Page 1 of 8 DLRCC TRAFFIC NEWS Saturday, 18 th July 2015 – to – Friday, 24 th July 2015 A public service provided by the Transportation & Water Services Department of Dún Laoghaire-Rathdown County Council. Listed below are noteworthy road works, which the Traffic and Road Safety Section has been informed of. Details are supplied as per information received by 16:00 hrs on the preceding Thursday. Emergency road works cannot be forecast. » New Entry Estimate of Potential Disruption: # Update *** major ** medium * minor » Longitude Festival at Marlay Park ** The Longitude Festival at Marlay Park will take place on: (Friday to Sunday) - 17 th , 18 th and 19 th July, 2015. Directions to the Event are as follows: Traffic from M1, N2, N3, N4, N7, N81 travel via M50 to Ballinteer Interchange (southern end of M50) - then first exit off roundabout - to the Green Route / Grange Road and Concert Car Parks. Traffic from N11 and South Dublin via Leopardstown Road, Sandyford Industrial Estate and new Drummartin Link Road to Green Route / Grange Road and Concert Car Parks. Traffic from Dublin City Centre travel via N81 to Terenure Crossroads - then Rathfarnham Road to Grange Road / College Road and Concert Car Parks. EVENTS

DLRCoCo Traffic News 18.07.15 to 24.07.15

Embed Size (px)

DESCRIPTION

A public service provided by the Transportation & Water Services Department of Dún Laoghaire-Rathdown County Council. Listed below are noteworthy road works, which the Traffic and Road Safety Section has been informed of. Details are supplied as per information received by 16:00 hrs on the preceding Thursday. Emergency road works cannot be forecast.

Citation preview

Page 1 of 8

D L R C C T R A F F I C N E W S

Saturday, 18th July 2015 – to – Friday, 24th July 2015

A public service provided by the Transportation & Water Services Department of

Dún Laoghaire-Rathdown County Council. Listed below are noteworthy road works, which

the Traffic and Road Safety Section has been informed of. Details are supplied as per

information received by 16:00 hrs on the preceding Thursday. Emergency road works

cannot be forecast.

» New Entry Estimate of Potential Disruption:

# Update *** major ** medium * minor

» Longitude Festival at Marlay Park **

The Longitude Festival at Marlay Park will take place on: (Friday to Sunday) - 17th, 18th and 19th July, 2015. Directions to the Event are as follows:

Traffic from M1, N2, N3, N4, N7, N81 travel via M50 to Ballinteer Interchange (southern end of M50) - then first exit off roundabout - to the Green Route / Grange Road and Concert Car Parks.

Traffic from N11 and South Dublin via Leopardstown Road, Sandyford Industrial Estate and new Drummartin Link Road to Green Route / Grange Road and Concert Car Parks.

Traffic from Dublin City Centre travel via N81 to Terenure Crossroads - then Rathfarnham Road to Grange Road / College Road and Concert Car Parks.

EVENTS

Page 2 of 8

Section 75 of the Roads Act, 1993 Temporary Closure of Johnstown Road, Cabinteely

Dún Laoghaire-Rathdown County Council has made an order to temporarily close Johnstown Road between the junction with the N11 and the junction at the Old Bray Road, Cabinteely.

The purpose of the closure is to facilitate the Cabinteely Crossroads Céilí – 2015. The closure will be from: 17:00 hrs on Saturday, 25th July to 01:00 hrs on Sunday, 26th July 2015. Pedestrian access will be maintained at all times. The proposed diversion route between Brennanstown Road and the N11 Dual-Carriageway will be via the Old Bray Road and onto the N11, at the junction with Clonkeen Road and vice versa. A Traffic Management Plan will be in place and the diversion will be clearly signposted. Section 75 of the Roads Act, 1993: Temporary Closure of Grove Avenue, Blackrock

Dún Laoghaire-Rathdown County Council has made an order to temporarily close Grove Avenue, Blackrock to through traffic from the entrance of Grove Lawn to the junction of Grove Avenue/Avoca Avenue from Monday, 29th June 2015 to Friday, 24th July 2015. The purpose of the closure is to facilitate the placing of two no. 225mm sewers in the road and associated manholes. Local access will be maintained throughout the works.

