DOCUMENT RELEASE AND CHANGE FORM Prepared For the U.S. Department of Energy, Assistant Secretary for Environmental Management By Washington River Protection Solutions, LLC., PO Box 850, Richland, WA 99352 Contractor For U.S. Department of Energy, Office of River Protection, under Contract DE-AC27-08RV14800 1a. Doc No: RPP-RPT-58298 Rev. 00 1b. Project Number: T2R02N/A 1 SPF-001 (Rev.0) TRADEMARK DISCLAIMER: Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States government or any agency thereof or its contractors or subcontractors. Printed in the United States of America. Release Stamp 2. Document Title LEAN Improvement Project Business Case to Benchmark Retrieval Technologies 3. Design Verification Required Yes No 4. USQ Number N/A 5. PrHA Number N/A Rev. 6. USQ Screening: a. Does the change introduce any new failure modes to the equipment? Yes No Basis is required for Yes: b. Does the change increase the probability of existing failure modes? Yes No Basis is required for Yes: c. For Safety Significant equipment, does the change require a modification to Chapter 4 of the DSA and/or FRED? Yes No N/A Basis is required for Yes: 7. Description of Change and Justification (Use Continuation pages as needed) Initial Release 8. Approvals Title Name Signature Date Checker WHITE, MICHAEL A WHITE, MICHAEL A 01/29/2015 Document Control Approval RAYMER, JULIA R RAYMER, JULIA R 03/09/2015 Originator WHITE, KATIE A WHITE, KATIE A 01/29/2015 Responsible Engineer BELLOMY, JIM BELLOMY, JIM 01/29/2015 Responsible Manager BAUER, ROGER E BAUER, ROGER E 01/29/2015 9. Clearance Review: Restriction Type: Public Undefined Unclassified Controlled Nuclear Information (UCNI) Export Control Information (ECI) Official Use Only Exemption 2-Circumvention of Statute (OUO-2) Official Use Only Exemption 3-Statutory Exemption (OUO-3) Official Use Only Exemption 4-Commercial/Proprietary (OUO-4) Official Use Only Exemption 5-Privileged Information (OUO-5) Official Use Only Exemption 6-Personal Privacy (OUO-6) Official Use Only Exemption 7-Law Enforcement (OUO-7) RPP-RPT-58298 3/9/2015 - 7:47 AM 1 of 106

DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

DOCUMENT RELEASE AND CHANGE FORM Prepared For the U.S. Department of Energy, Assistant Secretary for Environmental Management By Washington River Protection Solutions, LLC., PO Box 850, Richland, WA 99352 Contractor For U.S. Department of Energy, Office of River Protection, under Contract DE-AC27-08RV14800

1a. Doc No: RPP-RPT-58298 Rev. 00

1b. Project Number: T2R02☐ N/A

1 SPF-001 (Rev.0)

TRADEMARK DISCLAIMER: Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States government or any agency thereof or its contractors or subcontractors. Printed in the United States of America.

Release Stamp

2. Document Title

LEAN Improvement Project Business Case to Benchmark Retrieval Technologies

3. Design Verification Required

☐ Yes ☐ No

4. USQ Number ☒ N/A 5. PrHA Number ☒ N/A

Rev.

6. USQ Screening:

a. Does the change introduce any new failure modes to the equipment? ☐ Yes ☒ No

Basis is required for Yes:

b. Does the change increase the probability of existing failure modes? ☐ Yes ☒ No

Basis is required for Yes:

c. For Safety Significant equipment, does the change require a modification to Chapter 4 of the DSA and/or FRED? ☐ Yes ☐ No ☒ N/A

Basis is required for Yes:

7. Description of Change and Justification (Use Continuation pages as needed)

Initial Release

8. Approvals

Title Name Signature Date

Checker WHITE, MICHAEL A WHITE, MICHAEL A 01/29/2015

Document Control Approval RAYMER, JULIA R RAYMER, JULIA R 03/09/2015

Originator WHITE, KATIE A WHITE, KATIE A 01/29/2015

Responsible Engineer BELLOMY, JIM BELLOMY, JIM 01/29/2015

Responsible Manager BAUER, ROGER E BAUER, ROGER E 01/29/2015

9. Clearance Review:

Restriction Type:

☒ Public

☐ Undefined

☐ Unclassified Controlled Nuclear Information (UCNI)

☐ Export Control Information (ECI)

☐ Official Use Only Exemption 2-Circumvention of Statute (OUO-2)

☐ Official Use Only Exemption 3-Statutory Exemption (OUO-3)

☐ Official Use Only Exemption 4-Commercial/Proprietary (OUO-4)

☐ Official Use Only Exemption 5-Privileged Information (OUO-5)

☐ Official Use Only Exemption 6-Personal Privacy (OUO-6)

☐ Official Use Only Exemption 7-Law Enforcement (OUO-7)

RPP-RPT-58298 3/9/2015 - 7:47 AM 1 of 106

h3310581
Release
h3310581
Accepted
h3310581
Typewritten Text
JRR 3/9/15
Page 2: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

DOCUMENT RELEASE AND CHANGE FORM Doc No: RPP-RPT-58298 Rev. 00

2 SPF-001 (Rev.0)

10. Distribution:

Name Organization

BAUER, ROGER E A/AX RETRIEVAL ENGRNG

BELLOMY, JIM A/AX RETRIEVAL ENGRNG

BROWN, NICOLE L BASE OPERATIONS PROCESS ENGRNG

CARPENTER, KEITH E SST R&C PROJECT ENGINEERING

WITHERSPOON, JP P A/AX RETRIEVAL ENGRNG

11. TBDs or Holds ☒ N/A

12. Impacted Documents – Engineering ☒ N/A

Document Number Rev. Title

13. Other Related Documents ☒ N/A

Document Number Rev. Title

14. Related Systems, Structures, and Components:

14a. Related Building/Facilities ☐ N/A

241-C

241-C-101

241-C-107

241-C-111

241-C-112

14b. Related Systems ☐ N/A

241-WT

14c. Related Equipment ID Nos. (EIN) ☒ N/A

RPP-RPT-58298 3/9/2015 - 7:47 AM 2 of 106

Page 3: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

3 SPF-001 (Rev.0)

DOCUMENT RELEASE AND CHANGE FORM CONTINUATION SHEET

Document No: RPP-RPT-58298 Rev. 00

[Start Continuation Here]

RPP-RPT-58298 3/9/2015 - 7:47 AM 3 of 106

Page 4: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

A-6002-767 (REV 3)

RPP-RPT-58298, Rev. 0

LEAN Improvement Project Business Case to Benchmark Retrieval Technologies

Author Name: KA White ARES Corporation for Washington River Protection Solutions, LLC Richland, WA 99352 U.S. Department of Energy Contract DE-AC27-08RV14800 EDT/ECN: EDT 825781 UC: N/A Cost Center: N/A Charge Code: N/A B&R Code: N/A Total Pages: 104

Key Words: WRS, MARS, HHR, ERSS, LEAN, benchmark, retrieval, 241-C, C Farm, 241-C-101, 241-C-107, 241-C-111, 241-C-112, pump, failure, hydraulic, leak, ventilation, camera, temperature, sluicer, sluicing, bulk retrieval, hard heel retrieval, arm, extended reach sluicing system

Abstract: This document reviews the information from the 241-C-101 bulk retrieval campaign using the Waste Retrieval System (WRS), the 241-C-107 retrieval campaign using the Mobile Arm Retrieval System (MARS), the 241-C-111 bulk retrieval campaign using WRS, the 241-C-112 bulk retrieval campaign using WRS, and 241-C-112 hard heel retrieval (HHR) campaign to identify areas for equipment and operation process improvement. The evaluation addresses both equipment reliability and availability.

TRADEMARK DISCLAIMER. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof or its contractors or subcontractors.

Release Approval Date Release Stamp

Approved For Public Release

RPP-RPT-58298 3/9/2015 - 7:47 AM 4 of 106

h3310581
Line
h3310581
Typewritten Text
JRR 3/9/15
h3310581
Typewritten Text
106
h3310581
Typewritten Text
JRR 3/9/15
h3310581
Approved
h3310581
Release
h3310581
Line
Page 5: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

A-6002-767 (REV 3)

LEAN IMPROVEMENT PROJECT BUSINESS CASE TO BENCHMARK RETRIEVAL TECHNOLOGIES

November 2014

prepared by

ARES Corporation Energy Services Division 1100 Jadwin Avenue, Suite 400 Richland, Washington 99352

(509) 946-3300

prepared for

Washington River Protection Solutions, LLC

RPP-RPT-58298 3/9/2015 - 7:47 AM 5 of 106

Page 6: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

i

EXECUTIVE SUMMARY

Information for five retrieval campaigns was reviewed and events which caused either retrieval

shut-down or delay were noted by equipment type. Once documented, the findings were

evaluated to identify areas with repeated events. The information was obtained from the

Retrieval and Closure Operational Engineer Log Books, the Base Operations Log Books, the

retrieval completion reports, and the notes recorded by the Process Engineers in the material

balance calculation spreadsheets. Several hundred Problem Evaluation Requests, also known as

PERS, were reviewed and determined to not provide new pertinent information. The Document

Management Control System database was searched for lessons learned reports. No lessons

learned reports were found for the campaigns being evaluated.

There have been three distinct types of retrieval systems used in 241-C Tank Farm retrieval

efforts: the Modified Sluicing Waste Retrieval System, the Mobile Arm Retrieval System –

Sluicing, and Mobile Arm Retrieval System – Vacuum. The campaigns evaluated in this report

used either the Waste Retrieval System or the Mobile Arm Retrieval System – Sluicing. The

five campaigns evaluated are the 241-C-101 bulk retrieval campaign the 241-C-107 retrieval

campaign, 241-C-111 bulk retrieval campaign, the 241-C-112 bulk retrieval campaign, and

241-C-112 hard heel retrieval campaign.

A total of 487 events occurring over 390 operating days were documented. These events were

sorted into a number of categories as detailed in Section 3.0, “Methodology.” Analysis of these

events resulted in nine specific recommendations for areas needing improvement or further

review, as detailed in Section 5.0, “Recommendations.”

RPP-RPT-58298 3/9/2015 - 7:47 AM 6 of 106

Page 7: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

ii

TABLE OF CONTENTS

1.0 INTRODUCTION ..................................................................................................................1

2.0 SCOPE ....................................................................................................................................1

2.1 Evaluated Retrieval Systems ..........................................................................................1

2.1.1 Modified Sluicing Waste Retrieval System .......................................................1

2.1.2 Mobile Arm Retrieval System – Sluicing ..........................................................2

2.2 Evaluated Campaigns .....................................................................................................2

2.2.1 241-C-101 Bulk Retrieval ..................................................................................2

2.2.2 241-C-107 Retrieval...........................................................................................3

2.2.3 241-C-111 Bulk Retrieval ..................................................................................4

2.2.4 241-C-112 Bulk Retrieval ..................................................................................5

2.2.5 241-C-112 Hard Heel Retrieval .........................................................................5

2.3 Evaluated Equipment .....................................................................................................6

3.0 METHODOLOGY .................................................................................................................7

4.0 FINDINGS ..............................................................................................................................8

4.1 Significant Delay Equipment Failures ...........................................................................8

4.2 Minor Delay Equipment Failures...................................................................................8

4.2.1 241-C-101 Bulk Retrieval ..................................................................................9

4.2.2 241-C-107 Retrieval.........................................................................................14

4.2.3 241-C-111 Bulk Retrieval ................................................................................19

4.2.4 241-C-112 Bulk Retrieval ................................................................................23

4.2.5 241-C-112 Hard Heel Retrieval .......................................................................27

4.3 Equipment Failure Trends............................................................................................31

4.3.1 Hydraulic Leak Events .....................................................................................31

4.3.2 Ventilation Events ............................................................................................32

4.3.3 Camera and Lighting Events ............................................................................32

4.3.4 Supernatant Pump Start-Up and Shut-Down Events .......................................33

4.3.5 Supernatant Pump Flow Events .......................................................................33

4.3.6 Slurry Pump Low Flow and Plugging Events..................................................33

4.3.7 Slurry Pump Movement Events .......................................................................34

4.3.8 Sluicer / Extended Reach Sluicer System / Arm Movement Events ...............34

4.3.9 Hydraulic Temperature Events ........................................................................35

4.3.10 Miscellaneous Events .......................................................................................36

4.3.11 Total Number of Events ...................................................................................37

5.0 RECOMMENDATIONS ......................................................................................................38

6.0 REFERENCES .....................................................................................................................40

RPP-RPT-58298 3/9/2015 - 7:47 AM 7 of 106

Page 8: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

iii

LIST OF FIGURES

Figure 4-1. 241-C-101 Bulk Retrieval Recorded Events. ...............................................................9

Figure 4-2. 241-C-101 Bulk Retrieval Miscellaneous Events. .....................................................12

Figure 4-3. 241-C-101 Bulk Retrieval Total Number of Events. .................................................13

Figure 4-4. 241-C-107 Retrieval Recorded Events. ......................................................................14

Figure 4-5. 241-C-107 Retrieval Miscellaneous Events. ..............................................................17

Figure 4-6. 241-C-107 Retrieval Total Number of Events. ..........................................................18

Figure 4-7. 241-C-111 Bulk Retrieval Recorded Events. .............................................................19

Figure 4-8. 241-C-111 Bulk Retrieval Miscellaneous Events. .....................................................21

Figure 4-9. 241-C-111 Bulk Retrieval Total Number of Events. .................................................22

Figure 4-10. 241-C-112 Bulk Retrieval Recorded Events. ...........................................................23

Figure 4-11. 241-C-112 Bulk Retrieval Miscellaneous Events. ...................................................25

Figure 4-12. 241-C-112 Bulk Retrieval Total Number of Events. ...............................................26

Figure 4-13. 241-C-112 Hard Heel Retrieval Recorded Events. ..................................................27

Figure 4-14. 241-C-112 Hard Heel Retrieval Miscellaneous Events. ..........................................29

Figure 4-15. 241-C-112 Hard Heel Retrieval Total Number of Events. ......................................30

Figure 4-16. Retrieval Campaign Recorded Events. ....................................................................31

Figure 4-17. Hydraulic Fluid Temperature Events by Season. .....................................................35

Figure 4-18. Retrieval Activities Total Miscellaneous Events. ....................................................36

Figure 4-19. Retrieval Activities Total Number of Events. ..........................................................37

Figure 4-20. Retrieval Activity Events by Season. .......................................................................38

RPP-RPT-58298 3/9/2015 - 7:47 AM 8 of 106

Page 9: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

iv

LIST OF APPENDICES

Appendix A

Appendix B

Appendix C

Appendix D

Appendix E

Appendix F

Appendix G

Appendix H

Appendix I

Appendix J

Appendix K

241-C-101 Bulk Retrieval Activities Events

241-C-107 Retrieval Activities Events

241-C-111 Bulk Retrieval Activities Events

241-C-112 Bulk Retrieval Activities Events

241-C-112 Hard Heel Retrieval Activities Events

241-C-101 Bulk Retrieval Event Analysis

241-C-107 Retrieval Activities Event Analysis

241-C-111 Bulk Retrieval Activities Event Analysis

241-C-112 Bulk Retrieval Activities Event Analysis

241-C-112 Hard Heel Retrieval Activities Event Analysis

Evaluated Retrieval Activities Event Analysis

LIST OF ATTACHMENTS

Attachment 1

Reference Materials

RPP-RPT-58298 3/9/2015 - 7:47 AM 9 of 106

Page 10: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

v

LIST OF TERMS

Abbreviations, Initialisms, and Acronyms

CAM Continuous Air Monitor

DST Double-Shell Tank

ERSS Extended Reach Sluicer System

HHR Hard Heel Retrieval

HIHTL Hose-in-Hose Transfer Line

HMI Human-Machine Interface

HPU Hydraulic Power Unit

IDMS Integrated Document Management System

MARS Mobile Arm Retrieval System

OE Operational Engineer

SST Single-Shell Tank

VTP Ventilation Tank Primary

WRPS Washington River Protection Solutions, LLC

WRS Waste Retrieval System

Units

M moles

rpm revolutions per minute

RPP-RPT-58298 3/9/2015 - 7:47 AM 10 of 106

Page 11: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

1

1.0 INTRODUCTION

This document reviews information for five bulk and hard heel retrieval (HHR) campaigns to

identify areas for equipment and operational process improvement. The evaluation addresses

both equipment reliability and availability.

2.0 SCOPE

Information for five retrieval campaigns was reviewed and events which caused either retrieval

shut-down or delay were noted by equipment type. Once documented, the findings were

evaluated to identify areas with repeated events. The information was obtained from the

Retrieval and Closure Operational Engineer (OE) Log Books, the Base Operations Log Books,

the retrieval completion reports, and the notes recorded by the Process Engineers in the material

balance calculation spreadsheets. Several hundred Problem Evaluation Requests, also known as

PERS, were reviewed and determined to not provide new pertinent information. The Document

Management Control System database was searched for lessons learned reports. No lessons

learned reports were found for the campaigns being evaluated.

2.1 EVALUATED RETRIEVAL SYSTEMS

There have been three distinct types of retrieval systems used in 241-C Tank Farm retrieval

efforts: the Modified Sluicing Waste Retrieval System (WRS), the Mobile Arm Retrieval System

(MARS) – Sluicing, and MARS – Vacuum. The five campaigns evaluated in this report used

either the WRS or the MARS – Sluicing.

There are three styles of sluicers used in the sluicer-based retrieval systems: the standard sluicer,

the Extended Reach Sluicer System (ERSS) sluicer, and the arm-mounted sluicer used with the

MARS. All of the sluicers are hydraulically driven. The standard sluicer is capable of pan and

tilt movement. The ERSS consists of an extendable boom-mounted sluicer capable of pan and

tilt movement. The boom allows the ERSS sluicer nozzle to be placed closer to the waste

therefore increasing the sluicing effectiveness in breaking up solid waste in the single-shell tank

(SST). The ERSS are also equipped with two high-pressure water nozzles located on either side

of the sluicing nozzle.

2.1.1 Modified Sluicing Waste Retrieval System

A WRS includes three main components in the SST being retrieved and two in the receiving

double-shell tank (DST). The three SST components are two sluicers and a slurry pump. The

DST components are a slurry distributor, and a supernatant pump. The sluicers are generally

placed in risers toward the outside of the SST and the slurry pump located in the center. In the

DST, the slurry distributor and supernatant pump are co-located in the central pump pit. The

slurry distributor is a passive device which is manually raised or lowered. The supernatant pump

may be either electrically or hydraulically driven while the slurry pump is hydraulically driven.

During retrieval, the slurry pump is lowered as the SST waste level lowers. The supernatant

RPP-RPT-58298 3/9/2015 - 7:47 AM 11 of 106

Page 12: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

2

pump is raised as the solids level in the DST increases. The slurry distributor is raised and

lowered as necessary to minimize the amount of solids in suspension and therefore returned to

the SST in the supernate.

Hose-in-hose-transfer lines (HIHTLs) connect the two tanks via a portable valve pit and a

portable diversion box. Other ancillary equipment required for a WRS-based retrieval include

active ventilation systems on both the SST and DST tanks, leak detection, and in-tank cameras

and associated lighting systems.

2.1.2 Mobile Arm Retrieval System – Sluicing

A MARS includes two main components in the SST being retrieved and two in the receiving

DST. The two SST components are an arm-mounted sluicer and a slurry pump. The DST

components are a slurry distributor and a supernatant pump. The sluicer arm and slurry pump

are generally placed in risers located in the center of the SST. In the DST, the slurry distributor

and supernatant pump are co-located in the central pump pit. The slurry distributor is a passive

device which is manually raised or lowered. The supernatant pump may be either electrically or

hydraulically driven while the slurry pump is hydraulically driven. During retrieval, the slurry

pump is lowered as the SST waste level lowers. The supernatant pump is raised as the solids

level in the DST increases. The slurry distributor is raised and lowered as necessary to minimize

the amount of solids in suspension and therefore returned to the SST in the supernate.

HIHTLs connect the two tanks via a portable valve pit and a portable diversion box. Other

ancillary equipment required for a WRS-based retrieval include active ventilation systems on

both the SST and DST tanks, leak detection, and in-tank cameras and associated lighting

systems.

2.2 EVALUATED CAMPAIGNS

The retrieval campaigns evaluated are discussed in the following sections. The campaigns were

selected based on their use of MARS, standard, and ERSS sluicer technology, and their use of

diverse media to mobilize the waste.

2.2.1 241-C-101 Bulk Retrieval

Tank 241-C-101 was retrieved using a WRS with ERSS sluicers. Retrieval occurred from

December 2012 until September 2013 with the following non-equipment failure-related

interruptions:

Resources were diverted from the 241-C-101 retrieval to support the 241-C-107 retrieval

on March 19, 2013, and were not available until May 14, 2013;

Resources were diverted to support the 241-C-107 retrieval efforts again from May 18,

2013, until June 2, 2013;

RPP-RPT-58298 3/9/2015 - 7:47 AM 12 of 106

Page 13: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

3

Delays for installation and testing of high-pressure water support equipment occurred

from June 20, 2013, to July 8, 2013, and from September 3, 2013, to September 5, 2013;

and

An event investigation interrupted retrieval from August 22, 2013, until September 3,

2013.

The sluicing media used for the more readily retrieval solids was supernate from 241-AN-101.

High pressure water was the media used for larger pieces of hard waste that could not be broken

up by typical sluicing methods.

The following documents were used to evaluate the performance of the WRS and associated SST

and DST equipment:

A photocopy of the 241-C-101 Retrieval and Closure OE Log Book provided by

Washington River Protection Solutions, LLC (WRPS) Process Engineering (Attachment

1);

A photocopy of Base Operations Shift Office Log Book, BOSO-009, 11-21-11 to

08-19-12, obtained from Integrated Document Management System (IDMS) (Attachment

1);

A photocopy of Base Operations Shift Office Log Book: BOSO-010, 08/20/2012 to

03/03/2013, obtained from IDMS (Attachment 1);

A copy of the 241-C-101 volume balance Excel®1 file provided by WRPS Process

Engineering (Attachment 1); and

RPP-RPT-55573, “Retrieval Completion Report for Modified Sluicing of Tank

241-C-101 Using Extended Reach Sluicing and High Pressure Water.”

A compilation of the pertinent information obtained from these sources is contained in

Appendix A.

2.2.2 241-C-107 Retrieval

Tank 241-C-107 was retrieved using the MARS. Retrieval occurred from September 2011 until

April 2014 with intermittent interruptions to support 241-C-104 and 241-C-109 retrieval efforts.

The sluicing media used for the more readily retrievable solids was supernate from 241-AN-106.

High pressure water was the media used for larger pieces of hard waste that could not be broken

up by typical sluicing methods.

1 Excel is a registered trademark of Microsoft Corporation in the United States and/or other countries.

RPP-RPT-58298 3/9/2015 - 7:47 AM 13 of 106

Page 14: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

4

The following documents were used to evaluate the performance of the MARS and associated

SST and DST equipment:

A photocopy of the 241-C-107 Retrieval and Closure OE Log Book provided by WRPS

Process Engineering (Attachment 1);

A photocopy of Base Operations Shift Office Log Book: BOSO-007, 10-20-10 to

05-02-11, obtained from IDMS (Attachment 1);

A photocopy of Base Operations Shift Office Log Book: BOSO-008, 05-02-11 to

11-20-11, obtained from IDMS (Attachment 1);

A photocopy of Base Operations Shift Office Log Book: BOSO-009, 11-21-11 to

08-19-12, obtained from IDMS (Attachment 1);

A photocopy of Base Operations Shift Office Log Book: BOSO-010, 08/20/2012 to

03/03/2013, obtained from IDMS (Attachment 1);

A photocopy of Base Operations Shift Office Log Book: BOSO-011, 3/4/13 to 9/8/13,

obtained from IDMS (Attachment 1);

A copy of the 241-C-107 volume balance Excel file provided by WRPS Process

Engineering (Attachment 1); and

RPP-RPT-54959, “Single-Shell Tank 241-C-107 Hard Heel Retrieval Completion

Report.”

A compilation of the pertinent information obtained from these sources is contained in

Appendix B.

2.2.3 241-C-111 Bulk Retrieval

Tank 241-C-111 was retrieved using a WRS with standard sluicers. Retrieval occurred from

September 2010 until November 2010.

The sluicing media used was supernate from 241-AN-101.

The following documents were used to evaluate the performance of the WRS and associated SST

and DST equipment:

A photocopy of the 241-C-111 Retrieval and Closure OE Log Book provided by WRPS

Process Engineering (Attachment 1);

A photocopy of Base Operations Shift Office Log Book, BOSO-006, 4-30-10 to

10-19-10, obtained from IDMS (Attachment 1);

RPP-RPT-58298 3/9/2015 - 7:47 AM 14 of 106

Page 15: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

5

A photocopy of Base Operations Shift Office Log Book, BOSO-007, 10-20-10 to

05-02-11, obtained from IDMS (Attachment 1); and

A copy of the 241-C-111 volume balance Excel file provided by WRPS Process

Engineering (Attachment 1).

A completion report was not found.

A compilation of the pertinent information obtained from these sources is contained in

Appendix C.

2.2.4 241-C-112 Bulk Retrieval

Tank 241-C-112 bulk retrieval used a WRS with one standard sluicer and one ERSS sluicer.

