67
DOCUMENT RESUME ED 401 964 JC 960 702 AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto College Student Equity Plan Update. INSTITUTION Mount San Jacinto Coll., San Jacinto, Calif. PUB DATE Sep 96 NOTE 99p.; For the original 1995 Plan, see ED 389 356. PUB TYPE Statistical Data (110) Reports Descriptive (141) EDRS PRICE MF01/PC04 Plus Postage. DESCRIPTORS *Access to Education; *Affirmative Action; *College Planning; Community Colleges; Educational Opportunities; Educational Policy; Educational Quality; *Equal Education; *Ethnic Groups; Minority Groups; *School Demography; Two Year Colleges IDENTIFIERS *Mount San Jacinto College CA ABSTRACT The Student Equity Plan developed by California's Mount San Jacinto College (MSJC) is intended to assure equal access of historically underrepresented and ethnic minority students while maintaining excellence in academic standards. This update provides current information on the goals and activities involved in the Plan. An executive summary reviews state legislation mandating the development of student equity plans, the goals and initiatives of the Plan, and student equity indicators used at MSJC. The second section provides background information to the development of the plan, while the third provides tables of results from surveys of faculty, staff, and students regarding the campus climate. The fourth section disctisses student access at MSJC, providing data on the percentages of ethnic groups in the college service area and student body and suggesting that the college's funding be increased in order to adequately serve all the students. Sections five through eight then provide data by ethnic group and gender on basic skills completion, successful course completion, degree and certificate completion, and transfer. The final section describes MSJC's annual review model. Each section includes tables which detail the barriers pertaining to that section, and implementation strategies for each barrier. (AJL) ***********************i.AA:c******************************************** Reproductions supplied by EDRS are the best that can be made from the original document. ***********************************************************************

DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

DOCUMENT RESUME

ED 401 964 JC 960 702

AUTHOR Baylard, Dana Reece; And OthersTITLE Mt. San Jacinto College Student Equity Plan

Update.INSTITUTION Mount San Jacinto Coll., San Jacinto, Calif.PUB DATE Sep 96NOTE 99p.; For the original 1995 Plan, see ED 389 356.PUB TYPE Statistical Data (110) Reports Descriptive (141)

EDRS PRICE MF01/PC04 Plus Postage.DESCRIPTORS *Access to Education; *Affirmative Action; *College

Planning; Community Colleges; EducationalOpportunities; Educational Policy; EducationalQuality; *Equal Education; *Ethnic Groups; MinorityGroups; *School Demography; Two Year Colleges

IDENTIFIERS *Mount San Jacinto College CA

ABSTRACTThe Student Equity Plan developed by California's

Mount San Jacinto College (MSJC) is intended to assure equal accessof historically underrepresented and ethnic minority students whilemaintaining excellence in academic standards. This update providescurrent information on the goals and activities involved in the Plan.An executive summary reviews state legislation mandating thedevelopment of student equity plans, the goals and initiatives of thePlan, and student equity indicators used at MSJC. The second sectionprovides background information to the development of the plan, whilethe third provides tables of results from surveys of faculty, staff,and students regarding the campus climate. The fourth sectiondisctisses student access at MSJC, providing data on the percentagesof ethnic groups in the college service area and student body andsuggesting that the college's funding be increased in order toadequately serve all the students. Sections five through eight thenprovide data by ethnic group and gender on basic skills completion,successful course completion, degree and certificate completion, andtransfer. The final section describes MSJC's annual review model.Each section includes tables which detail the barriers pertaining tothat section, and implementation strategies for each barrier.(AJL)

***********************i.AA:c********************************************

Reproductions supplied by EDRS are the best that can be madefrom the original document.

***********************************************************************

Page 2: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Mt. San Jacinto CollegeStudent Equity. Plan Update

U.S. DEPARTMENT OF EDUCATION.' "PERMISSION TO REPRODUCE THIS

Office of Educational Research and Improvement MATERIAL HAS BEEN GRANTED BY

EDUCATIONAL RESOURCES INFORMATION I

CENTER (ERIC)

his document has been reproduced aseived from the person or organization

originating it.O Minor changes have been made to improve

reproduction duality.

O

Points of view or opinions stated in this docu-ment do not necessarily represent officialOERI Oosition or policy.

D.R. Baylard

TO THE EDUCATIONAL RESOURCESn INFORMATION CENTER (ERIC)."

September 19962

BEST COPY AVAILABLE

Page 3: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

AL San Jacinto ColleeeStudent faulty Flan

Update

Roy B. Mason II, Ph.D.Superintendent/President

Board of TrusteesEugene Kadow

Ann MotteKelly Roberts

Gwen SchlangeWayne Stuart

Submitted byMt. San Jacinto Community College

September 1996

3

Page 4: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Acknowledgments

Mt. San Jacinto College DistrictStudent Equity Committee

Co-Chairs

Superintendent/PresidentDr. Roy B. Mason

Vice President of Student ServicesMichael Tausig

Coordinator/CounselorDisabled Student Program

Debbi May

Committee MembersPamala Bowser, Counselor

Althaea Flicek, DSPKathi Jaffke, Human Resources

Mary Segreto, Student RepresentativeJoyce Thomas, EOPS

Juanita Velarde, Student Representative

Director of ResearchDana Reece Bay lard

4

Page 5: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

I.

II.

Mt. San Jacinto CollegeStudent Equity Plan Update

Table of Contents

Executive Summary 1

Introduction and Background 3

III. Campus Climate 4

IV. Access 13

V. ESL/Basic Skills Completion 27

VI. Successful Course Completion 39

VII Degree and Certificate Completion 47

VIII. Transfer 52

IX. Annual Review Model 58

5

Page 6: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

,9t is the mission ofMt. San Jacinto College toprovide excellent academic,career and life-long learningprograms in a student-centeredenvironment while meeting theneeds of the diverse communitiesand populations served, and to

promote the cultural and ethnicdiversity of students and staff.As a major community resource,the college also provides

programsfor personalenrichment and culturalopportunities foY theentire co

ADOPTED BY THE MT. SAN JACINTO COLLEGE BOARD OF TRUSTEES ON MAY 10. 1994

Page 7: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Executive Summary

LegislationThe Student Equity Policy adopted by the Board of Governors in September 1992 requiresdistricts in the community college system to develop student equity plans. The intent is toassure that the college population reflects the diversity of the college's demographic area andto increase the access, success, transfer, and completion of degrees and certificates ofhistorically underrepresented and ethnic minority students. During Spring 1993, theChancellor's Office of the California Community Colleges established regulations on studentequity, mandating the development of student equity plans. The definition of "Student Equity"can be found in Subchapter 4, section 54220, Division 6 of Title 5 of the California Code ofRegulations.

Goals and InitiativesThe majority of historically underrepresented students currently enrolled in higher educationare enrolled in community colleges. Consequently, the success of these students depends uponthe community college system's ability to retain and educate them. After seeking input fromall college sectors, the Student Equity Committee has identified barriers and set goals in orderto assure that all students and potential students of Mt. San Jacinto College, specifically thosewho have been historically underrepresented in higher education, feel welcome and have equalopportunities for educational success.

The Student Equity Plan Update addresses the following indicators: Campus Climate, Access,Basic Skills and ESL, Course Completion, Degrees and Certificates, and Transfer. Eachsection of the plan begins with a chart which includes and explains the research. Followingeach chart is a section entitled Research Implications which summarizes the data. Then theGoals are presented with charts which identify barriers, implementation strategies,accountability, timelines, resources, and evaluation benchmarks. To complete the review ofBarriers established by the College for the Student Equity Plan Update, all employees,departments, and committees named in the report received highlighted sections of the reportfor their review. Several follow-up reminders were then sent, as well as a generalmemorandum to all college employees allowing those not named in the reports' accountabilitysections to contribute.

The following goals serve as student equity indicators:

Campus Climate:To enhance the campus climate at MSJC so that all students and employees feelwelcome; To increase awareness of and sensitivity toward historically underrepresentedgroups among all students and employees

Access:To establish an ethnic distribution of enrollment that reflects the adult population of ourservice area by 2000; To increase college funding base so that all students, specificallyhistorically underrepresented students, have access to college

7

Page 8: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Basic Skills:To improve by 5% a year the percentage of students who successfully completethe degree-applicable course in English within six semesters of having completed thefinal ESL course; To improve by 5% a year the percentage of students whosuccessfully complete the degree-applicable course in English and math within sixsemesters of having completed the final basic skills course

Successful Course Completion:To increase completion rates by 5% a year for each historically underrepresentedgroup; To reduce the difference between all groups to a maximum of 10% by 2000; Tomaintain standards of rigor throughout the process

Degree and Certificate Completion:To increase the total number of degrees and certificates awarded by 10% a year;To ensure that the ethnic distribution of degree and certificate recipients is equal to theenrollments four years earlier

Transfer:To increase by 5% a year the number of students who transfer; To ensure that theethnic distribution of transfer students is within 2% of the enrollments four yearsearlier

The Student Equity Committee oversees efforts to achieve these goals.

ResourcesThe offices and departments responsible for the implementation of goals are responsible forseeking appropriate funding avenues for the achievement of these goals. The Student EquityCommittee monitors implementation, accountability, target completion dates, and evaluationbenchmarks.

ConclusionIt is the mission of Mt. San Jacinto College to provide excellent academic, career and life-longlearning programs in a student-centered environment while meeting the needs of the diversecommunities and populations served, and to promote the cultural and ethnic diversity ofstudents and staff. As a major community resource, the college also provides programs forpersonal enrichment and cultural opportunities for the entire community.

The Student Equity Plan reflects the college community's involvement in and commitment tothis purpose.

For additional information about Mt. San Jacinto College's Student Equity Plan, please contact Dana Reece Bay lard in theOffice of Research.

Page 9: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Introduction and Background

Plan DevelapmentThis plan exemplifies the collaborative work of representatives from all college constituencies,led by the Student Equity Committee, a committee comprised of students, faculty, staff, andmanagement. The initial charge of the committee was to develop a Student Equity Plan thatwould be reviewed and revised within the college's shared governance procedure.

Mt. San Jacinto College has designated student equity as a significant part of the ongoingplanning agenda coordinated by the Office of Research to insure wide range involvement of allsegments of the campus. The focus of the Student Equity Committee has been to assure equalaccess while maintaining excellence in academic standards.

Methadology_amLLimitationsThe State recommended student equity indicators were utilized to guide student equity researchat Mt. San Jacinto College. Research focused on area demographics, student bodydemographics, ESL and basic skills completion rates, successful course completion rates,degree and certificate completion rates, and transfer rates.

39

Page 10: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Campus Climate

Research ImplicationsThe California Postsecondary Education Commission (CPEC) published three documents (1990-1992) in which it examined the relationship between campus climate and student equity. Thesedocuments respond in part to Assembly Bill 4071 (Vasconcellos, 1988), which directed theCommission to investigate the feasibility of developing an educational assessment system forCalifornia higher education. CPEC recommends that all California institutions of higher educationassess campus climate as it relates to equity in order to assure that all historically underrepresentedstudents feel welcome and supported in their pursuit of educational advancement.

The purpose of Campus Climate research at Mt. San Jacinto College was to assess the extent towhich MSJC campuses provide a welcome and supportive environment for students of specialgroups. These groups include ethnic groups, racial groups, women, disabled students, and avariety of groups which were addressed less comprehensively, including gays and lesbians and agegroups.

In 1995, questionnaires were administered to students in two ways: by mail (former, current, andpotential students) and in classrooms (Summer, 1995). Questionnaires for full-time faculty andall staff were administered during the Fall Pre-College meeting (1995), and additional surveyswere distributed to all offices to assure that all staff were able to participate.

Additionally, a memorandum was sent to all managers, faculty, staff, ASB, and student clubsinviting suggestions for enhancing campus climate, and interviews were conducted of faculty andstaff who could provide additional information in relation to the assessment of campus climate.The suggestions generated by the interviews and memorandum were incorporated into theBarriers, Implementation Strategy, and Accountability sections of the report.

o

Page 11: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Research Summary

Questions:Does Mt. San Jacinto College provide a welcoming and supportive environment?

Do students experience bias?

Is the campus climate friendly and welcoming to faculty and staff?

Do faculty and staff (including administrators and managers) provide a friendly andwelcoming environment?

Conclusions:

Mt. San Jacinto College is a friendly and welcoming place for most students andfaculty according to questionnaire responses.

Most students from special groups expressed a need for further multi-culturalenrichment.

Significant discrepancies exist within faculty concerning demographic representation,equality for student groups, and sexist and racist behaviors.

A significant number of faculty respondents expressed a distinct disinterest in attendingworkshops concerning special groups.

A significant portion of staff respondents expressed that disparaging comments, sexistand racist behavior, and rude treatment existed within faculty, staff, andadministration.

Assessment of campus climate was more neutral for staff.

Goal: To enhance the campus climate at MSJC so that all students andemployees feel welcome.

Goal: To increase awareness of and sensitivity toward historicallyunderrepresented groups among all students and employees.

5

Page 12: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

CA

MPU

S C

LIM

AT

EB

artie

rshi

t ple

men

tatio

ni:S

teat

egY

:: :,

Acc

ount

abili

tyT

oget

Dat

01i,E

*.al

iiatio

ti:i e

nChi

n#

C. N

eed

for

incr

ease

d1.

a Pr

ovid

e C

olle

ge-w

ide

trai

ning

on

equi

ty1.

b O

ffic

e of

the

1.c

Fall,

f99

619

971.

dC

olle

ge q

uest

ionn

aire

sun

ders

tand

ing

abou

t a v

arie

tyof

eth

nic/

cultu

ral b

ackg

roun

dsan

d ab

ility

leve

ls a

mon

gst

uden

ts, s

taff

, fac

ulty

, and

man

ager

s

issu

es.

Pres

iden

t--

ong

oing

, ann

ual

Pre-

Col

lege

Day

pac

kets

.T

he

Offi

ce o

f the

Pre

side

nt is

com

mitt

edto

this

goa

l and

will

sup

port

the

addi

tion

of th

is tr

aini

ng in

toco

llege

-wid

e ac

tiviti

es.

Prov

ide

addi

tiona

l fle

x ac

tiviti

es w

hich

prom

ote

cultu

ral a

war

enes

s an

d di

ffer

ence

sin

lear

ning

sty

les.

Flex

Coo

rdin

ator

Facu

ltyFa

ft71

996

Spr

ing,

1997

--

ongo

ing

Flex

Man

ual.

The

flex

pro

gram

has

offe

red

in th

e pa

st a

nd w

illco

ntin

ue to

offe

r w

orks

hops

on

unde

rsta

ndin

g di

ffere

nces

inle

arni

ng s

tyle

s an

d ho

w to

teac

hm

ultip

le in

telle

genc

es. F

orex

ampl

e, th

e 19

97 p

rogr

am o

ffers

a M

yers

-Brig

gs le

arni

ng in

vent

ory

wor

ksho

p. A

dditi

onal

ly th

e F

lex

Com

mitt

ee w

ill e

ndea

vor

to a

dd a

cultu

ral a

war

enes

s w

orks

hop

to th

e19

97 p

rogr

am.

Prov

ide

addi

tiona

l fle

x ac

tiviti

es/tr

aini

ng f

orin

stru

ctor

s an

d fr

ont l

ine

staf

f de

sign

ed to

incr

ease

aw

aren

ess

of d

isab

led

stud

ents

'ne

eds.

Dis

able

d St

uden

tPr

ogra

mFa

t171

996

Spr

ing,

1997

--

ongo

ing

Flex

Man

ual

Prov

ide

Pre-

Col

lege

Day

pre

sent

atio

n on

Dis

able

d St

uden

tC

urre

nt (

once

Pre-

Col

lege

Day

Pac

ket

disa

bled

stu

dent

s.Pr

ogra

mye

arly

) --

ong

oing

Dis

play

stu

dent

art

wor

k th

roug

hout

the

Stud

ent S

ervi

ces

Fall,

199

7 --

Stud

ent E

quity

Rep

ort

publ

ic a

reas

of

the

cam

puse

s (e

.g.,

boar

dro

om, s

tude

nt lo

unge

, sta

ff b

reak

roo

ms,

etc.

).

ASB

facu

ltyA

rt G

alle

ry

ongo

ing

1312

Page 13: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Bar

rier

shr

iple

men

tatio

n .S

trat

egy.

Acc

ount

abili

ty.

--T

arge

t. D

ate

:.'.

Eva

luat

ion

Ben

chm

arks

,..

C. (

Con

t.)1.

a (C

ont.)

1.b

(Con

t.)1.

c (C

ont.)

1.d

(Con

t.)Pl

ace

acry

lic b

oard

s on

the

cam

pus

gree

nsto

dis

play

/hig

hlig

ht c

lub

activ

ities

, stu

dent

awar

ds, c

lass

/act

ivity

info

rmat

ion,

and

cultu

ral c

ontr

ibut

ions

.

Stud

ent S

ervi

ces

Spri

ng, 1

998,

on-g

oing

Acr

ylic

boa

rds

in p

lace

Bas

ines

elV

it,C

S

Dir

ecto

r of

Gov

ernm

ent

and

Com

mun

ity R

elat

ions

ASB

Facu

lty

1415

Page 14: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Ba

rrie

rsIn

plem

enta

tion:

Stra

tegy

Acc

ount

abili

ty:,

Ta:

rg

et:

ate

:..E

valn

a t i

onen

c m

arC

. Nee

d fo

r st

uden

ts to

fee

l agr

eate

r se

nse

of b

elon

ging

or

"mat

teri

ng"

to M

SJC

com

mun

ity 16

2.a

Dev

elop

an

inte

rnal

fol

low

-up

syst

emfo

r ne

w/a

t ris

k st

uden

ts th

at ta

kes

plac

epr

ior

to f

irst

cen

sus.

Des

ign

and

impl

emen

t men

tori

ng s

yste

m f

orne

w/a

t ris

k st

uden

ts.

Incr

ease

"co

llege

hou

r" a

ctiv

ities

(e.

g.,

brow

n ba

g lu

nch

lect

ures

/gat

heri

ngs)

whi

chal

low

stu

dent

s, f

acul

ty, a

nd s

taff

to in

tera

ctan

d in

crea

se s

tude

nt a

war

enes

s of

stu

dent

club

s.

Cre

ate

a "c

olle

ge h

our"

on

MV

C w

hich

prov

ides

equ

al o

ppor

tuni

ties

for

stud

ents

,fa

culty

, and

sta

ff o

f M

VC

to in

tera

ct.

Prov

ide

even

ing

club

act

iviti

es/e

vent

s so

that

nig

ht s

tude

nts

have

incr

ease

d so

cial

cont

act p

ossi

bilit

ies.

2.c

Fall,

-199

719

98--

ong

oing

Fall,

199

8on

goin

g

Fall,

199

7 --

ongo

ing

Fall,

199

7on

goin

g

Fall,

199

7on

goin

g

Fa11

7199

8--

ongo

ing

Fall

1998

2.d

Follo

w-u

p sy

stem

des

igne

d an

din

pla

ce. I

nstit

utio

nal R

esea

rch

Upd

ate.

Thi

s pr

oces

s is

now

unde

rway

in th

e O

ffice

of

Res

earc

h.

Men

tori

ng s

yste

m d

esig

ned

and

inpl

ace

Stud

ent H

andb

ook

Stud

ent H

andb

ook

Clu

b/ac

tiviti

es f

liers

2.b

ervi

ces

Off

ice

of R

esea

rch

htst

iuL

tiuua

ldl

.0 y

Info

rmat

ion

Ser

vice

s

Stud

ent S

ervi

ces

Inst

ruct

iona

l Fac

ulty

Stud

ent S

ervi

ces

ASB

Adv

isor

ASB

Stud

ent C

lubs

Stud

ent S

ervi

ces

ASB

Adv

isor

ASB

Stud

ent C

lubs

eim

ine

feas

ibili

ty u

allu

wiu

ig s

tude

ntA

duui

i.. o

f Ju

stic

eIl

ogia

mu

SeL

ui it

y

*c

hnpl

eiic

eida

tiuu

of c

adet

1/1

pew

'St

uden

t-H

andb

ook

Whi

le m

any

ofou

r st

uden

ts a

re in

tere

sted

in (

orac

tivel

y se

ekin

g) c

aree

rs in

law

ertfo

rcem

ent,

mos

t are

in a

prel

imin

ary

stag

e of

thei

red

ucat

ion

in th

is a

rea.

