14
RPS V4 - 2012 Part 5 - Overlays, Division 12 - Waterways, Wetlands and Moreton Bay Overlay - Page 1 Division 12 - Waterways, Wetlands and Moreton Bay Overlay 5.12.1 Introduction (1) This division contains the provisions for the Waterways, Wetlands and Moreton Bay Overlay. They are - (a) The Waterways, Wetlands and Moreton Bay Overlay - Tables of Assessment, that incorporates - (i) Levels of assessment for development in the Waterways, Wetlands and Moreton Bay Overlay (section 5.12.2); (ii) Assessment criteria for development in the Waterways, Wetlands and Moreton Bay Overlay (section 5.12.3); (iii) Waterways, Wetlands and Moreton Bay Overlay - Table of Assessment for Material Change of Use of Premises (section 5.12.4); (iv) Waterways, Wetlands and Moreton Bay Overlay - Table of Assessment for Other Development not associated with a Material Change of Use of Premises (section 5.12.5). (b) The Waterways, Wetlands and Moreton Bay Overlay Code, that incorporates - (i) Compliance with the Waterways, Wetlands and Moreton Bay Overlay Code (section 5.12.6); (ii) Overall Outcomes for the Waterways, Wetlands and Moreton Bay Overlay Code (section 5.12.7); (iii) Acceptable Solutions applicable to Self-Assessable Development (section 5.12.8) (iv) Specific Outcomes and Probable Solutions applicable to Assessable Development (section 5.12.9). 5.12.2 Levels of assessment for development affected by the Waterways, Wetlands and Moreton Bay Overlay (2) Sections 5.12.4 and 5.12.5 identify the level of assessment for development affected by the Waterways, Wetlands and Moreton Bay Overlay, as follows - (a) section 5.12.4 Waterways, Wetlands and Moreton Bay Overlay - Table of Assessment for Making a Material Change of Use of Premises - (i) column 1 identifies uses that are exempt, self assessable or assessable; (ii) column 2 identifies the level of assessment for the uses listed in column 1; (iii) where the use is defined in Part 9 - Schedule 3 - Dictionary, Division 1 - Uses and is not listed in column 1 it is exempt; (iv) where the use is not defined in Part 9 - Schedule 3 - Dictionary, Division 1 - Uses and is not listed in column 1 it is code assessable. (b) section 5.12.5 Waterways, Wetlands and Moreton Bay Overlay - Table of Assessment for Other Development not associated with a Material Change of Use of Premises - (i) column 1 identifies other development that is exempt, self assessable or assessable; (ii) column 2 identifies the level of assessment for other development listed in column 1; (iii) where the other development is not listed in column 1 it is exempt. (3) Other overlays may alter the level of assessment identified in 1(a) and (b) 5.58 . Note - If the use or other development is on a premises that has been created through a reconfiguration approval, since the current RPS version update, the maters for consideration against this Code are deemed to have been addressed. This applies to uses and other development that are listed as self- assessable in the applicable zone code. 5.58 Refer to Part 5 - Overlays to determine the level of assessment for the use or other development where another overlay affects the lot and Part 1 - section 1.2.5(10)(f) that explains how the highest level of assessment applies.

Division 12 - Waterways, Wetlands and Moreton Bay Overlay · (2) Sections 5.12.4 and 5.12.5 identify the level of assessment for development affected by the Waterways, Wetlands and

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Division 12 - Waterways, Wetlands and Moreton Bay Overlay · (2) Sections 5.12.4 and 5.12.5 identify the level of assessment for development affected by the Waterways, Wetlands and

RPS V4 - 2012 Part 5 - Overlays, Division 12 - Waterways, Wetlands and Moreton Bay Overlay - Page 1

