March 2003
Andy Gowans - UK RA
doc.: IEEE 802.18-03/015r0
Submission
Bands A & B update
Andy Gowans Private Business Systems Unit
UK Radiocommunications Agency
March 2003
Andy Gowans - UK RA
doc.: IEEE 802.18-03/015r0
Submission
Structure of the presentation
UK updateIR 2006 SI 2003 No.74
ETSIEN 301 893DFS parametersEffect on UK IR2006
March 2003
Andy Gowans - UK RA
doc.: IEEE 802.18-03/015r0
Submission
IR2006: Short Range, Broadband, Data Services (High performance RLAN) operating in the frequency range 5150 - 5725 MHzCompleted EU notification October 2002.Includes interim arrangements to allow use of equipment with limited DFS capabilities ( i.e no radar detection)Devices in the mobile service associated with Mobile/Nomadic and Local Area Network applications)
UK Interface requirement
March 2003
Andy Gowans - UK RA
doc.: IEEE 802.18-03/015r0
Submission
IR2006 Interim Arrangement Band A (5150-5350MHz)
Reduce the power level: where no TPC nor full DFS can be implemented equipment shall only operate at a maximum power level of 60 mW. Where TPC is implemented equipment shall only operate at a maximum power level of 120 mW
Limited DFS Equipment operating in this band must implement a random channel access mechanism capable of operating on all 8 carrier frequencies.
INDOOR ONLY
VALID FOR 12 TO 18 MONTHS FOR NEW EQUIPMENT !
March 2003
Andy Gowans - UK RA
doc.: IEEE 802.18-03/015r0
Submission
IR2006 Full ArrangementBands A (5150-5350MHz)
PSD shall not exceed 10mW/MHz. Max E.I.R.P 200mWINDOOR ONLY
Band B (5470-5725MHz)PSD shall not exceed 50mW/MHz. Max E.I.R.P 1W
Both Bands A & BDFS. Equipment operating in this band must implement a random channel access mechanism capable of operating on the all carrier frequencies within 330 MHz of the spectrum in bands A and B. Shall prevent co-channel operation in the presence of Radar signals. TPC shall be employed to ensure a mitigation factor of at least 3 dB on the average output power of the network.OFDM Mandatory
see http://www.radio.gov.uk/publication/interface/
March 2003
Andy Gowans - UK RA
doc.: IEEE 802.18-03/015r0
Submission
New Statutory Instrument
New draft SI to allow both Licence Exempt use and provision of public networks put before parliament in January 2003.SI 2003 No.74 Became law on the 12th of February 2003.Allows the Licence Exempt use of Equipment that meets the requirements of IR 2006.Allows the provision of public service.
see http://www.legislation.hmso.gov.uk/stat.htm
March 2003
Andy Gowans - UK RA
doc.: IEEE 802.18-03/015r0
Submission
ETSI
EN 301 893going through two step approval processcurrently doing the final comment resolution before voting.Looking to resolve comments April meeting and submit for vote.
March 2003
Andy Gowans - UK RA
doc.: IEEE 802.18-03/015r0
Submission
DFS parameters from EN Annex D
Table D.1: DFS requirement values
Parameter Value Channel Availability Check Time 60 s Channel Move Time 10 s Channel Closing Transmission Time 220? ms
March 2003
Andy Gowans - UK RA
doc.: IEEE 802.18-03/015r0
Submission
DFS parameters from EN Annex D
Table D.2: Interference Threshold values
Master Device
Maximum Transmit Power Value >200 mW-64 dBm
200 mW -62 dBm
March 2003
Andy Gowans - UK RA
doc.: IEEE 802.18-03/015r0
Submission
Slave device threshold ?Example 1:Maximum Transmit Power Value>200 mW -64 dBm200 mW N/AExample 2:Maximum Transmit Power Value>200 mW -62 dBm121 - 200 mW -55 dBm120 mW N/AExample 3:Maximum Transmit Power Value>500 mW -62 dBm201 - 500 mW -59 dBm101 - 200 mW-55 dBm51 - 100 mW-52 dBm50 mW N/A
March 2003
Andy Gowans - UK RA
doc.: IEEE 802.18-03/015r0
Submission
Ad hoc networking threshold
Maximum Transmit Power Value>200 mW -64 dBm26 - 200 mW -62 dBm mW N/A
Radar detection is not mandated in 5150 - 5250 MHz.
March 2003
Andy Gowans - UK RA
doc.: IEEE 802.18-03/015r0
Submission
Conclusions
May have to make alterations to IR2006 once DFS thresholds are completed.