The

few

trai

ned

law

enf

orce

men

t offi

cers

inou

r ni

ght c

lass

es w

ould

pro

babl

yno

t be

able

to p

artic

ipat

e in

apr

ogra

m s

uch

as th

is fo

r lia

bilit

yre

ason

s, u

nles

s sp

ecifi

c ap

prov

alw

as p

rovi

ded

by th

eir

agen

cies

.T

here

fore

, thi

s pr

ogra

m is

not

prac

tical

for

the

colle

ge a

t thi

stim

e. T

he S

afet

y C

omm

ittee

will

exam

ine

the

issu

e fu

rthe

r.

1

cade

ts (

Adm

in. o

f Ju

stic

e) to

wal

k st

uden

tsto

ca,

s at

.;t

1..g

i. al

ld a

ssis

t bU

y .

Prov

ide

"wel

com

e" s

igns

in s

ever

alla

ngua

ges

whi

ch d

irec

t stu

dent

s to

fir

stco

ntac

t off

ices

(bo

th c

ampu

ses.

)

Stud

ent

i

Stud

ent S

ervi

ces

7

Page 15: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Bar

rier

linpl

emen

tatio

n, S

Oat

egy:

AC

coun

tAbi

lity

: Tar

get

a:::

:Eya

ltiat

iOrt

0end

ithar

ks

C. N

eed

for

incr

ease

d co

llege

activ

ities

/eve

nts

whi

chhi

ghlig

ht d

iffe

rent

cul

tura

lco

ntri

butio

ns/b

ackg

roun

ds

3.a

Hol

d a

cultu

ral f

air/

expo

eac

h ye

ar to

help

fac

ulty

, sta

ff, a

nd s

tude

nts

beco

me

mor

e aw

are

of th

e di

vers

ity o

n ca

mpu

s an

din

the

com

mun

ity

Prov

ide

facu

lty le

ctur

es a

nd s

tude

ntsp

eake

rs o

n cu

ltura

lco

ntri

butio

ns/b

ackg

roun

ds

3.b

Stud

ent S

ervi

ces

Hum

an R

esou

rces

AS

B

Inte

rest

ed s

tude

nt c

lubs

Facu

lty

3.c

Fall,

-199

7 19

96--

ong

oing

, yea

rly

Set f

or O

ctob

er 2

2,19

96

Cur

rent

--

ongo

ing,

at le

ast t

wic

e a

sem

este

r, e

ach

cam

pus

3.d

Fair

/Exp

o do

cum

enta

tion/

flie

rsN

ewsp

aper

art

icle

s

Cam

pus

flie

rsT

aped

pre

sent

atio

ns (

depe

ndan

tup

on p

rese

nter

per

mis

sion

--

all

pres

enta

tions

may

not

be

avai

labl

e)

C. N

eed

for

cust

omer

serv

ice/

cultu

ral a

war

enes

str

aini

ng f

or a

ll fr

ont-

line

empl

oyee

s, e

spec

ially

inst

uden

t ser

vice

s

4.a

Spon

sor

a di

stri

ct-w

ide

effo

rt in

this

area

.4.

b St

aff

Dev

elop

men

tC

omm

ittee

.

4.c

Fall,

199

6 --

on-g

oing

4.d

Tra

inin

g Pr

ogra

mim

plem

enta

tion

Und

erw

ay

C. N

eed

for

incr

ease

dfu

ndin

g ba

se s

o th

at a

dditi

onal

facu

lty/s

taff

/man

agem

ent c

anbe

hir

ed

5.a

Con

tinue

to lo

bby

for

allo

catio

n of

fun

dsw

hich

coo

rdin

ate

dist

rict

pop

ulat

ion/

grow

thra

te w

ith F

TE

.

5.b

Off

ice

of th

ePr

esid

ent

Bus

ines

s Se

rvic

esB

oard

of

Tru

stee

s

5.c

Fall

1995

--

ongo

ing

5.d

Co

ebpu

iidel

l.e

wilt

Stat

e /

1 nu

ent O

ffi.,

ials

Incr

ease

in f

undi

ng a

lloca

tion.

The

Boa

rd o

f T

rust

ees

has

endo

rsed

this

MSJ

C le

gisl

ativ

eag

enda

. The

incr

ease

in f

undi

ngaw

arde

d to

MSJ

C h

as r

esul

ted

inad

ditio

nal h

ires

in f

acul

ty, s

taff

and

man

agem

ent.

C. N

eed

for

recn

iitm

ent

effo

rts

whi

ch r

esul

t in

a m

ore

dive

rse

appl

ican

t poo

l for

facu

lty/s

taff

/man

agem

ent

posi

tions

6.a

Subm

it jo

b op

port

unity

info

rmat

ion

toor

gani

zatio

ns/s

earc

h se

rvic

e or

gani

zatio

nsw

hich

sup

port

an

ethn

ical

ly d

iver

seap

plic

ant p

ool.

Que

ry o

ther

col

lege

s ab

out p

oten

tial s

ourc

esfo

r in

crea

sed

dive

rsity

in a

pplic

ant p

ool.

Mai

ntai

n A

ffir

mat

ive

Act

ion

reco

rds

whi

chat

test

to d

iver

sity

of

appl

ican

t poo

l.

6.b

Hum

an R

esou

rces

Hum

an R

esou

rces

6.c

Cur

rent

--

ongo

ing

6.d

Incr

ease

in e

thni

c di

vers

ityw

ithin

dis

tric

t em

ploy

ee p

opul

atio

n

Sp L

ug, 1

997

Cur

rent

ongo

ing

Cur

rent

--

ongo

ing

Rep

uct p

llit

.. y

-Huu

ait

Res

uuic

esG

reat

er e

mpl

oyee

div

ersi

ty

.1A

ff.«

iatia

e A

c,tiu

itA

ff 1

uU

i n I

MO

!G

reat

er e

mpl

oyee

div

ersi

tyO

ffic

e. H

uman

Res

ourc

es

BE

ST C

OPY

AV

AIL

AB

LE

,

Page 16: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

.B

arri

ers

hnpl

emen

tatio

n St

rate

gy..

..,:,.

.

Acc

ount

abili

ty,

Tar

get b

ate:

:Eya

luat

iori

Bel

le M

arC

. Nee

d fo

r m

ore

ethn

ic7.

a R

evie

w c

ours

e of

feri

ngs

of o

ther

7.c

Spri

ng, 1

996

7.d

Rep

ort p

rese

nted

to7.

b S

ttee

AD

stud

ies

cultu

ral d

iver

sity

-co

llege

s.H

OC

Gro

upcr

eate

dR

epor

t to

beC

urri

culu

m C

omm

ittee

rela

ted

cour

ses

by th

e C

urri

culu

mpr

esen

ted

in F

all,

1996

Com

mitt

ee fu

i t L

is

pulp

use

Upd

ate

curr

icul

um to

incl

ude

grea

ter

All

acad

emic

dep

artm

ents

Fall,

199

5 --

Cou

rse

desc

ript

ions

:ou

tline

s an

ddi

vers

ity.

ongo

ing

colle

ge c

atal

og. U

nder

way

,tim

elin

e is

app

ropr

iate

.T

heA

ll ac

adem

ic d

epar

tmen

tsP

rogr

am R

evie

w m

odel

app

rove

dA

dd e

tluiic

stud

ies

cultu

ral d

iver

sity

-rel

ated

cour

ses

to c

urri

culu

m.

Cur

ricu

lum

Com

mitt

eefo

r th

e 96

/97

acad

emic

yea

rdi

rect

ly a

ddre

sses

div

ersi

ty in

eac

h

prog

ram

.

O

Page 17: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

22

-::B

arri

ers

Impl

emen

tatio

n St

rate

gyA

ccou

ntab

ility

Tar

get D

ate

Eva

luat

ion

Ben

chm

arks

C. N

eed

for

bette

r8.

a Pr

ovid

e de

part

men

tal u

pdat

es f

or8.

b A

ll ar

eas/

depa

rtm

ents

8.c

Spri

ng, 1

996

8.d

Upd

ate

will

be

mai

ntai

ned

inco

mm

unic

atio

n co

llege

-wid

e.C

olle

ge-w

ide

effo

rts

toim

prov

e co

mm

unic

atio

nsco

ntin

ue. A

ll m

anag

ers

circ

ulat

ion

with

in th

e de

part

men

t (e.

g.,

polic

y ch

ange

s an

d m

eetin

g tim

es).

Prov

ide

depa

rtm

enta

l upd

ates

for

cir

cula

tion

All

area

s/de

part

men

ts

ongo

ing

Spri

ng, 1

996

--

depa

rtm

ent f

iles

Upd

ates

will

be

mai

ntai

ned

inat

tend

ed a

two-

day

retr

eat t

ode

velo

p an

d st

reng

then

com

mun

icat

ions

at t

hem

anag

emen

t lev

el. M

oreo

ver,

wee

kly

man

agem

ent m

eetin

gsno

w ta

ke p

lace

. The

Stu

dent

outs

ide

the

depa

rtm

ent (

e.g.

, dep

artm

ent

resp

onsi

bilit

ies

and

polic

y ch

ange

s).

Enh

ance

cou

rse

sche

dulin

g co

ordi

natio

nbe

twee

n ac

adem

ic d

epar

tmen

ts.

Off

ice

of I

nstr

uctio

nA

ll de

part

men

t cha

irs

ongo

ing

Fall,

199

6 --

ongo

ing

depa

rtm

ent f

iles

Off

ice

of h

IstI

nt -

ion

Rep

vit

Cou

rse

sche

dule

s

Ser

vice

s se

ctor

has

und

ergo

neIn

crea

se d

ialo

gue/

coor

dina

tion

betw

een

All

rela

ted/

inte

rdep

ende

ntSp

ring

, 199

6 --

Com

mun

icat

ions

bet

wee

nsi

gnifi

cant

reo

rgan

izat

ion

toen

hanc

e co

mm

unic

atio

n. A

llco

unse

lors

, inc

ludi

ngca

tego

rical

ly fu

nded

coun

selo

rs, a

re n

ow w

orki

ng

rela

ted/

inte

rdep

ende

nt d

epar

tmen

ts (

e.g.

,co

unse

ling

and

DSP

; cou

nsel

ing

and

acad

emic

facu

lty, D

SP a

nd f

acili

ties)

.

Prov

ide

both

cam

puse

s w

ith c

omm

unic

atio

n

depa

rtm

ents

adm

inis

trat

ion,

fac

ulty

,an

d st

aff

.

Off

ice

of th

e Pr

esid

ent

ongo

ing

Fall,

199

6

depa

rtm

ents

will

be

mai

ntai

ned

inde

part

men

t/are

a fi

les

Impl

emen

tatio

n of

com

mun

icat

ions

unde

r a

Div

isio

n D

irect

or.

The

Div

isio

n D

irect

or is

elec

ted

by th

e co

unse

ling

staf

fso

the

lead

ersh

ip is

res

pons

ive

both

to th

e co

unse

lors

and

toth

e ad

min

istr

atio

n.

tech

nolo

gy s

o th

at m

eetin

gs w

hich

invo

lve

both

cam

pus

pers

onne

l can

be

atte

nded

.

Prov

ide

stud

ents

with

dep

artm

enta

l/in

divi

dual

flo

w c

hart

in S

tude

nt H

andb

ook

so th

ey k

now

whe

re to

go

depe

ndan

t upo

nth

eir

need

s.

Bus

ines

s Se

rvic

es

Stud

ent S

ervi

ces

Fall,

199

6

syst

em.

Thi

s go

al h

as b

een

met

.

Stud

ent H

andb

ook

Prov

ide

depa

rtm

ent/a

rea

netw

ork

acce

ss.

Off

ice

of th

e Pr

esid

ent

Cur

rent

--

ongo

ing

Com

pute

r ad

dres

s fi

le.

Thi

s go

alha

s be

en m

et.

Hol

d ad

ditio

nal c

olle

ge-w

ide

func

tions

,w

orks

hops

, and

soc

ial a

ctiv

ities

that

invo

lve

staf

f an

d fa

culty

of

both

cam

puse

s so

that

Staf

f D

evel

opm

ent

Com

mitt

eeSp

ring

, 199

619

97--

ong

oing

Staf

f D

evel

opm

ent C

omm

ittee

Min

utes

shar

ed g

oals

and

inte

rest

s ca

n be

high

light

ed.

Flex

Com

mitt

eeFl

ex C

omm

ittee

Min

utes

23

Page 18: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

...... Bar

rier

s.li

plet

hent

atio

n St

eate

gy.

.

Act

Oun

tabi

lity.

,T

arge

tA

te:::

::,,,.

,....

V.a

Ua

ion.

:: en

dith

arks

..C

. Nee

d fo

r ad

equa

te9.

a C

ontin

ue a

nd e

xpan

d fa

culty

/sta

ff9.

b9.

c C

urre

nt -

-9.

d C

olle

ge r

ecor

ds o

f ac

tiviti

esco

mpe

nsat

ion/

reco

gniti

on o

fre

cogn

ition

act

iviti

esC

olle

ge A

dmin

istr

atio

non

goin

gU

nder

way

MSJ

C s

taff

Off

ice

of th

e Pr

esid

ent

Foun

datio

n

Con

tinue

to a

sses

s/re

vise

as

need

ed s

taff

Col

lege

Adm

inis

trat

ion

Cur

rent

--

ongo

ing

Job

desc

ript

ions

. Und

erw

ay, t

ime

resp

onsi

bilit

ies

in a

ccor

danc

e w

ith

com

pens

atio

n (r

ecla

ssif

icat

ion)

.C

lass

ifie

d Se

nate

is a

ppro

pria

te.

Com

pens

ate/

reco

gniz

e st

aff

for

dutie

sC

olle

ge A

dmin

istr

atio

nFa

ll, 1

995

--Jo

b de

scri

ptio

nsbe

yond

reg

ular

ass

ignm

ent (

e.g.

, bili

ngua

lst

aff

who

pro

vide

ass

ista

nce

to n

on-E

nglis

hsp

eake

rs o

n be

half

of

othe

r

depa

rtm

ents

/are

as).

Cla

ssif

ied

Sena

teon

goin

gPa

yiol

l (aL

cess

ible

pen

ing

empl

oyee

pei

tniS

siuu

) T

his

topi

cne

eds

to b

e be

tter

focu

sed

on it

sim

pact

on

stud

ent e

quity

issu

es.

How

ever

, the

Dis

tric

t mad

e gr

eat

stri

des

in th

is a

rea

by a

dopt

ing

asi

ngle

une

d sa

lary

sch

edul

e in

Spri

ng 1

996.

Are

as s

uch

asad

ditio

nal p

ay f

or b

iling

ual s

taff

can

only

be

addr

esse

d in

the

nego

tiatin

g en

viro

nmen

t. In

addi

tion,

the

entir

e cl

assi

fica

tion

syst

em f

or c

lass

ifie

d st

aff

was

revi

ewed

, with

one

-hal

f of

the

pane

l com

ing

from

the

clas

sifi

edst

aff

rank

s.

C. N

eed

for

addi

tiona

l10

.a C

ontin

ue to

lobb

y fo

r al

loca

tion

of10

.b O

ffic

e of

the

10.c

Fal

l, 19

95 -

-10

.d C

orre

spon

denc

e w

ithst

affi

ng to

pre

vent

exc

essi

vefu

nds

whi

ch c

oord

inat

e di

stri

ctPr

esid

ent

ongo

ing

Stat

e /G

over

nmen

t Off

icia

lsem

ploy

ee s

tres

s an

d st

uden

tpo

pula

tion/

grow

th r

ate

with

FT

E.

Bus

ines

s Se

rvic

esfr

ustr

atio

nB

oard

of

Tru

stee

sIn

crea

se in

fun

ding

allo

catio

nT

he B

oard

of

Tru

stee

s ha

sen

dors

ed th

is M

SJC

legi

slat

ive

agen

da. T

he in

crea

se in

fun

ding

awar

ded

to M

SJC

has

res

ulte

d in

addi

tiona

l hir

es in

fac

ulty

, sta

ffan

d m

anag

emen

t.

2425

Page 19: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Student Access at MSJC

Access ResearchThe comparison of the percentage of each group that is enrolled to the percentageof each group in the adult population within the community served.

Area Population Percentages

Asian 2.93%

African American 3.42%

Hispanic 19.68%

Native American 1.24%

White 83.44%

Female 51.89%

Area population is based on projection of the 1990 census by zip codes within service area. As MSJC service area isdetermined by trustee areas (comprised of census tracts) instead of zip codes, these data cannot be considered entirelyrepresentative.

Hispanic grouping has been projected as an ethnicity and may therefore overlap with other race categories. Therefore,comparisons between area Hispanic population and MSJC Hispanic population cannot be considered entirely representative.Disabled data are unavailable.

Spring, 1995

MSJC.population Male ee:: : :Fmat To' Total

Asian 0.89% n=056 0.95% n=060 1.84% n=116

African American 1.76% n=111 1.52% n=096 3.29% n=207

Filipino 0.64% n=040 0.81% n=051 1.44% n=091

Hispanic 6.70% n=422 11.05% n=696 17.75% n=1118

Native American 0.86% n=054 1.62% n=102 2.48% n =156

White 24.43% n=1539 44.79% n=2821 69.23% n=4360

Pacific Islander 0.11% n=007 0.14% n=009 0.25% n=016

Disabled 1.89% n =119 2.56% n=161 4.44% n=280

Female 63% n=3996

MSJC Population represents Spring 1995 enrollment

11" = the total number of students

(Benchmark figures exclude Unknown and Decline to State categories; therefore, the total of the seven ethnicity/racegroupings does not equal 100%. Disabled data represent only those students utilizing the Disabled Students Programand may therefore not be entirely representative.)

16

Page 20: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Research Implications, 1995California Community Colleges are designed to provide open access to all Californians who havegraduated from high school as well as those who have not graduated but who are 18 years of ageor older and can benefit from instruction. Mt. San Jacinto College, due to an enrollment capwhich did not'reflect its status as the second fastest growing district in the state, has been unableto adequately serve its community, which is growing rapidly and becoming increasingly diverse.According to projections of the 1990 census, the community Mt. San Jacinto College serves hasgrown by ten to twelve percent with a fairly even distribution by ethnicity and race.Consequently, ten to twelve percent of the population, regardless of ethnicity or race, has notbeen served. Due to increased funding for the 1996-97 year, Mt. San Jacinto College expects toexperience rapid growth and to begin to serve that population.

Although Mt. San Jacinto College's enrollment appears to reflect the diversity of the communityfairly well, the College is concerned that because of rapid growth in the service area, the censusprojection may not adequately reflect the diversity of the community. Funding limitationsimpacted outreach and recruitment efforts; however, the College is now working hard to expandthese efforts.

Community representation of Asians, when compared to college enrollment of Asians, Filipinos,and Pacific Islanders, is slightly below (.13%) their representation in the community. Hispanicsare 1.93% below their representation in the college; however, as Hispanic (as an ethnicity)overlaps with race categories, this number may not be entirely representative. Native Americansare represented at 1.24% above their numbers in the community. Women are represented at 12%above their numbers in the community.

Goal: To establish an ethnic distribution of enrollment that reflects theadult population of our service area by 2000

Goal: To increase college funding base so that all students, specificallyhistorically underrepresented students, have access to college

14

27

Page 21: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Spring, 1996

:MSJC Population e Female Total

Asian/Pacific Islander 1.04% n=60 1.14% n=66 2.18% n =126

African American 1.84% n =106 1.52% n=111 3..36% n=217

Filipino 0.85% n=49 0.83% n=48 1.68% n=97

Hispanic 7.44% n=430 11.15% n=644 18.59% n=1074

Native American 1.00% n=56 1.80% n =102 2.80% n =158

White 22.54% n=1302 42.76% n=2470 65.30% n=3772

Disabled 2.10% n=19 2.90% n =170 5.00% n=289

Female 60% n=3441

(MSJC Population) represents Spring 1996 enrollment

('h") = the total number of students

(Benchmark figures exclude Unknown and Decline to State categories; therefore, the total of the seven ethnicity/racegroupings does not equal 100%. Disabled data represent only those students utilizing the Disabled Students Programand may therefore not be entirely representative.)

Research Implications, 1996Mt. San Jacinto College is still concerned that the census projection may not adequately reflectthe diversity of the community and is hence planning to incorporate additional factors into acensus projection slated for next year.

College representative of Asians and Pacific Islanders, African Americans, Filipinos, Hispanics,and Native Americans has risen slightly, with the greatest gains made by the Hispanic population(0.84%). The Disabled Student population has also increased slightly (0.56%). The gain inhistorically underrepresented students represents a 3.93% increase in diversity for the Collegestudent body.

While the College is pleased that it has made progress toward both of its Access goals, increasingstudent diversity and increasing the college funding base are still considered to be of primaryimportance.

15

28

Page 22: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

AC

CE

SS

Bar

rier

sIm

plem

enta

tion

Stra

tegy

.