Division 12 - Waterways, Wetlands and Moreton Bay Overlay 5.12.1 Introduction (1) This division contains the provisions for the Waterways, Wetlands and Moreton Bay Overlay. They

are -

(a) The Waterways, Wetlands and Moreton Bay Overlay - Tables of Assessment, that incorporates - (i) Levels of assessment for development in the Waterways, Wetlands and Moreton Bay

Overlay (section 5.12.2); (ii) Assessment criteria for development in the Waterways, Wetlands and Moreton Bay

Overlay (section 5.12.3); (iii) Waterways, Wetlands and Moreton Bay Overlay - Table of Assessment for Material

Change of Use of Premises (section 5.12.4); (iv) Waterways, Wetlands and Moreton Bay Overlay - Table of Assessment for Other

Development not associated with a Material Change of Use of Premises (section 5.12.5).

(b) The Waterways, Wetlands and Moreton Bay Overlay Code, that incorporates - (i) Compliance with the Waterways, Wetlands and Moreton Bay Overlay Code (section

5.12.6); (ii) Overall Outcomes for the Waterways, Wetlands and Moreton Bay Overlay Code (section

5.12.7); (iii) Acceptable Solutions applicable to Self-Assessable Development (section 5.12.8) (iv) Specific Outcomes and Probable Solutions applicable to Assessable Development

(section 5.12.9). 5.12.2 Levels of assessment for development affected by the Waterways,

Wetlands and Moreton Bay Overlay (2) Sections 5.12.4 and 5.12.5 identify the level of assessment for development affected by the

Waterways, Wetlands and Moreton Bay Overlay, as follows -

(a) section 5.12.4 Waterways, Wetlands and Moreton Bay Overlay - Table of Assessment for Making a Material Change of Use of Premises - (i) column 1 identifies uses that are exempt, self assessable or assessable; (ii) column 2 identifies the level of assessment for the uses listed in column 1; (iii) where the use is defined in Part 9 - Schedule 3 - Dictionary, Division 1 - Uses and is not

listed in column 1 it is exempt; (iv) where the use is not defined in Part 9 - Schedule 3 - Dictionary, Division 1 - Uses and is

not listed in column 1 it is code assessable.

(b) section 5.12.5 Waterways, Wetlands and Moreton Bay Overlay - Table of Assessment for Other Development not associated with a Material Change of Use of Premises - (i) column 1 identifies other development that is exempt, self assessable or assessable; (ii) column 2 identifies the level of assessment for other development listed in column 1; (iii) where the other development is not listed in column 1 it is exempt.

(3) Other overlays may alter the level of assessment identified in 1(a) and (b)5.58. Note - If the use or other development is on a premises that has been created through a reconfiguration approval, since the current RPS version update, the maters for consideration against this Code are deemed to have been addressed. This applies to uses and other development that are listed as self-assessable in the applicable zone code.

5.58 Refer to Part 5 - Overlays to determine the level of assessment for the use or other development where another overlay affects the lot and Part 1 - section 1.2.5(10)(f) that explains how the highest level of assessment applies.

Page 2: Division 12 - Waterways, Wetlands and Moreton Bay Overlay · (2) Sections 5.12.4 and 5.12.5 identify the level of assessment for development affected by the Waterways, Wetlands and

Page 2 - Part 5 - Overlays, Division 12 - Waterways, Wetlands and Moreton Bay Overlay RPS V4 - 2012

5.12.3 Assessment criteria for development in the Waterways, Wetlands and Moreton Bay Overlay

(1) Development affected by the Waterways, Wetlands and Moreton Bay Overlay is assessed against

the assessment criteria listed in column 3 of sections 5.12.4 and 5.12.5, as follows -

(a) acceptable solutions in section 5.12.8 of the Waterways, Wetlands and Moreton Bay Overlay Code for self-assessable development; or

(b) specific outcomes in section 5.12.9 of the Waterways, Wetlands and Moreton Bay Overlay

Code for assessable development. (2) Self-assessable development that does not comply with all the acceptable solutions in section

5.12.8 of the Waterways, Wetlands and Moreton Bay Overlay Code is assessable development.