Retrieval occurred from December 2011 until April 2012.

The sluicing media used was supernate from 241-AN-101.

The following documents were used to evaluate the performance of the WRS and associated SST

and DST equipment:

A photocopy of the 241-C-112 Bulk Retrieval and Closure OE Log Book provided by

WRPS Process Engineering (Attachment 1);

A photocopy of Base Operations Shift Office Log Book, BOSO-009, 11-21-11 to

08-19-12, obtained from IDMS (Attachment 1);

A copy of the 241-C-112 volume balance Excel file provided by WRPS Process

Engineering (Attachment 1); and

RPP-RPT-52480, “Retrieval Completion Report for Modified Sluicing of Tank

241-C-112.”

A compilation of the pertinent information obtained from these sources is contained in

Appendix D.

2.2.5 241-C-112 Hard Heel Retrieval

Tank 241-C-112 HHR used a WRS with one standard sluicer and one ERSS sluicer. Retrieval

occurred from November 2013 until January 2014.

Concentrated 19.4 M sodium hydroxide was used during the two soaking and recirculation

periods. The sluicing media used for the majority of the retrieval was supernate from

241-AN-101. Hot water was used at the end to allow for dissolution of any water soluble salts

remaining in the tank.

RPP-RPT-58298 3/9/2015 - 7:47 AM 15 of 106

Page 16: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

6

The following documents were used to evaluate the performance of the WRS and associated SST

and DST equipment:

A photocopy of the 241-C-112 HHR Retrieval and Closure OE Log Book provided by

WRPS Process Engineering (Attachment 1);

A photocopy of Base Operations Shift Office Log Book, BOSO-011, 3/4/13 to 9/8/13,

obtained from IDMS (Attachment 1);

A copy of the 241-C-112 volume balance Excel file provided by WRPS Process

Engineering (Attachment 1); and

RPP-RPT-56900, “Single-Shell Tank 241-C-112 Hard Heel Retrieval Completion

Report.”

A compilation of the pertinent information obtained from these sources is contained in

Appendix E.

2.3 EVALUATED EQUIPMENT

Equipment included in the evaluation can be separated into two categories: SST-specific

equipment and shared equipment. The shared equipment includes the SST ventilation systems,

all of the DST equipment, the majority of the HIHTLs, the valve pits, the diversion boxes, and

control trailers.

The 241-C Tank Farm SSTs were retrieved to either 241-AN-101 or to 241-AN-106. The shared

equipment associated with the 241-AN-101 receiver tank is:

The POR137-WT-TRLR-001 control trailer,

The POR138-WT-VP-001 valve pit,

The POR134-WT-DB-001 diversion pit,

The 241-AN-101 transfer pump, and

The HIHTL which connects them.

Four of the campaigns evaluated were retrieved to 241-AN-101. These are the 241-C-101,

241-C-111, and both of the 241-C-112 retrievals. In addition to these tanks, 241-C-102 and

241-C-104 used 241-AN-101 as their receiver tank.

The shared equipment associated with the 241-AN-106 receiver tank is:

The POR104-WT-VP-001 valve pit,

The POR209-WT-DB-001 diversion pit,

The 241-AN-106 transfer pump, and

The HIHTL which connects them.

RPP-RPT-58298 3/9/2015 - 7:47 AM 16 of 106

Page 17: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

7

The 241-C-107 retrieval utilized 241-AN-106 as its receiver tank. MARS activities have a

dedicated control trailer, POR246-WT-TRLR-001. Other tanks which used 241-AN-106 as their

receiver tank include 241-C-103, 241-C-106, 241-C-108, 241-C-109, and 241-C-110. These

tanks used WRS for retrieval and used a WRS-dedicated control trailer.

All seven of the 241-AN Tank Farm tanks use the same primary tank ventilation system, the AN

ventilation tank primary (VTP). DSTs are required to maintain active ventilation and are

connected to the ventilation systems continuously. The 16 SSTs in the 241-C Tank Farm only

require active ventilation during retrieval activities and are usually passively ventilated. There

are two main ventilation systems in 241-C Tank Farm, POR008 and POR107. POR107 has been

connected to POR03 in order to increase the exhaust flow rate provided by the system. Many of

the SSTs in 241-C may be connected to either the POR008 ventilation system or to the

POR107/POR03 ventilation system.

Each of the SSTs includes sluicers, either standard, ERSS, or arm-mounted, and adjustable

height slurry pumps. In the WRS configuration, each of the sluicers is equipped with a hydraulic

power unit (HPU). Sluicer functions are controlled via a hydraulic valve manifold. The MARS

arm-mounted sluicer is also hydraulically driven and controlled with hydraulic valves. The

slurry pumps also are equipped with an HPU.

The DSTs each have an adjustable height slurry distributor as well as an adjustable height

supernatant pump. The pumps used in 241-AN-101 are hydraulically driven and as such are

equipped with an HPU. Tank 241-AN-106 used both electrically driven and hydraulically driven

pumps during the retrieval campaigns evaluated.

Sluicing activities are conducted using in-tank cameras, two per SST, which allows the operator

to determine the retrieval progress and direct the sluicer nozzle. These are portable camera units

with a built in light. In addition to the camera light, additional in-tank lighting is provided for

each camera.

Water at 241-C Tank Farm is provided from a common source, POR135.

These components and the instrumentation monitoring them were included in this evaluation.

3.0 METHODOLOGY

The information contained in Appendices A through E document a total of 487 events occurring

over 390 operating days. These events were sorted into a number of categories which were

suggested by the development of Appendices A through E. These categories are:

Hydraulic leak events,

Ventilation events,

Camera and lighting events,

Supernatant pump start-up and shut-down events,

Supernatant pump flow rate events,

Slurry pump flow rate events,

RPP-RPT-58298 3/9/2015 - 7:47 AM 17 of 106

Page 18: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

8

Slurry pump movement events,

Sluicer / ERSS / arm movement events,

Hydraulic temperature events, and

Other miscellaneous events.

Tables documenting the events by day and category for each retrieval campaign are contained in

Appendices F through J. Events were tallied in each category for each day. If a particular event

happened multiple times on a given day, it was counted as a single instance since it was likely

reoccurring due to not having completely resolved the initiating event. If a new initiating event

occurred on the same day, it counted as a new event in the tally. For example, if the ventilation

system was shut-down due to a continuous air monitor (CAM), it counted as a single event, even

if the ventilation system was shut down multiple times for CAM problems on that day. If there

were also seal pot issues on the same day, it would count as a separate event on that day.

Event categorizations by category over time for the entirety of the campaigns reviewed are

included in Appendix K.

4.0 FINDINGS

4.1 SIGNIFICANT DELAY EQUIPMENT FAILURES

There were four equipment failures which required component replacements resulting in

significant interruptions in the retrieval process. These failures were:

The AN106-WT-P-22 electric pump which failed during retrieval activities;

The AN106-WT-P-23 electric pump which failed during pre-installation testing;

The AN106-WT-P-24 hydraulic pump which failed during retrieval activities; and

The 241-C-107 slurry pump which failed during retrieval activities.

Retrieval activities did not resume for 208 days after the failure of the AN106-WT-P-22 pump

and subsequent failure of the AN106-WT-P-23 pump during testing. After the AN106-WT-P-24

pump failure, retrievals did not resume for an additional 241 days. Retrievals resumed 198 days

after the failure of the 241-C-107 pump. All of the pump failures were associated with the

241-C-107 MARS retrieval efforts. Given that the other retrieval efforts associated with the

241-AN-106 receiving tank are not within the scope of this review, it is not possible to evaluate

the total number of hours of pump use prior to failure.

No other failures were noted which resulted in a sustained suspension of retrieval activities.

4.2 MINOR DELAY EQUIPMENT FAILURES

The vast majority of failures resulted in short duration shutdowns or reduced capacity during

continued operations. The typical short duration shutdown impact was less than one shift with a

few extending into one or two days while the equipment was undergoing troubleshooting. The

other failures included here typically resulted in reduced capacity such as lost mobility in a

RPP-RPT-58298 3/9/2015 - 7:47 AM 18 of 106

Page 19: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

9

sluicer nozzle or reduced flow from a sluicer nozzle. The events are summarized by tank in the

following subsections. Trends and analysis of the findings are discussed in Section 4.3.

4.2.1 241-C-101 Bulk Retrieval

The information documented in Appendix A was sorted into the categories listed in Section 3.0,

“Methodology.” The resulting table is in Appendix F. A total of 110 entries were made

documenting issues over 101 days of operation. Figure 4-1 shows the distribution of the events

between categories. No trends were noted within the 241-C-101 information. Analyses of each

of the categories are summarized in the following subsections.

Figure 4-1. 241-C-101 Bulk Retrieval Recorded Events.

4.2.1.1. Hydraulic Leak Events. Eight hydraulic leak events were recorded during the

241-C-101 bulk retrieval campaign. Two of these events were associated with the slurry pump

HPU. One event was associated with the supernatant pump HPU. The other five were

associated with the two sluicers.

The slurry pump HPU leaks were at a flange on the HPU. The supernatant pump hydraulic leak

was at the pressure hose connection point of the HPU. All three of these leaks appear to have

been repaired with minimal impact to the retrieval efforts.

One of the sluicer leak entries was associated with the number 1 sluicer. The leak was apparent

during operation of the horizontal movement function. The hose providing the function was

0

5

10

15

20

25

Nu

mb

er

of

Eve

nts

Event Type

RPP-RPT-58298 3/9/2015 - 7:47 AM 19 of 106

Page 20: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

10

disconnected. Operation of the number 1 sluicer continued utilizing vertical movement of the

nozzle.

The remaining four hydraulic leak events noted were associated with the number 2 sluicer.

Those four entries documented the discovery and effects of the same two failures. The leaks

associated with the number 2 sluicer were at the rotary union. The initial entry identified both

leaks. The horizontal motion function had a drip-wise leak at the rotary union. A steady stream

of hydraulic fluid was observed at the rotary union during vertical motion. Sluicing continued

with the number 2 sluicer using the horizontal motion functions while the hoses to the vertical

motion functions were disconnected. Later investigation attributed these leaks to electro-spark

damage to the Teflon hydraulic hoses as identified in RPP-RPT-55036, “Summary Evaluation of

ERSS Hydraulic Hose Failures”. Corrective actions are in place to address this issue.

4.2.1.2. Ventilation Events. Seventeen entries were logged associated with ventilation issues.

Ten of the events were associated with the POR107 ventilation system, one was related to the

241-C-101 demister, and the remaining six were associated with the 241-AN VTP.

Eight of the 17 entries were associated with the CAMs, 5 on the POR107 ventilation system and

3 on the 241-AN system. Three entries documented the efforts associated with a single event of

the POR107 glycol heater smoking. The five entries note issues with the POR107 seal pot

temperature, the POR107 low flow alarm, the POR107 sample pump, high differential pressure

across the 241-C-101 demister, and entering an extended outage for 241-AN VTP upgrades for

compliance with RPP-13033, “Tank Farms Documented Safety Analysis.” One entry simply

noted that the 241-AN ventilation system was shut down.

4.2.1.3. Camera and Lighting Events. Fourteen entries were logged associated with the in-

tank cameras and lighting systems. Only one of the camera and lighting entries was for the

241-AN-101 camera. The remaining 13 entries were for the 241-C-101 in-tank cameras and

lights.

There were five entries associated with the in-tank lighting, including a stop work on the use of

all Alhberg lighting and three for the cameras and lighting. The camera and lighting installed in

Riser 3 had the majority of entries with replacement being noted ten times. The cameras and

lighting installed Riser 8 required replacement seven times.

4.2.1.4. Supernatant Pump Start-Up and Shut-Down Events. The 241-C-101 retrieval data

did not contain any information indicating the 241-AN-101 supernatant pump was having start-

up or shut-down issues.

4.2.1.5. Supernatant Pump Flow Events. Four entries noted problems with the 241-AN-101

supernatant pump flow rate. Three of these events were likely related to inlet screen plugging.

The fourth documents a loss of pump HPU speed increase/decrease controls. The HPU speed

control issue self-corrected as the system worked as designed during troubleshooting.

RPP-RPT-58298 3/9/2015 - 7:47 AM 20 of 106

Page 21: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

11

4.2.1.6. Slurry Pump Low Flow and Plugging Events. Twenty low flow and plugging events

were noted during the 241-C-101 campaign. Two of these events were associated with final

pump down as part of the volume displacement activities. The other 18 appear to have been

expected events as there was no indication that engineering or maintenance was notified.

4.2.1.7. Slurry Pump Movement Events. Three entries documented difficulties in moving the

slurry pump. All three events appear to have been due to material below the pump creating a rest

for the pump. The logs do not indicate that engineering or maintenance was notified, suggesting

this was expected behavior from the pump.

4.2.1.8. Sluicer / Extended Reach Sluicer System / Arm Movement Events. A single event

was noted during the 241-C-101 campaign. The sluicer number 1 controls were operating

backward, e.g., the command to move the nozzle in the upward direction resulted in downward

motion, etc. Engineering confirmed that the sluicer was oriented 180 degrees out causing the

backward nozzle controls. This was neither the first nor the last use of sluicer number 1.

4.2.1.9. Hydraulic Temperature Events. Twenty-one entries noted hydraulic system

temperature anomalies. Five instances were for low temperature, the other 16 were for high

temperature.

4.2.1.10. Miscellaneous Events. Twenty-two events were noted which did not appear to either

fit within one of the other categories or to reoccur. Figure 4-2 shows the distribution of the

events over time. The trend does not show that there was a noticeable difference in the rate of

occurrence associated with campaign start-up.

RPP-RPT-58298 3/9/2015 - 7:47 AM 21 of 106

Page 22: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

12

Figure 4-2. 241-C-101 Bulk Retrieval Miscellaneous Events.

4.2.1.11. Total Number of Events. Figure 4-3 is a graph showing the distribution of the 110

events over time. As with the rate of miscellaneous events, the trend does not show that there

was a noticeable difference in the rate of occurrence associated with campaign start-up. The

events occur at a steady rate over the duration of the campaign. This suggests that the

construction and start-up testing processes are of sufficient quality as to not adversely impact

operations.

0

5

10

15

20

25

1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 73 77 81 85 89 93 97 101

Cu

mm

ula

tive

Nu

mb

er

of

Eve

nts

Operating Days

RPP-RPT-58298 3/9/2015 - 7:47 AM 22 of 106

Page 23: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

13

Figure 4-3. 241-C-101 Bulk Retrieval Total Number of Events.

0

20

40

60

80

100

120

1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 73 77 81 85 89 93 97 101

Cu

mm

ula

tive

Nu

mb

er

of

Eve

nts

Operating Days

RPP-RPT-58298 3/9/2015 - 7:47 AM 23 of 106

Page 24: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

14

4.2.2 241-C-107 Retrieval

The information documented in Appendix B was sorted into the categories listed in Section 3.0,

“Methodology.” The resulting table is in Appendix G. A total of 231 entries were made

documenting issues over 136 days of operation. Figure 4-4 shows the distribution of the events

between categories. No trends were noted within the 241-C-107 information. Analyses of each

the categories are provided in the following subsections.

Figure 4-4. 241-C-107 Retrieval Recorded Events.

4.2.2.1. Hydraulic Leak Events. Nine hydraulic leak events were noted during the 241-C-107

campaign. Two events documented a drop in the supernatant pump hydraulic fluid level with no

apparent leakage immediately prior to failure of the pump. Two events were associated with a

spray leak by a filter in the POR237-WT-ENCL-400 hydraulic cabinet. A fitting leak at

POR241-WT-HPU-001 was noted as was a leak at the constant tension hoist reel in the MARS

containment box. Two events documented a seal leakage from the wrist sweep stack valve. The

final hydraulic leak event noted a steady stream of fluid from POR237-WT-ENCL-400.

4.2.2.2. Ventilation Events. Ventilation issues were noted 37 times during the campaign.

Thirty-two of the entries were associated with POR107, three were associated with POR03, and

one each with POR008 and the AN VTP.

Twenty of the events noted were associated with either the CAM or the record sampler. One of

these events was the result of a confirmed high radiation condition on the sample paper.

0

10

20

30

40

50

60

70

80

Nu

mb

er

of

Eve

nts

Event Type

RPP-RPT-58298 3/9/2015 - 7:47 AM 24 of 106

Page 25: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

15

Thirteen events were associated with the instrument flow rates. The other six events were noted

as CAM failures.

The other 17 events documented a variety of issues including 2 for Human-Machine Interface

(HMI) issues and 3 for control valve problems. Four events noted involved the 241-C-107

pressure transmitter. Five events were associated with problems with the stack temperature

differential. There was a single instance noted of low stack flow and two instances of the

systems shutting down without a cause being identified.

4.2.2.3. Camera and Lighting Events. Two camera and lighting events were noted. The first

event noted that the Riser 2 and Riser 7 cameras in 241-C-107 had both degraded to near failure

and that retrieval was not able to continue with the resulting visibility. The second event noted

that the 241-AN-106 camera had failed.

4.2.2.4. Supernatant Pump Start-Up and Shut-Down Events. Supernatant pump start-up or

shut-down events were noted on five occasions. Two of the events were associated with signal

problems for the flow control valves. The other three instances were simply described as “timed

out.”

4.2.2.5. Supernatant Pump Flow Events. There were 13 events noted associated with low

flow from the supernatant pump. Two were associated with the failure of the AN106-WT-P-22

electric pump. Two occurred when the pump speed was being ramped up or down. One event

was associated with flow control valve issues while another was documented as being due to the

MARS’ arm being moved to 90 degrees. Seven other events were associated with blockage of

the intake screen.

4.2.2.6. Slurry Pump Low Flow and Plugging Events. Plugging of the slurry pump intake

screen and associated shut down was noted on 71 days. Many of these days had in excess of five

events of shut down per shift worked. The logs do not indicate that engineering or maintenance

was notified, suggesting this was expected behavior from the pump. RPP-RPT-54959 notes that

the supernate used as sluicing medium starting in early 2014 reacted with the solids, creating

phosphate crystallized waste solids agglomerations within 241-C-107. Subtracting the events

after the introduction of the phosphate bearing supernate leaves 45 days where there were low-

flow related shut downs not related to the phosphate crystallized waste solids agglomerate. A

quick count indicates that in excess of 250 shut downs were experienced during these 45 days.

As this is the only example of the MARS retrieval technology included within the scope of this

analysis, it is not possible to determine if the reason the waste was not being broken down into

pieces small enough to be transferred was due to the waste type or due to the retrieval

technology.

There were four additional events documenting issues with the slurry pump speed sensors. The

first entry simply states that there were issues with the speed sensors. The second and third

entries documented the troubleshooting evolution associated with the failure of both speed

sensors. The final entry states that the speed sensor shows 0 rpm on start-up. No additional

information was provided.

RPP-RPT-58298 3/9/2015 - 7:47 AM 25 of 106

Page 26: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

16

4.2.2.7. Slurry Pump Movement Events. The slurry pump and back stop could not be moved

as desired 11 times during the campaign. Nine of the events were associated with the pump; the

other two were for issues with the back stop.

Pump movement was limited due to the lower cable limit six times. There was a single instance

of the pump not lowering because the contactor had tripped and one from having blockage

beneath it. The final entry discusses the slurry pump dragging when the turntable was rotated

which affected the reeving of the cable onto the winch. There were no apparent long-term ill-

effects to the winch.

There was one instance of the backstop being limited by the lower cable limit and one instance

of the backstop not moving without a cause being given.

4.2.2.8. Sluicer / Extended Reach Sluicer System / Arm Movement Events. There were 15

entries associated with the movement of the MARS’ arm. Seven of the events were related to

HMI operation. Problems with the constant tension hoist resulted in five entries. Two entries

were associated with failure of the proximity switches and the associated compensating efforts.

There was one documented instance of problems with the HPU and one where the curb feeler

stopped actuating.

4.2.2.9. Hydraulic Temperature Events. The hydraulic fluid temperature was either too high

or too low eight times.

RPP-RPT-58298 3/9/2015 - 7:47 AM 26 of 106

Page 27: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

17

4.2.2.10. Miscellaneous Events. Fifty-five events were noted which did not appear to either fit

within one of the other categories or to reoccur. Figure 4-5 is a graph showing the distribution of

the events over time. The trend does not show that there was a noticeable difference in the rate

of occurrence associated with campaign start-up.

Figure 4-5. 241-C-107 Retrieval Miscellaneous Events.

Five leak events were associated with the rotary union. During an interview with 241-C-107

project personnel, it was discovered that the leaks observed were not hydraulic leaks as

originally believed from the entries, but were waste leaks (WRPS-PER-2012-1321, “Evidence of

Previous leakage from the Rotary Union on the C-107 MARS Unit” and WRPS-PER-2012-1346,

“C-107 MARS Containment Box Rotary Union Drip Leak”). The project determined that the

leaks were the result of the manufacturing methods used when fabricating the rotary union. A

new rotary union was fabricated using a modified manufacturing method and installed in the

241-C-107 MARS. No leaks were observed at the rotary union after the new union was

installed.

0

10

20

30

40

50

60

1 6

11

16

21

26

31

36

41

46

51

56

61

66

71

76

81

86

91

96

10

1

10

6

11

1

11

6

12

1

12

6

13

1

Cu

mm

ula

tive

Nu

mb

er

of

Eve

nts

Operating Days

RPP-RPT-58298 3/9/2015 - 7:47 AM 27 of 106

Page 28: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

18

4.2.2.11. Total Number of Events. Figure 4-6 is a graph showing the distribution of the 231

events over time. As with the rate of miscellaneous events, the trend does not show that there

was a noticeable difference in the rate of occurrence associated with campaign start-up. The

events occur at a steady rate over the duration of the campaign. This suggests that the

construction and start-up testing processes are of sufficient quality as to not adversely impact

operations.

Figure 4-6. 241-C-107 Retrieval Total Number of Events.

0

50

100

150

200

250

1 6

11

16

21

26

31

36

41

46

51

56

61

66

71

76

81

86

91

96

10

1

10

6

11

1

11

6

12

1

12

6

13

1

Cu

mm

ula

tive

Nu

mb

er

of

Eve

nts

Operating Days

RPP-RPT-58298 3/9/2015 - 7:47 AM 28 of 106

Page 29: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

19

4.2.3 241-C-111 Bulk Retrieval

The information documented in Appendix C was sorted into the categories listed in Section 3.0,

“Methodology.” The resulting table is in Appendix H. A total of 37 entries were made

documenting issues over 40 days of operation. Figure 4-7 shows the distribution of the events

between categories. No trends were noted within the 241-C-111 information. Analyses of each

the categories are provided in the following subsections.

Figure 4-7. 241-C-111 Bulk Retrieval Recorded Events.

4.2.3.1. Hydraulic Leak Events. The 241-C-111 campaign log books did not document any

hydraulic leak events.

4.2.3.2. Ventilation Events. There were nine events noted associated with the ventilation

system in the log books. All nine events were associated with the 241-C Farm ventilation

systems, split between POR008 and POR03.

POR008 had two events. The first event noted was the system making significant noise and

cycling the variable frequency drive. Toward the end of the campaign, the system was shut

down on rate of increase in differential pressure.

POR03 was involved with seven events. Five of the events were associated with the CAM, one

documented software modifications, and one addressed a low plenum flow condition.

0

2

4

6

8

10

12

Nu

mb

er

of

Eve

nts

Event Type

RPP-RPT-58298 3/9/2015 - 7:47 AM 29 of 106

Page 30: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

20

4.2.3.3. Camera and Lighting Events. Camera and lighting events were noted seven times

during the campaign. The first entry may reflect the initial camera and lighting installation. A

second entry later in the campaign documents replacing the Riser 7 camera and lighting. The

Coffman lights were noted to have high amps on three occasions, once in Riser 1, once in Riser 7

and one entry did not indicate which riser was affected. The Riser 7 high amp entry was

followed shortly by the light in Riser 7 failing.

Three entries discussed concerns with the camera. The camera was noted to have lost the ability

to rotate. Shortly afterward an entry stated that the camera was adjusted. The entries did not

indicate which camera was involved. The Riser 1 camera was noted to have electrical issues

early in the campaign with burned wiring and a failed ground-fault circuit interrupter breaker.

4.2.3.4. Supernatant Pump Start-Up and Shut-Down Events. A single event was noted

indicating the supernatant pump had difficulties with start up or shut down. The pump would not

come up to speed in a timely fashion and would time out. Four attempts to start the pump all had

the same result – they timed out before the pump could reach operating speeds. Engineering

provided direction to wait 5-10 minutes after starting the HPU before attempting to increase the

supernatant pump speed. The log book indicates that this approach was successful.

4.2.3.5. Supernatant Pump Flow Events. The supernatant pump was observed to have 11

flow events. All of these events appear to be related to the speed indication and how it affected

the flow rate. Ten of these events took place over 14 operating days. During these 14 days,

operations continued with intermittent pauses for trouble shooting.

4.2.3.6. Slurry Pump Low Flow and Plugging Events. The slurry pump was noted to have

two low flow events. The first was associated with material build up and appears to have been

an expected event as there was no indication that engineering or maintenance was notified. The

second coincided with a supernatant pump shut down, also on low flow. The shift log noted that

the reason for the second shut down was unknown.