Acc

ount

abili

ty_

,.T

arge

t OA

tt.'

tvA

luat

iori

Ben

chm

arkg

-.

A. N

eed

for

incr

ease

d fu

ndin

gba

se/in

crea

sed

cour

seof

feri

ngs

so th

at d

istr

ict

popu

latio

n ca

n be

ade

quat

ely

serv

ed.

La

Con

tinue

to lo

bby

for

allo

catio

n of

fun

dsw

hich

coo

rdin

ate

dist

rict

pop

ulat

ion/

grow

thra

te w

ith F

TE

.

1.b

Off

ice

of th

ePr

esid

ent

Bus

ines

s Se

rvic

esB

oard

of T

rust

ees

1.c

Fall

1995

--

ongo

ing

1.d

ecn

iN

IL',

ence

-with

Stat

e/G

over

nmen

t-of

fici

als

Incr

ease

in fu

ndin

g al

loca

tion.

The

Boa

rd o

f Tru

stee

s ha

s en

dors

edth

is M

SJC

legi

slat

ive

agen

da. T

hein

crea

se in

fund

ing

awar

ded

toM

SJC

has

res

ulte

d in

an

addi

tiona

lba

se w

hich

will

allo

w th

e co

llege

tose

rve

its d

istr

ict p

opul

atio

n m

ore

adeq

uate

ly.

A. N

eed

for

bette

r te

leph

one

acce

ss to

bot

h co

llege

site

s an

dbe

twee

n si

tes

2.a

Wor

k w

ith te

leph

one

serv

ice

vend

or to

incr

ease

tele

phon

e sy

stem

cap

acity

2.b

Bus

ines

s Se

rvic

es2.

c Fa

ll, 1

995;

Fal

l, 19

972.

d C

onta

ct d

ocum

enta

tion

with

vend

or

Tel

epho

ne s

yste

m u

pdat

e.T

his

upgr

ade

has

take

n pl

ace.

How

ever

, add

ition

al u

pgra

ding

isne

cess

ary

to k

eep

pace

with

rap

idco

llege

gro

wth

.

A. N

eed

for

dist

rict

-wid

eT

.D.D

. tel

epho

ne s

yste

m3.

a W

ork

to s

ecur

e T

.D.D

. tel

epho

nesy

stem

3.b

Dis

able

d-St

uden

tSe

rvic

esC

ampu

s A

DA

3.c

Fall,

199

619

973.

d D

istr

ict-

wid

e T

.D.D

. tel

epho

nesy

stem

.D

SP

are

as h

ave

7DD

'sfo

r co

llege

/stu

dent

bus

ines

s ca

lls.

2.9

30

Page 23: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Bar

rier

sIm

plem

enta

tion

Stra

tegy

.

Acc

ount

abili

ty...

Tar

get :

Dat

e.

......

...:.:

::::

..E

valil

atio

n B

ench

mar

ks.

A. N

eed

for

addi

tiona

l sig

ns4.

a Pr

oduc

e-a-

Feas

ibili

ty-S

tudy

-tcr

exam

ine

4.b

Bus

ines

s-Se

rvic

es4.

d Fe

asib

ility

-stu

dy-o

n-bu

ildin

g4.

c-Fa

ll, 1

996

on c

ampu

s, m

ore

clea

rly

'ilai

lies'

orSt

uden

t-Se

rvic

esan

amee

-ori

deitt

ifie

rsde

sign

atio

rrof

-bui

ldin

gm

arke

d bu

ildin

gs, a

ndad

ditio

nal d

oors

with

labe

lsad

ditio

nal-

iden

tifie

rs r

.Pl

anni

ngC

--om

mitt

ee

Det

erm

ine

area

s/fu

ndin

g fo

r ad

ditio

nal s

igns

Bus

ines

s Se

rvic

esF

all,

1996

Add

ition

al s

igns

on

both

site

s.to

bot

h ca

mpu

ses

and

begi

n ad

ditio

nal s

ign

Stud

ent S

ervi

ces

Bui

ldin

gs o

n th

e S

an J

acin

toin

stal

latio

n.Pl

anni

ng-C

-om

mitt

eeF

acili

ties

Cam

pus

are

now

cle

arly

mar

ked

with

a b

uild

ing

num

ber

whi

chco

rres

pond

s w

ith th

e ro

omnu

mbe

rs w

ithin

the

build

ing.

The

Men

ifee

Val

ley

Cam

pus

need

s to

have

the

sam

e sy

stem

put

in p

lace

.

.St

rate

gik.

. Pla

rmin

g--D

ocum

ents

A. N

eed

for

bette

r m

arqu

ee5.

a C

oord

inat

e m

arqu

ee u

sage

on

the

SJC

5.b

Stud

ent-

Serv

ices

5.c

Spri

ng, 1

996

--5.

d In

form

atio

n O

ffic

er R

epor

t.us

age

or n

ew m

arqu

ee o

n SJ

Cm

id r

esea

rch

new

mar

quee

pos

sibi

litie

s.A

SBon

goin

gT

he P

ublic

Info

rmat

ion

Offi

ce h

asca

mpu

s; n

eed

for

mar

quee

for

MV

CIn

form

atio

n O

ffic

erta

ken

over

put

ting

up in

form

atio

non

the

sout

h m

arqu

ee. T

he n

orth

mar

quee

now

cov

ers

spor

ts, t

he a

rtga

llery

, spe

aker

s an

d ge

nera

ldi

stric

t eve

nts.

New

lette

rs a

rebe

ing

purc

hase

d to

rep

lace

thos

est

olen

or

brok

en.

Secu

re a

mar

quee

for

MV

C a

nd id

eally

aIn

form

atio

n O

ffic

erFa

ll, 1

998

Add

ition

al m

arqu

ee(s

) in

pla

ce. A

new

mar

quee

for

SJC

Fac

ilitie

sne

w S

JC m

arqu

ee a

nd a

n M

VC

mar

quee

are

def

inite

ly n

eede

d.T

he In

form

atio

n O

ffice

r is

wor

king

with

Fac

ilitie

s on

this

.

3132

Page 24: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

arri

ers

Impl

emen

tatio

n St

rate

gyA

ccou

ntab

ility

Tar

get D

ate

Eva

luat

ion

Ben

chm

arks

A. N

eed

for

switc

hboa

rd6.

a D

esig

n an

d im

plem

ent a

met

hod

of6.

b In

form

atio

n O

ffic

er6.

c C

urre

nt -

-6.

d In

form

atio

n fo

rm.

The

Pub

licop

erat

or a

war

enes

s of

all

corr

espo

nden

ce b

etw

een

all o

ffic

es/a

reas

ASB

ongo

ing,

enh

ance

dIn

form

atio

n O

ffice

pro

vide

sco

llege

eve

nts/

activ

ities

and

ASB

, and

the

switc

hboa

rdsw

itchb

oard

son

bot

h ca

mpu

ses

with

info

rmat

ion

rece

ived

, mon

thly

cale

ndar

s of

eve

nts,

cop

ies

of n

ews

rele

ases

, etc

., to

kee

p cu

rren

t.E

ffort

to im

prov

e th

at is

ong

oing

,es

peci

ally

in th

e ar

ea o

f ath

letic

sw

here

wea

ther

and

oth

erci

rcum

stan

ces

chan

ge d

ates

and

loca

tions

of e

vent

s. A

n in

form

atio

nfo

rm e

xist

s fo

r us

e by

clu

bs,

grou

ps, a

nd d

epar

tmen

ts to

giv

ein

form

atio

n to

the

Pub

licIn

form

atio

n O

ffice

, whi

ch th

engi

ves

it to

the

switc

hboa

rds.

Iqfo

rmat

ion

can

be fu

nnel

edth

roug

h th

e P

ublic

Info

rmat

ion

Offi

ce to

sw

itch

boar

ds to

avo

idco

nfus

ion.

A. N

eed

for

mor

e ef

fect

ive

7.a

Prov

ide

asse

ssm

ent a

t all

area

hig

h7.

b St

uden

t Ser

vice

s7.

c Fa

ilrf9

967.

d R

ecru

ituie

ut O

ffic

es n

ew h

ue)

coor

dina

tion

amon

g hi

ghsc

hool

s.R

ecru

itmen

t-O

ffic

ercu

rren

t --

All

high

sch

ools

in th

e S

JC s

ervi

cesc

hool

and

com

mun

ity c

olle

gest

aff

and

facu

ltyC

ouns

elor

son

goin

gar

ea a

re b

eing

don

e ea

ch s

prin

g.M

VC

has

mad

e th

e of

fer

to a

ll its

high

sch

ools

and

will

do

Per

ris.

Coo

rdin

ate

incr

ease

d co

mm

unic

atio

nSt

uden

t Ser

vice

sR

eciu

it[ne

nt O

ffic

e R

epu,

tth

roug

h ac

tiviti

es/m

eetin

gs b

etw

een

high

Mee

tings

occ

ur r

egul

arly

bet

wee

nR

ecitr

itrue

ot O

ffic

essc

hool

and

com

mun

ity c

olle

ge s

taff

and

facu

lty.

Cou

nsel

ors

coun

selo

rs a

t the

two

leve

ls.

Mee

tings

/act

iviti

es b

etw

een

high

scho

ol a

nd c

omm

unity

col

lege

sta

ffan

d fa

culty

343.

3

Page 25: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

..

Bie

rier

Ittit

ilem

enta

tiori

Ste

ateg

yhA

CC

Otin

tabi

lity.

.... :

.....

.....

Tae

ga D

ate.

....

.E*a

ltiat

ion,

enc

hitta

rks

A. N

eed

for

addi

tiona

l8.

a Se

ek a

venu

es f

or in

crea

sing

com

mun

ity8.

b St

uden

t Ser

vice

s8.

c Fa

ll, 1

997

--8.

dlu

i ii

iii

1 (n

ew li

ne)

know

ledg

e am

ong

com

mun

ityaw

aren

ess

of e

duca

tiona

l opp

ortu

nitie

s an

don

goin

gR

ey r

nitn

ieut

IC.

1R

eclu

itine

nt O

ffic

e R

epor

tm

embe

rs r

egar

ding

MSJ

Cco

mm

unity

act

iviti

es.

Publ

ic I

nfor

mat

ion

Rec

ords

. The

Cow

isel

uib

educ

atio

nal o

ppor

tuni

ties

and

Tec

h Pr

ep C

oord

inat

orPu

blic

Inf

orm

atio

n O

ffic

e ha

sco

mm

unity

act

iviti

esPu

blic

Inf

orm

atio

n O

ffic

erex

pand

ed it

s m

edia

and

oth

erou

tlets

to in

clud

e re

gion

alm

agaz

ines

and

rad

io, h

asen

hanc

ed r

elat

ions

with

med

iaw

ithin

the

dist

rict

, has

take

n pa

rtin

trad

e fa

irs

and

othe

r ev

ents

with

in th

e co

mm

uniti

es M

SJC

serv

ices

.

Coo

rdin

ate

com

mun

icat

ion

with

the

switc

hboa

rd s

o th

at in

com

ing

calls

reg

ardi

ngev

ents

/act

iviti

es a

re e

ffec

tivel

y ha

ndle

d.

Info

rmat

ion

Off

icer

Switc

hboa

rdC

urre

nt -

- on

goin

g,en

hanc

edT

he I

nfor

mat

ion

Off

icer

will

mai

ntai

ns a

file

on

com

mun

ityco

ntac

ts/p

ress

rel

ease

s an

d ar

ticle

s..

The

Pub

lic I

nfor

mat

ion

Off

ice

prov

ides

sw

itchb

oard

s on

bot

hca

mpu

ses

with

info

rmat

ion

rece

ived

, mon

thly

cal

enda

rs o

fev

ents

, cop

ies

of n

ews

rele

ases

,et

c., t

o ke

ep c

urre

nt. E

ffor

t to

impr

ove

that

is o

ngoi

ng, e

spec

ially

in th

e ar

ea o

f at

hlet

ics

whe

rew

eath

er a

nd o

ther

cir

cum

stan

ces

chan

ge d

ates

and

loca

tions

of

even

ts. A

n in

form

atio

n fo

rm e

xist

sfo

r us

e by

clu

bs, g

roup

s, a

ndde

part

men

ts to

giv

e in

form

atio

n to

the

Publ

ic I

nfor

mat

ion

Off

ice,

whi

ch th

en g

ives

it to

the

switc

hboa

rds.

Inf

orm

atio

n ca

n be

funn

eled

thro

ugh

the

Publ

icIn

form

atio

n O

ffic

e to

sw

itch

boar

dsto

avo

id c

onfu

sion

.

3536

Page 26: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Bar

rier

s.

.

linco

lem

enta

tion

Stra

tegy

Acc

ount

abili

ty..

:Tar

get D

ate

..:E

valn

atio

n B

ench

mar

ks...

,

A. N

eed

for

incr

ease

d'k

now

ledg

e am

ong

K-1

2st

uden

ts a

nd th

eir

pare

nts

rega

rdin

g co

llege

opp

ortu

nitie

san

d th

e hi

gher

edu

catio

nsy

stem

9.a

Prov

ide

K-1

2 st

uden

ts a

nd th

eir

pare

nts

Col

lege

Nig

ht p

rogr

ams

at a

rea

high

scho

ols

Prov

ide

Ope

n H

ouse

for

K-1

2 st

uden

ts a

ndth

eir

pare

nts

to to

ur c

ampu

s, m

eet s

taff

and

facu

lty, a

nd le

arn

of c

olle

ge o

ppor

tuni

ties

and

offe

ring

s.

Seek

gra

nt f

undi

ng to

incr

ease

out

reac

h.

9.c

Falir

.f99

7C

urre

nt -

-on

goin

g

.9.

b R

Gcl

i,;tn

lcllt

Off

icer

Cou

nsel

ors

Are

a H

igh

Scho

ols

9.d

Off

ices

vi

Ruc

initi

nent

Off

ice

Ref

/cut

Cou

nsel

ing

Off

ice

Rec

ords

. We

now

pro

vide

:1)

A C

olle

ge D

ay o

n ca

mpu

s fo

rju

nior

s an

d se

nior

s w

here

we

and

colle

ge r

epre

sent

ativ

es f

rom

oth

ersc

hool

s ar

e av

aila

ble.

2) I

nvita

tions

to 5

th g

rade

rs to

com

e an

d to

ur3)

We

have

als

o as

ked

the

pres

iden

t to

desi

gnat

e a

scho

ol d

ay(m

id-w

eek,

spr

ing)

as

a fa

culty

in-

serv

ice

day

for

an o

pen

hous

e.T

hen

all f

acul

ty a

nd s

taff

wou

ld b

ehe

re a

nd a

vaila

ble

for

moc

kcl

asse

s.

Rec

iuitn

lcnt

Off

iul

Cou

nsel

ors

Inst

ruct

iona

l Fac

ulty

Are

a H

igh

Scho

ols

Off

ice

of R

esea

rch

Fail,

199

7 C

urre

nt--

ong

oing

RIl

ritu

lellt

Off

icer

(ne

w h

ole)

Rec

ruiti

nellt

Off

ice

Rup

ult

Fund

ing/

gran

t rec

ords

Res

earc

h an

d D

evel

opm

ent R

epor

t.St

uden

t Ser

vice

s or

its

desi

gnat

edco

mm

ittee

will

pro

vide

a r

epor

t of

its f

indi

ngs.

Thr

ee g

rant

s an

d on

eco

nsor

tium

gra

nt h

ave

been

subm

itted

thro

ugh

the

Off

ice

ofR

esea

rch.

Oth

ers

are

in p

rogr

ess.

Spi j

ug, 1

996

Cur

rent

--

ongo

ing

Dea

n of

Dev

elup

itiet

itIn

stitu

tiona

l Adv

ance

men

t

A. N

eed

for

incr

ease

dre

crui

tmen

t eff

orts

/out

reac

h10

.a C

olle

ge N

ight

/Ope

n H

ouse

(Se

e A

.9.

a).

Seek

gra

nt f

undi

ng to

incr

ease

out

reac

h.

10.b

Stu

dent

Ser

vice

sR

ecru

itmen

t Off

icer

Off

ice

of R

esea

rch

Dea

n of

Dev

elop

nleu

tIn

stitu

tiona

l Adv

ance

men

t

10.c

Fal

l199

-7C

urre

nt -

- on

goin

g

Cur

rent

ongo

ing

10.d

Rec

ruitm

ent O

ffic

e R

epor

t

Res

earc

h an

d D

cvel

opul

eut

Rep

uit U

pdat

e. T

hree

gra

nts

and

one

cons

ortiu

m g

rant

hav

e be

ensu

bmitt

ed th

roug

h th

e O

ffic

e of

Res

earc

h. O

ther

s ar

e in

pro

gres

s.

BE

ST C

OPY

AV

AIL

AB

LE

Page 27: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Bar

rier

sIm

plem

enta

tion

Stra

tegy

AC

coim

itabi

lity

Tar

get

Eva

luat

ion

Ben

chm

arks

A. N

eed

for

stud

ents

to f

eel a

grea

ter

sens

e of

bel

ongi

ng o

r"m

atte

ring

" to

MSJ

Cco

mm

unity

12.a

Dev

elop

an

inte

rnal

fol

low

-up

syst

emfo

r ne

w/a

t ris

k st

uden

ts th

at ta

kes

plac

epr

ior

to f

irst

cen

sus.

Des

ign

and

impl

emen

t men

tori

ng s

yste

m f

orne

w/a

t ris

k st

uden

ts.

Prov

ide

stud

ents

with

a b

ookm

ark

listin

g al

lar

ea/d

epar

tmen

t per

sonn

el a

nd th

eir

resp

onsi

bilit

ies

and

phon

e nu

mbe

rs.

Prov

ide

Stud

ent H

andb

ooks

in S

tude

ntSe

rvic

es a

nd A

dmis

sion

s an

d R

ecor

dsof

fice

s.

Seek

stu

dent

inpu

t on

offi

ce/a

rea

orga

niza

tion.

12.b

Stu

dent

Ser

vice

sO

ffic

e of

Res

earc

h12

.c F

all,

f997

1998

--

ongo

ing

Fall,

199

7 --

ongo

ing

Fall,

199

6 --

ongo

ing

Fall,

199

6 --

ongo

ing

Fall,

199

7 --

ongo

ing

12.d

Fol

low

-up

syst

em d

esig

ned

and

in p

lace

.T

his

proc

ess

is n

ow u

nder

way

inth

e O

ffic

e of

Res

earc

h.

Men

tori

ng s

yste

m d

esig

ned

and

inpl

ace

Boo

kmar

k

Stud

ent h

andb

ooks

in d

esig

nate

dar

eas

Stud

ent E

quity

Rep

ort

Inst

itutio

nal R

esea

rch

Upd

ate.

In p

rogr

ess/

timel

ine

isap

prop

riat

e.

hstiu

ctiv

nal F

ai.,u

lty

Stud

ent S

ervi

ceIn

stru

ctio

nal F

acul

ty

Stud

ent S

ervi

ces

Stud

ent S

ervi

ces

Stud

ent S

ervi

ces

Off

ice

of R

esea

rch

A. N

eed

for

incr

ease

din

terc

ampu

s co

ordi

natio

n of

curr

icul

um-b

ased

and

stu

dent

serv

ices

pro

gram

s

13.a

Est

ablis

h a

proc

ess

to d

evel

op s

tude

ntaw

aren

ess

and

know

ledg

e of

voc

atio

nal a

ndce

rtif

icat

e pr

ogra

ms

(cla

ssro

ompr

esen

tatio

ns, i

nfor

mat

ion

tabl

es, e

tc...

).

Est

ablis

h a

com

pute

rize

d sy

stem

to id

entif

yan

d m

onito

r st

uden

t pro

gres

s an

d to

faci

litat

e th

eir

tran

sitio

n fr

om n

on-c

redi

t to

cred

it co

urse

s.

13.b

Tec

h-Pr

epC

oord

inat

orSt

uden

t Ser

vice

sFa

culty

Off

ice

of R

esea

rch

Stud

ent S

ervi

ces

13.c

Fal

l, 19

9719

98 -

- on

goin

g13

.d T

ech-

Prep

Rep

ort

Incr

ease

d tr

ansf

er r

ate

from

nonc

redi

t to

cred

it co

urse

s

Inst

itutio

nal R

esea

rch

Upd

ate

Mat

iicul

atiu

u D

uc,u

meu

tatiu

itC

urre

ntly

und

er a

sses

smen

t.

A. N

eed

for

asse

ssm

ent o

fvo

catio

nal c

ours

e of

feri

ngs

inre

latio

n to

com

mun

ity n

eeds

14.a

Ass

ess

the

com

mun

ity a

nd p

rese

ntvo

catio

nal c

ours

e of

feri

ngs

base

d on

rese

arch

fin

ding

s.

