tendered

2015 HSIP: Kodiak Rock Fall 642(1) Lump 1 30,000.00 41,707.71 73,954.00 2,212,795 10 Mitigation Construction Surveying Sum 16,000.00 38,000.00 30,000.00 30,000.00

(45205/57709/1141) 0.63% 1.72% 1.20% 1.13%

7 Bids Tendered

2009 Anchorage Area Safety 642(1) LUMP 1 23,100.00 26,942.86 30,000.00 1,996,872 12 Improvements, CONSTRUCTION SUM 28,000.00 25,000.00 27,500.00 23,100.00

Construction 2010 SURVEYING 1.12% 1.25% 1.36% 1.12%

(26013/51185/1141) 7 Bids Tendered

2016 Replacement of Water 642(1) Lump 1 60,000.00 190,000.00 390,000.00 22,300,050 01 Street Trestle No. 2 CONSTRUCTION Sum 40,000.00 60,000.00 390,000.00 120,000.00

(45076/69534/1141) SURVEYING 0.20% 0.27% 1.49% 0.42%

3 Bids Tendered

2016 Glacier Highway 642(1) LUMP 1 148,000.00 159,000.00 170,000.00 13,394,988 12 Reconstruction: Fritz Cove CONSTRUCTION SUM 200,000.00 170,000.00 148,000.00 0.00

Road To Seaview Avenue SURVEYING 1.32% 1.27% 1.09% 0.00%

(46359/Z684710000/1141) 2 Bids Tendered

2016 Seward Highway: Dimond 642(1) LUMP 1 275,000.00 387,500.00 500,000.00 55,969,371 12 Boulevard to Dowling CONSTRUCTION SUM 500,000.00 275,000.00 500,000.00 0.00

Road Reconstruction, SURVEYING 0.71% 0.49% 0.84% 0.00%

Phase I (46380//7546) 2 Bids Tendered

2014 South Cushman Street 642(1) Lump 1 40,000.00 61,166.67 74,000.00 6,138,597 05 Resurfacing & CONSTRUCTION Sum 90,000.00 69,500.00 74,000.00 40,000.00

South Cushman Sidewalk SURVEYING 1.34% 1.13% 1.15% 0.59%

and Drainage Improvements (42473/62687 & 62532/1141) 3 Bids Tendered

2011 Wrangell Road And Utility 642(1) LUMP 1 10,000.00 18,600.00 30,800.00 5,815,976 05 Improvements CONSTRUCTION SUM 18,000.00 30,800.00 10,000.00 15,000.00

(33218/STP-68828/67789/1141) SURVEYING 0.31% 0.53% 0.16% 0.23%

3 Bids Tendered

2014 Old Seward Highway: 642(1) LUMP 1 20,000.00 32,030.00 49,120.00 3,749,452 11 Rabbit Creek To Brandon CONSTRUCTION SUM 30,000.00 30,000.00 20,000.00 49,120.00

Street Pavement SURVEYING 0.75% 0.80% 0.53% 1.12%

Preservation (43599/56708/1141) 4 Bids Tendered

Page 60: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 60 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 NORDIC DRIVE & 642(1) LUMP 1 190,000.00 195,000.00 200,000.00 8,362,244 12 HAUGEN DRIVE CONSTRUCTION SUM 198,108.00 200,000.00 190,000.00 0.00

(43571/68048 & SURVEYING 2.37% 2.39% 2.01% 0.00%

69518/1141) 2 Bids Tendered

2009 Central Region Safety 642(1) LUMP 1 0.00 33,333.33 50,000.00 5,027,359 06 Improvement Project 2008 CONSTRUCTION SUM 106,000.00 50,000.00 50,000.00 0.00

(23772/51210 51229/1141) SURVEYING 2.19% 0.99% 0.88% 0.00%

3 Bids Tendered

2012 Petersburg Road 642(1) LUMP 1 60,000.00 87,500.00 115,000.00 3,761,496 07 Improvements/Sewer Main CONSTRUCTION SUM 48,000.00 60,000.00 115,000.00 0.00

Repairs SURVEYING 1.51% 1.60% 2.91% 0.00%

(38103/67879/68165/1141) 2 Bids Tendered

2010 King Cove Access Road 642(1) LUMP 1 43,200.00 176,275.00 250,000.00 14,459,880 12 Completion CONSTRUCTION SUM 500,000.00 148,500.00 115,000.00 43,200.00

(32716/59791/1141) SURVEYING 3.39% 1.03% 0.75% 0.26%

12 Bids Tendered

2012 AMATS: Muldoon Road 642(1) LUMP 1 25,000.00 36,766.67 45,000.00 3,199,546 03 Pedestrian and CONSTRUCTION SUM 100,000.00 36,100.00 45,000.00 39,500.00

Landscaping SURVEYING 2.35% 1.13% 1.36% 1.17%

Improvements, Phase III (36766/56530/1141) 6 Bids Tendered

2009 Kodiak: Rezanof Dr. 642(1) LUMP 1 18,000.00 22,825.00 27,650.00 5,963,225 05 Resurfacing Coast Guard CONSTRUCTION SUM 15,000.00 18,000.00 27,650.00 0.00

Access Road To Marine SURVEYING 0.34% 0.30% 0.43% 0.00%

Way (19675/51930/1141) 2 Bids Tendered

2016 Yak- Dangerous River 642(1) Lump 1 15,000.00 16,500.00 18,000.00 1,229,352 03 Road Resurfacing CONSTRUCTION Sum 10,000.00 18,000.00 15,000.00 0.00

(44965/68753/0) SURVEYING 0.97% 1.46% 1.10% 0.00%

2 Bids Tendered

2018 Kenai Spur Highway: Mp 642(1) LUMP 1 44,000.00 54,666.67 70,000.00 3,440,733 06 12 - 18 Pavement CONSTRUCTION SUM 28,000.00 70,000.00 44,000.00 50,000.00

Preservation SURVEYING 0.82% 2.03% 1.26% 1.26%

(48367//1141) 3 Bids Tendered

2015 Willow Fishhook MP 37.7 642(1) LUMP 1 70,000.00 93,267.10 127,500.00 8,594,153 10 to Parks Highway CONSTRUCTION SUM 75,000.00 100,000.00 100,000.00 82,000.00

Pavement Preservation SURVEYING 0.75% 1.16% 1.11% 0.91%

(45181/58651/1141) 8 Bids Tendered

2015 Kake Ferry Terminal 642(1) Lump 1 18,900.00 35,423.00 43,000.00 1,115,500 12 Passenger Facility CONSTRUCTION Sum 15,000.00 18,900.00 42,215.00 43,000.00

(45186/SAMHS00002/1141) SURVEYING 1.55% 1.69% 3.25% 3.17%

5 Bids Tendered

2015 CR Flashing Yellow Arrow 642(1) LUMP 1 18,831.00 32,595.25 72,750.00 4,757,548 12 ITS (45364/54474/0) CONSTRUCTION SUM 49,000.00 19,800.00 19,000.00 18,831.00

4 Bids Tendered SURVEYING 1.01% 0.42% 0.39% 0.38%

Page 61: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 61 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2018 Kenai Spur Highway: Mp 642(1) Lump 1.0 44,000.00 54,666.67 70,000.00 3,440,733 06 12 - 18 Pavement CONSTRUCTION Sum 28,000.00 70,000.00 44,000.00 50,000.00

Preservation (48367) SURVEYING (Alt) 0.82% 2.03% 1.26% 1.26%

3 Bids Tendered

2017 Dowling Road: Old Seward 642(1) LUMP 1 15,000.00 18,916.67 25,000.00 2,066,575 05 Hwy to Lake Otis Parkway CONSTRUCTION SUM 20,000.00 16,750.00 25,000.00 15,000.00

Pavement Preservation SURVEYING 0.87% 0.81% 1.13% 0.67%

(47034/CSHWY00075/1141)

3 Bids Tendered

2011 HSIP: Tudor Road: Laurel 642(1) LUMP 1 15,000.00 21,712.80 37,664.00 1,750,344 04 Street To Boniface CONSTRUCTION SUM 31,000.00 18,000.00 37,664.00 18,500.00

Parkway Channelization SURVEYING 1.36% 1.03% 2.08% 0.97%

Improvements & HSIP: Debarr Road: Bragaw Street to Hoyt Street Channelization Improvements (33163/51927 51918/1141) 5 Bids Tendered

2013 69003 Glacier Hwy And 642(1) LUMP 1 50,000.00 80,000.00 110,000.00 5,031,578 05 Back Loop Rd Intersection CONSTRUCTION SUM 70,000.00 110,000.00 50,000.00 0.00

Safety Improvements SURVEYING 1.63% 2.19% 0.97% 0.00%

(40432/69003/1141) 2 Bids Tendered

2010 HSIP: International Airport 642(1) LUMP 1 15,000.00 18,700.00 20,000.00 1,583,168 07 Rd At Old Seward Hwy CONSTRUCTION SUM 16,000.00 19,800.00 15,000.00 20,000.00

(29896/56611/1141) SURVEYING 1.06% 1.25% 0.94% 1.17%

4 Bids Tendered

2013 Jnu: Egan Drive Additional 642(1) LUMP 1 30,000.00 31,900.00 33,800.00 3,724,020 07 Illumination CONSTRUCTION SUM 36,000.00 30,000.00 33,800.00 0.00

(41062/67402/1141) SURVEYING 1.00% 0.81% 0.69% 0.00%

2 Bids Tendered

2016 KTN-North Tongass 642(1) LUMP 1 25,000.00 31,481.67 39,445.00 4,163,270 07 Highway: Illumination CONSTRUCTION SUM 36,000.00 30,000.00 25,000.00 39,445.00

Upgrades (HSIP) SURVEYING 0.93% 0.72% 0.58% 0.81%

(45699/Z684130000/0) 3 Bids Tendered

2011 VICTOR ROAD: 100TH 642(1) LUMP 1 49,738.00 60,056.33 100,000.00 6,242,977 11 AVENUE TO DIMOND CONSTRUCTION SUM 100,000.00 49,738.00 100,000.00 50,000.00

BLVD. SURVEYING 1.18% 0.80% 1.53% 0.72%

(35419/55027/1141) 6 Bids Tendered

2009 Sterling Highway 642(1) LUMP 1 25,000.00 33,100.00 38,300.00 5,636,173 06 Resurfacing: Soldotna To CONSTRUCTION SUM 65,000.00 36,000.00 38,300.00 25,000.00

Cohoe Loop Road SURVEYING 1.03% 0.64% 0.68% 0.42%

(19654/51916/1141) 3 Bids Tendered

Page 62: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 62 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 Schrock Road Pavement 642(1) LUMP 1 55,000.00 113,094.64 175,000.00 8,998,584 04 Preservation CONSTRUCTION SUM 103,000.00 122,000.00 100,000.00 140,000.00

Mat-Su Area Roads SURVEYING 0.77% 1.36% 1.04% 1.44%

Pavement Preservation

(Group A)

Mat-Su Area Roads

Pavement Preservation

(Group B)

2011 Illinois Street 642(1) LUMP 1 120,000.00 210,000.00 270,000.00 21,965,863 12 Reconstruction CONSTRUCTION SUM 200,000.00 270,000.00 250,000.00 120,000.00

(33274/63102/1141) SURVEYING 0.88% 1.23% 1.12% 0.54%

4 Bids Tendered

2013 Naukati Harbor 642(1) Lump 1 17,500.00 22,500.00 30,000.00 2,359,505 06 Improvements CONSTRUCTION Sum 25,000.00 20,000.00 30,000.00 17,500.00

(39471/69647/1141) SURVEYING 1.01% 0.85% 1.08% 0.38%

3 Bids Tendered

2014 Kodiak Ferry Terminal And 642(1) Lump 1 60,000.00 117,333.33 152,000.00 9,196,790 05 Dock Improvements CONSTRUCTION Sum 40,000.00 152,000.00 60,000.00 140,000.00

(41591/68938/1141) SURVEYING 0.43% 1.65% 0.59% 1.27%

3 Bids Tendered

2012 Eagle River Road 642(1) LUMP 1 200,000.00 208,333.33 220,000.00 16,932,672 10 Rehabilitation Mp 5.3 To CONSTRUCTION SUM 250,000.00 220,000.00 200,000.00 205,000.00

Mp 12.6 SURVEYING 1.22% 1.30% 1.16% 1.11%

(38731/53943/1141) 3 Bids Tendered

2011 HSIP: International Airport 642(1) LUMP 1 57,000.00 59,925.00 62,700.00 4,310,604 12 Rd at Jewel Lake Rd CONSTRUCTION SUM 59,000.00 60,000.00 60,000.00 62,700.00

Channelization SURVEYING 1.01% 1.39% 1.37% 1.39%

Improvements/HSIP: Jewel Lake Rd: 63rd Ave to Old International Airport Rd (35580/51922 51924/1141) 4 Bids Tendered

2012 Wrangell Ferry Terminal 642(1) Lump 1 10,000.00 15,000.00 20,000.00 1,934,860 11 Improvements CONSTRUCTION Sum 15,000.00 20,000.00 10,000.00 15,000.00

(38315/69432/1141) SURVEYING 0.77% 1.03% 0.45% 0.67%

3 Bids Tendered

2011 Wrangell Road And Utility 642(1) LUMP 1 67,100.00 95,700.00 130,000.00 5,815,976 05 Improvements CONSTRUCTION SUM 85,000.00 67,100.00 90,000.00 130,000.00

(33218/STP-68828/67789/1141) SURVEYING 1.47% 1.15% 1.45% 2.01%

3 Bids Tendered

Page 63: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 63 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 Chiniak Highway MP: 642(1) LUMP 1 75,000.00 99,700.00 124,400.00 10,388,523 05 10-15 Pavement CONSTRUCTION SUM 165,000.00 124,400.00 75,000.00 0.00

Preservation SURVEYING 1.33% 1.20% 0.66% 0.00%

HSIP: Kodiak Bridge Rail Upgrades (45787/56699 & 57090/0) 2 Bids Tendered

2017 Dowling Road: Old Seward 642(1) Lump 1.0 15,000.00 18,916.67 25,000.00 2,066,575 05 Hwy to Lake Otis Parkway CONSTRUCTION Sum 20,000.00 16,750.00 25,000.00 15,000.00

Pavement Preservation SURVEYING (Alt) 0.87% 0.81% 1.13% 0.67%

(47034) 3 Bids Tendered

2012 Petersburg Ferry Terminal 642(1) LUMP 1 5,000.00 13,333.33 20,000.00 2,095,400 07 Improvements CONSTRUCTION SUM 20,000.00 20,000.00 15,000.00 5,000.00

(37226/69422/1141) SURVEYING 0.95% 0.95% 0.67% 0.22%

3 Bids Tendered

2015 Chignik Public Dock 642(1) Lump 1 36,000.00 68,000.00 100,000.00 8,966,400 12 (45317/Z674740000/1141) CONSTRUCTION Sum 130,000.00 36,000.00 100,000.00 65,000.00

4 Bids Tendered SURVEYING 1.38% 0.40% 1.09% 0.61%

2012 Galena Campion Road 642(1) Lump 1 47,000.00 100,408.38 150,000.00 9,879,854 10 Erosion Protection Construction Surveying Sum 150,000.00 75,000.00 84,967.00 150,000.00

(38511/61653/1141) 1.57% 0.76% 0.83% 1.33%

8 Bids Tendered

2009 Alaska Highway MP 1308 642(1) Lump 1 20,000.00 34,412.44 60,000.00 6,460,641 11 Tok Weigh Station Construction Surveying Sum 17,700.00 27,000.00 20,000.00 25,000.00

(20712/67381/1141) 0.26% 0.42% 0.29% 0.36%

7 Bids Tendered

2014 Richardson Highway 642(1) Lump 1 36,115.00 53,278.75 75,000.00 11,172,615 06 Fairbanks New Weigh Construction Surveying Sum 50,000.00 75,000.00 52,000.00 36,115.00

Station 0.38% 0.67% 0.46% 0.29%

(42388/60552/1141) 4 Bids Tendered

2016 Fairbanks Noble Street 642(1) Lump 1.0 120,000.00 159,791.21 229,164.84 9,545,573 12 Upgrade (45722) Construction Surveying Sum 59,500.00 145,000.00 145,000.00 120,000.00

4 Bids Tendered (Alt) 0.56% 1.52% 1.49% 1.13%

2016 Fairbanks Noble Street 642(1) Lump 1 120,000.00 159,791.21 229,164.84 9,545,573 12 Upgrade Construction Surveying Sum 59,500.00 145,000.00 145,000.00 120,000.00

(45722/61725/1141) 0.56% 1.52% 1.49% 1.13%

4 Bids Tendered

2015 Angoon Ferry Terminal 642(1) Lump 1 30,000.00 40,000.00 50,000.00 1,593,868 10 Passenger Facility CONSTRUCTION Sum 25,000.00 40,000.00 30,000.00 50,000.00

(45185/Z683620000/1141) SURVEYING 1.63% 2.51% 1.31% 2.10%

3 Bids Tendered

2014 Haines Ferry Terminal 642(1) LUMP 1 50,800.00 75,700.00 107,000.00 14,979,745 05 Improvements CONSTRUCTION SUM 20,000.00 90,000.00 50,800.00 107,000.00

(39251/68433/1141) SURVEYING 0.21% 0.60% 0.32% 0.66%

4 Bids Tendered (UPLANDS)

Page 64: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 64 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Yankovich / Miller Hill 642(1) Lump 1 50,000.00 56,666.67 60,000.00 1,587,663 03 Multi-Use Path Contruction Surveying Sum 75,000.00 50,000.00 60,000.00 60,000.00

(43375/76707/1141) 4.50% 3.15% 3.21% 3.15%

3 Bids Tendered

2014 Road to Tanana-Stage 1 642(1).NTP1 Lump 1 110,000.00 163,675.60 278,378.00 10,650,925 05 (42658/61759/1141) Construction Surveying Sum 200,000.00 160,000.00 130,000.00 278,378.00

5 Bids Tendered 1.66% 1.50% 1.11% 1.82%

2014 Road to Tanana-Stage 1 642(1).NTP2 Lump 1 12,220.00 33,462.20 56,000.00 10,650,925 05 (42658/61759/1141) Construction Surveying Sum 150,000.00 30,000.00 20,000.00 49,091.00

5 Bids Tendered 1.24% 0.28% 0.17% 0.32%

2015 JNU Glacier Hwy. 642(1)a Lump 1 40,000.00 55,625.00 75,000.00 2,092,727 09 Multi-Use Separated Path Construction Surveying Sum 20,000.00 40,000.00 75,000.00 49,500.00

to UAS 0.84% 1.91% 3.29% 1.89%

(42928/69500/7546) 4 Bids Tendered

2015 JNU Glacier Hwy. 642(1)a Each 1.0 40,000.00 55,625.00 75,000.00 2,092,727 09 Multi-Use Separated Path Construction Surveying (Alt) 20,000.00 40,000.00 75,000.00 49,500.00

to UAS (42928) 0.84% 1.91% 3.29% 1.89%

4 Bids Tendered

2016 Gravina Mill Access Road 642(1)A Lump 1 7,500.00 12,625.00 25,000.00 1,695,525 04 (44786/Z699220000/1141) Construction Surveying Sum 1,159.74 8,000.00 10,000.00 7,500.00

4 Bids Tendered 0.06% 0.47% 0.58% 0.39%

2016 City of Fairbanks 642(1)-A Lump 1 12,000.00 17,000.00 24,000.00 2,311,182 05 Pedestrian Facilities Construction Surveying Sum 20,000.00 15,000.00 24,000.00 12,000.00

Upgrade and Aurora & 0.72% 0.65% 0.92% 0.44%

Auburn Drive Resurfacing (45744/62127/N/A/7546) 3 Bids Tendered

2016 HSIP: Parks Highway 642(1)-A Lump 1 17,500.00 30,375.00 55,000.00 544,441 08 Signing and Striping - Construction Surveying Sum 25,000.00 25,000.00 17,500.00 55,000.00

Project A & HSIP: 3.43% 4.59% 2.99% 7.91%

Fairbanks Area Signing and Striping - Project B (45833/64259 & 64261/1141) 4 Bids Tendered

2015 College Road Pavement 642(1)-A Lump 1 30,000.00 34,000.00 40,000.00 7,090,895 04 Rehabilitation & College Construction Surveying Sum 20,000.00 40,000.00 32,000.00 30,000.00

Rd/Antoinette 0.29% 0.56% 0.43% 0.38%

Ave/Margaret Ave Intersection Reconstruction (44449/62164 / 62854/1141) 3 Bids Tendered

2017 Farmers Loop Resurfacing 642(1)-A Lump 1 5,000.00 7,166.67 8,500.00 12,656,111 06 and Signal Interconnect Construction Surveying Sum 10,000.00 5,000.00 8,000.00 8,500.00

(47065//7546) 0.07% 0.04% 0.06% 0.06%

3 Bids Tendered

Page 65: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 65 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Airport Way Preventive 642(1)-A Lump 1 11,000.00 19,666.67 36,000.00 8,240,476 05 Maintenance - Stage II, Construction Surveying Sum 27,000.00 12,000.00 11,000.00 36,000.00

Northern Region Signal 0.38% 0.15% 0.13% 0.41%

Interconnect - Airport

Way/Peger Road &

Northern Region

Pedestrian Improvements

(44455/63278/62489/60520/7546)

3 Bids Tendered

2014 South Cushman Street 642(1)-A Lump 1 25,000.00 35,000.00 40,000.00 6,138,597 05 Resurfacing & Construction Surveying Sum 10,000.00 40,000.00 25,000.00 40,000.00

South Cushman Sidewalk 0.15% 0.65% 0.39% 0.59%

and Drainage Improvements (42473/62687 & 62532/1141) 3 Bids Tendered

2013 Parks Highway M P 642(1)-A Calendar 180.0 416.67 556.67 811.11 29,587,321 11 163-305 Passing Lanes - Construction Surveying Day 333.33 416.67 555.56 444.44

Stage 1 & Parks Highway (Alt) 0.16% 0.25% 0.33% 0.25% M P 163-305 Passing Lanes - Stage 2 - H S I P (41707) 5 Bids Tendered

2018 Elliott Highway MP 0-12 642(1)-A Lump 1 175,000.00 266,250.19 410,000.76 24,869,247 05 Rehabilitation, Northern Construction Surveying Sum 75,000.00 240,000.00 240,000.00 175,000.00

Region Deep Culverts 0.29% 0.97% 0.87% 0.58%

Stage II, HSIP: Fox Intersection Conspicuity Improvements (48044//1141) 4 Bids Tendered

2016 Taylor Highway MP 642(1)-A Lump 1 5,000.00 7,182.14 11,000.00 8,683,260 10 64-Canadian Border (MP Construction Surveying Sum 10,000.00 5,500.00 5,500.00 5,000.00

67 Construction) & Taylor 0.11% 0.06% 0.06% 0.04%

Highway New Waysides (FLAP) (45184/66446 & 60410/1141) 6 Bids Tendered

Page 66: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 66 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 H S I P: Richardson 642(1)-A Lump 1 5,000.00 7,500.00 10,000.00 325,003 09 Highway M P 291-295 Construction Surveying Sum 2,500.00 5,000.00 7,500.00 10,000.00

Enhanced Curve 0.46% 1.54% 1.39% 1.47%

Delineation

H S I P: Steese Highway

M P 18-20 Enhanced

Curve Delineation

H S I P: Parks Highway M

2015 HSIP: Chena Hot Springs 642(1)-A Lump 1 10,000.00 27,625.00 50,000.00 471,768 12 Road Safety Construction Surveying Sum 45,000.00 25,500.00 25,000.00 50,000.00

Improvements 8.13% 5.41% 4.76% 8.57%

& HSIP: Parks Highway MP 321 Speed Feedback Sign (45182/64119 & 64264/7546) 4 Bids Tendered

2013 Parks Highway M P 642(1)-A Lump 1 75,000.00 100,200.00 146,000.00 29,587,321 11 163-305 Passing Lanes - Construction Surveying Sum 60,000.00 75,000.00 100,000.00 80,000.00

Stage 1 & Parks Highway 0.16% 0.25% 0.33% 0.25%

M P 163-305 Passing Lanes - Stage 2 - H S I P (41707/62683 & 62685/1141) 5 Bids Tendered

2016 FMATS Pedestrian 642(1)-A Lump 1 40,000.00 54,000.00 80,000.00 8,963,033 04 Improvements - Stage I, Construction Surveying Sum 30,000.00 80,000.00 40,000.00 42,000.00

Peger Road Resurfacing, 0.26% 0.89% 0.43% 0.40%

& Northern Region Signal Interconnect - Mitchell to Johansen (45600/61661, 63035, & N/A/1141) 3 Bids Tendered

2017 Farmers Loop Resurfacing 642(1)-A Lump 1.0 5,000.00 7,166.67 8,500.00 12,656,111 06 and Signal Interconnect Construction Surveying Sum 10,000.00 5,000.00 8,000.00 8,500.00

(47065) (Alt) 0.07% 0.04% 0.06% 0.06%

3 Bids Tendered

2010 Port MacKenzie Access 642(1)AA1 Lump 1 10,000.00 17,908.18 35,000.00 5,025,609 12 Road (32453/58168/1141) Construction Surveying Sum 20,000.00 21,000.00 10,000.00 27,500.00

11 Bids Tendered 0.33% 0.42% 0.20% 0.47%

2010 Port MacKenzie Access 642(1)AA2 Lump 1 2,500.00 10,826.82 36,700.00 5,025,609 12 Road (32453/58168/1141) Construction Surveying Sum 10,000.00 8,200.00 7,000.00 7,620.00

11 Bids Tendered 0.16% 0.16% 0.14% 0.13%

2011 JNU-Thane Road 642(1)Alt A Lump 1 10,000.00 10,000.00 10,000.00 4,059,696 10 Pavement Rehabilitation Construction Surveying Sum 10,000.00 10,000.00 0.00 0.00

(28053/69340/1141) 0.23% 0.25% 0.00% 0.00%

1 Bids Tendered

Page 67: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 67 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2011 JNU-Thane Road 642(1)Alt B Lump 1 10,000.00 10,000.00 10,000.00 4,059,696 10 Pavement Rehabilitation Construction Surveying Sum 7,500.00 10,000.00 0.00 0.00

(28053/69340/1141) 0.17% 0.25% 0.00% 0.00%

1 Bids Tendered

2015 JNU Glacier Hwy. 642(1)b Lump 1 5,000.00 10,500.00 15,000.00 2,092,727 09 Multi-Use Separated Path Construction Surveying Sum 5,000.00 5,000.00 10,000.00 12,000.00

to UAS 0.21% 0.24% 0.44% 0.46%

(42928/69500/7546) 4 Bids Tendered

2015 JNU Glacier Hwy. 642(1)b Each 1.0 5,000.00 10,500.00 15,000.00 2,092,727 09 Multi-Use Separated Path Construction Surveying (Alt) 5,000.00 5,000.00 10,000.00 12,000.00

to UAS (42928) 0.21% 0.24% 0.44% 0.46%

4 Bids Tendered

2015 HSIP: Chena Hot Springs 642(1)-B Lump 1 1,250.00 2,062.50 3,000.00 471,768 12 Road Safety Construction Surveying Sum 3,000.00 2,000.00 1,250.00 3,000.00

Improvements 0.54% 0.42% 0.24% 0.51%

& HSIP: Parks Highway MP 321 Speed Feedback Sign (45182/64119 & 64264/7546) 4 Bids Tendered

2016 HSIP: Parks Highway 642(1)-B Lump 1 15,000.00 19,500.00 23,000.00 544,441 08 Signing and Striping - Construction Surveying Sum 20,000.00 15,000.00 20,000.00 20,000.00

Project A & HSIP: 2.74% 2.76% 3.42% 2.88%

Fairbanks Area Signing and Striping - Project B (45833/64259 & 64261/1141) 4 Bids Tendered

2015 Airport Way Preventive 642(1)-B Lump 1 2,000.00 2,400.00 3,000.00 8,240,476 05 Maintenance - Stage II, Construction Surveying Sum 5,000.00 2,000.00 2,200.00 3,000.00

Northern Region Signal 0.07% 0.02% 0.03% 0.03%

Interconnect - Airport

Way/Peger Road &

Northern Region

Pedestrian Improvements

(44455/63278/62489/60520/7546)

3 Bids Tendered

2013 Parks Highway M P 642(1)-B Mile 16.0 9,375.00 11,000.00 12,500.00 29,587,321 11 163-305 Passing Lanes - Construction Surveying (Alt) 15,000.00 10,000.00 12,500.00 10,625.00

Stage 1 & Parks Highway 0.63% 0.54% 0.65% 0.53%

M P 163-305 Passing Lanes - Stage 2 - H S I P (41707) 5 Bids Tendered

Page 68: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 68 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 Parks Highway M P 642(1)-B Lump 1 150,000.00 176,000.00 200,000.00 29,587,321 11 163-305 Passing Lanes - Construction Surveying Sum 240,000.00 160,000.00 200,000.00 170,000.00

Stage 1 & Parks Highway 0.63% 0.54% 0.65% 0.53%

M P 163-305 Passing Lanes - Stage 2 - H S I P (41707/62683 & 62685/1141) 5 Bids Tendered

2014 H S I P: Richardson 642(1)-B Lump 1 2,500.00 4,833.33 9,500.00 325,003 09 Highway M P 291-295 Construction Surveying Sum 2,500.00 2,500.00 2,500.00 9,500.00

Enhanced Curve 0.46% 0.77% 0.46% 1.40%

Delineation

H S I P: Steese Highway

M P 18-20 Enhanced

Curve Delineation

H S I P: Parks Highway M

P 215-219 Enhanced

Curve Delineation

(42595/62506/62508/62510/1141)

3 Bids Tendered

2018 Elliott Highway MP 0-12 642(1)-B Lump 1 5,000.00 16,100.00 32,400.00 24,869,247 05 Rehabilitation, Northern Construction Surveying Sum 15,000.00 12,000.00 15,000.00 5,000.00

Region Deep Culverts 0.06% 0.05% 0.05% 0.02%

Stage II, HSIP: Fox Intersection Conspicuity Improvements (48044//1141) 4 Bids Tendered

2016 FMATS Pedestrian 642(1)-B Lump 1 48,000.00 93,333.33 132,000.00 8,963,033 04 Improvements - Stage I, Construction Surveying Sum 125,000.00 100,000.00 132,000.00 48,000.00

Peger Road Resurfacing, 1.10% 1.12% 1.43% 0.46%

& Northern Region Signal Interconnect - Mitchell to Johansen (45600/61661, 63035, & N/A/1141) 3 Bids Tendered

2018 Elliott Highway MP 0-12 642(1)-C Lump 1 2,000.00 4,975.00 13,200.00 24,869,247 05 Rehabilitation, Northern Construction Surveying Sum 10,000.00 2,200.00 2,500.00 2,000.00

Region Deep Culverts 0.04% 0.01% 0.01% 0.01%

Stage II, HSIP: Fox Intersection Conspicuity Improvements (48044//1141) 4 Bids Tendered

Page 69: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 69 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 H S I P: Richardson 642(1)-C Lump 1 2,500.00 3,333.33 5,000.00 325,003 09 Highway M P 291-295 Construction Surveying Sum 2,500.00 2,500.00 2,500.00 5,000.00

Enhanced Curve 0.46% 0.77% 0.46% 0.74%

Delineation

H S I P: Steese Highway

M P 18-20 Enhanced

Curve Delineation

H S I P: Parks Highway M

2016 FMATS Pedestrian 642(1)-C Lump 1 7,000.00 10,166.67 15,000.00 8,963,033 04 Improvements - Stage I, CONSTRUCTION Sum 10,000.00 8,500.00 15,000.00 7,000.00

Peger Road Resurfacing, SURVEYING 0.09% 0.09% 0.16% 0.07%

& Northern Region Signal Interconnect - Mitchell to Johansen (45600/61661, 63035, & N/A/7546) 3 Bids Tendered

2009 JNU - Glacier Highway * 642(10) Each 26 450.00 483.33 500.00 9,793,198 06 Trailhead Stage II - Monument Case 300.00 450.00 500.00 500.00

Amalga Harbor to Kayak 0.08% 0.12% 0.13% 0.12% Launch (19996/68832/1142) 3 Bids Tendered

2012 Angoon Areawide Paving 642(10) Each 4 500.00 583.33 750.00 1,209,315 11 (38070/67460/1142) Monument Case 300.00 500.00 500.00 750.00

3 Bids Tendered 0.08% 0.17% 0.14% 0.17%

2017 Keku Road 642(10) Each 36 400.00 523.33 750.00 4,654,967 05 (42702/Z695390000/0) Monument Case 400.00 400.00 750.00 0.00

3 Bids Tendered 0.30% 0.31% 0.37% 0.00%

2009 North Pole Homestead Rd 642(10) Each 1 350.00 845.00 1,800.00 1,250,518 01 / North Pole HS Blvd. Monument Case 400.00 1,800.00 1,000.00 350.00

Ext.-AK146: Bids Opened 0.03% 0.14% 0.08% 0.03%

01/22/2009 (6183/63025//1142) 5 Bids Tendered

2018 Parks Hwy MP 99-123.5 642(10) Each 15 375.00 625.00 1,000.00 13,727,979 05 Pavement Preservation Monument Case 500.00 375.00 700.00 1,000.00

HSIP: Parks Hwy: 0.06% 0.04% 0.07% 0.09%

Systemic Passing Lanes MP 99-123.5 (48390//1142) 4 Bids Tendered

2009 Sawmill Creek Road - 642(10) Each 4 200.00 333.33 500.00 1,983,405 03 Halibut Point Road Monument Case 400.00 500.00 200.00 300.00

Roundabout 0.07% 0.10% 0.04% 0.06% (19212/68999/1142) 3 Bids Tendered

Page 70: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 70 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 JNU - Stephen Richards 642(10) Each 3 200.00 215.00 230.00 1,214,605 08 Safety And Capacity Monument Case 500.00 200.00 230.00 0.00

Improvements - REBID 0.15% 0.05% 0.05% 0.00% (40112/68740/1142) 2 Bids Tendered

2018 (67509 & 00057) Hns Hwy 642(10) EACH 10 400.00 400.00 400.00 6,157,603 07 & Old Haines Hwy Monument Case 690.00 400.00 0.00 0.00

Resurface, Hns Airport 0.12% 0.06% 0.00% 0.00% Access Rd. (48265/00057/67509/1142) 1 Bids Tendered

2015 HSIP: 36th Avenue Arctic 642(10) Each 2 350.00 432.40 586.41 1,990,576 05 Blvd to C Street 5 Lane Monument Case 500.00 350.00 586.41 400.00

Conversion 0.05% 0.04% 0.06% 0.04% (44656/55730/1142) 6 Bids Tendered

2015 Airport Way Preventive 642(10) Each 11 400.00 591.67 700.00 8,240,476 05 Maintenance - Stage II, Monument Case 1,200.00 700.00 675.00 400.00

Northern Region Signal 0.19% 0.09% 0.09% 0.05% Interconnect - Airport

Way/Peger Road &

Northern Region

Pedestrian Improvements

(44455/63278/62489/60520/7547)

3 Bids Tendered

2017 Farmers Loop Resurfacing 642(10) Each 29 270.00 356.67 500.00 12,656,111 06 and Signal Interconnect Monument Case 600.00 270.00 500.00 300.00

(47065//7547) 0.12% 0.06% 0.11% 0.06% 3 Bids Tendered

2011 JNU-Thane Road 642(10) Each 23 400.00 400.00 400.00 4,059,696 10 Pavement Rehabilitation Monument Case 300.00 400.00 0.00 0.00

(28053/69340/1142) 0.16% 0.23% 0.00% 0.00% 1 Bids Tendered

2009 Yak-Area wide Paving 642(10) Each 44 400.00 483.33 550.00 5,317,010 10 (25013/68345/1142) Monument Case 500.00 500.00 400.00 550.00

3 Bids Tendered 0.31% 0.41% 0.28% 0.35%

2011 Jnu - Glacier Hwy - North 642(10) Each 26 350.00 373.33 400.00 10,369,300 09 Eagle Beach Kayak Monument Case 500.00 400.00 350.00 370.00

Launch to Bessie Creek 0.10% 0.10% 0.08% 0.08% (32656/67526/1142) 3 Bids Tendered

2010 Wendell Avenue ADA 642(10) Each 2 500.00 500.00 500.00 1,573,111 07 Improvements Monument Case 450.00 500.00 500.00 0.00

(29033/60827/1142) 0.06% 0.06% 0.06% 0.00% 2 Bids Tendered

2010 23rd Avenue 642(10) Each 8 450.00 593.33 830.00 2,405,270 07 Improvements Monument Case 450.00 450.00 830.00 500.00

(28375/60745/1142) 0.12% 0.15% 0.25% 0.14% 3 Bids Tendered

Page 71: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 71 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 Skagway - Replace 642(10) Each 2 285.00 685.40 1,000.00 18,907,426 12 Captain William Henry Monument Case 800.00 642.00 1,000.00 500.00

Moore Bridge 0.01% 0.01% 0.01% 0.00%

(46281//1142) 5 Bids Tendered

2011 Yakutat Area Wide Paving, 642(10) Each 44 180.00 293.33 500.00 6,821,536 04 Yakutat Airport Runway Monument Case 500.00 500.00 200.00 180.00

11-29 Pavement Repairs, 0.32% 0.32% 0.12% 0.11% CBY Utilities RE-BID (26973//1142) 3 Bids Tendered

2010 AMATS: Jewel Lake Road 642(10) Each 1 300.00 400.00 500.00 1,977,927 02 Resurfacing, Dimond Monument Case 500.00 500.00 400.00 300.00

