31
DOMAIN COMMUNITY REFERENCE GROUP Meeting #9 Wednesday 22 August 2018, Seasons Botanic Gardens

DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

DOMAIN COMMUNITY REFERENCE GROUP

Meeting #9

Wednesday 22 August 2018, Seasons Botanic Gardens

Page 2: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

INTRODUCTION

Page 3: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

CROSS YARRA PARTNERSHIPSEPTEMBER WORKS UPDATE

Page 4: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

CURRENT WORKS – NORTHERN BOX

Page 5: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

CURRENT WORKS – NORTHERN BOX

Page 6: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

CURRENT WORKS – SOUTHERN BOX

Page 7: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

CURRENT WORKS

Page 8: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

UPCOMING WORKS

NORTHERN BOX

• D-Wall works have commenced

• Pedestrian covered walkway to be installed near Melbourne Grammar School

Page 9: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

UPCOMING TRAFFIC CHANGES

• Road realignment works, Bowen Lane to Albert Road South

• Line marking works on St Kilda Road and pinning barriers

Page 10: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

BOWEN LANE TO ALBERT ROAD (DRAFT CONCEPT)

Page 11: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

UPCOMING WORKS

SOUTHERN BOX

• Ground Anchor removal

• Obstruction removal

• Guide wall construction

Page 12: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

TRUCK ROUTES

Page 13: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

TREE REMOVAL UPDATE

Page 14: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

DUST MANAGEMENT

• Minimise ground disturbance and stockpiling onsite• Dust suppression for exposed surfaces • Apply stabilising agent• Use water sprayers • Restrict vehicles to defined roads• Ensure all plant and equipment are fitted with appropriate emission

control equipment • Entry, exit and haul roads to be kept clean• Speed limits to be used on unsealed surfaces• Cover loads on trucks• Check weather forecasts

Page 15: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

CROSS YARRA PARTNERSHIPCOMMUNITY AND BUSINESS SUPPORT

MEASURES

Page 16: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

METRO TUNNEL CREATIVE PROGRAM OBJECTIVES

• Keep the city vibrant and moving

• Think laterally about space and place

• Remain quintessentially 'Melbourne' in our approach

• Stay true to local character

• Keep the city's areas active

• Keep Melbourne liveable

Page 17: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

METRO TUNNEL CREATIVE PROGRAM

• Focus is on the edge of construction

• Scope of the program is the scope of the project

• Primary stakeholder is the community experiencing disruption

• Disruption brings unique opportunity to showcase arts and creativity

• No cash sponsorships

• Robust measuring and reporting will shape future program

Page 18: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

COVERED WALKWAY- INSTALLED ARTWORK

• Gantry artwork designed by Esther Stewart

• Recently won ‘Best stall’ at Melbourne Art Fair

• Routed and painted ply installed into container to provide improved visual amenity

Page 19: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

DOMAIN ROAD POP UP

Purpose• Aimed to replenish green space and

public amenity lost through the establishment of the construction site

• Provide a temporary space for the public to utilise and enjoy

• Help support local businesses disrupted by construction works

Timing• Indicative install date of December

2018• Temporary in nature – 5 months in

place before removal

Car Parking • Temporary usage of 9 x parking bays

located on Domain Road, roughly from the shopfronts of Baker D.Chiricoto Botanical

• Car parking will be reinstated at the conclusion of activation

Street Trading• Retailers will have the opportunity to

extend footpath dining into Parkletspace for the length of the pop-up.

Page 20: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

DOMAIN ROAD PARKLETS

Page 21: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com
Page 22: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com
Page 23: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com
Page 24: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com
Page 25: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com
Page 26: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

WHAT’S NEXT?

ACTION DATES

Community Consultation & Feedback

August 24-September 14

Revised Designs (Based on Feedback)

Mid September

Final design and documentation Late September

Fabrication October – December

Installation on site December

HAVE YOUR SAY ONLINE

metrotunnel.vic.gov.au/about-the-project/creative-program

Page 27: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

YARRA TRAMSTRAM NOISE UPDATE

Page 28: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

NOISE MONITORING AND ASSESSMENTS

• Noise monitoring by Rail Projects Victoria (RPV)

• Yarra Trams two trials

– Crack Sealant

– Friction Modifier

Page 29: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

CRACK SEALANT TRIAL

• Sawcut 25mm either side of rail (Jul18)

• Noise measurement post sawcut

• Gap Sealant (14Aug18)

• Noise measurement post gap sealant installation

Page 30: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

FRICTION MODIFIER TRIAL

• Brake performance testing at Preston Tram Depot completed July

• Site application on St Kilda Road

– Pre test measurement of noise

– Friction modifier applied and water added

– Noise measured after application

– Marked reduction in noise

Page 31: DOMAIN COMMUNITY REFERENCE GROUP - WordPress.com

FRICTION MODIFIER TRIAL: NEXT STEPS

• Design

– Design without compromising existing track

– Restricted locations

– Power and drainage

• TSV approval process