14.b

Off

ice

of I

nstr

uctio

n14

.c F

all,

1997

--

ongo

ing

14.d

lip R

cpoi

t

Inst

itutio

nal R

esea

rch

Upd

ate.

Und

erw

ay, i

n pr

ogre

ss. T

imel

ine

is a

ppro

pria

te.

1- 'o

p C

ooi l

ivat

orO

ffic

e of

Res

earc

hD

ean

of I

nstr

uctio

n/V

ocat

iona

l Edu

catio

n

3940

Page 28: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

N.) 4i

Bar

rier

s: .

Impl

emen

tatio

n St

rate

gyA

ccou

ntab

ility

Tar

get D

ate

:-.

:.:.:'

::.::i

::::i:

:::ii:

:::;i:

::':':

.:::::

:i?i..

::::::

.:::::

P:',.

.j::::

:::.-

.--

Eva

luat

ion

Ben

chm

arks

A. N

eed

for

addi

tiona

l,on

goin

g re

sear

ch o

f ar

eade

mog

raph

ics/

stud

ent b

ody

dem

ogra

phic

s

15.a

Con

duct

ong

oing

res

earc

h of

are

ade

mog

raph

ics/

stud

ent b

ody

dem

ogra

phic

san

d pr

ovid

e fi

ndin

gs to

Stu

dent

Ser

vice

s,In

stru

ctio

n, a

nd C

omm

unity

Edu

catio

n.

15.b

Off

ice

of R

esea

rch

15.c

Spr

ing,

199

7 -

- on

goin

g15

.d I

nstit

utio

nal R

esea

rch

Rep

ort

Stud

ent E

quity

Rep

ort

Des

ign

is in

pro

gres

s. T

imel

ine

isap

prop

riat

e.

A. N

eed

for

info

rmat

ion

diss

emin

atio

n/te

leph

one

serv

ices

in S

pani

sh

16.a

Ass

ess

area

s/de

part

men

ts/ p

rogr

ams

ofne

ed.

Wor

k w

ith te

leph

one

serv

ice

vend

or to

disc

uss

impl

emen

tatio

n of

pho

ne s

ervi

ce in

Span

ish

in d

esig

nate

d ar

eas.

16.b

Stu

dent

Ser

vice

s-

or -

Des

igna

ted

Com

mitt

ee

Bus

ines

s Se

rvic

es

16.c

Fal

l, 19

96

Fall,

199

7

16.d

Stu

dent

Ser

vice

s or

its

desi

gnat

ed c

omm

ittee

will

pro

vide

a re

port

of

its f

indi

ngs

Est

ablis

hmen

t of

phon

e se

rvic

es in

Span

ish

A. N

eed

for

addi

tiona

lSp

anis

h-sp

eaki

ng s

taff

17.a

Req

uest

all

stud

ent-

cont

act

area

s/de

part

men

ts/p

rogr

ams

to a

sses

s ne

edof

Spa

nish

spe

aker

s.

17.b

Stu

dent

Ser

vice

s17

.c S

prin

g, 1

996

17.d

Stu

dent

Ser

vice

s m

emo

to a

llst

uden

t-co

ntac

t are

as/

depa

rtm

ents

/pro

gram

sSt

uden

t Ser

vice

s ha

s be

gun

usin

g'b

iling

ual i

n E

nglis

h an

d Sp

anis

hde

sira

ble"

in a

ll jo

ban

noun

cem

ents

.

Aie

as/d

epar

tinei

its/p

iogi

anis

will

pie

sent

MI

ale

Sep

aitio

el, b

SUM

Ille

l , 1

996

Fall,

199

7 --

ongo

ing

Fall,

199

6

All

SW e

llt-t

AJ1

1 ac

t aie

as/

thei

l pi l

ul it

iLed

fui

diiig

s H

i WI

itiiig

to1.

710g

1 al

llb

Col

lege

Adm

inis

trat

ion

Hum

an R

esou

rces

Stud

ent S

ervi

ces

de1r

aitii

ieut

s/pi

ugiiu

us' W

I itt

eil

Stud

ent

Hir

e, r

eass

ign,

or

trai

n st

aff

as n

eede

d.

Prov

ide

all s

tude

nt c

onta

ct o

ffic

es w

ith a

list

of S

pani

sh s

peak

ing

pers

onne

l who

can

assi

st th

em u

ntil

addi

tiona

l hir

es/tr

aini

ng is

com

plet

e.

fuid

iiigs

Hir

ing

reco

rds/

Tra

inin

g pr

ogra

min

pla

ce. T

he p

rim

ary

need

for

Span

ish

spea

king

em

ploy

ees

is a

tfr

ont c

ount

ers

and

on te

leph

ones

whe

re c

omm

unity

mem

bers

mak

eth

eir

firs

t con

tact

with

the

colle

ge.

Thi

s is

gra

dual

ly ta

king

pla

ce a

sne

w s

taff

are

hir

ed.

Lis

t of

cont

act p

erso

nnel

that

incl

udes

pro

cedu

ral o

utlin

e

Page 29: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Bar

rier

sIi

ntile

itlen

tatio

Stra

tegy

Acc

onnt

abili

ty: !

..T

arge

t Dat

eE

valu

atio

n B

ench

mar

A. N

eed

for

incr

ease

d co

llege

-w

ide

use

of m

ultip

le m

easu

res

for

stud

ent p

lace

men

t

18.a

Eng

lish

and

Mat

h D

epar

tmen

ts w

illw

ork

with

Stu

dent

Ser

vice

s to

ass

ess

plac

emen

t tes

ts a

nd r

evis

e as

nee

ded

18.b

Stu

dent

Ser

vice

sE

nglis

h D

epar

tmen

tM

ath

Dep

artm

ent

18.c

Fal

l, 19

9718

.d R

epor

t of

depa

rtm

ent f

indi

ngs

Rev

ised

ass

essm

ent t

ests

(as

need

ed)

A. N

eed

for

incr

ease

din

stitu

tiona

l inp

ut to

orie

ntat

ion

and

regi

stra

tion

proc

esse

s

19.a

Exp

and

mul

ti-lin

gual

com

mun

icat

ion

capa

bilit

ies

(see

#14

& 1

5).

Mai

ntai

n re

gist

ratio

n op

enin

gs f

or a

ll sp

ecia

lgr

oups

(i.e

., E

OPS

, CA

RE

, dis

able

d, e

tc.)

Ass

ess

need

and

incr

ease

cre

dit c

ours

eof

feri

ngs

for

limite

d E

nglis

h sp

eaki

ngst

uden

ts.

Impr

ove

coor

dina

tion

betw

een

facu

lty a

ndst

aff

rega

rdin

g op

en c

lass

es, s

peci

al c

ours

eop

port

uniti

es f

or s

tude

nts,

and

occ

upat

iona

ltr

aini

ng/C

omm

unity

Ed.

cou

rses

.

19.b

Stu

dent

Ser

vice

sB

usin

ess

Serv

ices

Stud

ent S

ervi

ces

Off

ice

of I

nstr

uctio

nD

ean

of A

dmis

sion

s an

dR

ecor

ds

Off

ice

of I

nstr

uctio

nO

ffic

e of

Res

earc

h

Stud

ent S

ervi

ces

Off

ice

of I

nstr

uctio

nC

omm

unity

Edu

catio

n

19.c

Fal

l, 19

97

Ong

oing

Spri

ng, 1

997

--on

goin

g

Fall,

199

6 --

ongo

ing,

enh

ance

d

1

19.d

Exp

ansi

on o

f co

mm

unic

atio

nca

pabi

litie

s. U

nder

way

. Tim

elin

eis

app

ropr

iate

.

Stud

ent S

ervi

ces

repo

rt o

f fi

ndin

gs(s

ee A

.14

a& 1

5).

Reg

istr

atio

n op

enin

gs in

pla

ce

Inst

itutio

nal R

esea

rch

Upd

ate

Cur

ricu

lum

Com

mitt

ee M

inut

esR

esea

rch

desi

gn is

und

erw

ay.

Tim

elin

e is

app

ropr

iate

for

asse

ssm

ent.

For

cour

se a

ppro

val:

Fall,

199

7.

Coo

rdin

atio

n el

emen

ts in

pla

ce

A. N

eed

for

mor

e in

form

atio

nab

out r

eten

tion

fact

ors

20.b

Off

ice

of R

esea

rch

20.c

Spr

ing,

199

6 -

- on

goin

g20

.d I

nstit

utio

nal R

esea

rch

Upd

ate.

Und

erw

ay. T

imel

ine

isap

prop

riat

e.

20.a

Per

form

iitia

l and

luug

itudi

nal s

tudi

esex

amin

ing

rete

ntio

n fa

ctor

s.

Mat

iicul

atiu

n D

ot.,t

uneu

tutiu

u

43

44

Page 30: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Bar

rier

sIm

plem

enta

tion

Stra

tegy

Acc

ount

abili

tyT

arge

t Da

e..

.

va n

atio

n'en

chin

arks

A. N

eed

for

incr

ease

d le

vels

21.a

Inc

reas

e ou

trea

ch e

ffor

ts (

see

#9 a

nd21

.b S

tude

nt S

ervi

ces

21.c

Fal

l, 19

97 -

-21

.d R

ecru

itmen

t Off

ice

Rep

ort

of a

cces

s/ed

ucat

iona

lop

port

uniti

es f

or v

ario

usun

derr

epre

sent

ed g

roup

s

#10)

.C

ouns

elor

sIn

stru

ctio

nal F

acul

tyon

goin

g

Dev

elop

bili

ngua

l res

ourc

e lis

t to

prov

ide

bilin

gual

ser

vice

s to

stu

dent

s.St

uden

t Ser

vice

sFa

ll, 1

997

Res

ourc

e L

ist

Seek

gra

nt f

undi

ng a

nd r

esea

rch

outr

each

prog

ram

s to

ass

ist t

he C

olle

ge in

Off

ice

of R

esea

rch

Dea

n of

Dev

elop

men

tFa

ll, 1

997

Spri

ng,

1996

--

ongo

ing

Res

earc

h a,

iil D

evu

opul

ent R

epv,

tU

pdat

e.re

crui

tmen

t/ret

entio

n of

his

tori

cally

unde

rrep

rese

nted

stu

dent

s.In

stitu

tiona

l Adv

ance

men

tFu

ndin

g/gr

and

reco

rds.

Thr

eegr

ants

and

one

con

sort

ium

gra

ntha

ve b

een

subm

itted

thro

ugh

the

Off

ice

of R

esea

rch.

Mor

e ar

eun

derw

ay.

Est

ablis

h PU

EN

TE

on

the

MV

C c

ampu

s.C

ouns

elin

g D

epar

tmen

tFa

ll, 1

996

PUE

NT

E P

rogr

am in

pla

ce.

Eng

lish

Dep

artm

ent

Thi

s go

al h

as b

een

acco

mpl

ishe

d.T

he P

UE

NT

E p

rogr

am is

in p

lace

on th

e M

enif

ee C

ampu

s an

d th

eC

olle

ge p

lans

to e

stab

lish

the

prog

ram

on

the

San

Jaci

nto

Cam

pus.

Dev

elop

par

tner

ship

s w

ith a

genc

ies

serv

ing

disa

bled

citi

zens

to c

ondu

ct o

utre

ach

to th

eco

mm

unity

dis

able

d po

pula

tion.

Dis

able

d St

uden

t Ser

vice

sFa

ll, 1

996

Dis

able

d St

uden

t Ser

vice

s R

epor

t

Prod

uce

vide

os a

bout

the

Col

lege

and

its

Stud

ent S

ervi

ces

Fall,

199

7V

ideo

s. T

he P

ublic

Inf

orm

atio

npr

ogra

ms

and

serv

ices

. Dis

trib

ute

vide

osC

ouns

elor

sO

ffic

e ha

s pr

epar

ed a

pro

posa

l for

thro

ugho

ut th

e se

rvic

e ar

ea to

eth

nic

vari

ous

type

s of

vid

eos,

dep

endi

ngR

ecn,

itine

ut1.

.eco

mm

unity

and

cul

tura

l cen

ters

, pub

liclib

rari

es, a

nd h

igh

scho

ol c

ente

rs.

Info

rmat

ion

Off

icer

on th

e au

dien

ce. T

he ta

rget

dat

e is

appr

opri

ate,

giv

en b

udge

t and

prop

osal

app

rova

l.

Est

ablis

h a

pilo

t men

tori

ng p

rogr

am w

ithSt

uden

t Ser

vice

sFa

ll, 1

997

Rec

rait,

ueut

Off

ice

Rep

ort.

min

ority

mem

bers

of

the

com

mun

ity,

facu

lty, s

taff

, and

stu

dent

s to

pro

vide

supp

ort a

nd r

ole

mod

els

(see

#10

).

Men

tori

ng P

rogr

am in

pla

ce.

Rec

raitu

ieut

OfG

c,ei

Facu

ltyC

omm

unity

Org

aniz

atio

ns

Page 31: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Bar

rier

sIn

iple

men

tatit

itt, S

trat

egy

, AC

cOun

tabi

lity

: Tar

get .

0ate

:E

valu

atio

n B

enC

limar

A. N

eed

for

incr

ease

d di

sabl

ed22

.a I

nsta

ll an

ele

ctri

c do

or o

r be

ll fo

r D

SP22

.b S

tude

nt S

ervi

ces

22.c

Fal

l, 19

9822

.d E

lect

ric

door

or

bell

in p

lace

.st

uden

t acc

ess

to c

olle

gefa

cilit

ies

build

ing

entr

y po

ints

.D

isab

led

Stud

ent S

ervi

ces

Faci

lity

chan

ges

bein

g co

nsid

ered

prov

ide

bette

r ac

cess

.

Cre

ate

DSP

test

ing

spac

e at

MV

C.

Stud

ent S

ervi

ces

Dis

able

d St

uden

t Ser

vice

sFa

ll, 1

997

Tes

ting

spac

e de

term

ined

and

utili

zed.

Fac

ility

cha

nges

bei

ngco

nsid

ered

pro

vide

bet

ter

acce

ss.

A. N

eed

for

met

hods

to a

ssis

tst

uden

ts f

rom

low

23.a

Inc

reas

e st

uden

t and

fac

ulty

aw

aren

ess

of g

rant

fun

ding

/fin

anci

al a

id a

vaila

bilit

y by

23.b

Dea

n of

Dev

elop

men

t23

.d U

pdat

ed g

rant

info

rmat

ion

inlib

rari

es23

.c T

all,

Spri

ng, 1

997

soci

oeco

nom

ic b

ackg

roun

ds to

plac

ing

gran

t inf

orm

atio

n in

bot

h ca

mpu

sIn

stitu

tiona

l Adv

ance

men

ton

goin

gbe

com

e aw

are

of c

olle

ge a

s an

optio

n, to

enr

oll i

n co

llege

,an

d to

suc

ceed

in c

olle

ge

libra

ries

and

by

prov

idin

g fu

ndin

g up

date

sto

fac

ulty

.Fi

nanc

ial A

id

Prov

ide

addi

tiona

l ass

ista

nce

with

gra

ntFi

nanc

ial A

idFa

ll, 1

996

--Fu

ndin

g/gr

ant r

ecor

dsfu

ndin

g/fm

anci

al a

id a

pplic

atio

n pa

cket

s.A

SB S

tude

nt V

olun

teer

son

goin

g, p

endi

ng

Seek

gra

nd f

undi

ng to

incr

ease

acc

ess

toD

ean

of D

evel

upill

ent

Fall,

199

6 --

Incr

ease

d gr

ant a

pplic

atio

ns/g

rant

colle

ge f

or s

tude

nts

from

low

soc

ioec

onom

icIn

stitu

tiona

l Adv

ance

men

ton

goin

gfu

ndin

g. T

hree

gra

nts

and

one

back

grou

nds.

Facu

ltyco

nsor

tium

gra

nt h

ave

been

subm

itted

thro

ugh

the

Off

ice

ofR

esea

rch.

Mor

e ar

e un

derw

ay.

Res

earc

h pr

ogra

ms

desi

gned

to r

ecru

it an

dac

clim

ate

non

trad

ition

al s

tude

nts

to th

eD

ean

of D

evel

opul

ent

Inst

itutio

nal A

dvan

cem

ent

Fail-

;--f

99-7

Spr

ing,

1996

ongo

ing

Inst

itutio

nal R

esea

rch

Upd

ate

Fund

ing/

gran

t rec

ords

. Gra

nts

are

colle

ge e

nvir

onm

ent.

Off

ice

of R

esea

rch

unde

rway

. Pro

gram

res

earc

hde

laye

d un

til D

ean

of I

nstit

utio

nal

Adv

ance

men

t hir

ed.

Exp

and

child

care

fac

ilitie

s an

d ac

cess

at

Stud

ent S

ervi

ces

Fall,

199

9E

stab

lishm

ent o

f M

VC

fac

ilitie

s;SJ

C, a

nd e

stab

lish

child

care

fac

ilitie

s at

Chi

ldca

re C

ente

rin

crea

sed

SJC

hou

rs/e

mpl

oyee

s.M

VC

.T

his

stra

tegy

is a

ppro

pria

te, a

ndfu

ndin

g ha

s be

en a

ppro

ved

bySa

cram

ento

.

Page 32: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Bar

rier

s.:.

.:I

mpl

emen

tatio

n :S

trat

egy

.

Acc

ount

abili

tyT

arge

t Dat

e:E

valU

atio

n-B

ench

mar

ks

A. N

eed

for

incr

ease

d st

udy

skill

s /c

olle

ge li

fe a

mon

gin

com

ing

stud

ents

in g

ener

al,

spec

ific

ally

his

tori

cally

unde

rrep

rese

nted

and

stu

dent

sfr

om lo

w s

ocio

econ

omic

back

grou

nds

24.b

Sub

co«u

u;ttr

e24

.c S

prin

g, 1

996

1997

Fall,

199

7

Fall,

199

7

24.a

Res

eaiL

h fe

asib

ility

of

eg

a11

Skal

lege

life

24.d

Rep

ort p

iepi

ued

bySu

bcuu

unitt

ee. C

ours

e C

atal

og.

The

res

truc

turi

ng o

f E

nglis

hof

feri

ngs

to a

fou

r un

it fo

rmat

will

adva

nce

thes

e go

als

mor

eef

fect

ivel

y. T

here

fore

, cou

rse

wor

kdu

plic

atio

n in

the

Rea

ding

pro

gram

and

Gui

danc

e of

feri

ngs

will

not

occu

r.

Rep

ort p

repa

red

by th

e O

ffic

e of

Inst

ruct

ion.

Und

erw

ay. T

heco

llege

has

sub

mitt

ed a

gra

nt,

curr

ently

und

er c

onsi

dera

tion,

toad

dres

s th

ese

area

s.

num

d u

ly u

n ui

stu

dy b

esta

blis

hed

by th

esk

ills

C.U

111S

e te

am ta

ught

by

eti i

nStiu

utiu

nal

Aca

deuu

c Se

nate

Eng

lish

Dep

artm

ent

Off

ice

of I

nstr

uctio

n

Dea

n of

Ins

truc

tion

facu

lty a

nd L

ouus

elui

b: R

estr

uctu

re E

nglis

hco

urse

off

erin

gs to

a f

our

unit

form

at.

Incr

ease

lab

hour

s.

Incr

ease

tuto

r ac

cess

at M

VC

.

4950

Page 33: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Basic Skills Completion Rates at MSJC

Basic Math Completion Rates Research, Spring 1995The percentage of students who completed the degree-applicable course (Math90) within two semesters of having completed the final basic skills course(Math 51).

Population 1992 enrolled % in Math 51 % in Math 90

Asian 1.92% n=175 8.0% n=14 35.7% n=05

African American 2.66% n=243 16.1% n=39 30.8 n=12

Filipino 0.93% n=085 25.9% n=22 22.7% n=05

Hispanic 19.18% n=1751 13.3% n=233 31.8% n=74

Native American 2.57% n=235 25.1% n=59 22.0% n=13

White 68.10% n=6215 26.3% n=1072 46.2% n=383

Pacific Islander 0.26% n=024 12.5% n=03 66.7% n=02

Disabled 0.02% n=193 0.0% n=0 0.0% n=0

Females 62.94% n=5738 19.82% n=1137 35.62% n=405

1992 enrolled signifies opening course enrollment

% in Math 51 represents a subset of 1992 enrolled: students who enrolled in Math 51 during their academic career

% in Math 90 represents the subset of % in Math 51 enrolled who completed Math 90 within two semesters of havingtaken Math 51

"n" = the total number of students

(Benchmark figures exclude Unknown and Decline to State categories; therefore, the total of the seven ethnicity/racegroupings does not equal 100%. Disabled data represent only those students utilizing the Disabled Students Programand may therefore not be entirely representative.)