Boulevard To West 63rd 0.02% 0.03% 0.02% 0.01% Ave (27034/51987/1142) 3 Bids Tendered

2009 HAINES HIGHWAY - Front 642(10) Each 5 500.00 500.00 500.00 1,833,512 07 Street To Union Street Monument Case 500.00 500.00 0.00 0.00

Rehabilitation 0.11% 0.14% 0.00% 0.00% (20894/68948/1142) 1 Bids Tendered

2010 KTN-Totem Bight To 642(10) Each 8 300.00 937.50 1,575.00 8,744,515 03 Whipple Creek Monument Case 300.00 300.00 1,575.00 0.00

(17733/67443/1142) 0.02% 0.03% 0.14% 0.00%

2 Bids Tendered

2010 JNU-FFY09 Areawide 642(10) Each 21 175.00 312.50 450.00 1,068,730 03 Paving Monument Case 200.00 175.00 450.00 0.00

(24834/68837/1142) 0.32% 0.34% 0.76% 0.00% 2 Bids Tendered

2009 Emmonak Flood 642(10) Each 7 500.00 951.62 1,300.00 1,945,115 07 Permanent Repairs Monument Case 900.00 1,200.00 1,024.00 1,000.00

(May'05): Airport/Clinic 0.27% 0.43% 0.33% 0.31%

Road Bid Opened: 07/23/2009 (16392/62754/1142) 6 Bids Tendered

2013 JNU - Thane Road HSIP 642(10) Each 5 500.00 500.00 500.00 1,298,675 06 (33305/69331/1142) Monument Case 400.00 500.00 0.00 0.00

1 Bids Tendered 0.18% 0.19% 0.00% 0.00%

2016 Fairbanks Noble Street 642(10) Each 16 550.00 602.81 661.25 9,545,573 12 Upgrade Monument Case 1,500.00 550.00 600.00 600.00

(45722/61725/1142) 0.22% 0.09% 0.10% 0.09% 4 Bids Tendered

2011 Girdwood Streets And 642(10) Each 6 32.00 262.20 400.00 2,834,021 09 Drainage Improvements Monument Case 250.00 275.00 270.00 270.00

(34095/57057/1142) 0.04% 0.06% 0.05% 0.05% 10 Bids Tendered

Page 72: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 72 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 JNU-Glacier Highway 642(10) Each 3 648.00 1,116.00 2,000.00 25,154,532 12 Brotherhood Bridge Monument Case 425.00 700.00 648.00 2,000.00

Replacement 0.01% 0.01% 0.01% 0.02%

(34037/67987/1142) 3 Bids Tendered

2012 Hns - Beach Rd. 642(10) Each 1 500.00 500.00 500.00 3,934,144 06 Widening & Front St. Monument Case 500.00 500.00 0.00 0.00

Intersection Improvements 0.01% 0.01% 0.00% 0.00% Hns - Old Haines Highway Sidewalk Construction (36444/69316 & 69178/1142) 1 Bids Tendered

2015 SGY- Klondike Highway 642(10) Each 6 500.00 650.00 800.00 1,549,720 10 Repairs Monument Case 500.00 800.00 500.00 0.00

(43123/Z684800000/1142) 0.22% 0.31% 0.19% 0.00% 2 Bids Tendered

2010 JNU-North Douglas 642(10) Each 28 100.00 281.47 374.40 4,884,352 11 Highway Pavement Monument Case 400.00 100.00 374.40 370.00

Rehabilitation 0.18% 0.06% 0.15% 0.14% (26855/69633/1142) 3 Bids Tendered

2011 Hyder-Salmon River Road 642(10) Each 22 250.00 410.00 650.00 7,440,684 08 Rehabilitation Monument Case 600.00 250.00 650.00 330.00

(11216/68602/1142) 0.21% 0.07% 0.16% 0.07% 3 Bids Tendered

2012 KTN North Tongass 642(10) Each 13 500.00 800.00 1,100.00 2,232,313 11 Pavement Rehabilitation Monument Case 400.00 500.00 1,100.00 0.00

(38072/67477/1142) 0.18% 0.29% 0.48% 0.00%

2 Bids Tendered

2013 KTN- North Tongass 642(10) Each 13 220.00 260.00 300.00 9,118,342 03 Highway (Ward Cove to Monument Case 300.00 300.00 220.00 0.00

Refuge Cove) 0.05% 0.04% 0.03% 0.00% (29055/68973/1142) 2 Bids Tendered

2017 Haines Highway 642(10) Each 40 250.00 750.00 1,600.00 36,149,513 11 Reconstruction Milepost Monument Case 1,000.00 650.00 1,600.00 250.00

3.9 to 12.2, Phase 1 0.11% 0.07% 0.17% 0.02%

(47539//1142) 4 Bids Tendered

2016 Hns - Klehini River Bridge 642(10) Each 3 500.00 736.00 1,300.00 6,703,504 03 Replacement And Transfer Monument Case 400.00 880.00 500.00 500.00

(34258/69377/1142) 0.02% 0.04% 0.02% 0.02%

5 Bids Tendered

2014 Fritz Cove Road 642(10) Each 32 275.00 337.50 400.00 3,115,745 11 Rehabilitation And Repair Monument Case 400.00 400.00 275.00 0.00

(36604/69397/1142) 0.35% 0.41% 0.19% 0.00% 2 Bids Tendered

Page 73: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 73 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 69003 Glacier Hwy And 642(10) EACH 17 250.00 350.00 450.00 5,031,578 05 Back Loop Rd Intersection MONUMENT CASE 300.00 450.00 250.00 0.00

Safety Improvements 0.12% 0.15% 0.08% 0.00% (40432/69003/1142) 2 Bids Tendered

2011 VICTOR ROAD: 100TH 642(10) EACH 7 215.00 404.67 500.00 6,242,977 11 AVENUE TO DIMOND MONUMENT CASE 500.00 468.00 450.00 300.00

BLVD. 0.04% 0.05% 0.05% 0.03% (35419/55027/1142) 6 Bids Tendered

2011 Illinois Street 642(10) EACH 5 600.00 931.25 1,875.00 21,965,863 12 Reconstruction MONUMENT CASE 500.00 650.00 600.00 1,875.00

(33274/63102/1142) 0.01% 0.01% 0.01% 0.04%

4 Bids Tendered

2014 NORDIC DRIVE & 642(10) EACH 28 220.00 360.00 500.00 8,362,244 12 HAUGEN DRIVE MONUMENT CASE 600.00 500.00 220.00 0.00

(43571/68048 & 0.20% 0.17% 0.07% 0.00% 69518/1142) 2 Bids Tendered

2016 Glacier Highway 642(10) EACH 16 600.00 800.00 1,000.00 13,394,988 12 Reconstruction: Fritz Cove MONUMENT CASE 1,000.00 1,000.00 600.00 0.00

Road To Seaview Avenue 0.11% 0.12% 0.07% 0.00%

(46359/Z684710000/1142) 2 Bids Tendered

2014 South Cushman Street 642(10)-A Each 16 1,300.00 1,766.67 2,000.00 6,138,597 05 Resurfacing & Monument Case 1,000.00 1,300.00 2,000.00 2,000.00

South Cushman Sidewalk 0.24% 0.34% 0.50% 0.47%

and Drainage Improvements (42473/62687 & 62532/1142) 3 Bids Tendered

2011 JNU-Thane Road 642(10)Alt A Each 2 400.00 400.00 400.00 4,059,696 10 Pavement Rehabilitation Monument Case 300.00 400.00 0.00 0.00

(28053/69340/1142) 0.01% 0.02% 0.00% 0.00% 1 Bids Tendered

2011 JNU-Thane Road 642(10)Alt B Each 2 400.00 400.00 400.00 4,059,696 10 Pavement Rehabilitation Monument Case 300.00 400.00 0.00 0.00

(28053/69340/1142) 0.01% 0.02% 0.00% 0.00% 1 Bids Tendered

Page 74: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 74 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 FMATS Pedestrian 642(10)-B Each 17 500.00 600.00 750.00 8,963,033 04 Improvements - Stage I, Monument Case 400.00 500.00 750.00 550.00

Peger Road Resurfacing, 0.06% 0.09% 0.14% 0.09% & Northern Region Signal Interconnect - Mitchell to Johansen (45600/61661, 63035, & N/A/1142) 3 Bids Tendered

2017 Richardson Highway MP 642(103) Lump 1 10,000.00 13,440.00 19,640.00 3,030,526 06 80-82 Resurfacing & Cross Sections Sum 5,000.00 10,000.00 16,000.00 15,000.00

Drainage Improvemnts 0.17% 0.33% 0.43% 0.39%

(46367/60613/1141) 6 Bids Tendered

2015 Parks Highway MP 235 642(103) Lump 1 5,500.00 5,500.00 5,500.00 607,950 08 Drainage Improvements Cross Sections Sum 25,000.00 5,500.00 0.00 0.00

(44211/62176 & 5.00% 0.90% 0.00% 0.00%

62914/1141) 1 Bids Tendered

2017 Ktn: Front, Mill, And 642(104) Lump 1 5,000.00 5,000.00 5,000.00 9,681,105 11 Stedman Streets Bridge Survey Sum 10,000.00 5,000.00 0.00 0.00

Reconstruction 0.12% 0.05% 0.00% 0.00%

(47761/Z681600000/7198) 1 Bids Tendered

2016 Parks Highway Bridge 642(104) Lump 1 14,250.00 19,542.25 25,000.00 3,099,899 01 Deck Rehabilitation Bridge Survey Sum 40,000.00 25,000.00 20,405.00 18,514.00

(44362/62966/1141) 0.71% 0.81% 0.60% 0.47%

4 Bids Tendered

2016 Parks Highway Bridge 642(104) Square 73,029.0 0.20 0.27 0.34 3,099,899 01 Deck Rehabilitation Bridge Survey Foot 0.55 0.34 0.28 0.25

(44362) (Alt) 0.71% 0.81% 0.60% 0.47% 4 Bids Tendered

2009 HOONAH FERRY 642(11) Each 29 200.00 266.67 300.00 1,720,852 12 TERMINAL TO AIRPORT Adjust Existing 500.00 200.00 300.00 300.00

PAVEMENT Monument 0.57% 0.34% 0.48% 0.39% REHABILITATION (23195/68909/1647) 3 Bids Tendered

2015 International Airport Road 642(11) Each 1 500.00 500.00 500.00 6,487,960 06 Pavement Preservation Adjust Existing 350.00 500.00 500.00 0.00

South Aircraft Drive to Monument Case 0.01% 0.01% 0.01% 0.00% Homer Drive (44768/56729/7557) 2 Bids Tendered

2012 Juneau-FFY12 Areawide 642(11) Each 7 500.00 500.00 500.00 1,678,831 11 Paving Adjust Existing 500.00 500.00 0.00 0.00

(38026/67432/1648) Monument Case 0.20% 0.21% 0.00% 0.00% 1 Bids Tendered

Page 75: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 75 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2012 Juneau-Yandukin Drive / 642(11) Each 18 600.00 600.00 600.00 1,896,296 11 Shell Simmons Drive Adjust Existing 500.00 600.00 0.00 0.00

(36724/68045/1648) Monument Case 0.48% 0.57% 0.00% 0.00% 1 Bids Tendered

2009 Muldoon Rd. Resurfacing, 642(11) Each 8 200.00 230.00 250.00 3,673,329 11 36th to Glenn Hwy & Adjust Existing 210.00 225.00 200.00 250.00

HSIP: 6th Avenue at Monument Case 0.03% 0.05% 0.04% 0.05% Muldoon Road Safety Improvements (25455/50810 57254/1648) 4 Bids Tendered

2015 Raspberry Road: Jewel 642(11) Each 7 550.00 575.00 600.00 6,769,856 09 Lake - Minnesota Adjust Existing 1,750.00 600.00 550.00 0.00

Pavement Preservation Monument Case 0.15% 0.06% 0.06% 0.00% HSIP: Jewel Lake Rd At Raspberry Rd. East - West Left Turn Lanes (45141/56727 58760/1648) 2 Bids Tendered

2015 Parks Hwy: MP 35-40 642(11) Each 9 350.00 425.00 500.00 13,943,673 07 Pavement Preservation Adjust Existing 350.00 500.00 400.00 450.00

Glenn Hwy - Parks Hwy Monument Case 0.02% 0.03% 0.03% 0.03% Interchange Ramps (44802/56703 58571/1648) 4 Bids Tendered

2012 Sterling Hwy MP 150-169 642(11) Each 32 200.00 241.67 300.00 11,698,675 11 Pavement Preservation & Adjust Existing 384.38 300.00 200.00 225.00

Sterling Hwy MP 169-173 Monument Case 0.11% 0.08% 0.05% 0.06% Pavement Preservation (39053/54140 54130/1648) 3 Bids Tendered

Page 76: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 76 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 Homer: East End Road 642(11) Each 9 300.00 710.00 1,300.00 11,749,902 02 MP 3.75-5.5, Kachemak Adjust Existing 300.00 530.00 1,300.00 300.00

Drive to Waterman Road Monument Case 0.03% 0.04% 0.09% 0.02%

Rehabilitation Homer: East End Road MP 12.5 to MP 19.6 and Old East End Road MP 0.0 to MP 1.9 Pavement

2014 AMATS: A St Resurfacing: 642(11) Each 17 300.00 600.00 900.00 5,686,743 05 Northern Lights Blvd to 9th Adjust Existing 300.00 300.00 900.00 0.00

Ave and HSIP: 16th Ave at Monument Case 0.11% 0.09% 0.26% 0.00% A Street Channelization Improvements (42707/56000 51331/1648) 2 Bids Tendered

2015 Ingra and Gambell Phase 642(11) Each 30 300.00 350.00 400.00 5,296,083 06 1 Paving, 5th to 36th Adjust Existing 300.00 300.00 400.00 0.00

(44515/57858/1648) Monument Case 0.16% 0.17% 0.22% 0.00% 2 Bids Tendered

2015 West Anchorage Roads 642(11) Each 8 500.00 500.00 500.00 2,243,416 06 Pavement Preservation Adjust Existing 800.00 500.00 500.00 0.00

(44709/58795/1648) Monument Case 0.26% 0.18% 0.13% 0.00% 2 Bids Tendered

2010 68707 - POW Thorne Bay 642(11) Each 1 500.00 866.67 1,600.00 1,820,440 11 Road Bridges Painting Adjust Existing 800.00 500.00 1,600.00 500.00

(24753/68707/1648) Monument Case 0.06% 0.03% 0.08% 0.02%

3 Bids Tendered

2017 Aleknagik Lake Road MP 642(11) Each 92 200.00 313.75 425.00 5,393,658 06 0-5 Pavement Adjust Existing 375.00 330.00 200.00 425.00

Preservation Monument Case 0.46% 0.56% 0.30% 0.63% Aleknagik Wood River Bridge Construction - Phase III (47068/CFHWY00169 & CFHWY00107/1648) 4 Bids Tendered

2010 JNU-North Douglas 642(11) Each 1 200.00 658.00 1,404.00 4,884,352 11 Highway Pavement Adjust Existing 500.00 200.00 1,404.00 370.00

Rehabilitation Monument Case 0.01% 0.00% 0.02% 0.01%

(26855/69633/1648) 3 Bids Tendered

Page 77: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 77 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2018 Parks Hwy MP 99-123.5 642(11) Each 13 325.00 356.25 400.00 13,727,979 05 Pavement Preservation Adjust Existing 250.00 325.00 400.00 350.00

HSIP: Parks Hwy: Monument Case 0.02% 0.03% 0.03% 0.03% Systemic Passing Lanes MP 99-123.5 (48390//1648) 4 Bids Tendered

2009 Craig-Klawock Highway 642(11) Each 28 400.00 566.67 750.00 3,113,538 06 Resurfacing Adjust Existing 300.00 400.00 750.00 550.00

(18872/68784/1647) Monument Case 0.21% 0.36% 0.65% 0.39% 3 Bids Tendered

2012 Hns - Beach Rd. 642(11) Each 2 1,000.00 1,000.00 1,000.00 3,934,144 06 Widening & Front St. Adjust Existing 500.00 1,000.00 0.00 0.00

Intersection Improvements Monument Case 0.03% 0.05% 0.00% 0.00%

Hns - Old Haines Highway Sidewalk Construction (36444/69316 & 69178/1648) 1 Bids Tendered

2018 WRG - Evergreen Ave. 642(11) Each 19 500.00 500.00 500.00 4,674,097 04 Improvements and Adjust Existing 500.00 500.00 500.00 0.00

Pedestrian Access Monument Case 0.20% 0.20% 0.20% 0.00% (43122/Z680290000/1142) 2 Bids Tendered

2013 Ak Peninsula Hwy: King 642(11) Each 101 200.00 326.25 455.00 10,295,938 11 Salmon Naknek Pavement Adjust Existing 300.00 350.00 455.00 300.00

Preservation Monument Case 0.25% 0.34% 0.43% 0.28% (41790/55244/1648) 4 Bids Tendered

2013 Halibut Point Road 642(11) Each 42 200.00 965.00 1,925.00 19,292,860 01 Pavement Rehab Adjust Existing 500.00 1,925.00 770.00 200.00

(38459/69351/1648) Monument Case 0.11% 0.42% 0.16% 0.04%

3 Bids Tendered

2013 Sterling Highway Mp 79 - 642(11) Each 19 200.00 366.67 500.00 4,789,467 10 82.5 Pavement Adjust Existing 500.00 200.00 500.00 400.00

Preservation Monument Case 0.18% 0.08% 0.20% 0.15% (41786/54151/1648) 3 Bids Tendered

2010 JNU-Glacier Spur Road 642(11) Each 3 250.00 250.00 250.00 1,135,309 06 (Pavement Rehabilitation) Adjust Existing 500.00 250.00 0.00 0.00

(20472/69348/1647) Monument Case 0.13% 0.07% 0.00% 0.00% 1 Bids Tendered

2013 Dimond Blvd Resurfacing: 642(11) Each 11 250.00 375.00 500.00 7,227,267 03 Jewel Lake Rd To Seward Adjust Existing 350.00 250.00 500.00 0.00

Highway Monument Case 0.04% 0.04% 0.07% 0.00% (40291/53801/1648) 2 Bids Tendered

Page 78: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 78 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2010 Sterling Highway MP 642(11) Each 16 150.00 312.50 500.00 3,750,509 09 90-82 Resurfacing Adjust Existing 300.00 300.00 500.00 300.00

(29634/52493/1648) Monument Case 0.09% 0.13% 0.20% 0.12% 4 Bids Tendered

2010 AMATS: Jewel Lake Road 642(11) Each 13 250.00 325.00 400.00 1,977,927 02 Resurfacing, Dimond Adjust Existing 300.00 250.00 400.00 325.00

Boulevard To West 63rd Monument Case 0.16% 0.16% 0.22% 0.17% Ave (27034/51987/1648) 3 Bids Tendered

2013 Anchorage Asphalt 642(11) Each 39 100.00 486.67 1,000.00 1,793,675 05 Surface Repairs, 2013 Adjust Existing 300.00 100.00 360.00 1,000.00

(40314/54396/1648) Monument Case 0.58% 0.22% 0.75% 1.86%

3 Bids Tendered

2013 WRG Zimovia Pavement 642(11) Each 68 130.00 323.33 540.00 7,822,574 01 Rehabilitation Adjust Existing 350.00 300.00 130.00 540.00

(38064/67425/1647) Monument Case 0.26% 0.26% 0.11% 0.44% 3 Bids Tendered

2016 C Street Paving and 642(11) Each 25 450.00 650.00 1,000.00 10,998,774 07 Anchorage Curb Ramps Adjust Existing 350.00 500.00 450.00 1,000.00

2016 Monument Case 0.08% 0.11% 0.10% 0.21%

(46058/ANCPAV2016/1648)

3 Bids Tendered

2013 POW Big Salt Lake Road 642(11) Each 14 195.00 597.50 1,000.00 2,620,072 01 Pavement Rehabilitation Adjust Existing 900.00 195.00 1,000.00 0.00

(38069/67439/1144) Monument Case 0.37% 0.10% 0.41% 0.00%

2 Bids Tendered

2013 JNU-North Douglas 642(11) Each 36 275.00 287.50 300.00 4,522,796 12 Highway Pavement Adjust Existing 500.00 300.00 275.00 0.00

Rehabilitation Monument Case 0.32% 0.24% 0.18% 0.00% (40794/67531/1648) 2 Bids Tendered

2013 Kenai Spur Highway MP 642(11) Each 17 200.00 375.00 550.00 3,872,478 06 0-3 Pavement Adjust Existing 275.00 550.00 200.00 0.00

Preservation Monument Case 0.13% 0.24% 0.09% 0.00% (40631/54142/1648) 2 Bids Tendered

2010 JNU-FFY09 Areawide 642(11) Each 21 230.00 565.00 900.00 1,068,730 03 Paving Adjust Existing 450.00 230.00 900.00 0.00

(24834/68837/1647) Monument Case 0.73% 0.45% 1.51% 0.00% 2 Bids Tendered

2010 Seward Highway MP 642(11) Each 8 250.00 275.00 300.00 7,310,434 10 115-124 Resurfacing Adjust Existing 250.00 300.00 250.00 0.00

(32033/52491/1648) Monument Case 0.02% 0.03% 0.03% 0.00% 2 Bids Tendered

Page 79: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 79 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 Combined: Gustavus Ferry 642(11) Each 7 450.00 475.00 500.00 3,598,291 05 Terminal AK139/ Gustavus Adjust Existing 500.00 500.00 450.00 0.00

Areawide Paving Monument Case 0.08% 0.10% 0.07% 0.00% (39353/69139/ 67416/1648) 2 Bids Tendered

2011 Richardson Hwy MP 642(11) Each 1 500.00 750.00 1,000.00 7,389,044 04 340-346 Resurfacing ( Adjust Existing 1,000.00 750.00 1,000.00 500.00

Moose Creek) Monument Case 0.01% 0.01% 0.01% 0.01%

(33145/63362/1648) 3 Bids Tendered

2012 Sawmill Creek Road 642(11) Each 6 500.00 500.00 500.00 453,550 07 (37484/67427/1648) Adjust Existing 500.00 500.00 0.00 0.00

1 Bids Tendered Monument Case 0.64% 0.66% 0.00% 0.00%

2009 JNU- Mendenhall Loop to 642(11) Each 37 500.00 500.00 500.00 2,878,170 07 Ferry Terminal Adjust Existing 300.00 500.00 500.00 0.00

(23372/68901/1647) Monument Case 0.33% 0.64% 0.57% 0.00% 2 Bids Tendered

2015 Northern Lights Blvd: 642(11) Each 38 500.00 500.00 500.00 8,572,860 03 Forest Park Dr. To Lake Adjust Existing 350.00 500.00 500.00 0.00

Otis Pavement Monument Case 0.15% 0.22% 0.20% 0.00% Preservation, Phase 1 Benson Blvd.: Lois Dr. to LaTouche St. Pavement Preservation, Phase 1 (44280/58496 58497/1648) 2 Bids Tendered

2009 Sawmill Creek Road - 642(11) Each 4 200.00 308.33 450.00 1,983,405 03 Halibut Point Road Adjust Existing 500.00 275.00 450.00 200.00

Roundabout Monument Case 0.09% 0.06% 0.09% 0.04% (19212/68999/1648) 3 Bids Tendered

2017 Kalifornsky Beach Road, 642(11) Each 15 190.00 327.50 500.00 8,695,855 07 MP 16 to 22.2 Resurfacing Adjust Existing 500.00 220.00 500.00 190.00

& Signalization Monument Case 0.07% 0.04% 0.08% 0.03% (47186/59778/1648) 4 Bids Tendered

2012 Holt-Lamplight Road 642(11) Each 22 100.00 216.67 300.00 4,646,626 04 Resurfacing Adjust Existing 400.00 300.00 100.00 250.00

(37466/52638/1648) Monument Case 0.18% 0.14% 0.05% 0.10% 3 Bids Tendered

2014 KTN South Tongass 642(11) Each 1 500.00 662.50 825.00 3,069,946 12 Paving/ Collins Road Adjust Existing 300.00 500.00 825.00 0.00

Guardrail HSIP Monument Case 0.01% 0.02% 0.02% 0.00% (43547/67674/68412/1142) 2 Bids Tendered

Page 80: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 80 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2011 KTN-South Tongass 642(11) Each 8 500.00 500.00 500.00 1,219,195 07 Pavement Rehabilitation Adjust Existing 500.00 500.00 0.00 0.00

(30814/69571/1648) Monument Case 0.33% 0.33% 0.00% 0.00% 1 Bids Tendered

2018 AMATS: Rabbit Creek 642(11) Each 8 100.00 300.00 500.00 5,068,928 06 Road Pavement Adjust Existing 400.00 500.00 300.00 100.00

Preservation Monument Case 0.06% 0.08% 0.05% 0.02% (48393/58511/1648) 3 Bids Tendered

2011 Haines-2nd Ave. - Union 642(11) Each 5 246.00 623.00 1,000.00 2,482,181 10 St. to Main St. & Allen Rd. Adjust Existing 500.00 1,000.00 246.00 0.00

& Main St. Pavement Monument Case 0.11% 0.20% 0.04% 0.00%

Rehabilitation (34343/69565/69568/1142) 2 Bids Tendered

2015 HSIP: Muldoon Road 642(11) Each 1 500.00 833.33 1,500.00 2,499,849 06 Channelization, 11th Court Adjust Existing 300.00 500.00 1,500.00 500.00

to Boundary Avenue Monument Case 0.01% 0.02% 0.06% 0.02%

(44665/57341/1648) 3 Bids Tendered

2011 Van Horn Road West ( 642(11) Each 4 150.00 208.33 275.00 1,198,184 05 Cartwright Road) Adjust Existing 1,200.00 275.00 150.00 200.00

Improvements Monument Case 0.26% 0.09% 0.05% 0.06% (2484/Project No. 62056/1648) 3 Bids Tendered

2014 Soldotna: Birch Street 642(11) Each 1 420.00 430.00 440.00 1,745,059 10 Signal at Sterling Highway Adjust Existing 375.00 440.00 420.00 0.00

Rebid Monument Case 0.02% 0.03% 0.02% 0.00% (43526/59767A/1648) 2 Bids Tendered

2015 Sterling Highway: Soldotna 642(11) Each 9 400.00 455.00 500.00 3,688,652 12 Urban Pavement Adjust Existing 350.00 500.00 420.00 500.00

Preservation Monument Case 0.08% 0.12% 0.10% 0.11% (45376/58524/7548) 4 Bids Tendered

2015 HSIP: CR High Friction 642(11) Each 26 275.00 665.00 1,250.00 6,778,888 12 Surface Treatment Adjust Existing 500.00 275.00 750.00 550.00

(45334/57092/1648) Monument Case 0.17% 0.11% 0.27% 0.19%

5 Bids Tendered

2014 Abbott Road Pavement 642(11) Each 3 500.00 500.00 500.00 1,390,905 10 Preservation New Seward Adjust Existing 350.00 500.00 500.00 0.00

Highway to 88th Avenue Monument Case 0.08% 0.11% 0.09% 0.00% (43473/56728/7548) 2 Bids Tendered

Page 81: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 81 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2018 AMATS: Brayton Dr: 642(11) Each 7 600.00 618.75 650.00 1,109,658 05 DeArmoun Rd - O'Malley Adjust Existing 500.00 625.00 600.00 650.00

Rd Pavement Preservation Monument Case 0.25% 0.39% 0.35% 0.38% (48413/58575/1648) 4 Bids Tendered

2017 ANC Postmark Drive 642(11) Each 4 500.00 500.00 500.00 490,599 05 Repairs 2017 Adjust Existing 500.00 500.00 500.00 0.00

(47002/CSAPT00198/1648) Monument Case 0.37% 0.41% 0.40% 0.00% 2 Bids Tendered

2012 Petersburg Road 642(11) EACH 5 500.00 950.00 1,400.00 3,761,496 07 Improvements/Sewer Main ADJUST EXISTING 800.00 500.00 1,400.00 0.00

Repairs MONUMENT CASE 0.13% 0.07% 0.18% 0.00%

(38103/67879/68165/1648)

2 Bids Tendered

2014 Old Seward Highway: 642(11) EACH 5 100.00 432.50 600.00 3,749,452 11 Rabbit Creek To Brandon ADJUST EXISTING 300.00 500.00 100.00 530.00

Street Pavement MONUMENT CASE 0.04% 0.07% 0.01% 0.06% Preservation (43599/56708/1648) 4 Bids Tendered

2016 Schrock Road Pavement 642(11) EACH 2 200.00 681.43 1,500.00 8,998,584 04 Preservation ADJUST EXISTING 300.00 400.00 500.00 1,500.00

Mat-Su Area Roads MONUMENT CASE 0.00% 0.01% 0.01% 0.03% Pavement Preservation

(Group A)

Mat-Su Area Roads

Pavement Preservation

(Group B)

(45688/Z575280000/Z575470000/Z575500000/0)

7 Bids Tendered

2017 Dowling Road: Old Seward 642(11) EACH 1 500.00 700.00 1,000.00 2,066,575 05 Hwy to Lake Otis Parkway ADJUST EXISTING 500.00 500.00 600.00 1,000.00

Pavement Preservation MONUMENT CASE 0.02% 0.02% 0.03% 0.04%

(47034/CSHWY00075/1648)

3 Bids Tendered

2018 (67509 & 00057) Hns Hwy 642(11) EACH 6 285.00 285.00 285.00 6,157,603 07 & Old Haines Hwy Ajust Existing 300.00 285.00 0.00 0.00

Resurface, Hns Airport Monument Case 0.03% 0.03% 0.00% 0.00% Access Rd.

(48265/00057/67509/1648)

1 Bids Tendered

2012 Petersburg Road 642(11-Alt1) EACH 1 500.00 1,200.00 1,900.00 3,761,496 07 Improvements/Sewer Main ADJUST EXISTING 800.00 500.00 1,900.00 0.00

Repairs MONUMENT CASE 0.03% 0.01% 0.05% 0.00%

(38103/67879/68165/0) 2 Bids Tendered

Page 82: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 82 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2009 Emmonak Flood 642(13) Lump 1 3,700.00 14,533.33 26,000.00 1,945,115 07 Permanent Repairs Cross Sections Sum 64,800.00 20,000.00 15,000.00 15,000.00

(May'05): Airport/Clinic 2.80% 1.03% 0.69% 0.65%

Road Bid Opened: 07/23/2009 (16392/62754/1141) 6 Bids Tendered

2015 Egan Drive Pavement 642(13) Each 2 500.00 550.00 600.00 16,614,244 12 rehabilitation - 10th Street Adjust Existing Primary 600.00 500.00 600.00 0.00

to Mendenhall Loop Road Monument 0.01% 0.01% 0.01% 0.00% Project Number

NH-0932(049)~Z681290000

Salmon Creek Intersection

Safety Improvements Project

Number

EBL-0932(051)~Z69575

(45232/68129/1649)

2 Bids Tendered

2016 Ktn to Shelter Cove Road, 642(13) Lump 1 10,000.00 21,250.00 35,000.00 11,473,390 04 Stage 2 As-Built Survey Sum 25,000.00 35,000.00 10,000.00 20,000.00

(44995/00044/1141) 0.20% 0.31% 0.09% 0.11%

4 Bids Tendered

2009 Sterling Highway Bridge 642(13) Lump 1 7,500.00 8,500.00 10,000.00 3,355,964 01 Rehabilitation Bridge Survey Sum 30,000.00 7,500.00 10,000.00 8,000.00

(17792/50815/7198) 1.10% 0.22% 0.26% 0.16%

3 Bids Tendered

2010 68707 - POW Thorne Bay 642(13) Lump 1 4,000.00 7,666.67 13,000.00 1,820,440 11 Road Bridges Painting Bridge Survey Sum 10,000.00 4,000.00 6,000.00 13,000.00

(24753/68707/0) 0.70% 0.22% 0.30% 0.63%

3 Bids Tendered

2010 KTN Water Street 642(13) Lump 1 3,000.00 7,000.00 10,000.00 1,752,375 04 Sidewalk Bridge Survey Sum 10,000.00 3,000.00 10,000.00 8,000.00

(26238/69345/1649) 0.49% 0.17% 0.50% 0.31%

3 Bids Tendered

2012 Parks Highway M.P. 83-90, 642(13) Lump 1 9,000.00 24,200.00 50,000.00 10,932,542 06 Weight Restriction Contractor Furnished Sum 25,000.00 20,000.00 17,000.00 9,000.00

Elimination Project Computations 0.23% 0.18% 0.13% 0.07%

(38108/51850/7703) 5 Bids Tendered

2018 AMATS: Abbott Road 642(13) Lump 1 5,000.00 5,125.00 5,500.00 5,167,568 05 Rehab - Phase II Contractor Furnished Sum 5,000.00 5,000.00 5,000.00 5,500.00

(48404//7703) Computations 0.10% 0.10% 0.10% 0.10%

4 Bids Tendered

Page 83: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 83 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2018 Kenai Spur Highway 642(13) Lump 1 2,500.00 7,529.56 27,500.00 12,869,962 03 Rehabilitation: Sports Lake Contractor Furnished Sum 15,000.00 27,500.00 5,500.00 2,500.00

Road To Swires Road - Computations 0.11% 0.21% 0.04% 0.02%

Phase I (48214/54594/7703) 6 Bids Tendered

2009 Parks Highway MP 72-83, 642(13) Lump 1 12,000.00 32,857.14 48,000.00 20,758,919 09 Willow to Kashwitna Contractor Furnished Sum 50,000.00 40,000.00 45,000.00 48,000.00

(24913/54985/7703) Computations 0.18% 0.19% 0.21% 0.21%

7 Bids Tendered

2010 AMATS: Old Glenn Hwy S. 642(13) Lump 1 10,500.00 26,535.88 63,500.00 12,682,497 03 Birchwood Loop to Peters Contractor Furnished Sum 100,000.00 10,500.00 20,179.40 18,000.00

Creek (27774/50946/7703) Computations 0.56% 0.08% 0.14% 0.12%

5 Bids Tendered

2009 Trunk Road 642(13) Lump 1 0.01 59,218.75 225,000.00 22,945,463 05 Reconstruction, Phase I. Contractor Furnished Sum 144,000.00 23,750.00 50,000.00 15,000.00

Parks Highway to Computations 0.44% 0.10% 0.21% 0.06%

Palmer-Wasilla Highway (22872/59301/7703) 8 Bids Tendered

2017 AMATS: O'Malley Road 642(13) Lump 1 3,090.00 10,262.39 25,000.00 21,769,589 01 Reconstruction: Phase I, Contractor Furnished Sum 10,000.00 25,000.00 15,000.00 5,000.00

Seward Hwy To Livingston Computations 0.05% 0.11% 0.06% 0.02%

(46522//7703) 5 Bids Tendered

2014 Parks Highway MP 642(13) Lump 1 5,000.00 14,796.00 25,000.00 15,967,622 01 43.5-44.5 Reconstruction, Contractor Furnished Sum 25,000.00 25,000.00 21,000.00 5,000.00

Lucus Road To Church Computations 0.17% 0.16% 0.11% 0.03%

Road (42230/52914/7703) 5 Bids Tendered

2018 AMATS: Abbott Road 642(13) 5000 1.0 5,000.00 5,125.00 5,500.00 5,167,568 05 Rehab - Phase II (48404) Contractor Furnished (Alt) 5,000.00 5,000.00 5,000.00 5,500.00

4 Bids Tendered Computations 0.10% 0.10% 0.10% 0.10%

2013 Aleknagik Wood River 642(13) Lump 1 4,000.00 6,100.00 9,900.00 19,515,005 09 Bridge Construction - Contractor Furnished Sum 30,000.00 6,000.00 4,500.00 9,900.00

Phase I Computations 0.20% 0.03% 0.02% 0.05%

(41612/52972/7703) 4 Bids Tendered

2011 Seward Meridian Prkwy 642(13) Lump 1 15,000.00 19,600.00 22,000.00 11,989,291 06 Rd Imprvmnts, Ph I Parks Contractor Furnished Sum 20,000.00 20,000.00 15,000.00 22,000.00

to Palmer-Wasilla Hwy Computations 0.13% 0.17% 0.12% 0.16%

(33646/51184/7703) 5 Bids Tendered

2015 Parks Highway MP 642(13) Lump 1 15,000.00 23,490.24 50,000.00 42,094,598 08 44.5-48.8 Reconstruction Contractor Furnished Sum 200,000.00 20,000.00 50,000.00 15,000.00

Church Road to Pittman Computations 0.43% 0.05% 0.11% 0.03%

Road (44808/52929/0) 5 Bids Tendered

Page 84: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 84 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 Aleknagik Wood River 642(13) Lump 1 3,000.00 11,440.00 23,000.00 6,391,456 05 Bridge Construction - Contractor Furnished Sum 20,000.00 8,000.00 23,000.00 3,000.00

Phase II (45783/54627/0) Computations 0.25% 0.13% 0.34% 0.04%

5 Bids Tendered

2016 Lucus Road Improvements 642(13) Lump 1 7,500.00 11,261.80 16,500.00 4,639,288 01 (45390/55007/7703) Contractor Furnished Sum 4,025.00 16,500.00 11,000.00 10,000.00

10 Bids Tendered Computations 0.07% 0.36% 0.23% 0.20%

2018 Seward Highway, MP 642(13) Lump 1.0 3,000.00 6,553.59 10,000.00 51,418,510 02 75-90 Road and Bridge Contractor Furnished Sum 40,000.00 3,000.00 10,000.00 10,000.00