4.2.3.7. Slurry Pump Movement Events. One entry noted that the slurry pump went slack

when attempting to lower the pump. The logs do not indicate that engineering or maintenance

was notified, suggesting this was expected behavior from the pump.

4.2.3.8. Sluicer / Extended Reach Sluicer System / Arm Movement Events. The 241-C-111

campaign log books did not document any sluicer movement events.

4.2.3.9. Hydraulic Temperature Events. The 241-C-111 campaign log books did not

document any hydraulic temperature excursions.

RPP-RPT-58298 3/9/2015 - 7:47 AM 30 of 106

Page 31: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

21

4.2.3.10. Miscellaneous Events. Six events occurred which did not appear to either fit within

one of the other categories or to reoccur. Figure 4-8 is a graph showing the distribution of the

events over time. The trend does not show that there was a noticeable difference in the rate of

occurrence associated with campaign start-up.

Figure 4-8. 241-C-111 Bulk Retrieval Miscellaneous Events.

0

1

2

3

4

5

6

7

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39

Cu

mm

ula

tive

Nu

mb

er

of

Eve

nts

Operating Days

RPP-RPT-58298 3/9/2015 - 7:47 AM 31 of 106

Page 32: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

22

4.2.3.11. Total Number of Events. Figure 4-9 is a graph showing the distribution of the 37

events over time. As with the rate of miscellaneous events, the trend does not show that there

was a noticeable difference in the rate of occurrence associated with campaign start-up. The

events occur at a steady rate over the duration of the campaign. This suggests that the

construction and start-up testing processes are of sufficient quality as to not adversely impact

operations.

Figure 4-9. 241-C-111 Bulk Retrieval Total Number of Events.

0

5

10

15

20

25

30

35

40

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39

Cu

mm

ula

tive

Nu

mb

er

of

Eve

nts

Operating Days

RPP-RPT-58298 3/9/2015 - 7:47 AM 32 of 106

Page 33: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

23

4.2.4 241-C-112 Bulk Retrieval

The information documented in Appendix D was sorted into the categories listed in Section 3.0,

“Methodology.” The resulting table is in Appendix I. A total of 69 entries were made

documenting issues over 72 days of operation. Figure 4-10 shows the distribution of the events

between categories. No trends were noted within the 241-C-112 bulk retrieval information.

Analyses of each the categories are provided in the following subsections.

Figure 4-10. 241-C-112 Bulk Retrieval Recorded Events.

4.2.4.1. Hydraulic Leak Events. There were six notations of hydraulic leak events. Five of

these notations address the actions surrounding a leak associated with sluicer number 1. The

other notation documents a slurry pump HPU drip.

4.2.4.2. Ventilation Events. Nine ventilation events were documented during the 241-C-112

bulk retrieval campaign. One of these events documented that both POR008 and the 241-AN

VTP systems were off-line due to a power outage. There were four instances where the POR008

seal pot transmitter was indicating either a high or low level. It was noted that the low level

events appeared to be related to low ambient temperatures affecting the sensing legs. There were

two instances where the documentation simply stated that the 241-AN VTP was off-line. There

were also two notations documenting POR008 high differential pressure events.

4.2.4.3. Camera and Lighting Events. There were 15 entries associated with the cameras and

lighting. Four of the notations documented camera issues without indicating there were

problems with the lights. Four indicated instances where both the cameras and the lighting were

0

2

4

6

8

10

12

14

16

Nu

mb

er

of

Eve

nts

Event Type

RPP-RPT-58298 3/9/2015 - 7:47 AM 33 of 106

Page 34: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

24

inoperable or significantly degraded. Of these four, three of them were associated with a single

event where both of the cameras and all of the lights were impacted. The delay associated with

this event was longer than typical for camera or lighting issues due to poor weather curtailing

field activities.

There were seven entries which only addressed lighting issues. By the end of the campaign, as

soon as a light was replaced, the one in the other riser would fail, to the point that operations was

noting that only one light at a time would be used in an attempt to conserve the lights.

4.2.4.4. Supernatant Pump Start-Up and Shut-Down Events. The supernatant pump had

start-up or shut-down events noted seven times. Six of these events address start-up concerns,

while the remaining one is for a delay in the pump shutting down. All seven of the events appear

to be based on controlling the pump from the control trailer instead of at the HPU. All six

instances related to pump start-up include discussion on the pump amps not increasing. The log

books indicate that the pump would either start later that day or the next day without

maintenance or repair.

4.2.4.5. Supernatant Pump Flow Events. Events related to supernatant pump flow were noted

six times. All six events appear to be related to intake screen blockage. Operations documented

several attempts to clear the blockage with drain back with varying success. Flushing of the line

was used in two instances which cleared the blockage and the flow rates returned to the expected

ranges.

4.2.4.6. Slurry Pump Low Flow and Plugging Events. The slurry pump was noted to have

low flow and plugging events on seven days. This appears to have been anticipated behavior as

there was no indication that engineering or maintenance was notified.

4.2.4.7. Slurry Pump Movement Events. The slurry pump was noted to have hampered

movement on four occasions. In all four instances, it is likely that the pump was resting on

solids which prevented the pump from going lower into the tank. This appears to have been

anticipated behavior as there was no indication that engineering or maintenance was notified.

4.2.4.8. Sluicer / Extended Reach Sluicer System / Arm Movement Events. A single entry

for sluicer number 2 indicates that the sluicer’s range of motion was limited to around 180

degrees.

4.2.4.9. Hydraulic Temperature Events. Two events were noted where the hydraulic fluid

temperature disrupted operations. Both entries document low temperature conditions.

RPP-RPT-58298 3/9/2015 - 7:47 AM 34 of 106

Page 35: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

25

4.2.4.10. Miscellaneous Events. Ten events occurred which did not appear to either fit within

one of the other categories or to reoccur. Figure 4-11 shows the distribution of the events over

time. The trend does not show that there was a noticeable difference in the rate of occurrence

associated with campaign start-up.

Figure 4-11. 241-C-112 Bulk Retrieval Miscellaneous Events.

0

2

4

6

8

10

12

1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70

Cu

mm

ula

tive

Nu

mb

er

of

Eve

nts

Operating Days

RPP-RPT-58298 3/9/2015 - 7:47 AM 35 of 106

Page 36: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

26

4.2.4.11. Total Number of Events. Figure 4-12 is a graph showing the distribution of the 67

events over time. As with the rate of miscellaneous events, the trend does not show that there

was a noticeable difference in the rate of occurrence associated with campaign start-up. The

events occur at a steady rate over the duration of the campaign. This suggests that the

construction and start-up testing processes are of sufficient quality as to not adversely impact

operations.

Figure 4-12. 241-C-112 Bulk Retrieval Total Number of Events.

0

10

20

30

40

50

60

70

80

1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70

Cu

mm

ula

tive

Nu

mb

er

of

Eve

nts

Operating Days

RPP-RPT-58298 3/9/2015 - 7:47 AM 36 of 106

Page 37: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

27

4.2.5 241-C-112 Hard Heel Retrieval

The information documented in Appendix F was sorted into the categories listed in Section 3.0,

“Methodology.” The resulting table is in Appendix J. A total of 42 entries were made

documenting issues over 42 days of operation. Figure 4-13 shows the distribution of the events

between categories. No trends were noted within the 241-C-112 HHR information. Analyses of

each the categories are provided in the following subsections.

Figure 4-13. 241-C-112 Hard Heel Retrieval Recorded Events.

4.2.5.1. Hydraulic Leak Events. The 241-C-112 HHR campaign log books did not document

any hydraulic leak events.

4.2.5.2. Ventilation Events. Fourteen ventilation events were noted during the 241-C-112

HHR campaign. Three events were related to the POR008 seal pot level transmitter sending

erroneous high or low level signals. Two events documented the 241-AN VTP being shut down.

The remaining nine events document POR008 high differential pressure across various

components. All nine of these events appear to have been correctly indicated. Although

engineering was contacted for direction to proceed under the high differential pressure

conditions, maintenance was not called for equipment repair.

4.2.5.3. Camera and Lighting Events. The cameras and lighting were noted to have impacted

the retrieval four times during the 241-C-112 HHR campaign. The four entries document that

the Riser 6 camera was replaced twice, the riser 3 camera was replaced once, the riser 6 lights

were replaced once, and the riser 3 lights were replaced twice.

0

2

4

6

8

10

12

14

16

18

Nu

mb

er

of

Eve

nts

Event Type

RPP-RPT-58298 3/9/2015 - 7:47 AM 37 of 106

Page 38: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

28

4.2.5.4. Supernatant Pump Start-Up and Shut-Down Events. The 241-C-112 HHR

campaign log books did not document any supernatant pump start-up or shut-down events.

4.2.5.5. Supernatant Pump Flow Events. The 241-C-112 HHR campaign log books did not

document any supernatant pump flow events.

4.2.5.6. Slurry Pump Flow Events. There were two instances noted of slurry pump flow

excursions. The first instance resulted from a speed sensor failure. The second entry noted a

low flow event resulting from blocking of the intake screen.

4.2.5.7. Slurry Pump Movement Events. A single event was identified where the slurry pump

was raised and then lowered. The end position of the pump appeared the same as the original

position despite being raised and lowered different amounts. The log noted that there were

several turns of slack on the pump. As neither engineering nor maintenance were notified, it is

likely that the pump was resting on solids.

4.2.5.8. Sluicer / Extended Reach Sluicer System / Arm Movement Events. One entry

documented that sluicer number 2 was unable to rotate toward the sample sleeve opening. Thirty

minutes later, sluicer number 2 was fully rotating again.

4.2.5.9. Hydraulic Temperature Events. Four hydraulic fluid temperature excursions were

noted. Three of the events were associated with the slurry pump HPU while the other was

associated with the supernatant pump HPU. These events were in addition to those instances

where the ambient temperature drove the overall pit temperatures below the range where

transfers could occur.

RPP-RPT-58298 3/9/2015 - 7:47 AM 38 of 106

Page 39: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

29

4.2.5.10. Miscellaneous Events. Sixteen events occurred which did not appear to either fit

within one of the other categories or to reoccur. Figure 4-14 shows the distribution of the events

over time. The trend does not show that there was a noticeable difference in the rate of

occurrence associated with campaign start-up.

Figure 4-14. 241-C-112 Hard Heel Retrieval Miscellaneous Events.

0

2

4

6

8

10

12

14

16

18

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41

Cu

mm

ula

tive

Nu

mb

er

of

Eve

nts

Operating Days

RPP-RPT-58298 3/9/2015 - 7:47 AM 39 of 106

Page 40: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

30

4.2.5.11. Total Number of Events. Figure 4-15 is a graph showing the distribution of the 42

events over time. As with the rate of miscellaneous events, the trend does not show that there

was a noticeable difference in the rate of occurrence associated with campaign start-up. The

events occur at a steady rate over the duration of the campaign. This suggests that the

construction and start-up testing processes are of sufficient quality as to not adversely impact

operations.

Figure 4-15. 241-C-112 Hard Heel Retrieval Total Number of Events.

0

5

10

15

20

25

30

35

40

45

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41

Cu

mm

ula

tive

Nu

mb

er

of

Eve

nts

Operating Days

RPP-RPT-58298 3/9/2015 - 7:47 AM 40 of 106

Page 41: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

31

4.3 EQUIPMENT FAILURE TRENDS

There were 487 events noted in the retrieval information reviewed in this analysis. The table

tallying the events is contained in Appendix K. Figure 4-16 shows the distribution of the events

between categories. Trends were not observed on an individual retrieval basis as documented

above. Of interest in this finding is that there was not an increase in events at the start or the end

of the retrieval activities indicating that the failures are not entirely related to installation

concerns or equipment wear. Comparison of the total number of events per retrieval campaign

did not reveal any significant trends. An evaluation of the events based on the categories

described in Section 3.0, “Methodology,” is detailed in the following subsections.

Figure 4-16. Retrieval Campaign Recorded Events.

4.3.1 Hydraulic Leak Events

Hydraulic leaks were noted a total of 23 times. Nine of these events were noted during the

241-C-107 retrieval activities. No leaks were noted during the 241-C-111 bulk retrieval

activities or the 241-C-112 HHR activities.

Four of the events were related to the slurry pumps, with an additional three associated with

supernatant pumps. Twenty-one were specified as having come from the sluicer associated

equipment. Eleven of the sluicer related failures were on the MARS arm. The majority of the

hydraulic leaks resulted in the equipment continuing in service with reduced retrieval efficiency.

Notable exceptions to this trend were the two hydraulic leak entries immediately prior to the

0

20

40

60

80

100

120

Nu

mb

er

of

Eve

nts

Event Type

RPP-RPT-58298 3/9/2015 - 7:47 AM 41 of 106

Page 42: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

32

failure of supernatant pump AN106-WT-P-24. Seven of the leaks were in components external

to the tank while the other 21 occurred inside the tank or tank headspace.

One particular category of equipment was noted as leaking on multiple occasions. Two of the

hydraulic leaks from the 241-C-101 bulk retrieval were from a rotary union. Further

investigation into the 241-C-101 hydraulic leaks attributed these to electro-spark damage to the

Teflon hydraulic hoses. Waste leaks from the rotary union are discussed in Section 4.3.10.

4.3.2 Ventilation Events

Eighty-six entries in the various logs were connected to the four ventilation systems – POR107,

POR03, and POR008 in 241-C Farm and the 241-AN VTP. The 241-AN VTP being shut down

affected the retrieval campaigns 12 times. POR03 was shut down in a manner that delayed

retrieval 10 times while POR008 was noted as being shut down unexpectedly 22 times. POR107

impacted retrieval 42 times.

The ventilation failure mode which occurred most frequently involved the CAM or record

samplers. The stack particulate emissions monitoring systems disrupted retrieval 32 times

during the various campaigns. Many of these alarms were due to low record sample or CAM

sample flow. It is recommended that the record sample and CAM systems and the rate of

associated alarms be further investigated to explore design improvements (e.g., a different

vacuum pump) and alternate operational strategies (e.g., increasing the rate of filter paper change

out).

The next most common alarm condition was high differential pressure across various ventilation

components including the pre-filter, heater, and filters. The majority of the high differential

pressure events were associated with the hot water use during the 241-C-112 HHR activities.

Although they did not result in alarms, visibility issues (i.e., foggy conditions within the tank)

were noted many times during the high-pressure wall washing at the end of the various retrieval

activities. Reducing the rate at which the hot water is sprayed may help reduce the number of

differential pressure alarms. Increasing the tank’s ventilation flow rate would help with the

foggy conditions; however, it may increase the rate that the filter is loaded with water, which is

causing the high differential pressure alarms.

4.3.3 Camera and Lighting Events

Camera and lighting events are fairly common and occurred during all of the evaluated retrieval

campaigns. A total 42 entries were noted where at least one of these components required

replacement. Frequently, the cameras and lights were replaced at the same time. In total, the

cameras were replaced 32 times, as were the lights. Although these camera and lighting systems

serve their function well, there may be a more cost-effective solution than continuing to replace

the failed components with the same ones currently implemented in the field.

RPP-RPT-58298 3/9/2015 - 7:47 AM 42 of 106

Page 43: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

33

4.3.4 Supernatant Pump Start-Up and Shut-Down Events

Unexpected conditions during the start up or shut down of the supernatant pump were noted 13

times during the 5 retrieval campaigns. Ten times the pumps did not start or stop and were

described as having timed out. Generally the timing out was indicative of either a problem with

the signal from the control trailer to the HPU or the hydraulic fluid being too cold.

The other common failure was related to the operation of the supernatant line flow control

valves. The 241-C-107 retrieval activities had several events where the flow control valves did

not respond as anticipated which resulted in the pump shutting down for low flow conditions.

The logs indicate that the flow control valve problems were signal related and not associated

with valve or actuator failure.

4.3.5 Supernatant Pump Flow Events

There were 34 entries associated with supernatant pump flow events. Sixteen of the events were

associated with the intake screen being blocked, apparently an anticipated behavior as there was

no indication that engineering or maintenance was notified. Two of the events were documented

just prior to the failure of the AN106-WT-P-22 electric pump. Two other events were related to

operation of the flow control valves or the sluicer.

Fourteen events were related to issues with the speed sensors and the pumps’ response to

increases and decreases in speed. Evaluation of the pump speed and flow rate control devices

and the correct device to use for monitoring for each parameter during retrieval campaigns may

reduce the number of operational upsets.

4.3.6 Slurry Pump Low Flow and Plugging Events

Slurry pump low flow events were noted on 102 days. One event was attributed to the pump

timing out. There were two events clearly related to the final pump down process and four

events caused by issues with the speed sensors.

The slurry pump was shut down due to low flow on 99 days. The majority of these are during

the 241-C-107 retrieval campaign. On the 28 days where low flow shut down the pumps during

the other campaigns, one or two events were typically noted per day. During the 241-C-107

campaign, most of the days documented more than five low flow slurry pump events per shift

worked. As noted above, over one three-day period, the 241-C-107 slurry pump was shut down

due to low flow 34 times. The total number of 241-C-107 events was not tallied for this

analysis; however, it is likely that the pump was shut down on low flow more than 200 times.

The logs do not indicate that engineering or maintenance was notified, leading one to believe that

this was anticipated behavior. As the 241-C-107 campaign is the only example of the MARS

retrieval technology included within the scope of this analysis, it is not possible to determine if

the reason the waste was not being broken down into pieces small enough to be transferred was

due to the waste type or due to the retrieval technology. An evaluation of retrieval campaigns

which would include multiple retrieval efforts using the MARS technology is recommended to

RPP-RPT-58298 3/9/2015 - 7:47 AM 43 of 106

Page 44: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

34

determine if the MARS equipment should include additional equipment to reduce waste chunk

sizes.

4.3.7 Slurry Pump Movement Events

The slurry pump did not adjust its position as desired on 20 occasions. Ten of these events were

associated with a build-up material under the pump, restricting its downward progress. Seven

events were recorded when the 241-C-107 slurry pump reached the lower cable limit and was

unable to be further lowered. There was one instance where the pump did not move which was

attributed to the contactor having been tripped. The final event documented an occasion where

the 241-C-107 pump dragged on the bottom of the tank when the turntable was rotated.

4.3.8 Sluicer / Extended Reach Sluicer System / Arm Movement Events

Eighteen events were noted where the sluicer apparatus did not respond as anticipated. Fifteen

of these were during the 241-C-107 campaign. As the 241-C-107 campaign is the only example

of the MARS retrieval technology included within the scope of this analysis, is it not possible to

determine if the relatively high percentage of events associated with the 241-C-107 retrieval is

due to the MARS approach or is specific to the equipment installed in the 241-C-107 retrieval

equipment.

Eight of the events were attributed to problems with the control system, with seven of them from

the 241-C-107 campaign. The 241-C-107 campaign also noted five events where the constant

tension hoist, used to maintain the cables and lines leading to the end effector and its associated

nozzles and sluicer cannon, did not respond correctly and impacted the retrieval efforts.

RPP-RPT-58298 3/9/2015 - 7:47 AM 44 of 106

Page 45: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

35

4.3.9 Hydraulic Temperature Events

Thirty-five entries noted that the HPU temperature was either too high or too low. This does not

include entries when the in-pit air temperature readings were below the acceptable limit for

transfers under the waste transfer structure temperature monitoring program. Although the HPU

fluid temperatures were not at shut-down criteria levels, they were close enough that either the

system was not responding as desired or increased monitoring was required to ensure the system

was operating within the acceptable range. Figure 4-17 documents the number of hydraulic

temperature event per operating day by season. The findings suggest that the HPU cooling and

heating systems are not adequate for the temperature extremes of the depths of winter or the

height of summer.

Figure 4-17. Hydraulic Fluid Temperature Events by Season.

0

0.02

0.04

0.06

0.08

0.1

0.12

0.14

Spring/Fall Summer Winter

Eve

nts

Pe

r O

pe

rati

ng

Day

Season

RPP-RPT-58298 3/9/2015 - 7:47 AM 45 of 106

Page 46: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

36

4.3.10 Miscellaneous Events

Many events did not fall into the categories listed in Section 3.0, “Methodology,” and did not

reoccur frequently enough to result in generation of a new category. There were 109 of these

entries noted during the 390 operating days. These were graphed over the number of operating

days in Figure 4-18. The graph shows a steady trend that does not change noticeably over time.

This indicates that the events are not related to campaign start-up or campaign completion.

Figure 4-18. Retrieval Activities Total Miscellaneous Events.

Five 241-C-107 system leaks were from the MARS rotary union. The 241-C-107 project

determined that these waste leaks were the result of the manufacturing methods used when

fabricating the rotary union. Corrective actions are in place for both the hydraulic hose electro-

spark issue discussed in Section 4.3.1 and the fabrication issues with the MARS rotary union.

Further monitoring of these components is recommended to ensure that the corrective actions

have addressed the issues.

0

20

40

60

80

100

120

1

13

25

37

49

61

73

85

97

10

9

12

1

13

3

14

5

15

7

16

9

18

1

19

3

20

5

21

7

22

9

24

1

25

3

26

5

27

7

28

9

30

1

31

3

32

5

33

7

34

9

36

1

37

3

Cu

mm

ula

tive

Nu

mb

er

of

Eve

nts

Operating Days

RPP-RPT-58298 3/9/2015 - 7:47 AM 46 of 106

Page 47: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

37

4.3.11 Total Number of Events

There were 487 events noted over 390 operating days. These were graphed over the number of

operating days in Figure 4-19. The graph shows a steady trend that does not change noticeably

over time. This indicates that on average the events are not related to campaign start-up, or

campaign completion.

Figure 4-19. Retrieval Activities Total Number of Events.

The events were checked to determine if there were seasonal changes. Figure 4-20 shows the

breakdown by category of the events normalized by operating day by season. With the exception

of the hydraulic thermal events discussed in Section 4.3.9 and the ventilation seal pot transmitter

issues discussed in Section 4.2.4.2, no other significant trends were observed. The slight trend

shown by the miscellaneous events and total number of events indicating that they are more

likely to occur during the summer months may be attributed to the number of weather-related

events noted during the summer months. The miscellaneous category is where events such as

rain induced leak detection events and weather-related work/rest regimes are documented. This

skews the data indicating a seasonal trend.

0

100

200

300

400

500

600

1

13

25

37

49

61

73

85

97

10

9

12

1

13

3

14

5

15

7

16

9

18

1

19

3

20

5

21

7

22

9

24

1

25

3

26

5

27

7

28

9

30

1

31

3

32

5

33

7

34

9

36

1

37

3

Cu

mm

ula

tive

Nu

mb

er

of

Eve

nts

Operating Days

RPP-RPT-58298 3/9/2015 - 7:47 AM 47 of 106

Page 48: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

38

Figure 4-20. Retrieval Activity Events by Season.

5.0 RECOMMENDATIONS

This document reviewed the various log books and reports associated with five retrieval

campaigns: 241-C-101 bulk retrieval, 241-C-107 retrieval, 241-C-111 bulk retrieval, 241-C-112

bulk retrieval, and 241-C-112 HHR. A total of 487 events over 390 operating days were noted

that impacted retrieval duration and/or equipment effectiveness. These were graphed over the

number of operating days as shown in Figure 4-19. The graph shows a steady trend that does not

change noticeably over time. This indicates that on average the events are not related to

campaign start-up, campaign completion, or seasonal changes (with the exception of the

hydraulic thermal events discussed in Section 4.3.9 and the ventilation seal pot transmitter issues

discussed in Section 4.2.4.2).

Analysis of the events results in the following recommendations.

Monitor the rotary unions in future MARS installations where the manufacturing method

corrective actions have been implemented to determine if the waste leaks have been

resolved.

The record sample and CAM systems and the rate of associated alarms should be

reviewed to determine if a different design (e.g., a different vacuum pump) and/or

0

0.05

0.1

0.15

0.2

0.25

0.3

0.35

0.4

0.45

Spring/Fall Summer Winter

Eve

nts

Pe

r O

pe

rati

ng

Day

Season

Hydraulic Leak

Vent Issues

Camera

AN Pump Startup/ Shutdown

AN Pump Flow

C Pump Flow

C Pump Movement

ERSS/ARM Movement

Hydraulic Fluid Temperature

Miscellaneous

RPP-RPT-58298 3/9/2015 - 7:47 AM 48 of 106

Page 49: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

39

alternate operational strategies (e.g., increasing the rate of filter paper change out) would

reduce the number of ventilation system related outages.

The camera and lighting systems should be evaluated to determine if there may be a more

cost-effective solution than continuing to replace the failed components with the same

ones currently implemented in the field.

Signal transmission for both supernatant and slurry pump control should be reviewed.

Pump start-up, shut-down, and flow control issues were attributed to the system either

timing out or responding erratically in multiple instances.

An evaluation of the parameters and equipment used to control the supernatant and slurry

pumps (e.g., pump speed, flow control valves, flow rate indication, etc.) may lead to

changes in the operating strategy which could improve equipment responsiveness and

reduce inadvertent shut downs. The log entries frequently refer to pump speed with flow

indication and flow rate with speed indication.

An evaluation of retrieval campaigns which would include multiple retrieval efforts using

the MARS technology is recommended to determine if the MARS equipment should

include additional equipment to reduce waste chunk sizes. As the 241-C-107 campaign is

the only example of the MARS retrieval technology included within the scope of this

analysis, it is not possible to determine if the reason the waste was not being broken

down into pieces small enough to be transferred was due to the waste type or due to the

retrieval technology.