Page 3: Division 12 - Waterways, Wetlands and Moreton Bay Overlay · (2) Sections 5.12.4 and 5.12.5 identify the level of assessment for development affected by the Waterways, Wetlands and

RPS V4 - 2012 Part 5 - Overlays, Division 12 - Waterways, Wetlands and Moreton Bay Overlay - Page 3

5.12.4 Waterways, Wetlands and Moreton Bay Overlay - Table of Assessment for Material Change of Use of Premises

Waterways, Wetlands and Moreton Bay Overlay -

Table of Assessment for Material Change of Use of Premises

column 1 column 2 column 3

Use5.59 Level of Assessment5.60 Assessment Criteria

Bulky Goods Showroom

Car Wash Facility Commercial Office Display and Sale

Activity Funeral Parlour Garden Centre General Industry Health Care Centre Landscape Supply

Depot Place of Worship Produce Store Refreshment

Establishment Retail Warehouse Service Industry Service Station Shop Vehicle Depot Vehicle Repair

Premises Veterinary Surgery Warehouse

Exempt If - A tenancy change only; Involving only minor

building work to an existing building

Code Assessable If not Exempt

Waterways, Wetlands and

Moreton Bay Overlay Code

Bed and Breakfast Dwelling House Home Business Park Relatives Apartment

Self-Assessable If complying with the assessment criteria being the acceptable solutions listed in column 3 Code Assessable If not self-assessable

Acceptable Solutions in section 5.12.8 of the Waterways, Wetlands and Moreton Bay Overlay Code

Waterways, Wetlands and

Moreton Bay Overlay Code

Aged Persons and Special Needs Housing

Agriculture Airport Animal Keeping Apartment Building Brothel Cemetery Child Care Centre Community Facility Drive Through

Restaurant Dual Occupancy Education Facility Emergency Services

Code Assessable

Waterways, Wetlands and Moreton Bay Overlay Code

5.59 See Part 9 - Schedule 3 - Dictionary, Division 1 - Uses for defined used. 5.60 See Part 9 - Schedule 3 - Dictionary, Division 2 - Administrative Terms for a definition of level of assessment.

Page 4: Division 12 - Waterways, Wetlands and Moreton Bay Overlay · (2) Sections 5.12.4 and 5.12.5 identify the level of assessment for development affected by the Waterways, Wetlands and

Page 4 - Part 5 - Overlays, Division 12 - Waterways, Wetlands and Moreton Bay Overlay RPS V4 - 2012

Waterways, Wetlands and Moreton Bay Overlay - Table of Assessment for Material Change of Use of Premises

column 1 column 2 column 3

Use5.59 Level of Assessment5.60 Assessment Criteria

Continued - Estate Sales Office Extractive Industry Forestry Heavy Industry Hospital Hotel Indoor Recreation

Facility Institution Intensive Agriculture Marine Services Mobile Home Park Multiple Dwelling Night Club Outdoor Dining Outdoor Recreation

Facility Passenger Terminal Roadside Stall Rural Enterprise Small Lot House Telecommunications

Facility Tourist

Accommodation Tourist Park Utility Installation Vehicle Parking

Station

Code Assessable

Waterways, Wetlands and

Moreton Bay Overlay Code

Defined uses not listed in column 1

Exempt

Uses not defined in Part 9 - Schedule 3 - Dictionary, Division 1 - Uses

Code Assessable Waterways, Wetlands and

Moreton Bay Overlay Code

Page 5: Division 12 - Waterways, Wetlands and Moreton Bay Overlay · (2) Sections 5.12.4 and 5.12.5 identify the level of assessment for development affected by the Waterways, Wetlands and

RPS V4 - 2012 Part 5 - Overlays, Division 12 - Waterways, Wetlands and Moreton Bay Overlay - Page 5