Rehabilitation, Phase I Computations (Alt) 0.06% 0.01% 0.02% 0.01%

(48081) 4 Bids Tendered

2017 Sterling Highway 58 - 79, 642(13) Lump 1 10,000.00 38,000.00 100,000.00 53,907,758 05 Skilak Lake Road to Contractor Furnished Sum 40,000.00 10,000.00 20,000.00 22,000.00

Sterling, Rehabilitation & Computations 0.06% 0.02% 0.03% 0.04%

Passing Lanes; Sterling Highway MP 58-79 Rehabilitation Skilak Lake Road to Sterling, Sterling Highway MP 60-79 (WFLHD) Skilak Lake Road to Sterling; Sterling Highway Kenai NWR Visitor Enhancements (47023/54990, 58431, 58533/0) 4 Bids Tendered

2018 Glenn Hwy: S. Inner 642(13) Lump 1 17,000.00 31,750.00 50,000.00 36,616,095 05 Springer Loop to W. Arctic Contractor Furnished Sum 50,000.00 50,000.00 30,000.00 30,000.00

Avenue Computations 0.12% 0.14% 0.08% 0.08%

Glenn Hwy: S. Inner Springer Loop to W. Arctic Avenue Pathway (48402//7703) 4 Bids Tendered

2016 Seward Highway: 92nd 642(13) Lump 1 10,000.00 10,575.87 12,000.00 9,982,120 02 Avenue Connector Contractor Furnished Sum 50,000.00 11,000.00 10,000.00 10,300.00

(45465/59770/7703) Computations 0.47% 0.11% 0.10% 0.10%

7 Bids Tendered

2018 Seward Highway, MP 642(13) Lump 1 3,000.00 6,553.59 10,000.00 51,418,510 02 75-90 Road and Bridge Contractor Furnished Sum 40,000.00 3,000.00 10,000.00 10,000.00

Rehabilitation, Phase I Computations 0.06% 0.01% 0.02% 0.01%

(48081//7703) 4 Bids Tendered

Page 85: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 85 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2011 Trunk Road 642(13) Lump 1 10,000.00 27,285.71 50,000.00 13,969,176 11 Reconstruction, Phase II Contractor Furnished Sum 100,000.00 30,000.00 32,000.00 50,000.00

Palmer-Wasilla Highway to Computations 0.53% 0.21% 0.20% 0.31%

Palmer-Fishhook Rd (35222/51132/7703) 7 Bids Tendered

2010 Steese Hwy M P 62-81 642(13) Lump 1 22,000.00 43,800.00 57,000.00 20,807,850 11 Surface Treatment Cross Sections Sum 275,000.00 55,000.00 50,000.00 22,000.00

(30374/60916/1649) 1.23% 0.26% 0.23% 0.10%

5 Bids Tendered

2012 Dalton Highway MP 11-18 642(13) Lump 1 4,500.00 24,879.11 75,000.00 16,424,452 01 Reconstruction Cross Sections Sum 50,000.00 4,500.00 20,000.00 26,000.00

(35478/62196/0) 0.22% 0.03% 0.12% 0.13%

9 Bids Tendered

2009 Galena Road Resurfacing 642(13) Lump 1 5,500.00 20,616.67 41,000.00 1,220,000 05 Bid Opened: 05/12/2009 Cross Sections Sum 8,000.00 5,500.00 25,200.00 16,000.00

(17119/62060/1649) 0.71% 0.45% 2.02% 1.16%

6 Bids Tendered

2011 Richardson Highway MP 642(13) Station 754.0 15.92 69.38 243.40 27,434,902 03 148-159 Reconstruction Cross Sections (Alt) 33.16 15.92 31.83 66.31

(1642) 0.08% 0.04% 0.08% 0.17% 8 Bids Tendered

2009 Parks Hwy MP 287-305 642(13) Lump 1 5,000.00 32,333.33 50,000.00 7,091,346 09 Rehabilitation And Cross Sections Sum 122,500.00 5,000.00 44,000.00 25,000.00

Resurface 1.25% 0.07% 0.57% 0.31%

(20492/77137/1649) 6 Bids Tendered

2014 Edgerton Highway MP 642(13) Lump 1 8,500.00 12,750.00 21,000.00 7,445,892 04 0-19 Resurfacing Cross Sections Sum 50,000.00 12,000.00 8,500.00 13,000.00

(42129/63909/0) 0.54% 0.16% 0.11% 0.16%

6 Bids Tendered

2010 Tok Cut Off M P 0-2 and M 642(13) Lump 1 10,400.00 49,842.86 150,000.00 9,258,998 10 P 5-24 Resurfacing Cross Sections Sum 50,000.00 10,400.00 20,000.00 150,000.00

(28413/63364/1649) 0.40% 0.11% 0.21% 1.44%

7 Bids Tendered

2011 Richardson Highway MP 642(13) Lump 1 12,000.00 52,315.63 183,525.00 27,434,902 03 148-159 Reconstruction Cross Sections Sum 25,000.00 12,000.00 24,000.00 50,000.00

(1642/76727/1649) 0.08% 0.04% 0.08% 0.17%

8 Bids Tendered

2009 Dalton Highway MP 175 to 642(13) Lump 1 25,000.00 41,528.57 100,000.00 25,642,513 10 197 Rehabilitation Cross Sections Sum 40,000.00 25,000.00 28,000.00 50,000.00

(5722/62860/0) 0.15% 0.10% 0.11% 0.19%

7 Bids Tendered

2012 Top of the World Highway 642(13) Mile 13.0 447.85 2,889.57 7,692.31 15,555,427 07 MP 0-13 Rehab (33395) Cross Sections (Alt) 3,076.92 7,692.31 4,307.69 1,538.46

5 Bids Tendered 0.21% 0.64% 0.36% 0.12%

2012 Galena Campion Road 642(13) Lump 1 3,177.00 24,240.88 100,000.00 9,879,854 10 Erosion Protection Cross Sections Sum 30,000.00 15,000.00 3,177.00 100,000.00

(38511/61653/1649) 0.31% 0.15% 0.03% 0.89%

8 Bids Tendered

Page 86: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 86 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2011 Dalton Highway MP 642(13) Lump 1 27,300.00 38,039.29 53,600.00 23,953,284 11 197-209 Rehabilitation Cross Sections Sum 25,000.00 28,000.00 53,600.00 41,375.00

(33732/61214/1649) 0.10% 0.12% 0.21% 0.16%

7 Bids Tendered

2012 Top of the World Highway 642(13) Lump 1 5,822.00 37,564.40 100,000.00 15,555,427 07 MP 0-13 Rehab Cross Sections Sum 40,000.00 100,000.00 56,000.00 20,000.00

(33395/62799/0) 0.21% 0.64% 0.36% 0.12%

5 Bids Tendered

2014 Elliot Highway M P 107.7 642(13) Lump 1 25,000.00 67,469.44 123,225.00 19,656,000 10 To 120.5 Reconstruction Cross Sections Sum 40,000.00 25,000.00 123,225.00 80,000.00

(42896/62227/0) 0.16% 0.13% 0.52% 0.32%

9 Bids Tendered

2012 Dalton Hwy 9 Mile Hill 642(13) Lump 1 3,000.00 6,575.67 10,000.00 5,342,262 02 North (31053/64899/0) Cross Sections Sum 20,000.00 3,000.00 8,000.00 10,000.00

6 Bids Tendered 0.27% 0.06% 0.14% 0.16%

2010 JNU-Glacier Spur Road 642(13) Each 4 100.00 100.00 100.00 1,135,309 06 (Pavement Rehabilitation) Protect Base Line 500.00 100.00 0.00 0.00

(20472/69348/1649) Monument 0.18% 0.04% 0.00% 0.00% 1 Bids Tendered

2013 JNU-North Douglas 642(13) Lump 1 3,000.00 7,000.00 11,000.00 4,522,796 12 Highway Pavement Reference Existing Sum 5,000.00 3,000.00 11,000.00 0.00

Rehabilitation Guardrail 0.09% 0.07% 0.20% 0.00%

(40794/67531/1141) 2 Bids Tendered

2010 JNU-North Douglas 642(13) Each 36 200.00 361.67 585.00 4,884,352 11 Highway Pavement Removal of Monument 45.00 200.00 585.00 300.00

Rehabilitation and Case 0.03% 0.15% 0.31% 0.15% (26855/69633/1144) 3 Bids Tendered

2016 Seward Highway: 92nd 642(14) Contingent 1 100,000.00 100,000.00 100,000.00 9,982,120 02 Avenue Connector Contractor Furnished Sum 100,000.00 100,000.00 100,000.00 100,000.00

(45465/59770/7704) Engineering Tools 0.94% 1.00% 0.99% 0.97%

7 Bids Tendered

2011 Seward Hwy 642(14) Contingent 1 465,000.00 465,000.00 465,000.00 39,452,755 10 Reconstruction: Dowling Contractor Furnished Sum 465,000.00 465,000.00 465,000.00 465,000.00

Rd to Tudor Rd Engineering Tools 0.99% 1.18% 1.14% 1.05%

(34838/50816/7704) 4 Bids Tendered

2015 Parks Highway MP 642(14) Contingent 1 250,000.00 250,000.00 250,000.00 42,094,598 08 44.5-48.8 Reconstruction Contractor Furnished Sum 250,000.00 250,000.00 250,000.00 250,000.00

Church Road to Pittman Engineering Tools 0.54% 0.59% 0.57% 0.54%

Road (44808/52929/0) 5 Bids Tendered

2014 Parks Highway MP 642(14) Contingent 1 50,000.00 50,000.00 50,000.00 15,967,622 01 43.5-44.5 Reconstruction, Contractor Furnished Sum 50,000.00 50,000.00 50,000.00 50,000.00

Lucus Road To Church Engineering Tools 0.34% 0.31% 0.27% 0.27%

Road (42230/52914/7704) 5 Bids Tendered

Page 87: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 87 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 West Dowling Road Phase 642(14) Contingent 1 225,000.00 225,000.00 225,000.00 36,856,108 12 II: C St to Minnesota Drive Contractor Furnished Sum 225,000.00 225,000.00 225,000.00 0.00

& Engineering Tools 0.60% 0.61% 0.60% 0.00%

Alaska's Best Place: Raspberry Road to Ressel Avenue (42058/51030 54823/7704) 2 Bids Tendered

2013 Aleknagik Wood River 642(14) Contingent 1 223,000.00 223,000.00 223,000.00 19,515,005 09 Bridge Construction - Contractor Furnished Sum 223,000.00 223,000.00 223,000.00 223,000.00

Phase I Engineering Tools 1.47% 1.14% 1.11% 1.02%

(41612/52972/7704) 4 Bids Tendered

2016 Lucus Road Improvements 642(14) Contingent 1 50,000.00 50,000.00 50,000.00 4,639,288 01 (45390/55007/7704) Contractor Furnished Sum 50,000.00 50,000.00 50,000.00 50,000.00

10 Bids Tendered Engineering Tools 0.91% 1.08% 1.04% 1.01%

2017 Parks Hwy: MP 83-99 642(14) Contingent 1 140,000.00 140,000.00 140,000.00 18,937,555 11 Rehabilitation, Pedestrian, Contractor Furnished Sum 140,000.00 140,000.00 140,000.00 140,000.00

and Passing Lane Engineering Tools 0.64% 0.74% 0.68% 0.66%

Improvements (47720/ /7704) 7 Bids Tendered

2011 Seward Meridian Prkwy 642(14) Contingent 1 150,000.00 150,000.00 150,000.00 11,989,291 06 Rd Imprvmnts, Ph I Parks Contractor Furnished Sum 150,000.00 150,000.00 150,000.00 150,000.00

to Palmer-Wasilla Hwy Engineering Tools 1.00% 1.25% 1.23% 1.07%

(33646/51184/7704) 5 Bids Tendered

2012 HSIP: Bogard Rd & Peck 642(14) Contingent 1 100,000.00 100,000.00 100,000.00 2,530,822 09 St Intersection Contractor Furnished Sum 100,000.00 100,000.00 100,000.00 100,000.00

Improvements Engineering Tools 3.78% 3.95% 3.91% 3.69%

(38637/51847/7704) 5 Bids Tendered

2016 Aleknagik Wood River 642(14) Contingent 1 100,000.00 100,000.00 100,000.00 6,391,456 05 Bridge Construction - Contractor Furnished Sum 100,000.00 100,000.00 100,000.00 100,000.00

Phase II (45783/54627/0) Engineering Tools 1.25% 1.56% 1.48% 1.35%

5 Bids Tendered

2010 AMATS: Old Glenn Hwy S. 642(14) Contingent 1 25,000.00 25,000.00 25,000.00 12,682,497 03 Birchwood Loop to Peters Contractor Furnished Sum 25,000.00 25,000.00 25,000.00 25,000.00

Creek (27774/50946/7704) Engineering Tools 0.14% 0.20% 0.17% 0.17%

5 Bids Tendered

2012 Parks Highway M.P. 83-90, 642(14) Contingent 1 150,000.00 150,000.00 150,000.00 10,932,542 06 Weight Restriction Contractor Furnished Sum 150,000.00 150,000.00 150,000.00 150,000.00

Elimination Project Engineering Tools 1.35% 1.37% 1.16% 1.12%

(38108/51850/7704) 5 Bids Tendered

Page 88: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 88 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2018 Kenai Spur Highway 642(14) Contingent 1 110,000.00 110,000.00 110,000.00 12,869,962 03 Rehabilitation: Sports Lake Contractor Furnished Sum 110,000.00 110,000.00 110,000.00 110,000.00

Road To Swires Road - Engineering Tools 0.80% 0.85% 0.83% 0.82%

Phase I (48214/54594/7704) 6 Bids Tendered

2017 Fairview Loop Realign 642(14) Contingent 1 50,000.00 50,000.00 50,000.00 2,151,595 06 at Knik Goose Bay Road Contractor Furnished Sum 50,000.00 50,000.00 50,000.00 50,000.00

(47194/Z548000000/0) Engineering Tools 1.71% 2.32% 2.15% 2.05%

7 Bids Tendered

2009 Trunk Road 642(14) Contingent 1 295,000.00 295,000.00 295,000.00 22,945,463 05 Reconstruction, Phase I. Contractor Furnished Sum 295,000.00 295,000.00 295,000.00 295,000.00

Parks Highway to Engineering Tools 0.91% 1.29% 1.22% 1.19%

Palmer-Wasilla Highway (22872/59301/7704) 8 Bids Tendered

2017 AMATS: O'Malley Road 642(14) Contingent 1 125,000.00 125,000.00 125,000.00 21,769,589 01 Reconstruction: Phase I, Contractor Furnished Sum 125,000.00 125,000.00 125,000.00 125,000.00

Seward Hwy To Livingston Engineering Tools 0.63% 0.57% 0.51% 0.51%

(46522//7704) 5 Bids Tendered

2011 Trunk Road 642(14) Contingent 1 295,000.00 295,000.00 295,000.00 13,969,176 11 Reconstruction, Phase II Contractor Furnished Sum 295,000.00 295,000.00 295,000.00 295,000.00

Palmer-Wasilla Highway to Engineering Tools 1.57% 2.11% 1.85% 1.81%

Palmer-Fishhook Rd (35222/51132/7704) 7 Bids Tendered

2018 Glenn Hwy: S. Inner 642(14) Contingent 1 150,000.00 150,000.00 150,000.00 36,616,095 05 Springer Loop to W. Arctic Contractor Furnished Sum 150,000.00 150,000.00 150,000.00 150,000.00

Avenue Engineering Tools 0.37% 0.41% 0.40% 0.38%

Glenn Hwy: S. Inner Springer Loop to W. Arctic Avenue Pathway (48402//7704) 4 Bids Tendered

2018 HSIP: Jewel Lake Road 642(14) Contingent 1 50,000.00 50,000.00 50,000.00 5,719,942 07 Widening, 88th Avenue to Contractor Furnished Sum 50,000.00 50,000.00 50,000.00 50,000.00

Strawberry Road Engineering Tools 0.78% 0.87% 0.84% 0.80%

(48484/57310/7704) 9 Bids Tendered

2009 Parks Highway MP 72-83, 642(14) Contingent 1 295,000.00 295,000.00 295,000.00 20,758,919 09 Willow to Kashwitna Contractor Furnished Sum 295,000.00 295,000.00 295,000.00 295,000.00

(24913/54985/7704) Engineering Tools 1.08% 1.42% 1.38% 1.32%

7 Bids Tendered

2018 AMATS: Abbott Road 642(14) Contingent 1 50,000.00 50,000.00 50,000.00 5,167,568 05 Rehab - Phase II Contractor Furnished Sum 50,000.00 50,000.00 50,000.00 50,000.00

(48404//7704) Engineering Tools 0.98% 0.97% 0.95% 0.95%

4 Bids Tendered

Page 89: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 89 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2011 VICTOR ROAD: 100TH 642(14) CONTINGENT 1 84,000.00 84,000.00 84,000.00 6,242,977 11 AVENUE TO DIMOND CONTRACTOR SUM 84,000.00 84,000.00 84,000.00 84,000.00

BLVD. FURNISHED 0.99% 1.35% 1.29% 1.21%

(35419/55027/7704) ENGINEERING 6 Bids Tendered TOOLS

2016 Seward Highway: Dimond 642(14) CONTINGENT 1 600,000.00 600,000.00 600,000.00 55,969,371 12 Boulevard to Dowling CONTRACTOR SUM 600,000.00 600,000.00 600,000.00 0.00

Road Reconstruction, FURNISHED 0.85% 1.07% 1.01% 0.00%

Phase I (46380//0) ENGINEERING 2 Bids Tendered TOOLS

2015 Egan Drive Pavement 642(14) Each 6 300.00 400.00 500.00 16,614,244 12 rehabilitation - 10th Street Draft Record of 2,000.00 300.00 500.00 0.00

to Mendenhall Loop Road Monument Form 0.06% 0.01% 0.02% 0.00% Project Number

NH-0932(049)~Z681290000

Salmon Creek Intersection

Safety Improvements Project

Number

EBL-0932(051)~Z69575

(45232/68129/0)

2 Bids Tendered

2011 Richardson Highway MP 642(14) Each 5 700.00 2,421.88 8,700.00 27,434,902 03 148-159 Reconstruction Relocate USGS Bench 1,500.00 700.00 1,500.00 1,000.00

(1642/76727/1649) Marks 0.02% 0.01% 0.03% 0.02%

8 Bids Tendered

2010 Glenn Highway MP 109 to 642(16) Station 950 2.50 8.63 12.00 9,874,455 10 118 Resurfacing Passing Sight Distance 9.00 10.00 10.00 2.50

(31573/52095/6976) Measurement 0.08% 0.10% 0.09% 0.02% 4 Bids Tendered

2015 Seward Highway MP 50 to 642(16) Station 460 9.00 9.75 10.00 6,906,885 04 54.5 Pavement Passing Sight Distance 10.00 10.00 9.00 10.00

Preservation and Cooper Measurement 0.07% 0.07% 0.06% 0.06% Landing Walkable Community Project (44488/56685 54575/6976) 4 Bids Tendered

2015 Pittman Road MP 0.0 to 642(16) Station 208 11.00 11.50 12.00 1,125,191 05 2.1 Pavement Passing Sight Distance 10.00 11.00 12.00 0.00

Preservation Measurement 0.14% 0.20% 0.21% 0.00% (44645/58763/6976) 2 Bids Tendered

2017 Parks Hwy: MP 83-99 642(16) Station 970 5.00 13.54 57.50 18,937,555 11 Rehabilitation, Pedestrian, Passing Sight Distance 9.00 10.00 5.00 5.00

and Passing Lane Measurement 0.04% 0.05% 0.02% 0.02% Improvements (47720/ /6976) 7 Bids Tendered

Page 90: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 90 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2018 Parks Hwy MP 99-123.5 642(16) Station 2,586 5.00 6.63 7.50 13,727,979 05 Pavement Preservation Passing Sight Distance 9.00 7.00 5.00 7.00

HSIP: Parks Hwy: Measurement 0.17% 0.13% 0.09% 0.11% Systemic Passing Lanes MP 99-123.5 (48390//6976) 4 Bids Tendered

2015 Seward Highway MP 642(16) Station 125 20.00 20.00 20.00 7,497,210 02 99-100 Improvements Passing Sight Distance 3.52 20.00 20.00 0.00

(44337/58822/6976) Measurement 0.01% 0.03% 0.03% 0.00% 2 Bids Tendered

2011 Trunk Road 642(16) Station 214 6.00 44.00 200.00 13,969,176 11 Reconstruction, Phase II Passing Sight Distance 215.00 15.00 20.00 200.00

Palmer-Wasilla Highway to Measurement 0.24% 0.02% 0.03% 0.26% Palmer-Fishhook Rd (35222/51132/6976) 7 Bids Tendered

2018 Portage Glacier Rd 642(16) Station 46 10.00 59.13 90.00 2,253,083 01 Resurfacing; MP 4.7 to Passing Sight Distance 10.00 66.50 70.00 90.00

Whittier Tunnel Measurement 0.02% 0.14% 0.13% 0.17% (47989//6976) 4 Bids Tendered

2014 Petersville Road 642(16) Station 972 6.00 8.50 10.00 4,322,551 06 Preventive Maintenance, Passing Sight Distance 8.00 6.00 6.50 10.00

MP 0-9.2 Measurement 0.13% 0.13% 0.14% 0.21% (42965/52471/6976) 5 Bids Tendered

2015 Fairview Loop Road 642(16) Station 671 10.00 10.33 11.00 3,839,935 05 Pavement Preservation Passing Sight Distance 13.00 10.00 11.00 10.00

(44583/51774/6976) Measurement 0.23% 0.17% 0.19% 0.17% 3 Bids Tendered

2012 Parks Highway, MP 52 to 642(16) Station 465 5.00 8.33 10.00 6,379,578 02 57, Big Lake Road to Passing Sight Distance 20.00 5.00 10.00 10.00

Houston Resurfacing Measurement 0.12% 0.04% 0.07% 0.07% (36625/53469/6976) 3 Bids Tendered

2010 Tustumena Lake, Crooked 642(16) Station 647 6.00 11.90 15.00 2,880,645 05 Creek and Johnson Lake Passing Sight Distance 10.00 6.00 13.00 10.00

Roads Paving Measurement 0.17% 0.13% 0.29% 0.20% (28553/51670/6976) 6 Bids Tendered

Page 91: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 91 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2012 Sterling Highway MP 45 to 642(16) Station 680 8.00 9.00 10.00 10,891,541 10 58 Resurfacing Passing Sight Distance 10.00 10.00 8.00 0.00

Kenai Pen Flood Oct 02, Measurement 0.06% 0.06% 0.04% 0.00% Permanent Repairs, Ph II (38812/52081 56938/6976) 2 Bids Tendered

2016 Alyeska Hwy Resurfacing: 642(16) Station 210 10.00 37.50 110.00 5,198,107 03 Seward Hwy to Arlberg Passing Sight Distance 10.00 20.00 110.00 10.00

Ave and Alyeska Hwy: Measurement 0.04% 0.08% 0.43% 0.04% Pathway Rehabiliation

(GF)

(45618/58526&58509/6976)

4 Bids Tendered

2014 Parks Highway 642(16) Station 2,334 4.00 8.80 11.00 25,973,241 06 MP123.5-146 Passing Sight Distance 9.00 10.00 10.00 4.00

Rehabilitation Measurement 0.07% 0.09% 0.09% 0.03% (42801/57700/6976) 5 Bids Tendered

2017 Sterling Highway 58 - 79, 642(16) Station 2,300 5.00 6.75 9.00 53,907,758 05 Skilak Lake Road to Passing Sight Distance 10.00 5.00 8.00 9.00

Sterling, Rehabilitation & Measurement 0.04% 0.02% 0.03% 0.04% Passing Lanes; Sterling Highway MP 58-79 Rehabilitation Skilak Lake Road to Sterling, Sterling Highway MP 60-79 (WFLHD) Skilak Lake Road to Sterling; Sterling Highway Kenai NWR Visitor Enhancements (47023/54990, 58431, 58533/6976) 4 Bids Tendered

2018 HSIP: OLD GLENN & 642(16) Station 1,225 8.00 8.63 10.00 3,970,421 07 KGB: WIDER LANE Passing Sight Distance 10.17 10.00 8.00 8.50

LINES, PH I: KGB MP 8.1 Measurement 0.30% 0.31% 0.25% 0.25% - 20 (48468//6976) 4 Bids Tendered

2013 Seward Hwy: MP 642(16) Station 517 10.00 10.00 10.00 2,924,423 06 17.5-22.5 Pavement Passing Sight Distance 9.00 10.00 10.00 0.00

Preservation Measurement 0.15% 0.18% 0.16% 0.00% (41146/55256/6976) 2 Bids Tendered

Page 92: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 92 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2018 Mat-Su Area Roads 642(16) Station 1,257 1.00 8.44 48.00 7,494,743 04 Pavement Preservation Passing Sight Distance 10.00 48.00 1.00 2.00

(Group C) Measurement 0.14% 0.81% 0.02% 0.03% (48242/58977/6976) 7 Bids Tendered

2015 West Anchorage Roads 642(16) Station 25 75.00 87.50 100.00 2,243,416 06 Pavement Preservation Passing Sight Distance 15.00 75.00 100.00 0.00

(44709/58795/6976) Measurement 0.02% 0.08% 0.08% 0.00% 2 Bids Tendered

2012 Sterling Hwy MP 150-169 642(16) Station 1,910 9.00 9.67 10.00 11,698,675 11 Pavement Preservation & Passing Sight Distance 7.50 10.00 9.00 10.00

Sterling Hwy MP 169-173 Measurement 0.12% 0.16% 0.15% 0.16% Pavement Preservation (39053/54140 54130/6976) 3 Bids Tendered

2014 Sterling Highway MP 135 642(16) Station 1,500 5.00 7.17 10.00 11,961,445 11 - 150 Pavement Passing Sight Distance 9.00 10.00 6.50 5.00

Preservation Measurement 0.10% 0.13% 0.08% 0.05% (43947/56697/6976) 3 Bids Tendered

2012 Parks Highway M.P. 83-90, 642(16) Station 715 9.00 32.94 100.00 10,932,542 06 Weight Restriction Passing Sight Distance 10.00 10.00 9.00 10.70

Elimination Project Measurement 0.06% 0.07% 0.05% 0.06% (38108/51850/6976) 5 Bids Tendered

2014 Homer: East End Road 642(16) Station 1,132 5.00 7.83 13.00 11,749,902 02 MP 3.75-5.5, Kachemak Passing Sight Distance 8.25 5.50 13.00 5.00

Drive to Waterman Road Measurement 0.09% 0.05% 0.12% 0.04% Rehabilitation Homer: East End Road MP 12.5 to MP 19.6 and Old East End Road MP 0.0 to MP 1.9 Pavement Preservation (42246/53164 55261/6976) 3 Bids Tendered

2012 Parks Hwy Mp 146-163 642(16) Station 1,861 3.00 5.75 10.00 14,495,924 12 Pavement Preservation Passing Sight Distance 10.00 5.00 5.00 10.00

(39194/54147/6976) Measurement 0.10% 0.06% 0.06% 0.12% 4 Bids Tendered

2016 Sterling Highway MP 642(16) Station 2,120 7.00 8.25 10.00 15,712,283 04 114-135 Pavement Passing Sight Distance 9.00 8.00 10.00 7.00

Preservation Measurement 0.10% 0.11% 0.13% 0.09% (45711/56698/6976) 4 Bids Tendered

Page 93: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 93 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 Kanakanak Rd: D St To 642(16) Station 269 9.00 9.33 10.00 9,109,265 12 Squaw Cr Rd Resurfacing Passing Sight Distance 20.00 10.00 9.00 9.00

(41942/52799/6976) Measurement 0.06% 0.03% 0.02% 0.02% 3 Bids Tendered

2014 Glenn Highway MP 42-56 642(16) Station 401 10.00 10.67 12.00 9,998,998 12 Pavement Preservation, Passing Sight Distance 10.00 10.00 10.00 12.00

Glenn Highway MP 56-61 Measurement 0.03% 0.04% 0.04% 0.04% Pavement Preservation (44128/56663 56683/6976) 3 Bids Tendered

2017 Aleknagik Lake Road MP 642(16) Station 502 6.00 9.25 11.00 5,393,658 06 0-5 Pavement Passing Sight Distance 10.00 11.00 10.00 6.00

Preservation Measurement 0.07% 0.10% 0.08% 0.05% Aleknagik Wood River Bridge Construction - Phase III (47068/CFHWY00169 & CFHWY00107/6976) 4 Bids Tendered

2018 Seward Highway, MP 642(16) Station 1,600 3.00 5.23 10.00 51,418,510 02 75-90 Road and Bridge Passing Sight Distance 10.00 3.00 10.00 4.70

Rehabilitation, Phase I Measurement 0.02% 0.01% 0.03% 0.01% (48081//6976) 4 Bids Tendered

2012 Sterling Hwy MP 37-45 642(16) Station 570 8.50 8.70 9.00 4,799,276 06 Pavement Preservation Passing Sight Distance 9.00 9.00 8.50 8.60

(38025/54128/6976) Measurement 0.09% 0.11% 0.09% 0.09% 3 Bids Tendered

2012 Holt-Lamplight Road 642(16) Station 876 5.00 6.50 9.50 4,646,626 04 Resurfacing Passing Sight Distance 15.00 5.00 9.50 5.00

(37466/52638/6976) Measurement 0.27% 0.09% 0.18% 0.08% 3 Bids Tendered

2013 Ak Peninsula Hwy: King 642(16) Station 810 10.00 10.50 12.00 10,295,938 11 Salmon Naknek Pavement Passing Sight Distance 8.00 10.00 12.00 10.00

Preservation Measurement 0.05% 0.08% 0.09% 0.08% (41790/55244/6976) 4 Bids Tendered

2012 Seward Hwy Mp 89 To 642(16) Station 810 2.50 2.52 2.55 4,436,195 05 96.6 Resurfacing Passing Sight Distance 25.00 2.50 2.50 2.55

(37470/52991/6976) Measurement 0.41% 0.05% 0.04% 0.04% 3 Bids Tendered

2017 Homer: East End Road 642(16) Station 752 8.00 9.56 11.00 6,096,324 04 MP 5.5-12.6 Pavement Passing Sight Distance 8.25 9.25 8.00 11.00

Preservation Measurement 0.08% 0.11% 0.09% 0.12% (46938/58514/6976) 4 Bids Tendered

Page 94: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 94 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2009 Seward Hwy MP 43-50 642(16) Station 739 4.50 7.10 11.00 8,862,510 02 Pvmt Refurbishment Passing Sight Distance 10.00 5.00 10.00 4.50

(19472/59296/6976) Measurement 0.07% 0.04% 0.08% 0.03% 5 Bids Tendered

2018 Kenai Spur Highway: Mp 642(16) STATION 332 9.00 75.33 200.00 3,440,733 06 12 - 18 Pavement PASSING SIGHT 10.00 17.00 9.00 200.00

Preservation DISTANCE 0.10% 0.16% 0.09% 1.68% (48367//6976) MEASUREMENT 3 Bids Tendered

2012 Eagle River Road 642(16) STATION 433 10.00 10.67 11.00 16,932,672 10 Rehabilitation Mp 5.3 To PASSING SIGHT 200.00 11.00 10.00 11.00

Mp 12.6 DISTANCE 0.42% 0.03% 0.03% 0.03% (38731/53943/6976) MEASUREMENT 3 Bids Tendered

2009 Sterling Highway 642(16) STATION 944 5.00 5.33 5.50 5,636,173 06 Resurfacing: Soldotna To PASSING SIGHT 5.00 5.50 5.50 5.00

Cohoe Loop Road DISTANCE 0.07% 0.09% 0.09% 0.08% (19654/51916/6976) MEASUREMENT 3 Bids Tendered

2016 Schrock Road Pavement 642(16) STATION 1,497.5 7.00 10.73 20.00 8,998,584 04 Preservation PASSING SIGHT 10.00 7.00 8.00 11.00

Mat-Su Area Roads DISTANCE 0.11% 0.12% 0.12% 0.17% Pavement Preservation MEASUREMENT (Group A)

Mat-Su Area Roads

Pavement Preservation

(Group B)

(45688/Z575280000/Z575470000/Z575500000/6976)

7 Bids Tendered

2009 Kodiak: Rezanof Dr. 642(16) STATION 645 10.00 12.00 14.00 5,963,225 05 Resurfacing Coast Guard PASSING SIGHT 45.00 10.00 14.00 0.00

Access Road To Marine DISTANCE 0.66% 0.11% 0.14% 0.00% Way (19675/51930/6976) MEASUREMENT 2 Bids Tendered

2016 Chiniak Highway MP: 642(16) STATION 536 8.00 21.50 35.00 10,388,523 05 10-15 Pavement PASSING SIGHT 10.00 8.00 35.00 0.00

Preservation DISTANCE 0.04% 0.04% 0.16% 0.00% HSIP: Kodiak Bridge Rail MEASUREMENT Upgrades (45787/56699 & 57090/6976) 2 Bids Tendered

2015 Willow Fishhook MP 37.7 642(16) STATION 1,153 5.00 9.34 11.75 8,594,153 10 to Parks Highway PASSING SIGHT 10.00 10.00 10.00 10.00

Pavement Preservation DISTANCE 0.12% 0.13% 0.13% 0.13% (45181/58651/6976) MEASUREMENT 8 Bids Tendered

Page 95: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 95 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2012 Glenn Highway 2012 642(1-67.9) Lump 1 4,200.00 6,369.40 9,700.00 1,623,000 11 Emergency Repairs, MP Construction Surveying Sum 2,500.00 4,547.00 9,000.00 4,400.00

67.9, MP 78, MP 85 0.18% 0.28% 0.52% 0.25%

(38958/55575/1141) 5 Bids Tendered

2012 Glenn Highway 2012 642(1-78) Lump 1 8,500.00 15,718.60 30,000.00 1,623,000 11 Emergency Repairs, MP Construction Surveying Sum 20,000.00 9,093.00 22,000.00 9,000.00

67.9, MP 78, MP 85 1.40% 0.56% 1.27% 0.52%

(38958/55575/1141) 5 Bids Tendered

2012 Glenn Highway 2012 642(1-85) Lump 1 4,600.00 7,748.80 15,000.00 1,623,000 11 Emergency Repairs, MP Construction Surveying Sum 2,500.00 4,944.00 9,500.00 4,700.00

67.9, MP 78, MP 85 0.18% 0.30% 0.55% 0.27%

(38958/55575/1141) 5 Bids Tendered

2010 AMHS SW Warehouse 642(1A) Lump 1 2,937.00 7,584.33 14,350.00 639,474 10 (28695/69054/0) Construction Surveying Sum 5,000.00 2,937.00 5,466.00 14,350.00

3 Bids Tendered 0.69% 0.46% 0.81% 2.10%

2015 Baranof Warm Springs 642(1A) Lump 1 600.00 3,200.00 5,500.00 1,827,200 08 Harbor Improvements Construction Surveying Sum 5,000.00 600.00 3,500.00 5,500.00

(44860/68353/0) 0.26% 0.03% 0.18% 0.28%

3 Bids Tendered

2010 Annette Bay Ferry 642(1A) Lump 1 28,700.00 45,000.00 65,000.00 8,577,504 11 Terminal Construction Surveying Sum 40,000.00 28,700.00 65,000.00 36,300.00

(28833/69200/1141) (Uplands) 0.59% 0.33% 0.74% 0.40%

4 Bids Tendered

2012 Petersburg Road 642(1-Alt1) LUMP 1 5,000.00 6,000.00 7,000.00 3,761,496 07 Improvements/Sewer Main CONSTRUCTION SUM 3,700.00 5,000.00 7,000.00 0.00

Repairs SURVEYING 0.12% 0.13% 0.18% 0.00%

(38103/67879/68165/0) 2 Bids Tendered

2012 Petersburg Road 642(1-Alt2) LUMP 1 5,000.00 7,000.00 9,000.00 3,761,496 07 Improvements/Sewer Main CONSTRUCTION SUM 4,000.00 5,000.00 9,000.00 0.00

Repairs SURVEYING 0.13% 0.13% 0.23% 0.00%

(38103/67879/68165/0) 2 Bids Tendered

2012 Petersburg Road 642(1-Alt3) LUMP 1 3,200.00 4,100.00 5,000.00 3,761,496 07 Improvements/Sewer Main CONSTRUCTION SUM 4,200.00 5,000.00 3,200.00 0.00

Repairs SURVEYING 0.13% 0.13% 0.08% 0.00%

(38103/67879/68165/0) 2 Bids Tendered

2010 Annette Bay Ferry 642(1B) Lump 1 18,150.00 31,162.50 50,000.00 8,577,504 11 Terminal (28833/69200/0) Construction Surveying Sum 28,000.00 26,500.00 30,000.00 18,150.00

4 Bids Tendered (Marine) 0.41% 0.31% 0.34% 0.20%

2014 Haines Ferry Terminal 642(2) Lump 1 35,000.00 60,625.00 80,000.00 14,979,745 05 Improvements CONSTRUCTION Sum 30,000.00 80,000.00 73,500.00 54,000.00

(39251/68433/0) SURVEYING 0.31% 0.53% 0.46% 0.33%

4 Bids Tendered (MARINE)

Page 96: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 96 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Hydaburg Highway 642(2) Mile 22.5 1,500.00 3,060.00 5,380.00 11,859,725 01 Pavement Rehabilitation Office Engineering 2,000.00 5,380.00 1,500.00 2,300.00

