Joe Olewnicki, P.E., Division Chief
Division of Capital Maintenance
What DEP Does
Supplies drinking to New York City+
Protects the water quality of NYC waterways by sewage treatment and storm water management
Protects the air quality of NYC
In general, ensures NYC compliance with the Federal Clean Water Act and Clean Air Act
Bureau of Wastewater Treatment
• Handles and treats all sewage for the 5 boroughs of NYC
• Operates and Maintains
14 Sewage Treatment Plants
6 Sludge Dewatering Facilities
3 CSO Facilities
2 Aeration Facilities
98 Pumping Stations
500+ Outfalls
138 miles of sewage interceptors
BWT Engineering
Division
Director
Bureau Wastewater Treatment
Asset Management & Capital Projects
Project Coordination
Capital Maintenance
Infrastructure Sustainability
Planning
DepartmentEnvironmental
Protection
USEPA NYS-DEC
Typical Sewage Treatment Plant
Major Mechanical Systems
• Main Sewage Pumps
• Other process pumps
• Mechanical Bar Screens
• Process Compressors/Blowers
• Chain & Flight Collectors
• Digester Gas Collection Systems
• Cogen Power Systems
• Emergency Power Systems
• Dewatering Centrifuges
• Solid Handling Conveyor Belts
• HVAC
Division of Capital Maintenance
Division of
Capital Maintenance
Mechanical Engineering
Section
Electrical Engineering
Section
Structural Engineering
Section
Construction Management
Section
22 Mechanical Engineers
17 Electrical Engineers
15 Civil Engineers
4 Engineers of Various Background+ consultant support
Design Goals
Design
Energy Efficiency
Maintainability
Function
Pumps, Valves, & Pipes
• Main Sewage Pumps• PC pumps• Lobe pumps• Chemical pumps• Plug valves• Cone valves• Check valves• Butterfly valves• Gate valves• Sluice Gates ASME B31.3 Process Piping Standard
Capital Program
$55 Million Annually – Job Order Contracting (JOC)
$20 Million Annually – Specific Design Capital Contract Construction
$50 Million Annually – Capital Contracts with New York Power Authority
Main Sewage Pump Upgrade
$7,000,000 upgrade
100MGD per pump
Restore 5 to 10 MGD per pump
Horizontal Split Case Pump by Flowserve
Design by DEP
Installation by Welkin
CM by D&B Engineers & Architects
Conveyor Belt Upgrade
$20,000,000 Conveyor Upgrade
• 4 Dewatering Facilities
• 14 main conveyors
• 44 cross conveyors
• 14 shuttle conveyors
• Simplify conveyor system
• Increase conveyor capacity
• Eliminate rinse water
• Reduce residual water in biosolids
DEP Engineers
D&B CM
Welkin contracting
Bar Screen Upgades
Mechanical Bar Screen Protect All Treatment Plant Inflow
• Recent DEP Design Projects
• Jamaica WPCP 2012
• 26th Ward WPCP 2010
• Bowery Bay WPCP current
26th Ward Screen
Jamaica ScreensElectric Drives
Hydraulic Drives
Rack & Pinion Systems
Mechanical Linkage Assemblies
Numerous Maintenance Enhancements
Carriages function in hazardous gas and wet or dry conditions
Digester Gas & Engine Upgrade
$40,000,000 Combined Upgrade
• DEP & NYPA Project
• Project Team
• AECOM
• Vronay Engineering
• Advanced Engine Technologies Corp
• Hoerbiger Engineering
• GE
• Existing 1980 GE/Enterprise Engines• New engine controls• New micro-pilot fuel injectors• Reduce Diesel Emissions• Reduce fuel oil consumption to <2%• Reduce Greenhouse Gas Emissions (3,000 metric tons CO2/yr)
Digester Gas & Engine Upgrade
To Flare
To Building Heating
To Digesterand Building Heating
Minimal PowerTo WPCP
Modify the engine fuel gas system
Dewatering Centrifuge Upgrade
DEP & NYPA Project
Designs by CDM-
Smith and Arcadis
3 Major Projects
• Total $60,000,000
• 3 Facilities
• 52 Centrifuges
• Numerous ancillary systems
Replace c1992
centrifuges
• Increase machine throughput
• Improve energy efficiency
Emergency Structural Repair
North River Expansion Joint
The Challenges
• Stop a Large Leak
• No Existing Engineering Solution
• pressure
• size
• movement
• Requires a 3 day partial plant shutdown with several small full shutdowns
The Actions
• Develop a New Design
• Develop an Installation Plan
• Coordinate the needed shutdown with Plant Operations, SPDES Compliance, and BWT Management
DEP Engineers CM by Arcadis
DEP NR Operating Staff SHEELA Construction
Emergency Structural Repair
Emergency Structural Repair
Before
After
Emergency Repair
Pump Station Force Main in Staten Island
• Pipe installed in 1968
• Station upgraded in 1995
• 24” force main
• 15MGD Maximum Flow maintained by temporary bypass piping
DEP Engineers
Arcadis CM
DEP Collection Facilities Crews
Delphi contracting
Emergency - Sandy Recovery
Phase 1
• Restore Flow with Portable Units
• 3 Days
Phase 2
• Short Term Restoration of Electric Utility Functionality
• 2 Months
Phase 3
• Full Long Term Repair
• 7 Months
• $10,000,000 total cost
• DEP Design
• CM Services by D&B
• Prime JOC contractor WDF
• Field Services by DEP Collection Facilities
Assigned 7 Submerged
Pump Stations
Public Image
Skills for Engineers
Technical Design
Can Do Attitude
Integrity of Work
Get the Job Done
Communication
• Writing
• Speaking
• Diplomacy
Team Work
Team Effort
Deal-in
• Other design sections
• Planning groups
• Plant staff
• Process staff
• Safety staff
Communication
Communication
• Within work group
Communication
• With Engineering Partners
Communication
• With Key Stakeholders
Communication
• With Supervisors