Appendix I
District Minor Works (DMW) Projects in the Southern District 2014-2015
Proposed Works Projects discussed by Members during site visit
Project Title Proponent Proposed Scope of Works Comments after site visit
1. Installation of flower pots on
pavement railings at Repulse
Bay Road Note 1
(Annex 1-3)
Mr. FUNG
Se-goun, Fergus
Installing flower pots on
pavement railings at three
proposed locations (near No.4
Repulse Bay Road, near
No.16 Repulse Bay Road and
near the roundabout at
Repulse Bay Road and South
Bay Road )
Agree-in-principle to carry out preliminary feasibility study.
While LCSD’s initial comment was that it had no objection to
the proposed project, the sites were narrow which might be
difficult for greening maintenance. Besides, comments from
TD and HyD should be sought for the project. The exact
locations will be confirmed in detailed design stage after
consulting the project proponent.
2. Construction of a rainshelter
for bus stop near No. 11
Chung Hom Kok Road Note 2
(Annex 4)
Mrs. CHAN LEE
Pui-ying
To construct a rainshelter Agree-in-principle to carry out preliminary feasibility study.
Attending members noted the proposed location was quite
narrow and there was a more spacious site nearby. Members
agreed that if preliminary study found that the proposed
location was not feasible, the spacious site nearby would be
considered and TD would be requested to adjust the bus stop
location slightly to accommodate.
3. Construction of a rainshelter
for bus stop near No. 39
Chung Hom Kok Road Note 2
(Annex 5)
Mrs. CHAN LEE
Pui-ying
To construct a rainshelter Agree-in-principle to carry out preliminary feasibility study.
4. Construction of a rainshelter
for bus stop near No. 52
Chung Hom Kok Road Note 2
(Annex 6)
Mrs. CHAN LEE
Pui-ying
To construct a rainshelter Agree-in-principle to carry out preliminary feasibility study.
5. Construction of a rainshelter
for bus stop near No. 53
Chung Hom Kok Road Note 2
(Annex 7)
Mrs. CHAN LEE
Pui-ying
To construct a rainshelter Agree-in-principle to carry out preliminary feasibility study.
4
Project Title Proponent Proposed Scope of Works Comments after site visit
6. Construction of a rainshelter
for bus stop near No. 8 Cape
Road Note 2
(Annex 8)
Mrs. CHAN LEE
Pui-ying
To construct a rainshelter Agree-in-principle to carry out preliminary feasibility study.
7. Repaving the footpath next to
Stanley Post Office to Stanley
Main Street with anti-skid
materials Note 2
(Annex 9)
Mrs. CHAN LEE
Pui-ying
To repave the footpath with
anti-skid materials
Agree-in-principle to carry out preliminary fesaibility study.
8. Construction of a rainshelter
for bus stop near Regalia Bay
on Wong Ma Kok Road Note 2
(Annex 10)
Mrs. CHAN LEE
Pui-ying
To construct a rainshelter Agree-in-principle to carry out preliminary feasibility study.
9. Improvement works to the
staircase linking Lei Tung
Estate and Yuk Kwai Shan
Pavilion Note 3
(Annex 11)
Mr. LO Kin-hei To widen the staircase
To install handrails on the
side without them
Agree-in-principle to carry out preliminary feasibility study.
Attending members agreed that the comments from related
departments (e.g. WSD) should be sought. Also, members
agreed to also study the possibility of adding some “passing
place” at some locations as an alternative to staircase
widening.
10. Construction of a rainshelter
for bus stop on Ap Lei Chau
Bridge Road near Lee Chi
Road (South Horizons bound)
Note 3(Annex 12)
Ms. CHEUNG
Sik-yung
To construct a rainshelter Agree-in-principle to carry out preliminary feasibility study.
11. Improvement works to the
staircase leading to Wind
Tower Park near the
roundabout of Lee Chi Road
Note 3 (Annex 13)
Ms. CHEUNG
Sik-yung To repair the railings
To repave the stairs
Attending members noted that no relevant department had
taken up the maintenance responsibility of the existing railings
and agreed to repair the railings first with the funding from
“Minor improvement works 2014-15”. The Secretariat has
asked the Works Section to follow up after the site visit. On
suggestion to reconstruct the stairs, members agreed that it
should be considered after the improvement works to the steel
staircase nearby has completed.
5
Project Title Proponent Proposed Scope of Works Comments after site visit
12. Improvement and extension
works to the sitting out area at
Wah Lam Path Note 4
(Annex 14)
Mr. LO Kin-hei To extend and connect the
existing sitting out area to
the adjacent site
To install benches with
cover and fitness
equipments for elderly
Greening the sitting out
area
To open an exit linking
Wah Lam Path near
minibus stop
Agree-in-principle to carry out preliminary feasibility study.
Attending members noted LCSD’s initial comments that as
there was an unregistered slope in the proposed location,
LCSD would study the implication of the slope on cost and
works scale. Besides, the connectivity between the extended
area and the existing sitting out area should also be considered.
13. Improvement works to the
fencing at the promenade of
Waterfall Bay Park Note 4
(Annex 15)
Mr. LO Kin-hei To reconstruct the fencing
with more durable
materials (e.g. stainless
steel, concrete )
Tree pruning for better
viewing
Agree-in-principle to carry out preliminary feasibility study.
Attending members agreed to replace the existing taller
fencing with railings.
LCSD would follow up with pruning the trees regularly.
14. To construct a trail along the
rocky shore at Sandy Bay
Note 5 (Annex 16)
Mr. Paul
ZIMMERMAN To construct a trail to connect
the rocky shore at Sandy Bay
to (1) the staircase linking
Victoria Road and (2) HKU
Sports Centre
Agree-in-principle to carry out preliminary feasibility study.