5.12.5 Waterways, Wetlands and Moreton Bay Overlay - Table of Assessment for Other Development not associated with a Material Change of Use of Premises

Waterways, Wetlands and Moreton Bay Overlay - Table of Assessment for Other

Development

column 1 column 2 column 3

Other Development Level of Assessment5.61 Assessment Criteria

Reconfiguration for -

Creating lots by subdividing another lot by Standard Format Plan5.62

Rearranging the boundaries of a lot by registering a plan of subdivision; or

Dividing land into parts by Agreement; or

Creating an easement giving access to a lot from a constructed road

Code Assessable Waterways, Wetlands and

Moreton Bay Overlay Code

Building Work for -

Domestic Additions Domestic Outbuilding Private Swimming

Pool Private Tennis Court

Self-Assessable If complying with the assessment criteria being the acceptable solutions listed in column 3 Code Assessable If not self-assessable

Acceptable Solutions in section 5.12.8 of the Waterways, Wetlands and Moreton Bay Overlay Code

Waterways, Wetlands and

Moreton Bay Overlay Code

On-site raising or relocation of an existing dwelling unit

Code Assessable Waterways, Wetlands and

Moreton Bay Overlay Code

Operational Work for -

Excavation and Fill

Exempt If - (1) Disturbing less than 50m3

of soil; (2) A height/depth not

exceeding 300mm measured from ground level

Code Assessable If not Exempt

Waterways, Wetlands and

Moreton Bay Overlay Code

5.61 See Part 9 - Schedule 3 - Dictionary, Division 2 - Administrative Terms for a definition of level of assessment. 5.62 Whether or not having a Community Management Statement.

Page 6: Division 12 - Waterways, Wetlands and Moreton Bay Overlay · (2) Sections 5.12.4 and 5.12.5 identify the level of assessment for development affected by the Waterways, Wetlands and

Page 6 - Part 5 - Overlays, Division 12 - Waterways, Wetlands and Moreton Bay Overlay RPS V4 - 2012

Waterways, Wetlands and Moreton Bay Overlay - Table of Assessment for Other Development

column 1 column 2 column 3

Other Development Level of Assessment5.61 Assessment Criteria

Private Waterfront Structure

Operation Work for Reconfiguring a Lot (by Standard Format Plan)

Code Assessable Waterways, Wetlands and

Moreton Bay Overlay Code

All other development not listed in column 1

Exempt

Page 7: Division 12 - Waterways, Wetlands and Moreton Bay Overlay · (2) Sections 5.12.4 and 5.12.5 identify the level of assessment for development affected by the Waterways, Wetlands and

RPS V4 - 2012 Part 5 - Overlays, Division 12 - Waterways, Wetlands and Moreton Bay Overlay - Page 7

5.12.6 Compliance with the Waterways, Wetlands and Moreton Bay Code (1) Development that is consistent with the following complies with the Waterways, Wetlands and

Moreton Bay Overlay Code -

(a) acceptable solutions in section 5.12.8 where self-assessable development; or

(b) specific outcomes in section 5.12.9 where self assessable development. Note - The following planning scheme policies will assist in achieving specific outcomes within the Waterways, Wetlands and Moreton Bay Overlay Code - Planning Scheme Policy 4 - Ecological Impact; Planning Scheme Policy 14 - Waterways, Wetlands and Moreton Bay. 5.12.7 Overall Outcomes of the Waterways, Wetlands and Moreton Bay

Overlay Code (1) The overall outcomes are the purpose of the Waterways, Wetlands and Moreton Bay Overlay

Code. (2) The overall outcomes sought for the Waterways, Wetlands and Moreton Bay Overlay Code are

the following -

(a) uses and other development protect, enhance, manage and minimise impacts on the environmental values of waterways, wetlands, coastal drainage areas, Moreton Bay and natural drainage lines and their associated ecological, recreation, economic and scenic values by -

(i) retaining habitat links; (ii) protecting marine, tidal and riparian vegetation; (iii) retaining access for maintenance purposes; (iv) maintaining and enhancing water quality and hydrological balance; (v) retaining biodiversity; (vi) retaining bank stability; (vii) providing public access to open space where under local government ownership or

control.