An evaluation of the HPU cooling and heating systems is recommended. The 35 entries

associated with either high or low HPU temperatures suggest that the HPU cooling and

heating systems are not adequate for the temperature extremes of the depths of winter or

the height of summer.

An evaluation of the total cost per gallon retrieved should be done for each technology.

A consistent level of detail of the log entries in the various log books is recommended

and would make reviews of this type more fruitful. The logs reviewed for this report do

not consistently identify if a system was restarted after shut down or why the shut down

occurred. Very little can be determined, for example, when the entry simply states that

the 241-AN VTP was shut-down. It is not always clear from the entries on that day if the

retrieval activities were impacted, how long the ventilation system was down, or why the

system went down in the first place.

RPP-RPT-58298 3/9/2015 - 7:47 AM 49 of 106

Page 50: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

40

6.0 REFERENCES

RPP-13033, 2014, “Tank Farms Documented Safety Analysis,” Washington River Protection

Solutions, LLC, Richland, Washington.

RPP-RPT-52480, 2012, “Retrieval Completion Report for Modified Sluicing of Tank

241-C-112,” Washington River Protection Solutions, LLC, Richland, Washington.

RPP-RPT-54959, 2014, “Single-Shell Tank 241-C-107 Hard Heel Retrieval Completion Report,”

Washington River Protection Solutions, LLC, Richland, Washington.

RPP-RPT-55036, 2013, “Summary Evaluation of ERSS Hydraulic Hose Failures,” Washington

River Protection Solutions, LLC, Richland, Washington.

RPP-RPT-55573, 2013, “Retrieval Completion Report for Modified Sluicing of Tank 241-C-101

Using Extended Reach Sluicing and High Pressure Water,” Washington River Protection

Solutions, LLC, Richland, Washington.

RPP-RPT-56900, 2014, “Single-Shell Tank 241-C-112 Hard Heel Retrieval Completion Report,”

Washington River Protection Solutions, LLC, Richland, Washington.

WRPS-PER-2012-1321, “Evidence of Previous leakage from the Rotary Union on the C-107

MARS Unit”

WRPS-PER-2012-1346, “C-107 MARS Containment Box Rotary Union Drip Leak”

RPP-RPT-58298 3/9/2015 - 7:47 AM 50 of 106

Page 51: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

A-1

APPENDIX A

241-C-101 BULK RETRIEVAL ACTIVITIES EVENTS

RPP-RPT-58298 3/9/2015 - 7:47 AM 51 of 106

Page 52: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

A-2

241-C-101 Bulk Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

12/10/2012 AN01A-WT-TE-302 / -303 low temperature – p 1

Lines flushed – p 1 -

Low temperatures (below the 50 °F shutdown limit) – AN01A

No issues reported. Cold weather causing low temperatures

12/11/2012 IH equipment issues – management directed shut down – p 3 IH equipment issues – p 120 IH equipment issues No issues reported. Site wide equipment issues

12/12/2012

No activities this date

-

No retrieval operations performed

New Red Arrow: Entry into SST & DST Tank Farms is prohibited except for HPT and NCO rounds and routines

No issues reported.

-

12/13/2012 No activities this date - Cleared the Red Arrow regarding tank farm entry No issues reported. -

12/14/2012 No activities this date - Completed pre-requisites No issues reported. -

12/15/2012 No activities this date - - No issues reported. -

12/16/2012 No activities this date - - No issues reported. -

12/17/2012 No activities this date - POR107 power supply and CAM issues No issues reported. POR107 CAM issues

12/18/2012 POR107 CAM issues – p 4 Pumps active – p 130 POR107 power supply and CAM issues No issues reported. POR107 CAM issues

12/19/2012 Low temp AN – p 4

AN VTP CAM issues – p 4

Pumps active – p 131 AN VTP CAM issues No issues reported. AN VTP issues

12/20/2012 Slurry pump up and down – p 5

POR350 hydraulic leak – p 5

Pumps active – p 132 POR350 hydraulic leak No issues reported. Hydraulic leak

12/21/2012 No issues reported. Pumps active – p 135 No issues reported. No issues reported. -

12/22/2012 No activities this date - - No issues reported. -

12/23/2012 No activities this date - - No issues reported. -

12/24/2012 No activities this date - - No issues reported. -

12/25/2012 No activities this date - - No issues reported. -

12/26/2012 POR350 high temperature – p 7 Pumps active – p 139 No issues reported. No issues reported. Hydraulic unit temperature issues

12/27/2012 POR350 high temperature – p 7

Slurry pump up and down – p 7

Pumps active – p 139 No issues reported. No issues reported. Hydraulic unit temperature issues

12/28/2012 POR309 high temperature – p 8/9

Riser 3 light failed – p 9

C-101 light failed – p 140 POR309 high temperature

Riser 3 light failed

No issues reported. Hydraulic unit temperature issues

Camera issues

12/29/2012 No activities this date - - No issues reported. -

12/30/2012 No activities this date - - No issues reported. -

12/31/2012 No activities this date

- Riser 3 and Riser 8 camera and lights changed

out

No issues reported. -

01/01/2013 No activities this date - - No issues reported. -

01/02/2013 POR309 and POR307 low temperature – p 9

AN VTP shut down – FI/FSL-175 out of service – p 9

AN VTP issues – p 143 AN Farm pressurization alarm is out of service

AN01A-WT-FI/FSL-175 malfunction

No issues reported. Hydraulic unit temperature issues

01/03/2013 FI/FSL-175 issues – p 10

AN VTP down – CAM issues – p 10 - AN Farm CAM high sample flow alarm

No issues reported. AN VTP issues

01/04/2013 Flush of transfer lines – p 11 - Transfer line flush No issues reported. -

01/05/2013 No activities this date - - No issues reported. -

01/06/2013 No activities this date - - No issues reported. -

01/07/2013 No issues reported - No issues reported. No issues reported. -

01/08/2013 Slurry pump up and down – p 12 Pumps active – p 151 Slurry pump screen plugging No issues reported. Slurry pump low flow

01/09/2013 Slurry pump up and down – p 12

Unable to move slurry pump – p 13

Pumps active – p 152 Slurry pump did not lower

Slurry pump screen plugging

No issues reported. Slurry pump low flow

Slurry pump movement issues

01/10/2013 Slurry pump up and down – p 13 Pumps active – p 153 Slurry pump screen plugging No issues reported. Slurry pump low flow

01/11/2013

Supernatant pump up and down – p 14

POR350 pressure dropping – p 14

Slurry pump up and down – p 14

Pumps active – p 154 Slurry pump screen plugging No issues reported. Slurry pump low flow

Supernatant pump low flow

01/12/2013 No activities this date - - No issues reported. -

01/13/2013 No activities this date - - No issues reported. -

01/14/2013 POR107 seal pot cold temperatures issues – p 17

Sluicer #1 dose rate issues – p 17

Pumps active – p 157

POR107 shut down – seal pot level high – p 157

No issues reported. No issues reported. POR107 seal pot issues

Dose rate problems

RPP-RPT-58298 3/9/2015 - 7:47 AM 52 of 106

Page 53: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

A-3

241-C-101 Bulk Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

01/15/2013

Slurry pump up and down – p 18

Sluicer #1 dose rate issues – p 18

POR309 high temperature – p 18

Pumps active – p 158

Slurry pump screen plugging

No issues reported. Slurry pump low flow

Dose rate problems

Hydraulic unit temperature issues

01/16/2013

Slurry pump up and down – p 19

AN101 camera replaced – p 19

POR350 high pressure – p 19

Pumps active – p 159 No issues reported. No issues reported. Slurry pump low flow

Camera issues

Hydraulic unit pressure issues

01/17/2013 Slurry pump screen plugging issues – p 20 - Slurry pump screen plugging No issues reported. Slurry pump low flow

01/18/2013 POR314 dose issues – p 21 Pumps active – p 161 No issues reported. No issues reported. Dose rate problems

01/19/2013 No activities this date - - No issues reported. -

01/20/2013 No activities this date - - No issues reported. -

01/21/2013

No issues reported.

-

No issues reported. ~41,000 gal of tank 241-AN-101 (AN-101) supernate was added to tank 241-C-101 to soak the waste in an attempt to soften the solids

-

01/22/2013 Sluicer #1 temperatures low / heater not plugged in – p 24 POR107 shut down – p 165 No issues reported. - Hydraulic unit temperature issues

01/23/2013

POR107 exhauster secured – p 25 AN VTP issues – p 166 Outage begins for AN Farm ventilation upgrades in preparation for the implementation of Safety Basis amendment tor safety significant designation for DST primary tank ventilation systems.

Restart of C-101 retrieval expected ~2/11/13.

-

AN VTP down for planned activities

No activities until …

02/11/2013 No activities this date - Riser-003 & Riser-008 cameras replaced - Camera issues

02/12/2013 No activities this date POR107 shut down heater temperature issues –

p 188 POR107 shut down due to smoke coming from

glycol heater. -

POR107 heater issues

02/13/2013 No activities this date - POR107 glycol heater troubleshooting - POR107 heater issues

02/14/2013 No activities this date POR107 shut down heater temperature issues –

p 189 POR107 glycol heater troubleshooting, switching

to POR03 -

POR107 heater issues

02/15/2013 No activities this date - Prerequisites and startup checklists - -

02/16/2013 No activities this date - - - -

02/17/2013 No activities this date - - - -

02/18/2013 No activities this date - - - -

02/19/2013 C-101 Enraf issues – p 25 - Prerequisites and startup checklists - -

02/20/2013

POR03 exhauster used for C-101 – p 25

C-101 pressure set point issues – 25

Supernatant pump low flow up and down – p 26

-

Supernatant pump screen plugging No issues reported. Supernatant pump low flow

Programming issues

02/21/2013

POR03 exhauster used for C-101 – p 27

Low inlet temperature (TI-176)

Slurry pump low flow up and down – p 27

Pumps active – p 198 Slurry pump screen plugging No issues reported. POR03 heater issues

Slurry pump low flow

02/22/2013 POR03 exhauster used for C-101 – p 28

Slurry pump low flow up and down – p 28

Pumps active – p 198 Slurry pump screen plugging No issues reported. Slurry pump low flow

02/23/2013 No activities this date - - No issues reported. -

02/24/2013 No activities this date - - No issues reported. -

02/25/2013

POR03 exhauster used for C-101 – p 29

POR307 sluicer HPU hydraulic fluid level decreasing – p 29

Sluicer #1 hydraulic fluid leak on the nozzle transverse function – p 29

Pumps active – p 202 Sluicer #1 is out of service due to a hydraulic fluid leak on the nozzle transverse function.

Hydraulic fluid was observed to be leaking from the nozzle transverse function of ERSS #1 in riser 7

Hydraulic fluid leaks

02/26/2013

POR03 exhauster used for C-101 – p 30

Hydraulic fluid added to POR307 – p 30

Slurry pump low flow up and down – p 30

Supernatant pump increase/decrease control issues – p 30

Pumps active – p 203 Slurry pump screen plugging No issues reported. Slurry pump low flow

Supernatant pump controls issue

Hydraulic fluid leaks

02/27/2013 No activities this date

- AN-106 leak check being performed using AN-

101 pit

No issues reported. -

RPP-RPT-58298 3/9/2015 - 7:47 AM 53 of 106

Page 54: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

A-4

241-C-101 Bulk Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

02/28/2013

POR107 exhauster used for C-101 – p 31

POR107 CAM hi flow set point issues – p 31

Slurry pump low flow up and down – p 31

Pumps active – p 206 Exhausting with POR107 No issues reported. Slurry pump low flow

POR107 CAM set point issues

03/01/2013

POR107 exhauster used for C-101 – p 32

POR107 CAM hi flow set point issues – p 32

Riser 3 light issues – p 33

POR309 slight hydraulic fluid level leak – p 33

Pumps active – p 206

Slurry pump did not lower

Slurry pump hydraulic leak a POR309 flange

No issues reported. Light issues

POR107 CAM set point issues

Hydraulic fluid leak

03/02/2013

POR107 exhauster used for C-101 – p 33

Riser 3 light issues – p 33

Ahlberg light use restricted – p 33

- -

No issues reported. Camera and light issues

03/03/2013 No activities this date - - No issues reported. -

03/04/2013 No activities this date

- Stop work was issued to restrict all use of

Ahlberg lights

No issues reported. -

03/05/2013 POR107 exhauster used for C-101 – p 34 - - No issues reported. -

03/06/2013 POR107 exhauster used for C-101 – p 34

Riser 3 and riser 8 light issues – p 34 - -

No issues reported. Light issues

03/07/2013 POR107 exhauster used for C-101 – p 35

Riser 3 and riser 8 lights replaced, riser 8 camera replaced – p 35

Pumps active – p 11 No issues reported. No issues reported. Light issues

Camera issues

03/08/2013

POR107 exhauster used for C-101 – p 35

Slurry pump low flow up and down – p 36

POR309 temperature and fan issues – p 36

POR107 secured – p 13 Sluicer #1 hydraulic lines to the sluicer’s transverse nozzle function were disconnected to prevent further loss of hydraulic fluid

Hydraulic lines transverse movement of the ERSS #1 nozzle were disconnected, ERSS #1 nozzle operation restored in locked position..

Slurry pump low flow

Hydraulic unit temperature issues

03/09/2013 No activities this date - - No issues reported. -

03/10/2013 No activities this date - - No issues reported. -

03/11/2013

POR107 exhauster used for C-101 – p 36

Slurry pump low flow up and down – p 37

Odor issues around AN-101 – p 16/17

Pumps active – p 18

POR107 shut down – p 18

No issues reported. No issues reported. Slurry pump low flow

03/12/2013

POR107 exhauster used for C-101 – p 37

POR309 HPU disconnect reset – p 37

Camera in Riser 8 failure – p 37 -

Sluicer #2 mast transverse is operating sporadically/slowly in the counter clockwise direction

Riser 8 camera stopped

No issues reported. Camera issues

Hydraulic unit temperature issues

03/13/2013 POR107 exhauster used for C-101 – p 38

Slurry pump low flow up and down – p 38

Pumps active – p 20 Slurry pump screen plugging No issues reported. Slurry pump low flow

03/14/2013 POR107 exhauster used for C-101 – p 39

POR107 low flow alarm issues – p 39

Pumps active – p 21 POR107 low flow alarm issues No issues reported. POR107 low flow issues

03/15/2013 POR107 exhauster used for C-101 – p 40 - No issues reported. No issues reported. -

03/16/2013 No activities this date - - No issues reported. -

03/17/2013 No activities this date - - No issues reported. -

03/18/2013 POR107 exhauster used for C-101 – p 40

-

No issues reported. Tank 241-C-101 retrieval operations were suspended while resources were shifted to tank 241-C-107 retrieval operations.

-

03/19/2013 POR107 exhauster used for C-101 – p 41

Supernatant and slurry lines and pumps flushed – p 41 -

Flush of the transfer lines, sluicers, and pumps performed

- -

No activities until …

05/05/2013 No activities this date Pumps active – p 98 - - -

05/06/2013 No activities this date - - - -

05/07/2013 No activities this date - - - -

05/08/2013 No activities this date - - - -

05/09/2013 POR107 exhauster used for C-101 – p 42

Riser 8 and riser 3 cameras and lights installed – p 42 -

New cameras and Ahlberg lights were installed in risers 3 and 8.

- Light issues

Camera issues

05/10/2013 No activities this date - - - -

05/11/2013 No activities this date - - - -

RPP-RPT-58298 3/9/2015 - 7:47 AM 54 of 106

Page 55: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

A-5

241-C-101 Bulk Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

05/12/2013 No activities this date - - - -

05/13/2013 POR107 exhauster sample pump issues– p 43

POR107 exhauster used for C-101 – p 43 -

Slurry distributor and supernatant pump adjustments

- POR107 sample pump issues

05/14/2013

POR107 exhauster used for C-101 – p 43

Sluicer #1 controls appear reversed (up is down, etc.) – p 44

Slurry pump low flow up and down – p 44

-

No issues reported. No issues reported. Slurry pump low flow

Sluicer #1 control issues

05/15/2013

POR107 exhauster used for C-101 – p 45

POR309 temp high – p 45

POR307 temp high, low oil level – p 45

-

Slurry pump HPU temperature high

Sluicer HPU POR307 temperature high, low oil levels

Hydraulic fluid began leaking from the nozzle elevation function of ERSS #2 in riser 2

Hydraulic unit temperature issues

05/16/2013

POR307 oil added – p 46

POR107 exhauster used for C-101 – p 46

Sluicer #2 leakage at rotary union during transverse functions of the wrist (drip wise) and up and down motions of nozzle (steady stream) – p 46

No retrieval activities per management direction – p 46

POR107 shut down – p 100 Sluicer HPU POR307 oil added Nozzle elevation function of ERSS #2 in riser 2 hydraulic lines disconnected.

Hydraulic system leaks – rotary union

05/17/2013 POR107 exhauster used for C-101 – p 46

Sluicer #2 nozzle functions to be disconnected due to leaks – p 47

- Leak observed from fitting on line that controls

ERSS #2 wrist up/down motion coming from the rotary union area

Tank C-101 retrieval operations were suspended while resources were shifted to tank 241-C-107 retrieval operations.

Hydraulic system leaks – rotary union

05/18/2013 No activities this date - - - -

05/19/2013 No activities this date - - - -

05/20/2013 No activities this date

- Resources will be shifted from tank C-101 to tank

C-107. - -

No activities until …

05/31/2013 POR132 water skid leaking water to ground from tank overfill

– p 47

POR107 exhauster used for C-101 – p 47

- Prerequisites and startup checklists

- Water system overflow

06/01/2013 No activities this date - - - -

06/02/2013 No activities this date - - - -

06/03/2013 Supernatant pump low flow up and down – p 48

POR307 temperature high – p 48 -

No issues reported. No issues reported. Supernatant pump low flow

Hydraulic unit temperature issues

06/04/2013 POR107 CAM high flow rate issues – p 49 Pumps active – p 121 POR107 CAM flow rate issues No issues reported. POR107 CAM flow issues

06/05/2013

POR107 exhauster used for C-101 – p 50

Slurry pump low flow up and down – p 51

Supernatant pump low flow up and down – p 51

POR307 high temperature issues – p 51

POR309 low pressure issues – p 51

Pumps active – p 123 Slurry pump screen plugging

Supernatant pump screen plugging

Slurry pump HPU POR309 showing low pressure

ERSS HPU POR307 temperature running high

ERSS HPU POR307 low hydraulic fluid – no visible leaks

Hydraulic fluid levels in the sluicer hydraulic power units began to drop

Supernatant pump low flow

Slurry pump low flow

Hydraulic unit temperature issues

06/06/2013

No issues reported.

- ERSS #1 elevation function for the nozzle is

leaking – hydraulic lines to this function disconnected

The lines to the nozzle elevation function of ERSS #1 were disconnected

Hydraulic system leaks

06/07/2013

POR107 exhauster used for C-101 – p 52

Supernatant and slurry pumps and lines flushed – p 53

POR309 flange hydraulic fluid leak – p 54

Pumps active – p 125 Slurry pump HPU POR309 motor flange hydraulic fluid leak

No issues reported. Hydraulic system leaks

06/08/2013 No activities this date - - No issues reported. -

06/09/2013 No activities this date - - No issues reported. -

06/10/2013 POR307 high temperature issues – p 54 Pumps active – p 128 No issues reported. No issues reported. Hydraulic unit temperature issues

06/11/2013 POR307 insulation removed – p 55 - No issues reported. No issues reported. Hydraulic unit temperature issues

06/12/2013 Slurry pump won’t lower – p 55

Sluicer #2 wrist function leak – p 56 -

Sluicer #2 nozzle transverse function hydraulic fluid leak

The nozzle transverse function of ERSS #2 appeared to begin leaking

Slurry pump movement issues

Hydraulic fluid leaks

06/13/2013 No issues reported. Pumps active – p 133 Sluicer #2 nozzle transverse function hydraulic

lines disconnected The nozzle transverse function hydraulic lines of

ERSS #2 were disconnected -

06/14/2013 POR307 high temperature issues – p 57 Pumps active – p 136 ERSS HPU POR307 low hydraulic fluid – no

visible leaks

No issues reported. Hydraulic unit temperature issues

06/15/2013 No activities this date - - No issues reported. -

RPP-RPT-58298 3/9/2015 - 7:47 AM 55 of 106

Page 56: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

A-6

241-C-101 Bulk Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

06/16/2013 No activities this date Pumps active – p 140 - No issues reported. -

06/17/2013 POR307 hydraulic fluid added – p 57

Power loss with lightening in the area – p 58

Transfer line flushing – p 144 ERSS HPU POR307 low hydraulic fluid – no visible leaks

No issues reported. Weather related issues

06/18/2013 C-102 ERSS hydraulic lines disconnected – p 59

Supernatant and slurry lines flushed – p 59

Transfer line flushing – p 145 ERSS HPU POR307 low hydraulic fluid – no visible leaks

Transfer line flushes performed

No issues reported.

-

06/19/2013 POR307 hydraulic fluid level constant – p 59 Pumps active – p 146

Transfer line flushing – p 146

C-102 hydraulic lines isolated – POR307 hydraulic level stabilized

Riser 3 camera deteriorating

No issues reported. Camera issues

06/20/2013

No activities this date

-

Riser 3 camera replaced

C-101 high pressure water manifold installation activities

Tank C-101 retrieval operations were suspended while manifolds for the connection of high-pressure water to the tank C-101 ERSSs was completed and tested.

Camera issues

06/21/2013 No activities this date - - - -

06/22/2013 No activities this date - - - -

06/23/2013 No activities this date - - - -

06/24/2013 No activities this date

- C-101 high pressure water manifold installation

activities - -

06/25/2013 No activities this date - - - -

06/26/2013 No activities this date - - - -

06/27/2013 No activities this date - - - -

06/28/2013 No activities this date - - - -

06/29/2013 No activities this date - - - -

06/30/2013 No activities this date - - - -

07/01/2013 No activities this date - - - -

07/02/2013 No activities this date

- C-101 high pressure water manifold testing

issues - -

07/03/2013 No activities this date - - - -

07/04/2013 No activities this date - - - -

07/05/2013 No activities this date - - - -

07/06/2013 No activities this date - - - -

07/07/2013 No activities this date - - - -

07/08/2013 No activities this date - Prerequisites and startup checklists - -

07/09/2013

POR137 flow indication issues – p 60

POR307 high temperature issues – p 60

High heat working condition issues – p 60/61

-

No issues reported. No issues reported. Weather related issues

Hydraulic unit temperature issues

07/10/2013 High heat working condition issues – p 62 - No issues reported. No issues reported. Hydraulic unit temperature issues

07/11/2013 Riser 3 camera issues – p 62

POR307 high temperature issues – p 62 -

No issues reported. No issues reported. Camera issues

Hydraulic unit temperature issues

07/12/2013 No activities this date - - No issues reported. -

07/13/2013 No activities this date - - No issues reported. -

07/14/2013 No activities this date - - No issues reported. -

07/15/2013 No activities this date - No issues reported. No issues reported. -

07/16/2013 No issues reported.

- Prerequisites and startup checklists

AN01A LDE wiring insulation melted/ burnt

No issues reported. Wiring issues

07/17/2013 No activities this date - AN01A LDE wiring issues No issues reported. Wiring issues

07/18/2013 No activities this date - No issues reported. No issues reported. -

07/19/2013 No activities this date - - No issues reported. -

07/20/2013 No activities this date - - No issues reported. -

07/21/2013 No activities this date - - No issues reported. -

07/22/2013 AN VTP issues – p 63 - No issues reported. No issues reported. -

RPP-RPT-58298 3/9/2015 - 7:47 AM 56 of 106

Page 57: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

A-7

241-C-101 Bulk Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

07/23/2013 High heat working condition issues – p 64/65

AN VTP low CAM sample flow – p 65

Pumps active – p 203 AN VTP CAM sample flow low issues No issues reported. AN VTP CAM issues

07/24/2013 High heat working condition issues – p 66

POR307 high temperature issues – p 66

Pumps active – p 205 No issues reported. No issues reported. Weather related issues

Hydraulic unit temperature issues

07/25/2013

Riser 3 and 8 cameras replaced – p 66

C-101 demister differential pressure issues – p 67

High pressure washing causing visibility issues – p 68

Pumps active – p 208 New cameras and lights were installed in risers 3 and 8.

High pressure system used – down for fogging High-pressure water operation began

Camera issues

Demister pressure issues

Visibility issues

07/26/2013

High heat working condition issues – p 69

POR307 high temperature issues – p 69

High pressure washing causing visibility issues – p 69/70

AN VTP issues – p 209 High pressure system used – down for fogging No issues reported. Weather related issues

Hydraulic unit temperature issues

Visibility issues

07/27/2013

No activities this date AN VTP issues – p 210 -

Retrieval operations were suspended while quarterly electrical cord inspections were performed at the 241-C Tank Farm.

-

No activities until …

08/07/2013 High heat working condition issues – p 71

POR137 leak detector jumper needed – p 71 -

Prerequisites and startup checklists

C-112 TVFM issues affecting C-101 operations -

Weather related issues

Prerequisites issues

08/08/2013

High pressure water work – p 71

POR307 high temperature – p 72

High pressure washing causing visibility issues – p 72

-

No issues reported.