Attending members noted that some areas on site involved
temporary land allocation to government departments and it
would be necessary to accommodate and follow up with
relevant departments (e.g. WSD and DSD) when
implementing the project.
Note 1: Members attended this item include: Mr. AU Lap-sing, Mr. CHAI Man-hon, Ms. CHAN Judy Kapui, Ms. CHEUNG Sik-yung,
Mr. FUNG Se-goun, Ms. LAM Yuk-chun, MH, Dr. LIU Hong-fai, JP, Mr. LO Kin-hei, and Ir CHAN Lee-shing, William, JP.
Note 2: Members attended this item include: Mr. AU Lap-sing, Mr. CHAI Man-hon, Ms. CHAN Judy Kapui, Mrs. CHAN LEE Pui-ying,
Ms. CHEUNG Sik-yung, Mr. FUNG Se-goun, Ms. LAM Yuk-chun, MH, Dr. LIU Hong-fai, JP, Mr. LO Kin-hei, and
Ir CHAN Lee-shing, William, JP.
6
Note 3: Members attended this item include: Mr. AU Lap-sing, Mr. CHAI Man-hon, Ms. CHAN Judy Kapui, Mrs. CHAN LEE Pui-ying,
Ms. CHEUNG Sik-yung, Ms. LAM Yuk-chun, MH, Dr. LIU Hong-fai, JP, Mr. LO Kin-hei, and Ir CHAN Lee-shing, William, JP.
Note 4: Members attended this item include: Mr. AU Lap-sing, Mr. CHAI Man-hon, Dr. LIU Hong-fai, JP, Mr. LO Kin-hei, and
Ir CHAN Lee-shing, William, JP.
Note 5: Members attended this item include: Mr. AU Lap-sing, Mr. CHAI Man-hon, Dr. LIU Hong-fai, JP, Mr. LO Kin-hei,
Mr. Paul ZIMMERMAN and Ir CHAN Lee-shing, William, JP.
Annex 1
District Minor Works (DMW) Projects in the Southern District 2014-2015
Proposed Works Projects discussed by Members during site visit
Installation of flower pots on pavement railings at Repulse Bay Road -
near No.4 Repulse Bay Road
Approximate Location
Annex 2
District Minor Works (DMW) Projects in the Southern District 2014-2015
Proposed Works Projects discussed by Members during site visit
Installation of flower pots on pavement railings at Repulse Bay Road -
near No.16 Repulse Bay Road
Approximate Location
Annex 3
District Minor Works (DMW) Projects in the Southern District 2014-2015
Proposed Works Projects discussed by Members during site visit
Approximate Location
Installation of flower pots on pavement railings at Repulse Bay Road -
near the roundabout at Repulse Bay Road and South Bay Road
Annex 4
District Minor Works (DMW) Projects in the Southern District 2014-2015
Proposed Works Projects discussed by Members during site visit
Construction of a rainshelter for bus stop near No. 11 Chung Hom Kok Road
Location
Alternative Location
Annex 5
District Minor Works (DMW) Projects in the Southern District 2014-2015
Proposed Works Projects discussed by Members during site visit
Location
Construction of a rainshelter for bus stop near No. 39 Chung Hom Kok Road
Annex 6
District Minor Works (DMW) Projects in the Southern District 2014-2015
Proposed Works Projects discussed by Members during site visit
Location
Construction of a rainshelter for bus stop near No. 52 Chung Hom Kok Road
Annex 7
District Minor Works (DMW) Projects in the Southern District 2014-2015
Proposed Works Projects discussed by Members during site visit
Location
Construction of a rainshelter for bus stop near No. 53 Chung Hom Kok Road
Annex 8
District Minor Works (DMW) Projects in the Southern District 2014-2015
Proposed Works Projects discussed by Members during site visit
Location
Construction of a rainshelter for bus stop near No. 8 Cape Road
Annex 9
District Minor Works (DMW) Projects in the Southern District 2014-2015
Proposed Works Projects discussed by Members during site visit
Location
Repaving the footpath next to Stanley Post Office to Stanley Main Street with anti-skid
materials
Annex 10
District Minor Works (DMW) Projects in the Southern District 2014-2015
Proposed Works Projects discussed by Members during site visit
Construction of a rainshelter for bus stop near Regalia Bay on Wong Ma Kok Road
Location
Annex 11
District Minor Works (DMW) Projects in the Southern District 2014-2015
Proposed Works Projects discussed by Members during site visit
Improvement works to the staircase linking Lei Tung Estate and
Yuk Kwai Shan Pavilion
Location
Annex 12
District Minor Works (DMW) Projects in the Southern District 2014-2015
Proposed Works Projects discussed by Members during site visit
Location
Construction of a rainshelter for bus stop on Ap Lei Chau Bridge Road
near Lee Chi Road (South Horizons bound)
Annex 13
District Minor Works (DMW) Projects in the Southern District 2014-2015
Proposed Works Projects discussed by Members during site visit
Location
Improvement works to the staircase leading to Wind Tower Park near the roundabout of
Lee Chi Road
Annex 14
District Minor Works (DMW) Projects in the Southern District 2014-2015
Proposed Works Projects discussed by Members during site visit
Improvement and extension works to the sitting out area at Wah Lam Path
Location
Annex 15
District Minor Works (DMW) Projects in the Southern District 2014-2015
Proposed Works Projects discussed by Members during site visit
Location
Improvement works to the fencing at the promenade of Waterfall Bay Park
Annex 16
District Minor Works (DMW) Projects in the Southern District 2014-2015
Proposed Works Projects discussed by Members during site visit
To construct a trail along the rocky shore at Sandy Bay
Approximate Location