The proposed diversion route will be signposted.

A Traffic Management Plan will be in operation for the duration of these works. Section 75 of the Roads Act, 1993 Temporary Closure of St. Peter’s Terrace, Glasthule

Dún Laoghaire-Rathdown County Council has made an order to temporarily close St. Peter’s Terrace (Cul de Sac) Glasthule, from its junction with Adelaide Road from Monday, 13th July 2015 to Friday, 14th August 2015 both dates inclusive.

The purpose of the closure is to facilitate road restoration works and associated works. This work will be done on a phased basis which will allow local access to residents for the duration of the works.

The proposed diversion route will be signposted and further details will be available on our website – www.dlrcoco.ie

A Traffic Management Plan will be in operation for the duration of these works.

ROAD CLOSURES

Page 3 of 8

Section 75 of the Roads Act, 1993 Temporary Closure of Waltham Terrace, Blackrock

Dún Laoghaire-Rathdown County Council has made an order to temporarily close Waltham Terrace (Blackrock) at its junction with Mount Merrion Avenue and Green Road to through traffic from Monday, 13th July 2015 to Friday, 2nd October 2015 both dates inclusive. The purpose of the closure is to facilitate road restoration works and associated works. This work will be done on a phased basis which will allow local access to residents for the full duration of the works. The proposed diversion route will be signposted and further details will be available on our website – www.dlrcoco.ie

A Traffic Management Plan will be in operation for the duration of these works. Section 75 of the Roads Act, 1993 dlr Bay 10km Road Race

Dún Laoghaire-Rathdown County Council has made an order to temporarily close the roads listed below on Monday, 3rd August 2015 in order to facilitate a

10km road race. The race will take the following route: Newtownsmith, Windsor Terrace, Queen’s Road, Crofton Road, Harbour Road, Dunleary Road, Longford Terrace, Seapoint Avenue, Seafield Avenue, Monkstown Road, Carrickbrennan Road, Mounttown Upper, Mounttown Lower, Upper Glenageary Road, Albert Road Upper, Albert Road, St. Catherine’s Road, Castle Park Road, Elton Park, Sandycove Road, Glasthule Road and Link Road. Newtownsmith, Windsor Terrace, Queen’s Road, Crofton Road and Harbour Road will be closed from 06.00 a.m. – 12.30 p.m. and the remaining roads will be subject to a rolling closure as the race progresses between 9.50 a.m. – 12.30 p.m. A Traffic Management Plan will be in place and diversions will be signposted. Full details of the diversions will appear on our website www.dlrcoco.ie

Page 4 of 8

» Section 75 of the Roads Act, 1993 Temporary Closure of the following roads in Dún Laoghaire-Rathdown area ***

Dún Laoghaire-Rathdown County Council are considering the temporary closure

of the following roads to facilitate the Ironman 70.3 Dublin Triathlon event which will take place on Sunday, 9th August 2015 in the administrative area of Dún Laoghaire-Rathdown County Council: Section A: Marine Parade, Otranto Place and Sandycove Avenue West from 07:00hrs to 17:00hrs on Saturday, 8th August 2015. Section B: Windsor Terrace, Newtownsmith, Marine Parade, Otranto Place, Sandycove Avenue West and Sandycove Point from 04:00hrs to11:00hrs on Sunday, 9th August 2015. Section C: Newtownsmith, Queen’s Road, Crofton Road, Dunleary Road, Old Dunleary Road, Longford Terrace, Seapoint Avenue, Newtown Avenue, Temple Road, Frascati Road, Rock Road from 06:30hrs to 10:30hrs on Sunday, 9th August 2015. Any person may lodge an objection in writing in respect of the proposed temporary road closures in the administrative areas of Dún Laoghaire-Rathdown County Council to Dublin City Council, Environment & Transportation Department, Block 2 Floor 6, Civic Offices, Wood Quay, Dublin 8, or by email to [email protected] The closing time and date for receipt of objections is 12:00hrs on: Friday, 24th July 2015.

» N11 – Stillorgan Road (at St. John of God’s) ***

Emergency footpath repairs will take place on the N11 - Stillorgan Road (at St John of God’s) southbound from Tuesday, 21st July 2015 for approximately 1 week. The Bus Lane and Cycle Track will be CLOSED.