5127

Page 34: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Basic English Completion Rates Research, Spring 1995The percentage of students who completed the degree-applicable course(English 98) within two semesters of having completed the final basic skillscourse (English 60;64).

ii Population . 1992 enrolled % Eng. 60/64 % Eng. 98

Asian 1.92% n =175 39.4% n=69 23.2% n=16

African American 2.66% n=243 20.6% n=50 32.0% n=16

Filipino 0.93% n=085 38.8% n=33 30.3% n=10

Hispanic 19.18% n=1751 19.6% n=343 27.4% n=94

Native American 2.57% n=235 20.4% n=48 25.0% n=12

White 68.10% n=6215 12.1% n=754 32.5% n=245

Pacific Islander 0.26% n=024 12.5% n=3 33.3% n=1

Disabled 0.02% n =193 0.0% n=0 0.0% n=0

Female 62.94% n=5738 15.68% n=900 23.0% n=207

1992 enrolled signifies opening course enrollment

% Eng. 60/64 represents a subset of 1992 enrolled: students who enrolled in English 60 during their academic career

% English 98 represents the subset of % Eng. 60/64 students who completed English 98 within two semesters of havingtaken either English 60 or English 64

"n" = the total number of students

(Benchmark figures exclude Unknown and Decline to State categories; therefore, the total of the seven ethnicity/racegroupings does not equal 100%)

52

28

Page 35: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Research Implications, 1995Successful completion rates in ESL/basic skills courses are an important indicator of studentsuccess, specifically for historically underrepresented student populations. Statewide basic skillscourse completion rates tend to be lower than completion rates in all other course work areas.According toMeacnres (April, 1995), Statewide completion rates were 4.4% for ESL courses and 9.3% forremediation/basic skills courses for Fall 1992. Presumably, the statewide rates for successfulcompletion of degree-applicable course work in the discipline within a given number of semestersof having completed the final basic skills course would be significantly lower. Mt. San JacintoCollege found that the lack of transfer level ESL course offerings compromised accurateassessment of student progress in ESL. Completion rates from final ESL courses (English53/54), which are non-transferable, to the degree-applicable English course (English 98) arevirtually non-existent, with 0.0006% being the highest average (Hispanic) for all ethnicgroupings.

I I . II 11 11 I II 1 -.I " r es . I

Basic skills course completion rates in English (within two semesters) are fairly evenlydistributed, with a mean of 29.1%. Successful completion rates are highest for Pacific Islanders,whites, and African Americans, in that order. Completion rates are lowest for Asians, females,Native Americans, and Hispanics, in that order. The range between all groupings is 10.1%. Therange between all groupings except for Pacific Islanders, whose group is comprised of threeindividuals and hence skews the sample, is.9.3%. No disabled students enrolled.

Successful course completion rates in math (within two semesters) have a range of 44.7%, with amean completion rate of 36.6%. Distribution reflects significantly higher completion rates forPacific Islanders, whose grouping is comprised of three individuals and hence skews thesampling. The range without this grouping is 24.2%. Whites have the second highestcompletion rate, though they fall 20.5% below Pacific Islanders. Asians and females are third atapproximately 10.5% lower than whites. Lowest completion rates are held by Filipinos andNative Americans, whose rates differ by only 0.7%. These results display the importance ofbreaking Asians into as many categories as possible, as their success rates as well as their culturesdiffer widely. No disabled students enrolled in Math 51.

Goal: To improve by 5% a year the percentage of students who successfullycomplete the degree-applicable course in English (English 98) within sixsemesters of having completed the final ESL course

Goal: To improve by 5% a year the percentage of students who successfullycomplete the degree-applicable course (English 98) within two semesters ofhaving completed the final basic skills course (English 60)

Goal: To improve by 5% a year the percentage of students who successfullycomplete the degree-applicable course (Math 90) in the discipline withintwo semesters of having completed the final basic skills course (Math 51)

5329

Page 36: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Basic Math Completion Rates Research, Spring 1996The percentage of students who completed the degree-applicable course (Math90) within two semesters of having completed the final basic skills course(Math 51).

Population 1993 enrolled % in Math 51 ,i % in Math 90

Asian 2.02% n=146 9.59% n=14 35.71% n=5

African American 3.34% n=242 19.42% n=47 27.66% n=13

Filipino 1.13% n=82 24.39% n=20 25.00% n=5

Hispanic 16.39% n=1186 21.75% n=258 34.88% n=90

Native American 2.56% n =185 26.49% n=49 28.57% n=14

White 70.31% n=5089 19.73 % n=1004 38.45% n=386

Pacific Islander 0.32% n=23 17.39% n=4 50.00% n=2

Disabled 3.19% n=231 40.69% n=94 38.30% n=36

Females 62.59% n=4530 24.13% n=1093 37.79% n=413

1993 enrolled signifies opening course enrollment

% in Math 51 represents a subset of 1993 enrolled: students who enrolled in Math 51 during their academic career

% in Math 90 represents the subset of % in Math 51 enrolled who completed Math 90 within two semesters of havingtaken Math 51

"n" = the total number of students

(Benchmark figures exclude Unknown and Decline to State categories; therefore, the total of the seven ethnicity/racegroupings does not equal 100%. Disabled data represent only those students utilizing the Disabled Students Programand may therefore not be entirely representative.)

54

30

Page 37: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Basic English Completion Rates Research, Spring 1996The percentage of students who completed the degree-applicable course(English 98) within two semesters of having completed the final basic skillscourse (English 60;64).

Population 1993 enrolled % Eng. 60/64 % Eng. 98

Asian 2.02% n =146 36.30% n=53 35.85% n=19

African American 3.34% n=242 16.12% n=39 25.64% n=10

Filipino 1.13% n=82 35.37% n=29 34.48% n=10

Hispanic 16.39% n =1186 22.77% n=270 28.89% n=78

Native American 2.56% n =185 14.59% n=27 33.33% n=9

White 70.31% n=5089 11.30% n=575 37.57% n=216

Pacific Islander 0.32% n=23 8.70% n=2 100.00% n=2

Disabled 3.19% n=231 45.45% n=105 34.29% n=36

Female 62.59% n=4530 15.43% n=699 33.62% n=235

1993 enrolled signifies opening course enrollment

% Eng. 60/64 represents a subset of 1993 enrolled: students who enrolled in English 60 during their academic career

% English 98 represents the subset of % Eng. 60/64 students who completed English 98 within two semesters of havingtaken either English 60 or English 64

"n" = the total number of students

(Benchmark figures exclude Unknown and Decline to State categories; therefore, the total of the seven ethnicity/racegroupings does not equal 100%)

5531

Page 38: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Research Implications, 1996

Basic math completion rates for Asians have remained within 1% of 1995 percentages. AfricanAmericans (at 3.14%) and Whites at (7.75%) both experienced a drop in completion rates,whereas gains were made by disabled students (38.30%), Native Americans (6.57%), Hispanics(3.08%), Filipinos (2.3%), and female students 2.17%).

Basic English completion rates for African Americans fell by 6.36%, whereas gains were madeby disabled students (34.39%), female students (10.62%), Native Americans (8.33%), Whites(5.07%), Filipinos (4.18%), and Hispanics (1.49%).

While the goal of increasing successful completion has been surpassed by disabled students andmet by Native Americans in math and English and by Whites in English, the College needs toincrease retention efforts. The drop in successful completion rates experienced by AfricanAmericans in both math and English is cause for concern.

56

32

Page 39: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

ESL

/BA

SIC

SK

ILL

S C

OM

PLE

TIO

NB

arri

ers

Impl

emen

tatio

n St

rate

gyA

ccou

ntab

ility

Tar

get D

ate

Eva

luat

ion

Ben

chm

arks

E. N

eed

for

grea

ter

acce

ss to

stud

ent s

uppo

rt s

ervi

ces

l.a E

valu

ate

met

hods

for

incr

easi

ng s

tude

ntac

cess

to c

ouns

elin

g, f

inan

cial

aid

, and

care

er s

ervi

ces.

Eva

luat

e m

etho

ds f

or in

crea

sing

stu

dent

acce

ss to

cla

ssro

om, l

ab, a

nd li

brar

y sp

ace

and/

or h

ours

.

1.b

Stud

ent S

ervi

ces

Dea

n of

Ins

truc

tion

Lib

rari

ans

1.c

Fall,

199

7

Fall,

199

7

1.d

Stud

ent S

ervi

ces

Rep

ort

Mat

ricu

latio

n D

ocum

enta

tion

Dea

n of

Ins

truc

tion/

Lib

rary

Rep

ort

E. N

eed

for

low

enr

ollm

ent

ESL

cou

rses

to b

e su

stai

ned

soth

at s

tude

nts

are

not p

reve

nted

from

ESL

cou

rse

sequ

ence

com

plet

ion

2.a

Ass

ess

feas

ibili

ty o

f co

nver

ting

ESL

cour

ses

to p

rote

cted

(O

meg

a) s

tatu

s.2.

b E

nglis

h D

epar

tmen

tC

urri

culu

m C

omm

ittee

2.c

Fall,

199

62.

d E

nglis

h D

epar

tmen

t mem

o to

Cur

ricu

lum

Com

mitt

ee.

Cur

ricu

lum

Com

mitt

ee M

inut

es.

The

Cur

ricul

um C

omm

ittee

will

addr

ess

this

nee

d as

soo

n as

isco

mes

forw

ard

from

the

Eng

lish

Dep

artm

ent.

E. N

eed

for

grea

ter

flue

ncy

of E

nglis

h in

stu

dent

bod

y3.

a D

eter

min

e fe

asib

ility

of

offe

ring

low

erle

vel E

SL/C

omm

unity

Ed.

cou

rses

eac

hse

mes

ter.

3.b

Eng

lish

Dep

artm

ent

Com

mun

ity E

duca

tion

3.c

Fall,

199

73.

d E

nglis

h D

etra

,t,t,e

ut M

ettu

,glv

t-ir

mte

sC

ours

es in

pla

ce

E. N

eed

for

grea

ter

acce

ss to

cour

ses

for

seco

nd la

ngua

gest

uden

ts

4.a

Det

erm

ine

feas

ibili

ty o

f of

feri

ngtr

ansf

er-l

evel

, pro

tect

ed (

Om

ega)

ESL

and

sequ

ence

d co

urse

s th

at p

aral

lel E

nglis

h 60

and

98.

Det

erm

ine

feas

ibili

ty o

f of

feri

ng C

omm

unity

Edu

catio

n E

SL c

ours

es, d

esig

ned

totr

ansi

tion

stud

ents

into

col

lege

cre

dit E

SLco

urse

s, e

ach

sem

este

r.

4.b

Eng

lish

Dep

artm

ent

Cur

ricu

lum

Com

mitt

ee

Eng

lish

Dep

artm

ent

Com

mun

ity E

duca

tion

4.c

Fall,

199

7

Fall,

199

7

4.d

Eng

lish

Dep

artm

ent M

eetin

gM

inut

es.

Cur

ricul

um C

omm

ittee

Min

utes

.T

he C

urric

ulum

Com

mitt

ee w

illad

dres

s th

is n

eed

as s

oon

as it

com

es fo

rwar

d fr

om th

e E

nglis

hD

epar

tmen

t.

Eng

lish

Dep

artm

ent M

eetin

gM

inut

es

5758

Page 40: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Bar

tiers

.Iin

Ole

men

tatio

niSt

irA

gy,

Act

oUri

tabi

lity,

;Tar

get-

bate

Eva

luat

ion

:Ber

ithrt

tark

s

E. N

eed

for

incr

ease

d st

udy

skill

s am

ong

ESU

Bas

ic S

kills

stud

ents

5.a

-,..:

19II

..:I

.1.1

5.c

Spri

ng, 1

997

Fall,

199

7

Spri

ng, 1

996

--on

goin

g

5.b

..11.

7111

1111

5.d

R W

I pi

p 1

byilb

ill d

Ory

one

uni

t stu

dy s

kills

1 Se

(G

aul

esta

blis

h 1

ed b

y A

caile

lllic

,

Sena

teE

nglis

h D

epar

tmen

t

Off

ice

of I

nstr

uctio

n

Dea

n of

Ins

truc

tion

Stud

ent S

ervi

ces

Sit

uuul

titte

eC

ours

e ca

talo

g

The

res

truc

turin

g of

Eng

lish

offe

rings

to a

four

-uni

t for

mat

will

adva

nce

thes

e go

als

mor

eef

fect

ivel

y.T

here

fore

, cou

rse

wor

kdu

plic

atio

n in

the

Rea

ding

pro

gram

and

Gui

danc

e of

ferin

gs w

ill n

otoc

cur.

Rep

ort p

repa

red

by O

ffic

e of

Inst

ruct

ion

taug

ht b

y al

l ius

trut

-tio

udl f

aulty

dud

,ot

lllse

luls

, at

leas

t fvl

hig

h -r

isk

stud

ents

Incr

ease

lab

hour

s.

Incr

ease

tuto

r ac

cess

at b

oth

site

s.

E. N

eed

for

incr

ease

dtr

acki

ng o

f lo

w s

cori

ng a

nd/o

rhi

gh r

isk

stud

ents

6.b

Off

ice

of R

esea

rch

6.c

Spri

ng, 1

997

--on

goin

g6.

d In

stitu

tiona

l Res

earc

h U

pdat

e6.

a Pe

rfor

m in

itial

and

long

itudi

nal-

stud

ies

trac

king

low

sco

ring

and

/or

high

ris

kst

uden

ts.

Mat

liLal

atio

u D

UL

.uII

lellt

atiU

llD

esig

nis

und

erw

ay. T

imel

ine

isap

prop

riate

.

E. N

eed

for

incr

ease

daw

aren

ess

of p

rogr

am o

ptio

nsin

stu

dent

bod

y

7.a

Dis

sem

inat

e si

mpl

ifie

d lis

ts a

nd/o

rch

arts

abo

ut p

rogr

ams/

prog

ram

opt

ions

toco

unse

lors

and

in c

lass

room

s.

7.b

Aca

dem

icD

epar

tmen

ts7.

c Fa

ll, 1

996

--on

goin

g7.

d D

epar

tmen

t file

sC

ours

e lis

ts/c

hart

s.

5960

Page 41: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Bar

rier

s'hi

iple

men

tAtio

n st

rate

gy .:

.

;Acc

ount

Abi

lity

Tar

get D

ate

:.:E

,fas

tiAtio

ri:iB

eric

hilla

tit.:

:

E. N

eed

for

grea

ter

8.a

Flex

act

ivity

foc

used

in th

is a

rea

for

all

8.b

Flex

Com

mitt

ee8.

c Fa

ll, 1

997

8.d

Flex

Han

dboo

kin

stru

ctio

nal f

acul

ty a

war

enes

sof

the

role

of

lang

uage

in th

ele

arni

ng p

roce

ss a

nd th

ena

ture

of

lear

ning

in a

sec

ond

lang

uage

inst

ruct

iona

l fac

ulty

.In

stru

ctio

nal F

acul

tyE

ach

year

, the

Fle

x C

omm

ittee

puts

into

the

Janu

ary

sche

dule

at

leas

t one

cla

ss d

evot

ed to

the

use

of w

ritin

g in

the

clas

sroo

m. T

he19

96 p

rogr

am in

clud

ed "

Wha

t I'm

Thi

nkin

g, "

a w

orks

hop

in w

hich

inst

ruct

ors

stud

ied

the

conn

ectio

nbe

twee

n w

ritin

g an

d th

inki

ng v

iacr

eativ

e w

ritin

g te

chni

ques

. The

1997

pro

gram

con

tain

s th

ew

orks

hop

'Wri

ting

Acr

oss

the

Dis

cipl

ines

." A

dditi

onal

ly, t

he F

lex

Com

mitt

ee w

ill in

vest

igat

epr

esen

ting

a re

pris

e of

a w

orks

hop

pres

ente

d m

any

year

s ag

o en

title

d'T

he M

usic

ality

of

Lan

guag

e, "

asw

ell a

s a

requ

est o

f D

r. C

arl G

aofo

r a

wor

ksho

p in

teac

hing

ESL

stud

ents

.

E. N

eed

for

grea

ter

facu

lty9.

a Fl

ex a

ctiv

ity f

ocus

ed in

this

are

a fo

r al

l9.

b Fl

ex C

omm

ittee

9.c

Fall,

199

79.

d Fl

ex H

andb

ook

awar

enes

s of

opt

imal

lear

ning

styl

es a

nd e

nvir

onm

ents

amon

g st

uden

ts

inst

ruct

iona

l fac

ulty

.In

stru

ctio

nal F

acul

tyT

he f

lex

prog

ram

has

off

ered

in th

epa

st a

nd w

ill c

ontin

ue to

off

erw

orks

hops

on

unde

rsta

ndin

gdi

ffer

ence

s in

lear

ning

sty

les

and

how

to te

ach

mul

tiple

inte

llege

nces

.Fo

r ex

ampl

e, th

e 19

97 p

rogr

amof

fers

a M

yers

-Bri

ggs

lear

ning

inve

ntor

y w

orks

hop.

Add

ition

ally

,th

e Fl

ex C

omm

ittee

will

end

eavo

rto

add

a c

ultu

ral a

war

enes

sw

orks

hop

to th

e 19

97 p

rogr

am.

61

BE

ST C

OPY

AV

AIL

AB

LE

62

Page 42: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

63

Bat

rier

s.

:... :

.,..

,.,..,

..:...

.:...:

.:::::

::.:.

,.....

:.

.:. .

...Im

plem

enta

tion:

Str

ateg

y::

:.

:. ::

::::

-::::

:::.:-

::::-

:':,::

.-;':

::::::

::.':,

i.:'::

::.'

::Acc

otib

tabi

lity.

::i:.:

:::H

..:

...::.

:.....

::Tar

getE

Pat

e :.:

,'.;.:

:::.i:

:::::,

:-:..

.....

...::

:i:i.:

-::i:

i:::::

::::::

.:::::

::.E

ya p

atio

n:::1

1.en

chm

ar.

.iy10

.b M

ath-

Dep

-art

men

tE

. Nee

d to

det

jeae

-cl

ass-

size

10.a

Dut

eim

nie

SIof

ita

,ing

10.c

Spi

ing,

199

710

.d M

ath

1 D

epai

'tnie

iit M

eetin

g

in E

tiglis

h 60

and

Mat

h I

soco

urse

JIL

.G.

Eng

lish

Dep

aitin

elit

Min

utes J

that

stu

dent

s m

ay o

btai

neu

ilic.

n U

ni C

oiiu

nitte

eiii

ciea

sed

iiltli

vidu

al a

ttent

ion

Thi

s is

not

cur

rent

ly f

easi

ble.

The

Col

lege

will

con

duct

rese

arch

to e

stab

lish

the

valid

ity o

f th

e ba

rrie

r.Pr

evio

us c

ours

e si

zere

duct

ions

hav

e no

t aff

ecte

dpe

rsis

tenc

e or

suc

cess

.

Sejie

ii o

inla

tiOn-

10i

n ot

lei i

olle

ges

with

ilig

1 D

epai

tuie

iit M

eetin

gsn

ialle

i cla

sses

reg

aidi

iig s

tude

iit s

ucce

ss.

Min

utes

E. N

eed

to il

la h

igh

11.a

hii.

ieae

I I

d ili

llU

l b w

ith a

rea

11.b

1;_

a i .

1.ni

Oif

icei

11.c

Cui

teut

11.d

Aiti

cula

tiou

Upd

ata

SC. 1

UU

b in

oic

IdW

aIG

of

high

I b

l, IO

U b

ongo

ing,

eiik

uii.e

dtiL

d M

ilk, w

i i in

g i m

ini'

eine

n S

ofE

nglis

h pi

ogi

tun

E. N

eed

for

incr

ease

d re

adin

gsk

ills

amon

g in

com

ing

stud

ents

so

that

they

are

bet

ter

able

to a

cces

s co

llege

text

book

s

12.a

Dev

elop

sho

rt-t

erm

imm

ersi

on c

ours

esin

rea

ding

.12

.b E

nglis

h D

epar

tmen

t12

.c F

all,

1997

12.d

Cur

ricu

lum

Com

mitt

eeM

inut

es

E. N

eed

for

mor

eun

ders

tand

ing

abou

t col

lege

on

the

part

of

inco

min

g M

SJC

stud

ents

13.a

Dev

elop

rig

orou

s, m

anda

tory

orie

ntat

ion

prog

ram

for

all

inco

min

gst

uden

ts.

Exp

and

outr

each

eff

orts

to p

aren

ts o

f M

SJC

and

futu

re M

SJC

stu

dent

s.