(43422/67576/1643) 0.30% 1.02% 0.26% 0.37%

3 Bids Tendered

2012 Glenn Highway Path 642(2) Mile 18 500.00 930.00 2,140.00 5,399,662 07 Rehabilitation: Muldoon Office Engineering 2,000.00 500.00 580.00 2,140.00

Rd to North Birchwood 0.70% 0.17% 0.19% 0.62%

(38202/55659/1643) 4 Bids Tendered

2013 St. Mary's / Mountain 642(2) Mile 15.5 1,500.00 2,400.00 5,000.00 10,510,726 11 Village Road Office Engineering 1,300.00 2,500.00 1,600.00 1,500.00

Rehabilitation 0.17% 0.37% 0.23% 0.19%

(33343/60240/1643) 7 Bids Tendered

2010 Tok Bike Path 642(25) Lump 1 15,000.00 30,470.00 40,000.00 2,034,860 10 Rehabilitation Plan and Profile Sum 145,000.00 40,000.00 30,000.00 37,350.00

(26935/63501/0) Development 5.38% 1.97% 1.43% 1.78%

5 Bids Tendered

2012 Kipnuk Boardwalk 642(3) AA1 Hour 20 0.00 284.81 400.00 11,975,883 06 Improvements Phase II Three Person Survey 300.00 400.00 250.00 340.00

Final PS&E Party 0.05% 0.07% 0.04% 0.05% (38038/57181/1143) 6 Bids Tendered

2011 Girdwood Streets And 642(3) AA1 Hour 10 275.00 315.70 400.00 2,834,021 09 Drainage Improvements Three Person Survey 250.00 320.00 315.00 297.00

(34095/57057/1143) Party 0.07% 0.11% 0.10% 0.09% 10 Bids Tendered

2012 Kipnuk Boardwalk 642(3) AA2 Hour 20 0.00 282.69 400.00 11,975,883 06 Improvements Phase II Three Person Survey 300.00 400.00 250.00 325.00

Final PS&E Party 0.05% 0.07% 0.04% 0.05% (38038/57181/1143) 6 Bids Tendered

2016 HSIP Johns Rd & Klatt Rd 642(3) B Hour 50 300.00 352.33 400.00 4,196,232 03 Intersection Three Person Survey 310.00 300.00 350.00 400.00

Improvements, Klatt Rd Party 0.37% 0.36% 0.42% 0.47% Sight Distance

Improvements, and HSIP

Bragaw St at 16th Ave

(45607/54599&52120/1143)

6 Bids Tendered

2012 Kipnuk Boardwalk 642(3) BB Hour 100 250.00 363.55 475.30 11,975,883 06 Improvements Phase II Three Person Survey 300.00 400.00 250.00 350.00

Final PS&E Party 0.27% 0.33% 0.18% 0.25% (38038/57181/1143) 6 Bids Tendered

Page 97: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 97 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 HSIP Johns Rd & Klatt Rd 642(3) K Hour 60 300.00 352.33 400.00 4,196,232 03 Intersection Three Person Survey 300.00 300.00 350.00 400.00

Improvements, Klatt Rd Party 0.43% 0.43% 0.50% 0.56% Sight Distance

Improvements, and HSIP

Bragaw St at 16th Ave

(45607/54599&52120/1143)

6 Bids Tendered

2010 Japonski Island Utility And 642(3) Hour 15 275.00 308.33 350.00 1,576,571 02 Road Improvements Three Man Survey 350.00 350.00 275.00 300.00

(11912/68790/1143) Party 0.32% 0.33% 0.26% 0.27% 3 Bids Tendered

2013 CR Hwy Safety Corridor 642(3) Hour 100 275.00 326.25 429.00 1,197,783 07 Near Term Improvements Three Person Survey 325.00 429.00 285.00 275.00

(GF) and Parks Hwy & Party 2.79% 3.58% 2.09% 1.87% Pittman Rd Signal Modifications (GF) (41206/53425 54602/1143) 4 Bids Tendered

2009 Muldoon Rd. Resurfacing, 642(3) Hour 25 300.00 306.25 325.00 3,673,329 11 36th to Glenn Hwy & Three Person Survey 275.00 325.00 300.00 300.00

HSIP: 6th Avenue at Party 0.13% 0.22% 0.18% 0.18% Muldoon Road Safety Improvements (25455/50810 57254/1143) 4 Bids Tendered

2013 HSIP : CR Traffic Signal 642(3) Hour 40 320.00 425.00 530.00 1,471,817 08 Modifications and OH Three Person Survey 325.00 320.00 530.00 0.00

Beacons, 2013 Party 0.99% 0.87% 1.42% 0.00% (41304/55753/1143) 2 Bids Tendered

2010 KTN-Totem Bight To 642(3) Hour 80 250.00 317.50 385.00 8,744,515 03 Whipple Creek Three Person Survey 250.00 250.00 385.00 0.00

(17733/67443/1143) Party 0.21% 0.23% 0.35% 0.00% 2 Bids Tendered

2012 Parks Hwy Mp 146-163 642(3) Hour 136 1.00 136.75 325.00 14,495,924 12 Pavement Preservation Three Person Survey 275.00 1.00 1.00 325.00

(39194/54147/1143) Party 0.21% 0.00% 0.00% 0.28% 4 Bids Tendered

2010 AMATS: Old Glenn Hwy S. 642(3) Hour 130 10.00 181.00 300.00 12,682,497 03 Birchwood Loop to Peters Three Person Survey 275.00 10.00 300.00 20.00

Creek (27774/50946/1143) Party 0.20% 0.01% 0.27% 0.02% 5 Bids Tendered

2011 Seward Hwy: Trail RV, 642(3) Hour 140 294.00 311.50 350.00 17,817,902 08 Falls CR, & Ptarmigan Three Person Survey 275.00 300.00 325.00 300.00

Bridge Replacement Party 0.19% 0.24% 0.25% 0.21% (33825/52035/1143) 6 Bids Tendered

Page 98: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 98 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2011 Kenai Pen Flood Oct 02, 642(3) Hour 32 200.00 271.00 330.00 453,209 04 CONSENT DECREE Three Person Survey 300.00 300.00 200.00 300.00

MITIGATION (GF) Party 2.26% 2.12% 1.39% 2.00% (33215/52992/1143) 5 Bids Tendered

2013 Kalifornsky Beach Rd 642(3) Hour 20 290.00 304.00 330.00 1,230,669 07 Pedestrian Pathway (GF) Three Person Survey 300.00 300.00 290.00 300.00

(41205/54633/1143) Party 0.49% 0.49% 0.46% 0.47% 5 Bids Tendered

2010 GLENN HWY: EKLUTNA 642(3) Hour 100 1.00 145.50 300.00 5,859,876 03 TO PARKS HWY Three Person Survey 300.00 280.00 1.00 1.00

RESURFACING/CULVERT Party 0.38% 0.48% 0.00% 0.00% MP 13.0(FARM AVE)

(27674/52110 52385/1143)

4 Bids Tendered

2012 Sterling Hwy MP 150-169 642(3) Hour 110 1.00 208.67 325.00 11,698,675 11 Pavement Preservation & Three Person Survey 260.00 300.00 325.00 1.00

Sterling Hwy MP 169-173 Party 0.25% 0.28% 0.30% 0.00% Pavement Preservation (39053/54140 54130/1143) 3 Bids Tendered

2009 Parks Highway MP 72-83, 642(3) Hour 100 250.00 305.00 390.00 20,758,919 09 Willow to Kashwitna Three Person Survey 300.00 300.00 310.00 350.00

(24913/54985/1143) Party 0.11% 0.14% 0.15% 0.16% 7 Bids Tendered

2013 HSIP: Glenn Highway 642(3) Hour 80 50.00 267.50 330.00 688,095 07 Speed Limit Evaluation, Three Person Survey 300.00 300.00 50.00 330.00

Palmer to Glennallen Party 3.12% 3.49% 0.56% 3.53% (41317/55103/1143) 6 Bids Tendered

2009 Mertarvik Barge Facility 642(3) Hour 40 150.00 314.17 500.00 2,442,000 03 (20456/50850/1143) Three Person Survey 250.00 300.00 185.00 400.00

6 Bids Tendered Party 0.45% 0.49% 0.25% 0.52%

2012 Parks Hwy: Stanley Road 642(3) Hour 30 195.00 236.25 309.00 1,573,730 08 Signal (37366/54453/1143) Three Person Survey 300.00 309.00 204.75 195.00

3 Bids Tendered Party 0.50% 0.59% 0.36% 0.27%

2009 Nome Storm E R 642(3) Hour 20 300.00 328.67 420.00 4,091,282 10 Permanent Repairs Three Person Survey 300.00 352.00 420.00 300.00

2004-2005 Stage I I Party 0.15% 0.17% 0.16% 0.11% (20312/61866/1143) 6 Bids Tendered

Page 99: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 99 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 College Road Pavement 642(3) Hour 30 350.00 358.33 365.00 7,090,895 04 Rehabilitation & College Three Person Survey 330.00 350.00 365.00 360.00

Rd/Antoinette Party 0.14% 0.15% 0.15% 0.14% Ave/Margaret Ave Intersection Reconstruction (44449/62164 / 62854/1143)

2015 AMATS: Eagle River Road 642(3) Hour 50 300.00 316.67 350.00 6,887,552 03 Mp 0.0-5.3 Pavement Three Person Survey 300.00 300.00 350.00 300.00

Preservation Party 0.20% 0.22% 0.24% 0.20% (44413/56185/1143) 3 Bids Tendered

2009 Glenn Highway: Hiland to 642(3) Hour 100 250.00 260.00 290.00 12,676,055 05 Eklutna Resurfacing/Glenn Three Person Survey 325.00 250.00 250.00 290.00

Highway Emergency Party 0.18% 0.20% 0.20% 0.22% Bridge Repair, 2009 (21792/52000 51777/1143) 4 Bids Tendered

2015 Seward Highway MP 642(3) Hour 200 200.00 200.00 200.00 7,497,210 02 99-100 Improvements Three Person Survey 300.00 200.00 200.00 0.00

(44337/58822/7551) Party 0.93% 0.53% 0.47% 0.00% 2 Bids Tendered

2011 Girdwood Streets And 642(3) Hour 40 275.00 316.70 400.00 2,834,021 09 Drainage Improvements Three Person Survey 250.00 300.00 315.00 297.00

(34095/57057/1143) Party 0.29% 0.42% 0.41% 0.36% 10 Bids Tendered

2011 Nome - Council M P 642(3) Hour 100 100.00 295.55 400.00 4,359,365 01 62-73.6 Three Person Survey 300.00 305.00 330.00 341.00

(29073/60400/1143) Party 0.50% 0.70% 0.69% 0.64% 11 Bids Tendered

2009 Williamsport - Pile Bay 642(3) Hour 200 200.00 312.56 430.00 4,645,000 03 Road (20012/51651/1143) Three Person Survey 300.00 378.30 420.00 300.00

14 Bids Tendered Party 0.91% 1.63% 1.71% 1.15%

2014 Petersville Road 642(3) Hour 150 0.01 77.20 375.00 4,322,551 06 Preventive Maintenance, Three Person Survey 300.00 10.00 0.01 0.01

MP 0-9.2 Party 0.77% 0.03% 0.00% 0.00% (42965/52471/1143) 5 Bids Tendered

2015 Seward Highway MP 50 to 642(3) Hour 45 300.00 357.50 400.00 6,906,885 04 54.5 Pavement Three Person Survey 300.00 400.00 380.00 350.00

Preservation and Cooper Party 0.21% 0.26% 0.25% 0.21% Landing Walkable Community Project (44488/56685 54575/1143) 4 Bids Tendered

Page 100: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 100 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Richardson Hwy M P 295 642(3) Hour 150 200.00 300.28 540.50 6,419,604 04 Banner Creek Bridge Three Person Survey 400.00 540.50 370.00 330.00

#0526 Replacement Party 0.87% 1.26% 0.76% 0.65% (43350/61767/1645) 7 Bids Tendered

2015 Northern Lights Blvd: 642(3) Hour 100 250.00 275.00 300.00 8,572,860 03 Forest Park Dr. To Lake Three Person Survey 300.00 300.00 250.00 0.00

Otis Pavement Party 0.34% 0.35% 0.26% 0.00% Preservation, Phase 1 Benson Blvd.: Lois Dr. to LaTouche St. Pavement Preservation, Phase 1 (44280/58496 58497/1143) 2 Bids Tendered

2009 Minnesota Drive 642(3) Hour 100 250.00 268.00 285.00 6,809,020 04 Resurfacing (22032/51135 Three Person Survey 325.00 262.00 250.00 275.00

51340/1143) Party 0.37% 0.38% 0.36% 0.36% 4 Bids Tendered

2012 SGY- Dyea Road 642(3) Hour 160 160.00 211.67 275.00 2,559,735 11 Improvements (Realign) Three Person Survey 300.00 200.00 160.00 275.00

(34159/67424/1143) Party 1.32% 1.25% 0.61% 0.98% 3 Bids Tendered

2011 Hyder-Salmon River Road 642(3) Hour 10 290.00 363.33 500.00 7,440,684 08 Rehabilitation Three Person Survey 250.00 300.00 500.00 290.00

(11216/68602/1143) Party 0.04% 0.04% 0.06% 0.03% 3 Bids Tendered

2012 HSIP: Seward Hwy 642(3) Hour 95 300.00 316.67 325.00 10,713,734 11 Turnagain Pass - Potter Three Person Survey 325.00 325.00 325.00 300.00

Slow Vehicle Turnouts & Party 0.27% 0.29% 0.29% 0.26% Passing Lanes/HSIP: Seward Hwy Milepost 88 Safety Improvements (39059/52451 52121/1143) 3 Bids Tendered

2010 Kalifornsky Beach Rd; 642(3) Hour 5 265.00 355.00 440.00 1,953,352 02 Coal Creek Fish Passage Three Person Survey 300.00 440.00 265.00 440.00

(26835/51170/1143) Party 0.09% 0.11% 0.07% 0.11% 6 Bids Tendered

2013 Knik-Goose Bay Road & 642(3) Hour 60 300.00 331.67 350.00 3,172,129 05 Fern Street Intersection Three Person Survey 325.00 350.00 300.00 350.00

Improvements Fern Street Party 0.53% 0.66% 0.53% 0.60% to Palmer-Wasilla Highway MP 0.738 to MP 1.753 (40791/51896/1143) 6 Bids Tendered

2009 Chena Pump Road/Roland 642(3) Hour 10 325.00 434.00 770.00 96,927 12 Road Right Turn Lane Three Person Survey 300.00 325.00 325.00 350.00

(19832/77246/1143) Party 2.46% 3.35% 3.25% 2.96% 5 Bids Tendered

Page 101: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 101 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2010 Chester Creek Trail 642(3) Hour 20 250.00 322.75 355.24 2,874,171 03 Connection Project Three Person Survey 300.00 315.00 330.00 349.50

(27113/55066/1143) Party 0.18% 0.22% 0.22% 0.23% 9 Bids Tendered

2013 FMATS Area Surface 642(3) Hour 30 330.00 350.00 400.00 1,159,171 05 Upgrades FFY2013 Three Person Survey 300.00 330.00 330.00 340.00

(40871/62358/1143) Party 0.64% 0.85% 0.84% 0.83% 4 Bids Tendered

2010 Dillingham Wood River 642(3) Hour 100 300.00 321.00 350.00 9,994,028 03 Road Reconstruction Three Person Survey 300.00 300.00 350.00 330.00

(27513/55130/1143) Party 0.30% 0.30% 0.33% 0.29% 5 Bids Tendered

2013 Birch Road: O'Malley to 642(3) Hour 25 300.00 316.50 325.00 611,591 05 Huffman Resurfacing (GF) Three Person Survey 300.00 300.00 324.50 325.00

(40551/55432/1143) Party 1.28% 1.23% 1.16% 1.11% 3 Bids Tendered

2013 Sterling Highway Mp 79 - 642(3) Hour 50 10.00 223.33 360.00 4,789,467 10 82.5 Pavement Three Person Survey 300.00 10.00 300.00 360.00

Preservation Party 0.28% 0.01% 0.31% 0.35% (41786/54151/1143) 3 Bids Tendered

2014 88th Ave Upgrade, Spruce 642(3) Hour 20 300.00 338.81 375.00 2,773,227 04 Brook St To Elmore Rd Three Person Survey 300.00 332.00 300.00 360.00

(GF) (42655/54601/1143) Party 0.21% 0.24% 0.21% 0.24% 9 Bids Tendered

2014 Seward Highway MP 54.5 642(3) Hour 180 300.00 337.00 370.00 15,157,512 06 to 75 Pavement Three Person Survey 300.00 370.00 300.00 350.00

Preservation Party 0.23% 0.44% 0.34% 0.39% (42893/58080/1143) 5 Bids Tendered

2014 POW: Hydaburg Highway 642(3) Hour 20 100.00 225.00 350.00 388,512 04 Fish Passage Three Person Survey 350.00 100.00 350.00 0.00

Improvements Party 1.46% 0.51% 1.53% 0.00% (41388/68026/1143) 2 Bids Tendered

2009 Central Region Rumble 642(3) Hour 92 85.00 267.00 350.00 1,447,224 08 Strips Phase II Three Person Survey 300.00 300.00 85.00 300.00

(23672/51047/1143) Party 1.50% 1.91% 0.49% 1.50% 5 Bids Tendered

2012 Kalifornsky Beach Rd MP 642(3) Hour 20 250.00 319.44 400.00 826,020 10 11 Emergency Culvert Three Person Survey 300.00 350.00 300.00 300.00

Repairs Party 0.60% 0.85% 0.64% 0.64% (38671/52333/1143) 9 Bids Tendered

2009 Dalton Highway Culverts, 642(3) Hour 200 200.00 291.44 350.00 17,738,224 12 M P 260-321 Three Person Survey 300.00 248.00 300.00 350.00

(25514/62622/1143) Party 0.28% 0.28% 0.31% 0.32% 9 Bids Tendered

Page 102: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 102 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 POW Big Salt Lake Road 642(3) Hour 10 200.00 350.00 500.00 2,620,072 01 Pavement Rehabilitation Three Person Survey 300.00 200.00 500.00 0.00

(38069/67439/1143) Party 0.09% 0.08% 0.15% 0.00% 2 Bids Tendered

2010 AMATS: Jewel Lake Road 642(3) Hour 10 275.00 283.33 300.00 1,977,927 02 Resurfacing, Dimond Three Person Survey 300.00 300.00 275.00 275.00

Boulevard To West 63rd Party 0.12% 0.15% 0.12% 0.11% Ave (27034/51987/1143) 3 Bids Tendered

2013 Seward Hwy: MP 642(3) Hour 50 10.00 155.00 300.00 2,924,423 06 17.5-22.5 Pavement Three Person Survey 206.00 10.00 300.00 0.00

Preservation Party 0.32% 0.02% 0.46% 0.00% (41146/55256/1143) 2 Bids Tendered

2010 Illinois Street 642(3) Hour 20 300.00 341.67 400.00 4,191,814 02 Reconstruction - Barnette Three Person Survey 375.00 400.00 325.00 300.00

Bridge Construction Party 0.19% 0.19% 0.13% 0.11% (23473/62317/1143) 3 Bids Tendered

2013 Halibut Point Road 642(3) Hour 100 300.00 334.33 363.00 19,292,860 01 Pavement Rehab Three Person Survey 300.00 363.00 340.00 300.00

(38459/69351/1143) Party 0.15% 0.19% 0.17% 0.15% 3 Bids Tendered

2013 Aleknagik Wood River 642(3) Hour 80 300.00 366.25 465.00 19,515,005 09 Bridge Construction - Three Person Survey 250.00 300.00 350.00 465.00

Phase I Party 0.13% 0.12% 0.14% 0.17% (41612/52972/1143) 4 Bids Tendered

2013 Kenai Spur Highway MP 642(3) Hour 50 100.00 212.50 325.00 3,872,478 06 0-3 Pavement Three Person Survey 300.00 325.00 100.00 0.00

Preservation Party 0.42% 0.42% 0.13% 0.00% (40631/54142/1143) 2 Bids Tendered

2013 Johns Road 642(3) Hour 15 333.00 356.50 390.00 3,496,801 05 Improvements, Klatt To Three Person Survey 200.00 333.00 353.00 350.00

High View (GF) Party 0.06% 0.14% 0.15% 0.15% (40515/52783/1143) 4 Bids Tendered

2013 KTN- North Tongass 642(3) Hour 80 250.00 255.00 260.00 9,118,342 03 Highway (Ward Cove to Three Person Survey 250.00 250.00 260.00 0.00

Refuge Cove) Party 0.24% 0.22% 0.21% 0.00% (29055/68973/1143) 2 Bids Tendered

2009 Alaska Highway M P 642(3) Hour 250 50.00 164.17 285.00 11,696,889 12 1222-1235 Rehabilitation Three Person Survey 300.00 280.00 50.00 60.00

(26075/60519/1645) Party 0.45% 0.60% 0.11% 0.12% 6 Bids Tendered

Page 103: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 103 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 Richardson Highway M P 642(3) Hour 200 300.00 326.25 375.00 10,388,566 10 345 Moose Creek R R Three Person Survey 300.00 300.00 300.00 330.00

Overpass Party 0.53% 0.58% 0.55% 0.56% (17152/66566/1143) 8 Bids Tendered

2010 Glenn Hwy: Airport Heights 642(3) Hour 50 300.00 300.00 300.00 11,052,764 01 To Hiland Resurfacing Three Person Survey 325.00 300.00 300.00 300.00

(25119/51945/1143) Party 0.12% 0.14% 0.13% 0.13% 4 Bids Tendered

2013 Anchorage Asphalt 642(3) Hour 72 250.00 300.00 325.00 1,793,675 05 Surface Repairs, 2013 Three Person Survey 325.00 250.00 325.00 325.00

(40314/54396/1143) Party 1.16% 1.00% 1.25% 1.12% 3 Bids Tendered

2013 Debarr Road Resurfacing 642(3) Hour 50 250.00 283.33 325.00 4,590,728 05 (GF) (40444/53433/1143) Three Person Survey 300.00 275.00 250.00 0.00

3 Bids Tendered Party 0.33% 0.30% 0.26% 0.00%

2015 Olympic Mountain Loop 642(3) Hour 80 310.00 338.25 373.00 2,364,890 01 Improvements - Girdwood Three Person Survey 300.00 340.00 350.00 348.00

(44236/59766/1143) Party 1.26% 1.15% 1.04% 1.00% 8 Bids Tendered

2009 HOONAH FERRY 642(3) Hour 5 300.00 303.33 310.00 1,720,852 12 TERMINAL TO AIRPORT Three Person Survey 250.00 310.00 300.00 300.00

PAVEMENT Party 0.05% 0.09% 0.08% 0.07% REHABILITATION (23195/68909/1143) 3 Bids Tendered

2011 West Dowling Road - 642(3) Hour 180 275.00 287.00 300.00 13,486,059 11 Phase I, Old Seward Three Person Survey 300.00 300.00 286.00 275.00

Highway to C Street & Party 0.32% 0.40% 0.37% 0.35% Cordova Street Extension (35201/50898 53454/1143) 3 Bids Tendered

2010 Seward Highway MP 642(3) Hour 50 250.00 267.50 285.00 7,310,434 10 115-124 Resurfacing Three Person Survey 300.00 285.00 250.00 0.00

(32033/52491/1143) Party 0.16% 0.19% 0.16% 0.00% 2 Bids Tendered

2012 Glenn Highway Path 642(3) Hour 100 300.00 315.00 350.00 5,399,662 07 Rehabilitation: Muldoon Three Person Survey 300.00 300.00 350.00 310.00

Rd to North Birchwood Party 0.59% 0.56% 0.65% 0.50% (38202/55659/1143) 4 Bids Tendered

2009 JNU - Glacier Highway * 642(3) Hour 100 200.00 226.67 250.00 9,793,198 06 Trailhead Stage II - Three Person Survey 325.00 230.00 250.00 200.00

Amalga Harbor to Kayak Party 0.33% 0.23% 0.25% 0.19% Launch (19996/68832/1143) 3 Bids Tendered

Page 104: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 104 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2012 Parks Highway M.P. 83-90, 642(3) Hour 75 275.00 316.00 400.00 10,932,542 06 Weight Restriction Three Person Survey 275.00 300.00 400.00 318.00

Elimination Project Party 0.19% 0.21% 0.23% 0.18% (38108/51850/1143) 5 Bids Tendered

2014 Portage Glacier Road 642(3) Hour 20 330.00 355.00 390.00 1,782,765 08 Embankment Stabilization Three Person Survey 150.00 350.00 390.00 350.00

(43186/53726/1143) Party 0.24% 0.39% 0.31% 0.26% 4 Bids Tendered

2014 Cordova Point Whitshed 642(3) Hour 75 350.00 367.33 377.00 2,180,349 08 Road M P 0-3 Asphalt Three Person Survey 350.00 377.00 375.00 350.00

Surface Repairs Party 1.40% 1.30% 1.22% 1.06% (41879/64020/1143) 3 Bids Tendered

2011 Jnu - Glacier Hwy - North 642(3) Hour 100 250.00 258.33 265.00 10,369,300 09 Eagle Beach Kayak Three Person Survey 325.00 265.00 250.00 260.00

Launch to Bessie Creek Party 0.26% 0.26% 0.22% 0.21% (32656/67526/1143) 3 Bids Tendered

2014 Sterling Hwy Mp 57 642(3) Hour 25 300.00 317.50 340.00 1,699,250 07 Erosion Protection Three Person Survey 400.00 340.00 315.00 315.00

(43116/57729/1143) Party 0.67% 0.50% 0.36% 0.33% 4 Bids Tendered

2014 ANC Kulis Transition 642(3) Hour 20 290.00 345.25 400.00 1,178,369 10 Repairs and Modifications Three Person Survey 275.00 290.00 297.00 325.00

(43566/54066/1143) Party 0.45% 0.49% 0.49% 0.51% 8 Bids Tendered

2012 Kalifornsky Beach Road 642(3) Hour 24 100.00 200.00 300.00 767,725 06 Asphalt Surface Repairs Three Person Survey 350.00 100.00 300.00 0.00

2012 MP 16 To MP 22 Party 0.82% 0.31% 0.74% 0.00% (38039/54429/1143) 2 Bids Tendered

2014 ANC Postmark Storm 642(3) Hour 24 275.00 291.67 300.00 2,568,324 07 Drain Outfall Repairs Three Person Survey 270.00 300.00 275.00 300.00

(43054/57348/1143) Party 0.31% 0.28% 0.21% 0.21% 3 Bids Tendered

2014 Soldotna: Birch Street 642(3) Hour 40 360.00 368.95 377.89 1,745,059 10 Signal at Sterling Highway Three Person Survey 250.00 377.89 360.00 0.00

Rebid Party 0.59% 0.87% 0.60% 0.00% (43526/59767A/1143) 2 Bids Tendered

2014 Central Region Highway 642(3) Hour 200 275.00 287.50 300.00 4,551,390 09 Data Equipment 2012 Three Person Survey 300.00 275.00 300.00 0.00

(43114/52809/1143) Party 1.50% 1.21% 1.02% 0.00% 2 Bids Tendered

2010 Kenai: Various Road 642(3) Hour 20 200.00 262.00 310.00 574,593 08 Improvements, 2009 Three Person Survey 300.00 300.00 200.00 310.00

(30275/59774/1143) Party 0.77% 1.04% 0.65% 0.94% 5 Bids Tendered

Page 105: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 105 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2012 ANC East Airpark 642(3) Hour 120 291.60 309.08 360.00 7,589,893 06 Drainage Extension Phase Three Person Survey 275.00 360.00 300.00 300.00

II & ANC Postmark Drive Party 0.37% 0.57% 0.47% 0.46% Storm Drain Repair (38037/52365 52412/1143) 8 Bids Tendered

2014 Sterling Highway Erosion 642(3) Hour 50 300.00 337.75 382.00 3,371,200 10 Response MP 150-157 Three Person Survey 300.00 350.00 300.00 365.00

(43583/52472/1143) Party 0.45% 0.52% 0.43% 0.50% 8 Bids Tendered

2010 Stevens Village Sanitation 642(3) Hour 40 230.00 329.60 400.00 1,250,601 09 Road (26373/61532/1143) Three Person Survey 340.00 373.00 230.00 400.00

5 Bids Tendered Party 0.51% 1.19% 0.43% 0.67%

2014 Glenn Highway MP 42-56 642(3) Hour 350 250.00 300.00 350.00 9,998,998 12 Pavement Preservation, Three Person Survey 300.00 250.00 300.00 350.00

Glenn Highway MP 56-61 Party 0.77% 0.88% 0.96% 1.01% Pavement Preservation (44128/56663 56683/1143) 3 Bids Tendered

2012 Holt-Lamplight Road 642(3) Hour 50 100.00 233.33 300.00 4,646,626 04 Resurfacing Three Person Survey 400.00 300.00 100.00 300.00

(37466/52638/1143) Party 0.41% 0.32% 0.11% 0.27% 3 Bids Tendered

2014 HSIP: Glenn Hwy 642(3) Hour 100 330.00 386.76 453.96 6,691,146 10 Continuous Lighting, MP Three Person Survey 290.00 330.00 385.00 453.96

27-31 (43506/55613/1143) Party 0.52% 0.49% 0.54% 0.63% 6 Bids Tendered

2011 Huffman Road 642(3) Hour 170 250.00 264.50 300.00 12,332,894 02 Reconstruction - Old Three Person Survey 300.00 250.00 250.00 262.50

Seward Hwy to Lake Otis Party 0.34% 0.34% 0.31% 0.33% Parkway to Pintail Street (33102/53933 51920/1143) 5 Bids Tendered

2012 Seward Hwy Mp 89 To 642(3) Hour 50 200.00 201.67 205.00 4,436,195 05 96.6 Resurfacing Three Person Survey 325.00 200.00 200.00 205.00

(37470/52991/1143) Party 0.33% 0.23% 0.21% 0.20% 3 Bids Tendered

2012 Sterling Hwy MP 37-45 642(3) Hour 80 300.00 301.67 305.00 4,799,276 06 Pavement Preservation Three Person Survey 260.00 300.00 300.00 305.00

(38025/54128/1143) Party 0.35% 0.50% 0.47% 0.46% 3 Bids Tendered

2014 HSIP: CR Crash Cushions 642(3) Hour 10 300.00 332.83 358.50 1,445,300 11 Upgrade 2014 Three Person Survey 400.00 300.00 358.50 340.00

(43690/57607/1143) Party 0.21% 0.21% 0.21% 0.19% 3 Bids Tendered

2014 HSIP: Central Region 642(3) Hour 70 300.00 307.85 330.00 1,465,959 11 Overhead Beacons 2014 Three Person Survey 350.00 300.00 300.00 330.00

(43589/57081/1143) Party 1.41% 1.43% 1.23% 1.10% 4 Bids Tendered

Page 106: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 106 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2010 Glenn Highway Lighting, 642(3) Hour 200 215.00 298.50 413.44 9,162,250 09 S. Birchwood To Eklutna Three Person Survey 315.00 215.00 288.07 275.00

(30933/51970/1143) Party 0.47% 0.47% 0.62% 0.57% 7 Bids Tendered

2014 CR School Zone Upgrades 642(3) Hour 70 325.00 358.55 380.00 1,791,306 12 PH II/ CR UPS Load Three Person Survey 400.00 369.20 360.00 325.00

Centers 2014 Party 1.70% 1.44% 1.19% 0.88% (44005/55500 57689/1143) 4 Bids Tendered

2009 Glenn Hwy Mp34-42, 642(3) Hour 100 200.00 231.25 285.00 1,697,995 05 Parks To Palmer Three Person Survey 325.00 200.00 200.00 240.00

Resurfacing Party 1.24% 1.18% 1.09% 1.18% (23312/52015/1143) 4 Bids Tendered

2014 Sterling Highway MP 135 642(3) Hour 20 300.00 325.00 350.00 11,961,445 11 - 150 Pavement Three Person Survey 300.00 300.00 350.00 325.00

Preservation Party 0.05% 0.05% 0.06% 0.05% (43947/56697/1143) 3 Bids Tendered

2009 Trunk Road 642(3) Hour 200 225.00 265.63 320.00 22,945,463 05 Reconstruction, Phase I. Three Person Survey 320.00 225.00 300.00 250.00

Parks Highway to Party 0.20% 0.20% 0.25% 0.20% Palmer-Wasilla Highway (22872/59301/1143) 8 Bids Tendered

2009 PSG - Mitkof HWY - Scow 642(3) Hour 50 250.00 352.00 406.00 4,592,240 06 Bay to Crystal Lake Three Person Survey 300.00 250.00 406.00 400.00

Hatchery Road Party 0.25% 0.27% 0.35% 0.29% (18612/68819/1143) 3 Bids Tendered

2014 Parks Highway M P 642(3) Hour 100 200.00 355.67 439.00 5,284,485 09 163-305 Passing Lanes - Three Person Survey 400.00 200.00 400.00 400.00

Stage I I I Party 0.51% 0.38% 0.63% 0.60% (43265/63515/1645) 6 Bids Tendered

2014 F M A T S Area Surface 642(3) Hour 47 330.00 350.00 360.00 1,642,460 09 Upgrades F F Y 2014 Three Person Survey 330.00 350.00 330.00 360.00

(42061/63372/1143) Party 0.94% 1.00% 0.92% 0.95% 4 Bids Tendered

2010 Port MacKenzie Access 642(3) Hour 60 100.00 280.27 365.00 5,025,609 12 Road (32453/58168/1143) Three Person Survey 275.00 330.00 250.00 365.00

11 Bids Tendered Party 0.27% 0.39% 0.29% 0.38%

2015 Old Seward Highway: 642(3) Hour 40 300.00 312.50 325.00 4,114,208 06 O'Malley Rd to Dimond Three Person Survey 325.00 300.00 325.00 0.00

Blvd Pavement Party 0.25% 0.29% 0.28% 0.00% Preservation (44609/56712/1143) 2 Bids Tendered

Page 107: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 107 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 Edgerton Highway MP 642(3) Hour 100 280.00 365.00 500.00 7,445,892 04 0-19 Resurfacing Three Person Survey 200.00 335.00 280.00 425.00

(42129/63909/1143) Party 0.22% 0.45% 0.38% 0.52% 6 Bids Tendered

2015 International Airport Road 642(3) Hour 50 300.00 312.50 325.00 6,487,960 06 Pavement Preservation Three Person Survey 300.00 325.00 300.00 0.00

South Aircraft Drive to Party 0.22% 0.25% 0.23% 0.00% Homer Drive (44768/56729/7551) 2 Bids Tendered

2015 HSIP: Muldoon Road 642(3) Hour 80 300.00 333.33 350.00 2,499,849 06 Channelization, 11th Court Three Person Survey 300.00 350.00 300.00 350.00

to Boundary Avenue Party 1.09% 1.12% 0.95% 1.03% (44665/57341/1143) 3 Bids Tendered

2015 Ingra and Gambell Phase 642(3) Hour 80 300.00 312.50 325.00 5,296,083 06 1 Paving, 5th to 36th Three Person Survey 300.00 325.00 300.00 0.00

(44515/57858/1143) Party 0.44% 0.49% 0.45% 0.00% 2 Bids Tendered

2011 Seward Meridian Prkwy 642(3) Hour 100 200.00 286.00 330.00 11,989,291 06 Rd Imprvmnts, Ph I Parks Three Person Survey 300.00 300.00 300.00 330.00

to Palmer-Wasilla Hwy Party 0.20% 0.25% 0.25% 0.24% (33646/51184/1143) 5 Bids Tendered

2009 Sawmill Creek Road - 642(3) Hour 110 215.00 271.67 350.00 1,983,405 03 Halibut Point Road Three Person Survey 200.00 350.00 215.00 250.00

Roundabout Party 1.00% 1.94% 1.17% 1.31% (19212/68999/1143) 3 Bids Tendered

2009 Kenai Area Roads 642(3) Hour 40 10.00 117.50 225.00 1,194,692 05 Resurfacing, 2009 (Gas Three Person Survey 350.00 10.00 225.00 0.00

Well Road & Wendy Lane) Party 0.86% 0.03% 0.76% 0.00% (21492/51595/1143) 2 Bids Tendered

2011 Rezanof Drive Resurfacing 642(3) Hour 50 300.00 325.00 350.00 4,704,798 11 - Kodiak Wye - Monashka Three Person Survey 250.00 300.00 350.00 325.00

Bay Road Party 0.29% 0.32% 0.33% 0.30% (35118/52105/1143) 3 Bids Tendered

2011 Trunk Road 642(3) Hour 230 300.00 317.86 350.00 13,969,176 11 Reconstruction, Phase II Three Person Survey 320.00 300.00 315.00 300.00

Palmer-Wasilla Highway to Party 0.39% 0.49% 0.45% 0.42% Palmer-Fishhook Rd (35222/51132/1143) 7 Bids Tendered

2009 Kotzebue Roads - Shore 642(3) Contingent 1 25,500.00 25,500.00 25,500.00 33,010,932 04 Avenue Three Person Survey Sum 25,500.00 25,500.00 25,500.00 25,500.00

(20872/60788/1143) Party 0.07% 0.08% 0.07% 0.07%

9 Bids Tendered

Page 108: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 108 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2011 Glenn Hwy Signing Anch 642(3) Hour 50 200.00 308.87 572.30 3,177,820 11 To Palmer (gf) Three Person Survey 300.00 200.00 288.00 283.00

(35463/52334/1143) Party 0.34% 0.31% 0.43% 0.35% 9 Bids Tendered

2015 West Anchorage Roads 642(3) Hour 4 350.00 387.50 425.00 2,243,416 06 Pavement Preservation Three Person Survey 300.00 350.00 425.00 0.00