High-pressure water operations

Hydraulic unit temperature issues

Visibility issues

08/09/2013 High pressure water work – p 73 Pumps active – p 233 No issues reported. High-pressure water operations -

08/10/2013 No activities this date - - No issues reported. -

08/11/2013 No activities this date - - No issues reported. -

08/12/2013 Riser 8 camera issues – p 74/75

High heat working condition issues – p 75

Pumps active – p 240 No issues reported. No issues reported. Camera issues

Weather related issues

08/13/2013 High heat working condition issues – p 75/76 Pumps active – p 241 No issues reported. No issues reported. Weather related issues

08/14/2013 High heat working condition issues – p 75/76/77

Slurry pump would not lower – p 77

Pumps active – p 244/246 The hydraulic lines to the nozzle functions of ERSS #2 were reconnected to reposition the nozzle

The hydraulic lines to the nozzle functions of ERSS #2 were reconnected to reposition the nozzle.

Slurry pump movement issues

Weather related issues

08/15/2013 POR132 out of service – p 78

- POR132 water skid out of service – directed to

shut down

No issues reported. Water system issues

08/16/2013 POR107 used for C-101 – p 79

Riser 3 and riser 8 camera/light issues – p 79 - Riser 3 and 8 camera issues

No issues reported. Camera issues

08/17/2013 No activities this date - - No issues reported. -

08/18/2013 No activities this date - - No issues reported. -

08/19/2013 Riser 3 and riser 8 camera/light issues – p 79

High heat working condition issues – p 80 -

New camera and lights installed in riser 8

New lights installed in riser 3

No issues reported. Camera issues

Weather related issues

08/20/2013

High pressure water work – p 80

V-600 and PRV-200 leaks – p 80/82

Pumps active – p 258 HPWS #2 water leak at V-600 and PRV-200

The hydraulic lines to the nozzle functions of ERSS #1 were reconnected to reposition the nozzle

Additional water spray leak at a PRV

The hydraulic lines to the nozzle functions of ERSS #1 were reconnected to reposition the nozzle

High-pressure water operations

Water leaks

08/21/2013

PI-404 issues – p 82

High pressure washing causing visibility issues – p 83

Dose issues at HIHTL to Sluicer #1 – p 83

Pumps active – p 259

High dose rates – p 260

High rad in C farm, HPT management directs shutdown

High-pressure water operations

Tank wall sluicing

Dose rate issues

Visibility issues

08/22/2013

No activities this date Red arrow. Do not operate C-101 high pressure water system until event investigation and path forward is developed – p 261/262

No retrieval operations were performed – event investigation to determine the cause of the elevated radiation readings.

No retrieval operations were performed – event investigation to determine the cause of the elevated radiation readings.

Dose rate issues

08/23/2013

No activities this date

- No retrieval operations were performed – event

investigation to determine the cause of the elevated radiation readings.

- Dose rate issues

08/24/2013 No activities this date - - - -

08/25/2013 No activities this date - - - -

08/26/2013

No issues reported.

- No retrieval operations were performed – event

investigation to determine the cause of the elevated radiation readings.

- Dose rate issues

RPP-RPT-58298 3/9/2015 - 7:47 AM 57 of 106

Page 58: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

A-8

241-C-101 Bulk Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

08/27/2013

No activities this date

- No retrieval operations were performed – event

investigation to determine the cause of the elevated radiation readings.

- Dose rate issues

08/28/2013

No activities this date Red arrow cleared to allow access to C farm – p 274

No retrieval operations were performed – event investigation to determine the cause of the elevated radiation readings.

- Dose rate issues

08/29/2013

No activities this date

-

Closed red arrow restricting access into C-Farm without R&C Manager approval based upon ISR results and communications from Senior Management.

- -

08/30/2013 No activities this date - - - -

08/31/2013 No activities this date - - - -

09/01/2013 No activities this date - - - -

09/02/2013 No activities this date - - - -

09/03/2013 No activities this date - Hot water skid POR357 OAT Hot water skid POR357 OAT

09/04/2013 No activities this date Red arrow cleared to allow retrieval – p 290 Hot water skid POR357 OAT delayed due to

weather issues -

Weather related issues

09/05/2013 No activities this date - Hot water skid POR357 OAT - -

09/06/2013 No issues reported. Pumps active – p 294 Flush of the transfer lines performed No issues reported. -

09/07/2013 No activities this date - - No issues reported. -

09/08/2013 No activities this date - - No issues reported. -

09/09/2013

High pressure pump #5 leak – p 85

High pressure washing causing visibility issues – p 85

High heat working condition issues – p 85

Slurry pump low flow up and down – p 85

-

No issues reported. No issues reported. Hydraulic fluid leaks

Visibility issues

Weather related issues

Slurry pump low flow issues

09/10/2013 High pressure washing causing visibility issues – p 86/87 - No issues reported. No issues reported. Visibility issues

09/11/2013 Slurry pump low flow up and down – p 87

Volume displacement activities – p 88 -

Performed a liquid displacement measurement of the waste remaining in the tank.

Performed a liquid displacement measurement of the waste remaining in the tank.

Slurry pump low flow issues

09/12/2013 Flushing activities – p 90

- Performed a liquid displacement measurement of

the waste remaining in the tank. Performed a liquid displacement measurement of

the waste remaining in the tank. -

No activities until …

09/24/2013 No issues reported. - - - -

09/25/2013 No activities this date - - - -

09/26/2013 No activities this date - - - -

09/27/2013 No activities this date - - - -

09/28/2013 No issues reported. - - - -

09/29/2013 No issues reported. - Performed rinse of C-101 wastes. - -

09/30/2013 No issues reported. - Final pump down of C-101. - -

RPP-RPT-58298 3/9/2015 - 7:47 AM 58 of 106

Page 59: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

B-1

APPENDIX B

241-C-107 RETRIEVAL ACTIVITIES EVENTS

RPP-RPT-58298 3/9/2015 - 7:47 AM 59 of 106

Page 60: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

B-2

241-C-107 Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

09/27/2011

Slurry pump lower cable limit issues – p 1

Slurry pump enable mess-ups – p 1

Supernatant pump bell housing leak – p 2

Start of retrieval work – p 238

Possible AN-106 transfer pump bell housing leak – p 239

-

No issues reported. Cable limit issues

Waste leak

09/28/2011 No activities this date - - No issues reported. -

09/29/2011 Speed sensor issues on the slurry pump – p 2

- - No issues reported. Procedure issues

Set point issues

09/30/2011 No activities this date - - No issues reported. -

10/01/2011 No activities this date - - No issues reported. -

10/02/2011 No activities this date - - No issues reported. -

10/03/2011 No activities this date - - No issues reported. -

10/04/2011 No activities this date - - No issues reported. -

10/05/2011 No activities this date Hydraulic fluid spill during install – p 248 - No issues reported. -

10/06/2011 POR240 Sump pump – p 3

ARM problems – p 3 - -

No issues reported. Programming issues

10/07/2011 Slurry pump fault alarm / HPU – p 4 - - No issues reported. Procedure / electrical line-up issues

10/08/2011 No activities this date - - No issues reported. -

10/09/2011 No activities this date - - No issues reported. -

10/10/2011 ARM will not lower – p 5

No local indication for slurry pump therefore no speed protection – p 5

Removed admin locks – p 253

Problems with Slurry pump HPU speed sensor – p 253

-

No issues reported. Failed speed sensors

ARM issues

10/11/2011 Speed sensor issues on the slurry pump – p 6

Shut down / slurry low flow multiple times – p 6, p 7

Pumps active – p 255 -

No issues reported. Failed speed sensors

Slurry pump low flow

10/12/2011 Shut down / slurry low flow multiple times – p 7, p 8 Pumps active – p 256 - No issues reported. Slurry pump low flow

10/13/2011 No activities this date - - No issues reported. -

10/14/2011 No activities this date - - No issues reported. -

10/15/2011 No activities this date - - No issues reported. -

10/16/2011 No activities this date - - No issues reported. -

10/17/2011

POR107 Shutdown, record sampler – p 9

Retrieval Prerequisites underway – p 9

C-108 activities concurrent – p 261

POR107 Vent shutdown – p 261

POR107 shutdown due to record sample low flow – p 262

-

No issues reported. Record sampler low flow

10/18/2011 POR107 restarted, pumps restarted – p 10

Slurry Pump shut down low flow – p 10

POR107 restarted, pumps restarted – p 262 -

No issues reported. Slurry pump low flow

10/19/2011

Supernatant pump low flow – p 11

POR107 CAM Issues – p 11

POR214 leaking hydraulic fluid – p 11/12

- -

No issues reported. Slurry pump low flow

CAM low flow

Fitting leak

10/20/2011

Slurry pump shut down low flow – p 13

POR107 shut down low sample flow, restarted – p 13

Cameras failed – p 14

Red arrow entry – don't restart if down >2 hr due to particulate formation/ expansion of freezing issue to include precipitation – p 265

POR107 shutdown due to sample pump failure, restarted – p 266

Red arrow entry – In tank camera issues shutting down transfers – p 266

-

No issues reported. Slurry pump low flow

Record sampler vacuum pump failure

Camera issues

10/21/2011 No activities this date C-108 activities begin – p 267 - No issues reported. -

10/22/2011 No activities this date - - No issues reported. -

10/23/2011 No activities this date AN-106 to AP-104 transfer – no C-107 – p 268 - No issues reported. -

10/24/2011 No activities this date - - No issues reported. -

10/25/2011

No activities this date POR-107 accidental shutdown, restart – p 271, 272

C-108 concurrent p 272

-

No issues reported.

-

10/26/2011 POR107 problems – p 13 POR-107 shutdown, planned – p 273 - No issues reported. Record sampler low flow

RPP-RPT-58298 3/9/2015 - 7:47 AM 60 of 106

Page 61: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

B-3

241-C-107 Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

10/27/2011

AN-106 camera failure – p 14

AN-106 pump winch stuck – p 14

Slurry pump shut down low flow – p 15

POR-107 restarted, planned – p 273

C-108 concurrent- p 273

C-107 starting – p 274

-

No issues reported. Slurry pump low flow

Camera issues

Winch issues

10/28/2011

Slurry pump shutdown low flow / restart – p 15

Supernatant pump shutdown low flow / restart – p 15

Supernatant pump out on high amps – p 16

High pressure on ARM HPU – p 16

Installed admin locks – p 274

-

Retrieval was halted by failure of the electric supernatant pump AN06A-WT-P-022 in 241-AN-106.

Replacement electric pump AN06A-WT-P-023 failed on the test stand.

Slurry pump low flow

ARM HPU issues

AN06A pump issues

10/29/2011 No activities this date - - - -

10/30/2011 No activities this date - - - -

10/31/2011 No activities this date - - - -

11/1/2011 No activities this date - - - -

11/2/2011 POR104-WT-FCV-102 indication failure – p 17 - - - Valve position indication issues

11/3/2011 Pump bump – p 17 - - - -

No activities until …

01/25/2012 Supernatant pump level confirmed – p 17 - - - -

No activities until …

04/20/2012 POR240 sump pumped – p 18

POR107 HMI issues – p 18 - - -

Programming issues

No activities until …

05/01/2012 POR104 sump pumped – p 18 - - - -

No activities until …

05/09/2012 Retrieval Prerequisites underway – p 18 - - - -

05/10/2012 AN-106 pump issues – p 19

POR240-WT-FCV-161 and FCV-162 issues – p 20 - - -

Valve position indication issues – causes pump starting issues

No activities until …

05/17/2012 AN-106 pump issues – p 21

POR240-WT-FCV-161 and FCV-162 issues – p 21 - - -

Valve position indication issues – causes pump starting issues

05/18/2012 POR240-WT-FCV-161 and FCV-162 issues – p 22

- - - Valve position indication issues – causes pump

starting issues

05/19/2012 No activities this date - - - -

05/20/2012 No activities this date - - - -

05/21/2012 POR240-WT-FCV-161 and FCV-162 issues – p 22

- - - Valve position indication issues – causes pump

starting issues

05/22/2012 POR107 exhauster issues – p 23 - - - Exhauster issues

05/23/2012 Changed from POR107 to POR03 – p 23 POR03 started, pumps started – p 201 - - -

05/24/2012

AN-106 annulus LDA – p 25

Constant tension hoist issue (ARM) – p 25

ARM motion issues – p 25

AN-106 annulus LDE activates, transfers shut down, restarted – p 202 -

No issues reported. Constant tension hoist issues

05/25/2012 No issues this date AN-106 pump on HPU high return oil pressure –

p 203 -

No issues reported. -

05/26/2012 No activities this date - - No issues reported. -

05/27/2012 No activities this date - - No issues reported. -

05/28/2012 No activities this date - - No issues reported. -

05/29/2012

Slurry pump speed sensor issues – p 27

Supernatant pump rate issues – p 27

Slurry pump low flow issues – p 27

POR107 started – p 205

-

No issues reported. Slurry pump low flow

AN06A pump flow rate control issues

05/30/2012 Supernatant pump rate issues – p 28

POR107 shut down low CAM sample flow – p 29

Vapors in C farm / farm access down for day – p 207

- No issues reported. AN06A pump flow rate control issues

CAM low flow

05/31/2012 No activities this date POR107 unplanned shutdown – p 207

C farm vapors / access down – p 207 -

No issues reported. C Farm vapors – restricted access

06/01/2012 No activities this date - - No issues reported. -

RPP-RPT-58298 3/9/2015 - 7:47 AM 61 of 106

Page 62: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

B-4

241-C-107 Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

06/02/2012 No activities this date - - No issues reported. -

06/03/2012 POR240 sump pumped – p 30 - - No issues reported. Weather caused leak detection alarms

06/04/2012

Supernatant pump down on low flow – p 31

AN06A LDA – p 31

ARM extend/retract indications no longer reliable – p 32

C-107 admin locks reapplied, leak detector at AN-06A in, likely due to rains – p 213 -

No issues reported. ARM position indication issues

Weather caused leak detection alarms

06/05/2012

POR240 LDA / sump pumped – p 32

POR104 LDA / sump pumped – p 32

AN06A LDA – p 33

Constant tension hoist issues / dragging cable – p 33

C-107 admin locks removed p 213

-

No issues reported. Constant tension hoist issues

06/06/2012 Slurry pump low flow / cable limit interlock issues – p 34/35 POR03 exhauster shut down, planned outage –

p 214 -

No issues reported. Cable limit issues

Slurry pump low flow

06/07/2012 POR03 on C107 only – p 36

Supernatant / slurry pump low flow – p 36/37

"Retrieval completed" – p 215 -

No issues reported. Slurry pump low flow

Supernatant pump low flow

06/08/2012 Supernatant / slurry pump low flow – p 37

ARM HPU discharge pressure issue – p 38

POR03 planned shutdown – p 215 -

No issues reported. Slurry pump low flow

Supernatant pump low flow

06/09/2012 No activities this date - - No issues reported. -

06/10/2012 No activities this date - - No issues reported. -

06/11/2012

AN VTP issues – p 39

POR107 cam flow issues – p 39

Slurry pump low flow – p 39/40

C-107 pump started – p 218

-

No issues reported. CAM low flow

Slurry pump low flow

06/12/2012

POR107 cam flow issues – p 40

Moved to POR03 – p 40

Slurry / supernatant pump low flow – p 40/41

POR107 exhauster down – p 218

-

No issues reported. CAM low flow

Slurry pump low flow

06/13/2012 Slurry pump low flow – p 42

Slurry pump lower cable limit issues – p 42 - -

Declaration of 50% retrieval complete

Declaration of completion of bulk retrieval

Cable limit issues

Slurry pump low flow

06/14/2012 On POR107 vent sys – p 43

Valving misroute – p 43

No flow condition observed, miss-positioned valve in POR209 – p 221

- No issues reported. Procedure issues

06/15/2012 No activities this date - - No issues reported. -

06/16/2012 No activities this date - - No issues reported. -

06/17/2012 No activities this date - - No issues reported. -

06/18/2012 Slurry pump low flow – p 44 - - No issues reported. Slurry pump low flow

06/19/2012 No activities this date - - No issues reported. -

06/20/2012 Preparations – p 45 C-107 containment box heater under admin lock

control – p 228 -

No issues reported. -

06/21/2012

POR107 down for high C-107 vacuum – p 46

Slurry pump low flow – p 46/47

C-107 transfer started – p 228

POR107 down for high C-107 vacuum – p 229

POR107 shutdown in include more tanks – p 230

-

No issues reported. C-107 vacuum issues

Slurry pump low flow

06/22/2012 No activities this date - - No issues reported. -

06/23/2012 No activities this date - - No issues reported. -

06/24/2012 No activities this date - - No issues reported. -

06/25/2012 POR103 breaker issues – p 48 - - No issues reported. POR103 breaker tripped

06/26/2012

Slurry pump low flow – p 49

Hoses in waste due to constant tension hoist issues – p 49

POR246 LDA – p 50

POR104 LDA / Sump pumped – p 50

POR240 LDA / Sump pumped – p 50

C-107 restarted – p 238

-

No issues reported. Slurry pump low flow

Weather caused leak detection alarms

Constant tension hoist issues

06/27/2012 Slurry pump low flow – p 51

POR107 cam failure – p 52

POR107 shut down due to cam failure – p 240 -

No issues reported. CAM failure

Slurry pump low flow

06/28/2012 Slurry pump low flow – p 52

POR240-WT-FCV-161 issues – p 53

POR107 restarted – p 240 -

No issues reported. Slurry pump low flow

Valve closed causing pump shut downs

06/29/2012 No issues this date - - No issues reported. -

06/30/2012 No activities this date - - No issues reported. -

07/01/2012 No activities this date - - No issues reported. -

RPP-RPT-58298 3/9/2015 - 7:47 AM 62 of 106

Page 63: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

B-5

241-C-107 Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

07/02/2012 POR107 Sample pump issues – p 54

Slurry pump low flow – p 54

POR107 shutdown – p 249 -

No issues reported. Sample pump low flow

Slurry pump low flow

07/03/2012 Slurry pump low flow – p 55/56

Supernatant pump shutdown – p 55 - -

No issues reported. Slurry pump low flow

Supernatant pump low flow

07/04/2012 No activities this date - - No issues reported. -

07/05/2012 Slurry pump low flow – p 56/57 - - No issues reported. Slurry pump low flow

07/06/2012 POR107 cam failure – p 57

POR107 Sample pump issues – p 57

POR107 shut down due to cam failure, restarted, transfers restored, POR107 shutdown again for sample flow low – p 247

-

No issues reported. Sample pump low flow

CAM failure

07/07/2012 No activities this date - - No issues reported. -

07/08/2012 No activities this date - - No issues reported. -

07/09/2012 POR107 CAM Sample failure – p 58 POR107 shut down – p 251 - No issues reported. CAM low flow

07/10/2012

Pumps started, slurry pump up and down – p 59/60

Supernatant pump hoist not operable – p 59

ARM HPU Cabinet high temperature – p 59

- -

No issues reported. Slurry pump low flow

AN06A pump hoist issues

07/11/2012

Slurry / supernatant pumps up and down – p 60/61

POR03 ventilating C107 – p 60

POR03 Instrument Enclosure problems – p 61

Moved C-107 to POR03, restarted – p 253

Vent system shut down, restarted – p 258 -

No issues reported. Slurry pump low flow

Supernatant pump low flow

Power spike suspected in instrument enclosure issues

07/12/2012 Slurry pump up and down – p 62

POR107 Cam/Sampler problems – p 63 - -

No issues reported. Slurry pump low flow

CAM low flow

07/13/2012 Slurry /supernatant pumps up and down – p 63

POR107 Sampler problems – p 64 - -

No issues reported. Slurry pump low flow

Sample pump low flow

07/14/2012 No activities this date - - No issues reported. -

07/15/2012 No activities this date - - No issues reported. -

07/16/2012 ARM HPU Leaking hydraulic fluid – p 66 C-107 retrieval stopped, admin locks installed –

p 262 -

No issues reported. ENCL-400 visible hydraulic leak

07/17/2012

POR03 started – p 66

POR240 sump pumped – p 66

ENCL-002 for ARM HPU AC failing – p 66

Slurry pump up and down – p 66/67

AN VTP down and up – p 264

C-107 retrieval restarted – p 265 -

No issues reported. Slurry pump low flow

Weather caused leak detection alarms

ENCL-002 AC issues

07/18/2012

Back-stop not operable – p 67

Slurry pump up and down – p 67/68

Lower cable limit issues – p 68

POR107 CAM failure problems – POR03 stack high temp shutdown – p 68

C-107 retrieval stopped, POR03 stack air temperature high alarms – p 266

POR03 restarted, C107 lines flushed – p 267 -

No issues reported. Slurry pump low flow

Back-stop issues

Cable limit issues

CAM instrument failures

Stack air temperature issues

07/19/2012 Slurry / supernatant pumps up and down – p 69/70 - - No issues reported. Slurry pump low flow

07/20/2012 Slurry / supernatant pumps up and down – p 70/71 C-107 shut down / planned activity – p 269 - No issues reported. Slurry pump low flow

07/21/2012 No activities this date - - No issues reported. -

07/22/2012 No activities this date - - No issues reported. -

07/23/2012 No activities this date - - No issues reported. -

07/24/2012 No activities this date - - No issues reported. -

07/25/2012 No activities this date - - No issues reported. -

07/26/2012

Slurry / supernatant pumps up and down – p 71/72

ARM angle indication issues – p 72

C-107 retrieval secured – p 274

-

No issues reported. Slurry pump low flow

Supernatant pump low flow

ARM indication issues

07/27/2012 No issues this date - - No issues reported. -

07/28/2012 No activities this date - - No issues reported. -

07/29/2012 No activities this date - - No issues reported. -

07/30/2012

POR107 issues – p 73

Slurry / supernatant pumps up and down – p 74

Slurry pump off vertical, continues typical operation – p 74

POR107 down high radiation / CAM failure – p 277

-

No issues reported. CAM instrument failures

Slurry pump low flow

RPP-RPT-58298 3/9/2015 - 7:47 AM 63 of 106

Page 64: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

B-6

241-C-107 Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

07/31/2012 Slurry pump up and down – p 75

Leak path evaluations of rotary union, leakage residue observed – p 75

C-107 starting – p 283 -

No issues reported. Slurry pump low flow

08/01/2012 No activities this date POR03 shutdown on low differentia pressure –

p 280 -

No issues reported. -

08/02/2012 No activities this date - - No issues reported. -

08/03/2012 No activities this date Op Eval for POR237 rotary union dealt with leak

from union – p 282/283 -

No issues reported. -

08/04/2012 No activities this date - - No issues reported. -

08/05/2012 No activities this date POR007 started (107?) – p 283 - No issues reported. -

08/06/2012

POR107 temperature issues – p 78

Slurry / supernatant pumps up and down – p 78

Rotary union leak, flush water to ground – p 78/79

POR03 started – p 285

-

No issues reported. Slurry pump low flow

Supernatant pump low flow

Rotary union leak

Flush water spill

Exhauster low differential temperature

08/07/2012 Repaired damaged gasket which caused leak to ground –

p 79 Rotary union visible leak shut down – p 285

- - -

08/08/2012 POR107 issues – p 79 - - - Low HEPA differential pressure

No activities until …

08/20/2012 HPWS-1 work package – p 80 - - - -

08/21/2012 POR107 down on C-107 signal failure – p 80 - - - C-107 pressure transmitter issues

08/22/2012 No activities this date - - - -

08/23/2012 No activities this date - - - -

08/24/2012 No activities this date - - - -

08/25/2012 No activities this date - - - -

08/26/2012 No activities this date - - - -

08/27/2012 POR107 down on C-107 signal failure – p 80

ARM operation issues – p 80

Planned POR107 shut down/restart – p 12 -

No issues reported. C-107 pressure transmitter issues

ARM proximity switch failure

08/28/2012

Proximity switch issues – p 81

Flow indicator issues – p 81

Fogging issues – p 81

POR107 unplanned shutdown sometime on 8/27 – p 15 -

No issues reported. C-107 pressure transmitter issues

ARM proximity switch issues

08/29/2012

Flow indicator issues – p 82

Fogging issues – p 82/83

Issues with ARM contacting the waste – p 83

End effector issues

- -

No issues reported. ARM Proximity switch issues – software fix

Fogging due to operation

FI-214 “stuck”

End effector curb feeler failure

08/30/2012 Pumps up and down, Fogging issues – p 84/85 - - No issues reported. Fogging due to operation

08/31/2012 Pumps up and down, Fogging issues?? – p 85/86

- - Wall cleaning was discontinued with the failure of

one of the four high pressure water nozzles on the end effector.

Fogging due to operation

09/01/2012 No activities this date - - - -

09/02/2012 No activities this date - - - -

09/03/2012 No activities this date - - - -

09/04/2014 Leakage at base of one of the high pressure nozzles – p 86 - - - Leak near one of the high pressure nozzles

No activities until …

09/13/2012

POR107 low heater temperature alarm – p 87

Rotary union still dripping – p 87

Shut down due to low slurry pump flow – p 87

Rotary union issues still – p 28

- A total of 13,393 gallons of accumulated wash

water and residual supernate was pumped from 241-C-107 to 241-AN-106.