Page 8: Division 12 - Waterways, Wetlands and Moreton Bay Overlay · (2) Sections 5.12.4 and 5.12.5 identify the level of assessment for development affected by the Waterways, Wetlands and

Page 8 - Part 5 - Overlays, Division 12 - Waterways, Wetlands and Moreton Bay Overlay RPS V4 - 2012

5.12.8 Acceptable Solutions applicable to Self-Assessable Development

Self-Assessable Development Acceptable Solutions

A1. Uses and other development are located outside the area shown on the overlay map.

5.12.9 Specific Outcomes and Probable Solutions applicable to Assessable

Development

Assessable Development Specific Outcomes Probable Solutions

Where proposed on a lot or premises affected by a major waterway, minor waterway, freshwater wetland, Moreton Bay foreshore buffer or waterway or wetland buffer on this overlay map –

S1.1 (1) Uses and other development are located outside the area shown on the overlay map; or

Note - Compliance with S1.1(1) achieves compliance with this Code.

P1.1 (1) No probable solution identified; or

(2) Uses and other development protect and minimise impacts on environmental values and associated ecological, recreation, economic and scenic values by - (a) providing buffers in the form of

riparian vegetation; (b) providing separation by way of

distance between the development and the vegetated buffers;

(c) ensuring stormwater run-off is treated within the premises to maintain or enhance water quality of receiving waters;

(d) utilising a range of source, conveyance and discharge mechanisms, such as stormwater storage systems, retention trenches, detention basins, or constructed wetlands to re-use and reduce stormwater run-off volumes, peaks and velocity;

(e) ensuring stormwater discharge is dispersed naturally to minimise erosion impacts;

(f) maximising the use of permeable surfaces to allow infiltration of stormwater run-

(2) Protect and minimise impacts on the identified environmental values and associated ecological, recreation, economic and scenic values by - (a) providing vegetated buffers in

accordance with Table 1 - Minimum Buffer Distances and Vegetation Requirements;

(b) utilising native plants listed in Part 9 - Schedule 10 - Vegetation Species List as being suitable to the area;

(c) incorporating methods other than direct piping of stormwater to receiving waters to - (i) reduce velocity and quantity

of stormwater run-off, (ii) enhance water quality at the

point of discharge; (iii) minimise erosion impacts; (iv) maximise permeable

surfaces; (d) incorporate water collection

devices that allow for the re-use of run-off, such as rainwater tanks fitted with a first flush system;

(e) ensure stormwater leaving the premises complies with the

Page 9: Division 12 - Waterways, Wetlands and Moreton Bay Overlay · (2) Sections 5.12.4 and 5.12.5 identify the level of assessment for development affected by the Waterways, Wetlands and

RPS V4 - 2012 Part 5 - Overlays, Division 12 - Waterways, Wetlands and Moreton Bay Overlay - Page 9

Assessable Development Specific Outcomes Probable Solutions

off; (g) maintaining stability of bed and

banks of waterways and the foreshore of Moreton Bay;

(h) enhancing biodiversity of marine, tidal and riparian habitat.

water quality objectives listed in Part 9 - Schedule 11 - Water Quality Objectives.

Note - Refer to Part 9 - Schedule 11 -

Water Quality Objectives to determine the identified environmental values.

Refer to Part 8 - Division 9 -

Stormwater Management for mechanisms to address water quality and stormwater run-off.