13.b

Mat

iicuh

atiu

uC

oinn

iitte

tiSt

uden

t Ser

vice

s

Rec

ruitm

ent-

Off

icer

(new

13.b

Fal

l, 19

9713

.d M

atxi

culu

tioa

Con

iniit

tee

Min

utes

Ori

enta

tion

Doc

umen

ts

Rer

uitm

ent-

Off

ice-

Rep

ort

Out

reac

h D

ocum

ents

Spi i

ng, 1

997

Cur

rent

ongo

ing

lire)

Stud

ent S

ervi

ces

E. N

eed

for

asse

ssm

ent/

eval

uatio

n of

mat

h an

d E

nglis

hpl

acem

ent m

easu

res

14.a

Ass

ess

mat

h an

d E

nglis

h pl

acem

ent

mea

sure

s.14

.b M

ath

Dep

artm

ent

Eng

lish

Dep

artm

ent

Cou

nsel

ors

14.c

Spr

ing,

199

714

.d P

lace

men

t mea

sure

rev

isio

n/up

date

Mat

iicul

dtio

n C

omm

ittee

Min

utes

E. N

eed

for

mor

e in

tera

ctio

nw

ith a

djun

ct f

acul

ty15

.a D

evel

op p

rogr

am o

f in

tera

ctio

nbe

twee

n ad

junc

t and

ful

l tim

e fa

culty

.15

.b A

cade

mic

Dep

artm

ents

15.c

Fal

l, 19

9715

.d P

rogr

am o

f in

tera

ctio

n in

plac

e -o

r- F

lex

Han

dboo

k (a

ctiv

ity)

Page 43: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Bar

rier

S.Im

plem

enta

tion

Stra

tegy

...:

::::::

:

Acc

ount

abili

ty-,

.,ar

geti:

Dat

e.:

:

Eva

luat

ion

Ben

chm

arks

.t...

16.c

Fat

t719

97E

. Ner

d f0

1 gr

eate

r16

.a 6

icre

ase

aItI

Lul

atiu

n cf

f I-

II b

bet

wcc

u16

.b'

ta ju

t' O

f tc

..1

16.d

AC

tit,u

lntio

u an

dtth

iCul

atiu

uar

ticul

a in

n be

twee

n K

-12

MSJ

C a

nd K

-12

eat

, let

S.

R p

01 b

tudd

iel s

and

MSJ

Lou

ise

offe

r ill

s

E. N

eed

for

ESL

pla

cem

ent

mea

sure

s17

.a S

ecur

e sa

mpl

e te

stin

g m

easu

res

from

othe

r co

llege

s

Ass

ess

feas

ibili

ty o

f ex

pand

ing

asse

ssm

ent

proc

ess

to a

ccom

mod

ate

inco

min

g E

SLst

uden

ts.

Wor

k w

ith a

rea

scho

ols

to in

crea

seaw

aren

ess

of th

e im

port

ance

of

corr

ect/v

alid

asse

ssm

ents

.

17.b

Eng

lish

Dep

artm

ent

Mat

ricu

latio

n C

omm

ittee

17.c

Fal

l, 19

97

Fall,

199

7

Fall,

199

6 --

Spri

ng, 1

997

17.d

Pla

ceri

ent m

easu

re r

evis

ion/

upda

te

Mat

ricu

latio

n D

ocum

enta

tion

Art

icul

atio

n-U

pdat

eM

eetin

g D

ocum

enta

tion

1 IC

d IO

U O

filL

etR

ecru

itmen

t-ef

fice

rC

ouns

elor

s

E. N

eed

for

bilin

gual

coun

selin

g se

rvic

es f

or E

SLst

uden

ts o

n bo

th c

ampu

ses

18.a

Ass

ess

ESL

cou

nsel

ing

need

.

Req

uest

nee

ded

trai

ning

and

/or

addi

tiona

lco

unse

lor(

s).

18.b

Cou

nsel

ors

.

Stud

ent S

ervi

ces

18.c

Fal

l, 19

97

Fall,

199

7

18.d

Cou

nsel

ing

Dep

artm

ent

Mer

nola

ndur

nR

ecor

ds

E. N

eed

for

effe

ctiv

e re

adin

gan

d w

ritin

g sk

ills

with

inst

uden

t pop

ulat

ion

19.a

Wor

k to

enh

ance

wri

ting

acro

ss th

ecu

rric

ulum

.

Wor

k to

incr

ease

enr

ollm

ent i

n re

adin

gcl

asse

s.

Dev

elop

a s

hort

term

imm

ersi

on c

ours

e in

read

ing.

19.b

Aca

dem

icD

epar

tmen

ts

Eng

lish

Dep

artm

ent

Eng

lish

Dep

artm

ent

19.c

Fal

l, 19

96

Fall,

199

6

Fall,

199

7

19.d

Cou

rse

guid

elin

esC

ours

e sy

llabi

Flie

rs f

or c

ouns

elor

s, c

lass

room

,an

d ge

nera

l col

lege

dis

trib

utio

n

Cur

ricu

lum

Com

mitt

ee M

inut

es

E. N

eed

for

stud

ent a

cces

s to

full

arra

y of

day

and

eve

ning

ESL

cou

rse

offe

ring

s on

bot

hca

mpu

ses

20.a

Dev

elop

add

ition

al E

SL c

ours

es in

acco

rdan

ce w

ith n

on c

redi

t and

cre

dit

need

s.

Off

er p

ilot E

SL c

ours

es w

ith p

rote

cted

stat

us (

Om

ega)

for

day

and

eve

ning

stud

ents

.

20.b

Com

mun

ityE

duca

tion

Eng

lish

Dep

artm

ent

Eng

lish

Dep

artm

ent

20.c

Spr

ing,

199

8

Fall,

199

8

20.d

Eng

lish

Dep

artm

ent M

inut

es

Eng

lish

Dep

artm

ent

Min

utes

CuI

li u

unr

Com

mic

ittee

Min

utes

65

Page 44: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

BáI

Tie

is.

::

linip

lem

ento

tiort

: Sfr

ateg

y,:

Acc

ount

abili

tyT

arge

tpat

e::::

::::::

:::

Eva

itiA

ticir

itetiC

hini

Atk

:::-:

::!:

E. N

eed

for

effe

ctiv

e tr

acki

ngof

ESL

/Bas

ic S

kills

stu

dent

s21

.a C

reat

e an

d im

plem

ent i

nitia

l and

long

itudi

nal r

esea

rch

trac

king

ESL

/Bas

icSk

ills

stud

ents

.

21.b

Off

ice

of R

esea

rch

21.c

Spr

ing,

199

7;

;21

.d7:

1I

-ll

al -

ID

ocui

iieiit

atiu

ii

Inst

itutio

nal R

esea

rch

Upd

ate

Des

ign

is u

nder

way

. Tim

elin

e is

appr

opri

ate,

E. N

eed

for

pre-

colle

ge c

redi

tle

vel c

ours

es f

or E

SL s

tude

nts

offe

red

each

sem

este

r

22.a

Det

erm

ine

feas

ibili

ty o

f of

feri

ng lo

wer

leve

l ESL

Com

mun

ity E

d. C

ours

es e

ach

sem

este

r.

22.b

Eng

lish

Dep

artm

ent

Com

mun

ity E

duca

tion

22.c

Fal

l, 19

9722

.d E

nglis

h D

epar

tmen

till

CS

Cou

rse

sche

dule

E. N

eed

for

stud

ents

to b

egin

mat

h se

quen

ce d

urin

g fi

rst

sem

este

r, o

r as

soo

n as

poss

ible

, to

take

mat

h co

urse

sco

nsec

utiv

ely,

and

to s

eek

help

whe

n ne

cess

ary

23.a

Adv

ise

stud

ents

to b

egin

mat

h ea

rly,

tota

ke c

ours

es c

onse

cutiv

ely,

and

to s

eek

help

whe

n ne

cess

ary.

Info

rm m

ath

stud

ents

abo

ut tu

tori

ngav

aila

bilit

y at

SJC

and

abo

ut c

ompu

ter

lab

tuto

rial

s at

MV

C b

y an

noun

cing

this

in c

lass

and

incl

udin

g it

in c

ours

e sy

llabi

.W

hene

ver

poss

ible

, off

er s

tude

nt in

cent

ives

for

seek

ing

thes

e se

rvic

es (

e.g.

, ext

racr

edit)

.

23.b

Cou

nsel

ors

Mat

h Fa

culty

Mat

h Fa

culty

23.c

Spr

ing,

199

6 -

- on

goin

g

Spri

ng, 1

996

--on

goin

g

23.d

Cou

rse

sylla

biC

ouns

elin

g M

eetin

g M

inut

esT

utor

ing

reco

rds

Cou

rse

sylla

biL

ab-r

eccr

rds

Tut

orin

g re

cord

s

6768

Page 45: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Successful Course Completion at MSJC

Successful Course Completion Research, Spring 1995The ratio of the number of courses that students successfully complete (A, B,C, Cr) to the number of courses in which students are enrolled on the censusday of the term.

Grouping Total Population Courses Enrolled Courses Completed

Asian 1.84% n =116 n=276 75% n=207

African American 3.29% n=207 n=617 51% n=317

Filipino 1.44% n=091 n=201 75% n=150

Hispanic 17.75% n=1118 n=2569 60% n =1553

Native American 2.48% n =156 n=386 60% n=220

White 69.23% n=4360 n=9250 69% n=6392

Pacific Islander 0.25% n=016 n=030 53% n=016

Disabled 4.43% n=279 n=873 62% n=519

Female 62.79% n=3955 n=8367 69% n=5792

Total Population represents Spring 1995 enrollment

Courses Enrolled represents the total number of courses taken by each grouping

"= the total number of students

(Benchmark figures exclude Unknown and Decline to State categories; therefore, the total of the seven ethnicity/racegroupings does not equal 100%. Disabled data represent only those students enrolled in the Disabled Students Programand may therefore not be entirely representative.)

39

69

Page 46: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Successful Course Completion Research, Spring 1996The ratio of the number of courses that students successfully complete (A, B,C, Cr) to the number of courses in which students are enrolled on the censusday of the term.

Grouping Total Population Courses Courses Completed

Asian 1.7% n =127 n=294 71.77% n=211

African American 3.2% n=239 n=717 52.16% n=374

Filipino 1.45% n =108 n=241 62.66% n=151

Hispanic 16.1% n=1,198 n=2,801 61.91 % n =1,734

Native American 2.32% n=173 n=430 56.74% n=244

White 58.2% n=4,343 n=9,592 67.96% n=6,519

Pacific Islander 0.23% n =17 n=37 45.95% n=17

Disabled 3.85% n=287 n=859 60.42% n=519

Female 55.37% n=4,130 n=9,170 67.96% n=6,232

Total Population represents Spring 1996 enrollment (by start-date, including Commuter and Late Start classes)

Courses Enrolled represents the total number of courses taken by each grouping

"= the total number of students

(Benchmark figures exclude Unknown and Decline to State categories; therefore, the total of the seven ethnicity/racegroupings does not equal 100%. Disabled data represent only those students enrolled in the Disabled Students Programand may therefore not be entirely representative.)

40 7 0

Page 47: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Research Implications, 1995Successful course completion is an important measure of equity. Mt. San Jacinto College'ssuccessful course completion rates are highest for Asians and Filipinos, who share a 75 % successrate. Successful course completion rates are second highest for whites and females at 69%.Disabled students succeed at 62%. Hispanics and Native Americans share a success rate of 60%.Lowest completion rates are held by disabled students, who succeed at 57%, by Pacific Islanders,who succeed at 53%, and by African Americans, who succeed at 51%. The range between allgroupings is 24%.

Goal: To increase completion rates by 5% for each group

Goal: To reduce the difference between all groups to a maximum of 10%by 2000

Goal: To maintain standards of rigor throughout the process

Research Implications, 1996

Successful course completion rates are up slightly for African Americans (1.16%) and Hispanics(1.91%) and down slightly for Whites (1.04%), Females (1.04%), and disabled students(1.58%). Asians and Native Americans are both down by three percent. Pacific Islanderssucceed at 7.05% below last year, and Filipinos succeed at 12.34% below last year.

The reasons for these drops is not clear and will need to be examined further. These results willbe distributed college wide for discussion and input.

4171

Page 48: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

SUC

CE

SSFU

L C

OU

RSE

CO

MPL

ET

ION

Bar

rier

s

S. N

eed

for

a sy

stem

atic

revi

ew a

nd u

pdat

e of

all

curr

icul

a to

ens

ure

dive

rsity

issu

es a

re in

tegr

al to

the

mat

eria

l

72

Impl

emen

tatio

n St

rate

gyA

ccou

ntab

ility

EV

alU

atio

itBen

Chi

nar

1.a

Rev

iew

all

curr

icul

a to

ens

ure

dive

rsity

issu

es a

re in

tegr

al to

the

mat

eria

l.1.

b A

cade

mic

Dep

artm

ents

1.c

Fall,

-19

99 1

996

1.c1

Cou

rse

guid

elin

es

Off

ice

of I

nstr

uctio

nC

ours

e sy

llabi

Cur

ricu

lum

Com

mitt

eeC

urri

culu

m C

omm

ittee

Min

utes

The

199

6-97

Pro

gram

Rev

iew

mod

el a

ppro

ved

by th

e C

urri

culu

mC

omm

ittee

inco

rpor

ates

an

entir

ese

ctio

n w

hich

req

uire

s re

view

of

all

curr

icul

a to

ens

ure

dive

rsity

issu

esar

e in

tegr

al to

pro

gram

off

erin

gs.

Page 49: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

,,,,H

:::..:

::':::

::i:.,

::::::

::1;::

::::,:

':::

:":''

':i'':

'':-,

:,.:':

::-':.

::B

arri

ers

.:,.',

:,....

-:".

.,.--

.,..:

....,.

..-:

...:::

:,.:::

..:.::

::::,:

.:..::

::-:

.:'''.

1:'

.i.itn

iple

men

tatio

n.St

rate

gy.

.,..

....

...,.

"R:::

....i:

:::.::

:'::.,

:.:::i

:.:.

Acc

ount

abiti

ty:,:

,:.:::

::i',:

if.:M

::::::

::::::

::::::

::::i.

::::::

:::::f

t1:::

::::;:

'

Tar

get D

ate

i':.::

':::::

::::::

:i::::

::::::

::%:::

:;:.::

::::::

,:::::

:::::.

''::.:

R.::

::::::

::::i:

::::;;

:--:

.::-.

..:...

:Ev.

.alu

atio

tt::1

3etic

hoac

ks..,

S. N

eed

for

addi

tiona

l sup

port

serv

ices

2.a

Eva

luat

e m

etho

ds f

or in

crea

sing

stu

dent

acce

ss to

cou

nsel

ing,

fin

anci

al a

id, a

ndca

reer

ser

vice

s.

2.b

Stud

ent S

ervi

ces

2.c

Fall,

199

72.

d St

uden

t Ser

vice

s R

epor

t

Eva

luat

e m

etho

ds f

or in

crea

sing

stu

dent

acce

ss to

cla

ssro

om, l

ab, a

nd li

brar

y sp

ace

and/

or h

ours

.

Dea

n of

Ins

truc

tion

Lib

rari

ans

Fall,

199

7D

ean

of I

nstr

uctio

n/L

ibra

ry R

epor

t

Incr

ease

tuto

r ac

cess

at b

oth

cam

pus

cite

s.D

ean

of I

nstr

uctio

nSp

ring

, 199

6 --

ongo

ing

Rep

oit p

iepa

ied

by O

ffk

,w u

fho

ti-tic

tiuli

Tut

orin

g R

ecor

ds

Prov

ide

text

book

s on

res

erve

.In

stru

ctio

nal F

acul

tyC

urre

nt -

-C

ours

e sy

llabi

expa

nded

, ong

oing

Lib

rary

Res

erve

Rec

ords

Pim

i e

tent

bouk

sO

ILta

pe.

Prov

ide

dist

rict

-wid

e T

DD

tele

phon

eFa

ll, 1

-996

199

7D

istr

ict-

wid

e T

DD

tele

phon

eD

isdb

led

Stud

ent S

ervi

ces

syst

em.

Cam

pus

AD

Asy

stem

. DSP

are

as h

ave

T.D

.D.'s

for

colle

ge/s

tude

nt b

usin

ess

calls

.

Exp

and

child

care

fac

ilitie

s/ac

cess

at S

JC,

and

esta

blis

h ch

ildca

re f

acili

ties

at M

VC

.St

uden

t Ser

vice

sC

hild

care

Cen

ter

Fall,

199

9In

crea

sed

SJC

hou

rs/a

cces

sE

stab

lishm

ent o

f M

VC

fac

ilitie

s.T

his

stra

tegy

is a

ppro

pria

te, a

ndfu

ndin

g ha

s be

en a

ppro

ved

bySa

cram

ento

.

Incr

ease

fin

anci

al a

id, s

mal

l em

erge

ncy

awar

ds, a

nd ti

mel

y di

sper

sem

ent o

f fu

nds.

Fina

ncia

l Aid

Off

ice

Dea

n of

Adm

issi

ons

and

Fall,

199

8Fi

nanc

ial A

id R

ecor

ds

Rec

ords

Wor

k w

ith R

TA

to p

rovi

de b

us s

ched

ules

on

Info

rmat

ion

Off

icer

Spri

ng, 1

996

--B

us s

ched

ules

both

cam

puse

s an

d to

incr

ease

ser

vice

to th

eco

llege

,on

goin

gT

he P

ublic

Inf

orm

atio

n O

ffic

eco

ntin

ues

to w

ork

with

RT

A f

or b

ussc

hedu

les.

Est

ablis

h pr

ogra

m d

esig

ned

to in

crea

seSt

uden

t Ser

vice

sby

Fal

l, 19

98Pr

ogra

m D

ocum

enta

tion

succ

ess

rate

for

Afr

ican

Am

eric

ans.

ongo

ing

Prog

ram

in p

lace

Dea

n of

eve

()Fl

uent

Inst

itutio

nal A

dvan

cem

ent

7 4

75

Page 50: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

:::

.

:Bae

rier

's: I

iiitli

eitie

ntat

ion_

Stra

tegy

:-:-

Acc

iiini

tabi

lity:

.

.,,.:.

:::.

::i...

:::..

:: ,

Tat

get D

ate:

.:...

::::::

1:,,:

,z:::

::-::-

]::E

yaE

valu

atio

ner

ichm

arks

S. N

eed

for

incr

ease

dfa

culty

/fro

nt li

ne p

erso

nnel

awar

enes

s of

ser

vice

are

as a

ndth

e va

riet

y of

MSJ

C 's

stu

dent

popu

latio

n

3.a

Prov

ide

flex

act

ivity

bus

trip

s th

roug

hse

rvic

e ar

eas,

spe

cifi

cally

rur

al a

nd lo

win

com

e ar

eas

so th

at f

acul

ty/f

ront

line

pers

onne

l can

be

mor

e aw

are

of a

ndse

nsiti

ve to

the

need

s of

all

MSJ

C s

tude

nts.

Prov

ide

stud

ent p

rese

ntat

ions

/for

ums

for

facu

lty/f

ront

line

per

sonn

el.

3.b

Flex

Com

mitt

eeFa

culty

ASB

Stud

ent C

lubs

3.c

Spri

ng, 1

997

--on

goin

g

Fall,

199

6 --

ongo

ing

3.d

Flex

Han

dboo

k. B

us to

urs

have

bee

n co

nduc

ted

twic

e be

fore

as p

art o

f th

e Ja

nuar

y Fl

expr

ogra

m. T

hese

tour

s w

ere

cond

ucte

d, th

ough

, whe

n M

SJC

still

ope

rate

d its

ow

n bu

s. T

his

serv

ice

has

been

sus

pend

ed a

tM

SJC

, and

bus

es, c

ontr

acte

d el

sew

here

, cos

t app

roxi

mat

ely

$500

per

day,

a p

rice

y su

m f

or a

sin

gle

Flex

act

ivity

. How

ever

, the

Fle

xC

omm

ittee

will

look

into

sec

urin

gfu

nds

for

just

suc

h an

act

ivity

inlig

ht o

f th

e St

uden

t Equ

ityC

omm

ittee

's c

harg

e an

dre

com

men

datio

n.

Flex

Han

dboo

kPr

esen

tatio

n in

form

atio

n w

ill b

em

aint

aine

d in

col

lege

file

s

S. N

eed

for

incr

ease

dse

nsiti

vity

to c

ultu

ral/a

bilit

ydi

ffer

ence

s

4.a

Prov

ide

flex

act

iviti

es/P

re-C

olle

ge D

ayac

tiviti

es d

esig

ned

to e

nhan

ce a

war

enes

s of

cultu

ral/a

bilit

y di

ffer

ence

s.