(44709/58795/1143) Party 0.05% 0.06% 0.06% 0.00% 2 Bids Tendered

2015 West Anchorage Roads 642(3) Hour 16 350.00 387.50 425.00 2,243,416 06 Pavement Preservation Three Person Survey 300.00 350.00 425.00 0.00

(44709/58795/1143) Party 0.19% 0.25% 0.23% 0.00% 2 Bids Tendered

2015 Pittman Road MP 0.0 to 642(3) Hour 30 310.00 317.50 325.00 1,125,191 05 2.1 Pavement Three Person Survey 300.00 310.00 325.00 0.00

Preservation Party 0.62% 0.83% 0.82% 0.00% (44645/58763/1143) 2 Bids Tendered

2010 Glenn Highway MP 109 to 642(3) Hour 120 250.00 316.00 414.00 9,874,455 10 118 Resurfacing Three Person Survey 280.00 250.00 300.00 300.00

(31573/52095/1143) Party 0.33% 0.30% 0.35% 0.34% 4 Bids Tendered

2015 Fairview Loop Road 642(3) Hour 150 0.01 3.67 10.00 3,839,935 05 Pavement Preservation Three Person Survey 325.00 1.00 10.00 0.01

(44583/51774/1143) Party 1.27% 0.00% 0.04% 0.00% 3 Bids Tendered

2010 Weigh-in-Motion Rehab: 642(3) Hour 40 200.00 226.67 250.00 3,851,734 01 Minnesota Dr. Near Three Person Survey 275.00 250.00 230.00 200.00

Raspberry Rd., Sterling Party 0.50% 0.26% 0.23% 0.19% Hwy MP 88.4, Glenn Hwy MP 53.3 (26218/51059/1143) 3 Bids Tendered

2014 Abbott Road Pavement 642(3) Hour 40 300.00 300.00 300.00 1,390,905 10 Preservation New Seward Three Person Survey 300.00 300.00 300.00 0.00

Highway to 88th Avenue Party 0.95% 0.86% 0.72% 0.00% (43473/56728/7551) 2 Bids Tendered

2012 Parks Highway, MP 52 to 642(3) Hour 30 300.00 316.67 350.00 6,379,578 02 57, Big Lake Road to Three Person Survey 250.00 300.00 350.00 300.00

Houston Resurfacing Party 0.09% 0.14% 0.16% 0.13% (36625/53469/1143) 3 Bids Tendered

2015 HSIP: 36th Avenue Arctic 642(3) Hour 120 300.00 350.53 400.00 1,990,576 05 Blvd to C Street 5 Lane Three Person Survey 300.00 325.00 381.16 400.00

Conversion Party 1.96% 1.96% 2.30% 2.29% (44656/55730/1143) 6 Bids Tendered

Page 109: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 109 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2009 Seward Hwy MP 43-50 642(3) Hour 20 225.00 305.00 350.00 8,862,510 02 Pvmt Refurbishment Three Person Survey 300.00 300.00 350.00 350.00

(19472/59296/1143) Party 0.06% 0.07% 0.08% 0.07% 5 Bids Tendered

2011 Copper River Highway MP 642(3) Hour 50 300.00 350.29 420.00 4,102,329 09 0-6 Resurfacing Three Person Survey 300.00 300.00 350.00 350.00

(32933/63804/1143) Party 0.27% 0.37% 0.40% 0.40% 7 Bids Tendered

2010 HSIP: NHS Warning & 642(3) Hour 100 200.00 221.27 250.00 1,404,195 11 Delineation Three Person Survey 325.00 210.00 200.00 250.00

(30713/51289/1143) Party 1.81% 1.50% 1.23% 1.53% 6 Bids Tendered

2009 North Pole Homestead Rd 642(3) Hour 30 300.00 333.00 370.00 1,250,518 01 / North Pole HS Blvd. Three Person Survey 200.00 370.00 350.00 300.00

Ext.-AK146: Bids Opened Party 0.50% 0.89% 0.82% 0.70% 01/22/2009 (6183/63025//1645) 5 Bids Tendered

2009 CR: Bridge Repair - Trail 642(3) Hour 20 265.00 293.75 345.00 3,583,367 02 Rv, Falls Cr, Ptarmigan Three Person Survey 300.00 300.00 265.00 265.00

(GO), Phase II Party 0.15% 0.17% 0.14% 0.13% (18933/51931/1143) 4 Bids Tendered

2015 Airport Way Preventive 642(3) Hour 136 370.00 380.00 400.00 8,240,476 05 Maintenance - Stage II, Three Person Survey 355.00 370.00 370.00 400.00

Northern Region Signal Party 0.68% 0.61% 0.59% 0.62% Interconnect - Airport

Way/Peger Road &

Northern Region

Pedestrian Improvements

(44455/63278/62489/60520/7551)

3 Bids Tendered

2011 Hyder-Causeway 642(3) Hour 40 300.00 308.33 325.00 7,842,000 10 Reconstruction & Three Person Survey 250.00 300.00 325.00 300.00

Extention (Concrete Party 0.11% 0.15% 0.15% 0.14% Trestle) (33912/69070/1143) 3 Bids Tendered

2009 Kotzebue Roads - Shore 642(3) Contingent 1 4,500.00 4,500.00 4,500.00 33,010,932 04 Avenue Three Person Survey Sum 4,500.00 4,500.00 4,500.00 4,500.00

(20872/60788/1143) Party 0.01% 0.01% 0.01% 0.01%

9 Bids Tendered

2010 Kalifornsky Beach Road, 642(3) Hour 20 1.00 230.20 300.00 1,195,515 05 Pedestrian Pathway (GF) Three Person Survey 300.00 300.00 250.00 300.00

(28634/51482/1143) Party 0.56% 0.50% 0.37% 0.41% 5 Bids Tendered

2014 Richardson Highway 642(3) Contingent 1 40,000.00 40,000.00 40,000.00 11,172,615 06 Fairbanks New Weigh Three Person Survey Sum 40,000.00 40,000.00 40,000.00 40,000.00

Station (42388/60552/0) Party 0.31% 0.36% 0.35% 0.32%

4 Bids Tendered

Page 110: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 110 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 Palmer-Wasilla Highway: 642(3) Hour 80 0.01 0.34 1.00 2,798,426 04 Parks Highway to Knik Three Person Survey 340.00 1.00 0.01 0.01

Goose Bay Road Party 0.89% 0.00% 0.00% 0.00% Pavement Preservation (42652/55270/1143) 3 Bids Tendered

2016 Gravina Mill Access Road 642(3) Hour 10 200.00 337.50 450.00 1,695,525 04 (44786/Z699220000/1143) Three Person Survey 350.00 300.00 450.00 200.00

4 Bids Tendered Party 0.18% 0.18% 0.26% 0.10%

2016 Alyeska Hwy Resurfacing: 642(3) Hour 35 300.00 320.00 340.00 5,198,107 03 Seward Hwy to Arlberg Three Person Survey 300.00 340.00 315.00 300.00

Ave and Alyeska Hwy: Party 0.20% 0.23% 0.20% 0.19% Pathway Rehabiliation

(GF)

(45618/58526&58509/1143)

4 Bids Tendered

2017 Tudor Road, Minnesota to 642(3) Hour 160 300.00 300.00 300.00 9,986,105 06 E. 36th, Pavement Three Person Survey 300.00 300.00 300.00 0.00

Preservation Party 0.45% 0.48% 0.45% 0.00% (47192/58507/1143) 2 Bids Tendered

2016 Aleknagik Wood River 642(3) Hour 250 1.00 253.20 400.00 6,391,456 05 Bridge Construction - Three Person Survey 350.00 350.00 400.00 1.00

Phase II Party 1.09% 1.37% 1.48% 0.00% (45783/54627/1143) 5 Bids Tendered

2015 Badger Road 642(3) Hour 30 370.00 378.75 400.00 1,257,111 12 Bike/pedestrian Path Three Person Survey 330.00 375.00 370.00 370.00

Resurfacing Party 0.75% 0.89% 0.81% 0.74% (44891/60820/1143) 4 Bids Tendered

2016 F M A T S Area Surface 642(3) Hour 44 230.00 323.33 390.00 782,631 07 Upgrades F F Y 2016 Three Person Survey 330.00 350.00 390.00 230.00

(45472//7551) Party 1.63% 1.97% 2.15% 1.01% 3 Bids Tendered

2018 Seward Highway, MP 642(3) Hour 350 202.04 256.76 300.00 51,418,510 02 75-90 Road and Bridge Three Person Survey 325.00 225.00 300.00 300.00

Rehabilitation, Phase I Party 0.16% 0.15% 0.20% 0.14% (48081//1143) 4 Bids Tendered

2016 Seward Highway: 92nd 642(3) Hour 100 300.00 309.42 335.00 9,982,120 02 Avenue Connector Three Person Survey 300.00 335.00 300.00 309.00

(45465/59770/1143) Party 0.28% 0.34% 0.30% 0.30% 7 Bids Tendered

2018 AMATS: Abbott Road 642(3) Hour 150 250.00 267.50 300.00 5,167,568 05 Rehab - Phase II Three Person Survey 300.00 300.00 250.00 270.00

(48404//7551) Party 0.89% 0.87% 0.71% 0.77% 4 Bids Tendered

Page 111: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 111 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2018 FMATS Area Surface 642(3) Hour 100 300.00 326.67 370.00 2,540,774 04 Upgrades FFY2018 Three Person Survey 330.00 310.00 300.00 370.00

(47333/90243/1143) Party 1.10% 1.22% 1.16% 1.33% 3 Bids Tendered

2016 C Street Paving and 642(3) Hour 270 300.00 308.33 325.00 10,998,774 07 Anchorage Curb Ramps Three Person Survey 320.00 300.00 325.00 300.00

2016 Party 0.78% 0.74% 0.76% 0.69% (46058/ANCPAV2016/1143)

3 Bids Tendered

2017 Ktn: Front, Mill, And 642(3) Hour 250 330.00 330.00 330.00 9,681,105 11 Stedman Streets Three Person Survey 300.00 330.00 0.00 0.00

Reconstruction Party 0.91% 0.85% 0.00% 0.00% (47761/Z681600000/1143) 1 Bids Tendered

2018 (67509 & 00057) Hns Hwy 642(3) HOUR 120 300.00 300.00 300.00 6,157,603 07 & Old Haines Hwy Three Person Survey 393.00 300.00 0.00 0.00

Resurface, Hns Airport Party 0.82% 0.58% 0.00% 0.00% Access Rd. (48265/00057/67509/1143) 1 Bids Tendered

2018 AMATS: Anchorage 642(3) Hour 10 310.00 352.00 400.00 672,850 05 Areawide Trails Three Person Survey 350.00 350.00 350.00 400.00

Rehabilitation - Benson Party 0.44% 0.52% 0.47% 0.51% Boulevard Pathway (48256//1143) 5 Bids Tendered

2018 Kenai Spur Highway 642(3) Hour 40 250.00 297.95 385.00 12,869,962 03 Rehabilitation: Sports Lake Three Person Survey 300.00 385.00 330.00 250.00

Road To Swires Road - Party 0.09% 0.12% 0.10% 0.07% Phase I (48214/54594/1143) 6 Bids Tendered

2017 Kalifornsky Beach Road, 642(3) Hour 100 100.00 240.00 385.00 8,695,855 07 MP 16 to 22.2 Resurfacing Three Person Survey 200.00 250.00 100.00 225.00

& Signalization Party 0.18% 0.29% 0.11% 0.23% (47186/59778/1143) 4 Bids Tendered

2017 Seward Road 642(3) Hour 51 0.10 115.03 160.00 2,946,524 03 Improvements Three Person Survey 500.00 150.00 160.00 0.10

(46779/N/A/1143) Party 0.87% 0.26% 0.26% 0.00% 4 Bids Tendered

2017 Fairbanks Area Signal 642(3) Hour 100 300.00 393.38 450.00 14,143,690 04 Upgrades-Stage 1 Three Person Survey 300.00 300.00 450.00 415.51

(46308//7551) Party 0.18% 0.21% 0.31% 0.27% 4 Bids Tendered

2015 College Road Right Turn 642(3) Hour 20 300.00 361.80 400.00 947,198 10 Lanes (44899/77227/1143) Three Person Survey 500.00 389.00 370.00 400.00

5 Bids Tendered Party 1.17% 0.82% 0.75% 0.81%

Page 112: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 112 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2017 Birch Hill Bicycle and 642(3) Hour 30 350.00 380.75 410.00 1,634,123 07 Pedestrian Facility Three Person Survey 385.00 350.00 388.00 375.00

(46027/63768/1143) Party 0.72% 0.64% 0.65% 0.60% 4 Bids Tendered

2016 Glenn Highway: Hiland 642(3) Hour 45 300.00 307.50 330.00 10,696,233 06 Road to Eklutna Pavement Three Person Survey 250.00 300.00 300.00 330.00

Preservation Party 0.08% 0.13% 0.12% 0.12% Glenn Highway: Median Crossover (45880/59028/1143) 4 Bids Tendered

2017 Glenn Highway: Airport 642(3) Hour 24 325.00 341.67 350.00 9,998,959 03 Heights Drive to Hiland Three Person Survey 320.00 350.00 325.00 350.00

Road, Pavement Party 0.07% 0.08% 0.08% 0.08% Preservation (46737//1143) 3 Bids Tendered

2018 AMATS: Anchorage 642(3) Hour 40 300.00 322.55 365.00 2,706,436 06 Areawide Trails Three Person Survey 350.00 320.41 330.00 300.00

Rehabilitation Fish Creek Party 0.44% 0.47% 0.43% 0.37% Trail AMATS: Fish Creek Trail Rehabilitation Turnagain Blvd to Kona Ln (TAP) (48417//7551) 8 Bids Tendered

2018 AMATS: Brayton Dr: 642(3) Hour 30 350.00 356.25 375.00 1,109,658 05 DeArmoun Rd - O'Malley Three Person Survey 300.00 350.00 350.00 375.00

Rd Pavement Preservation Party 0.65% 0.95% 0.88% 0.93% (48413/58575/1645) 4 Bids Tendered

2017 Dalton Highway MP 265 642(3) Hour 75 300.00 336.50 404.00 4,903,523 03 Roche Moutonnee Creek Three Person Survey 330.00 350.00 335.00 300.00

Bridge #1519 Party 0.53% 0.54% 0.48% 0.39% (45176/62704/7551) 6 Bids Tendered

2015 Glenn Highway and 642(3) Hour 250 250.00 329.94 399.69 40,745,592 11 Muldoon Road Three Person Survey 300.00 399.69 350.00 300.00

Interchange Improvements Party 0.19% 0.25% 0.21% 0.18% (45321/54625/1143) 5 Bids Tendered

2017 HSIP: Pedestrian Fencing 642(3) Hour 20 100.00 182.17 400.00 821,903 03 (46697/58150/1143) Three Person Survey 300.00 100.00 100.00 105.00

7 Bids Tendered Party 0.43% 0.24% 0.24% 0.24%

Page 113: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 113 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2017 September 2012 and May 642(3) Hour 125 235.00 313.89 500.00 2,359,224 04 2013 ER Denali Hwy Three Person Survey 375.00 250.00 250.00 300.00

Corridor Flood Repairs Party 1.78% 1.32% 1.17% 1.30% (46834/62699 / 62914 / 62283/1143) 9 Bids Tendered

2016 Sterling Highway MP 642(3) Hour 30 350.00 381.25 400.00 15,712,283 04 114-135 Pavement Three Person Survey 325.00 400.00 400.00 350.00

Preservation Party 0.05% 0.08% 0.07% 0.06% (45711/56698/1143) 4 Bids Tendered

2017 Seward Road 642(3) Hour 224 0.10 115.03 160.00 2,946,524 03 Improvements Three Person Survey 500.00 150.00 160.00 0.10

(46779/N/A/1143) Party 3.83% 1.14% 1.13% 0.00% 4 Bids Tendered

2016 North Fork Road Bridge 642(3) Hour 20 0.01 306.25 420.00 1,126,215 10 Erosion Repair Three Person Survey 340.00 0.01 300.00 400.00

(46238/57908/1143) Party 0.54% 0.00% 0.49% 0.63% 8 Bids Tendered

2015 Parks Highway MP 642(3) Hour 250 300.00 324.80 375.00 42,094,598 08 44.5-48.8 Reconstruction Three Person Survey 300.00 375.00 300.00 300.00

Church Road to Pittman Party 0.16% 0.22% 0.17% 0.16% Road (44808/52929/1143) 5 Bids Tendered

2015 Richardson Highway 642(3) Hour 25 350.00 350.00 350.00 3,271,889 09 Milepoint 0-3.6 Asphalt Three Person Survey 350.00 350.00 350.00 0.00

Surface Repairs Party 0.19% 0.27% 0.26% 0.00% (45127/60435/1143) 2 Bids Tendered

2018 Bethel Ridgecrest Drive 642(3) Hour 50 325.00 325.00 325.00 2,415,196 07 Rehabilitation; Three Person Survey 350.00 325.00 0.00 0.00

HSIP: 15CN01 Bethel Party 0.79% 0.67% 0.00% 0.00% Ridgecrest Drive School Zone Upgrades; HSIP: 15CR01 Akakeek Street and Ridgecrest Drive Intersection Improvements (48470//1143) 1 Bids Tendered

2016 Denali Highway Seattle 642(3) Hour 50 300.00 363.50 436.54 3,617,128 01 Creek Bridge Three Person Survey 330.00 390.00 375.00 320.00

Replacement Party 0.48% 0.54% 0.51% 0.42% (45226/61912/1143) 9 Bids Tendered

Page 114: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 114 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2017 Haines Highway 642(3) Hour 265 210.00 290.00 350.00 36,149,513 11 Reconstruction Milepost Three Person Survey 325.00 300.00 210.00 300.00

3.9 to 12.2, Phase 1 Party 0.23% 0.22% 0.15% 0.20% (47539//1143) 4 Bids Tendered

2018 Mat-Su Area Roads 642(3) Hour 310 0.01 78.86 300.00 7,494,743 04 Pavement Preservation Three Person Survey 300.00 300.00 0.01 1.00

(Group C) Party 1.04% 1.24% 0.00% 0.00% (48242/58977/1143) 7 Bids Tendered

2015 Raspberry Road: Jewel 642(3) Hour 50 350.00 350.00 350.00 6,769,856 09 Lake - Minnesota Three Person Survey 300.00 350.00 350.00 0.00

Pavement Preservation Party 0.18% 0.26% 0.25% 0.00% HSIP: Jewel Lake Rd At Raspberry Rd. East - West Left Turn Lanes (45141/56727 58760/1143) 2 Bids Tendered

2015 HSIP: Kodiak Rock Fall 642(3) Hour 20 120.00 320.86 465.00 2,212,795 10 Mitigation Three Person Survey 275.00 120.00 315.00 300.00

(45205/57709/1143) Party 0.22% 0.11% 0.25% 0.23% 7 Bids Tendered

2016 Kenai Spur Highway: MP 642(3) Hour 155 10.00 233.75 325.00 7,898,726 04 8-12.4 Pavement Three Person Survey 325.00 300.00 10.00 300.00

Preservation; Kenai Spur Party 0.49% 0.59% 0.02% 0.50% Highway: MP 9.8 & MP 10.2 Culvert Replacement; Bicycle-Pedestrian Facilities Rehabilitation and Improvements (45736//1143) 4 Bids Tendered

2014 Homer: East End Road 642(3) Hour 110 300.00 335.00 375.00 11,749,902 02 MP 3.75-5.5, Kachemak Three Person Survey 300.00 330.00 375.00 300.00

Drive to Waterman Road Party 0.31% 0.31% 0.32% 0.25% Rehabilitation Homer: East End Road MP 12.5 to MP 19.6 and Old East End Road MP 0.0 to MP 1.9 Pavement Preservation (42246/53164 55261/1143) 3 Bids Tendered

2017 Soldotna: Funny River 642(3) Hour 20 300.00 342.50 385.00 1,964,337 05 Road Improvements Three Person Survey 350.00 300.00 385.00 0.00

(47045/53750/1143) Party 0.29% 0.31% 0.39% 0.00% 2 Bids Tendered

2016 Hns - Klehini River Bridge 642(3) Hour 20 350.00 415.00 500.00 6,703,504 03 Replacement And Transfer Three Person Survey 300.00 350.00 375.00 400.00

(34258/69377/1143) Party 0.08% 0.10% 0.10% 0.08% 5 Bids Tendered

Page 115: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 115 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2017 Palmer-Wasilla Highway 642(3) Hour 50 100.00 293.66 350.00 4,648,330 06 Eastern Terminus, Phase I Three Person Survey 350.00 350.00 100.00 300.00

(47145/51363/1143) Party 0.31% 0.38% 0.10% 0.30% 9 Bids Tendered

2016 Lucus Road Improvements 642(3) Hour 12 300.00 377.29 500.00 4,639,288 01 (45390/55007/1143) Three Person Survey 300.00 350.00 400.00 500.00

10 Bids Tendered Party 0.07% 0.09% 0.10% 0.12%

2016 Snug Harbor Road 642(3) Hour 10 100.00 320.39 420.00 276,989 02 Improvements Advanced Three Person Survey 300.00 402.31 300.00 350.00

Utility Relocation Party 0.95% 1.45% 1.08% 1.19% (45462/56810/1143) 6 Bids Tendered

2018 Dalton Hwy MP 89-90 642(3) Hour 30 400.00 418.33 460.00 2,085,850 07 Embankment Stabilization Three Person Survey 350.00 450.00 400.00 400.00

(48451//1143) Party 0.42% 0.65% 0.54% 0.53% 6 Bids Tendered

2018 Parks Hwy MP 99-123.5 642(3) Hour 104 325.00 343.75 360.00 13,727,979 05 Pavement Preservation Three Person Survey 350.00 350.00 325.00 340.00

HSIP: Parks Hwy: Party 0.27% 0.27% 0.22% 0.22% Systemic Passing Lanes MP 99-123.5 (48390//1143) 4 Bids Tendered

2016 Valdez River 642(3) Hour 75 350.00 357.00 375.00 2,739,467 04 Encroachment Repairs Three Person Survey 330.00 360.00 350.00 350.00

(44838/64121/7551) Party 0.86% 0.99% 0.96% 0.78% 5 Bids Tendered

2016 HSIP: Eklutna Overpass 642(3) Hour 32 0.01 244.29 350.00 412,688 09 Bridge Warning 2015 Three Person Survey 300.00 110.00 310.00 0.01

(46219/58099/1143) Party 1.57% 0.85% 2.32% 0.00% 7 Bids Tendered

2018 Portage Glacier Rd 642(3) Hour 10 350.00 350.00 350.00 2,253,083 01 Resurfacing; MP 4.7 to Three Person Survey 300.00 350.00 350.00 350.00

Whittier Tunnel Party 0.11% 0.16% 0.15% 0.14% (47989//1143) 4 Bids Tendered

2017 FMATS Area Surface 642(3) Hour 54 325.00 343.33 375.00 1,290,111 06 Upgrades FFY 2017 Three Person Survey 330.00 325.00 330.00 375.00

(46184//7551) Party 1.29% 1.36% 1.34% 1.33% 3 Bids Tendered

2017 Glenn Highway: Eklutna to 642(3) Hour 24 150.00 153.33 160.00 5,541,578 12 Parks Highway Pavement Three Person Survey 320.00 160.00 150.00 150.00

Preservation Party 0.12% 0.07% 0.06% 0.06% (47863/58534/1143) 3 Bids Tendered

Page 116: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 116 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 Skagway - Replace 642(3) Hour 100 300.00 383.00 500.00 18,907,426 12 Captain William Henry Three Person Survey 300.00 350.00 500.00 300.00

Moore Bridge Party 0.22% 0.19% 0.25% 0.14% (46281//1143) 5 Bids Tendered

2018 Chena Ridge Cripple 642(3) Hour 25 1.00 328.71 410.00 1,950,325 04 Creek Culvert Three Person Survey 325.00 410.00 350.00 400.00

Replacement Party 0.46% 0.53% 0.41% 0.42% (46349/60624/1645) 7 Bids Tendered

2016 Fairbanks Noble Street 642(3) Hour 170 300.00 375.72 462.88 9,545,573 12 Upgrade Three Person Survey 330.00 300.00 370.00 370.00

(45722/61725/1143) Party 0.52% 0.53% 0.65% 0.59% 4 Bids Tendered

2017 Aleknagik Lake Road MP 642(3) Hour 615 1.00 90.25 150.00 5,393,658 06 0-5 Pavement Three Person Survey 275.00 110.00 1.00 150.00

Preservation Party 2.26% 1.25% 0.01% 1.50% Aleknagik Wood River Bridge Construction - Phase III (47068/CFHWY00169 & CFHWY00107/1143) 4 Bids Tendered

2016 Glenn Highway MP 63 and 642(3) Hour 24 300.00 328.05 400.00 2,643,730 03 64 Erosion Protection Three Person Survey 350.00 300.00 400.00 315.00

(45592/N/A/1143) Party 0.20% 0.27% 0.33% 0.23% 15 Bids Tendered

2015 Parks Highway MP 642(3) Contingent 1 0.00 0.00 0.00 2,089,539 09 192-194 Resurfacing Three Person Survey Sum 0.00 0.00 0.00 0.00

(43411/60741/1645) Party 0.00% 0.00% 0.00% 0.00% 2 Bids Tendered

2017 Parks Hwy: MP 83-99 642(3) Hour 144 300.00 318.57 345.00 18,937,555 11 Rehabilitation, Pedestrian, Three Person Survey 350.00 300.00 300.00 320.00

and Passing Lane Party 0.23% 0.23% 0.21% 0.22% Improvements (47720/ /1143) 7 Bids Tendered

2018 C St, 40th Ave to 642(3) Hour 80 250.00 258.33 275.00 8,532,028 03 Minnesota Pavement Three Person Survey 300.00 250.00 250.00 275.00

Preservation and AMATS: Party 0.24% 0.23% 0.22% 0.21% Anchorage Area Wide Trails Rehabilitaion - C Street Pathway (48136//1143) 3 Bids Tendered

Page 117: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 117 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2017 Homer: East End Road 642(3) Hour 50 225.00 287.50 325.00 6,096,324 04 MP 5.5-12.6 Pavement Three Person Survey 335.00 225.00 300.00 325.00

Preservation Party 0.21% 0.18% 0.23% 0.23% (46938/58514/1143) 4 Bids Tendered

2018 FMATS Yukon Drive 642(3) Hour 75 310.00 370.00 440.00 2,077,001 05 Improvements Three Person Survey 330.00 380.00 350.00 440.00

(46581//1143) Party 1.00% 1.37% 1.26% 1.55% 4 Bids Tendered

2017 Seward Road 642(3) Hour 25 0.12 115.03 160.00 2,946,524 03 Improvements Three Person Survey 500.00 150.00 160.00 0.12

(46779/N/A/1143) Party 0.43% 0.13% 0.13% 0.00% 4 Bids Tendered

2009 Seward Highway MP 69 To 642(3) Hour 24 11.00 190.25 350.00 1,145,189 07 MP 75 Pavement Three Person Survey 350.00 11.00 300.00 100.00

Refurbishment Party 0.55% 0.02% 0.62% 0.19% (23972/52027/1143) 4 Bids Tendered

2013 52765 Ninilchik Village 642(3) Hour 80 325.00 342.50 357.50 2,199,212 10 Bridge Replacement Three Person Survey 150.00 357.50 325.00 330.00

(41877/52765/1143) Party 0.52% 1.30% 1.16% 1.12% 5 Bids Tendered

2013 HSIP: Minnesota Dr. 642(3) Hour 80 0.00 30.00 330.00 116,500 11 Moose-Vehicle Crash Three Person Survey 265.00 0.00 0.00 0.00

Mitigation Party 0.63% 0.00% 0.00% 0.00% (41883/53455/1143) 11 Bids Tendered

2013 Ak Peninsula Hwy: King 642(3) Hour 150 275.00 306.25 350.00 10,295,938 11 Salmon Naknek Pavement Three Person Survey 300.00 300.00 275.00 350.00

Preservation Party 0.37% 0.44% 0.39% 0.49% (41790/55244/1143) 4 Bids Tendered

2013 HSIP: Minnesota Dr. 642(3) Hour 80 300.00 324.32 350.00 1,122,851 11 Moose-Vehicle Crash Three Person Survey 265.00 330.00 310.00 300.00

Mitigation Party 0.63% 2.35% 1.88% 1.72% (41866/53455/1143) 11 Bids Tendered

2012 Sawmill Creek Road 642(3) Hour 200 330.00 336.67 350.00 11,789,167 11 Upgrade Three Person Survey 300.00 350.00 330.00 330.00

(37924/68216/1143) Party 0.49% 0.59% 0.52% 0.50% 3 Bids Tendered

2011 EAGLE RIVER LOOP 642(3) Hour 50 250.00 288.75 330.00 2,599,433 07 ROAD RESURFACING: Three Person Survey 325.00 330.00 250.00 300.00

GLENN HWY TO EAGLE Party 0.58% 0.63% 0.44% 0.51% RIVER RD (GF) (33695/52881/1143) 4 Bids Tendered

Page 118: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 118 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2010 CENTRAL REGION 642(3) Hour 70 0.00 155.86 308.00 2,390,565 04 SCHOOL ZONE Three Person Survey 325.00 308.00 1.00 220.29

UPGRADES Party 1.39% 0.90% 0.00% 0.55% (28093/58298/1143) 5 Bids Tendered

2012 Sterling Highway MP 45 to 642(3) Hour 130 250.00 275.00 300.00 10,891,541 10 58 Resurfacing Three Person Survey 250.00 300.00 250.00 0.00

Kenai Pen Flood Oct 02, Party 0.28% 0.36% 0.25% 0.00% Permanent Repairs, Ph II (38812/52081 56938/1143) 2 Bids Tendered

2009 CR: Bridge Repair - Trail 642(3) Hour 20 250.00 330.00 560.00 4,964,043 08 Rv, Falls Cr, Ptarmigan Three Person Survey 300.00 325.00 300.00 300.00

(GO), Phase III Party 0.12% 0.13% 0.11% 0.11% (24133/51967/1143) 7 Bids Tendered

2010 Tustumena Lake, Crooked 642(3) Hour 70 1.00 289.33 560.00 2,880,645 05 Creek and Johnson Lake Three Person Survey 300.00 1.00 300.00 275.00

Roads Paving Party 0.55% 0.00% 0.73% 0.60% (28553/51670/1143) 6 Bids Tendered

2011 Valdez Airport Access 642(3) Hour 10 250.00 330.00 410.00 657,440 08 Road Resurfacing Three Person Survey 350.00 250.00 410.00 0.00

(31994/63465/1143) Party 0.67% 0.38% 0.53% 0.00% 2 Bids Tendered

2013 JNU-Glacier Highway 642(3) Hour 40 300.00 341.33 400.00 25,154,532 12 Brotherhood Bridge Three Person Survey 350.00 300.00 324.00 400.00

Replacement Party 0.06% 0.05% 0.05% 0.05% (34037/67987/1143) 3 Bids Tendered

2009 HAINES HIGHWAY - Front 642(3) Hour 50 255.00 255.00 255.00 1,833,512 07 Street To Union Street Three Person Survey 250.00 255.00 0.00 0.00

Rehabilitation Party 0.54% 0.70% 0.00% 0.00% (20894/68948/1143) 1 Bids Tendered

2013 Kodiak Area Roads 642(3) Hour 40 300.00 311.25 330.00 5,696,203 11 Pavement Preservation & Three Person Survey 320.00 300.00 330.00 300.00

Kodiak Areawide Party 0.21% 0.21% 0.22% 0.17% Delineation Improvements (41874/54149 55966/1143) 4 Bids Tendered

Page 119: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 119 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 HSIP: STERLING 642(3) Hour 100 150.00 203.33 300.00 6,527,698 01 HIGHWAY: SOLDOTNA Three Person Survey 265.00 150.00 160.00 300.00

TO HOMER HILL Party 0.29% 0.23% 0.23% 0.40% SLOW VEHICLE TURNOUTS (42017/52997/1143) 3 Bids Tendered

2013 Dimond Blvd Resurfacing: 642(3) Hour 40 250.00 275.00 300.00 7,227,267 03 Jewel Lake Rd To Seward Three Person Survey 200.00 250.00 300.00 0.00

Highway Party 0.09% 0.14% 0.15% 0.00% (40291/53801/1143) 2 Bids Tendered

2014 Parks Highway 642(3) Hour 184 300.00 332.00 370.00 25,973,241 06 MP123.5-146 Three Person Survey 200.00 300.00 340.00 350.00

Rehabilitation Party 0.12% 0.21% 0.23% 0.24% (42801/57700/1143) 5 Bids Tendered

2014 AMATS: A St Resurfacing: 642(3) Hour 96 300.00 311.50 323.00 5,686,743 05 Northern Lights Blvd to 9th Three Person Survey 300.00 300.00 323.00 0.00

Ave and HSIP: 16th Ave at Party 0.64% 0.51% 0.52% 0.00% A Street Channelization Improvements (42707/56000 51331/1143) 2 Bids Tendered

2017 HSIP: Sterling Hwy MP 642(3) Hour 100 1.00 187.20 385.00 1,980,177 08 89.8 Left Turn Lanes Three Person Survey 325.00 385.00 100.00 350.00

(47285/CFHWY00155/1143) Party 1.13% 1.94% 0.45% 1.49% 5 Bids Tendered

2012 HSIP: Bogard Rd & Peck 642(3) Hour 40 300.00 327.00 400.00 2,530,822 09 St Intersection Three Person Survey 300.00 325.00 310.00 300.00

Improvements Party 0.45% 0.51% 0.48% 0.44% (38637/51847/1143) 5 Bids Tendered

2013 West Dowling Road Phase 642(3) Hour 250 150.00 225.00 300.00 36,856,108 12 II: C St to Minnesota Drive Three Person Survey 300.00 150.00 300.00 0.00

& Party 0.20% 0.10% 0.20% 0.00% Alaska's Best Place: Raspberry Road to Ressel Avenue (42058/51030 54823/1143) 2 Bids Tendered

2014 5th and 6th Avenue 642(3) Hour 130 300.00 310.00 320.00 8,696,000 05 Paving, L Street To Ingra Three Person Survey 300.00 300.00 320.00 0.00

L & I Couplet Pavement Party 0.43% 0.45% 0.42% 0.00% Preservation: Phase 1 (42905/57835 58003/1143) 2 Bids Tendered

Page 120: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 120 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2011 Richardson Hwy MP 642(3) Hour 20 300.00 313.33 325.00 7,389,044 04 340-346 Resurfacing ( Three Person Survey 300.00 315.00 300.00 325.00

Moose Creek) Party 0.08% 0.09% 0.08% 0.08% (33145/63362/1143) 3 Bids Tendered

2014 HSIP: Central Region 642(3) Hour 10 240.00 372.25 540.00 1,169,103 01 Railroad/Highway Grade Three Person Survey 275.00 240.00 400.50 540.00

Crossing Guardrail Party 0.19% 0.21% 0.33% 0.35% Replacement HSIP: CR Guardrail Delineation Enhancements (42191/52113 55750/1143) 6 Bids Tendered

2014 Birch Road: Whispering 642(3) Hour 30 275.00 317.86 375.00 734,400 05 Spruce Intersection Three Person Survey 325.00 297.00 335.00 290.00

Improvements Party 1.29% 1.21% 1.26% 1.09% (42792/55627/1143) 7 Bids Tendered

2012 Lake Hood Strip RPZ Land 642(3) Hour 40 300.00 329.75 384.00 442,368 08 Acquisition Three Person Survey 300.00 300.00 315.00 384.00

(38451/52336/1143) Party 1.75% 2.71% 2.57% 3.02% 4 Bids Tendered

2014 Parks Highway MP 642(3) Hour 150 300.00 323.27 375.00 15,967,622 01 43.5-44.5 Reconstruction, Three Person Survey 300.00 300.00 375.00 300.00

Lucus Road To Church Party 0.30% 0.28% 0.31% 0.24% Road (42230/52914/1143) 5 Bids Tendered

2015 Parks Hwy: MP 35-40 642(3) Hour 300 1.00 240.25 360.00 13,943,673 07 Pavement Preservation Three Person Survey 300.00 1.00 300.00 300.00

Glenn Hwy - Parks Hwy Party 0.57% 0.00% 0.63% 0.61% Interchange Ramps (44802/56703 58571/1143) 4 Bids Tendered

2013 Kanakanak Rd: D St To 642(3) Hour 200 325.00 353.33 385.00 9,109,265 12 Squaw Cr Rd Resurfacing Three Person Survey 350.00 385.00 350.00 325.00

(41942/52799/2124) Party 0.79% 0.85% 0.69% 0.63% 3 Bids Tendered

2012 Kodiak: Chiniak Road MP 642(3) Hour 300 1.00 235.69 396.75 4,277,730 10 23.7 Improvements Three Person Survey 100.00 345.00 200.00 396.75

(38695/58107/1143) Party 0.79% 2.42% 1.22% 2.19% 4 Bids Tendered

2012 West Dowling Road Phase 642(3) Hour 200 200.00 321.89 409.00 1,048,926 10 IIa: C Street to Minnesota Three Person Survey 300.00 344.25 409.00 315.00

Drive (38771/55280/1143) Party 5.09% 6.56% 7.34% 5.43% 7 Bids Tendered

Page 121: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 121 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2012 Kanakanak Rd: Squaw Cr 642(3) Hour 120 300.00 367.00 411.00 5,598,065 11 Rd To Hospital Three Person Survey 300.00 390.00 300.00 411.00