S1.2 (1) Degraded, cleared or otherwise

disturbed waterways, wetlands and the foreshore of Moreton Bay are rehabilitated, re-vegetated and stabilised in conjunction with use or other development by incorporating - (a) direct restoration including

associated bank and in-stream vegetation;

(b) protection or enhancement of significant habitat for migratory birds, including areas subject to conservation agreements such as JAMBA, CAMBA and Ramsar and other water dependant fauna species;

(c) weed management strategies; (d) access management; (e) replanting of native species so

as to achieve a vegetation density and structure compatible with adjacent undisturbed areas.

P1.2 (1) Rehabilitation, re-vegetation and stabilisation includes - (a) fully vegetated core and

foreshore riparian areas and partially vegetation outer riparian areas in accordance with Table 1 - Minimum Buffer Distances and Vegetation Requirements;

(b) incorporate native species identified in Part 9 - Schedule 10- Vegetation Species List as being suited to the local area;

(c) where remnant vegetation exists retain and enhance the existing vegetation to meet the above requirements;

(d) remove weed species identified in Part 9 - Schedule 12 - Weed Species List from within the riparian area;

(e) where a minor waterway, select species that at maturity will provide 70 percent canopy coverage of the waterway. Refer to Diagram 3.

S1.3 (1) Uses and other development within the core and outer riparian, or foreshore buffer areas is limited to that necessary to - (a) achieve desired water quality

objectives; (b) provide passive recreational

opportunities; (c) allow low-impact access and

access for maintenance purposes.

P1.3 (1) Uses and other development - (a) in the outer riparian area are

limited to - (i) low-impact pedestrian and

cycle paths; (ii) BBQ facilities, tables,

seating and shelters; (iii) stormwater quality

improvement devices, such as constructed wetlands and natural drainage design;

(b) do not occur in the core riparian area.

Page 10: Division 12 - Waterways, Wetlands and Moreton Bay Overlay · (2) Sections 5.12.4 and 5.12.5 identify the level of assessment for development affected by the Waterways, Wetlands and

Page 10 - Part 5 - Overlays, Division 12 - Waterways, Wetlands and Moreton Bay Overlay RPS V4 - 2012

Assessable Development Specific Outcomes Probable Solutions

S1.4 Retain or restore in-stream habitat values through the enhancement or reinstatement of habitat features.

P1.4 No probable solution identified. Note - The incorporation of features such as fallen logs, rocks, bank overhangs, trailing vegetation, among others will assist in replicating natural in-stream habitat values.

Where proposed on a lot or premises affected by a natural drainage line on this overlay map -

S2. (1) Retain the drainage line in its natural state and provide sufficient buffers to protect the drainage line;

(2) Where degraded, enhance the natural drainage line through stabilisation, re-vegetation and stormwater quality improvement devices that recognise the function of the natural drainage line.

P2. (1) No probable solution identified; (2) No probable solution identified.

Where proposed on a lot or premises affected by the coastal drainage area on this overlay map -

S3. (1) Uses and other development minimise impacts on environmental values and associated ecological, recreation, economic and scenic values by - (a) providing buffers in the form of

riparian vegetation; (b) providing separation by way of

distance between the development and the vegetated buffers;

(c) ensuring stormwater run-off is treated within the premises to maintain or enhance water quality of receiving waters;

(d) enhancing biodiversity of marine, tidal and riparian habitat.

P3. (1) Minimise impacts on the identified environmental values and associated ecological, recreation, economic and scenic values by - (a) providing vegetated buffers in

accordance with Table 1 - Minimum Buffer Distances and Vegetation Requirements;

(b) utilising native plants listed in Part 9 - Schedule 10 - Vegetation Species List as being suitable to the area.