Slurry pump low flow

Rotary union leak

Exhauster low heater temperature

09/14/2012 No activities this date - - - -

09/15/2012 No activities this date - - - -

09/16/2012 No activities this date - - - -

09/17/2012 No activities this date - - - -

09/18/2012 No activities this date - - - -

RPP-RPT-58298 3/9/2015 - 7:47 AM 64 of 106

Page 65: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

B-7

241-C-107 Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

09/19/2012

ARM HPU temp reading issues – p 88

Supernatant pump issues – p 88

Slurry pump up and down, low flow – p 88

C-107 started – p 34

-

No issues reported. Slurry pump low flow

ARM HPU indication issues

Exhauster low heater temperature

09/20/2012

Slurry pump up and down, low flow – p 89

Slurry pump movement issues – p 89

Supernatant pump stopped low HPU fluid level – p 90

C-107 started – p 35

AN-106 pump shutdown low oil interlock – p 35 -

No issues reported. Slurry pump low flow

Slurry pump winch issues

AN06A HPU hydraulic fluid level issues

09/21/2012

Supernatant pump stopped low HPU fluid level – p 91 C-107 started – p 35

AN-106 pump shutdown low oil interlock – p 35

-

Retrieval operations resumed briefly but discontinued to troubleshoot issues with 241-C-107 pump elevation movement and supernatant pump hydraulic power unit fluid losses.

Decant of 241-AN-106 on September 26, 2012, demonstrated significant hydraulic fluid losses resulting in the loss of supernatant pump AN06A-WT-P-024.

AN06A HPU hydraulic fluid level issues

No activities until …

05/06/2013 Retrieval Prerequisites underway – p 90 - - - -

05/07/2013 Apparently lowered slurry distributor instead of pump – p 93 - - - Procedure issues

No activities until …

05/17/2013 Can't lower slurry distributor – p 93

- - - Slurry distributor would only lower 81 turns, not the

161 required

05/18/2013 No activities this date - - - -

05/19/2013 No activities this date - - - -

05/20/2013 FCV-162 issues – p 94

Transfer continued with supernate low flow alarm in – p 94

POR237 changes noted, AN-106 pump secured – p 100

- No issues reported. Valve position indication issues

05/21/2013

Can't lower slurry distributor – p 95

Slurry pump low flow – p 95

Material balance discrepancy – p 95

Transfers secured due to lightning, restarted? – p 101 -

Initial operations were those of a volume displacement on May 20-21st.

Slurry distributor would only lower 22 turns, not the 84 required

Slurry pump low flow

05/22/2013 Pumping stopped until 5/20 material balance discrepancy

issue addressed – p 97 Material balance discrepancy event investigation –

p 103 -

No issues reported. Pumping stopped until 5/20 material balance discrepancy issue addressed

05/23/2013 No activities this date - - No issues reported. -

05/24/2013 No activities this date - - No issues reported. -

05/25/2013 No activities this date - - No issues reported. -

05/26/2013 No activities this date - - No issues reported. -

05/27/2013 No activities this date - - No issues reported. -

05/28/2013

No issues this date Investigation started for C-107 procedure issue – p 109

Pumping resumed, secured for the night – p 109

-

No issues reported.

-

05/29/2013

Slurry pump low flow – p 99

AN06A LDE, floor drain opened, cleared – p 100

"LDE-196" alarm – p 101

Pumping resumed, AN06A LDA shuts down – p 111

Pit drained, pumping resumed, leak condition again shuts down – p 112

-

No issues reported. Slurry pump low flow

AN06A anti-siphon line loose

05/30/2013 Anti-siphon line leak – p 102 Leak observed in AN06A anti-siphon line – p 112 - No issues reported. AN06A anti-siphon line loose

No activities until …

06/26/2013 No issues this date - - No issues reported. -

06/27/2013

Shut down for procedure issues – p 104 AN06A Anti-siphon lines leak checked – p 159

POR03 seal pot leaking – p 159

Procedure issues – p 160

-

No issues reported. Procedure issues

06/28/2013 Supernate starting issues – p 105

Slurry pump low flow/solid build-up – p 105

AN106 pump positioning event investigation started – p 160

Pumps started, shift run – p 162

-

No issues reported. Slurry pump low flow

Supernatant pump low flow

06/29/2013 No activities this date - - No issues reported. -

06/30/2013 No activities this date - - No issues reported. -

07/01/2013 AN vent issues – p 106 POR008 up and down, high stack temperature –

p 171 -

No issues reported. Retrieval not authorized because AN VTP is down

RPP-RPT-58298 3/9/2015 - 7:47 AM 65 of 106

Page 66: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

B-8

241-C-107 Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

07/02/2013 Work/rest heat issues – p 107 Pump started – p 172

Pump stopped – p 173 -

No issues reported. Weather related work / rest regimen delays

07/03/2013

Pumps up and down, solids blocking – p 108/109

Work/rest heat issues – p 108

Containment box drip wise leak – p 109

Flow indication/alarm agreement issues – p 110

pump stopped – p 174

-

No issues reported. Slurry pump low flow

Supernatant pump low flow

Weather related work / rest regimen delays

Rotary union leak

Flow indication and alarm agreement issues

07/04/2013 No activities this date - - No issues reported. -

07/05/2013 Leaks observed at fitting near constant tension hoist reel

and rotary union- p 111

Slurry pump – liquid pouring out of column – p 111

- -

No issues reported. Rotary union leak

Slurry pump failure starts

07/06/2013 No activities this date - - No issues reported. -

07/07/2013 No activities this date - - No issues reported. -

07/08/2013 Leak test needed on hose runs – p 111 - - No issues reported. -

07/09/2013 No activities this date - - No issues reported. -

07/10/2013 No activities this date Initiated C-107 temporary rounds – p 182 - No issues reported. -

07/11/2013 No activities this date - - No issues reported. -

07/12/2013 High pressure wall washing – p 112

Fogging issues – p 113

Wall washing complete for shift – p 186 -

HP water wall washing with 7,670 gallons of water was conducted on July 12, 2013.

Fogging due to operation

07/13/2013 No activities this date - - No issues reported. -

07/14/2013 No activities this date - - No issues reported. -

07/15/2013 Problems with high pressure pumps – p 114

Apparent slurry pump failure – p 115 - - The slurry pump in 241-C-107 failed. High pressure pump P-003 not working – belt

failure

Slurry pump would not start – pump failure

07/16/2013 Troubleshooting on slurry pump – p 116 - - - Slurry pump would not start – pump failure

07/17/2013 Flushed lines - - - -

07/18/2013 No activities this date - - - -

07/19/2013 No activities this date - - - -

07/20/2013 No activities this date - - - -

07/21/2013 No activities this date - - - -

07/22/2013 Troubleshooting on slurry pump – p 117 - - - Slurry pump would not start – pump failure

07/23/2013 No activities this date - - - -

07/24/2013 Placed system into maintenance mode – p 117 - - - -

No activities until …

09/12/2013 Slurry pump replacement support activities on 9/7/2013 –

p 117 - - - -

No activities until …

10/02/2013 Slurry pump replacement support activities – p 118 - - - -

No activities until …

01/27/2014 Retrieval Prerequisites underway – p 119 - - - -

01/28/2014 MARS arm issues – p 120 - - - ARM motion issues

01/29/2014

Cold temp issues with HPUs – p 121/122

Flow indication issues – p 122

Slurry pump over-speed issues – p 122

- -

No issues reported. HPUs low temperature time-out issues associated with cold weather

FI-168 readings erratic

01/30/2014 Supernatant pump crystal issues – p 123 - - No issues reported. Waste crystals on pump screen washed off

01/31/2014 No activities this date - - No issues reported. -

02/01/2014 No activities this date - - No issues reported. -

02/02/2014 No activities this date - - No issues reported. -

02/03/2014 No activities this date - - No issues reported. -

02/04/2014 Cold temp issues – p 123

- - No issues reported. HPUs low temperature time-out issues associated

with cold weather

RPP-RPT-58298 3/9/2015 - 7:47 AM 66 of 106

Page 67: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

B-9

241-C-107 Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

02/05/2014 No activities this date - - No issues reported. -

02/06/2014 No activities this date - - No issues reported. -

02/07/2014 No activities this date - - No issues reported. -

02/08/2014 No activities this date - - No issues reported. -

02/09/2014 No activities this date - - No issues reported. -

02/10/2014 AN106 ENRAF issues – p 125 - - No issues reported. ENRAF / TMACS communication issues

02/11/2014 Slurry pump HPU start issues – p 125

FCV-161 indication issues – p 126 - -

No issues reported. Slurry pump speed sensor communications issues

Valve position indication issues

02/12/2014 Slurry pump up/down plugging – p 127 - - No issues reported. Slurry pump low flow

02/13/2014 Slurry pump up/down plugging – p 128/129/130

Constant tension hoist issues – p 128 - -

No issues reported. Slurry pump low flow

Constant tension hoist issues

02/14/2014 Slurry pump up/down plugging – p 130 - - No issues reported. Slurry pump low flow

02/15/2014 No activities this date - - No issues reported. -

02/16/2014 No activities this date - - No issues reported. -

02/17/2014 No activities this date - - No issues reported. -

02/18/2014 Slurry pump up/down plugging – p 131

Cold temp issues – p 131 - -

No issues reported. Slurry pump low flow

HPUs temperature issues

02/19/2014 HPU TE indication issues – p 132 - - No issues reported. HPUs temperature indication issues

02/20/2014 HPU Temp issues – p 132 - - No issues reported. HPUs temperature indication issues

02/21/2014 Slurry pump up/down plugging – p 134/135 - - No issues reported. Slurry pump low flow

02/22/2014 No activities this date - - No issues reported. -

02/23/2014 No activities this date - - No issues reported. -

02/24/2014 Slurry pump up/down plugging – p 135/136

Temp indication issues – p 136 - -

No issues reported. Slurry pump low flow

HPUs temperature issues

02/25/2014 Slurry pump up/down plugging – p 137/138

When on the floor, pump drags when turn table rotated – p 137

- -

No issues reported. Slurry pump low flow

Slurry pump motion issues

02/26/2014 Slurry pump raise/lower issues – p 138

Slurry pump stop/ start low flow – p 139 - -

No issues reported. Slurry pump low flow

Slurry pump motion issues

02/27/2014 Slurry pump stop/ start low flow – p 139/140 - - No issues reported. Slurry pump low flow

02/28/2014 Slurry pump stop/ start low flow – p 141 - - No issues reported. Slurry pump low flow

03/01/2014 No activities this date - - No issues reported. -

03/02/2014 No activities this date - - No issues reported. -

03/03/2014 Slurry pump stop/ start low flow – p 142/143 - - No issues reported. Slurry pump low flow

03/04/2014 Slurry pump stop/ start low flow – p 143

Shutdown for CAM issues – p 144 - -

No issues reported. Slurry pump low flow

CAM alarm – high radiation found on filter

03/05/2014 Slurry pump stop/ start low flow – p 144/145 - - No issues reported. Slurry pump low flow

03/06/2014 Slurry pump stop/ start low flow – p 146/147/ 148/149

MARS arm extension issues – p 146/147/148 - -

No issues reported. Slurry pump low flow

ARM motion issues

03/07/2014 Slurry pump stop/ start low flow – p 149/150/ 151 - - No issues reported. Slurry pump low flow

03/08/2014 No activities this date - - No issues reported. -

03/09/2014 No activities this date - - No issues reported. -

03/10/2014

Slurry pump stop/ start low flow – p 151/152/ 153/154

Water leak at HPWS-2 – p 153

HPWS-2 high-high alarm issues – p 153

- -

No issues reported. Slurry pump low flow

HPWS-2 water leak – possibly associated with high-high level alarm issues

03/11/2014 Slurry pump stop/ start low flow – p 154/155/ 156

Hydraulic leaks at constant tension hoist – p 155/156 - -

No issues reported. Slurry pump low flow

ARM motion issues – leak

03/12/2014 Slurry pump stop/ start low flow – p 156/157/ 158

Wrist sweep motion is leaking seal at constant tension hoist – p 157

- -

No issues reported. Slurry pump low flow

ARM motion issues – leak

03/13/2014 Slurry pump stop/ start low flow – p 158/159/ 160 - - No issues reported. Slurry pump low flow

RPP-RPT-58298 3/9/2015 - 7:47 AM 67 of 106

Page 68: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

B-10

241-C-107 Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

03/14/2014 Slurry pump stop/ start low flow – p 161/162 /163 - - No issues reported. Slurry pump low flow

03/15/2014 No activities this date - - No issues reported. -

03/16/2014 No activities this date - - No issues reported. -

03/17/2014 Slurry pump stop/ start low flow – p 163/164

ENCL-400 hydraulic leak – p 164 - -

No issues reported. ENCL-400 visible hydraulic leak

Slurry pump low flow

03/18/2014 No activities this date - - No issues reported. -

03/19/2014 No activities this date - - No issues reported. -

03/20/2014 No activities this date - - No issues reported. -

03/21/2014 No activities this date - - No issues reported. -

03/22/2014 No activities this date - - No issues reported. -

03/23/2014 No activities this date - - No issues reported. -

03/24/2014 No activities this date - - No issues reported. -

03/25/2014 Slurry pump stop/ start low flow – p 165 - - No issues reported. Slurry pump low flow

03/26/2014 Slurry pump stop/ start low flow – p 165/166 /167 - - No issues reported. Slurry pump low flow

03/27/2014 Slurry pump stop/ start low flow – p 167/168 - - No issues reported. Slurry pump low flow

03/28/2014 Slurry pump stop/ start low flow – p 167/169 - - No issues reported. Slurry pump low flow

No activities until …

04/23/2014 No issues this date - - - -

RPP-RPT-58298 3/9/2015 - 7:47 AM 68 of 106

Page 69: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

C-1

APPENDIX C

241-C-111 BULK RETRIEVAL ACTIVITIES EVENTS

RPP-RPT-58298 3/9/2015 - 7:47 AM 69 of 106

Page 70: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

C-2

241-C-111 Bulk Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

09/09/10 No activities this date RED ARROW, no C-111 waste retrieval until TSR Readiness Checklist complete

- - -

09/10/10 No activities this date - - - -

09/11/10 No activities this date - - - -

09/12/10 No activities this date - - - -

09/13/10 No activities this date Shift office received AN-101 pump replacement paperwork to support C-111 WRS

- - -

09/14/10 Supernatant pump up and down, flow meter issues

-

The light and camera were replaced Supernatant pump started

Supernatant flow meter instrument reading a factor of 10 low

Supernatant volume based on AN-101 Enraf

-

Lights and camera replaced

Supernatant flow meter instrument reading a factor of 10 low.

09/15/10 Slurry pump active

Supernatant pump active

Post transfer radiation survey issues

-

Retrieval re-started after flow meter repaired

Transfer line radiation readings above procedure limit

-

Flow meter repaired

Transfer line radiation issues

09/16/10 Slurry pump active

Supernatant pump active

Supernatant pump over speed alarm issues

-

Dose rates measured at C-4 on berm reading 5 mrem/hr exceeding criteria.

Several spurious over speed alarms.

-

Supernatant pump over speed alarm issues

Transfer line radiation issues

09/17/10 Slurry pump active

Supernatant pump active

Radiation survey issues

-

Radiological Control reports difference in open and closed window readings where slurry line meets POR134

-

Transfer line radiation issues

09/18/10 No activities this date - - - -

09/19/10 No activities this date - - - -

09/20/10 POR137 Slurry Pump LDE issues

Slurry pump active

Supernatant pump active

-

No issues reported

-

LDE issues

09/21/10 Supernatant pump up and down, low flow

Slurry pump up and down, low flow -

No issues reported -

Slurry pump low flow

Supernatant pump low flow

09/22/10 Slurry pump active

Supernatant pump active

Riser 1 camera issues

Radiation surveys issues

Supernatant pump over speed alarm issues

C-Farm access restriction during retrieval lifted due to IH sampling being within acceptable ranges

Speed sensor troubleshooting for supernatant pump commenced in the afternoon. A 20 second time average appears to have eliminated the spurious alarms.

-

Camera issues

Supernatant pump low flow

09/23/10 Slurry pump active

Supernatant pump active

Direction received to control supernatant pump speed with FCV, not HPU

-

HPU used to control supernatant pump, causing an expected shutdown.

Directed to use FCV-102 to control supernatant flow.

-

Supernatant pump flow control issues

09/24/10 Slurry pump active

Supernatant pump active

- Supernatant soak planned for weekend for center

'bowl' of tank while sluicing is continued to focus on the raised edges.

- -

09/25/10 Supernatant pump up and down, low flow and high flow

Slurry pump active -

No issues reported -

Slurry pump low flow

Supernatant pump flow issues

09/26/10 Slurry pump active

Supernatant pump up and down, low flow

POR008 exhauster making noise

-

No issues reported

-

Supernatant pump flow issues

09/27/10 Supernatant pump up and down, low flow

Slurry pump up and down, low flow -

Supernatant pumped down to obtain an as-of-yet best MBD, but still negative.

- Slurry pump low flow

Supernatant pump low flow

09/28/10 Supernatant pump up and down, low flow and high flow -

The supernatant pump continues to have problems and shut down several times on high speed.

- Supernatant pump flow issues

09/29/10 Supernatant pump up and down, low flow and high flow -

Transfers for volume displacement were performed

- Supernatant pump flow issues

RPP-RPT-58298 3/9/2015 - 7:47 AM 70 of 106

Page 71: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

C-3

241-C-111 Bulk Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

09/30/10 Slurry pump active

Supernatant pump active

POR03 CAM sample issues

POR03 stack air temperature issues

POR03 shutdown low CAM sample flow

Slurry pump shutdown POR03 "stack air temp hi" alarm

Transfers for volume displacement were performed

-

POR03 issues

10/01/10 Leaking gasket on water manifold Added hot water First hot water addition started

The tank headspace fogged up and visibility was lost.

- Water system leak

10/02/10 No activities this date - - - -

10/03/10 No activities this date - - - -

10/04/10 No issues reported - - - -

10/05/10 POR03 shut down Workers in C-Farm sprayed by condensate from POR03, farm evacuated

- - POR03 issues

10/06/10 No issues reported - - - -

10/07/10 POR03 CAM sample flow low

Power outage in 200E Tank Farms - - -

POR03 CAM issues

200E Area wide power outage

10/08/10 POR137 LDA issues

POR03 CAM has water in it - - -

POR137 LDA issues

POR03 CAM issues

10/09/10 No activities this date - - - -

10/10/10 No activities this date - - - -

10/11/10 POR03 CAM issues - - - POR03 CAM issues

10/12/10 No issues reported - - - -

10/13/10 POR03 CAM issues - - - POR03 CAM issues

10/14/10 No issues reported - Riser 7 camera and light replaced. - Riser 7 camera and light issues.

10/15/10 No issues reported Camera and light replaced in Riser 7 - - -

10/16/10 No activities this date - - - -

10/17/10 No activities this date - - - -

10/18/10 POR008 shut down differential pressure issues -

POR-008 exhauster coupling broken, parts ordered.

- POR008 issues

10/19/10 No issues reported - - - -

10/20/10 No issues reported - - - -

10/21/10 Coffman light amp and voltage issues

-

Hot water added to tank C-111

-

Coffman light issues

10/22/10 POR03 low vacuum alarm -

111 °F water added to tank C-111.

Visibility in the tank was poor due to fog, even before the water addition.

- POR03 issues

10/23/10 No activities this date - - - -

10/24/10 No activities this date - - - -

10/25/10 No issues reported

-

Water initially appeared clear, but by afternoon, the sluicing stream appeared reddish brown, indicating some solids have been picked up (may be sludge near the pump inlet below the hard waste layer).

- -

10/26/10 Water truck PTO pump leaking -

Operators report that no changes in the tank waste are evident.

- Water leak issues

10/27/10 Supernatant pump start-up issues - Supernatant pump would not start. - Supernatant pump start-up issues

10/28/10 Riser 7 Coffman light issues

Supernatant pump started -

The pump started up on the first attempt -

Riser 7 Coffman light issues

10/29/10 Camera issues -

Observation of video of the waste in the area below the camera shows that the waste surface appears to have been abraded.

- Camera issues

10/30/10 No activities this date - - - -

RPP-RPT-58298 3/9/2015 - 7:47 AM 71 of 106

Page 72: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

C-4

241-C-111 Bulk Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

10/31/10 No activities this date - - - -

11/01/10 No activities this date - - - -

11/02/10 No issues reported -

Started sluicing with sluicer #1.

Switched to sluicer #2. - -

11/03/10 Attempted to lower the pump but pump did not go down.

-

Sluicer switched from #2 to #1

Camera is having problems panning,

Attempted to lower the pump but pump did not go down.

-

Attempted to lower the pump but pump did not go down.

11/04/10 Material balance Discrepancy math issues

Supernatant pump low speed shut down issues - Attempted to restart the supernatant pump;

speed would not increase and the pump timed out and shut down

- Supernatant pump low speed shut down issues

11/05/10 No issues reported - Final transfer line flushes were performed. - -

RPP-RPT-58298 3/9/2015 - 7:47 AM 72 of 106

Page 73: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

D-1

APPENDIX D

241-C-112 BULK RETRIEVAL ACTIVITIES EVENTS

RPP-RPT-58298 3/9/2015 - 7:47 AM 73 of 106

Page 74: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

D-2

241-C-112 Bulk Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

12/27/2011 Procedure / line-up issues

Supernatant pump start issues

Supernatant pump start issues Supernatant pump start issues No issues reported. Procedure / line-up issues

Supernatant pump start issues

12/28/2011

Supernatant pump start issues

POR008 low flow issues (power outage)

AN VTP issues (power outage)

POR008 shut down issues

AN VTP issues

Supernatant pump start issues No issues reported. Supernatant pump start issues

Power outage issues

12/29/2011 Sluicer #2 motion issues

Slurry pump shut down low flow

No issues reported. No issues reported. No issues reported. Sluicer #2 motion issues

Slurry pump shut down low flow

12/30/2011 Hydraulic fluid leak from the ERSS - Hydraulic fluid leak from the ERSS Hydraulic fluid leak from the ERSS ERSS hydraulic leak issues

12/31/2011 No activities this date - - - -

01/01/2012 No activities this date - - - -

01/02/2012 No activities this date - - - -

01/03/2012 Cold weather issues POR134 - No issues reported. No issues reported. Cold weather issues POR134

01/04/2012 Hydraulic fluid leak from the ERSS - Hydraulic fluid leak from the ERSS No issues reported. ERSS hydraulic leak issues

01/05/2012 Riser 3 camera issues

- Hydraulic fluid leak from the ERSS No issues reported. Riser 3 camera issues

ERSS hydraulic leak issues

01/06/2012 Riser 3 camera issues - No issues reported. No issues reported. Riser 3 camera issues

01/07/2012 No activities this date - - No issues reported. -

01/08/2012 No activities this date - - No issues reported. -

01/09/2012 No issues reported. - No issues reported. No issues reported. -

01/10/2012 No activities this date - Riser 6 camera issues No issues reported. Riser 6 camera issues

01/11/2012 Cold weather issues

Hydraulic fluid leak from the ERSS is from the nozzle positioning controls

- Hydraulic fluid leak from the ERSS Hydraulic fluid leak from the ERSS is from the

nozzle positioning controls ERSS hydraulic leak issues

01/12/2012

POR008 seal pot issues

Riser 3 camera and riser 6 light issues -

Riser 3 camera issues No issues reported. POR008 seal pot issues

Riser 3 camera issues

Riser 6 light issues

01/13/2012 POR008 seal pot issues

Cold weather issues -

No issues reported. No issues reported. POR008 seal pot issues

Cold weather issues

01/14/2012 No activities this date POR008 seal pot issues - No issues reported. POR008 seal pot issues

01/15/2012 No activities this date - - No issues reported. -

01/16/2012 POR008 seal pot issues POR008 seal pot issues Hydraulic fluid leak from the ERSS No issues reported. ERSS hydraulic leak issues

POR008 seal pot issues

01/17/2012 AN VTP issues - AN VTP issues No issues reported. AN VTP issues

01/18/2012 No issues reported.