4.b

Facu

ltyD

isab

led

Stud

ent S

ervi

ces

4.c

Spri

ng, 1

997

--on

goin

g4.

d Fl

ex H

andb

ook

Pre-

Col

lege

Day

act

iviti

es r

ecor

ds

S. N

eed

for

incr

ease

dac

know

ledg

men

t and

reco

gniti

on o

f th

e ac

adem

icac

hiev

emen

ts o

f hi

stor

ical

lyun

derr

epre

sent

ed s

tude

nts

5.a

Dev

elop

and

exp

and

exis

ting

stud

ent

reco

gniti

on p

rogr

ams,

5.b

Stud

ent S

ervi

ces

5.c

Cur

rent

--

ongo

ing,

enh

ance

d5.

d St

uden

t Ser

vice

s re

cord

sR

ecog

nitio

n pr

ogra

ms

in p

lace

Rec

ogni

tion

prog

ram

s re

cord

s

7677

Page 51: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

,:,.,:

::.if

:'::

Bar

rier

s:'.

.:.:..

:..::.

:..:

.

.::...

:.::::

::::::

:::.-

i,:::.

;:::.'

::,

:.::

:..jii

irile

irie

ntat

ion:

Stia

tegy

:-:

Acc

ount

abili

ty:..

Tar

get :

: Dat

e:

.::::

.:.:.:

::i,':

.:::::

:::::i

:::i.i

...''

-::.:

.:.:

.:..::

:i:-

.

Nia

luA

tiori

:Ben

chri

tArk

s

S. N

eed

for

incr

ease

d su

ppor

tfo

r fa

culty

to m

aint

ain

curr

ency

in th

eir

disc

iplin

es

...

6.a

Mai

ntai

n an

d ex

pand

cur

renc

y in

lear

ning

mat

eria

ls/e

quip

men

t.

Incr

ease

fac

ulty

ski

lls/k

now

ledg

e.Pr

ovid

e co

mpu

ter

and

mul

ti-m

edia

pres

enta

tion

trai

ning

,

Prov

ide

reim

burs

emen

t and

rec

ogni

tion

for

colle

ge c

ours

e w

ork

rela

ted

to a

rea

ofse

rvic

e.

6.b

Flex

Com

mitt

eeFa

culty

Flex

Com

mitt

eeFa

culty

Off

ice

of I

nstr

uctio

nSa

lary

Adv

ance

men

tC

omm

ittee

6.c

Cur

rent

--

ongo

ing

Cur

rent

--

ongo

ing

Cur

rent

--

ongo

ing,

enha

nced

6.d

Flex

Han

dboo

k

Flex

Han

dboo

kO

ne o

f th

e Fl

ex C

omm

ittee

's m

ain

char

ges

is to

aid

inst

ruct

ors

inm

aint

aini

ng c

urre

ncy

in th

eir

disc

iplin

es, a

nd th

is is

in p

art

acco

mpl

ishe

d by

mai

ntai

ning

and

expa

ndin

g cu

rren

cy in

lear

ning

mat

eria

ls/e

quip

men

t and

by

incr

easi

ng f

acul

ty s

kills

/kno

wle

dge.

Past

and

pre

sent

Fle

x sc

hedu

les

show

that

any

num

ber

ofw

orks

hops

sat

isfy

thes

e go

als.

The

Flex

Com

mitt

ee w

ill m

aint

ain

this

focu

s.

Sala

ry A

dvan

cem

ent C

omm

ittee

Min

utes

S. N

eed

for

low

enr

ollm

ent

tran

sfer

leve

l/deg

ree-

appl

icab

le c

ours

es to

be

sust

aine

d so

that

stu

dent

s ar

eno

t pre

vent

ed f

rom

tran

sfer

or

degr

ee c

ompl

etio

n in

a ti

mel

ym

anne

r

7.a

Ass

ess

feas

ibili

ty o

f co

nver

ting

sele

cted

tran

sfer

leve

l/deg

ree-

appl

icab

le c

ours

es to

Om

ega

stat

us.

7.b

Off

ice

of I

nstr

uctio

nA

cade

mic

Dep

artm

ents

Cur

ricu

lum

Com

mitt

ee

7.c

Fall,

199

6 --

ongo

ing

7.d

Cur

ricu

lum

Com

mitt

eeM

inut

esT

he C

urri

culu

m C

omm

ittee

will

addr

ess

this

issu

e w

hen

it co

mes

forw

ard.

Cou

rse

Out

lines

S. N

eed

for

grea

ter

stud

ent

acce

ss to

reg

ular

cou

rse

offe

ring

s/co

urse

sch

edul

e

8.a

Cre

ate

grea

ter

cons

iste

ncy

of c

ours

eof

feri

ngs

so th

at s

ched

ulin

g ch

ange

s ar

em

inim

ized

(e.

g., p

reve

nt la

st m

inut

e ad

d or

dele

tion

of c

ours

e of

feri

ngs

whe

n po

ssib

le).

Prov

ide

fina

l exa

m s

ched

ule

in s

ched

ule

ofcl

asse

s so

that

stu

dent

s ca

n co

ordi

nate

thei

rM

SJC

sem

este

r sc

hedu

les

with

out

side

com

mitm

ents

.

8.b

Off

ice

of I

nstr

uctio

n8.

c Fa

ll, 1

996

--on

goin

g

Fall,

-1-

997

1996

--on

goin

g

8.d

Sche

dule

of

clas

ses

Off

ice

of I

nstr

uctio

n re

cord

s-of

Div

isio

n D

izeU

ois

Inst

ruct

iona

l Dea

nsD

epar

tmen

t Cha

irs

Off

ice

of I

nstr

uctio

n

t..U

lll S

e C

luui

gs

Sche

dule

of

clas

ses

The

fin

al e

xam

sch

edul

e is

now

inpl

ace

in th

e sc

hedu

le o

f cl

asse

s.

7879

Page 52: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

.B

arri

ers

.Im

plem

enta

tion

Stra

tegy

..A

ccou

ntab

ility

Tar

get D

ate

Eva

luat

ion

Ben

chm

arks

S. N

eed

for

vari

ed9.

a E

ncou

rage

fac

ulty

to te

ach/

coun

sel

9.b

Aca

dem

ic9.

c Sp

ring

, 199

6 --

9.d

Sche

dule

of

clas

ses

staf

f/fa

culty

hou

rs s

o th

atdu

ring

aft

erno

on a

nd e

veni

ng h

ours

.D

epar

tmen

tson

goin

gSc

hedu

le o

f co

unse

ling

nigh

t/par

t tim

e st

uden

ts h

ave

Off

ice

of I

nstr

uctio

nap

poin

tmen

ts.

incr

ease

d ac

cess

to s

tude

ntA

sses

s fe

asib

ility

of

offe

ring

var

ied

wor

kSt

uden

t Ser

vice

sFa

ll, 1

996

Cou

nsel

ing

offe

rs s

ervi

ces

at b

oth

serv

ices

sche

dule

s fo

r st

aff.

All

stud

ent c

onta

ct s

ervi

cear

eas

ongo

ing

cam

puse

s 5

days

per

wee

k an

d 4

even

ings

per

wee

k. M

any

full-

time

facu

lty te

ach

in th

e ev

enin

gs T

his

goal

has

ther

efor

e be

en m

et.

All

stud

ent c

onta

ct s

ervi

ce a

rea

reco

rds

S. N

eed

for

Adm

issi

ons

and

10.a

Mov

e A

dmis

sion

s an

d R

ecor

ds a

nd10

.b O

ffic

e of

the

10.c

Fal

l, 19

9610

.d L

ocat

ion

of o

ffic

es/c

ampu

sR

ecor

ds a

nd S

tude

nt S

ervi

ces

Stud

ent S

ervi

ces

to p

rovi

de a

cen

tral

ized

Pres

iden

tm

aps.

to b

e ce

ntra

lized

and

bet

ter

loca

tion.

Adm

issi

ons

and

Rec

ords

Adm

issi

ons

and

Rec

ords

is n

owco

ordi

nate

dSt

uden

t Ser

vice

sho

used

with

in th

e St

uden

t Suc

cess

Mai

ntai

n re

gula

rly

sche

dule

d m

eetin

gsFa

ll, 1

996

Cen

ter,

alo

ng w

ith a

ll St

uden

tbe

twee

n A

dmis

sion

s an

d R

ecor

ds a

ndA

dmis

sion

's a

nd R

ecor

dson

goin

gSe

rvic

es. T

his

goal

has

bee

n m

et.

Stud

ent S

ervi

ces

adm

inis

trat

ors,

fac

ulty

, and

staf

f.St

uden

t Ser

vice

s

Min

utes

of

mee

tings

8180

Page 53: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Degree and Certificate Completion at MSJC

Degree and Certificate Research, Fall 1994The total number of degrees and certificates awarded and the ethnicdistribution of the recipients.

MSJC Population Degrees Certificates Total

Asian 2.69% n=12 1.37% n=02 2.35% n=14

African American 1.56% n=07 1.37% n=02 1.51% n=09

Filipino 0.67% n=03 4.80% n=07 1.68% n =10

Hispanic 9.56% n=43 11.64% n=17 10.07% n=60

Native American 1.78% n=08 2.74% n=04 2.01% n=12

White 83.33% n=375 78.10% n=114 82.05% n=489

Pacific Islander 0.44% n=02 0.0% n=0 0.34% n=02

Female 75.11% n=338 74.70% n=109 75% n=447

MSJC Population represents the students who were enrolled during Fall, 1994.

`h" = the total number of students

Disabled data are currently unavailable

Research Implications, 1995Degree and certificate completion rates are consequential measures of student success and equity.At Mt. San Jacinto College, Asians, Native Americans, Filipinos, and Pacific Islanders receivedegrees and certificates within .5% of their representation in the college. African Americansreceive degrees and certificates at 1.78% below their representation; Hispanics, at 7.68% belowtheir representation. Females receive degrees and certificates at 12% above their representationin the college.

Goal: To increase by 10% a year the total number of degrees andcertificates awarded

Goal: To ensure that the ethnic distribution of degree and certificaterecipients is within 2% of the enrollments four years earlier

47 82

Page 54: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Degree and Certificate Research, Fall 1995The total number of degrees and certificates awarded and the ethnicdistribution of the recipients.

MSJC Population Degrees Certificates Total

Asian - 1.90% n=17 0.67% n=2 1.59% n=19

African American 1.12% n=10 1.00% n=3 1.09% n=13

Filipino 0.89% n=8 2.34% n=7 1.26% n=15

Hispanic 9.15% n=82 7.69% n=23 8.79% n=105.

Native American 1.79% n=16 3.01% n=9 2.09% n=25

White 41.07% n=368 41.47% n=124 41.17% n=492

Pacific Islander 0.00% n=0 0.00% n=0 0.00% n=0

Female 40.74% n=365 39.80% n=119 40.50% n=484

Disabled 3.35% n=30 4.01% n=12 3.51% n=42

MSJC Population represents the students who registered for Fall, 1995 classes.

`h" = the total number of students

Disabled data represent only those students utilizing the Disabled Students Program and maytherefore not be entirely representative.

Research ImplicationsDegree and certificate completion rates are consequential measures of student success and equity.At Mt. San Jacinto College, Asians, Native Americans, Filipinos, and Pacific Islanders receivedegrees and certificates within .5% of their representation in the college. African Americansreceive degrees and certificates at 1.78% below their representation; Hispanics, at 7.68% belowtheir representation. Females receive degrees and certificates at 12% above their representationin the college.

Goal: To increase by 10% a year the total number of degrees and certificatesawarded

Goal: To ensure that the ethnic distribution of degree and certificate recipients iswithin 2% of the enrollments four years earlier

48 $3

Page 55: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Research Implications, 1996

Degree and certificate completion rates are down slightly (about 1%) for Asians, AfricanAmericans, Filipinos, and Hispanics. Whites and females experienced substantial drops at40.88% and 34.5% respectively. Native Americans experienced a very slight increase of 0.08%.Disabled Student data were unavailable last year.

These data display that the College fell far short of its degree and certificate completion goal ofincreasing by 10% a year for the total number of degrees and certificates awarded.Consequently, the College will need to distribute and discuss these data and make expandedefforts to increase degree and certificate completion rates.

8449

Page 56: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

DE

GR

EE

AN

D C

ER

TIF

ICA

TE

CO

MPL

ET

ION

arri

ers

Impl

emen

tatio

n St

rate

gyA

ccou

ntab

ility

Tar

get D

ate

Eva

luat

ion

Ben

chm

arks

D. N

eed

for

grea

ter

awar

enes

s am

ong

stud

ents

/pot

entia

l stu

dent

sre

gard

ing

degr

ee a

ndce

rtif

icat

e op

tions

1.a

Prep

are

broc

hure

that

out

lines

deg

ree

and

cert

ific

ate

offe

ring

s fo

r cl

assr

oom

,co

unse

ling

offi

ce, a

nd c

omm

unity

diss

emin

atio

n.

Prov

ide

com

preh

ensi

ve C

aree

r C

ente

rse

rvic

es o

n th

e M

VC

.

Incr

ease

iufu

mia

tiou

awar

enes

s ab

out

Car

eer

Cen

ter

serv

ices

.

Rev

iew

and

rev

ise

orie

ntat

ion

proc

ess

toen

hanc

e hi

gh c

onta

ct, m

ultip

le a

rea

intr

oduc

tion

to M

SJC

and

its

serv

ices

.

Edu

cate

bus

ines

s co

mm

unity

reg

ardi

ngsc

ope

of c

ertif

icat

es a

vaila

ble.

1.b

Tec

h-Pr

epC

oord

inat

orO

ffic

e of

Ins

truc

tion

Car

eer

Cen

ter

Car

eer

Cen

ter

Stud

ent S

ervi

ces

Off

ice

of I

nstr

uctio

n

Tec

h-Pr

ep C

oord

inat

orM

arke

ting

Com

mitt

ee

1.c

Fall,

199

6

Fall,

199

7

Cur

rent

--

ongo

ing

Fall,

199

7 --

ongo

ing

Cur

rent

--

ongo

ing

1.d

Bro

chur

esT

ech-

Prep

Rep

ort

.

Est

ablis

hmen

t of

com

preh

ensi

veC

aree

r C

ente

r se

rvic

es o

n M

VC

Cut

e, C

eiite

law

lpd

tt C

S

Cla

ssro

om p

rese

ntat

ions

.

aon

Do<

.un,

CU

tatiu

iiC

ouns

elin

g R

ecor

ds

Tec

h-Pr

ep R

epor

t

D. N

eed

for

grea

ter

acce

ssib

ility

to p

rogr

amsc

hedu

le

2.a

Exp

lore

sch

edul

ing

alte

rnat

ives

toau

gmen

t reg

ular

16

wee

k se

mes

ter

cour

ses.

Tra

ck s

tude

nt s

ched

ules

sem

este

r to

sem

este

r to

det

erm

ine

whe

ther

deg

rees

and

cert

ific

ates

can

be

obta

ined

in a

tim

ely

man

ner

(i.e

., ar

e st

uden

ts a

ble

to c

ompl

ete

degr

ee p

rogr

ams

base

d on

cou

rse

time/

day

avai

labi

lity?

)

2.b

Off

ice

of I

nstr

uctio

n2.

c Fa

ilTl9

9-7

Spri

ng 1

996

Fall,

199

7

2.d

Sche

dule

of

Cou

rse

Off

erin

gsC

ours

e O

utlin

esU

nder

way

. Cur

rent

ly, t

he C

olle

geof

fers

late

sta

rt' c

ours

es a

nd is

expa

ndin

g af

tern

oon

and

Satu

rday

offe

ring

s.

Inst

itutio

nal R

esea

rch

Upd

ate

Des

ign

is in

pro

gres

s.

Aca

dem

ic F

acul

ty

Off

ice

of R

esea

rch

D. N

eed

for

grea

ter

acad

emic

supp

ort

3.a

Exp

and

tuto

ring

ava

ilabi

lity.

Prov

ide

tuto

ring

for

voc

atio

nal c

ours

es.

3.b

Stud

ent S

ervi

ces

Stud

ent S

ervi

ces

Dea

n of

Ins

truc

tion

3.c

Fall,

199

7

Spri

ng, 1

997

3.d

Rep

ort b

y D

ean

of I

nstr

uctio

n

Tec

h-Pr

ep R

epor

t

85

Page 57: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Bar

rier

sIm

plem

enta

tion

Stra

tegy

Acc

ount

abili

ty.

Tar

get D

ate

Eva

luat

ion

Ben

chm

arks

D. N

eed

for

asse

ssm

ent o

fde

gree

and

cer

tific

ate

offe

ring

sto

det

erm

ine

how

MSJ

C m

eets

degr

ee a

nd c

ertif

icat

e ne

eds

ofits

ser

vice

are

a (e

.g.,

busi

ness

need

s)

4.a

Tra

ck e

mpl

oym

ent p

lace

men

t rat

e to

dete

rmin

e pr

ogra

m s

ucce

ss.

Wor

k w

ith c

omm

unity

/bus

ines

s le

ader

s to

asse

ss p

rogr

am o

ffer

ings

.

4.b

Off

ice

of R

esea

rch

Dea

n of

Inst

ruct

ionN

ocat

iona

lE

duca

tion

Tec

h-Pr

ep C

oord

inat

orM

arke

ting

Com

mitt

ee

4.c

Fall,

199

7 --

ongo

ing

4.d

Inst

itutio

nal R

esea

rch

Upd

ate

Des

ign

is in

pro

gres

s.

Tec

h-Pr

ep R

epor

t

D. N

eed

for

rese

arch

tode

term

ine

disa

bled

deg

ree

and

cert

ific

ate

com

plet

ion

rate

s

5.a

Res

earc

h di

sabl

ed d

egre

e an

dce

rtif

icat

e co

mpl

etio

n ra

tes.

5.b

Off

ice

of R

esea

rch

5.c

Fal1

,-19

96C

urre

nton

goin

g5.

d St

uden

t Equ

ity R

epor

tU

nder

way

.

'88

Page 58: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Transfer at MSJC

Transfer Research Results, 1995The percentage of each group that is enrolled to the percentage who transfer toa CSU or a UC campus each year and the ethnic distribution of these transferstudents.

% MSJC population 91/92 92/93 93/94

Asian/Pacific Islander 2.3% 2.3% 2.5%

African American 2.7% 3.2% 3.3%

Filipino 0.9% 1.1% 1.1%

Hispanic 14.2% . 15.3% 16.5%

Native American 2.7% 2.8% 2.6%

White 74.7% 71.3% 69.7%

(Benchmark figures exclude Unknown and Decline to State categories; therefore, the total of the six groups does not equal100%. As Disabled and Female rates are currently unavailable, they are not displayed in MSJC population.)

% MSJC transfer rates 91/92 92/93 93/94

Asian/Pacific Islander 2.5% 5.5% 4.2%

African American 4.2% 6.4% 3.1%

Filipino 0.0% 1.8% 0.52%

Hispanic 11.8% 13.6% 18.2%

Native American 0.8% 0.9% 0.0%

White 74.0% 55.5% 61.5%

(Benchmark figures exclude Unknown and Decline to State categories; therefore, the total of the six groups does not equal100%. These data are provided by CPEC. Disabled and Female population data are currently unavailable.)

8952

Page 59: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Transfer at MSJC

Transfer Research Results, 1996The percentage of each group that is enrolled to the percentage who transfer toa CSU or a UC campus four years later and the ethnic distribution of thesetransfer students.

% MSJC population 91/92

Asian/Pacific Islander 2.3%

African American 2.7%

Filipino 0.9%

Hispanic 14.2%

Native American 2.7%

White 74.7%

(Benchmark figures exclude Unknown and Decline to State categories; therefore, the total of the six groups does not equal100%. As Disabled and Female rates are currently unavailable, they are not displayed in MSJC population.)

% MSJC transfer rates 94/95

Asian/Pacific Islander 3.6%

African American 3.2%

Filipino 0.0%

Hispanic 13.2%

Native American 2.3%

White 64.5%

(Benchmark figures exclude Unknown and Decline to State categories; therefore, the total of the six groups does not equal100%. These data are provided by CPEC. Disabled and Female population data are currently unavailable.)

9053

Page 60: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Research Implications, 1995Education Code section 51027 requires that the governing board of each community college districtrecognize transfer as one of its primary missions, and that an emphasis shall be placed on thepreparation and transfer of underrepresented students. Mt. San Jacinto College found that althoughit places great importance on transfer, and has established a successful Transfer Center, more needsto be done to increase transfer rates, specifically among historically underrepresented groups andethnic minorities, as defined by Division 6 of Title 5, Subchapter 4, Section 54220.