Page 11: Division 12 - Waterways, Wetlands and Moreton Bay Overlay · (2) Sections 5.12.4 and 5.12.5 identify the level of assessment for development affected by the Waterways, Wetlands and

RPS V4 - 2012 Part 5 - Overlays, Division 12 - Waterways, Wetlands and Moreton Bay Overlay - Page 11

Table 1 - Minimum Buffer Distances and Re-vegetation Requirements

Waterway Category

Buffer Requirements

Riparian Vegetation Requirements

Core and Foreshore

Outer

Major Waterway

(1) 100 metres measured from top bank, except where there is- (a) tidal influence (See Note 1), in which case

100 metres from the line of Highest Astronomical Tide (HAT) or the top of the bank whichever is the greater; or

(b) no definable bank, in which case 100 metres measured from the mid point between the 1 percent AEP (100 year ARI) lines on both sides of the waterway as illustrated in Diagram 1 - Determining Buffer Distances Where No Definable Bank.

40 metres 60 metres

Freshwater Wetland - See Note 2

100 metres measured from the 1 percent AEP (100 year ARI) line.

40 metres 60 metres

Tingalpa Reservoir

150 metres measured from the high water level. 40 metres 110 metres

Minor Waterway

(1) 60 metres measured from the top of bank, except where there is - (a) no definable bank, in which case 100

metres measured from the mid point between the 1 percent AEP (100 year ARI) lines on both sides of the waterway as illustrated in Diagram 1 - Determining Buffer Distances Where No Definable Bank.

40 metres 20 metres

Moreton Bay Foreshore - See Note 3

100 metres measured from Highest Astronomical Tide (HAT).

40 metres 60 metres

Coastal Drainage Area

5 metres the location of which is determined on an individual basis.

5 metres in total

Note 1 - Tidal influence points and buffer areas are identified on the Waterways, Wetlands and Moreton Bay

Overlay Map. Note 2 - Freshwater Wetlands include -

Black Swamp Wetlands, Cleveland; Tarradarrapin Wetlands, Birkdale; and Egret Colony Wetlands, Victoria Point.

Note 3 - For foreshore areas of Moreton Bay, soft foreshore treatments, such as beaches, vegetation or natural design revetments are used. Sea walls or the like are not preferred.

Page 12: Division 12 - Waterways, Wetlands and Moreton Bay Overlay · (2) Sections 5.12.4 and 5.12.5 identify the level of assessment for development affected by the Waterways, Wetlands and

Page 12 - Part 5 - Overlays, Division 12 - Waterways, Wetlands and Moreton Bay Overlay RPS V4 - 2012

Diagram 1 - Determining Buffer Distances Where No Definable Bank

Where no definable bank exists,waterway buffer distances are measured from themid point of the 1 percent AEP Lines.

1 percent AEP 1 percent AEP

Diagram 2 - Major Waterway and Wetland Buffers

Weed ControlRequired

Bank Stability

In - Stream Habitat

Ecosystem Processes

60 metres fromCore Riparian Area

Core Riparian Area40 metres from

Top of BankOuter Riparian Area

Core Riparian Area40 metres from

Top of Bank 60 metres fromCore Riparian Area

Outer Riparian Area

Page 13: Division 12 - Waterways, Wetlands and Moreton Bay Overlay · (2) Sections 5.12.4 and 5.12.5 identify the level of assessment for development affected by the Waterways, Wetlands and

RPS V4 - 2012 Part 5 - Overlays, Division 12 - Waterways, Wetlands and Moreton Bay Overlay - Page 13

Diagram 3 - Minor Waterway Buffers

In - Stream Habitat

Ecosystem Processes

20 metres from CoreRiparian Area

Core Riparian Area40 metres from

Top of Bank

Outer Riparian Area

Minimum 70 PercentPercent Canopy Cover

Core Riparian Area40 metres from

Top of Bank 20 metres from CoreRiparian Area

Outer Riparian Area

Weed ControlRequired

Bank Stability

Page 14: Division 12 - Waterways, Wetlands and Moreton Bay Overlay · (2) Sections 5.12.4 and 5.12.5 identify the level of assessment for development affected by the Waterways, Wetlands and

Page 14 - Part 5 - Overlays, Division 12 - Waterways, Wetlands and Moreton Bay Overlay RPS V4 - 2012

this page purposely left blank