A Traffic Management Plan will be in place.

PROPOSED ROAD CLOSURES

ROADWORKS / LANE RESTRICTIONS

Page 5 of 8

# Leopardstown Road – R113 *** Leopardstown Link Road and Roundabout Reconfiguration Scheme

Leopardstown Link Road will OPEN to traffic on Wednesday 22nd July 2015, providing a new access to South County Business Park, Leopardstown Race Course and Leopardstown Park Hospital. The existing access to South County Business Park and Leopardstown Park Hospital off the roundabout will be CLOSED as will the existing access to Leopardstown Race Course. A Traffic Management Plan / (Diversions) will be in place. # Dunleary Road, Dún Laoghaire **

Excavation works and reinstatement of footpaths will commence on Monday, 20th July until Wednesday, 22nd July 2015. A Stop / Go Traffic Management Plan will be in place at the junction of Crofton Road / Clarence Street / Dunleary Road. # Crinken Lane / Dublin Road Junction, Shankill **

Junction improvement works will commence at junction of Crinken Lane/ Dublin Road on Monday, 20th July to Friday, 24th July 2015. A Traffic Management Plan will be in operation. Dundrum By Pass / Main Street Dundrum (nightworks) **

Construction works will take place on the Dundrum By Pass at the junction of Dundrum By Pass with Main Street, Dundrum to facilitate the laying of a gas main. Works will take place at night between 21:30hrs and 06:00hrs beginning on Monday night, 13th July 2015 for a period of approximately five weeks.

A Traffic Management Plan will be in operation for the duration of the works. Cross Avenue, Blackrock *

Dún Laoghaire-Rathdown County Council will undertake a traffic management scheme at the eastern end of Cross Avenue, Blackrock on Monday, 13th July 2015. This includes the construction of an uncontrolled raised crossing and build outs for additional school warning lights. The works will continue for approximately 3 weeks. A Traffic Management Plan will be in operation.

Page 6 of 8

Goatstown Road / Roebuck Road Junction, Goatstown **

Drainage works will take place on Goatstown Road/Roebuck Road Junction from Monday, 22nd June 2015 until end of July between 10:00 and 16:00 hrs. A Traffic Management Plan will be in operation. Frascati Road / Temple Hill Improvement Scheme, Blackrock ***

Construction works for the Frascati Road / Temple Hill Improvement Scheme will continue until August 2015. A new temporary road and junction layout will be in place to facilitate junction improvement works at Temple Hill / Newtownpark Avenue, Blackrock. This will be in place on Temple Hill between Monkstown Road and Newtownpark Avenue junctions. As part of this traffic management plan there will be “No Right Turn” movement allowed from Temple Hill onto Newtownpark Avenue for the duration of these works. A diversion route will be in place via Stradbrook Road, Dean’s Grange Road, Brookville Park and Benamore Road. The new layout and diversion routes will be fully signed for the duration of the construction works on this section of road and junction. It is expected that this new layout will remain in place until Friday, 31st July 2015. A Traffic Management Plan will be in place. Traffic disruption will be kept to a minimum with business as usual. Glenageary Road Upper / Glenageary Road Lower / Sallyglen Road Roundabout ***

Pedestrian crossing upgrading works will take place on Glenageary Road Upper adjacent to the roundabout from Monday, 6th July 2015 until end of July 2015 between 10:00 and 16:00 hrs. A Traffic Management Plan will be in operation for the duration of the works. Public Lighting Lantern and Bracket Upgrade Works **

Public lighting lantern and bracket upgrade works will take place on:

Braemor Road Churchtown Road Taney Road Ballinteer Avenue Dundrum By Pass and Dundrum Road

from Monday, 6th July 2015 until August 2015 between 10:00 to 16:00 hrs and 19:00 to 23:00 hrs.

A Stop / Go Traffic Management Plan will be in operation as required.