At. Mt. San Jacinto College, Asians and Pacific Islanders are transferring at slightly higher rates thantheir representation in the community and at the college. African Americans are transferring on parwith their representation (1993/94) though transfer rates are below representation figures for the twoproceeding years. African Americans are also transferring at slightly higher rates than theirrepresentation in the community. Filipinos are transferring at rates very slightly under theirrepresentation in the college. Their representative percentage in the community cannot bedetermined from current census data. Hispanics are transferring at rates very slightly under theirrepresentation in the college and slightly below their representation in the community. NativeAmericans are transferring at much lower rates than their representation in the college and slightlybelow their representation in the community, though their representation in the college is slightlyhigher than within the community. Whites transfer at rates slightly lower than their representation inthe college.

Goal: To increase by 5% a year the number of students who transfer

Goal: To ensure the ethnic distribution of transfer students is within 2% of theenrollments four years earlier

Research Implications, 1996Transfer rates are up less than 1% for African Americans and down less than 1% for Asian/PacificIslanders and Filipinos. Hispanics experienced a 5% drop in transfer. Whites experienced a 3%increase in transfer. Although the College met its goal of ensuring the ethnic distribution of transferstudents is within 2% of the enrollments four years earlier, the goal of increasing by 5% a year thenumber of students who transfer has not been met. The College must consequently increase itstransfer efforts.

9154

Page 61: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

TR

AN

SFE

RB

arri

ers

Impl

emen

tatio

n St

rate

gyA

ccou

ntab

ility

Tar

get D

ate

Eva

luat

ion

Ben

c m

arks

T. N

eed

for

grea

ter

cam

pus-

wid

e aw

aren

ess

of tr

ansf

erre

quir

emen

ts

1.a

The

tran

sfer

cen

ter

will

pro

duce

info

rmat

iona

l bro

chur

es a

nd f

act s

heet

s to

incr

ease

stu

dent

, cou

nsel

or, a

ndin

stru

ctio

nal f

acul

ty a

war

enes

s of

tran

sfer

requ

irem

ents

and

opt

ions

.

1.b

Tra

nsfe

r C

ente

rSt

uden

t Ser

vice

s1.

c Sp

ring

, 199

6 --

ongo

ing

1.d

Prod

uctio

n of

bro

chur

es a

ndfa

ct s

heet

s

T. N

eCil

fui i

11c,

ICab

ed w

litte

lt2.

a T

llc A

lticu

lativ

u O

ffic

cl w

ill2.

b A

lticu

llltiv

u1

2.c

Full,

ongo

ing

2.d

Tra

nnfc

1 C

eiat

e1 A

u11u

u1 R

Gpu

itat

icu

a i n

agl

eCU

mel

ltsill

I/1

1 it.

.11

it jU

ll ag

leei

ueut

b.

3.c

Fa11

-199

6T

. Nee

d fo

ol il

lciC

aanc

l3.

a T

he A

1tic

ulat

1V11

Off

1GC

1i i

lioki

3.b

Alti

culu

tiuil

Off

ic,C

I3.

d T

ians

frl C

eute

l Aw

luul

Rep

uit

in u

ity...

iOu

Uet

Wec

u 4.

-uuu

Sc O

tSI

gu a

u iu

eet1

11gs

with

ill,t

iuU

iviia

l fac

ulty

toU

ugui

ng, r

un y

slid

nun

em

it, d

ivib

iullS

I,

11.

F.0

II O

lega

l diii

g at

kll

a [U

lfkl

Uil

Cal

k. d

ivi,i

uiu.

reg

tu ju

g ul

titA

l a it

'll.

T. N

eed

for

grea

ter

tran

sfer

amon

g al

l stu

dent

s,pa

rtic

ular

ly h

isto

rica

llyun

derr

epre

sent

ed s

tude

nts

4.a

The

Tra

nsfe

r C

ente

r w

ill o

ffer

tran

sfer

orie

ntat

ions

.

The

Tra

nsfe

r C

ente

r w

ill w

ork

with

all

appr

opri

ate

colle

ge p

erso

nnel

to in

crea

setr

ansf

er a

mon

g hi

stor

ical

ly u

nder

repr

esen

ted

stud

ents

and

to r

esea

rch

prog

ram

s w

hich

supp

ort u

nder

repr

esen

ted

stud

ent t

rans

fer.

4.b

Tra

nsfe

r C

ente

r4.

c Sp

ring

, 199

6 --

ongo

ing

Est

ablis

hmen

t of

atle

ast o

ne p

rogr

am:

Fall,

199

7 --

ongo

ing

4.d

Tra

nsfe

r C

ente

r A

nnua

l Rep

ort

Incr

ease

in n

umbe

r of

tran

sfer

s,sp

ecif

ical

ly a

mon

g tr

aditi

onal

lyun

derr

epre

sent

ed s

tude

nts

Est

ablis

hmen

t of

prog

ram

All

ttpin

up

itt o

cul

lege

pers

onne

lC

ouns

elor

s

T. N

eed

for

incr

ease

dcu

rric

ulum

off

erin

gs to

ass

ure

that

stu

dent

s ca

n m

eet G

Ere

quir

emen

ts a

t MSJ

C in

ava

riet

y of

dis

cipl

ines

5.a

The

Off

ice

of I

nstr

uctio

n w

ill o

vers

ee a

stud

y of

GE

req

uire

men

ts/c

ours

e of

feri

ngs

at C

alif

orni

a co

mm

unity

col

lege

s in

ord

er to

asse

ss M

SJC

cou

rse

offe

ring

s.

5.b

Off

ice

of I

nstr

uctio

n5.

c A

ugus

t, 19

975.

d Pr

esen

tatio

n of

stu

dy to

all

colle

ge f

acul

ty/a

dmin

istr

ator

s

T. N

eed

for

data

base

toid

entif

y pr

ospe

ctiv

e tr

ansf

erst

uden

ts

6.a

The

Off

ice

of R

esea

rch

will

wor

k w

ithD

ata-

Proc

essi

ngIn

form

atio

n S

ervi

ces

and

the

Tra

nsfe

r C

ente

r to

est

ablis

h a

data

base

to id

entif

y tr

ansf

er s

tude

nts

and

pote

ntia

ltr

ansf

er s

tude

nts

and

to e

valu

ate

MSJ

C's

tran

sfer

eff

orts

. The

Off

ice

of R

esea

rch

and

the

Tra

nsfe

r C

ente

r w

ill p

rodu

ce a

join

tre

port

on

thei

r fi

ndin

gs.

5.b

Off

ice

of R

esea

rch

Dat

a-Pr

oces

sing

Info

rmat

ion

Ser

vice

sT

rans

fer

Cen

ter

6.c

June

; -19

97C

urre

nton

goin

g6.

d Pr

oduc

tion

of O

ffic

e of

Res

earc

h/T

rans

fer

Cen

ter

Rep

ort

Tra

nsfe

r C

ente

r se

rvic

es h

ave

been

eval

uate

d. P

relim

inar

y re

sear

chre

-eva

luat

ing

the

tran

sfer

bas

elin

eha

s be

en c

ondu

cted

.

92B

EST

CO

PY A

VA

ILA

BL

E

93

Page 62: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Bar

rier

sIm

plem

enta

tion

Stra

tegy

Acc

ount

abili

tyT

arge

t Dat

eE

valu

atio

n B

ench

mar

ks

T. N

eed

for

tran

sfer

orie

ntat

ions

7.a

The

Tra

nsfe

r C

ente

r w

ill o

ffer

tran

sfer

orie

ntat

ions

7.b

Tra

nsfe

r C

ente

r7.

c Sp

ring

, 199

6on

goin

g7.

d T

rans

fer

Cen

ter

Ann

ual R

epor

t

T. N

eed

for

coor

dina

tion

oftr

ansf

er f

unct

ions

with

fou

rye

ar c

olle

ges

and

univ

ersi

ties

8.a

The

Tra

nsfe

r C

ente

r w

ill w

ork

toco

ordi

nate

tran

sfer

fun

ctio

ns w

ith f

our

year

colle

ges

and

univ

ersi

ties

8.b

Tra

nsfe

r C

ente

r8.

c Sp

ring

, 199

6 --

ongo

ing

8.d

Tra

nsfe

r C

ente

r A

nnua

l Rep

ort

T. N

eed

for

Tra

nsfe

r C

ente

rre

view

of

impl

emen

tatio

n of

Stat

e m

anda

tes

9.a

The

Tra

nsfe

r C

ente

r w

ill r

evie

w S

tate

man

date

s9.

b T

rans

fer

Cen

ter

9.c

Spri

ng, 1

996

ongo

ing

9.d

Tra

nsfe

r C

ente

r A

nnua

l Rep

ort

T. N

eed

for

recl

assi

fica

tion

ofth

e T

rans

fer

Cen

ter

Spec

ialis

tcl

assi

fied

pos

ition

to a

Cer

tific

ated

pos

ition

10.a

The

Tra

nsfe

r C

ente

r Sp

ecia

list w

illco

ntin

ue r

ecla

ssif

icat

ion

proc

edur

es.

10.b

Off

ice

of th

ePr

esid

ent

Stud

ent S

ervi

ces

10.c

Fal

l, 19

9510

.d R

ecla

ssif

icat

ion

Tra

nsfe

r C

ente

r A

nnua

l Rep

ort

Thi

s go

al h

as b

een

met

.

T. N

eed

for

impl

emen

tatio

nof

a lo

cal a

dvis

ory

com

mitt

eeth

at c

onsi

sts

of s

tude

nts,

cam

pus,

and

fou

r ye

ar c

olle

gean

d un

iver

sity

per

sonn

el

11.a

The

Tra

nsfe

r C

ente

r w

ill w

ork

toim

plem

ent a

n ad

viso

ry c

omm

ittee

11.b

Tra

nsfe

r C

ente

r11

.c S

prin

g, 1

996

-

ongo

ing,

pen

ding

recl

assi

fica

tion

11.d

Tra

nsfe

r C

ente

r A

nnua

lre

port

T. N

eed

for

the

esta

blis

hmen

tof

inst

itutio

nal r

esea

rch

for

ongo

ing

inte

rnal

eva

luat

ion

ofth

e ef

fect

iven

ess

of th

eco

llege

's tr

ansf

er e

ffor

ts a

ndth

e ac

hiev

emen

t of

its T

rans

fer

Cen

ter

Plan

12.a

The

Off

ice

of R

esea

rch

and

Dat

a12

.c J

une,

199

7 --

ongo

ing

12.d

Tra

nsfe

r C

ente

r A

nnua

lR

epor

tR

esea

rch

Upd

ate.

Tra

nsfe

r C

ente

r Se

rvic

es h

ave

been

eval

uate

d. P

relim

inar

y re

sear

chre

eval

uatin

g th

e tr

ansf

er b

asel

ine

has

been

con

duct

ed.

12.b

Dat

a PL

OC

eSsi

il g

Info

rmat

ion

Serv

ices

Off

ice

of R

esea

rch

Tra

nsfe

r C

ente

r

Pioc

usbi

ng I

nfor

mat

ion

Serv

ices

will

wor

kw

ith th

e T

rans

fer

Cen

ter

to a

ssis

t in

this

inte

rnal

eva

luat

ion;

the

Tra

nsfe

r C

ente

r w

illun

dert

ake

the

impl

emen

tatio

n of

the

Tra

nsfe

r C

ente

r Pl

an w

ith th

e su

ppor

ting

docu

men

tatio

n pr

ovid

ed,

T. N

eed

for

stud

ent o

n-si

teex

posu

re to

fou

r ye

ar c

olle

gean

d un

iver

sity

exp

erie

nce

13.a

The

Tra

nsfe

r C

ente

r w

ill w

ork

with

all

coun

selo

rs to

incr

ease

on-

site

tour

s to

fou

rye

ar c

olle

ges

and

univ

ersi

ties

for

MSJ

Cst

uden

ts.

The

Tra

nsfe

r C

ente

r w

ill w

ork

with

coun

selo

rs to

est

ablis

h su

mm

er p

lace

men

ton

loca

l col

lege

and

uni

vers

ity c

ampu

ses.

13.b

Stu

dent

Ser

vice

sC

ouns

elin

g D

epar

tmen

tT

rans

fer

Cen

ter

Cou

nsel

ing

Dep

artm

ent

Tra

nsfe

r C

ente

r

13.c

Fal

l, 19

96 -

-on

goin

g

Sum

mer

, 199

7on

goin

g

13.d

Tra

nsfe

r C

ente

r A

nnua

lR

epor

t; in

crea

se in

num

ber

of o

n-si

te v

isits

as

docu

men

ted

bySt

uden

t Ser

vice

s

Tra

nsfe

r C

ente

r A

nnua

l Rep

ort

Page 63: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

Bar

rier

s i

:'*i:]

::Itti

plei

nent

atio

tC S

trat

egy

Acc

ount

abili

ty ii

:::::

Tar

get D

ate

Eva

luat

ion

Ben

chm

arks

T. N

eed

for

tran

spor

tatio

n to

take

stu

dent

s on

tour

s of

fou

rye

ar c

olle

ge a

nd u

nive

rsity

cam

puse

s

14.a

The

Off

ice

of th

e Pr

esid

ent w

ill w

ork

with

the

Tra

nsfe

r C

ente

r to

sec

ure

tran

spor

tatio

n to

take

stu

dent

s on

cam

pus

tour

s.

14.b

Off

ice

of th

ePr

esid

ent

Tra

nsfe

r C

ente

r

14.c

Spr

ing,

+99

619

97 -

- on

goin

g14

.d D

esig

nate

d tr

ansp

orta

tion

vehi

cle

Tra

nsfe

r C

ente

r A

nnua

l Rep

ort

Incr

ease

d st

uden

t tou

rs

T. N

eed

for

grea

ter

stud

ent

acce

ss to

tran

sfer

ser

vice

s15

.a T

he T

rans

fer

Cen

ter

will

wor

k w

ith th

eV

ice

Pres

iden

t of

Stud

ent S

ervi

ces

and

the

Off

ice

of th

e Pr

esid

ent t

o se

cure

incr

ease

dtr

ansf

er c

ente

r sp

ace,

incr

ease

tran

sfer

cent

er s

uppo

rt s

taff

, and

incr

ease

tran

sfer

cent

er h

ours

on

both

col

lege

cam

puse

s.

15.b

Vic

e Pr

esid

ent o

fSt

uden

t Ser

vice

sO

ffic

e of

the

Pres

iden

tT

rans

fer

Cen

ter

15.c

Fal

l, 19

96 -

-on

goin

g15

.d S

trat

egic

Pla

nnin

g R

epor

tT

rans

fer

Cen

ter

Ann

ual R

epor

tT

his

proc

ess

is u

nder

way

.

T. N

eed

for

Tra

nsfe

r C

ente

rac

cess

to a

ll st

uden

t tra

nscr

ipts

16.a

Dat

a-Pr

oces

sing

-witF

wcr

rk-t

o-ad

ci-n

on=

16.c

Fal

l, 19

9716

.d N

on-M

SJC

stu

dent

tran

scri

pts

adde

d to

mai

nfra

me

16.b

Dat

a Pi

v..e

bbtn

gIn

form

atio

n Se

rvic

esM

SJC

btu

deut

-ti m

m-1

4,6

tu th

e m

ainf

iam

e.In

form

atio

n Se

rvic

es w

ill w

ork

with

Stu

dent

Serv

ices

and

the

Tra

nsfe

r C

ente

r to

esta

blis

h th

e m

etho

dolo

gies

to in

put n

on-

MSJ

C tr

ansc

ript

s.

T. N

eed

for

rese

arch

dat

a on

tran

sfer

rat

es f

or f

emal

e an

ddi

sabl

ed p

opul

atio

ns

17.a

Res

earc

h co

mpl

etio

n ra

tes

and

tran

sfer

stat

us f

or f

emal

es a

nd f

or d

isab

led

stud

ents

.17

.b O

ffic

e of

Res

earc

h17

.c S

prin

g, 1

997

--

ongo

ing

17.d

Ins

titut

iona

l Res

earc

h U

pdat

e

Stud

ent E

quity

Rep

ort

96

BE

ST C

OPY

AV

AIL

AB

LE

'97

Page 64: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

MSJC Annual Review Model

Student Equity goals and activities have become a component of MSJC'sregular program review process. Each year, the Student Equity Committee,aided by the Office of Research, produces a Student Equity Report based onongoing research and assessment of campus climate, access, and success.The Student Equity Committee seeks input from all college areas andmaintains representative membership.

58

98

Page 65: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

P;inting by::MSJC Print Shop

Page 66: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

U.S. Department of EducationOffice of Educational Research and Improvement (OERO

Educational Resources Information Center (ERIC)

REPRODUCTION RELEASE

I. DOCUMENT IDENTIFICATION:

(Specific Document)

(ID

ERICLTC. c760 3-0 2

Title:

Author(s):

Corporate Source:

ac,(4* GO Ili S TS pig. Qgficute_

Publication Date:

c3, C4km/W ('k119

II. REPRODUCTION RELEASE:912

In order to disseminate as widely as possible timely and significant materials of interest to the educational community, documents announcedin the monthly abstract journal of the ERIC system, Resources in Education (RIE), are usually made available to users in microfiche, reproducedpaper copy, and electronic/optical media, and sold through the ERIC Document Reproduction Service (EDRS) or other ERIC vendors. Credit isgiven to the source of each document, and, if reproduction release is granted, one of the following notices is affixed to the document.

If permission is granted to reproduce and disseminate the identified document, please CHECK ONE of the following two options and sign atthe bottom of the page.

ICheck here

For Level 1 Release:Permitting reproduction inmicrofiche (4" x 6" film) orother ERIC archival media(e.g., electronic or optical)and paper copy.

Signhere)please

The sample sticker shown below will be

affixed to all Level 1 documents

PERMISSION TO REPRODUCE ANDDISSEMINATE THIS MATERIAL

HAS BEEN GRANTED BY

TO THE. EDUCATIONAL RESOURCESINFORMATION CENTER (ERIC)

Level 1

The sample sticker shown below will beaffixed to all Level 2 documents

PERMISSION TO REPRODUCE ANDDISSEMINATE THIS

MATERIAL IN OTHER THAN PAPERCOPY HAS BEEN GRANTED BY

TO THE EDUCATIONAL RESOURCESINFORMATION CENTER (ERIC)

Level 2

Documents will be processed as indicated provided reproduction quality permits. If permissionto reproduce is granted, but neither box is checked, documents will be processed at Level 1.

ICheck here

For Level 2 Release:Permitting reproduction inmicrofiche (4' x 6" film) orother ERIC archival media(e.g., electronic or optical),but not in paper copy.

hereby grant to the Educational Resources Information Center (ERIC) nonexclusive permission to reproduce and disseminatethis document as indicated above. Reproduction from the ERIC microfiche or electronic/optical media by persons other thanERIC employees and its system contractors requires permission from the copyright holder. Exception is made for non-profit

uction by I'. . otherservi_= agencies to satisfy information needs of educators in response to discrete inquiries."

cure: nn = lame/ osition

144-D

U0q) (9511S111Date:

kg Dec tp

rganization/ ress:

lAco Noy fik90.c.-tAib C qz 5K3

Telephone:

'it0q)tirl 1015111M,-Mail Address:

c16410-icleAks- Cc eaJc. LLS

lotste..1

Page 67: DOCUMENT RESUME JC 960 702 AUTHOR Baylard, Dana Reece; … · 2014. 5. 14. · DOCUMENT RESUME. ED 401 964 JC 960 702. AUTHOR Baylard, Dana Reece; And Others TITLE Mt. San Jacinto

I

III. DOCUMENT AVAILABILITY INFORMATION (FROM NON-ERIC SOURCE):

If permission to reproduce is not granted to ERIC, or, if you wish ERIC to cite the availability of the document from another source,please provide the following information regarding the availability of the document. (ERIC will not announce a document unless it ispublicly available, and a dependable source can be specified. Contributors should also be aware that ERIC selection criteria aresignificantly more stringent for documents that cannot be made available through EDRS.)

Publisher/Distributor:

Address:

Price:

IV. REFERRAL OF ERIC TO COPYRIGHT/REPRODUCTION RIGHTS HOLDER:

If the right to grant reproduction release is held by someone other than the addressee, please provide the appropriate name and address:

Name:

Address:

V. WHERE TO SEND THIS FORM:

Send this form to the following ERIC Clearinghouse: Rika Nakazawa, Acquisitions CoordinatorERIC Clearinghouse for Community Colleges3051 Moore HallBox 951521Los Angeles, CA 90095-1521

However, if solicited by the ERIC Facility, or if making an unsolicited contribution to ERIC, return this form (and the document beingcontributed) to:

(Rev. 3/96/96) 1996 IR Mailing