Resurfacing Party 0.51% 0.84% 0.61% 0.76% (38959/52458/1143) 3 Bids Tendered

2017 AMATS: O'Malley Road 642(3) Hour 200 200.00 207.16 215.00 21,769,589 01 Reconstruction: Phase I, Three Person Survey 300.00 200.00 215.00 200.00

Seward Hwy To Livingston Party 0.30% 0.18% 0.17% 0.16% (46522//1143) 5 Bids Tendered

2015 Sterling Highway: Soldotna 642(3) Hour 50 160.00 280.00 350.00 3,688,652 12 Urban Pavement Three Person Survey 250.00 160.00 350.00 300.00

Preservation Party 0.31% 0.22% 0.47% 0.36% (45376/58524/7551) 4 Bids Tendered

2017 Keku Road 642(3) Hour 20 360.00 393.33 420.00 4,654,967 05 (42702/Z695390000/1143) Three Person Survey 300.00 400.00 420.00 0.00

3 Bids Tendered Party 0.12% 0.17% 0.11% 0.00%

2018 AMATS: Rabbit Creek 642(3) Hour 40 250.00 275.00 300.00 5,068,928 06 Road Pavement Three Person Survey 300.00 275.00 300.00 250.00

Preservation Party 0.23% 0.22% 0.23% 0.19% (48393/58511/1143) 3 Bids Tendered

2017 Sterling Highway Beluga 642(3) Hour 40 200.00 329.53 422.63 1,094,150 10 Lake Dam Improvements Three Person Survey 325.00 200.00 422.63 300.00

(47427/58672/1143) Party 1.51% 0.73% 1.28% 0.90% 5 Bids Tendered

2018 HSIP: Sterling Highway 642(3) Hour 150 266.76 318.63 385.00 29,100,627 03 Shoulder Widening MP 97 Three Person Survey 300.00 300.00 310.00 350.00

to MP 118 Party 0.16% 0.15% 0.16% 0.18% (48174/58980/7551) 6 Bids Tendered

2018 HSIP: OLD GLENN & 642(3) Hour 27 0.01 265.00 375.00 3,970,421 07 KGB: WIDER LANE Three Person Survey 329.78 375.00 0.01 335.00

LINES, PH I: KGB MP 8.1 Party 0.22% 0.26% 0.00% 0.22% - 20 (48468//1143) 4 Bids Tendered

2016 Goldhill Road Bicycle And 642(3) Hour 30 350.00 387.05 418.19 2,864,888 04 Pedestrian Facility Three Person Survey 500.00 380.00 400.00 350.00

(45033/63293/1143) Party 0.46% 0.40% 0.40% 0.34% 4 Bids Tendered

2018 Williamsport-Pile Bay 642(3) Hour 20 330.00 422.00 531.00 7,065,003 01 Road: Iliamna River Bridge Three Person Survey 300.00 500.00 361.00 400.00

Replacement Party 0.09% 0.14% 0.10% 0.10% (47969/55110/7551) 6 Bids Tendered

Page 122: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 122 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 HSIP: CR High Friction 642(3) Hour 200 350.00 390.00 550.00 6,778,888 12 Surface Treatment Three Person Survey 300.00 350.00 350.00 550.00

(45334/57092/1143) Party 0.80% 1.03% 0.95% 1.47% 5 Bids Tendered

2017 Bogard Rd. Resurfacing: 642(3) Hour 12 250.00 312.60 350.00 473,904 02 N. Lazy Eight Ct. to E. Three Person Survey 320.00 350.00 250.00 300.00

Stoney Hollow Dr. Party 0.87% 0.89% 0.57% 0.65% (46673//1143) 5 Bids Tendered

2015 HSIP: Municipality of 642(3) Hour 36 325.00 364.44 390.00 4,631,344 09 Anchorage Flashing Yellow Three Person Survey 325.00 375.00 390.00 325.00

Arrow Project Party 0.28% 0.29% 0.30% 0.25% Anchorage Signal Upgrades, Phase I (45174/52797 53728/1143) 5 Bids Tendered

2016 Richardson Highway MP 642(3) Hour 200 175.00 230.00 300.00 8,986,166 07 24-35 Resurfacing Three Person Survey 375.00 300.00 300.00 200.00

(45918/n/a/1143) Party 0.72% 0.67% 0.57% 0.37% 5 Bids Tendered

2015 FMATS Area Surface & 642(3) Hour 14 300.00 361.67 415.00 541,111 07 Approach Upgrades Three Person Survey 330.00 415.00 370.00 300.00

FFY2015 Party 0.81% 1.07% 0.84% 0.56% (44227/64103/7551) 3 Bids Tendered

Page 123: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 123 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2017 Sterling Highway 58 - 79, 642(3) Hour 120 275.00 325.00 375.00 53,907,758 05 Skilak Lake Road to Three Person Survey 310.00 350.00 300.00 375.00

Sterling, Rehabilitation & Party 0.06% 0.08% 0.06% 0.08% Passing Lanes; Sterling Highway MP 58-79 Rehabilitation Skilak Lake Road to Sterling, Sterling Highway MP

2016 Point MacKenzie Road 642(3) Hour 10 200.00 275.63 375.00 419,951 05 Improvement: MP 21.8 to Three Person Survey 300.00 200.00 200.00 220.00

23 (45643/58211/1143) Party 0.37% 0.48% 0.45% 0.48% 8 Bids Tendered

2016 AMATS: Abbott Rd. 642(3) Hour 150 300.00 317.22 350.00 8,348,321 03 Rehab-Phase I Three Person Survey 300.00 300.00 310.00 300.00

(45647/59190/7551) Party 0.48% 0.54% 0.54% 0.52% 8 Bids Tendered

2016 Point MacKenzie Road 642(3) Hour 5 200.00 275.63 375.00 419,951 05 Improvement: MP 21.8 to Three Person Survey 300.00 200.00 200.00 220.00

23 (45643/58211/1143) Party 0.18% 0.24% 0.22% 0.24% 8 Bids Tendered

2018 Ktn - Airport Creek Bridge 642(3) Hour 20 225.00 366.67 450.00 1,878,256 08 (USFS) Three Person Survey 300.00 450.00 450.00 375.00

(47167/68226/1143) Party 0.28% 0.48% 0.48% 0.33% 6 Bids Tendered

2017 Fairview Loop Realign 642(3) Hour 40 1.00 268.63 334.42 2,151,595 06 at Knik Goose Bay Road Three Person Survey 350.00 315.00 315.00 300.00

(47194/Z548000000/1143) Party 0.48% 0.59% 0.54% 0.49% 7 Bids Tendered

2009 TUDOR ROAD & LAKE 642(3) Hour 24 250.00 293.75 375.00 7,489,670 12 OTIS PARKWAY Three Person Survey 350.00 250.00 300.00 250.00

INTERSECTION Party 0.09% 0.08% 0.09% 0.07% IMPROVEMENTS (25576/58890/1143) 4 Bids Tendered

2015 Glenn Highway: MP 49 642(3) Hour 20 275.00 329.74 390.00 2,836,370 10 (45214/50994/1143) Three Person Survey 300.00 340.00 378.00 390.00

13 Bids Tendered Party 0.17% 0.24% 0.26% 0.27%

Page 124: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 124 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 Amalga Harbor Rd & 642(3) Hour 32 290.00 320.00 340.00 2,927,828 12 Bridges Reconstruction & Three Person Survey 175.00 330.00 340.00 290.00

Replacement Party 0.20% 0.36% 0.37% 0.28% (34598/69684/1143) 3 Bids Tendered

2018 AMATS: Westchester 642(3) Hour 25 200.00 210.00 220.00 506,884 07 Lagoon Nature Trail Three Person Survey 300.00 210.00 220.00 200.00

Rehabilitation Party 1.61% 1.04% 0.92% 0.76% (48449//1143) 3 Bids Tendered

2017 AMATS: Pedestrian Plan 642(3) Hour 30 100.00 134.50 250.00 684,191 02 Implementation Boniface Three Person Survey 350.00 100.00 110.00 110.00

Pkwy: Debarr Rd to Carrs Party 1.27% 0.44% 0.48% 0.44% AMATS: Pedestrian Plan Implementation Patterson Street: Debarr Rd to Chester Court (46703//1143) 6 Bids Tendered

2018 HSIP: Jewel Lake Road 642(3) Hour 50 300.00 318.60 360.00 5,719,942 07 Widening, 88th Avenue to Three Person Survey 350.00 310.00 310.00 325.00

Strawberry Road Party 0.27% 0.27% 0.26% 0.26% (48484/57310/1143) 9 Bids Tendered

2016 ANC Paving and Drainage 642(3) Hour 10 250.00 323.28 400.00 341,075 06 Improvements 2016 Three Person Survey 275.00 319.53 335.00 350.00

(45805/58341/1143) Party 0.77% 0.94% 0.95% 0.97% 9 Bids Tendered

2017 Dalton Highway MP 642(3) Hour 150 300.00 365.94 495.00 20,984,015 06 209-222 Reconstruction Three Person Survey 330.00 350.00 352.57 400.00

(45785//1645) Party 0.19% 0.25% 0.22% 0.24% 7 Bids Tendered

2018 Glenn Hwy: S. Inner 642(3) Hour 375 300.00 326.25 350.00 36,616,095 05 Springer Loop to W. Arctic Three Person Survey 300.00 300.00 350.00 330.00

Avenue Party 0.28% 0.31% 0.35% 0.31% Glenn Hwy: S. Inner Springer Loop to W. Arctic Avenue Pathway (48402//1143) 4 Bids Tendered

2009 Central Region Safety 642(3) HOUR 36 0.00 183.33 300.00 5,027,359 06 Improvement Project 2008 THREE PERSON 275.00 300.00 250.00 0.00

(23772/51210 51229/1143) SURVEY PARTY 0.20% 0.21% 0.16% 0.00% 3 Bids Tendered

Page 125: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 125 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 Chiniak Highway MP: 642(3) HOUR 350 1.00 163.00 325.00 10,388,523 05 10-15 Pavement THREE PERSON 275.00 1.00 325.00 0.00

Preservation SURVEY PARTY 0.78% 0.00% 1.00% 0.00% HSIP: Kodiak Bridge Rail Upgrades (45787/56699 & 57090/0) 2 Bids Tendered

2009 Kodiak: Rezanof Dr. 642(3) HOUR 30 300.00 335.00 370.00 5,963,225 05 Resurfacing Coast Guard THREE PERSON 350.00 300.00 370.00 0.00

Access Road To Marine SURVEY PARTY 0.24% 0.15% 0.17% 0.00% Way (19675/51930/1143) 2 Bids Tendered

2014 Old Seward Highway: 642(3) HOUR 100 250.00 261.38 280.00 3,749,452 11 Rabbit Creek To Brandon THREE PERSON 300.00 250.00 250.00 265.50

Street Pavement SURVEY PARTY 0.75% 0.67% 0.66% 0.61% Preservation (43599/56708/1143) 4 Bids Tendered

2009 Sterling Highway 642(3) HOUR 50 200.00 266.67 380.00 5,636,173 06 Resurfacing: Soldotna To THREE PERSON 300.00 220.00 380.00 200.00

Cohoe Loop Road SURVEY PARTY 0.24% 0.20% 0.34% 0.17% (19654/51916/1143) 3 Bids Tendered

2009 Anchorage Area Safety 642(3) HOUR 62 225.00 262.32 335.00 1,996,872 12 Improvements, THREE PERSON 275.00 225.00 250.00 236.25

Construction 2010 SURVEY PARTY 0.68% 0.70% 0.77% 0.71% (26013/51185/1143) 7 Bids Tendered

2018 Kenai Spur Highway: Mp 642(3) HOUR 100 1.00 200.33 375.00 3,440,733 06 12 - 18 Pavement THREE PERSON 300.00 1.00 225.00 375.00

Preservation SURVEY PARTY 0.88% 0.00% 0.64% 0.95% (48367//1143) 3 Bids Tendered

2013 Jnu: Egan Drive Additional 642(3) HOUR 40 400.00 420.00 440.00 3,724,020 07 Illumination THREE PERSON 300.00 400.00 440.00 0.00

(41062/67402/1143) SURVEY PARTY 0.33% 0.43% 0.36% 0.00% 2 Bids Tendered

2013 69003 Glacier Hwy And 642(3) HOUR 40 300.00 300.00 300.00 5,031,578 05 Back Loop Rd Intersection THREE PERSON 300.00 300.00 300.00 0.00

Safety Improvements SURVEY PARTY 0.28% 0.24% 0.23% 0.00% (40432/69003/1143) 2 Bids Tendered

2011 Wrangell Road And Utility 642(3) HOUR 10 250.00 276.67 330.00 5,815,976 05 Improvements THREE PERSON 300.00 330.00 250.00 250.00

(33218/STP-68828/67789/1143) SURVEY PARTY 0.05% 0.06% 0.04% 0.04% 3 Bids Tendered

Page 126: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 126 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Willow Fishhook MP 37.7 642(3) HOUR 300 1.00 241.81 410.00 8,594,153 10 to Parks Highway THREE PERSON 300.00 1.00 350.00 340.00

Pavement Preservation SURVEY PARTY 0.90% 0.00% 1.17% 1.13% (45181/58651/1143) 8 Bids Tendered

2016 Schrock Road Pavement 642(3) HOUR 272 0.01 185.09 350.00 8,998,584 04 Preservation THREE PERSON 300.00 0.10 1.00 300.00

Mat-Su Area Roads SURVEY PARTY 0.61% 0.00% 0.00% 0.84% Pavement Preservation

(Group A)

Mat-Su Area Roads

Pavement Preservation

(Group B)

(45688/Z575280000/Z575470000/Z575500000/0)

7 Bids Tendered

2015 CR Flashing Yellow Arrow 642(3) HOUR 84 330.00 400.63 465.00 4,757,548 12 ITS (45364/54474/0) THREE PERSON 275.00 379.50 330.00 428.00

4 Bids Tendered SURVEY PARTY 0.48% 0.67% 0.57% 0.73%

2012 Eagle River Road 642(3) HOUR 100 300.00 310.00 325.00 16,932,672 10 Rehabilitation Mp 5.3 To THREE PERSON 280.00 325.00 300.00 305.00

Mp 12.6 SURVEY PARTY 0.14% 0.19% 0.17% 0.16% (38731/53943/1143) 3 Bids Tendered

2011 Illinois Street 642(3) HOUR 140 300.00 313.75 330.00 21,965,863 12 Reconstruction THREE PERSON 400.00 300.00 300.00 325.00

(33274/63102/1143) SURVEY PARTY 0.25% 0.19% 0.19% 0.20% 4 Bids Tendered

2016 KTN-North Tongass 642(3) HOUR 40 350.00 384.17 402.50 4,163,270 07 Highway: Illumination THREE PERSON 300.00 350.00 400.00 402.50

Upgrades (HSIP) SURVEY PARTY 0.31% 0.34% 0.37% 0.33% (45699/Z684130000/0) 3 Bids Tendered

2011 HSIP: Tudor Road: Laurel 642(3) HOUR 115 250.00 279.50 330.00 1,750,344 04 Street To Boniface THREE PERSON 275.00 300.00 267.50 330.00

Parkway Channelization SURVEY PARTY 1.38% 1.97% 1.70% 2.00% Improvements & HSIP: Debarr Road: Bragaw Street to Hoyt Street Channelization Improvements (33163/51927 51918/1143) 5 Bids Tendered

2017 Dowling Road: Old Seward 642(3) HOUR 100 250.00 265.00 295.00 2,066,575 05 Hwy to Lake Otis Parkway THREE PERSON 300.00 295.00 250.00 250.00

Pavement Preservation SURVEY PARTY 1.30% 1.43% 1.13% 1.12% (47034/CSHWY00075/1143)

3 Bids Tendered

Page 127: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 127 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 Glacier Highway 642(3) HOUR 40 350.00 355.00 360.00 13,394,988 12 Reconstruction: Fritz Cove THREE PERSON 300.00 360.00 350.00 0.00

Road To Seaview Avenue SURVEY PARTY 0.08% 0.11% 0.10% 0.00% (46359/Z684710000/1143) 2 Bids Tendered

2016 Seward Highway: Dimond 642(3) HOUR 350 345.00 345.00 345.00 55,969,371 12 Boulevard to Dowling THREE PERSON 300.00 345.00 345.00 0.00

Road Reconstruction, SURVEY PARTY 0.15% 0.22% 0.20% 0.00% Phase I (46380//7551) 2 Bids Tendered

2012 Petersburg Road 642(3) HOUR 35 230.00 240.00 250.00 3,761,496 07 Improvements/Sewer Main THREE PERSON 300.00 250.00 230.00 0.00

Repairs SURVEY PARTY 0.33% 0.23% 0.20% 0.00% (38103/67879/68165/1143) 2 Bids Tendered

2012 AMATS: Muldoon Road 642(3) HOUR 40 275.00 290.00 300.00 3,199,546 03 Pedestrian and THREE PERSON 300.00 290.00 300.00 300.00

Landscaping SURVEY PARTY 0.28% 0.36% 0.36% 0.35% Improvements, Phase III (36766/56530/1143) 6 Bids Tendered

2011 HSIP: International Airport 642(3) HOUR 100 150.00 208.75 300.00 4,310,604 12 Rd at Jewel Lake Rd THREE PERSON 275.00 150.00 165.00 220.00

Channelization SURVEY PARTY 0.47% 0.35% 0.38% 0.49% Improvements/HSIP: Jewel Lake Rd: 63rd Ave to Old International Airport Rd (35580/51922 51924/1143) 4 Bids Tendered

2010 HSIP: International Airport 642(3) HOUR 16 250.00 297.50 340.00 1,583,168 07 Rd At Old Seward Hwy THREE PERSON 300.00 300.00 250.00 340.00

(29896/56611/1143) SURVEY PARTY 0.32% 0.30% 0.25% 0.32% 4 Bids Tendered

2010 King Cove Access Road 642(3) HOUR 80 300.00 368.58 594.00 14,459,880 12 Completion THREE PERSON 300.00 400.00 450.00 594.00

(32716/59791/1143) SURVEY PARTY 0.16% 0.22% 0.23% 0.29% 12 Bids Tendered

2011 VICTOR ROAD: 100TH 642(3) HOUR 80 275.00 296.33 325.00 6,242,977 11 AVENUE TO DIMOND THREE PERSON 300.00 286.00 275.00 300.00

BLVD. SURVEY PARTY 0.28% 0.37% 0.34% 0.35% (35419/55027/1143) 6 Bids Tendered

2011 Wrangell Road And Utility 642(3) HOUR 50 250.00 283.33 330.00 5,815,976 05 Improvements THREE PERSON 300.00 330.00 250.00 270.00

(33218/STP-68828/67789/1143) SURVEY PARTY 0.26% 0.28% 0.20% 0.21% 3 Bids Tendered

Page 128: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 128 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 FMATS Pedestrian 642(3)-A Hour 60 350.00 366.67 390.00 8,963,033 04 Improvements - Stage I, Three Person Survey 300.00 360.00 350.00 390.00

Peger Road Resurfacing, Party 0.16% 0.24% 0.23% 0.22% & Northern Region Signal Interconnect - Mitchell to Johansen (45600/61661, 63035, & N/A/1143) 3 Bids Tendered

2016 City of Fairbanks 642(3)-A Hour 14 340.00 378.33 415.00 2,311,182 05 Pedestrian Facilities Three Person Survey 330.00 380.00 340.00 415.00

Upgrade and Aurora & Party 0.17% 0.23% 0.18% 0.21% Auburn Drive Resurfacing (45744/62127/N/A/7551) 3 Bids Tendered

2014 South Cushman Street 642(3)-A Hour 30 350.00 353.33 360.00 6,138,597 05 Resurfacing & Three Person Survey 330.00 350.00 350.00 360.00

South Cushman Sidewalk Party 0.15% 0.17% 0.16% 0.16% and Drainage Improvements (42473/62687 & 62532/1143) 3 Bids Tendered

2015 College Road Pavement 642(3)-A Hour 30 350.00 358.33 365.00 7,090,895 04 Rehabilitation & College Three Person Survey 330.00 350.00 365.00 360.00

Rd/Antoinette Party 0.14% 0.15% 0.15% 0.14% Ave/Margaret Ave Intersection Reconstruction (44449/62164 / 62854/1143) 3 Bids Tendered

2015 Airport Way Preventive 642(3)-A Labor 35 360.00 366.67 370.00 8,240,476 05 Maintenance - Stage II, Three Person Survey Hour 300.00 370.00 370.00 360.00

Northern Region Signal Party 0.15% 0.16% 0.15% 0.14% Interconnect - Airport

Way/Peger Road &

Northern Region

Pedestrian Improvements

(44455/63278/62489/60520/7552)

3 Bids Tendered

2010 Port MacKenzie Access 642(3)AA1 Hour 20 250.00 308.45 400.00 5,025,609 12 Road (32453/58168/1143) Three Person Survey 275.00 330.00 250.00 400.00

11 Bids Tendered Party 0.09% 0.13% 0.10% 0.14%

Page 129: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 129 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 FMATS Pedestrian 642(3)-B Hour 60 350.00 366.67 390.00 8,963,033 04 Improvements - Stage I, Three Person Survey 350.00 360.00 350.00 390.00

Peger Road Resurfacing, Party 0.18% 0.24% 0.23% 0.22% & Northern Region Signal Interconnect - Mitchell to Johansen (45600/61661, 63035, & N/A/1143) 3 Bids Tendered

2018 Elliott Highway MP 0-12 642(3)-C Hour 20 300.00 372.50 480.00 24,869,247 05 Rehabilitation, Northern Three Person Survey 500.00 350.00 360.00 300.00

Region Deep Culverts Party 0.04% 0.03% 0.03% 0.02% Stage II, HSIP: Fox Intersection Conspicuity Improvements (48044//1143) 4 Bids Tendered

2016 FMATS Pedestrian 642(3)-C Hour 20 350.00 366.67 390.00 8,963,033 04 Improvements - Stage I, THREE PERSON 370.00 360.00 350.00 390.00

Peger Road Resurfacing, SURVEY PARTY 0.07% 0.08% 0.08% 0.07% & Northern Region Signal Interconnect - Mitchell to Johansen (45600/61661, 63035, & N/A/7551) 3 Bids Tendered

2012 Glenn Highway 2012 642(3-78) Hour 20 320.00 397.00 455.00 1,623,000 11 Emergency Repairs, MP Three Person Survey 150.00 455.00 320.00 440.00

67.9, MP 78, MP 85 Party 0.21% 0.56% 0.37% 0.51% (38958/55575/1143) 5 Bids Tendered

2014 NORDIC DRIVE & 642(3A) CONTINGENT 1 17,561.00 17,561.00 17,561.00 8,362,244 12 HAUGEN DRIVE ADDITIONAL SURVEY SUM 17,561.00 17,561.00 17,561.00 0.00

(43571/68048 & 0.21% 0.21% 0.19% 0.00%

69518/1645) 2 Bids Tendered

2016 Richardson Hwy MP 642(3A) Contingent 1 2,000.00 2,000.00 2,000.00 503,450 10 110-Tazlina Wayside Three Person Survey Sum 2,000.00 2,000.00 2,000.00 2,000.00

Improvements Party 0.21% 0.40% 0.37% 0.31%

(46051/61076/1645) 12 Bids Tendered

2018 Alaska Highway MP 1309 642(3A) Contingent 1 20,000.00 20,000.00 20,000.00 9,911,534 04 Tok River Bridge Three Person Survey Sum 20,000.00 20,000.00 20,000.00 20,000.00

Replacement Party 0.18% 0.20% 0.20% 0.18%

(47902//1645) 6 Bids Tendered

2013 Nordale Road 642(3A) Contingent 1 6,000.00 6,000.00 6,000.00 4,442,893 02 Rehabilitation Three Person Survey Sum 6,000.00 6,000.00 6,000.00 6,000.00

(39751/62166/1143) Party 0.13% 0.14% 0.13% 0.13%

3 Bids Tendered

Page 130: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 130 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 University Avenue 642(3A) Contingent 1 10,000.00 10,000.00 10,000.00 335,460 05 Rehabilitation & Widening: Three Person Survey Sum 10,000.00 10,000.00 10,000.00 10,000.00

Building Demolition Stage Party 1.96% 2.98% 2.33% 2.33%

1 (38457/63213/1645) 3 Bids Tendered

2017 Elliott Highway MP 642(3A) Contingent 1 50,000.00 50,000.00 50,000.00 2,798,511 07 107.7-120.5 Surfacing - Three Person Survey Sum 50,000.00 50,000.00 50,000.00 50,000.00

2nd Contract Party 1.61% 1.79% 1.40% 1.36%

(47051//1645) 7 Bids Tendered

2013 Old Glenn Highway: MP 642(3A) Contingent 1 5,000.00 5,000.00 5,000.00 543,900 06 15 Erosion Protection (GF) Three Person Survey Sum 5,000.00 5,000.00 5,000.00 5,000.00

(39952/55912/1645) Party 0.79% 0.92% 0.75% 0.70%

8 Bids Tendered

2011 McCarthy Rd & Edgerton 642(3A) Contingent 1 5,000.00 5,000.00 5,000.00 967,365 05 Hwy Flood Permanent Three Person Survey Sum 5,000.00 5,000.00 5,000.00 5,000.00

Repairs ( Oct '06 ) Party 0.51% 0.52% 0.51% 0.49%

(29893/77083/1645) 8 Bids Tendered

2013 Elliott Hwy Livengood 642(3A) Contingent 1 10,000.00 10,000.00 10,000.00 2,330,539 06 Creek Bridge (#0229) Three Person Survey Sum 10,000.00 10,000.00 10,000.00 10,000.00

AK090 Party 0.43% 0.43% 0.40% 0.40%

(39153/63579/1645) 7 Bids Tendered

2013 WRG Zimovia Pavement 642(3A) Contingent 1 10,000.00 10,000.00 10,000.00 7,822,574 01 Rehabilitation Three Person Survey Sum 10,000.00 10,000.00 10,000.00 10,000.00

(38064/67425/1645) Party 0.11% 0.13% 0.12% 0.12%

3 Bids Tendered

2018 WRG - Evergreen Ave. 642(3A) Contingent 1 5,000.00 5,000.00 5,000.00 4,674,097 04 Improvements and Three Person Survey Sum 5,000.00 5,000.00 5,000.00 0.00

Pedestrian Access Party 0.11% 0.11% 0.11% 0.00%

(43122/Z680290000/1645) 2 Bids Tendered

2012 Dalton Hwy M P 267 642(3A) Contingent 1 6,000.00 6,000.00 6,000.00 3,964,939 12 Holden Creek Bridge Three Person Survey Sum 6,000.00 6,000.00 6,000.00 6,000.00

(#1520) Party 0.10% 0.15% 0.12% 0.12%

(38951/63571/1645) 7 Bids Tendered

2009 Dalton Highway MP 175 to 642(3A) Contingent 1 30,000.00 30,000.00 30,000.00 25,642,513 10 197 Rehabilitation Three Person Survey Sum 30,000.00 30,000.00 30,000.00 30,000.00

(5722/62860/1645) Party 0.11% 0.12% 0.12% 0.12%

7 Bids Tendered

2013 St. Mary's / Mountain 642(3A) Contingent 1 10,000.00 10,000.00 10,000.00 10,510,726 11 Village Road Three Person Survey Sum 10,000.00 10,000.00 10,000.00 10,000.00

Rehabilitation Party 0.09% 0.10% 0.09% 0.08%

(33343/60240/1645) 7 Bids Tendered

Page 131: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 131 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2009 Parks Hwy MP 287-305 642(3A) Contingent 1 15,000.00 15,000.00 15,000.00 7,091,346 09 Rehabilitation And Three Person Survey Sum 15,000.00 15,000.00 15,000.00 15,000.00

Resurface Party 0.15% 0.21% 0.19% 0.19%

(20492/77137/1645) 6 Bids Tendered

2017 Old Nenana/Ester Hill 642(3A) Contingent 1 20,000.00 20,000.00 20,000.00 12,499,865 09 Rehabilitation Three Person Survey Sum 20,000.00 20,000.00 20,000.00 20,000.00

(46580/60455/1645) Party 0.17% 0.16% 0.14% 0.14%

3 Bids Tendered

2016 Taylor Highway MP 642(3A) Contingent 1 20,000.00 20,000.00 20,000.00 8,683,260 10 64-Canadian Border (MP Three Person Survey Sum 20,000.00 20,000.00 20,000.00 20,000.00

67 Construction) & Taylor Party 0.22% 0.23% 0.20% 0.18%

Highway New Waysides (FLAP) (45184/66446 & 60410/1645) 6 Bids Tendered

2016 YAK - Fish Passage 642(3A) Contingent 1 5,000.00 5,000.00 5,000.00 588,799 11 Improvements Three Person Survey Sum 5,000.00 5,000.00 5,000.00 5,000.00

(45726/Z680270000/1645) Party 0.84% 0.85% 0.84% 0.79%

7 Bids Tendered

2013 Parks Highway M P 642(3A) Contingent 1 20,000.00 20,000.00 20,000.00 28,866,904 11 239-252 Rehabilitation Three Person Survey Sum 20,000.00 20,000.00 20,000.00 20,000.00

(41926/61275/1645) Party 0.07% 0.07% 0.07% 0.07%

4 Bids Tendered

2016 Richardson Highway MP 642(3A) Contingent 1 10,000.00 10,000.00 10,000.00 5,769,321 11 235 Ruby Creek Bridge Three Person Survey Sum 10,000.00 10,000.00 10,000.00 10,000.00

#0594 Party 0.15% 0.17% 0.15% 0.15%

(46302/60262/1645) 8 Bids Tendered

2010 Richardson Highway Shaw 642(3A) Contingent 1 35,000.00 35,000.00 35,000.00 5,363,762 04 Creek Bridge No. 525 Three Person Survey Sum 35,000.00 35,000.00 35,000.00 35,000.00

(20032/62077/1645) Party 0.58% 0.65% 0.64% 0.62%

7 Bids Tendered

2016 Richardson Highway MP 642(3A) Contingent 1 10,000.00 10,000.00 10,000.00 327,000 11 235 Ruby Creek Bridge Three Person Survey Sum 10,000.00 10,000.00 10,000.00 10,000.00

#0594 MESSED UP Party 0.15% 3.06% 3.06% 3.06%

(44549/60262/1645) 8 Bids Tendered

2012 False Pass Airport Access 642(3A) Contingent 1 7,500.00 7,500.00 7,500.00 1,655,094 12 Road Resurfacing and Three Person Survey Sum 7,500.00 7,500.00 7,500.00 7,500.00

Bridge Repair Party 0.59% 0.45% 0.39% 0.38%

(39295/57109/1645) 5 Bids Tendered

2017 Dalton Highway MP 642(3A) Contingent 1 100,000.00 100,000.00 100,000.00 31,994,827 01 362-379 Reconstruction Three Person Survey Sum 100,000.00 100,000.00 100,000.00 100,000.00

(46042/63816/1645) Party 0.29% 0.31% 0.28% 0.27%

4 Bids Tendered

Page 132: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 132 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2012 Glenn Highway M P 642(3A) Contingent 1 20,000.00 20,000.00 20,000.00 20,669,751 10 172-189 Rehabilitation Three Person Survey Sum 20,000.00 20,000.00 20,000.00 20,000.00

(38155/60922/1645) Party 0.09% 0.10% 0.10% 0.09%

9 Bids Tendered

2014 Parks Highway M P 194 642(3A) Contingent 1 0.00 0.00 0.00 20,669,482 04 Broad Pass RR Three Person Survey Sum 0.00 0.00 0.00 0.00

Overcrossing Party 0.00% 0.00% 0.00% 0.00% (42228/61277/1645) 6 Bids Tendered

2016 Tok Cutoff MP 0 - 24 642(3A) Contingent 1 20,000.00 20,000.00 20,000.00 6,367,197 11 Culvert Replacement Three Person Survey Sum 20,000.00 20,000.00 20,000.00 20,000.00

(45784/63017/1645) Party 0.28% 0.31% 0.26% 0.25%

9 Bids Tendered

2012 Emmonak Landfill Road & 642(3A) Contingent 1 24,000.00 24,000.00 24,000.00 6,748,620 10 Community Roads Three Person Survey Sum 24,000.00 24,000.00 24,000.00 24,000.00

(36449/61179 & Party 0.25% 0.36% 0.35% 0.35%

61307/1645) 8 Bids Tendered

2017 Farmers Loop Resurfacing 642(3A) Contingent 1 30,000.00 30,000.00 30,000.00 12,656,111 06 and Signal Interconnect Three Person Survey Sum 30,000.00 30,000.00 30,000.00 30,000.00

(47065//7552) Party 0.20% 0.24% 0.22% 0.22%

3 Bids Tendered

2011 Taylor Highway MP 70 642(3A) Contingent 1 50,000.00 50,000.00 50,000.00 1,656,700 05 Lost Chicken Slide Three Person Survey Sum 50,000.00 50,000.00 50,000.00 50,000.00

(32215/63379/1645) Party 1.94% 3.02% 2.64% 2.57%

9 Bids Tendered

2018 HSIP: Phillips Field Road 642(3A) Contingent 1 10,000.00 10,000.00 10,000.00 3,244,574 02 Safety Improvements and Three Person Survey Sum 10,000.00 10,000.00 10,000.00 0.00

Phillips Field Road - Party 0.27% 0.31% 0.31% 0.00%

Automated Vehicle Classification (46888//7552) 2 Bids Tendered

2014 Northern Region E R 642(3A) Contingent 1 70,000.00 70,000.00 70,000.00 2,342,885 04 Galena Ice Jam Flooding Three Person Survey Sum 70,000.00 70,000.00 0.00 0.00

(41787/62697/1645) Party 4.33% 2.99% 0.00% 0.00%

1 Bids Tendered

2012 Steese Highway MP 5-11 642(3A) Contingent 1 15,000.00 15,000.00 15,000.00 7,189,147 10 Resurfacing Three Person Survey Sum 15,000.00 15,000.00 15,000.00 15,000.00

(38319/63915/1645) Party 0.17% 0.21% 0.21% 0.19%

3 Bids Tendered

2012 Emmonak Landfill Road & 642(3A) Contingent 1 24,000.00 24,000.00 24,000.00 6,748,620 10 Community Roads Three Person Survey Sum 24,000.00 24,000.00 24,000.00 24,000.00

(36449/61179 & Party 0.25% 0.36% 0.35% 0.35%

61307/1645) 8 Bids Tendered

Page 133: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 133 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2011 Richardson Highway MP 642(3A) Contingent 1 50,000.00 50,000.00 50,000.00 9,722,159 10 228 One Mile Creek Three Person Survey Sum 50,000.00 50,000.00 50,000.00 50,000.00

Bridge Replacement & Party 0.39% 0.51% 0.50% 0.50%

Richardson Highway MP

228 Flood Permanent

Repairs (Oct '06)

(25917/61870/76791/1645)

9 Bids Tendered

2009 Emmonak Flood 642(3A) Contingent 1 9,000.00 9,000.00 9,000.00 1,945,115 07 Permanent Repairs Three Person Survey Sum 9,000.00 9,000.00 9,000.00 9,000.00

(May'05): Airport/Clinic Party 0.39% 0.46% 0.41% 0.39%

Road Bid Opened: 07/23/2009 (16392/62754/1645) 6 Bids Tendered

2018 Chicken Airport Access 642(3A) Contingent 1 10,000.00 10,000.00 10,000.00 518,974 06 Road Resurfacing Three Person Survey Sum 10,000.00 10,000.00 10,000.00 0.00

(48004//1645) Party 2.36% 1.93% 1.70% 0.00%

2 Bids Tendered

2016 Tok Cutoff MP 17 Tulsona 642(3A) Contingent 1 50,000.00 50,000.00 50,000.00 4,094,773 01 Creek Bridge #1250 Three Person Survey Sum 50,000.00 50,000.00 50,000.00 50,000.00

Replacement Party 1.26% 1.22% 1.18% 1.13%

(45044/64270/1645) 9 Bids Tendered

2009 Fort Yukon Dust Control 642(3A) Contingent 1 5,000.00 5,000.00 5,000.00 1,044,049 06 (22433/76917/1645) Three Person Survey Sum 5,000.00 5,000.00 5,000.00 0.00

2 Bids Tendered Party 0.37% 0.48% 0.36% 0.00%

2011 F M A T S Area Surface 642(3A) Contingent 1 25,000.00 25,000.00 25,000.00 677,767 07 Upgrades FFY2011 Three Person Survey Sum 25,000.00 25,000.00 25,000.00 25,000.00

(33057/63814/1645) Party 2.57% 3.69% 3.34% 2.64%

3 Bids Tendered

2012 Top of the World Highway 642(3A) Contingent 1 25,000.00 25,000.00 25,000.00 15,555,427 07 MP 0-13 Rehab Three Person Survey Sum 25,000.00 25,000.00 25,000.00 25,000.00

(33395/62799/1645) Party 0.13% 0.16% 0.16% 0.15%

5 Bids Tendered

2012 Valdez Tidal Flats Culvert 642(3A) Contingent 1 20,000.00 20,000.00 20,000.00 1,574,686 09 Replacement AK122 Three Person Survey Sum 20,000.00 20,000.00 20,000.00 20,000.00

(38113/63765/1645) Party 0.55% 1.27% 0.85% 0.42%

3 Bids Tendered

2012 Northern Region Deep 642(3A) Contingent 1 25,000.00 25,000.00 25,000.00 2,199,000 08 Culverts Replacement - Three Person Survey Sum 25,000.00 25,000.00 25,000.00 25,000.00