- Cold weather issues Cold weather related issues

Ventilation system issues

Cold weather issues

01/19/2012 No activities this date Cold weather issues Cold weather issues Cold weather related issues

Ventilation system issues

Cold weather issues

01/20/2012 No activities this date

- Cold weather issues Cold weather related issues

Ventilation system issues

Cold weather issues

01/21/2012 No activities this date - - No issues reported. -

01/22/2012 No activities this date - - No issues reported. -

01/23/2012 POR008 seal pot issues - POR008 seal pot low issues No issues reported. POR008 seal pot issues

01/24/2012 Cold weather issues - No issues reported. No issues reported. Cold weather issues

01/25/2012 AN VTP issues - AN VTP issues No issues reported. AN VTP issues

01/26/2012 No activities this date AN VTP issues AN VTP issues No issues reported. AN VTP issues

01/27/2012 No activities this date AN VTP issues AN VTP issues No issues reported. AN VTP issues

01/28/2012 No activities this date - - No issues reported. -

01/29/2012 No activities this date Cold weather issues - No issues reported. Cold weather issues

01/30/2012

Supernatant pump start issues

-

AN VTP issues

Cold weather issues

Supernatant pump start issues

No issues reported. AN VTP issues

Cold weather issues

Supernatant pump start issues

RPP-RPT-58298 3/9/2015 - 7:47 AM 74 of 106

Page 75: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

D-3

241-C-112 Bulk Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

01/31/2012 Slurry pump flow rate issues

Procedure issues -

Slurry pump flow rate issues

Procedure issues

No issues reported. Slurry pump flow rate issues

Procedure issues

02/01/2012 Hydraulic lines to the ERSS disconnected - Hydraulic lines to the ERSS disconnected Hydraulic lines to the ERSS disconnected ERSS hydraulic leak issues

02/02/2012 No issues reported. - No issues reported. No issues reported. -

02/03/2012 No issues reported. - No issues reported. No issues reported. -

02/04/2012 No activities this date - - No issues reported. -

02/05/2012 No activities this date - - No issues reported. -

02/06/2012 No issues reported. Cold weather issues No issues reported. No issues reported. Cold weather issues

02/07/2012

Cold weather issues

Supernatant pump start issues

POR137 PI-101 out of service

-

Cold weather issues

Supernatant pump start issues

No issues reported. Cold weather issues

Supernatant pump start issues

POR137 issues

02/08/2012

Network outage issues – unable to get temperatures

-

Network outage issues – unable to get temperatures

No issues reported. Network outage issues – unable to get temperatures

02/09/2012 POR132 PM issues - No issues reported. No issues reported. POR132 PM issues

02/10/2012 Slurry pump flow rate issues - No issues reported. No issues reported. Slurry pump flow rate issues

02/11/2012 No activities this date - - No issues reported. -

02/12/2012 No activities this date - - No issues reported. -

02/13/2012 Supernatant pump start issues - Supernatant pump start issues No issues reported. Supernatant pump start issues

02/14/2012 Supernatant pump start issues - Supernatant pump start issues No issues reported. Supernatant pump start issues

02/15/2012 Riser 3 and Riser 6 light issues, Riser 3 camera issues

- Supernatant pump start issues

Riser 3 and Riser 6 light issues, Riser 3 camera issues

No issues reported. Supernatant pump start issues

Riser 3 and Riser 6 light issues, Riser 3 camera issues

02/16/2012 No issues reported. Riser 3 and Riser 6 light issues, Riser 3 camera

issues

No issues reported. No issues reported. Riser 3 and Riser 6 light issues, Riser 3 camera issues

02/17/2012 No issues reported. - No issues reported. No issues reported. -

02/18/2012 No activities this date - - No issues reported. -

02/19/2012 No activities this date - - No issues reported. -

02/20/2012 No issues reported. - No issues reported. No issues reported. -

02/21/2012 Slurry pump flow rate issues - No issues reported. No issues reported. Slurry pump flow rate issues

02/22/2012 Power spike issues Power spike issues Power spike issues No issues reported. Power spike issues

02/23/2012 Slurry pump flow rate issues - No issues reported. No issues reported. Slurry pump flow rate issues

02/24/2012 Slurry pump movement issues

Slurry pump flow rate issues -

Slurry pump movement issues No issues reported. Slurry pump movement issues

Slurry pump flow rate issues

02/25/2012 No activities this date - - No issues reported. -

02/26/2012 No activities this date - No issues reported. No issues reported. -

02/27/2012 Slurry pump movement issues AN VTP issues Slurry pump movement issues No issues reported. Slurry pump movement issues

02/28/2012 No activities this date - Supernatant pump HPU issues No issues reported. Supernatant pump HPU issues

02/29/2012 Slurry pump HPU issues - No issues reported. No issues reported. Slurry pump HPU issues

03/01/2012 No issues reported. Slurry pump HPU issues Slurry pump HPU issues No issues reported. Slurry pump HPU issues

03/02/2012 No activities this date - - No issues reported. -

03/03/2012 No activities this date - - No issues reported. -

03/04/2012 No activities this date - - No issues reported. -

03/05/2012 No issues reported. AN Enraf issues AN Enraf issues No issues reported. AN Enraf issues

03/06/2012 No issues reported. AN Enraf issues AN Enraf issues No issues reported. AN Enraf issues

03/07/2012 No issues reported. - No issues reported. No issues reported. -

03/08/2012 No issues reported. - Ahlberg light issues No issues reported. Ahlberg light issues

03/09/2012 Power outage issues

Ahlberg lights installed

Power outage issues Riser 6 light issues

Power outage issues

No issues reported. Riser 6 light issues

Power outage issues

RPP-RPT-58298 3/9/2015 - 7:47 AM 75 of 106

Page 76: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

D-4

241-C-112 Bulk Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Findings

03/10/2012 No activities this date - - No issues reported. -

03/11/2012 No activities this date - No issues reported. No issues reported. -

03/12/2012 No issues reported. - POR008 differential pressure issues No issues reported. POR008 differential pressure issues

03/13/2012 No issues reported. - No issues reported. No issues reported. -

03/14/2012 Slurry pump movement issues - No issues reported. No issues reported. Slurry pump movement issues

03/15/2012 No issues reported. - No issues reported. No issues reported. -

03/16/2012 No issues reported. - No issues reported. No issues reported. -

03/17/2012 No activities this date - - No issues reported. -

03/18/2012 No activities this date - - No issues reported. -

03/19/2012 Riser 3 and Riser 6 camera and light issues - Visibility issues No issues reported. Riser 3 and Riser 6 camera and light issues

03/20/2012 No activities this date - Visibility issues No issues reported. Visibility issues

03/21/2012 Riser 3 and Riser 6 camera and light issues - No issues reported. No issues reported. Riser 3 and Riser 6 camera and light issues

03/22/2012 No activities this date - - No issues reported. -

03/23/2012 POR008 planned outage - POR008 planned outage No issues reported. -

03/24/2012 No activities this date - - No issues reported. -

03/25/2012 No activities this date - - No issues reported. -

03/26/2012 Slurry pump movement issues - Slurry pump movement issues No issues reported. Slurry pump movement issues

03/27/2012 Supernatant pump flow rate issues Supernatant pump flow rate issues Supernatant pump flow rate issues No issues reported. Supernatant pump flow rate issues

03/28/2012 No issues reported. - No issues reported. No issues reported. -

03/29/2012 Slurry pump low flow issues

Supernatant pump speed issues

Light plant drip pan full of water and oil Slurry pump low flow issues

Supernatant pump speed issues

No issues reported. Slurry pump low flow issues

Supernatant pump speed issues

03/30/2012 No issues reported. - No issues reported. No issues reported. -

03/31/2012 No activities this date - - No issues reported. -

04/01/2012 No activities this date - - No issues reported. -

04/02/2012

Supernatant pump flow rate issues -

Supernatant pump flow rate issues

Riser 3 light issues

POR008 differential pressure issues

No issues reported. Supernatant pump flow rate issues

Riser 3 light issues

POR008 differential pressure issues

04/03/2012 Riser 3 and riser 6 light issues

Supernatant pump flow rate issues -

Supernatant pump speed issues

Riser 3 and riser 6 light issues

No issues reported. Supernatant pump flow rate issues

Riser 3 and riser 6 light issues

04/04/2012 No issues reported. - No issues reported. No issues reported. -

04/05/2012 No activities this date - POR008 differential pressure issues No issues reported. POR008 differential pressure issues

04/06/2012 Slurry pump HPU POR272 hydraulic leak issues - Slurry pump HPU POR272 hydraulic leak issues No issues reported. Slurry pump hydraulic leak issues

04/07/2012 No activities this date - - No issues reported. -

04/08/2012 No activities this date - - No issues reported. -

04/09/2012 No activities this date - No issues reported. No issues reported. -

04/10/2012 Supernatant pump flow rate issues

- Supernatant pump flow rate issues

Riser 3 light issues

No issues reported. Supernatant pump flow rate issues

Riser 3 light issues

04/11/2012 Supernatant pump flow rate issues

Supernatant pump stop issues -

Supernatant pump stop issues No issues reported. Supernatant pump flow rate issues

Supernatant pump stop issues

04/12/2012 Riser 3 and 6 light issues - Riser 3 and 6 light issues No issues reported. Riser 3 and 6 light issues

04/13/2012 Riser 3 and 6 light issues

Noise level issues at supernatant pump -

No issues reported. No issues reported. Riser 3 and 6 light issues

Noise level issues at supernatant pump

04/14/2012 No activities this date - - No issues reported. -

04/15/2012 No activities this date - - No issues reported. -

04/16/2012 POR303 TI issues - No issues reported. No issues reported. POR303 TI issues

04/17/2012 No issues reported. - No issues reported. No issues reported. -

04/18/2012 No issues reported. - No issues reported. No issues reported. -

RPP-RPT-58298 3/9/2015 - 7:47 AM 76 of 106

Page 77: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

E-1

APPENDIX E

241-C-112 HARD HEEL RETRIEVAL ACTIVITIES EVENTS

RPP-RPT-58298 3/9/2015 - 7:47 AM 77 of 106

Page 78: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

E-2

241-C-112 HHR Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Activity Findings

11/18/2013 Caustic Addition – p 1

- Caustic Addition ~12,000 gal 50 wt% caustic followed

by water line flushes are added to initiate caustic pre-soak process

Normal Operating Conditions

-

11/19/2013 Slurry pump speed and flow irregularity issues – p 2/3

- Caustic Addition Recirculation of caustic Off Normal Conditions Slurry pump speed and flow

irregularity issues

11/20/2013

POR008 pre-filter differential pressure issues – p 3/4

Riser 6 camera issues – p 3

Enraf reading issues – p 5 -

Recirculation Recirculation of caustic Off Normal Conditions POR008 pre-filter differential pressure issues

Camera and light issues

Enraf reading issues

11/21/2013 Cold weather related issues in boxes and slurry pump HPU –

p 5 -

Recirculation Recirculation of caustic Off Normal Conditions Cold weather related issues slurry pump HPU

11/22/2013 Cold weather related issues in boxes and slurry pump HPU –

p 6/7 -

Recirculation Recirculation of caustic Off Normal Conditions Cold weather related issues slurry pump HPU

11/23/2013 No activities this date - - - - -

11/24/2013 No activities this date - - - - -

11/25/2013 Cameras replaced in Risers 3 and 6 and light in Riser 3 – p 7

Slurry pump active – p 8 -

Recirculation Recirculation of caustic Normal Operating Conditions -

11/26/2013 Slurry pump active – p 8

Cold weather related issues slurry pump HPU – p 8/9 -

Recirculation Recirculation of caustic Off Normal Conditions Cold weather related issues slurry pump HPU

11/27/2013 POR008 pre-filter differential pressure issues – p 10

- Recirculation Recirculation of caustic Off Normal Conditions POR008 pre-filter differential

pressure issues

11/28/2013 No activities this date - - - - -

11/29/2013 No activities this date - - - - -

11/30/2013 No activities this date - - - - -

12/01/2013 No activities this date - - - - -

12/02/2013 POR008 pre-filter differential pressure issues – p 11/12/13

- Recirculation Recirculation of caustic Off Normal Conditions POR008 pre-filter differential

pressure issues

12/03/2013 Riser 3 camera issues – p 14 - - - Off Normal Conditions Camera and light issues

12/04/2013 Cold weather related issues in boxes and slurry pump HPU –

p 15 -

Recirculation Recirculation of caustic Off Normal Conditions Cold weather related issues slurry pump HPU

12/05/2013 No activities this date - - - - -

12/06/2013 No activities this date - - - - -

12/07/2013 No activities this date - - - - -

12/08/2013 No activities this date - - - - -

12/09/2013

Cold weather related issues in boxes and slurry pump HPU – p 16

Enraf reading issues – p 16

POR117 indication issues – p 16

POR318 circuit 5 tripped – p 16

- - -

Off Normal Conditions Cold weather related issues slurry pump HPU

Enraf reading issues

POR117 indication issues

POR318 circuit issues

12/10/2013 POR008 seal pot issues – p 17 - - - Off Normal Conditions POR008 seal pot issues

12/11/2013 POR008 seal pot issues – p 17 - Transfer of caustic out Transfer of caustic out Off Normal Conditions POR008 seal pot issues

12/12/2013 POR008 seal pot issues – p 18 - - - Off Normal Conditions POR008 seal pot issues

12/13/2013 No activities this date - - - - -

12/14/2013 No activities this date - - - - -

12/15/2013 No activities this date - - - - -

12/16/2013 No activities this date - - - - -

12/17/2013 No activities this date - - - - -

12/18/2013 No issues reported - Sluicing Sluicing Normal Operating Conditions -

12/19/2013 Material balance discrepancy issues – p 21/22

AN VTP issues – p 22 - Sluicing Sluicing 6.1 Off Normal Conditions Material balance discrepancy

issues

AN VTP issues

RPP-RPT-58298 3/9/2015 - 7:47 AM 78 of 106

Page 79: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

E-3

241-C-112 HHR Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Activity Findings

12/20/2013 Material balance discrepancy issues – p 22

AN VTP issues – p 23 - Sluicing Sluicing 6.2 Off Normal Conditions Material balance discrepancy

issues

AN VTP issues

12/21/2013 No activities this date - - - - -

12/22/2013 No activities this date - - - - -

12/23/2013 POR334 temperature issues – p 23

- Sluicing Sluicing 6.3 Off Normal Conditions Temperature monitoring

issues

12/24/2013 No activities this date - - - - -

12/25/2013 No activities this date - - - - -

12/26/2013 Material balance discrepancy issues – p 24

- Sluicing Sluicing 6.4 Off Normal Conditions Material balance discrepancy

issues

12/27/2013 No issues reported - Sluicing Sluicing Normal Operating Conditions -

12/28/2013 No activities this date - - - - -

12/29/2013 No activities this date - - - - -

12/30/2013

Cold weather related issues slurry pump HPU – p 26

POR137 FQI-101A reset issues – p 26 -

Sluicing Sluicing 6.5 Off Normal Conditions Cold weather related issues slurry pump HPU

12/31/2013 No issues reported

- Sluicing

Hot water dissolution

Sluicing

Hot water dissolution

Normal Operating Conditions -

01/01/2014 No activities this date - - - - -

01/02/2014 No issues reported - Sluicing Sluicing Normal Operating Conditions -

01/03/2014 No issues reported - Hot water dissolution Hot water dissolution Normal Operating Conditions -

01/04/2014 No activities this date - - - - -

01/05/2014 No activities this date - - - - -

01/06/2014 No activities this date - Caustic Addition Caustic Addition - -

01/07/2014 POR008 high differential pressure issues – p 30

- Caustic Addition Caustic Addition 6.6 Off Normal Conditions POR008 differential pressure

issues

01/08/2014 POR008 high differential pressure issues – p 30

- Recirculation of caustic Recirculation of caustic 6.7 Off Normal Conditions POR008 differential pressure

issues

01/09/2014 No issues reported - Recirculation of caustic Recirculation of caustic Normal Operating Conditions -

01/10/2014 Slurry pump positioning issues – p 32 - Recirculation of caustic Recirculation of caustic 6.8 Off Normal Conditions Slurry pump positioning issues

01/11/2014 No activities this date - - - - -

01/12/2014 No activities this date - - - - -

01/13/2014

No issues reported

-

Recirculation of caustic

Procedural issues with the prerequisites

ERSS #1 nozzle caught on stiffener ring and bent

In tank light burned out

Recirculation of caustic Normal Operating Conditions

-

01/14/2014

Sluicer #2 positioning issues – p 33

Light issues – p 34

ERSS #1 nozzle caught on stiffener ring and bent – p 34

ERSS #2 nozzle plugging – p 34

-

Grab sampling

ERSS #2 nozzle plugging

Recirculation of caustic

Sluicer response issues

Sluicer nozzle discovered to be bent

6.9 Off Normal Conditions Sluicer positioning issues

In tank lighting issues

ERSS #1 nozzle caught on stiffener ring and bent

ERSS #2 nozzle plugging

01/15/2014 No issues reported - ERSS #2 nozzle plugging Recirculation of caustic Normal Operating Conditions -

01/16/2014

POR008 high demister/heater differential pressure issues – p 36

Visibility issues – p 36 -

ERSS #2 shut down

ERSS #1 used

POR008 high demister/heater differential pressure issues

Visibility issues

Recirculation of caustic 6.10 Off Normal Conditions POR008 differential pressure issues

Visibility issues

01/17/2014 POR008 high demister/heater differential pressure issues –

p 37

Visibility issues – p 37

- POR008 high demister/heater differential

pressure issues

Visibility issues

Recirculation of caustic 6.11 Off Normal Conditions POR008 differential pressure issues

Visibility issues

01/18/2014 No activities this date - - - - -

RPP-RPT-58298 3/9/2015 - 7:47 AM 79 of 106

Page 80: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

E-4

241-C-112 HHR Retrieval Activities Events

Date Retrieval/Closure Operations Engineer Log Base Operations Shift Manager Log Process Engineer Log Completion Report Activity Findings

01/19/2014 No activities this date - - - - -

01/20/2014 Jersey barricade missing – p 38 - No issues reported. Recirculation of caustic Normal Operating Conditions Jersey barricade missing

01/21/2014 Cold weather related issues slurry pump HPU – p 39

Sluicer #2 plugging issues – p 39 -

No issues reported. Recirculation of caustic 6.12 Off Normal Conditions Cold weather related issues slurry pump HPU

Sluicer #2 plugging

01/22/2014 No activities this date - - - - -

01/23/2014 Slurry pump flow issues – p 40

- No issues reported. Transfer of caustic out

Sluicing 6.13 Off Normal Conditions Slurry pump flow issues

01/24/2014 Sluicer #2 plugging issues – p 41 - No issues reported. Sluicing 6.14 Off Normal Conditions Sluicer #2 plugging

01/25/2014 No activities this date - - - - -

01/26/2014 No activities this date - - - - -

01/27/2014 POR008 high demister/heater differential pressure issues –

p 42

Radiological control stop work issues – p 43

-

No issues reported. Sluicing 6.15 Off Normal Conditions POR008 differential pressure issues

