Case Title - [Safety Case Title] COIN Numbers - [Case] / [SVC Number] Operator – [Company Name] Environmental Topic Assessor – [Name] TRIM 2014/xxxxx: [Topic] Assessment Template – DRAFT for working – Feb 2015 P:\Documents\Recovered My documents\OED & Inspectorate Issues\Competent Authority\SEMS Assessment\2. Environmental Assessment Template – Design & Notification - DRAFT Feb 2015.doc DESIGN OR RELOCATION NOTIFICATION ENVIRONMENTAL OPERATIONAL CONTROL REQUIREMENTS - ASSESSMENT SUMMARY NAI – Non Acceptance Issue Regulatory Requirement Clarification Required NAI Required Conclusion 7. [Design Notification] Requirements a) Regulation 15 Design and relocation notifications for production installation b) Regulation 19 - Design notification and safety case for non-production installation to be converted c) Schedule 5 - Particulars to be included in a design notification or a relocation notification

Dn Environmental Operational Control Inspection Template

  • Upload
    john

  • View
    8

  • Download
    7

Embed Size (px)

DESCRIPTION

amework Safety Case

Citation preview

  • Case Title - [Safety Case Title] COIN Numbers - [Case] / [SVC Number] Operator [Company Name] Environmental Topic Assessor [Name]

    TRIM 2014/xxxxx: [Topic] Assessment Template DRAFT for working Feb 2015 P:\Documents\Recovered My documents\OED & Inspectorate Issues\Competent Authority\SEMS Assessment\2. Environmental Assessment Template Design & Notification - DRAFT Feb 2015.doc

    DESIGN OR RELOCATION NOTIFICATION ENVIRONMENTAL OPERATIONAL CONTROL REQUIREMENTS - ASSESSMENT SUMMARY

    NAI Non Acceptance Issue

    Regulatory Requirement Clarification Required

    NAI Required

    Conclusion

    7. [Design Notification] Requirements

    a) Regulation 15 Design and relocation notifications for production installation

    b) Regulation 19 - Design notification and safety case for non-production installation to be converted

    c) Schedule 5 - Particulars to be included in a design notification or a relocation notification

  • Case Title - [Safety Case Title] COIN Numbers - [Case] / [SVC Number] Operator [Company Name] Environmental Topic Assessor [Name]

    TRIM 2014/xxxxx: [Topic] Assessment Template DRAFT for working Feb 2015 P:\Documents\Recovered My documents\OED & Inspectorate Issues\Competent Authority\SEMS Assessment\2. Environmental Assessment Template Design & Notification - DRAFT Feb 2015.doc

    ENVIRONMENTAL OPERATIONAL CONTROL ASSESSMENT TEMPLATE

    Work Instructions

    This document will be available to inspectors to record their assessment of the environmental management system, safety and environmentally critical elements, OPEP and other aspects relevant to this discipline contained in a Design Notification or Relocation Notification submitted under SCR2015. It identifies the specific regulations contained within SCR2015 that relate to these topics and identifies what the CA expects to find within a design notification or relocation notification to meet those requirements. The document is drafted to complement the guidance being produced to support the regulations as well as existing topic sector guidance.

    Non Acceptance Issue A Non Acceptance Issue (NAI) is a deficiency in the demonstration made for health, safety and environment within the safety case, which, if not resolved, will prevent the case from being accepted under the relevant statutory provisions. Non Acceptance Issues require formal communication with the operator to ensure they are dealt with in the appropriate manner giving them every chance to address the deficiency. The Operator will be given 14 calendar days to respond.

    Clarification A Clarification is an explanation provided to an inspector, by an operator, to allow them to be confident of their interpretation of the demonstration provided within the safety case.

    Clarifications are carried out as part of the routine of assessment work and should be raised with the operator swiftly and informally and by direct means of communication (by telephone / email) and would normally expect a prompt response.

    In complex cases the requirement for clarification can be pre-empted by setting up a meeting between the operator and relevant topic specialists to facilitate discussion and understanding between the 2 parties before the case is submitted or in the very early stages of the assessment.

    Where any uncertainty relates to an area that has the potential to lead to a Non-Acceptance Issue a request for Clarification would not be appropriate and the issue should be identified as a Non-Acceptance Issue and raised immediately in the appropriate fashion

    Relevant Pre-Existing Guidance

    OPEP Guidance Reference:

    X.X [Chapter Title]

    Heading Heading

  • Case Title - [Safety Case Title] COIN Numbers - [Case] / [SVC Number] Operator [Company Name] Environmental Topic Assessor [Name]

    TRIM 2014/xxxxx: [Topic] Assessment Template DRAFT for working Feb 2015 P:\Documents\Recovered My documents\OED & Inspectorate Issues\Competent Authority\SEMS Assessment\2. Environmental Assessment Template Design & Notification - DRAFT Feb 2015.doc

    1. [Design Notification] Requirements a) SCR2015 Regulation 15 Design and relocation notifications for production installation

    SCR2015 Regulatory Requirement

    C

    l

    a

    r

    i

    f

    i

    c

    a

    t

    i

    o

    n

    N

    A

    I

    16.(1) The operator of a production installation which is to be established in relevant waters must (a) prepare a design notification containing the particulars specified in Schedule 5

    Assessment Criteria / Minimum Information SC Ref Criteria met / Not Met Assessment Comments Has owner prepared and submitted a design notification Cross reference with Schedule 5

    Does the Environmetnal Statement that has been submitted and reviewed agree with the proposals in the Design or Relocation Notiifcation

    b) SCR2015 Regulation 19 Design notification and safety case for non-production installation to be converted

    SCR2015 Regulatory Requirement

    C

    l

    a

    r

    i

    f

    i

    c

    a

    t

    i

    o

    n

    N

    A

    I

    19.(1) Where a non-production installation is to be converted to enable it to be operated as a production installation, the owner must (a) prepare a design notification in respect of the proposed conversion containing, subject to paragraph (3), the particulars specified in Schedule 5 not contained in any current safety case for that installation.

    Assessment Criteria / Minimum Information SC Ref Criteria met / Not Met Assessment Comments Has owner prepared and submitted a design notification

    c) SCR2015 Schedule 5 Particulars to be included in a Design Notification or a Relocation Notification

    SCR2015 Regulatory Requirement

    C

    l

    a

    r

    i

    f

    i

    c

    a

    t

    i

    o

    n

    N

    A

    I

    9. A description of the verification scheme prepared pursuant to sub-paragraph (b) of paragraph (2) of regulation 19 and an initial list of the safety and environmental-critical elements and their required performance.

    10. A general description of the safety and environmental management system by which the intended major accident risk control measures are to be maintained in good effect.

    Assessment Criteria / Minimum Information SC Ref Criteria met / Not Met Assessment Comments Does the Design Notification or Relocation Notification include a

  • Case Title - [Safety Case Title] COIN Numbers - [Case] / [SVC Number] Operator [Company Name] Environmental Topic Assessor [Name]

    TRIM 2014/xxxxx: [Topic] Assessment Template DRAFT for working Feb 2015 P:\Documents\Recovered My documents\OED & Inspectorate Issues\Competent Authority\SEMS Assessment\2. Environmental Assessment Template Design & Notification - DRAFT Feb 2015.doc

    description of the verification scheme and provide an initial list of SECE and their required performance Does the Design Notification or Relocation Notification include a general description of the (S)EMS and the risk control measures to prevent a MA (MEI) and how they will be maintained in good effect.