Stage 1 Party 1.12% 1.14% 0.92% 0.78%

(37444/61693/1645) 8 Bids Tendered

2010 23rd Avenue 642(3A) Contingent 1 10,000.00 10,000.00 10,000.00 2,405,270 07 Improvements Three Person Survey Sum 10,000.00 10,000.00 10,000.00 10,000.00

(28375/60745/1645) Party 0.35% 0.42% 0.38% 0.35%

3 Bids Tendered

Page 134: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 134 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2012 Galena Campion Road 642(3A) Contingent 1 30,000.00 30,000.00 30,000.00 9,879,854 10 Erosion Protection Three Person Survey Sum 30,000.00 30,000.00 30,000.00 30,000.00

(38511/61653/1645) Party 0.31% 0.30% 0.29% 0.27%

8 Bids Tendered

2013 Goldstream Road 642(3A) Contingent 1 60,000.00 60,000.00 60,000.00 16,585,844 04 Improvements & Fairbanks Three Person Survey Sum 60,000.00 60,000.00 60,000.00 60,000.00

Area Spot Intersection Party 0.35% 0.36% 0.36% 0.34%

Improvements (39958/63513 & 60264/1645) 4 Bids Tendered

2011 Northern Region Deferred 642(3A) Contingent 1 5,000.00 5,000.00 5,000.00 634,448 06 Maintenance F Y11: Three Person Survey Sum 5,000.00 5,000.00 5,000.00 5,000.00

Dawson, Lineman & Party 0.62% 0.79% 0.75% 0.66%

Newby Resurfacing (33271/63639/1645) 3 Bids Tendered

2009 Phillips Field Road 642(3A) Contingent 1 6,000.00 6,000.00 6,000.00 1,588,185 09 Upgrade Three Person Survey Sum 6,000.00 6,000.00 6,000.00 6,000.00

(23832/65199/1645) Party 0.21% 0.38% 0.36% 0.33%

4 Bids Tendered

2013 Richardson Hwy MP 201 642(3A) Contingent 1 50,000.00 50,000.00 50,000.00 3,915,515 04 Phelan Creek Bridge Three Person Survey Sum 50,000.00 50,000.00 50,000.00 50,000.00

#0579 Party 1.09% 1.28% 1.17% 1.11%

(40312/63519/1645) 6 Bids Tendered

2015 Tok Cutoff M P 24-30 642(3A) Contingent 1 20,000.00 20,000.00 20,000.00 4,112,844 05 Resurfacing Three Person Survey Sum 20,000.00 20,000.00 20,000.00 20,000.00

(43646/62188/1645) Party 0.43% 0.49% 0.48% 0.43%

4 Bids Tendered

2015 Parks Highway MP 235 642(3A) Contingent 1 3,000.00 3,000.00 3,000.00 607,950 08 Drainage Improvements Three Person Survey Sum 3,000.00 3,000.00 0.00 0.00

(44211/62176 & Party 0.60% 0.49% 0.00% 0.00%

62914/1645) 1 Bids Tendered

2010 Wendell Avenue ADA 642(3A) Contingent 1 5,000.00 5,000.00 5,000.00 1,573,111 07 Improvements Three Person Survey Sum 5,000.00 5,000.00 5,000.00 0.00

(29033/60827/1645) Party 0.32% 0.32% 0.28% 0.00%

2 Bids Tendered

2015 HSIP: CR Sign Assembly 642(3A) Contingent 1 10,000.00 10,000.00 10,000.00 3,319,315 11 Improvements 2015 Three Person Survey Sum 10,000.00 10,000.00 10,000.00 10,000.00

(45259/57587/1645) Party 0.31% 0.30% 0.27% 0.24%

4 Bids Tendered

2014 Parks Hwy MP 237 Riley 642(3A) Contingent 1 10,000.00 10,000.00 10,000.00 10,727,261 08 Creek Bridge Three Person Survey Sum 10,000.00 10,000.00 0.00 0.00

Replacement Party 0.09% 0.09% 0.00% 0.00%

(42954/63763/1645) 2 Bids Tendered

2014 Hurst Road Resurfacing 642(3A) Hour 100 250.00 261.67 275.00 2,595,968 10 (42903/63037/1645) Three Person Survey 100.00 275.00 260.00 250.00

3 Bids Tendered Party 0.28% 1.06% 0.93% 0.81%

Page 135: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 135 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2017 Steese Expressway to 642(3A) Contingent 1 5,000.00 5,000.00 5,000.00 858,231 03 Front Street Three Person Survey Sum 5,000.00 5,000.00 5,000.00 5,000.00

Bicycle/Pedestrian Path Party 0.55% 0.58% 0.54% 0.50%

(45878/62836/1645) 4 Bids Tendered

2011 Richardson Highway MP 642(3A) Contingent 1 25,000.00 25,000.00 25,000.00 27,434,902 03 148-159 Reconstruction Three Person Survey Sum 25,000.00 25,000.00 25,000.00 25,000.00

(1642/76727/1645) Party 0.08% 0.09% 0.09% 0.08%

8 Bids Tendered

2018 Northern Region River 642(3A) Contingent 1 20,000.00 20,000.00 20,000.00 3,612,284 06 Encroachment Repairs - Three Person Survey Sum 20,000.00 20,000.00 20,000.00 20,000.00

Richardson Highway MP Party 0.39% 0.55% 0.40% 0.38%

1-16 (47740//1645) 4 Bids Tendered

2014 Tok Cutoff M P 50-60 642(3A) Contingent 1 20,000.00 20,000.00 20,000.00 5,671,025 10 Resurfacing Three Person Survey Sum 20,000.00 20,000.00 20,000.00 20,000.00

(41360/62190/1645) Party 0.25% 0.35% 0.32% 0.30%

6 Bids Tendered

2014 Elliot Highway M P 107.7 642(3A) Contingent 1 100,000.00 100,000.00 100,000.00 19,656,000 10 To 120.5 Reconstruction Three Person Survey Sum 100,000.00 100,000.00 100,000.00 100,000.00

(42896/62227/1645) Party 0.40% 0.51% 0.43% 0.40%

9 Bids Tendered

2010 Geist Road Rehabilitation 642(3A) Contingent 1 7,500.00 7,500.00 7,500.00 2,139,893 09 (28993/63360/1645) Three Person Survey Sum 7,500.00 7,500.00 7,500.00 7,500.00

3 Bids Tendered Party 0.29% 0.35% 0.33% 0.30%

2014 Tok Cutoff M P 104 Tok 642(3A) Contingent 1 10,000.00 10,000.00 10,000.00 11,699,696 11 River Bridge #0663 Three Person Survey Sum 10,000.00 10,000.00 10,000.00 10,000.00

(43365/63565/1645) Party 0.10% 0.09% 0.08% 0.08%

7 Bids Tendered

2012 Nome Snake River Bridge 642(3A) Contingent 1 16,000.00 16,000.00 16,000.00 8,584,329 05 Replacement Three Person Survey Sum 16,000.00 16,000.00 16,000.00 16,000.00

(19492/76745/1645) Party 0.17% 0.19% 0.18% 0.18%

5 Bids Tendered

2015 Plack Road 642(3A) Contingent 1 8,000.00 8,000.00 8,000.00 2,329,969 02 Bicycle/Pedestrian Facility Three Person Survey Sum 8,000.00 8,000.00 8,000.00 8,000.00

(43167/77248/1645) Party 0.33% 0.34% 0.32% 0.31%

4 Bids Tendered

2017 Richardson Highway MP 642(3A) Contingent 1 18,000.00 18,000.00 18,000.00 1,364,112 06 337 Eielson AFB Three Person Survey Sum 18,000.00 18,000.00 18,000.00 18,000.00

Intersection Improvements Party 1.05% 1.32% 1.31% 1.14%

(46282//7552) 3 Bids Tendered

2015 Edgerton Highway Lakina 642(3A) Contingent 1 15,000.00 15,000.00 15,000.00 7,766,987 05 River Bridge Replacement Three Person Survey Sum 15,000.00 15,000.00 15,000.00 15,000.00

(44157/63905/1645) Party 0.26% 0.19% 0.18% 0.16%

4 Bids Tendered

Page 136: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 136 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2011 Seward Hwy 642(3A) Hour 250 275.00 298.00 332.00 39,452,755 10 Reconstruction: Dowling Three Person Survey 300.00 300.00 275.00 285.00

Rd to Tudor Rd Party 0.16% 0.19% 0.17% 0.16% (34838/50816/1645) 4 Bids Tendered

2018 Nenana Little Goldstream 642(3A) Contingent 1 20,000.00 20,000.00 20,000.00 936,532 01 Bridge Replacement Three Person Survey Sum 20,000.00 20,000.00 20,000.00 20,000.00

(#2080) (45491//1645) Party 1.22% 2.14% 2.12% 2.00%

9 Bids Tendered

2015 Tok Cutoff MP 75.6 Slana 642(3A) Contingent 1 20,000.00 20,000.00 20,000.00 7,125,000 11 River Bridge #0654 Three Person Survey Sum 20,000.00 20,000.00 20,000.00 20,000.00

(43476/63567/1645) Party 0.27% 0.28% 0.23% 0.23%

6 Bids Tendered

2012 Parks Highway M P 642(3A) Contingent 1 10,000.00 10,000.00 10,000.00 12,580,165 05 252-263 Rehabilitation Three Person Survey Sum 10,000.00 10,000.00 10,000.00 10,000.00

(33781/63655/1645) Party 0.07% 0.08% 0.08% 0.08%

7 Bids Tendered

2014 Chena Small Tracts 642(3A) Contingent 1 6,000.00 6,000.00 6,000.00 1,063,885 09 Improvements Three Person Survey Sum 6,000.00 6,000.00 6,000.00 6,000.00

(41972/60260/1645) Party 0.51% 0.56% 0.54% 0.51%

4 Bids Tendered

2017 Ktn Roosevelt Dr & 642(3A) Contingent 1 6,000.00 6,000.00 6,000.00 1,624,145 03 Franklin Rd Pavement Three Person Survey Sum 6,000.00 6,000.00 6,000.00 0.00

Rehab. Party 0.36% 0.37% 0.30% 0.00%

(44698/68663/1645) 2 Bids Tendered

2014 Doyle Road Improvements 642(3A) Contingent 1 10,000.00 10,000.00 10,000.00 1,691,090 06 (42055/61669/1645) Three Person Survey Sum 10,000.00 10,000.00 10,000.00 0.00

2 Bids Tendered Party 0.71% 0.59% 0.56% 0.00%

2015 SGY- Klondike Highway 642(3A) Contingent 1 5,000.00 5,000.00 5,000.00 1,549,720 10 Repairs Three Person Survey Sum 5,000.00 5,000.00 5,000.00 0.00

(43123/Z684800000/1645) Party 0.37% 0.32% 0.32% 0.00%

2 Bids Tendered

2009 Chena Hot Springs Road 642(3A) Contingent 1 15,000.00 15,000.00 15,000.00 9,525,695 03 MP 24-56 Rehabilitation: Three Person Survey Sum 15,000.00 15,000.00 15,000.00 15,000.00

Bids Opened 03/12/2009 Party 0.13% 0.16% 0.16% 0.15%

(17952/61425/1645) 7 Bids Tendered

2018 FIA Water Infrastructure 642(3A) Contingent 1 25,000.00 25,000.00 25,000.00 1,357,045 06 FY2018 (48383//1645) Three Person Survey Sum 25,000.00 25,000.00 25,000.00 25,000.00

4 Bids Tendered Party 1.51% 1.84% 1.50% 1.35%

2009 Alaska Highway: Tanana 642(3A) Contingent 1 50,000.00 50,000.00 50,000.00 30,650,414 02 River Bridge #505: Bids Three Person Survey Sum 50,000.00 50,000.00 50,000.00 50,000.00

Opened 02/26/2009 Party 0.16% 0.16% 0.16% 0.15%

(18134/61637/61253/1141) 8 Bids Tendered

2010 Northern Region Highway 642(3A) Contingent 1 15,000.00 15,000.00 15,000.00 377,662 10 Sign Replacement Three Person Survey Sum 15,000.00 15,000.00 15,000.00 15,000.00

(16332/62761/1645) Party 2.69% 3.97% 2.81% 2.55%

8 Bids Tendered

Page 137: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 137 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2012 Nome Emergency Repairs 642(3A) Contingent 1 30,000.00 30,000.00 30,000.00 9,340,824 03 November 2011 Three Person Survey Sum 30,000.00 30,000.00 30,000.00 30,000.00

(36021/61696/1143) Party 0.35% 0.32% 0.32% 0.31%

8 Bids Tendered

2009 Tok Cutoff Gakona River 642(3A) Contingent 1 15,000.00 15,000.00 15,000.00 6,488,641 05 Bridge Replacement #646 Three Person Survey Sum 15,000.00 15,000.00 15,000.00 15,000.00

(19852/61713/1645) Party 0.24% 0.23% 0.21% 0.20%

5 Bids Tendered

2012 68688 - Klw To Hollis Pvmt 642(3A) Contingent 1 20,000.00 20,000.00 20,000.00 12,913,532 02 Rehab - Final Estimate Three Person Survey Sum 20,000.00 20,000.00 20,000.00 20,000.00

(35641/68688/1645) Party 0.13% 0.15% 0.15% 0.14%

3 Bids Tendered

2012 Dalton Hwy 9 Mile Hill 642(3A) Contingent 1 50,000.00 50,000.00 50,000.00 5,342,262 02 North (31053/64899/1143) Three Person Survey Sum 50,000.00 50,000.00 50,000.00 50,000.00

6 Bids Tendered Party 0.68% 0.94% 0.88% 0.79%

2012 Mccarthy Road Upgrades 642(3A) Contingent 1 15,000.00 15,000.00 15,000.00 3,369,611 02 (28774/77129/1645) Three Person Survey Sum 15,000.00 15,000.00 15,000.00 15,000.00

6 Bids Tendered Party 0.39% 0.45% 0.39% 0.36%

2012 Nome - Council Road M P 642(3A) Contingent 1 30,000.00 30,000.00 30,000.00 11,967,372 04 4-16 (36424/66166/1645) Three Person Survey Sum 30,000.00 30,000.00 30,000.00 30,000.00

11 Bids Tendered Party 0.24% 0.25% 0.25% 0.24%

2012 University Ave Asphalt 642(3A) Contingent 1 36,000.00 36,000.00 36,000.00 1,368,111 04 Surface Repairs Three Person Survey Sum 36,000.00 36,000.00 36,000.00 36,000.00

(33592/60762/1645) Party 1.84% 2.63% 2.36% 2.32%

3 Bids Tendered

2012 South Cushman Street - 642(3A) Contingent 1 15,000.00 15,000.00 15,000.00 3,098,636 01 Mitchell Expressway To Three Person Survey Sum 15,000.00 15,000.00 15,000.00 15,000.00

Sanduri Street Party 0.43% 0.48% 0.46% 0.44%

(33536/63289/1645) 4 Bids Tendered

2015 Richardson Hwy Milepoint 642(3A) Contingent 1 20,000.00 20,000.00 20,000.00 961,510 09 2 Improvements Three Person Survey Sum 20,000.00 20,000.00 0.00 0.00

(43385/62125/1645) Party 1.62% 2.08% 0.00% 0.00%

1 Bids Tendered

2010 Tok Cut Off M P 0-2 and M 642(3A) Contingent 1 15,000.00 15,000.00 15,000.00 9,258,998 10 P 5-24 Resurfacing Three Person Survey Sum 15,000.00 15,000.00 15,000.00 15,000.00

(28413/63364/1645) Party 0.12% 0.16% 0.16% 0.14%

7 Bids Tendered

2015 POW-Big Salt Lake Rd 642(3A) Contingent 1 5,000.00 5,000.00 5,000.00 2,452,963 10 Resurfacing, Steelhead Three Person Survey Sum 5,000.00 5,000.00 5,000.00 0.00

River to Thorne Bay Rd Party 0.14% 0.20% 0.19% 0.00%

(43175/68084/1645) 2 Bids Tendered

2010 Tok Bike Path 642(3A) Contingent 1 30,000.00 30,000.00 30,000.00 2,034,860 10 Rehabilitation Three Person Survey Sum 30,000.00 30,000.00 30,000.00 30,000.00

(26935/63501/1645) Party 1.11% 1.47% 1.43% 1.43%

5 Bids Tendered

Page 138: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 138 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2012 Dalton Highway MP 11-18 642(3A) Contingent 1 100,000.00 100,000.00 100,000.00 16,424,452 01 Reconstruction Three Person Survey Sum 100,000.00 100,000.00 100,000.00 100,000.00

(35478/62196/1143) Party 0.45% 0.61% 0.60% 0.51%

9 Bids Tendered

2012 Healy Community Roads 642(3A) Contingent 1 8,000.00 8,000.00 8,000.00 1,078,338 07 Rehabilitation / Surfacing Three Person Survey Sum 8,000.00 8,000.00 8,000.00 8,000.00

(37308/63786/1645) Party 0.64% 0.74% 0.56% 0.52%

3 Bids Tendered

2015 Bennett Road Resurfacing 642(3A) Contingent 1 30,000.00 30,000.00 30,000.00 961,036 02 (44212/63911/7552) Three Person Survey Sum 30,000.00 30,000.00 30,000.00 30,000.00

3 Bids Tendered Party 1.79% 3.12% 2.82% 2.50%

2015 Alaska Highway MP 642(3A) Contingent 1 20,000.00 20,000.00 20,000.00 9,525,913 09 1354-1365 Rehabilitation Three Person Survey Sum 20,000.00 20,000.00 20,000.00 20,000.00

(41425/61271/1645) Party 0.19% 0.21% 0.20% 0.18%

5 Bids Tendered

2011 Dalton Highway MP 642(3A) Contingent 1 30,000.00 30,000.00 30,000.00 23,953,284 11 197-209 Rehabilitation Three Person Survey Sum 30,000.00 30,000.00 30,000.00 30,000.00

(33732/61214/1143) Party 0.13% 0.13% 0.12% 0.11%

7 Bids Tendered

2010 Steese Hwy M P 62-81 642(3A) Contingent 1 60,000.00 60,000.00 60,000.00 20,807,850 11 Surface Treatment Three Person Survey Sum 60,000.00 60,000.00 60,000.00 60,000.00

(30374/60916/1143) Party 0.27% 0.29% 0.28% 0.28%

5 Bids Tendered

2014 Haines Ferry Terminal 642(3A) CONTINGENT 1 15,000.00 15,000.00 15,000.00 14,979,745 05 Improvements THREE PERSON SUM 15,000.00 15,000.00 15,000.00 15,000.00

(39251/68433/1645) SURVEY PARTY 0.15% 0.10% 0.09% 0.09%

4 Bids Tendered

2016 Yak- Dangerous River 642(3A) Contingent 1 5,000.00 5,000.00 5,000.00 1,229,352 03 Road Resurfacing THREE PERSON Sum 5,000.00 5,000.00 5,000.00 0.00

(44965/68753/0) SURVEY PARTY 0.49% 0.41% 0.37% 0.00%

2 Bids Tendered

2014 South Cushman Street 642(3A) Contingent 1 30,000.00 30,000.00 30,000.00 6,138,597 05 Resurfacing & THREE PERSON Sum 30,000.00 30,000.00 30,000.00 30,000.00

South Cushman Sidewalk SURVEY PARTY 0.45% 0.49% 0.47% 0.44%

and Drainage Improvements (42473/62687 & 62532/1645) 3 Bids Tendered

2014 Road to Tanana-Stage 1 642(3A).NTP1 Contingent 1 100,000.00 100,000.00 100,000.00 10,650,925 05 (42658/61759/1645) Three Person Survey Sum 100,000.00 100,000.00 100,000.00 100,000.00

5 Bids Tendered Party 0.83% 0.94% 0.85% 0.65%

2014 Road to Tanana-Stage 1 642(3A).NTP2 Contingent 1 75,000.00 75,000.00 75,000.00 10,650,925 05 (42658/61759/1645) Three Person Survey Sum 75,000.00 75,000.00 75,000.00 75,000.00

5 Bids Tendered Party 0.62% 0.70% 0.64% 0.49%

Page 139: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 139 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 Parks Highway M P 642(3A)-A Contingent 1 10,000.00 10,000.00 10,000.00 29,587,321 11 163-305 Passing Lanes - Three Person Survey Sum 10,000.00 10,000.00 10,000.00 10,000.00

Stage 1 & Parks Highway Party 0.03% 0.03% 0.03% 0.03%

M P 163-305 Passing Lanes - Stage 2 - H S I P (41707/62683 & 62685/1645) 5 Bids Tendered

2016 Taylor Highway MP 642(3A)-A Contingent 1 4,000.00 4,000.00 4,000.00 8,683,260 10 64-Canadian Border (MP Three Person Survey Sum 4,000.00 4,000.00 4,000.00 4,000.00

67 Construction) & Taylor Party 0.04% 0.05% 0.04% 0.04%

Highway New Waysides (FLAP) (45184/66446 & 60410/1645) 6 Bids Tendered

2018 Elliott Highway MP 0-12 642(3A)-A Contingent 1 50,000.00 50,000.00 50,000.00 24,869,247 05 Rehabilitation, Northern Three Person Survey Sum 50,000.00 50,000.00 50,000.00 50,000.00

Region Deep Culverts Party 0.19% 0.20% 0.18% 0.17%

Stage II, HSIP: Fox Intersection Conspicuity Improvements (48044//1645) 4 Bids Tendered

2017 Farmers Loop Resurfacing 642(3A)-A Contingent 1 7,400.00 7,400.00 7,400.00 12,656,111 06 and Signal Interconnect Three Person Survey Sum 7,400.00 7,400.00 7,400.00 7,400.00

(47065//7552) Party 0.05% 0.06% 0.05% 0.05%

3 Bids Tendered

2013 Parks Highway M P 642(3A)-B Contingent 1 40,000.00 40,000.00 40,000.00 29,587,321 11 163-305 Passing Lanes - Three Person Survey Sum 40,000.00 40,000.00 40,000.00 40,000.00

Stage 1 & Parks Highway Party 0.10% 0.14% 0.13% 0.13%

M P 163-305 Passing Lanes - Stage 2 - H S I P (41707/62683 & 62685/1645) 5 Bids Tendered

2018 Elliott Highway MP 0-12 642(3A)-B Contingent 1 5,000.00 5,000.00 5,000.00 24,869,247 05 Rehabilitation, Northern Three Person Survey Sum 5,000.00 5,000.00 5,000.00 5,000.00

Region Deep Culverts Party 0.02% 0.02% 0.02% 0.02%

Stage II, HSIP: Fox Intersection Conspicuity Improvements (48044//1645) 4 Bids Tendered

2012 Petersburg Road 642(3-Alt1) HOUR 5 250.00 275.00 300.00 3,761,496 07 Improvements/Sewer Main THREE PERSON 300.00 250.00 300.00 0.00

Repairs SURVEY PARTY 0.05% 0.03% 0.04% 0.00% (38103/67879/68165/0) 2 Bids Tendered

Page 140: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 140 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2012 Petersburg Road 642(3-Alt2) HOUR 5 250.00 275.00 300.00 3,761,496 07 Improvements/Sewer Main THREE PERSON 300.00 250.00 300.00 0.00

Repairs SURVEY PARTY 0.05% 0.03% 0.04% 0.00% (38103/67879/68165/0) 2 Bids Tendered

2012 Petersburg Road 642(3-Alt3) HOUR 5 250.00 275.00 300.00 3,761,496 07 Improvements/Sewer Main THREE PERSON 300.00 250.00 300.00 0.00

Repairs SURVEY PARTY 0.05% 0.03% 0.04% 0.00% (38103/67879/68165/0) 2 Bids Tendered

2012 Kipnuk Boardwalk 642(4) AA1 Each 11 0.00 138.35 300.00 11,975,883 06 Improvements Phase II Set Primary Monument 200.00 175.00 300.00 105.00

Final PS&E 0.02% 0.02% 0.02% 0.01% (38038/57181/1144) 6 Bids Tendered

2012 Kipnuk Boardwalk 642(4) AA2 Each 19 0.00 143.84 300.00 11,975,883 06 Improvements Phase II Set Primary Monument 200.00 175.00 300.00 110.00

Final PS&E 0.03% 0.03% 0.04% 0.01% (38038/57181/1144) 6 Bids Tendered

2012 Kipnuk Boardwalk 642(4) BB Each 67 115.00 264.27 700.00 11,975,883 06 Improvements Phase II Set Primary Monument 200.00 175.00 300.00 115.00

Final PS&E 0.12% 0.10% 0.15% 0.05% (38038/57181/1144) 6 Bids Tendered

2016 Glacier Highway 642(4) EACH 16 1,000.00 1,000.00 1,000.00 13,394,988 12 Reconstruction: Fritz Cove PRIMARY 1,000.00 1,000.00 1,000.00 0.00

Road To Seaview Avenue MONUMENT 0.11% 0.12% 0.12% 0.00%

(46359/Z684710000/0) 2 Bids Tendered

2013 JNU-Glacier Highway 642(4) Each 3 432.00 2,977.33 6,000.00 25,154,532 12 Brotherhood Bridge Set Primary Monument 350.00 2,500.00 432.00 6,000.00

Replacement 0.00% 0.03% 0.00% 0.06%

(34037/67987/1144) 3 Bids Tendered

2016 Goldhill Road Bicycle And 642(4) Each 21 800.00 1,051.47 1,450.00 2,864,888 04 Pedestrian Facility Set Primary Monument 2,000.00 1,450.00 800.00 1,000.00

(45033/63293/7553) 1.29% 1.06% 0.56% 0.69%

4 Bids Tendered

Page 141: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 141 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2012 Hns - Beach Rd. 642(4) Each 1 750.00 750.00 750.00 3,934,144 06 Widening & Front St. Set Primary Monument 300.00 750.00 0.00 0.00

Intersection Improvements 0.01% 0.02% 0.00% 0.00% Hns - Old Haines Highway Sidewalk Construction (36444/69316 & 69178/1144) 1 Bids Tendered

2015 Egan Drive Pavement 642(4) Each 6 600.00 650.00 700.00 16,614,244 12 rehabilitation - 10th Street Set Primary Monument 1,000.00 600.00 700.00 0.00

to Mendenhall Loop Road 0.03% 0.02% 0.02% 0.00% Project Number

NH-0932(049)~Z681290000

Salmon Creek Intersection

Safety Improvements Project

Number

EBL-0932(051)~Z69575

(45232/68129/1144)

2 Bids Tendered

2013 JNU - Stephen Richards 642(4) Each 3 70.00 285.00 500.00 1,214,605 08 Safety And Capacity Set Primary Monument 500.00 70.00 500.00 0.00

Improvements - REBID 0.15% 0.02% 0.11% 0.00% (40112/68740/1144) 2 Bids Tendered

2012 Sawmill Creek Road 642(4) Each 24 550.00 709.00 1,000.00 11,789,167 11 Upgrade Set Primary Monument 500.00 1,000.00 550.00 577.00

(37924/68216/1144) 0.10% 0.20% 0.10% 0.11%

3 Bids Tendered

2012 F M A T S - Palo Verde 642(4) Each 6 1,000.00 1,383.33 2,150.00 536,334 10 Ave & North Pole East 5th Set Primary Monument 850.00 2,150.00 1,000.00 1,000.00

Ave Resurfacing 0.59% 2.41% 1.09% 0.93%

(36425/61905/1144) 3 Bids Tendered

2016 Hns - Klehini River Bridge 642(4) Each 3 500.00 1,370.00 3,000.00 6,703,504 03 Replacement And Transfer Set Primary Monument 1,000.00 1,450.00 500.00 3,000.00

(34258/69377/1144) 0.04% 0.06% 0.02% 0.09%

5 Bids Tendered

2014 Hurst Road Resurfacing 642(4) Each 6 1,200.00 1,216.67 1,250.00 2,595,968 10 (42903/63037/1144) Set Primary Monument 1,800.00 1,200.00 1,250.00 1,200.00

3 Bids Tendered 0.30% 0.28% 0.27% 0.23%

2011 Jnu - Glacier Hwy - North 642(4) Each 26 250.00 343.33 430.00 10,369,300 09 Eagle Beach Kayak Set Primary Monument 500.00 250.00 350.00 430.00

Launch to Bessie Creek 0.10% 0.06% 0.08% 0.09% (32656/67526/1144) 3 Bids Tendered

2011 Girdwood Streets And 642(4) Each 2 100.00 169.10 700.00 2,834,021 09 Drainage Improvements Set Primary Monument 400.00 108.00 115.00 108.00

(34095/57057/1144) 0.02% 0.01% 0.01% 0.01% 10 Bids Tendered

Page 142: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 142 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Edgerton Highway Lakina 642(4) Each 2 500.00 1,156.83 1,787.50 7,766,987 05 River Bridge Replacement Set Primary Monument 500.00 1,787.50 939.80 1,400.00

(44157/63905/1144) 0.02% 0.05% 0.02% 0.03%

4 Bids Tendered

2016 Richardson Highway MP 642(4) Each 13 400.00 478.00 700.00 8,986,166 07 24-35 Resurfacing Set Primary Monument 1,500.00 400.00 700.00 440.00

(45918/n/a/1144) 0.19% 0.06% 0.09% 0.05% 5 Bids Tendered

2012 Angoon Areawide Paving 642(4) Each 4 500.00 583.33 750.00 1,209,315 11 (38070/67460/1144) Set Primary Monument 300.00 500.00 500.00 750.00

3 Bids Tendered 0.08% 0.17% 0.14% 0.17%

2015 SGY- Klondike Highway 642(4) Each 3 500.00 1,000.00 1,500.00 1,549,720 10 Repairs Set Primary Monument 1,000.00 1,500.00 500.00 0.00

(43123/Z684800000/1144) 0.22% 0.29% 0.10% 0.00%

2 Bids Tendered

2011 JNU-Thane Road 642(4) Each 23 400.00 400.00 400.00 4,059,696 10 Pavement Rehabilitation Set Primary Monument 300.00 400.00 0.00 0.00

(28053/69340/1144) 0.16% 0.23% 0.00% 0.00% 1 Bids Tendered

2013 JNU - Thane Road HSIP 642(4) Each 5 500.00 500.00 500.00 1,298,675 06 (33305/69331/1144) Set Primary Monument 300.00 500.00 0.00 0.00

1 Bids Tendered 0.13% 0.19% 0.00% 0.00%

2012 KTN North Tongass 642(4) Each 13 85.00 292.50 500.00 2,232,313 11 Pavement Rehabilitation Set Primary Monument 400.00 500.00 85.00 0.00

(38072/67477/1144) 0.18% 0.29% 0.04% 0.00% 2 Bids Tendered

2011 Hyder-Salmon River Road 642(4) Each 17 500.00 1,003.33 1,650.00 7,440,684 08 Rehabilitation Set Primary Monument 900.00 500.00 860.00 1,650.00

(11216/68602/1144) 0.24% 0.11% 0.16% 0.27%

3 Bids Tendered

2014 Fritz Cove Road 642(4) Each 34 440.00 520.00 600.00 3,115,745 11 Rehabilitation And Repair Set Primary Monument 500.00 600.00 440.00 0.00

(36604/69397/1144) 0.46% 0.65% 0.33% 0.00% 2 Bids Tendered

2013 KTN- North Tongass 642(4) Each 12 250.00 400.00 550.00 9,118,342 03 Highway (Ward Cove to Set Primary Monument 300.00 250.00 550.00 0.00

Refuge Cove) 0.04% 0.03% 0.07% 0.00% (29055/68973/1144) 2 Bids Tendered

2014 Cordova Point Whitshed 642(4) Each 6 60.00 1,086.67 1,700.00 2,180,349 08 Road M P 0-3 Asphalt Set Primary Monument 500.00 1,700.00 1,500.00 60.00

Surface Repairs 0.16% 0.47% 0.39% 0.01%

(41879/64020/1144) 3 Bids Tendered

2010 Richardson Highway M P 642(4) Each 9 500.00 850.00 2,000.00 2,980,832 02 265-267 Rehabilitation & Set Primary Monument 1,250.00 500.00 550.00 550.00

Resurfacing 0.31% 0.15% 0.16% 0.15%

(25033/63146/1144) 6 Bids Tendered

Page 143: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 143 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2017 Ktn: Front, Mill, And 642(4) Each 4 2,000.00 2,000.00 2,000.00 9,681,105 11 Stedman Streets Set Primary Monument 1,000.00 2,000.00 0.00 0.00

Reconstruction 0.05% 0.08% 0.00% 0.00%

(47761/Z681600000/0) 1 Bids Tendered

2009 Yak-Area wide Paving 642(4) Each 44 450.00 500.00 550.00 5,317,010 10 (25013/68345/1144) Set Primary Monument 500.00 500.00 550.00 450.00

3 Bids Tendered 0.31% 0.41% 0.39% 0.29%

2009 Sawmill Creek Road - 642(4) Each 4 500.00 883.33 1,200.00 1,983,405 03 Halibut Point Road Set Primary Monument 500.00 1,200.00 950.00 500.00

Roundabout 0.09% 0.24% 0.19% 0.10%

(19212/68999/1144) 3 Bids Tendered

2009 JNU - Glacier Highway * 642(4) Each 26 320.00 440.00 500.00 9,793,198 06 Trailhead Stage II - Set Primary Monument 300.00 320.00 500.00 500.00

Amalga Harbor to Kayak 0.08% 0.08% 0.13% 0.12% Launch (19996/68832/1144) 3 Bids Tendered

2014 F M A T S Area Surface 642(4) Each 14 1,000.00 1,520.00 2,150.00 1,642,460 09 Upgrades F F Y 2014 Set Primary Monument 2,000.00 1,000.00 1,500.00 2,150.00

(42061/63372/1144) 1.69% 0.85% 1.24% 1.69%

4 Bids Tendered

2009 Alaska Highway M P 642(4) Each 22 250.00 722.86 1,375.00 3,747,075 10 1412-1422 Rehabilitation Set Primary Monument 5,000.00 675.00 1,375.00 700.00

(17052/61777/1144) 2.47% 0.40% 0.76% 0.38%

7 Bids Tendered

2009 HAINES HIGHWAY - Front 642(4) Each 5 750.00 750.00 750.00 1,833,512 07 Street To Union Street Set Primary Monument 500.00 750.00 0.00 0.00

Rehabilitation 0.11% 0.20% 0.00% 0.00% (20894/68948/1144) 1 Bids Tendered

2010 Wendell Avenue ADA 642(4) Each 2 800.00 1,150.00 1,500.00 1,573,111 07 Improvements Set Primary Monument 450.00 1,500.00 800.00 0.00

(29033/60827/1144) 0.06% 0.19% 0.09% 0.00%

2 Bids Tendered

2011 Yakutat Area Wide Paving, 642(4) Each 44 200.00 316.67 500.00 6,821,536 04 Yakutat Airport Runway Set Primary Monument 500.00 500.00 200.00 250.00

11-29 Pavement Repairs, 0.32% 0.32% 0.12% 0.15% CBY Utilities RE-BID (26973//1144) 3 Bids Tendered

2010 23rd Avenue 642(4) Each 8 350.00 566.67 900.00 2,405,270 07 Improvements Set Primary Monument 450.00 450.00 900.00 350.00

(28375/60745/1144) 0.12% 0.15% 0.27% 0.10% 3 Bids Tendered

2017 Keku Road 642(4) Each 36 400.00 933.33 1,800.00 4,654,967 05 (42702/Z695390000/0) Set Primary Monument 600.00 400.00 1,800.00 0.00

3 Bids Tendered 0.45% 0.31% 0.88% 0.00%

Page 144: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 144 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2017 Haines Highway 642(4) Each 40 500.00 1,162.50 2,650.00 36,149,513 11 Reconstruction Milepost Set Primary Monument 800.00 1,000.00 2,650.00 500.00

3.9 to 12.2, Phase 1 0.09% 0.11% 0.29% 0.05%

(47539//1144) 4 Bids Tendered

2011 Glacier Highway Extension 642(4) Each 16 500.00 658.33 900.00 2,556,698 04 (32937/69583/1144) Set Primary Monument 500.00 575.00 900.00 500.00

3 Bids Tendered 0.26% 0.36% 0.49% 0.18%

2016 Skagway - Replace 642(4) Each 2 683.00 1,046.60 1,550.00 18,907,426 12 Captain William Henry Set Primary Monument 1,300.00 1,550.00 1,000.00 1,000.00

Moore Bridge 0.02% 0.02% 0.01% 0.01%

(46281//1144) 5 Bids Tendered

2010 JNU-North Douglas 642(4) Each 28 200.00 444.00 702.00 4,884,352 11 Highway Pavement Set Primary Monument 500.00 200.00 702.00 430.00

Rehabilitation 0.22% 0.11% 0.28% 0.16% (26855/69633/1648) 3 Bids Tendered

2010 JNU-FFY09 Areawide 642(4) Each 21 175.00 287.50 400.00 1,068,730 03 Paving Set Primary Monument 450.00 175.00 400.00 0.00

(24834/68837/1144) 0.73% 0.34% 0.67% 0.00% 2 Bids Tendered

2009 Emmonak Flood 642(4) Each 7 600.00 813.81 1,000.00 1,945,115 07 Permanent Repairs Set Primary Monument 850.00 1,000.00 640.00 1,000.00

(May'05): Airport/Clinic 0.26% 0.36% 0.21% 0.31%

Road Bid Opened: 07/23/2009 (16392/62754/1144) 6 Bids Tendered

2010 KTN-Totem Bight To 642(4) Each 8 300.00 542.50 785.00 8,744,515 03 Whipple Creek Set Primary Monument 300.00 300.00 785.00 0.00