Radiological conditions issues

01/28/2014 No issues reported

- Volume displacement activities Sluicing

Volume displacement activities

Normal Operating Conditions -

01/29/2014 No issues reported - Flushing Flushing Normal Operating Conditions -

01/30/2014 POR008 differential pressure issues – p 46

- Flushing Flushing 6.16 Off Normal Conditions POR008 differential pressure

issues

01/31/2014 No issues reported - Flushing Flushing Normal Operating Conditions -

RPP-RPT-58298 3/9/2015 - 7:47 AM 80 of 106

Page 81: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

F-1

APPENDIX F

241-C-101 BULK RETRIEVAL EVENT ANALYSIS

RPP-RPT-58298 3/9/2015 - 7:47 AM 81 of 106

Page 82: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

F-2

241-C-101 Bulk Retrieval Activities Event Analysis

Date Hydraulic Leak Ventilation

Issues Camera

Supernatant Pump Start-Up /

Shut-Down

Supernatant Pump Flow

Slurry Pump Flow

Slurry Pump Movement

Sluicer / ERSS / ARM Movement

Hydraulic Fluid Temperature

Miscellaneous Total

12/10/2012 1 1

12/11/2012 1 1

12/18/2012 1 1

12/19/2012 1 1 2

12/20/2012 1 1 2

12/21/2012 0

12/26/2012 1 1

12/27/2012 1 1 2

12/28/2012 1 1 2

01/02/2013 1 2 3

01/03/2013 1 1

01/04/2013 0

01/07/2013 0

01/08/2013 1 1

01/09/2013 1 1 2

01/10/2013 1 1

01/11/2013 1 1 1 3

01/14/2013 1 1 2

01/15/2013 1 1 2

01/16/2013 1 1 2

01/17/2013 1 1

01/18/2013 1 1

01/21/2013 0

01/22/2013 1 1

01/23/2013 1 1

02/11/2013 1 1

02/12/2013 1 1

02/13/2013 1 1

02/14/2013 1 1

02/19/2013 1 1

02/20/2013 1 1 2

02/21/2013 1 1

02/22/2013 1 1

02/25/2013 1 1

02/26/2013 1 1 2

02/28/2013 1 1 2

03/01/2013 1 1 1 3

03/02/2013 1 1

03/05/2013 0

03/06/2013 0

03/07/2013 0

03/08/2013 1 1 2

03/11/2013 1 1

03/12/2013 1 1 2

03/13/2013 1 1

03/14/2013 1 1

03/15/2013 0

RPP-RPT-58298 3/9/2015 - 7:47 AM 82 of 106

Page 83: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

F-3

241-C-101 Bulk Retrieval Activities Event Analysis

Date Hydraulic Leak Ventilation

Issues Camera

Supernatant Pump Start-Up /

Shut-Down

Supernatant Pump Flow

Slurry Pump Flow

Slurry Pump Movement

Sluicer / ERSS / ARM Movement

Hydraulic Fluid Temperature

Miscellaneous Total

03/18/2013 0

03/19/2013 0

05/05/2013 0

05/09/2013 1 1

05/13/2013 1 1

05/14/2013 1 1 2

05/15/2013 2 2

05/16/2013 1 1 2

05/17/2013 1 1

05/31/2013 1 1

06/03/2013 1 1

06/04/2013 1 1

06/05/2013 1 1 1 1 4

06/06/2013 0

06/07/2013 1 1

06/10/2013 1 1

06/11/2013 1 1

06/12/2013 1 1 2

06/13/2013 0

06/14/2013 1 1

06/17/2013 1 1

06/18/2013 1 1

06/19/2013 1 1

06/20/2013 1 1

07/09/2013 1 2 3

07/10/2013 0

07/11/2013 1 1 2

07/16/2013 0

07/22/2013 1 1

07/23/2013 1 1

07/24/2013 1 1

07/25/2013 1 1 1 3

07/26/2013 0

08/07/2013 2 2

08/08/2013 1 1

08/09/2013 0

08/12/2013 1 1

08/13/2013 0

08/14/2013 1 1

08/15/2013 1 1

08/16/2013 1 1

08/19/2013 1 1

08/20/2013 1 1

08/21/2013 2 2

08/26/2013 0

09/06/2013 0

09/09/2013 1 1 2

RPP-RPT-58298 3/9/2015 - 7:47 AM 83 of 106

Page 84: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

F-4

241-C-101 Bulk Retrieval Activities Event Analysis

Date Hydraulic Leak Ventilation

Issues Camera

Supernatant Pump Start-Up /

Shut-Down

Supernatant Pump Flow

Slurry Pump Flow

Slurry Pump Movement

Sluicer / ERSS / ARM Movement

Hydraulic Fluid Temperature

Miscellaneous Total

09/10/2013 0

09/11/2013 1 1

09/12/2013 1 1

09/24/2013 0

09/28/2013 0

09/29/2013 0

09/30/2013 0

Number of Events 8 17 14 0 4 20 3 1 21 22 110

RPP-RPT-58298 3/9/2015 - 7:47 AM 84 of 106

Page 85: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

G-1

APPENDIX G

241-C-107 RETRIEVAL ACTIVITIES EVENT ANALYSIS

RPP-RPT-58298 3/9/2015 - 7:47 AM 85 of 106

Page 86: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

G-2

241-C-107 Retrieval Activities Event Analysis

Date Hydraulic Leak Ventilation

Issues Camera

Supernatant Pump Start-Up /

Shut-Down

Supernatant Pump Flow

Slurry Pump Flow

Slurry Pump Movement

Sluicer / ERSS / ARM Movement

Hydraulic Fluid Temperature

Miscellaneous Total

09/27/2011 1 2 3

09/29/2011 1 1

10/06/2011 1 1 2

10/07/2011 1 1

10/10/2011 1 1 2

10/11/2011 1 1

10/12/2011 1 1

10/17/2011 1 1

10/18/2011 1 1 2

10/19/2011 1 1 1 3

10/20/2011 1 1 1 3

10/26/2011 1 1

10/27/2011 1 1 1 3

10/28/2011 1 1 2 4

11/02/2011 1 1

11/03/2011 0

01/25/2012 0

04/20/2012 1 1

05/01/2012 1 1

05/09/2012 0

05/10/2012 1 1 2

05/17/2012 1 1 2

05/18/2012 1 1

05/21/2012 1 1

05/22/2012 1 1

05/23/2012 1 1

05/24/2012 1 1

05/29/2012 1 1 1 3

05/30/2012 1 1 2

06/03/2012 1 1

06/04/2012 1 1 1 3

06/05/2012 1 3 4

06/06/2012 1 1 2

06/07/2012 1 1 1 3

06/08/2012 1 1 1 3

06/11/2012 2 1 3

06/12/2012 2 1 1 4

06/13/2012 1 1 2

06/14/2012 1 1 2

06/18/2012 1 1

06/20/2012 0

06/21/2012 1 1 2

06/25/2012 1 1

06/26/2012 1 1 3 5

06/27/2012 1 1 2

06/28/2012 1 1 2

06/29/2012 0

RPP-RPT-58298 3/9/2015 - 7:47 AM 86 of 106

Page 87: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

G-3

241-C-107 Retrieval Activities Event Analysis

Date Hydraulic Leak Ventilation

Issues Camera

Supernatant Pump Start-Up /

Shut-Down

Supernatant Pump Flow

Slurry Pump Flow

Slurry Pump Movement

Sluicer / ERSS / ARM Movement

Hydraulic Fluid Temperature

Miscellaneous Total

07/02/2012 1 1 2

07/03/2012 1 1 2

07/05/2012 1 1

07/06/2012 2 2

07/09/2012 1 1

07/10/2012 1 1 1 3

07/11/2012 1 1 1 3

07/12/2012 1 1 2

07/13/2012 1 1 2

07/16/2012 1 1

07/17/2012 1 1 1 3

07/18/2012 1 1 2 4

07/19/2012 1 1

07/20/2012 1 1

07/26/2012 1 1 1 3

07/27/2012 0

07/30/2012 1 1 1 1 4

07/31/2012 1 1 2

08/06/2012 1 1 1 1 1 5

08/07/2012 1 1

08/08/2012 1 1

08/20/2012 1 1

08/21/2012 1 1

08/27/2012 1 1 2

08/28/2012 1 1 2

08/29/2012 2 2

08/30/2012 1 1 2

08/31/2012 1 1 2

09/04/2012 1 1

09/13/2012 1 1 1 3

09/19/2012 1 1 1 3

09/20/2012 1 1 1 3

09/21/2012 1 1

05/17/2013 1 1

05/20/2013 1 1 2

05/21/2013 1 2 3

05/22/2013 1 1

05/28/2013 0

05/29/2013 1 1 2

05/30/2013 1 1

06/26/2013 0

06/27/2013 1 1

06/28/2013 1 1 2

07/01/2013 1 1

07/02/2013 1 1

07/03/2013 1 1 1 2 5

07/05/2013 1 1 2

RPP-RPT-58298 3/9/2015 - 7:47 AM 87 of 106

Page 88: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

G-4

241-C-107 Retrieval Activities Event Analysis

Date Hydraulic Leak Ventilation

Issues Camera

Supernatant Pump Start-Up /

Shut-Down

Supernatant Pump Flow

Slurry Pump Flow

Slurry Pump Movement

Sluicer / ERSS / ARM Movement

Hydraulic Fluid Temperature

Miscellaneous Total

07/08/2013 0

07/12/2013 0

07/15/2013 2 2

07/16/2013 1 1

07/17/2013 0

07/22/2013 1 1

07/24/2013 0

01/27/2014 0

01/28/2014 1 1

01/29/2014 1 1 1 3

01/30/2014 1 1

02/04/2014 1 1

02/10/2014 1 1

02/11/2014 1 1 2

02/12/2014 1 1

02/13/2014 1 1 2

02/14/2014 1 1

02/18/2014 1 1 2

02/19/2014 1 1

02/20/2014 1 1

02/21/2014 1 1

02/24/2014 1 1 2

02/25/2014 1 1 2

02/26/2014 1 1 2

02/27/2014 1 1

02/28/2014 1 1

03/03/2014 1 1

03/04/2014 1 1 2

03/05/2014 1 1

03/06/2014 1 1 2

03/07/2014 1 1

03/10/2014 1 2 3

03/11/2014 1 1 2

03/12/2014 1 1 2

03/13/2014 1 1

03/14/2014 1 1

03/17/2014 1 1 2

03/25/2014 1 1

03/26/2014 1 1

03/27/2014 1 1

03/28/2014 1 1

04/23/2014 0

Number of Events 16 29 2 5 17 70 9 13 10 55 226

RPP-RPT-58298 3/9/2015 - 7:47 AM 88 of 106

Page 89: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

H-1

APPENDIX H

241-C-111 BULK RETRIEVAL ACTIVITIES EVENT ANALYSIS

RPP-RPT-58298 3/9/2015 - 7:47 AM 89 of 106

Page 90: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

H-2

241-C-111 Bulk Retrieval Activities Event Analysis

Date Hydraulic Leak Ventilation

Issues Camera

Supernatant Pump Start-Up /

Shut-Down

Supernatant Pump Flow

Slurry Pump Flow

Slurry Pump Movement

Sluicer / ERSS / ARM Movement

Hydraulic Fluid Temperature

Miscellaneous Total

09/14/2010 1 1 2

09/15/2010 1 1

09/16/2010 1 1

09/17/2010 1 1

09/20/2010 1 1

09/21/2010 1 1 2

09/22/2010 1 1 2

09/23/2010 1 1

09/24/2010 0

09/25/2010 1 1

09/26/2010 1 1 2

09/27/2010 1 1 2

09/28/2010 1 1

09/29/2010 1 1

09/30/2010 1 1

10/01/2010 1 1

10/04/2010 0

10/05/2010 1 1

10/06/2010 0

10/07/2010 1 1

10/08/2010 1 1

10/11/2010 1 1

10/12/2010 0

10/13/2010 1 1

10/14/2010 1 1

10/15/2010 0

10/18/2010 1 1

10/19/2010 0

10/20/2010 0

10/21/2010 1 1

10/22/2010 1 1

10/25/2010 0

10/26/2010 1 1

10/27/2010 1 1

10/28/2010 1 1

10/29/2010 1 1

11/02/2010 0

11/03/2010 1 1 2

11/04/2010 1 1 2

11/05/2010 0

Number of Events 0 9 7 1 11 2 1 0 0 6 37

RPP-RPT-58298 3/9/2015 - 7:47 AM 90 of 106

Page 91: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

I-1

APPENDIX I

241-C-112 BULK RETRIEVAL ACTIVITIES EVENT ANALYSIS

RPP-RPT-58298 3/9/2015 - 7:47 AM 91 of 106

Page 92: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

I-2

241-C-112 Bulk Retrieval Activities Event Analysis

Date Hydraulic Leak Ventilation

Issues Camera

Supernatant Pump Start-Up /

Shut-Down

Supernatant Pump Flow

Slurry Pump Flow

Slurry Pump Movement

Sluicer / ERSS / ARM Movement

Hydraulic Fluid Temperature

Miscellaneous Total

12/27/2011 1 1 2

12/28/2011 1 1 2

12/29/2011 1 1 2

12/30/2011 1 1

01/03/2012 1 1

01/04/2012 1 1

01/05/2012 1 1

01/06/2012 1 1

01/09/2012 0

01/10/2012 1 1

01/11/2012 1 1

01/12/2012 1 1 2

01/13/2012 1 1 2

01/16/2012 1 1 2

01/17/2012 1 1

01/18/2012 0

01/23/2012 1 1

01/24/2012 1 1

01/25/2012 1 1

01/30/2012 1 1

01/31/2012 1 1 2

02/01/2012 1 1

02/02/2012 0

02/03/2012 0

02/06/2012 0

02/07/2012 1 1 2

02/08/2012 1 1

02/09/2012 1 1

02/10/2012 1 1

02/13/2012 1 1

02/14/2012 1 1

02/15/2012 1 1

02/16/2012 0

02/17/2012 0

02/20/2012 0

02/21/2012 1 1

02/22/2012 1 1

02/23/2012 1 1

02/24/2012 1 1 2

02/27/2012 1 1

02/29/2012 1 1

03/01/2012 0

03/05/2012 1 1

03/06/2012 1 1

03/07/2012 0

03/08/2012 1 1

03/09/2012 1 1

RPP-RPT-58298 3/9/2015 - 7:47 AM 92 of 106

Page 93: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

I-3

241-C-112 Bulk Retrieval Activities Event Analysis

Date Hydraulic Leak Ventilation

Issues Camera

Supernatant Pump Start-Up /

Shut-Down

Supernatant Pump Flow

Slurry Pump Flow

Slurry Pump Movement

Sluicer / ERSS / ARM Movement

Hydraulic Fluid Temperature

Miscellaneous Total

03/12/2012 1 1

03/13/2012 0

03/14/2012 1 1

03/15/2012 0

03/16/2012 0

03/19/2012 1 1

03/20/2012 1 1

03/21/2012 1 1

03/23/2012 0

03/26/2012 1 1

03/27/2012 1 1

03/28/2012 0

03/29/2012 1 1 2

03/30/2012 0

04/02/2012 1 1 1 3

04/03/2012 1 1 2

04/04/2012 0

04/06/2012 1 1

04/10/2012 1 1 2

04/11/2012 1 1 2

04/12/2012 1 1

04/13/2012 1 1 2

04/16/2012 1 1

04/17/2012 0

04/18/2012 0

Number of Events 6 9 15 7 7 6 4 1 4 10 69

RPP-RPT-58298 3/9/2015 - 7:47 AM 93 of 106

Page 94: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

J-1

APPENDIX J

241-C-112 HARD HEEL RETRIEVAL ACTIVITIES EVENT ANALYSIS

RPP-RPT-58298 3/9/2015 - 7:47 AM 94 of 106

Page 95: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

J-2

241-C-112 HHR Activities Event Analysis

Date Hydraulic Leak Ventilation

Issues Camera

Supernatant Pump Start-Up /

Shut-Down

Supernatant Pump Flow

Slurry Pump Flow

Slurry Pump Movement

Sluicer / ERSS / ARM Movement

Hydraulic Fluid Temperature

Miscellaneous Total

11/18/2013 0

11/19/2013 1 1

11/20/2013 1 1 1 3

11/21/2013 1 1

11/22/2013 1 1

11/25/2013 1 1

11/26/2013 1 1

11/27/2013 1 1

12/02/2013 1 1

12/03/2013 1 1

12/04/2013 1 1

12/09/2013 1 3 4

12/10/2013 1 1

12/11/2013 1 1

12/12/2013 1 1

12/19/2013 1 1 2

12/20/2013 1 1 2

12/23/2013 1 1

12/26/2013 1 1

12/27/2013 0

12/30/2013 1 1 2

12/31/2013 0

01/02/2014 0

01/03/2014 0

01/07/2014 1 1

01/08/2014 1 1

01/09/2014 0

01/10/2014 1 1

01/13/2014 0

01/14/2014 1 1 2 4

01/15/2014 0

01/16/2014 1 1 2

01/17/2014 1 1 2

01/20/2014 1 1

01/21/2014 1 1 2

01/23/2014 1 1

01/24/2014 1 1

01/27/2014 1 1 2

01/28/2014 0

01/29/2014 0

01/30/2014 1 1

01/31/2014 0

Number of Events 0 14 4 0 0 2 1 1 8 16 46

RPP-RPT-58298 3/9/2015 - 7:47 AM 95 of 106

Page 96: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

K-1

APPENDIX K

EVALUATED RETRIEVAL ACTIVITIES EVENT ANALYSIS

RPP-RPT-58298 3/9/2015 - 7:47 AM 96 of 106

Page 97: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

K-2

Retrieval Activities Event Analysis

Date Hydraulic Leak Ventilation

Issues Camera

Supernatant Pump Start-Up /

Shut-Down

Supernatant Pump Flow

Slurry Pump Flow

Slurry Pump Movement

Sluicer / ERSS / ARM Movement

Hydraulic Fluid Temperature

Miscellaneous Total

09/14/2010 1 1 2

09/15/2010 1 1

09/16/2010 1 1

09/17/2010 1 1

09/20/2010 1 1

09/21/2010 1 1 2

09/22/2010 1 1 2

09/23/2010 1 1

09/24/2010 0

09/25/2010 1 1

09/26/2010 1 1 2

09/27/2010 1 1 2

09/28/2010 1 1

09/29/2010 1 1

09/30/2010 1 1

10/01/2010 1 1

10/04/2010 0

10/05/2010 1 1

10/06/2010 0

10/07/2010 1 1

10/08/2010 1 1

10/11/2010 1 1

10/12/2010 0

10/13/2010 1 1

10/14/2010 1 1

10/15/2010 0

10/18/2010 1 1

10/19/2010 0

10/20/2010 0

10/21/2010 1 1

10/22/2010 1 1

10/25/2010 0

10/26/2010 1 1

10/27/2010 1 1

10/28/2010 1 1

10/29/2010 1 1

11/02/2010 0

11/03/2010 1 1 2

11/04/2010 1 1 2

11/05/2010 0

09/27/2011 1 2 3

09/29/2011 1 1

10/06/2011 1 1 2

10/07/2011 1 1

10/10/2011 1 1 2

10/11/2011 1 1

10/12/2011 1 1

RPP-RPT-58298 3/9/2015 - 7:47 AM 97 of 106

Page 98: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

K-3

Retrieval Activities Event Analysis

Date Hydraulic Leak Ventilation

Issues Camera

Supernatant Pump Start-Up /

Shut-Down

Supernatant Pump Flow

Slurry Pump Flow

Slurry Pump Movement

Sluicer / ERSS / ARM Movement

Hydraulic Fluid Temperature

Miscellaneous Total

10/17/2011 1 1

10/18/2011 1 1 2

10/19/2011 1 1 1 3

10/20/2011 1 1 1 3

10/26/2011 1 1

10/27/2011 1 1 1 3

10/28/2011 1 1 2 4

11/02/2011 1 1

11/03/2011 0

12/27/2011 1 1 2

12/28/2011 1 1 2

12/29/2011 1 1 2

12/30/2011 1 1

01/03/2012 0

01/04/2012 1 1

01/05/2012 1 1

01/06/2012 1 1

01/09/2012 0

01/10/2012 1 1

01/11/2012 1 1

01/12/2012 1 1 2

01/13/2012 1 1 2

01/16/2012 1 1 2

01/17/2012 1 1

01/18/2012 0

01/23/2012 1 1

01/24/2012 1 1

01/25/2012 1 1

01/30/2012 1 1

01/31/2012 1 1 2

02/01/2012 1 1

02/02/2012 0

02/03/2012 0

02/06/2012 0

02/07/2012 1 1

02/08/2012 1 1

02/09/2012 1 1

02/10/2012 1 1

02/13/2012 1 1

02/14/2012 1 1

02/15/2012 1 1

02/16/2012 0

02/17/2012 0

02/20/2012 0

02/21/2012 1 1

02/22/2012 1 1

02/23/2012 1 1

RPP-RPT-58298 3/9/2015 - 7:47 AM 98 of 106

Page 99: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

K-4

Retrieval Activities Event Analysis

Date Hydraulic Leak Ventilation

Issues Camera

Supernatant Pump Start-Up /

Shut-Down

Supernatant Pump Flow

Slurry Pump Flow

Slurry Pump Movement

Sluicer / ERSS / ARM Movement

Hydraulic Fluid Temperature

Miscellaneous Total

02/24/2012 1 1 2

02/27/2012 1 1

02/29/2012 1 1

03/01/2012 0

03/05/2012 1 1

03/06/2012 1 1

03/07/2012 0

03/08/2012 1 1

03/09/2012 1 1

03/12/2012 1 1

03/13/2012 0

03/14/2012 1 1

03/15/2012 0

03/16/2012 0

03/19/2012 1 1

03/20/2012 1 1

03/21/2012 1 1

03/23/2012 0

03/26/2012 1 1

03/27/2012 1 1

03/28/2012 0

03/29/2012 1 1 2

03/30/2012 0

04/02/2012 1 1 1 3

04/03/2012 1 1 2

04/04/2012 0

04/06/2012 1 1

04/10/2012 1 1 2

04/11/2012 1 1 2

04/12/2012 1 1

04/13/2012 1 1 2

04/16/2012 1 1

04/17/2012 0

04/18/2012 0

04/20/2012 1 1

05/01/2012 1 1

05/09/2012 0

05/10/2012 1 1 2

05/17/2012 1 1 2

05/18/2012 1 1

05/21/2012 1 1

05/22/2012 1 1

05/23/2012 2 2

05/24/2012 2 2

05/29/2012 1 1 1 3

05/30/2012 1 1 2

06/03/2012 1 1

RPP-RPT-58298 3/9/2015 - 7:47 AM 99 of 106

Page 100: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

K-5

Retrieval Activities Event Analysis

Date Hydraulic Leak Ventilation

Issues Camera

Supernatant Pump Start-Up /

Shut-Down

Supernatant Pump Flow

Slurry Pump Flow

Slurry Pump Movement

Sluicer / ERSS / ARM Movement

Hydraulic Fluid Temperature

Miscellaneous Total

06/04/2012 1 2 1 4

06/05/2012 1 3 4

06/06/2012 1 1 2

06/07/2012 1 1 2

06/08/2012 1 1 1 3

06/11/2012 2 1 3

06/12/2012 2 1 1 4

06/13/2012 1 1 2

06/14/2012 1 1

06/18/2012 1 1

06/20/2012 0

06/21/2012 4 1 5

06/25/2012 1 1

06/26/2012 1 1 3 5

06/27/2012 1 1 2

06/28/2012 1 1 2

06/29/2012 0

07/02/2012 1 1 2

07/03/2012 1 1 2

07/05/2012 1 1

07/06/2012 2 2

07/09/2012 1 1

07/10/2012 1 1 1 3

07/11/2012 1 1 1 3

07/12/2012 1 1 2

07/13/2012 1 1 2

07/16/2012 1 1

07/17/2012 1 1 1 1 4

07/18/2012 3 1 2 6

07/19/2012 1 1

07/20/2012 1 1

07/26/2012 1 1 1 3

07/27/2012 0

07/30/2012 1 1 1 1 1 5

07/31/2012 1 1 2

08/06/2012 1 2 1 1 5

08/07/2012 1 1

08/08/2012 1 1

08/20/2012 1 1

08/21/2012 1 1

08/27/2012 1 1 2

08/28/2012 1 1 2

08/29/2012 1 1

08/30/2012 1 1

08/31/2012 1 1

09/04/2012 1 1

09/13/2012 1 1 1 3

RPP-RPT-58298 3/9/2015 - 7:47 AM 100 of 106

Page 101: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

K-6

Retrieval Activities Event Analysis

Date Hydraulic Leak Ventilation

Issues Camera

Supernatant Pump Start-Up /

Shut-Down

Supernatant Pump Flow

Slurry Pump Flow

Slurry Pump Movement

Sluicer / ERSS / ARM Movement

Hydraulic Fluid Temperature

Miscellaneous Total

09/19/2012 1 1 1 3

09/20/2012 1 1 3 5

09/21/2012 1 1

12/10/2012 1 1

12/11/2012 1 1

12/18/2012 1 1

12/19/2012 1 1 2

12/20/2012 1 1 2

12/21/2012 0

12/26/2012 1 1

12/27/2012 1 1 2

12/28/2012 1 1 2

01/02/2013 1 2 3

01/03/2013 1 1

01/04/2013 0

01/07/2013 0

01/08/2013 1 1

01/09/2013 1 1 2

01/10/2013 1 1

01/11/2013 1 1 1 3

01/14/2013 1 1 2

01/15/2013 1 1 2

01/16/2013 1 1 2

01/17/2013 1 1

01/18/2013 1 1

01/21/2013 0

01/22/2013 1 1

01/23/2013 1 1

02/11/2013 1 1

02/12/2013 1 1

02/13/2013 1 1

02/14/2013 1 1

02/19/2013 1 1

02/20/2013 1 1 2

02/21/2013 1 1

02/22/2013 1 1

02/25/2013 1 1

02/26/2013 1 1 2

02/28/2013 1 1 2

03/01/2013 1 1 1 3

03/02/2013 1 1

03/05/2013 0

03/06/2013 0

03/07/2013 0

03/08/2013 1 1 2

03/11/2013 1 1

03/12/2013 1 1 2

RPP-RPT-58298 3/9/2015 - 7:47 AM 101 of 106

Page 102: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

K-7

Retrieval Activities Event Analysis

Date Hydraulic Leak Ventilation

Issues Camera

Supernatant Pump Start-Up /

Shut-Down

Supernatant Pump Flow

Slurry Pump Flow

Slurry Pump Movement

Sluicer / ERSS / ARM Movement

Hydraulic Fluid Temperature

Miscellaneous Total

03/13/2013 1 1

03/14/2013 1 1

03/15/2013 0

03/18/2013 0

03/19/2013 0

05/05/2013 0

05/09/2013 1 1

05/13/2013 1 1

05/14/2013 1 1 2

05/15/2013 2 2

05/16/2013 1 1 2

05/17/2013 1 1 2

05/20/2013 1 1 2

05/21/2013 1 2 3

05/22/2013 1 1

05/28/2013 0

05/29/2013 1 1 2

05/30/2013 1 1

05/31/2013 1 1

06/03/2013 1 1

06/04/2013 1 1

06/05/2013 1 1 1 1 4

06/06/2013 0

06/07/2013 1 1

06/10/2013 1 1

06/11/2013 1 1

06/12/2013 1 1 2

06/13/2013 0

06/14/2013 1 1

06/17/2013 1 1

06/18/2013 1 1

06/19/2013 1 1

06/20/2013 1 1

06/26/2013 0

06/27/2013 1 1

06/28/2013 1 1 2

07/02/2013 1 1

07/03/2013 1 1 1 2 5

07/05/2013 1 1 2

07/08/2013 0

07/09/2013 1 2 3

07/10/2013 0

07/11/2013 1 1 2

07/12/2013 0

07/15/2013 2 2

07/16/2013 1 1

07/17/2013 0

RPP-RPT-58298 3/9/2015 - 7:47 AM 102 of 106

Page 103: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

K-8

Retrieval Activities Event Analysis

Date Hydraulic Leak Ventilation

Issues Camera

Supernatant Pump Start-Up /

Shut-Down

Supernatant Pump Flow

Slurry Pump Flow

Slurry Pump Movement

Sluicer / ERSS / ARM Movement

Hydraulic Fluid Temperature

Miscellaneous Total

07/22/2013 1 1 2

07/23/2013 1 1

07/24/2013 0

07/24/2013 1 1

07/25/2013 1 1 1 3

07/26/2013 0

08/07/2013 2 2

08/08/2013 1 1

08/09/2013 0

08/12/2013 1 1

08/13/2013 0

08/14/2013 1 1

08/15/2013 1 1

08/16/2013 1 1

08/19/2013 1 1

08/20/2013 1 1

08/21/2013 2 2

08/26/2013 0

09/06/2013 0

09/09/2013 1 1 2

09/10/2013 0

09/11/2013 1 1

09/12/2013 1 1

09/24/2013 0

09/28/2013 0

09/29/2013 0

09/30/2013 0

11/18/2013 0

11/19/2013 1 1

11/20/2013 1 1 1 3

11/21/2013 1 1

11/22/2013 1 1

11/25/2013 1 1

11/26/2013 1 1

11/27/2013 1 1

12/02/2013 1 1

12/03/2013 1 1

12/04/2013 0

12/09/2013 3 3

12/10/2013 1 1

12/11/2013 1 1

12/12/2013 1 1

12/19/2013 1 1 2

12/20/2013 1 1 2

12/23/2013 0

12/26/2013 1 1

12/27/2013 0

RPP-RPT-58298 3/9/2015 - 7:47 AM 103 of 106

Page 104: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

K-9

Retrieval Activities Event Analysis

Date Hydraulic Leak Ventilation

Issues Camera

Supernatant Pump Start-Up /

Shut-Down

Supernatant Pump Flow

Slurry Pump Flow

Slurry Pump Movement

Sluicer / ERSS / ARM Movement

Hydraulic Fluid Temperature

Miscellaneous Total

12/30/2013 1 1 2

12/31/2013 0

01/02/2014 0

01/03/2014 0

01/07/2014 1 1

01/08/2014 1 1

01/09/2014 0

01/10/2014 1 1

01/13/2014 0

01/14/2014 1 1 2 4

01/15/2014 0

01/16/2014 1 1 2

01/17/2014 1 1 2

01/20/2014 1 1

01/21/2014 1 1

01/23/2014 1 1

01/24/2014 1 1

01/27/2014 1 1 2

01/28/2014 1 1

01/29/2014 1 1 1 3

01/30/2014 1 1 2

01/31/2014 0

02/04/2014 1 1

02/10/2014 1 1

02/11/2014 1 1

02/12/2014 1 1

02/13/2014 1 1 1 3

02/14/2014 1 1

02/18/2014 1 1 2

02/19/2014 1 1

02/20/2014 1 1

02/21/2014 1 1

02/24/2014 1 1

02/25/2014 1 1 2

02/26/2014 1 1 2

02/27/2014 1 1

02/28/2014 1 1

03/03/2014 1 1

03/04/2014 1 1 2

03/05/2014 1 1

03/06/2014 1 1 2

03/07/2014 1 1

03/10/2014 1 2 3

03/11/2014 1 1 2

03/12/2014 1 1 2

03/13/2014 1 1

03/14/2014 1 1

RPP-RPT-58298 3/9/2015 - 7:47 AM 104 of 106

Page 105: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

K-10

Retrieval Activities Event Analysis

Date Hydraulic Leak Ventilation

Issues Camera

Supernatant Pump Start-Up /

Shut-Down

Supernatant Pump Flow

Slurry Pump Flow

Slurry Pump Movement

Sluicer / ERSS / ARM Movement

Hydraulic Fluid Temperature

Miscellaneous Total

03/17/2014 1 1 2

03/25/2014 1 1

03/26/2014 1 1

03/27/2014 1 1

03/28/2014 1 1

04/23/2014 0

Number of Events 28 86 42 13 34 102 20 18 35 109 487

RPP-RPT-58298 3/9/2015 - 7:47 AM 105 of 106

Page 106: DOCUMENT RELEASE AND CHANGE FORM Doc No: Rev. · rpp-rpt-58298 3/9/2015 - 7:47 am 1 of 106. jrr 3/9/15. document release and change form . doc no: rpp-rpt-58298. rev. 00. 2 spf-001

RPP-RPT-58298, Rev. 0

1-1

ATTACHMENT 1

REFERENCE MATERIALS

Due to the size of the documents, the reference materials included in this attachment are

provided electronically in the Smart Plant Foundation database with this report.

RPP-RPT-58298 3/9/2015 - 7:47 AM 106 of 106