Page 7 of 8

Lynwood Estate, Dundrum *

Footpath restoration works will commence in Lynwood Estate on Monday, 6th July 2015 until Friday, 24th July 2015 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation. Thornhill Road, Mount Merrion *

Road restoration works will commence on Thornhill Road on Monday, 6th July 2015 to Friday, 24th July 2015 between 08:00 and 18:00 hrs. A Traffic Management Plan will be in operation. Shanganagh Road Junction / Commons Road / River Road ***

Junction improvement works commenced on-site on Wednesday, 24th June 2015 at the junction of Shanganagh Road / Commons Road / River Road. A Stop /Go Traffic Management Plan will be in place between 10:00 and 16:00 hrs to facilitate road crossings. Works will continue for approximately 6 weeks. A Traffic Management Plan will be in operation for the duration of the works. » Irish Water *

Irish Water meter installation works will continue next week. A Traffic Management Plan will be in operation.

Further information on planned Irish Water works may be obtained from:

Irish Water 1890 278 278 » M50/M11 - Northbound/Southbound

M50: Junction 16 (Cherrywood) to Junction 17 (Bray) - Southbound Lane 1 closure from 22.00 hours on Friday, 17th July 2015 to 06.00 hours on Saturday, 18th July 2015 to facilitate Safety Barrier Repair. M50: Junction 13 (Sandyford) – to M50 SB on ramp - Southbound – On ramp Closure (traffic diverted via J12 Firhouse) from 22.00 hours on Monday, 20th July 2015 to 06:00 hours on Tuesday, 21st July 2015 to facilitate Road Sweeping, Gully Empting, Sign Cleaning.

Page 8 of 8

M50: Junction 13 M50 NB – off ramp to Sandyford - Northbound – Off ramp Closure (traffic diverted via J12 Firhouse) – from 22:00 hours on Monday, 20th July 2015 to 06:00 hours on Tuesday, 21st July 2015 to facilitate Road Sweeping, Gully Empting, Sign Cleaning. M50: Junction 13 Sandyford Rotary – Northbound – Lane 1 Rotary Closure– from 22:00 hours on Monday, 20th July 2015 to 06:00 hours on Tuesday, 21st July 2015 to facilitate Road Sweeping, Gully Empting, Sign Cleaning. M50: Junction 13 Dundrum Rotary – Southbound – Lane 2 Rotary Closure– from 22:00 hours on Tuesday, 21st July 2015 to 06:00 hours on Wednesday, 22nd July 2015 to facilitate Road Sweeping, Gully Empting, Sign Cleaning. M50: SB Off ramp to Dundrum – Southbound – Off ramp Closure (Traffic diverted via Carrickmines) – from 22:00 hours on Wednesday, 22nd July 2015 to 06:00 hours on Thursday, 23rd July 2015 to facilitate Road Sweeping, Gully Empting, Sign Cleaning. M50: Junction 13 Dundrum on ramp to M50 – Northbound – On ramp Closure (Traffic diverted via Carrickmines) – from 22:00 hours on Wednesday, 22nd July 2015 to 06:00 hours on Thursday, 23rd July 2015 to facilitate Road Sweeping, Gully Empting, Sign Cleaning. M50: Junction 14 Leopardstown to J12 Firhouse - Northbound – Lane 3 Closure – from 22:00 hours on Thursday, 23rd July 2015 to 06:00 hours on Friday, 24th July 2015 to facilitate Bridge Inspection. M50: Junction 14 Leopardstown to M50 NB on ramp – Northbound – On ramp Closure (Traffic diverted via Kilgobbin) – from 22:00 hours on Friday, 24th July 2015 to 06:00 hours on Saturday, 25th July 2015 to facilitate Road Sweeping, Gully Empting, Sign Cleaning. M50: Junction 14 Leopardstown to M50 SB on ramp – Southbound – Off ramp Closure (Traffic diverted via Carrickmines) – from 22:00 hours on Friday, 24th July 2015 to 06:00 hours on Saturday, 25th July 2015 to facilitate Road Sweeping, Gully Empting, Sign Cleaning. M50: Junction 14 Leopardstown Rotary – Northbound – Lane 3 Closure – from 22:00 hours on Friday, 24th July 2015 to 06:00 hours on Saturday, 25th July 2015 to facilitate Road Sweeping, Gully Empting, Sign Cleaning. Further information on planned road works along the M50 can be found at: http://m50concession.com/operation-maintenance/planned-road-works/ End