(17733/67443/1144) 0.02% 0.03% 0.07% 0.00% 2 Bids Tendered

2013 69003 Glacier Hwy And 642(4) EACH 7 400.00 450.00 500.00 5,031,578 05 Back Loop Rd Intersection SET PRIMARY 500.00 400.00 500.00 0.00

Safety Improvements MONUMENT 0.08% 0.06% 0.07% 0.00% (40432/69003/1144) 2 Bids Tendered

2011 VICTOR ROAD: 100TH 642(4) EACH 7 150.00 225.17 500.00 6,242,977 11 AVENUE TO DIMOND SET PRIMARY 800.00 156.00 150.00 500.00

BLVD. MONUMENT 0.07% 0.02% 0.02% 0.05% (35419/55027/1144) 6 Bids Tendered

2015 JNU Glacier Hwy. 642(4)a Each 4 1,200.00 1,600.00 2,500.00 2,092,727 09 Multi-Use Separated Path Set Primary Monument 500.00 1,500.00 2,500.00 1,200.00

to UAS 0.08% 0.29% 0.44% 0.18%

(42928/69500/1144) 4 Bids Tendered

Page 145: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 145 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2011 JNU-Thane Road 642(4)Alt A Each 2 400.00 400.00 400.00 4,059,696 10 Pavement Rehabilitation Set Primary Monument 300.00 400.00 0.00 0.00

(28053/69340/1144) 0.01% 0.02% 0.00% 0.00% 1 Bids Tendered

2011 JNU-Thane Road 642(4)Alt B Each 2 400.00 400.00 400.00 4,059,696 10 Pavement Rehabilitation Set Primary Monument 300.00 400.00 0.00 0.00

(28053/69340/1144) 0.01% 0.02% 0.00% 0.00% 1 Bids Tendered

2016 Glacier Highway 642(5) EACH 5 1,000.00 1,100.00 1,200.00 13,394,988 12 Reconstruction: Fritz Cove SECONDARY 1,000.00 1,000.00 1,200.00 0.00

Road To Seaview Avenue MONUMENT 0.03% 0.04% 0.04% 0.00%

(46359/Z684710000/0) 2 Bids Tendered

2013 Steese Highway Birch 642(5) Each 8 50.00 1,172.39 7,125.00 588,125 04 Creek Boat Launch Set Secondary 1,000.00 50.00 600.00 450.00

(40077/76591/1646) Monument 0.99% 0.07% 0.77% 0.55%

10 Bids Tendered

2014 Fritz Cove Road 642(5) Each 2 400.00 420.00 440.00 3,115,745 11 Rehabilitation And Repair Set Secondary 400.00 400.00 440.00 0.00

(36604/69397/1646) Monument 0.02% 0.03% 0.02% 0.00% 2 Bids Tendered

2011 Girdwood Streets And 642(5) Each 3 75.00 144.70 700.00 2,834,021 09 Drainage Improvements Set Secondary 200.00 81.00 75.00 81.00

(34095/57057/1646) Monument 0.02% 0.01% 0.01% 0.01% 10 Bids Tendered

2017 Ktn: Front, Mill, And 642(5) Each 22 410.00 410.00 410.00 9,681,105 11 Stedman Streets Set Secondary 500.00 410.00 0.00 0.00

Reconstruction Monument 0.13% 0.09% 0.00% 0.00% (47761/Z681600000/0) 1 Bids Tendered

2012 Parks Highway M P 642(5) Each 6 500.00 629.29 1,000.00 12,580,165 05 252-263 Rehabilitation Set Secondary 300.00 500.00 500.00 600.00

(33781/63655/1646) Monument 0.01% 0.02% 0.02% 0.03%

7 Bids Tendered

2014 Cordova Point Whitshed 642(5) Each 12 30.00 810.00 1,400.00 2,180,349 08 Road M P 0-3 Asphalt Set Secondary 450.00 1,400.00 1,000.00 30.00

Surface Repairs Monument 0.29% 0.77% 0.52% 0.01%

(41879/64020/1646) 3 Bids Tendered

2013 69003 Glacier Hwy And 642(5) EACH 10 300.00 400.00 500.00 5,031,578 05 Back Loop Rd Intersection SET SECONDARY 500.00 300.00 500.00 0.00

Safety Improvements MONUMENT 0.12% 0.06% 0.10% 0.00% (40432/69003/1646) 2 Bids Tendered

2014 NORDIC DRIVE & 642(6) EACH 28 275.00 387.50 500.00 8,362,244 12 HAUGEN DRIVE REFERENCE AND 800.00 500.00 275.00 0.00

(43571/68048 & REPLACE EXISTING 0.27% 0.17% 0.08% 0.00% 69518/1138) WITH PRIMARY 2 Bids Tendered MONUMENT

Page 146: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 146 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 SGY- Klondike Highway 642(6) Each 3 300.00 400.00 500.00 1,549,720 10 Repairs Reference Existing 600.00 300.00 500.00 0.00

(43123/Z684800000/1138) Monument 0.13% 0.06% 0.10% 0.00% 2 Bids Tendered

2012 University Ave Asphalt 642(6) Each 7 800.00 1,100.00 1,500.00 1,368,111 04 Surface Repairs Replace Existing with 2,500.00 1,500.00 800.00 1,000.00

(33592/60762/1138) Primary Monument 0.90% 0.77% 0.37% 0.45%

3 Bids Tendered

2016 Goldhill Road Bicycle And 642(6) Each 2 955.87 1,110.22 1,385.00 2,864,888 04 Pedestrian Facility Replace Existing with 1,200.00 1,385.00 1,100.00 1,000.00

(45033/63293/1138) Primary Monument 0.07% 0.10% 0.07% 0.07%

4 Bids Tendered

2016 Fairbanks Noble Street 642(6) Each 16 320.00 1,064.25 1,750.00 9,545,573 12 Upgrade Replace Existing with 1,050.00 600.00 1,750.00 320.00

(45722/61725/1138) Primary Monument 0.16% 0.10% 0.29% 0.05%

4 Bids Tendered

2018 FMATS Area Surface 642(6) Each 32 1,600.00 1,916.67 2,150.00 2,540,774 04 Upgrades FFY2018 Replace Existing with 2,000.00 2,000.00 1,600.00 2,150.00

(47333/90243/1138) Primary Monument 2.14% 2.52% 1.99% 2.47%

3 Bids Tendered

2015 College Road Pavement 642(6) Each 25 1,200.00 1,283.33 1,400.00 7,090,895 04 Rehabilitation & College Replace Existing with 1,200.00 1,250.00 1,400.00 1,200.00

Rd/Antoinette Primary Monument 0.44% 0.44% 0.48% 0.38%

Ave/Margaret Ave Intersection Reconstruction (44449/62164 / 62854/1138) 3 Bids Tendered

2018 FMATS Yukon Drive 642(6) Each 2 1,000.00 1,612.50 2,350.00 2,077,001 05 Improvements Replace Existing with 2,000.00 2,350.00 1,000.00 1,400.00

(46581//1138) Primary Monument 0.16% 0.23% 0.10% 0.13%

4 Bids Tendered

2016 Denali Highway Seattle 642(6) Each 1 500.00 797.67 2,000.00 3,617,128 01 Creek Bridge Replace Existing with 3,000.00 2,000.00 525.00 500.00

Replacement Primary Monument 0.09% 0.06% 0.01% 0.01%

(45226/61912/1138) 9 Bids Tendered

2010 Nordale Road Pavement 642(6) Each 3 650.00 1,108.33 1,675.00 1,748,183 05 Rehabilitation - FMATS Replace Existing with 4,000.00 1,675.00 650.00 1,000.00

(Badger Road to Chena Primary Monument 0.48% 0.29% 0.11% 0.16%

River) (28033/63158/1138) 3 Bids Tendered

Page 147: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 147 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 Taylor Highway MP 642(6) Each 1 650.00 1,719.11 3,000.00 8,683,260 10 64-Canadian Border (MP Replace Existing with 500.00 3,000.00 650.00 2,000.00

67 Construction) & Taylor Primary Monument 0.01% 0.03% 0.01% 0.02%

Highway New Waysides (FLAP) (45184/66446 & 60410/1138) 6 Bids Tendered

2009 Alaska Highway M P 642(6) Each 72 350.00 406.67 500.00 11,696,889 12 1222-1235 Rehabilitation Replace Existing with 575.00 400.00 400.00 420.00

(26075/60519/1138) Primary Monument 0.25% 0.25% 0.24% 0.24% 6 Bids Tendered

2016 Richardson Highway MP 642(6) Each 34 400.00 478.00 700.00 8,986,166 07 24-35 Resurfacing Replace Existing with 1,000.00 400.00 700.00 440.00

(45918/n/a/1138) Primary Monument 0.33% 0.15% 0.23% 0.14% 5 Bids Tendered

2012 Dalton Highway MP 11-18 642(6) Each 7 368.00 763.11 1,500.00 16,424,452 01 Reconstruction Replace Existing With 1,000.00 650.00 400.00 600.00

(35478/62196/1138) Primary Monument 0.03% 0.03% 0.02% 0.02%

9 Bids Tendered

2012 South Cushman Street - 642(6) Each 7 1,000.00 1,625.00 2,500.00 3,098,636 01 Mitchell Expressway To Replace Existing With 1,500.00 1,000.00 2,000.00 2,500.00

Sanduri Street Primary Monument 0.30% 0.23% 0.42% 0.51%

(33536/63289/1138) 4 Bids Tendered

2017 FMATS Area Surface 642(6) Each 6 1,250.00 1,583.33 1,900.00 1,290,111 06 Upgrades FFY 2017 Replace Existing With 1,250.00 1,900.00 1,600.00 1,250.00

(46184//7555) Primary Monument 0.54% 0.88% 0.72% 0.49%

3 Bids Tendered

2013 Nordale Road 642(6) Each 2 700.00 1,165.00 1,995.00 4,442,893 02 Rehabilitation Replace Existing With 4,000.00 700.00 1,995.00 800.00

(39751/62166/1138) Primary Monument 0.18% 0.03% 0.09% 0.03%

3 Bids Tendered

2012 Parks Highway M P 642(6) Each 1 500.00 925.00 1,500.00 12,580,165 05 252-263 Rehabilitation Replace Existing With 1,000.00 500.00 1,000.00 925.00

(33781/63655/1138) Primary Monument 0.01% 0.00% 0.01% 0.01%

7 Bids Tendered

2017 Farmers Loop Resurfacing 642(6) Each 29 500.00 650.00 900.00 12,656,111 06 and Signal Interconnect Replace Existing With 350.00 550.00 900.00 500.00

(47065//7555) Primary Monument 0.07% 0.13% 0.19% 0.11% 3 Bids Tendered

2010 Geist Road Rehabilitation 642(6) Each 7 800.00 1,016.67 1,250.00 2,139,893 09 (28993/63360/1138) Replace Existing With 3,500.00 1,000.00 1,250.00 800.00

3 Bids Tendered Primary Monument 0.96% 0.33% 0.38% 0.23%

2011 Girdwood Streets And 642(6) Each 8 125.00 196.00 700.00 2,834,021 09 Drainage Improvements Replace Existing With 350.00 135.00 150.00 135.00

(34095/57057/1138) Primary Monument 0.08% 0.04% 0.04% 0.03% 10 Bids Tendered

Page 148: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 148 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 WRG Zimovia Pavement 642(6) Each 1 1,000.00 1,200.00 1,600.00 7,822,574 01 Rehabilitation Replace Existing With 500.00 1,000.00 1,000.00 1,600.00

(38064/67425/1138) Primary Monument 0.01% 0.01% 0.01% 0.02%

3 Bids Tendered

2011 Copper River Highway MP 642(6) Each 28 200.00 692.86 1,400.00 4,102,329 09 0-6 Resurfacing Replace Existing With 1,000.00 1,200.00 500.00 350.00

(32933/63804/1138) Primary Monument 0.51% 0.82% 0.32% 0.23%

7 Bids Tendered

2015 FMATS Area Surface & 642(6) Each 15 1,500.00 2,033.33 2,500.00 541,111 07 Approach Upgrades Replace Existing With 2,000.00 2,100.00 1,500.00 2,500.00

FFY2015 Primary Monument 5.23% 5.82% 3.63% 5.04%

(44227/64103/7555) 3 Bids Tendered

2016 F M A T S Area Surface 642(6) Each 14 950.00 1,150.00 1,300.00 782,631 07 Upgrades F F Y 2016 Replace Existing With 2,000.00 1,200.00 950.00 1,300.00

(45472//7555) Primary Monument 3.14% 2.15% 1.66% 1.82%

3 Bids Tendered

2013 KTN- North Tongass 642(6) Each 4 250.00 400.00 550.00 9,118,342 03 Highway (Ward Cove to Replace Existing With 300.00 250.00 550.00 0.00

Refuge Cove) Primary Monument 0.01% 0.01% 0.02% 0.00% (29055/68973/1138) 2 Bids Tendered

2015 Richardson Highway 642(6) Each 9 630.00 815.00 1,000.00 3,271,889 09 Milepoint 0-3.6 Asphalt Replace Existing With 1,000.00 1,000.00 630.00 0.00

Surface Repairs Primary Monument 0.20% 0.28% 0.17% 0.00%

(45127/60435/1138) 2 Bids Tendered

2015 Alaska Highway MP 642(6) Each 20 500.00 680.00 1,000.00 9,525,913 09 1354-1365 Rehabilitation Replace Existing With 700.00 800.00 500.00 500.00

(41425/61271/1138) Primary Monument 0.13% 0.17% 0.10% 0.09%

5 Bids Tendered

2011 Northern Region Deferred 642(6) Each 3 550.00 1,083.33 1,500.00 634,448 06 Maintenance F Y11: Replace Existing With 1,000.00 550.00 1,500.00 1,200.00

Dawson, Lineman & Primary Monument 0.37% 0.26% 0.68% 0.47%

Newby Resurfacing (33271/63639/1138) 3 Bids Tendered

2018 (67509 & 00057) Hns Hwy 642(6) EACH 9 800.00 800.00 800.00 6,157,603 07 & Old Haines Hwy Replace Existing With 1,000.00 800.00 0.00 0.00

Resurface, Hns Airport Primary Monument 0.16% 0.12% 0.00% 0.00% Access Rd. (48265/00057/67509/1138) 1 Bids Tendered

Page 149: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 149 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Airport Way Preventive 642(6) Each 11 300.00 626.67 1,250.00 8,240,476 05 Maintenance - Stage II, Replace Existing With 800.00 1,250.00 330.00 300.00

Northern Region Signal Primary Monument 0.12% 0.17% 0.04% 0.04%

Interconnect - Airport

Way/Peger Road &

Northern Region

Pedestrian Improvements

(44455/63278/62489/60520/1138)

2013 JNU - Thane Road HSIP 642(6) Each 5 500.00 500.00 500.00 1,298,675 06 (33305/69331/1138) Replace Existing With 200.00 500.00 0.00 0.00

1 Bids Tendered Primary Monument 0.09% 0.19% 0.00% 0.00%

2015 Plack Road 642(6) Each 2 600.00 1,400.00 2,400.00 2,329,969 02 Bicycle/Pedestrian Facility Replace Existing With 500.00 2,400.00 600.00 1,200.00

(43167/77248/1138) Primary Monument 0.04% 0.21% 0.05% 0.09%

4 Bids Tendered

2013 Combined: Gustavus Ferry 642(6) Each 2 1,000.00 1,250.00 1,500.00 3,598,291 05 Terminal AK139/ Gustavus Replace Existing With 1,000.00 1,500.00 1,000.00 0.00

Areawide Paving Primary Monument 0.04% 0.08% 0.05% 0.00%

(39353/69139/ 67416/1138) 2 Bids Tendered

2013 Parks Highway M P 642(6) Each 20 500.00 650.00 850.00 28,866,904 11 239-252 Rehabilitation Replace Existing With 700.00 500.00 750.00 500.00

(41926/61275/1138) Primary Monument 0.05% 0.03% 0.05% 0.03% 4 Bids Tendered

2015 Jnu - Glacier Highway 642(6) Each 11 550.00 1,025.00 1,500.00 3,491,195 10 Pavement Rehabilitation Replace Existing With 500.00 550.00 1,500.00 0.00

Point Lena To Tee Harbor Primary Monument 0.12% 0.17% 0.45% 0.00%

(44347/67564/7555) 2 Bids Tendered

2013 Airport Way Preventive 642(6) Each 8 620.00 1,190.00 1,950.00 5,388,089 10 Maintenance - Stage I Replace Existing With 800.00 1,950.00 620.00 1,000.00

(41617/60921/1138) Primary Monument 0.11% 0.29% 0.09% 0.14%

3 Bids Tendered

2011 Illinois Street 642(6) EACH 7 600.00 1,137.50 1,750.00 21,965,863 12 Reconstruction REPLACE EXISTING 500.00 600.00 1,200.00 1,750.00

(33274/63102/1138) WITH PRIMARY 0.02% 0.02% 0.04% 0.05%

4 Bids Tendered MONUMENT

2016 City of Fairbanks 642(6)-A Each 6 680.00 1,293.33 2,000.00 2,311,182 05 Pedestrian Facilities Replace Existing with 2,000.00 2,000.00 1,200.00 680.00

Upgrade and Aurora & Primary Monument 0.43% 0.52% 0.28% 0.15%

Auburn Drive Resurfacing (45744/62127/N/A/7555) 3 Bids Tendered

Page 150: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 150 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2016 FMATS Pedestrian 642(6)-B Each 17 300.00 883.33 1,350.00 8,963,033 04 Improvements - Stage I, Replace Existing with 2,000.00 300.00 1,000.00 1,350.00

Peger Road Resurfacing, Primary Monument 0.30% 0.06% 0.18% 0.22%

& Northern Region Signal Interconnect - Mitchell to Johansen (45600/61661, 63035, & N/A/1138) 3 Bids Tendered

2014 NORDIC DRIVE & 642(7) Each 39 165.00 332.50 500.00 8,362,244 12 HAUGEN DRIVE REFERENCE AND 800.00 500.00 165.00 0.00

(43571/68048 & REPLACE EXISTING 0.37% 0.23% 0.07% 0.00% 69518/1139) WITH SECONDARY 2 Bids Tendered MONUMENT

2017 Ktn: Front, Mill, And 642(7) Each 25 360.00 360.00 360.00 9,681,105 11 Stedman Streets Replace Existing with 1,000.00 360.00 0.00 0.00

Reconstruction Secondary Monument 0.30% 0.09% 0.00% 0.00% (47761/Z681600000/0) 1 Bids Tendered

2016 Fairbanks Noble Street 642(7) Each 16 160.00 786.75 1,587.00 9,545,573 12 Upgrade Replace Existing with 1,050.00 600.00 800.00 160.00

(45722/61725/1139) Secondary Monument 0.16% 0.10% 0.13% 0.02%

4 Bids Tendered

2016 Goldhill Road Bicycle And 642(7) Each 10 420.00 654.36 1,100.00 2,864,888 04 Pedestrian Facility Replace Existing with 1,000.00 1,100.00 420.00 500.00

(45033/63293/1139) Secondary Monument 0.31% 0.38% 0.14% 0.16%

4 Bids Tendered

2016 City of Fairbanks 642(7) Each 10 500.00 810.00 1,250.00 2,311,182 05 Pedestrian Facilities Replace Existing with 500.00 1,250.00 500.00 680.00

Upgrade and Aurora & Secondary Monument 0.18% 0.54% 0.19% 0.25%

Auburn Drive Resurfacing (45744/62127/N/A/7556) 3 Bids Tendered

2012 Parks Highway M P 642(7) Each 2 500.00 917.86 1,500.00 12,580,165 05 252-263 Rehabilitation Replace Existing With 300.00 500.00 1,000.00 625.00

(33781/63655/1139) Secondary Monument 0.00% 0.01% 0.02% 0.01%

7 Bids Tendered

2018 (67509 & 00057) Hns Hwy 642(7) EACH 1 860.00 860.00 860.00 6,157,603 07 & Old Haines Hwy Replace Existing With 550.00 860.00 0.00 0.00

Resurface, Hns Airport Secondary Monument 0.01% 0.01% 0.00% 0.00% Access Rd. (48265/00057/67509/1139) 1 Bids Tendered

2011 Girdwood Streets And 642(7) Each 5 75.00 147.70 700.00 2,834,021 09 Drainage Improvements Replace Existing With 250.00 81.00 75.00 81.00

(34095/57057/1139) Secondary Monument 0.04% 0.01% 0.01% 0.01% 10 Bids Tendered

Page 151: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 151 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2014 South Cushman Street 642(7) Each 23 400.00 1,000.00 2,000.00 6,138,597 05 Resurfacing & REPLACE EXISTING 1,200.00 600.00 400.00 2,000.00

South Cushman Sidewalk WITH SECONDARY 0.41% 0.22% 0.14% 0.67%

and Drainage MONUMENT Improvements (42473/62687 & 62532/1139) 3 Bids Tendered

2011 Illinois Street 642(7) EACH 11 350.00 962.50 1,700.00 21,965,863 12 Reconstruction REPLACE EXISTING 500.00 350.00 1,200.00 1,700.00

(33274/63102/1139) WITH SECONDARY 0.02% 0.02% 0.06% 0.08%

4 Bids Tendered MONUMENT

2016 Skagway - Replace 642(8) Each 1 456.00 851.20 1,000.00 18,907,426 12 Captain William Henry Adjust Existing 1,000.00 800.00 1,000.00 1,000.00

Moore Bridge Monument 0.01% 0.00% 0.00% 0.00%

(46281//1647) 5 Bids Tendered

2016 Kenai Spur Highway: MP 642(8) Each 22 450.00 500.00 600.00 7,898,726 04 8-12.4 Pavement Adjust Existing 300.00 500.00 450.00 600.00

Preservation; Kenai Spur Monument 0.06% 0.14% 0.11% 0.14% Highway: MP 9.8 & MP 10.2 Culvert Replacement; Bicycle-Pedestrian Facilities Rehabilitation and Improvements (45736//1647) 4 Bids Tendered

2018 WRG - Evergreen Ave. 642(8) Each 19 600.00 600.00 600.00 4,674,097 04 Improvements and Adjust Existing 700.00 600.00 600.00 0.00

Pedestrian Access Monument 0.28% 0.24% 0.24% 0.00% (43122/Z680290000/1144) 2 Bids Tendered

2012 Glenn Highway Path 642(8) Each 5 500.00 530.00 600.00 5,399,662 07 Rehabilitation: Muldoon Adjust Existing 300.00 500.00 600.00 520.00

Rd to North Birchwood Monument 0.03% 0.05% 0.06% 0.04% (38202/55659/1647) 4 Bids Tendered

2010 KTN Water Street 642(8) Each 7 430.00 810.00 1,000.00 1,752,375 04 Sidewalk Adjust Existing 500.00 1,000.00 1,000.00 430.00

(26238/69345/1647) Monument 0.17% 0.40% 0.35% 0.12%

3 Bids Tendered

Page 152: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 152 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Raspberry Road: Jewel 642(8) Each 4 400.00 400.00 400.00 6,769,856 09 Lake - Minnesota Adjust Existing 3,000.00 400.00 400.00 0.00

Pavement Preservation Monument 0.15% 0.02% 0.02% 0.00% HSIP: Jewel Lake Rd At Raspberry Rd. East - West Left Turn Lanes (45141/56727 58760/1647)

2017 Seward Road 642(8) Each 12 300.00 575.00 1,000.00 2,946,524 03 Improvements Adjust Existing 500.00 1,000.00 500.00 300.00

(46779/N/A/1647) Monument 0.21% 0.41% 0.19% 0.11%

4 Bids Tendered

2009 PSG - Mitkof HWY - Scow 642(8) Each 31 500.00 693.00 1,000.00 4,592,240 06 Bay to Crystal Lake Adjust Existing 300.00 500.00 579.00 1,000.00

Hatchery Road Monument 0.16% 0.34% 0.31% 0.45%

(18612/68819/1647) 3 Bids Tendered

2011 Girdwood Streets And 642(8) Each 5 90.00 168.30 700.00 2,834,021 09 Drainage Improvements Adjust Existing 200.00 110.00 115.00 108.00

(34095/57057/1647) Monument 0.03% 0.02% 0.02% 0.02% 10 Bids Tendered

2009 HAINES HIGHWAY - Front 642(8) Each 1 480.00 480.00 480.00 1,833,512 07 Street To Union Street Adjust Existing 500.00 480.00 0.00 0.00

Rehabilitation Monument 0.02% 0.03% 0.00% 0.00% (20894/68948/1647) 1 Bids Tendered

2013 Ketchikan-Waterfront 642(8) Each 1 1,200.00 1,700.00 2,200.00 759,170 12 Promenade - Phase III Adjust Existing 500.00 1,200.00 2,200.00 0.00

(41422/68162/1647) Monument 0.08% 0.16% 0.24% 0.00%

2 Bids Tendered

2009 Wasilla Gravel Roads 642(8) EACH 5 0.00 516.67 1,250.00 363,263 04 Paving ADJUST EXISTING 250.00 700.00 150.00 700.00

(19874/58165/1647) MONUMENT 0.21% 0.96% 0.19% 0.80%

6 Bids Tendered

2009 Yak-Area wide Paving 642(9) Each 44 125.00 318.33 500.00 5,317,010 10 (25013/68345/1140) Reference Existing 250.00 500.00 125.00 330.00

3 Bids Tendered Monument 0.16% 0.41% 0.09% 0.21%

2013 JNU - Thane Road HSIP 642(9) Each 5 500.00 500.00 500.00 1,298,675 06 (33305/69331/1140) Reference Existing 200.00 500.00 0.00 0.00

1 Bids Tendered Monument 0.09% 0.19% 0.00% 0.00%

2012 Juneau-Yandukin Drive / 642(9) Each 18 500.00 500.00 500.00 1,896,296 11 Shell Simmons Drive Reference Existing 500.00 500.00 0.00 0.00

(36724/68045/1140) Monument 0.48% 0.47% 0.00% 0.00% 1 Bids Tendered

2010 JNU-Glacier Spur Road 642(9) Each 3 100.00 100.00 100.00 1,135,309 06 (Pavement Rehabilitation) Reference Existing 400.00 100.00 0.00 0.00

(20472/69348/1140) Monument 0.11% 0.03% 0.00% 0.00% 1 Bids Tendered

Page 153: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 153 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2013 JNU - Stephen Richards 642(9) Each 3 633.00 696.50 760.00 1,214,605 08 Safety And Capacity Reference Existing 300.00 633.00 760.00 0.00

Improvements - REBID Monument 0.09% 0.16% 0.17% 0.00% (40112/68740/1140) 2 Bids Tendered

2010 JNU-North Douglas 642(9) Each 3 100.00 351.67 585.00 4,884,352 11 Highway Pavement Reference Existing 400.00 100.00 585.00 370.00

Rehabilitation Monument 0.02% 0.01% 0.03% 0.02% (26855/69633/1140) 3 Bids Tendered

2013 JNU-Glacier Highway 642(9) Each 3 324.00 908.00 2,000.00 25,154,532 12 Brotherhood Bridge Reference Existing 125.00 400.00 324.00 2,000.00

Replacement Monument 0.00% 0.00% 0.00% 0.02%

(34037/67987/1140) 3 Bids Tendered

2014 Fritz Cove Road 642(9) Each 5 400.00 420.00 440.00 3,115,745 11 Rehabilitation And Repair Reference Existing 500.00 400.00 440.00 0.00

(36604/69397/1140) Monument 0.07% 0.06% 0.05% 0.00% 2 Bids Tendered

2009 Emmonak Flood 642(9) Each 7 300.00 462.86 1,000.00 1,945,115 07 Permanent Repairs Reference Existing 400.00 300.00 320.00 1,000.00

(May'05): Airport/Clinic Monument 0.12% 0.11% 0.10% 0.31%

Road Bid Opened: 07/23/2009 (16392/62754/1140) 6 Bids Tendered

2012 Juneau-FFY12 Areawide 642(9) Each 7 500.00 500.00 500.00 1,678,831 11 Paving Reference Existing 500.00 500.00 0.00 0.00

(38026/67432/1140) Monument 0.20% 0.21% 0.00% 0.00% 1 Bids Tendered

2012 Sawmill Creek Road 642(9) Each 6 500.00 500.00 500.00 453,550 07 (37484/67427/1140) Reference Existing 500.00 500.00 0.00 0.00

1 Bids Tendered Monument 0.64% 0.66% 0.00% 0.00%

2017 Ktn: Front, Mill, And 642(9) Each 51 280.00 280.00 280.00 9,681,105 11 Stedman Streets Reference Existing 500.00 280.00 0.00 0.00

Reconstruction Monument 0.31% 0.15% 0.00% 0.00% (47761/Z681600000/0) 1 Bids Tendered

2011 Haines-2nd Ave. - Union 642(9) Each 5 150.00 450.00 750.00 2,482,181 10 St. to Main St. & Allen Rd. Reference Existing 200.00 750.00 150.00 0.00

& Main St. Pavement Monument 0.04% 0.15% 0.02% 0.00% Rehabilitation (34343/69565/69568/1140) 2 Bids Tendered

2013 JNU-North Douglas 642(9) Each 36 200.00 375.00 550.00 4,522,796 12 Highway Pavement Reference Existing 500.00 200.00 550.00 0.00

Rehabilitation Monument 0.32% 0.16% 0.35% 0.00% (40794/67531/1140) 2 Bids Tendered

Page 154: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 154 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Egan Drive Pavement 642(9) Each 8 400.00 550.00 700.00 16,614,244 12 rehabilitation - 10th Street Reference Existing 600.00 400.00 700.00 0.00

to Mendenhall Loop Road Monument 0.02% 0.02% 0.03% 0.00% Project Number

NH-0932(049)~Z681290000

Salmon Creek Intersection

Safety Improvements Project

Number

EBL-0932(051)~Z69575

(45232/68129/1140)

2 Bids Tendered

2012 Angoon Areawide Paving 642(9) Each 4 500.00 583.33 750.00 1,209,315 11 (38070/67460/1140) Reference Existing 250.00 500.00 500.00 750.00

3 Bids Tendered Monument 0.07% 0.17% 0.14% 0.17%

2009 Kenai Area Roads 642(9) Each 3 150.00 150.00 150.00 1,194,692 05 Resurfacing, 2009 (Gas Reference Existing 250.00 150.00 150.00 0.00

Well Road & Wendy Lane) Monument 0.05% 0.04% 0.04% 0.00% (21492/51595/1140) 2 Bids Tendered

2013 KTN- North Tongass 642(9) Each 4 135.00 192.50 250.00 9,118,342 03 Highway (Ward Cove to Reference Existing 300.00 250.00 135.00 0.00

Refuge Cove) Monument 0.01% 0.01% 0.01% 0.00% (29055/68973/1140) 2 Bids Tendered

2011 Yakutat Area Wide Paving, 642(9) Each 44 120.00 273.33 500.00 6,821,536 04 Yakutat Airport Runway Reference Existing 300.00 500.00 200.00 120.00

11-29 Pavement Repairs, Monument 0.19% 0.32% 0.12% 0.07% CBY Utilities RE-BID (26973//1140) 3 Bids Tendered

2011 Copper River Highway MP 642(9) Each 28 200.00 301.43 425.00 4,102,329 09 0-6 Resurfacing Reference Existing 500.00 300.00 300.00 350.00

(32933/63804/1140) Monument 0.25% 0.20% 0.19% 0.23% 7 Bids Tendered

2017 Farmers Loop Resurfacing 642(9) Each 29 270.00 290.00 300.00 12,656,111 06 and Signal Interconnect Reference Existing 350.00 270.00 300.00 300.00

(47065//7558) Monument 0.07% 0.06% 0.06% 0.06% 3 Bids Tendered

2012 Hns - Beach Rd. 642(9) Each 1 750.00 750.00 750.00 3,934,144 06 Widening & Front St. Reference Existing 200.00 750.00 0.00 0.00

Intersection Improvements Monument 0.01% 0.02% 0.00% 0.00% Hns - Old Haines Highway Sidewalk Construction (36444/69316 & 69178/1140) 1 Bids Tendered

2012 KTN North Tongass 642(9) Each 13 270.00 385.00 500.00 2,232,313 11 Pavement Rehabilitation Reference Existing 400.00 500.00 270.00 0.00

(38072/67477/1140) Monument 0.18% 0.29% 0.12% 0.00% 2 Bids Tendered

Page 155: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 155 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2009 Sawmill Creek Road - 642(9) Each 4 200.00 316.67 450.00 1,983,405 03 Halibut Point Road Reference Existing 300.00 200.00 450.00 300.00

Roundabout Monument 0.05% 0.04% 0.09% 0.06% (19212/68999/1140) 3 Bids Tendered

2010 JNU-FFY09 Areawide 642(9) Each 21 60.00 230.00 400.00 1,068,730 03 Paving Reference Existing 200.00 60.00 400.00 0.00

(24834/68837/1140) Monument 0.32% 0.12% 0.67% 0.00% 2 Bids Tendered

2011 Van Horn Road West ( 642(9) Each 4 200.00 250.00 275.00 1,198,184 05 Cartwright Road) Reference Existing 500.00 275.00 275.00 200.00

Improvements Monument 0.11% 0.09% 0.08% 0.06% (2484/Project No. 62056/1140) 3 Bids Tendered

2011 KTN-South Tongass 642(9) Each 8 250.00 250.00 250.00 1,219,195 07 Pavement Rehabilitation Reference Existing 300.00 250.00 0.00 0.00

(30814/69571/1140) Monument 0.20% 0.16% 0.00% 0.00% 1 Bids Tendered

2018 (67509 & 00057) Hns Hwy 642(9) EACH 1 400.00 400.00 400.00 6,157,603 07 & Old Haines Hwy Reference Existing 550.00 400.00 0.00 0.00

Resurface, Hns Airport Monument 0.01% 0.01% 0.00% 0.00% Access Rd. (48265/00057/67509/1140) 1 Bids Tendered

2011 Girdwood Streets And 642(9) Each 4 75.00 144.60 700.00 2,834,021 09 Drainage Improvements Reference Existing 200.00 80.00 75.00 81.00

(34095/57057/1140) Monument 0.02% 0.01% 0.01% 0.01% 10 Bids Tendered

2013 Halibut Point Road 642(9) Each 42 200.00 660.75 1,100.00 19,292,860 01 Pavement Rehab Reference Existing 300.00 682.25 1,100.00 200.00

(38459/69351/1140) Monument 0.06% 0.15% 0.23% 0.04%

3 Bids Tendered

2011 Hyder-Salmon River Road 642(9) Each 9 250.00 590.00 970.00 7,440,684 08 Rehabilitation Reference Existing 300.00 250.00 970.00 550.00

(11216/68602/1140) Monument 0.04% 0.03% 0.10% 0.05% 3 Bids Tendered

2009 Alaska Highway M P 642(9) Each 72 50.00 68.33 100.00 11,696,889 12 1222-1235 Rehabilitation Reference Existing 450.00 100.00 50.00 80.00

(26075/60519/1140) Monument 0.19% 0.06% 0.03% 0.05% 6 Bids Tendered

2013 69003 Glacier Hwy And 642(9) EACH 18 145.00 197.50 250.00 5,031,578 05 Back Loop Rd Intersection REFERENCE 250.00 145.00 250.00 0.00

Safety Improvements EXISTING 0.10% 0.05% 0.09% 0.00% (40432/69003/1140) MONUMENT 2 Bids Tendered

Page 156: dot.alaska.govdot.alaska.gov/nreg/precon/contracts/Historical_Bid... · 2020-04-29 · %642% %642% Page 1 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project (VersionID/Aksas/Ref

%642% %642% Page 156 of 160 Opened --Project Name Item Number Unit (f) Quantity Eng Project

(VersionID/Aksas/Ref. Description (f) (f) Est Min Avg Max Low Bid Std. ID)------ Bid Bid Bid Amount (f) 1406 Listed Low 2nd 3rd

Bidder Low Low % of Bidder Bidder Bid % of % of

Bid Bid

2015 Airport Way Preventive 642(9) Each 11 200.00 650.00 1,150.00 8,240,476 05 Maintenance - Stage II, Reference Existing 275.00 600.00 1,150.00 200.00

Northern Region Signal Monuments 0.04% 0.08% 0.15% 0.03%

Interconnect - Airport

Way/Peger Road &

Northern Region

Pedestrian Improvements

(44455/63278/62489/60520/1140)

2015 JNU Glacier Hwy. 642(9)a Each 4 500.00 887.50 1,200.00 2,092,727 09 Multi-Use Separated Path Reference Existing 500.00 500.00 1,000.00 1,200.00

to UAS Monument 0.08% 0.10% 0.18% 0.18%

(42928/69500/7558) 4 Bids Tendered

2016 FMATS Pedestrian 642(9)-B Each 17 150.00 583.17 1,349.51 8,963,033 04 Improvements - Stage I, Reference Existing 500.00 150.00 250.00 1,349.51

Peger Road Resurfacing, Monument 0.07% 0.03% 0.05% 0.22%

& Northern Region Signal Interconnect - Mitchell to Johansen (45600/61661, 63035, & N/A/1140) 3 Bids Tendered

2015 Seward Highway MP 50 to 642(99A) Lump 1 5,000.00 8,500.00 10,000.00 6,906,885 04 54.5 Pavement Bridge Survey Sum 7,500.00 10,000.00 9,000.00 5,000.00

Preservation and Cooper 0.12% 0.14% 0.13% 0.07%

Landing Walkable Community Project (44488/56685 54575/7198) 4 Bids Tendered